HomeMy WebLinkAboutbeaver creek greenway relocation in kelly road parkROY COOPER
Governor
MICHAEL S. REGAN
.Secretary
LINDA CULPEPPER
Director
Town of Apex
PO Box 250
Apex, NC 27502
sball@sandec.com
NORTH CAROLINA
Environmental Quality
July 16, 2019
Subject: Determination Letter
NBRRO #19-224
Wake County
Determination Type: Town of Apex project in Cape Fear Basin
Buffer
Intermittent/Perennial
❑ Neuse (15A NCAC 2B .0233)
Start@
❑ Tar -Pamlico (15A NCAC 2B.0259)
® Intermittent/Perennial Determination (where local buffer
USGS
To o
ordinances apply)
❑ Jordan (15A NCAC 2B .0267)
(governmental and/or interjurisdictional
throughout
projects)
X
Project Name
Address/Location:
Stream(s):
Beaver Creek Greenway Relocation in Kellv Road Park
Kelly Road Park, Apex
UT to Beaver Creek
Determination Date: July 15, 2019 Staff: Ray Milosh
Stream
E/l/P*
Not
Subject
Subject
Start@
Stop@
Soil
Survey
USGS
To o
Stream A
P
X
throughout
X
X
Stream B
I
X
throughout
X
X
Stream C
Does not exist
X
throughout
X
*Ephemeral/Intermittent/Perennial
E Ncor9 to Carolina Department of £,rrvir'aerir a: rrtal Quality I Divisic>ri of water Re (c:urces
Raleigh Regional Office 3800 Barrett Drive I Raleigh, North Carolina 27609
news lout€awn'_"0--\ jI"'1�1 919141.4200
Explanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of
North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each stream
that is checked "Not Subject" has been determined to not be at least intermittent or is not present.
Streams that are checked "Subject" have been located on the property and possess characteristics that qualify
it to be at least an intermittent stream. There may be other streams located on the property that do not show
up on the maps referenced above but may be considered jurisdictional according to the US Army Corps of
Engineers.
This on-site determination shall expire five (5) years from the date of this letter. Landowners or
affected parties that dispute a determination made by the DWR may request a determination by the
Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a
determination by the Director shall be referred to the Director in writing. If sending via US Postal
Service: c/o Karen Higgins; DWR - 401 & Buffer Permitting Unit; 1617 Mail Service Center, Raleigh, NC
2 76 99-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins; DWR - 401 & Buffer
Permitting Unit, 512 N. Salisbury Street, Raleigh, NC 2 76 04.
This determination is final and binding unless, as detailed above, unless an appeal is requested within
sixty (60) days.
This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884.
If you have questions regarding this determination, please feel free to contact Ray Milosh at (919) 741-4240
Sincerely,
aren Higgins, Supervisor
401 & Buffer Permitting Branc
cc: RRO DWR File Copy
Stream
E/I/P*
Not Sub-
ject
Subject
Start@
Stop@
Soil
Survey
USGS
Topo
Stream A
P
X
throughout
X
X
Stream B
I
X
throughout
X
X
Stream C
Does not exist
X
throughout
X
,+ STAIrfa
Legend: Map provided by NCDEQ
_ \\
. ' n Division of Water Resources
D
-Approximate Site boundary:
Locations are approximate
d '
and are provided for
` QIAI�" reference only ::
19-224: Beaver Creek Greenway Relocation at
Kelly Road Park
Stream
E/I/P*
Not Sub-
ject
Subject
Start@
Stop@
Soil
Survey
USGS
Topo
Stream A
P
X
throughout
X
X
Stream B
I
X
throughout
X
X
Stream C
Does not exist
X
throughout
X
30 STATpo- Map provided by NCDEQ
Division of Water Resources
Legend:
Locations are approximate
-Approximate Site boundary: ✓,
and are provided for
reference only ::