Loading...
HomeMy WebLinkAboutAQ_F_0800107_20180803_CMPL_InspRpt (4) NORTH CAROLINA DIVISION OF Washington Regional Office AIR QUALITY W.E.Partners II,LLC-Lewiston Woodville NC Facility ID 0800107 Inspection Report County/FIPS:Bertie/015 Date: 09/11/2018 Facility Data .Permit Data W.E.Partners II, LLC-Lewiston Woodville Permit 10126/R03 3539 Governors Road Issued 12/8/2016 Lewiston Woodville,NC 27849 Expires 11/30/2024 Lat: 36d 8.3590m Long: 77d 13.3450m Classification Synthetic Minor SIC: 4961 /Steam Supply Permit Status Active NAICS: 22133 /Steam and Air-Conditioning Supply Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Garald Cottrell Garald Cottrell Garald Cottrell MALT Part Subpart 6J President President President NSPS: Subpart Dc (336)339-9055 (336)339-9055 (336)339-9055 Compliance Data Comments: Visible emissions were observed. No issues were discovered. Inspection Date 08/03/2018 Inspector's Signature: Inspector's Name Betsy Huddleston Operating Status Operating "7 Compliance Code Compliance-inspection Date of Signature: / c�J��/(g Action Code PCE On-Site Iuspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2014 35.28 359.38 1254.53 72.76 1913.77 24.25 1697.70 *Highest HAP Emitted inpounds) Five Year Violation History: Date Letter Tvoe Rule Violated Violation Resolution Date 06/07/2017 NOV Permit Permit Condition 06/07/2017 11/22/2016 NOWNRE 2D .I I I I Maximum Achievable Control Technology 03/24/2017 05/12/2015 NOWNRE Part 63 -NESHAP/GACT Subpart JJJJJJ Industrial, 06/12/2015 Commercial and Institutional Boilers at Area Sources Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested While conducting an annual inspection at Valley Proteins (0800081), Sam Mellott and I also performed visible emissions surveillance on W.E. Partners ESP stack. We watched the emissions from the stack from approximately 3:23 PM - 3:30 PM. The sky was overcast. We both agreed that the opacity was not more than 5%. (...Facilities\Bertie08\00107\AQ16s\20180803 VE surveillance)