Loading...
HomeMy WebLinkAboutAQ_F_0400036_20170511_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office i AIR QUALITY B.V.Hedrick Gravel and Sand Co. -Lilesville Plant NC Facility ID 0400036 Inspection Report County/FIPS: Anson/007 Date: 05/17/2017 Facility Data Permit Data I B.V.Hedrick Gravel and Sand Co. -Lilesville Plant Permit 06725/R05 Ingram Mountain Road-SR 1704 Issued 1/10/2014 Lilesville,NC 28091 Expires 12/31/2021 Lat: 34d 59.9820m Long: 79d 58.5360m Classification Small SIC: 1423/Crushed And Broken Granite Permit Status Active NAICS: 212313/Crushed and Broken Granite Mining and Quarrying Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP a Jason Conner Jeffrey Goodman Jason Conner Environmental Director President Environmental Director (828)686-3844 (828)277-7030 (828)686-3844 Compliance Data Comments: Inspection Date 05/11/2017 Inspector's Name Mike Thomas Inspector's Signature: Operating Status Operating Zure: Compliance Code Compliance-inspection Action Code FCE Date of Signa On-Site Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2012 --- 2008 --- --- --- *Highest HAP Emitted(inpounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested 1) Location/Directions B.V. Hedrick Gravel and Sand Quany-Lilesville is located on Ingram Mountain Road near Lilesville,NC, Anson County. From Lilesville,turn right at flashing caution light onto 5' Street(at elementary school). Follow 51 Street,and bear left to continue on Wall Street,go-1/2 mile to Stanback Ferry Road. Turn right and go '/z mile to Ingram Mountain Road,turn right and go—1 mile. Proposed quarry site is located on the left past gate. 2) Safety Considerations Currently there are no mining activities taking place at this facility. Standard DAQ safety gear will be required if mining operations ever commence. 3) Facility Process and Description This facility has never been built. The following description is what was proposed for the facility originally. This facility is a 350 ton per hour throughput capacity crushing/screening operation that processes granite aggregate products,using a primary jaw crusher with a capacity of 250 tons per hour. The granite is mined from the quarry by drilling and blasting the material. Material from the quarry is loaded into haulage trucks via power shovel or front end loader and conveyed to the primary crusher. A grizzly feeder is utilized to remove undersize material, and oversize material is fed to the primary crusher,which is described as a jaw crusher,250 tons per hour maximum throughput with a 6-inch crusher setting. Discharged material from the crusher is sent to various secondary screens and a secondary crusher in order to obtain various sizes of aggregate materials. The materials are stored in piles on site,and loaded into trucks via front end loader for shipment to the customer. There is no washing of product at this site. Particulate emissions are controlled by water sprays on the crusher, screens,and conveyor transfer points. There are no stationary reciprocating internal combustion engines at this site. 4) Permitted Emission Sources _-— Crushing Operations ES Crush N/A N/A _ Not installed ES Screen Screening Operations N/A N/A Not installed Conveying Operations ES Convey N/A N/A Not installed 5) Inspection Summary On 11 May 2017 I Mike Thomas, of FRO DAQ conducted a compliance evaluation inspection of this facility. This facility has not been constructed. I spoke to the facility contact,Jason Connor who informed me that there are currently no plans to construct anything at the site. Mr. Connor also stated that the facility would retain the current air permit at this time. 6) Permit Stipulations j a) A.2 2Q .0304 PERMIT RENEWAL AND EMISSIONINVENTORYREQUIREMENT—Entire E facility subject. Submit permit renewal application and EI at least 90 days prior to permit expiration. Appeared to be in compliance—The facility was due to submit their EI and Permit Renewal by 2 March 2014. Both were received on 12 December 2013. 1 The other stipulations in this permit could not be evaluated for compliance as the facility has never been constructed. 7) 112R Status Undetermined as the facility has not been constructed. 8) Non-compliance History Since 2010 None. 9) Comments and Compliance Statement B.V. Hedrick Gravel and Sand Co.—Lilesville Plant appeared to be in compliance with the conditions of the facility's current air permit on 11 May 2017. Pink Sheet:No comments. /mst