Loading...
HomeMy WebLinkAbout19970412 Ver 1_Mitigation Project Review_20000710 State of North Carolina Department of Environment and Natural Resources • Division of Water Quality James B. Hunt, Jr., Govemor NC ENR Bill Holman, Secretary NORTH CAROLINA DEPARTMENT OF Kerr T. D , Fes- ENVIRONMENT AND NATURAL RESOURCES 10A1v WATER ppUALITY SECTION ASHEVILLE REGIONAL OFFICE x R E C E i k/L Mr. Mickey Henson N.C. Dept. of EHNA Appalachian Environmental Services J U L 2 6 2000 P.O. Box 52 Webster, North Carolina 28788 Winston-Salef,l R(,qi anal Offic§ Re: iinnhaven II, Stream Restoration D 12 Dear Mickey, Thanks for the Restoration Plan for the Lynnhaven R project in Watauga County. The approach to this plan is valid; however, it is not supported with necessary information. Please reference Appendix B of the Draft Technical Guide for Stream Work in North Carolina for specific details. This document can be accessed through our web site (http://h2o.enr.state.nc.us/ncwetiands/). Specifically we would request that you provide the precise location of the reference reach and that the cross section,pattern and profile data for this reach is indicated. Pebble count data and analysis also should be provided. In addition to this information we also request that you provide the following: ♦ Please submit data and calculations to show that sediment transport should be a dynamic equilibrium. This should include sediment transport and shear stress analysis. The "read outs" of any models such as HEC RAS that are used in such analyses should be provided. ♦ Please provide general design details and specifications for any grade control or bank stabilization structures that shall be used. ♦ Please provide preliminary site and cross section plans showing the required 25-foot buffers and planting plan. The plans should show the existing and proposed channel and features. These plans should be provided on full size sheets and should indicate proposed locations of structures, grading, etc. to be performed during construction. i Please provide a co%struc;tioa sequence and estiui-mi.ed tinic line of the construction. ♦ Also provide some kind of permanent protection for the restored stream and buffers. Wetlands/401 Unit 1621 Mail Service Center Raleigh,North Carolina 27699-1621 Telephone 919-733-1786 FAX#733-9959 An Equal Opportunity Af mnative Action Employer 50%cecycled/10%post consumer paper ♦ Please provide a more detailed monitoring plan for this project. The plan as presented is inadequate. Please refer to the Technical Guide for Stream Work in North Carolina and the Benthic Macroinvertebrate Guidance documents for additional information. Please be reminded that the 401 certification states that no stream impact shall occur until written DWQ approval is received for a detailed stream restoration. Sincerely, qhn Dorney Cc: Dave Penrose,Wetland Unit Jeff Jurek, Wetlands Restoration Program Asheville District Corps of Engineers Central Files