Loading...
HomeMy WebLinkAboutAQ_F_0400053_20170822_CMPL_InspRpt 11 l NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY Boggs Materials,Inc. -Pee Dee Asphalt Plant NC Facility ID 0400053 Inspection Report County/FIPS:Anson/007 Date: 09/27/2017 Facility Data Permit Data Boggs Materials,Inc. -Pee Dee Asphalt Plant Permit 09882/R03 481 Pee Dee Road Issued 9/8/2015 Lilesville,NC 28091 Expires 1/31/2018 Lat: 34d 56.0450m Long: 79d 53.2263m Classification Synthetic Minor SIC: 2951 /Paving Mixtures And Blocks Permit Status Active NAILS: 324121 /Asphalt Paving Mixture and Block Manufacturing Current Permit Application(s)None I Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Tim Melton Tim Melton Tim Melton NSPS: Subpart I Vice President Vice President Vice President F (843)675-4285 (843)675-4285 (843)675-4285 Compliance Data i Comments: Inspection Date 08/22/2017 Inspector's Name Mike Thomas Inspector's Si nat e: Operating Status Operating Compliance Code Compliance-inspection Action Code FCE Date'ofe Signature:2 On-Site Inspection Result Compliance y Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2011 2.00 3.69 2.60 2.00 5.50 1.10 262.00 *Highest HAP Emitted(inpounds) Five Year Violation History: Date Letter Type Rule Violated Violation Resolution Date 02/17/2017 NOV 2D .1100 Control of Toxic Air Pollutants 02/09/2017 02/17/2017 NOV 2Q .0315 Synthetic Minor Facilities 02/09/2017 Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested i I. Location/Directions:From FRO,take US401 south through Wagram;just outside of Wagram take a ` right onto NC144 and drive 12 miles through Laurel Hill. Just past Laurel Hill,take US74 west—36 miles into Anson County. Less than 1 mile into Anson County,turn south(left)onto NC 145. After 0.3 miles,turn left onto County Road 1842 at the Boggs Paving sign; it later becomes Pee Dee Road. The plant is on left just past the railroad tracks. 1 I i i I H. Safety Considerations: Standard FRO safety gear.Main concern is truck traffic. HI. Facility and Process Description Boggs Materials,Inc. -Pee Dee Asphalt Plant is a batch hot mix asphalt(HMA)plant with a screen and feed system for adding recycled asphalt pavement(RAP). This facility is permitted under Air Permit No. ; 09882R03,effective from 8 September 2015 until 31 January 2018.Jeff Cole conducted the last ! compliance inspection on 24 May 2016. IV. Permitted Emission Sources: __... ._. _.._ .... _.. _.. . ---------------- Natural gas/No. 2 fuel oil/No. 2 recycled Horizontal cyclone ; I ES 1 fuel oil/No.4 fuel oil/No. 4 recycled fuel CD2 (120 inch wide, 108 inch high) d (NSPS) oil-fired aggregate drum dryer/mixer In series with in series with (120 mmBtu/hr maximum heat input rate) CD 1 baghouse (12,390 square feet of filter area) ES3 Surge bin N/A N/A F 1 Truck loadout o peration N/A N/A Lime Silo Bagfilter ES4 __ _..._ . e.e .CD3...... .. __._ r. _. .._.term. ------ area 60 Ton C a pacity 265 square feet of filter ar ��—F2� Three RAP conveyors N/A N/A 173 Two RAP screens N/A N/A V. Inspection Summary: On 22 August 2017,I Mike Thomas of FRO DAQ, conducted a compliance inspection of this facility. This plant has not operated since 2011. 1 verified that all permitted equipment, dryer,surge bin, silo, conveyor, and screens have been removed from the property.I called the facility contact,Tim Melton and inquired if there were any plans to reopen the facility. Mr.Melton stated that there were no plans to reopen the plant in the near future.I discussed the facility's upcoming permit renewal with Mr.Melton and he stated that they would be renewing the permit and would contact me if he needed assistance. VI. 112R Status G This facility does not store chemical compounds that require a written risk management plan under Section 112R of the Clean Air Act. VII. Non-compliance History Since 2010 2/17/17 NOD for late reporting. 2/25/14 NOD for late reporting. VIII. Comments and Compliance Statement Boggs Materials,Inc. -Pee Dee Asphalt Plant appeared to be in compliance with the specific ' conditions found in the facility's current Air Permit on 22 August 2017. Pink Sheet Notes:None /mst F