Loading...
HomeMy WebLinkAbout19970231 Ver 2_401 Application_20090814DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 REPLY TO ATTENTION OF: Environmental Resources Section Ms. Cyndi Karoly North Carolina Division of Water Quality 2321 Crabtree Boulevard Suite 250 Raleigh, North Carolina 27604 Dear Ms. Karoly: August 12, 2009 AUG 14 2009 DENR - WATER QUALITY WETLANDS AND STORMW.ATER BRANCH The U.S. Army Corps of Engineers, Wilmington District (Corps) proposes the repair of the existing jetty, located in Pamlico Sound, at the entrance to Silver Lake Harbor, Ocracoke Island, Hyde County, North Carolina. The existing jetty was constructed in 1931, extended landward in 1964, and repaired during the mid 1970's. The entire portion of the structure located in Pamlico Sound has subsided, resulting in diminished protection of the entrance channel into Silver Lake Harbor. In addition, a small (25-30 foot) portion of the jetty located along the beach where the structure ties into land has been breached, resulting in erosion and scouring from boat wakes, jeopardizing the stability of this portion. The proposed project involves the placement of large rock atop the existing rock in these areas. No increase in footprint would occur, and no fill material, other than the rock, will be placed within the project area. All rock will be transported by barge and individually placed, with no placement in or impact to adjacent waters. Because the project involves maintenance/repair of an existing structure, it is the Corps; opinion that the project complies with General Certification No. 3687. A courtesy PCN and figures that further describe the project are enclosed. Thank you for your attention to this matter. Should you have any questions, please contact Mr. Jeff Richter of my Environmental Resources section at telephone 910-251-4636. Sincerely, W. Coleman Long, Chief Planning and Environmental Branch Enclosures oWjATF?9OG ?IIIJ_WV?? O liii? -c Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: F-1 Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ? Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ? No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ? No 2. Project Information 2a. Name of project: Silver Lake Harbor jetty repair 2b. County: Hyde 2c. Nearest municipality / town: Ocracoke 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: US Federal Government 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page I of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: Regional fed govt entity 4b. Name: Colonel Jefferson Ryscavage, Distrit Engineer, c/o Jeff Richter 4c. Business name (if applicable): US Army Corps of Engineers, Wilmington District 4d. Street address: 69 Darlington Avenue 4e. City, state, zip: Wilmington. NC 28403 4f. Telephone no.: 910-251-4636 4g. Fax no.: 910-251-4744 4h. Email address: jeffrey.h.richter@usace.army. miI 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): Latitude: 35.115 Longitude: - 75.989 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Pamlico Sound proposed project: 2b. Water Quality Classification of nearest receiving water: SA; HWQ 2c. River basin: Tar-Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing federally authorized rubblemound jetty in Pamlico Sound at entrance to Silver Lake Harbor. Majority of structure is below water at high tide and much of it is below water at low tide, resulting in reduced effectiveness of protection of navigation to and from the harbor. Approx 25-30 feet of structure where it ties into land has been breached 3b. List the total estimated acreage of all existing wetlands on the property: N/A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A 3d. Explain the purpose of the proposed project: Restore protective capability of jetty for mariners navigating the channel in and out of the harbor., 3e. Describe the overall project in detail, including the type of equipment to be used: Rock (larger than originally used), to be placed individually by barge-mounted crane to restore protective capability of the structure. All stone within original alignment, no increase in footprint from original structure and no fill material other than the rock will be placed in the project area. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ®No El Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 4 of 11 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ? Buffers ® Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary (T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? PEI T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form -Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or 01 ®P ? T Pamlico Sound repair of existing jetty Sound < 1 acre 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts <1 acre 4g. Comments: Rock to be placed atop old rock, no increase in footprint and no additional fill material will be placed 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? 6b. 6c. 6d. Buffer impact number - Reason Permanent (P) or for Temoorarv (T) impact B1 ?P?T B2 ?P?T B3 ?P?T 6i. Comments: ? Neuse ? Tar-Pamlico ? Other: ? Catawba ? Randleman 6e. 6f. 6g. Buffer Stream name mitigation required? ? Yes ? No ? Yes ? No ? Yes ? No 6h. Total buffer impacts Zone 1 impact Zone 2 impact (square feet) (square feet) Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Rock designed to be placed atop old rock, no increase in footprint and no additional fill material will be placed 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Rock will be placed atop old rock, no increase in footprint and no additional fill material will be placed 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank El Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. - El Yes F 1 No Comments: 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? >90 % 2b . Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: located in Pamlico Sound 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a . Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b . If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 10 of 11 PCN Form -Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ® Yes E] No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. El Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Location and scope of project, USFWS website with species habitat, professional experience with similar projects 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ® Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Professional experience with similar projects 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation t t ? Yes ® No s a us (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? In-house professional expertise 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ?Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Definition of floodplain - site located in Pamlico Sound W. Coleman Long, Chief Planning/Environmental Branch US Army Corps of Engineers Wilmington District 0/1z/01 69 D li ar ngton Avenue Applicant/Agent's Sign u e Date Wilmington, NC 28403 (Agent's signature is valid only if an authorization tter from the applicant is provided.) Applicant/Agent's Printed Name Page 11 of 11 PCN Form -Version 1.3 December 10, 2008 Version Figure 1: Location Map Figure 2: Project Map