Loading...
HomeMy WebLinkAboutAQ_F_0400053_20180718_CMPL_CAV-Rpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY Boggs Materials,Inc. -Pee Dee Asphalt Plant NC Facility ID 0400053 Inspection Report County/FIPS:Anson/007 Date: 07/30/2018 Facility Data Permit Data Boggs Materials,Inc. -Pee Dee Asphalt Plant Permit 09882/R04 481 Pee Dee Road Issued 11/17/2017 Lilesville,NC 28091 Expires 10/31/2025 Lat: 34d 56.0450m Long: 79d 53.2263m Classification Synthetic Minor SIC: 2951 /Paving Mixtures And Blocks Permit Status Active NAICS: 324121 /Asphalt Paving Mixture and Block Manufacturing Current Permit Application(s)None i Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Tim Melton Tim Melton Tim Melton NSPS: Subpart I Asphalt Plant Manager Asphalt Plant Manager Asphalt Plant Manager (704)634-3491 (704)634-3491 (704)634-3491 Compliance Data Comments: Inspection Date 07/18/2018 Inspector's Name Mike Thomas Inspecto 's ignature: Operating Status Operating Compliance Code Compliance-inspection Action Cade FCE Date of Signature: On-Site Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2016 — — 2011 2.00 3.69 2.60 2.00 5.50 1.10 262.00 *Highest HAP Emitted(in ounds) Five Year Violation History: Date Letter Type Rule Violated Violation Resolution Date 02/17/2017 NOV 2D.I100 Control of Toxic Air Pollutants 02/09/2017 02/17/2017 NOV 2Q .0315 Synthetic Minor Facilities 02/09/2017 Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested I. Location/Directions: From FRO, take US401 south through Wagram;just outside of Wagram take a right onto NC 144 and drive 12 miles through Laurel Hill. Just past Laurel Hill,take US74 west—36 miles into Anson County. Less than I mile into Anson County,turn south(left)onto NC 145. After 0.3 miles,turn left onto County Road 1842 at the Boggs Paving sign; it later becomes Pee Dee Road. The plant is on left just past the railroad tracks. H. Safety Considerations: Standard FRO safety gear.Main concern is truck traffic. III. Facility and Process Description Boggs Materials,Inc. -Pee Dee Asphalt Plant is a portable continuous drum-type hot mix asphalt plant with a screen and feed system for adding recycled asphalt pavement(RAP). This facility is permitted under Air Permit No.09882R04,effective from 17 November 2017 until 31 October 2025. Mike Thomas conducted the last compliance inspection on 22 August 2017. IV. Permitted Emission Sources: n anion Soule Control Control System ID escription`�' System ID Description lPorta Ia Continuous Drum-Type Hot Mix Asphalt Plant,385 tons per hour capacity,consisting of: r Horizontal cyclone Natural gas/No. 2 fuel oil/No. 2 recycledFInseCr 2 (120 inch wide, 108 inch high) ES1 fuel oil/No.4 fuel oil/No. 4 recycled fuel s with in series with NSPSoil-fired aggregate drum dryer/mixer(120 mmBtu/hr maximum heat input rate) l bre feet e (12,390 square feet of filter area) ES3 Surge bin _F11 Truck loadout operation N/A N/A ES4 Lime Silo CD3 Bagfilter 60 Ton Capacity 265 square feet of filter area Portable Recycled Asphalt Pavement System,193 tons per hour capacity,consisting of: F2 F Three RAP conveyors N/A N/A F3 Two RAP screens N/A N/A V. Inspection Summary: On 18 July 2018 I Mike Thomas of FRO DAQ, conducted a compliance inspection of this facility. This plant has not operated since 2011. I verified that all permitted equipment,dryer, surge bin,silo, conveyor, and screens have been removed from the property. I called the facility contact,Tim Melton and inquired if there were any plans to reopen the facility. Mr.Melton stated that there were no plans to reopen the plant in the near future. VI. 112R Status This facility does not store chemical compounds that require a written risk management plan under Section 112R of the Clean Air Act. VIL Non-compliance History Since 2010 2/17/17 NOD for late reporting. 2/25/14 NOD for late reporting. VIH. Comments and Compliance Statement Boggs Materials,Inc. -Pee Dee Asphalt Plant appeared to be in compliance with the specific conditions found in the facility's current Air Permit on 18 July 2018. Pink Sheet Notes:None /mst ltluY Ejri�t yui .�.yj+n;r: '1nijgnjotn 1polig nr Fjrs Lacjj!(X,?cmiruj vjL j ct,}ft uu i 8 f'lifl !gc Alit, (,6wag e,ae ftq(isurk�.bpnt �i�WWeu�