HomeMy WebLinkAbout19980260 Ver 3_R-2247EB 4C Meeting Minutes Draft_20190528MEETING MINUTES
DATE: May 15, 2019
CLIENT: NCDOT
PROJECT: R-2247EB Winston-Salem Northern Beltway Interchange at US 52 (Future 1-74)
MEETING LOCATION: NCDOT Structure Design Conference Room, Building A
STARTING TIME: 8:30 am
ENDING TIME: 11:30 am
SUBJECT: 4C Merger Meeting Minutes
Meeting Attendees
Robert Patterson, NCDEQ-DWR
Dave Wanucha, NCDEQ-DWR (via phone)
Nicholle Braspennickx, USAGE
Marla Chambers, NCWRC
Amy Euliss, NCDOT-Division DEO (via phone)
Craig Lee, NCDOT-Hydraulics
Michael Shumsky, NCDOT-Design Build
Bill Barrett, NCDOT-EAU
Jordan Scott — NCDOT - Resident Engineer
Matt Adams, Blythe Construction
Luca Pellegrini, Blythe Construction
Richard Hiner, Wood PLC (via phone)
Eddie Vance, STV
Joseph Freeman, STV
Mark Pugh, STV
Michael Iagnocco, STV
Josh Kotheimer, STV
Note: Discussion and comments from meeting are in blue
Protect Limits
• Project extended approximately 500 L.F. north along US 52
• EA/EB project limits shifted from the west side of NC-65 to the east side of NC-65
• EB project impacts includes work inside the EC limits due to project overlap
• The permit mod for EB will cover the extension of pipe culverts and additional road work
located within the Overlap with the EC section.
Site Overview
• Duke Transmission Lines
900 WEST TRADE STREET, SUITE 715
AIV EMPLOYEE -OWNED COMPANY PROVIDING QUALITY SERVICE SINCE 1912 I CHARLOTTE, NC 28202-1144
(704) 372-1885 FAX: (704) 372-3393
sTv too
• PNG Line
• NS Railroad Right of Way
• Grassy Creek — FEMA Regulated Stream
• Project located within the Yadkin River Basin. There are no specific stormwater
requirements. However, the Design -Build Team will provide stormwater treatment where
there are opportunities
• Identified two locations for stormwater basin
• Culverts
• 10 Large Culverts on the Project
■ Including 3 extensions
■ 2 replacements
■ 5 new crossings
■ 2 FEMA (Grassy Creek)
• New double box culvert at Grassy Creek buried 1' below streambed w/ I' flood bench
• Sills not placed in existing culverts to maintain design capacity
• Remaining culverts were not buried because of length and slope of barrel
• Riprap pads will be flush with the streambed
• 2 Small Pipe Culvert Extensions
■ Additional impacts to the R-2247EC Project
Pipe Location
Size and Material
Impact Site
Pipe Invert Burial
Depth (feet)
2 @ 7'x7' RCBC
64+85 -L-
(Extension)
I
0'
8'x7' RCBC (Ext.) w/
77+07 -L-
60" Steel (Flood
4
0'
bench pipe)
107+98 -L-
48" Steel
6
0'
(Extension)
66' Steel
111+58 -L-
(Extension)
7
0'
20+18 -RPB-
4'x5' RCBC
10C
0'
17+92 -LPB-
5'x5' RCBC
l0E
0'
27+38-WBBYP-
6'x5' RCBC
lOF
0'
12+01
7'x5' RCBC
IOH
0'
169+98 -L-
8'x6 RCBC
14B
0'
186+91 -L-
2 @ 9'x9' RCBC
15A
1' w/ flood bench
2 @ 9'x9' RCBC
106+53 -Y68-
15G
0'
(Extension)
19+90 -RPD-
7'x6' RCBC
16
0'
Project Design
• Project design speed increased to 70 mph
• Avoidance and Minimization
Lowered interchange to minimize Duke Power and NS Railroad conflicts
■ Reduced earthwork (million cubic yards of borrow to balanced on -site)
■ Eliminated a new continuous 1200' culvert (Ramps & Loop B)
• Retained 350' open channel inside Loop B
• Retained 100' minimum open channel between culverts
Shifted Ramp DB and Loop D away from Grassy Creek
■ Eliminated Ramp DB crossing over Grassy Creek
Reduced 1600' mainline culvert to 1200'
• Added retaining walls along west side of US 52 to minimize PNG conflicts
■ Reduced stream impacts
Discussion on method to distinguish new EB impacts from Drevious EC impacts
• See examples of Permit Drawing Sheet 19 attached at end
• Show overlapping impacts as depicted in the attachment.
■ If there is a change in impact type it should be shown with the new type of
impact hatching overlapping with the impact previously shown on the
2247EC permit drawings.
■ On the impact summary sheet impact changes should be counted on
separate lines and noted so that totals for mitigation can be properly
accounted for.
• General Comments
SHT 4
• Breakout items on impact summary table to show specific type of impact such as
inlet protection, outlet protection, channel relocation, culvert construction, etc.
• Adjust labeling for impacts from R2247 EC being shown on all plan sheets.
■ Make sure all labels are properly grey scaled, and are discernable from
each other when printed.
■ Place label beside impacts shown from R2247 EC ex. TS (EC).
• Bank stabilization should be shown with a "S" callout and noted separately in the
impact summary sheet.
• If there is no significant realignment of the channel, at inlets and outlets of
culverts impacts should be shown as bank stabilization.
Site 1 — Beaver Dam Creek (QQQ)