Loading...
HomeMy WebLinkAbout20001426_New Hanover R-2405A_401 CF_20061229DWQ Project No: 001426 Applicant: North Carolina 1hpartment of Transportation D tit �V F� 9 19 County: New Hanover & Pender Counties Project Name: R-2405A - I-40 connector from east of I-40 interchange to US 17 northeast of SR 1571 (Scotts Hill Loop Rd0 Date of Issuance of 401 Water Quality Certification: January 15, 2002 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules and any subsequent modifications, the applicant is required to return this certificate to the 40 1 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, H. Allen Pie , hereby state that to the best of my abilities, due care and diligence was used in the observation of the constru 'on such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certificaf n nd Buff r Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, Mason Herndon hereby state that to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: 1 7_ - Z Z - U (� Engineer's Certification Partial Final I, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Registration No.