HomeMy WebLinkAboutAQ_F_0400028_20180417_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY Concrete Supply Co.,LLC-Wadesboro
NC Facility ID 0400028
Inspection Report County/FIPS:Anson/007
Date: 04/26/2018
Facility Data Permit Data
Concrete Supply Co.,LLC-Wadesboro Permit n/a
Rt 4 Box 110 Issued n/a
Wadesboro,NC 28170 Expires n/a
Lat: 34d 58.6320m Long: 80d 5.5620m Classification Permit Exempt
SIC: 3273/Ready-Mixed Concrete Permit Status Inactive
NAICS: 32732/Ready-Mix Concrete Manufacturing Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Johnie Alexander Henry Batten Johnie Alexander
Environmental Manager President Environmental Manager
(704)372-2930 (704)372-2930 (704)372-2930
Compliance Data
Comments:
Inspection Date 04/17/2018
Inspector's Name Mike Thomas
Inspector' Sig ature: Operating Status Operating
_ Compliance Code Compliance-inspection
Action Code FCE
Date of Signature: Al ZL On-Site Inspection Result Compliance
Total Actual emissions in TONSIYEAR:
TSP S02 NOX VOC CO PM10 *HAP
2010 --- --- --- -- ---
2006 2.79 --- --- --- 0.8400 . 0.2410
*Highest HAP Emitted inpounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
i
i
Performed Stack Tests since last FCE:None
i
Date Test Results Test Method(s) Source(s)Tested
i
I
i
I. DIRECTIONS TO SITE: From FRO,take Hwy 401 South to Wagram.Turn right at Old Wire Road
(Hwy 144)and continue—11 '/2 miles to Laurel Hill.Turn right onto Hwy 74 West and travel—35 miles to
Wadesboro. Continue through town,the facility is on the left,—50 yards past the Hwy 52 intersection.
i
i
i
H. SAFETY: Standard FRO safety gear is required. j
III. FACILITY DESCRIPTION: Concrete Supply Co.,LLC is a dormant concrete batch plant located in
Wadesboro,Anson County. The facility has not been operational for years,but there are still silos,
conveyors and raw material bunkers on site. The facility's air quality permit was rescinded on 09 August
2016 under the newly adopted 2Q .0102(d)exemption.
IV. INSPECTION SUMMARY: On 17 April 2018,I Mike Thomas of FRO DAQ,conducted a site visit for
a compliance inspection of the Concrete Supply Co.,LLC., -Wadesboro location. The facility remains
unused and there appeared to be no signs of activity to suggest reopening in the near future. I spoke to
Mr.Johnie Alexander,Environmental Manager,who stated that there are no plans to operate the plant in
the future.
V. NON-COMPLIANCE HISTORY SINCE 2010: The facility does not have a history of non-
compliance.
VI. RISK MANAGEMENT(112r): This facility does not store any 112(r)subject materials in excess of
threshold quantities. Therefore,the facility is not required to maintain a written Risk Management Plan
(RMP)•
VII. CONCLUSION AND RECOMMENDATIONS:
Concrete Supply Co.,LLC -Wadesboro was non-operational at the time of the visit,and appeared to be
IN COMPLLANCE with applicable air quality regulations.
PINK SHEET ADDITIONS:
None
/mst
c
C