HomeMy WebLinkAboutAQ_F_0400033_20171011_CMPL_InspRpt 1
i
�7f
'I
NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY Martin Marietta Materials,Inc. -Pee Dee Quarry
NC Facility ID 0400033
Inspection Report County/FIPS:Anson/007
Date: 10/12/2017
Facility Data Permit Data
Martin Marietta Materials,Inc. -Pee Dee Quarry Permit 06334/R08
2710 Wycliff Road Issued 2/28/2017
Pee Dee,NC 28091 Expires 1/31/2025
Lat: 34d 56.2500m Long: 79d 53.0000m Classification Small
SIC: 1423/Crushed And Broken Granite Permit Status Active
,f
NAILS: 212313/Crushed and Broken Granite Mining and Quarrying Current Permit Application(s)None
Contact Data Program Applicability
L Facility Contact Authorized Contact Technical Contact SIP
Richard Broughton John Tiberi Richard Broughton
NSPS: Subpart 000
Environmental Services Division President Environmental Services
Manager (919)783-4534 Manager
(803)978-6275 (803)978-6275
Compliance Data
Comments:
Inspection Date 10/11/2017
Inspector's Name Mike Thomas
Inspector's Signature: Operating Status Operating
-*W"/- Compliance Code Compliance-inspection
Action Code FCE
Date of Signature: On-Site Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP _. . 502 NOX VOC. CO....:� PM10 - *HAP
i
2015 --- --- ---
2011 --- --- ---
*Highest HAP Emitted(in pounds)
Five Year Violation History:None
Date Letter Tyne Rule Violated Violation Resolution Date
E
E Performed Stack Tests since last FCE:None
f Date Test Results Test Method(s) Source(s)Tested
t
t�
F
1) LOCATION/DIRECTIONS:
Martin Marietta Aggregates Pee Dee Quarry is located at 2710 Wycliff Rd. in Pee Dee,NC.
From Rockingham take HWY 74W until you cross the Pee Dee River,then take HWY 145 on the
left. The proposed project site is approximately 0.5 miles down HWY 145 on the right.
i
i!
i
1
2) SAFETY CONSIDERATIONS: Standard DAQ equipment. The mine has never been
constructed so there is no activity.
i
3) Facility and Process Description: j
Martin Marietta Aggregates Pee Dee Quarry is a mining operation that will produce gravel and
aggregates for the construction industry. This facility is permitted under Air Permit No.
06334R08, effective from 28 February 2017 until 31 January 2025. Mike Thomas conducted the
last compliance inspection on 29 December 2016.
4) PERMITTED EMISSIONS SOURCES:
Non Metallic Mineral Processing Plant,,utilizing water suppression with no other control devices,including:
Crushers(NSPS) Crushing Operations WS Wet suppression water spray system
Crushers__..._.._ _.___._. �. _ _...._..�.._..__ _ _..
Conveyors(NSPS) Conveying Operations WS - -Wet suppression water spray system
Screens NSPS Screen O erations WS Wet su ression waters ra s stem
_._ _� � -g Operations _pp es p__y-n y_�_._.
5) INSPECTION SUMMARY:
The facility has never been constructed nor have any operations been conducted-there. I spoke to
Richard Broughton,Environmental Services Manager. Mr.Broughton stated that there were no
plans to construct the facility at this point but that Martin Marietta intended to retain the permit in
case things change in the future.
6) COMMENTS AND COMPLIANCE STATEMENT:
Martin Marietta Aggregates Pee Dee Quarry appeared to be in compliance on 11 October 2017
as not yet constructed or operating.
Pink Sheet: No comments.
/mstP.
pp�
t
F
Y.
j
I
1.
E
F
ii
r.