HomeMy WebLinkAbout19980260 Ver 3_Site Inspection_20190913Wetland Inspection Report
Project Num: 19980260 Version: 3
Project Name: NC DOT - Winston-Salem Northern Beltway Phase 2
County: Forsyth(R-2247/U-2579)
Location: NC DOT - Winston-Salem Northern Beltway Phase 2 (R-2247/U-2579)
Latitude: +36' 10' 49"
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 9/11/2019
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Status: Issued
Project Type: New Road/Highway
Region: Winston-Salem
Longitude: -80' 16' 23"
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WOC)
Inspection Summary:
page: 1
Site Number: 19980260 Owner: Thorpe, Gregory
Inspection Date: 9/11/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: We reviewed Sites 30, 5, 6, 7 and 8 with the Corps, DOT's DEC, Roadside Environmental, Assistant
Regional Engineer and several other contractors and inspectors. The project is active and several sites
are being worked on at various stages of construction along with grading/filling work. The sites were in
compliance, EC measures and SDOs were all maintained and in good working order. Construction BMPs
(pump arounds) were operating by design. No turbid water discharges were noted.
page: 2