Loading...
HomeMy WebLinkAbout19980260 Ver 3_R-2247EB 4C Meeting Minutes Draft_20190528MEETING MINUTES DATE: May 15, 2019 CLIENT: NCDOT PROJECT: R-2247EB Winston-Salem Northern Beltway Interchange at US 52 (Future 1-74) MEETING LOCATION: NCDOT Structure Design Conference Room, Building A STARTING TIME: 8:30 am ENDING TIME: 11:30 am SUBJECT: 4C Merger Meeting Minutes Meeting Attendees Robert Patterson, NCDEQ-DWR Dave Wanucha, NCDEQ-DWR (via phone) Nicholle Braspennickx, USAGE Marla Chambers, NCWRC Amy Euliss, NCDOT-Division DEO (via phone) Craig Lee, NCDOT-Hydraulics Michael Shumsky, NCDOT-Design Build Bill Barrett, NCDOT-EAU Jordan Scott — NCDOT - Resident Engineer Matt Adams, Blythe Construction Luca Pellegrini, Blythe Construction Richard Hiner, Wood PLC (via phone) Eddie Vance, STV Joseph Freeman, STV Mark Pugh, STV Michael Iagnocco, STV Josh Kotheimer, STV Note: Discussion and comments from meeting are in blue Protect Limits • Project extended approximately 500 L.F. north along US 52 • EA/EB project limits shifted from the west side of NC-65 to the east side of NC-65 • EB project impacts includes work inside the EC limits due to project overlap • The permit mod for EB will cover the extension of pipe culverts and additional road work located within the Overlap with the EC section. Site Overview • Duke Transmission Lines 900 WEST TRADE STREET, SUITE 715 AIV EMPLOYEE -OWNED COMPANY PROVIDING QUALITY SERVICE SINCE 1912 I CHARLOTTE, NC 28202-1144 (704) 372-1885 FAX: (704) 372-3393 sTv too • PNG Line • NS Railroad Right of Way • Grassy Creek — FEMA Regulated Stream • Project located within the Yadkin River Basin. There are no specific stormwater requirements. However, the Design -Build Team will provide stormwater treatment where there are opportunities • Identified two locations for stormwater basin • Culverts • 10 Large Culverts on the Project ■ Including 3 extensions ■ 2 replacements ■ 5 new crossings ■ 2 FEMA (Grassy Creek) • New double box culvert at Grassy Creek buried 1' below streambed w/ I' flood bench • Sills not placed in existing culverts to maintain design capacity • Remaining culverts were not buried because of length and slope of barrel • Riprap pads will be flush with the streambed • 2 Small Pipe Culvert Extensions ■ Additional impacts to the R-2247EC Project Pipe Location Size and Material Impact Site Pipe Invert Burial Depth (feet) 2 @ 7'x7' RCBC 64+85 -L- (Extension) I 0' 8'x7' RCBC (Ext.) w/ 77+07 -L- 60" Steel (Flood 4 0' bench pipe) 107+98 -L- 48" Steel 6 0' (Extension) 66' Steel 111+58 -L- (Extension) 7 0' 20+18 -RPB- 4'x5' RCBC 10C 0' 17+92 -LPB- 5'x5' RCBC l0E 0' 27+38-WBBYP- 6'x5' RCBC lOF 0' 12+01 7'x5' RCBC IOH 0' 169+98 -L- 8'x6 RCBC 14B 0' 186+91 -L- 2 @ 9'x9' RCBC 15A 1' w/ flood bench 2 @ 9'x9' RCBC 106+53 -Y68- 15G 0' (Extension) 19+90 -RPD- 7'x6' RCBC 16 0' Project Design • Project design speed increased to 70 mph • Avoidance and Minimization Lowered interchange to minimize Duke Power and NS Railroad conflicts ■ Reduced earthwork (million cubic yards of borrow to balanced on -site) ■ Eliminated a new continuous 1200' culvert (Ramps & Loop B) • Retained 350' open channel inside Loop B • Retained 100' minimum open channel between culverts Shifted Ramp DB and Loop D away from Grassy Creek ■ Eliminated Ramp DB crossing over Grassy Creek Reduced 1600' mainline culvert to 1200' • Added retaining walls along west side of US 52 to minimize PNG conflicts ■ Reduced stream impacts Discussion on method to distinguish new EB impacts from Drevious EC impacts • See examples of Permit Drawing Sheet 19 attached at end • Show overlapping impacts as depicted in the attachment. ■ If there is a change in impact type it should be shown with the new type of impact hatching overlapping with the impact previously shown on the 2247EC permit drawings. ■ On the impact summary sheet impact changes should be counted on separate lines and noted so that totals for mitigation can be properly accounted for. • General Comments SHT 4 • Breakout items on impact summary table to show specific type of impact such as inlet protection, outlet protection, channel relocation, culvert construction, etc. • Adjust labeling for impacts from R2247 EC being shown on all plan sheets. ■ Make sure all labels are properly grey scaled, and are discernable from each other when printed. ■ Place label beside impacts shown from R2247 EC ex. TS (EC). • Bank stabilization should be shown with a "S" callout and noted separately in the impact summary sheet. • If there is no significant realignment of the channel, at inlets and outlets of culverts impacts should be shown as bank stabilization. Site 1 — Beaver Dam Creek (QQQ)