Loading...
HomeMy WebLinkAbout19980260 Ver 3_Inspections_20190913Wetland Inspection Report Project Num: 19980260 Version: 3 Project Name: NC DOT - Winston-Salem Northern Beltway Phase 2 County: Forsyth(R-2247/U-2579) Location: NC DOT - Winston-Salem Northern Beltway Phase 2 (R-2247/U-2579) Latitude: +36' 10' 49" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 9/11/2019 Reason for Inspection Routine Inspection Type: Records/File Review (DOT) Status: Issued Project Type: New Road/Highway Region: Winston-Salem Longitude: -80' 16' 23" Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: NPDES SW - Roadway (DOT) Question Areas: Operation and Maintenance Inspection Summary: page: 1 Site Number: 19980260 Owner: Thorpe, Gregory Inspection Date: 9/11/2019 Inspection Type: Records/File Review (DOT) Reason for Visit: Routine Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑ Are the inspection and maintenance records complete and available for review? 0 ❑ ❑ ❑ Comment: Records were reviewed (for Section DEF) at contractors field office along with DOT staff. All records were in order and weekly inspections noted along with precipitation data. page: 2