Loading...
HomeMy WebLinkAbout20181638 Ver 1_Addendum to application_20190522Homewood, Sue From: Miller, Alex <Alex.Miller@nexteraenergy.com> Sent: Thursday, May 23, 2019 11:11 AM To: David.E.Bailey2@usace.army.mil Cc: Salvador, Kathy; Higgins, Karen; Homewood, Sue Subject: [External] RE: MVP Southgate Project, NC Joint Permit Application Supplement External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hello Mr. Bailey, To clarify, this is not a revised submittal. The supplement is simply additional information to be considered for jurisdictional determination purposes on the currently proposed route. Thank you for your time, Alex V. Miller Environmental Permitting Lead on behalf of Mountain Valley Pipeline, LLC 713-374-1599 rq MVP SOUI"GATE From: Patti, Heather <HPatti @trccompanies.com> Sent: Wednesday, May 22, 2019 1:39 PM To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil>; Higgins, Karen <karen.higgins@ncdenr.gov> Cc: Walker, Lisa <LWalker@trccompanies.com>; Zimmer, John <JZimmer@trccompanies.com>; Miller, Alex <Alex.Miller@nexteraenergy.com>; Faul, Travis<Travis.Faul@nexteraenergy.com>; Miller, Todd M CIV USARMY CENAO (US) <Todd.M.Miller@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov>; Hamberg, Alexis <Alexis.Ham berg@ nexteraenergy.com> Subject: MVP Southgate Project, NC Joint Permit Application Supplement Hi Dave and Karen, A supplement to the November 2018 MVP Southgate Project Joint Permit Application has been uploaded to the project's Sharepoint site: https://trcextranet.tresolutions.com/sites/CS-KM1/MVP-Southgate- Agency/SitePages/Home.aspx?RootFolder=%2Fsites%2FCS-KM1%2FMVP-Southgate- Agency%2FSha red%20Docu ments%2FMay% 202019%20J PA%20Su pplement&FolderCTI D=Ox012000BB735D23F68CBE43 BOEA67C7FE3D6E6E&View=%7BBCBB181D-F76D-460C-9A9F-7E063BA81F3E%7D The supplementary PDF files are in a folder entitled "May 2019 JPA Supplement". Please let me know if you have any trouble logging in or downloading the files. Thankyou! Heather Patti, PWS Senior Ecologist TIRC5540 Centerview Drive, Suite 100, Raleigh, NC 27606 T: 919-256-6236 F: 919-838-9661 1 C: 262-623-1079 Linkedln I Twitter Blog Flickr www.TRCcompanies.com Please note that our domain name and email addresses have changed P1 MVP SOUTHGATE May 22, 2019 Mr. David Bailey United States Army Corps of Engineers -Wilmington District Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 SAW -2018-00887 Ms. Karen Higgins North Carolina Department of Environmental Quality Division of Water Resources 401 & Buffer Permitting Unit, Wetlands Branch 1617 Mail Service Center Raleigh, North Carolina 27699 -1617 625 Liberty Avenue, Suite 1700 1 Pittsburgh, PA 15222 833 -MV -SOUTH I mail@mvpsouthgate.com www.mvpsouthgate.com RE: MVP Southgate Project, Rockingham and Alamance Counties, North Carolina Addendum to Pre -Construction Notification for Nationwide Permit 12 (SAW -2018-00887) Addendum to Application for Individual 401 Water Quality Certification (DWR# 20181638) Authorization for Buffer Impacts in Jordan Lake Watershed Dear Mr. Bailey and Ms. Higgins: Mountain Valley Pipeline, LLC ("Mountain Valley") is providing an addendum to the Joint Permit Application ("JPA") for the MVP Southgate Project ("Project"). Mountain Valley is proposing to construct and operate the Project to provide timely, cost-effective access to new natural gas supplies to meet the growing needs of natural gas users in the southeastern United States ("U.S."). The Project is a separate project from the 303 -mile Mountain Valley Pipeline that is currently under construction. Subsequent to the initial submittal of the JPA, as well as the application to the Federal Energy Regulatory Commission ("FERC') for a Certificate of Public Convenience and Necessity, in November 2018, Mountain Valley has continued to evaluate the pipeline alignment and submitted a Supplemental Filing to FERC in March of 2019 reflecting modifications incorporated based on FERC review and stakeholder / agency comments. Mountain Valley is now providing this addendum to the JPA which reflects those changes as well as additional biological field surveys along with updated wetland and waterbody impact tables and drawings. In March of 2019, the Southgate Project submitted a Wetland Delineation Addendum to FERC summarizing the second round of field surveys within the North Carolina Project survey area based on additional survey access to identify the presence and delineate the boundaries of wetlands and other waters potentially subject to regulation by the USACE and North Carolina Department of Environmental Quality. In summary, Mountain Valley identified and delineated 17 additional wetlands, 15 extensions of previously delineated wetlands, 2 approximated wetlands, 3 new ponds, 29 new streams and 40 extended streams. Since the submittal of the March 2019 addendum to FERC, additional field surveys have occurred, and the enclosed information reflects the most recent data. As you know, a preliminary jurisdictional determination (PJD) review process is currently ongoing with the USACE- Wilmington District and NC Department of Water Resources to review the delineated resources. To -date, several field visits have occurred with the USACE and NCDWR (in September of 2018) with additional field visits planned for the summer of 2019. In addition to the PJD, Mountain Valley submitted a major variance application to the NCDWR on February 81h, 2019 for non -perpendicular stream crossings within the Jordan Lake Watershed (NC DWR# 20181638). This application is currently under review, and an addendum was submitted to NCDWR reflecting the supplemental information on May 3rd, 2019. Mountain Valley appreciates the opportunity to provide this information in support of its request for the Joint USACE Section 404/NCDEQ Section 401 authorization of the Project pursuant to Nationwide Permit 12. Should you have any additional questions or further information to complete your review of the Project, please do not hesitate to contact Alex Miller at 713-374-1599 or via email at alex.miller(a)nexteraenergy.com or me at 561-691-7054 or via email kathy.salvador(a�nexteraenergy.com. Thank you for your continued consideration. Sincerely, Mountain Valley Pipeline, LLC Kathy Salvador Senior Director, Environmental Services Attachments CC: Todd Miller, Corps, NAO Travis Faul, MVP John Zimmer, TRC Lisa Walker, TRC Heather Patti, TRC MVP SOUTHGATE M Mountain Valley PIPELINE uc May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Table 4-1 Summary of Proposed Wetland Impacts in North Carolina - Updated May 2019 Cowardin Temporary Construction Permanent PFO Converstion Permanent Fill for Access Milepost (MP)/Watershed Classification a/ Number of Affected Resources Pipeline Crossing Length (feet) b/ Workspace Impacts (acres) b/ to PEM/PSS (acres) c/ Road (acre) d/ PEM 55 1,979.17 5.81 0.00 0.00 MP: 26.1-39.7 HUC 8: Upper Dan (03010103) HUC 10: Cascade Creek - PSS 14 153.72 0.31 0.00 0.00 Dan River (0301010309) PFO 22 1,778.91 3.30 1.18 0.00 Subtotal 91 3,911.80 9.42 1.18 0.00 PEM 5 0.00 0.05 0.00 0.00 MP: 39.7 - 48.36 HUC 8: Lower Dan PSS 0 0.00 0.00 0.00 0.00 (03010104) HUC 10: Hogans Creek- PFO 4 136.07 0.25 0.11 0.00 Dan River (0301010401) Subtotal 9 136.07 0.30 0.11 0.00 PEM 9 186.67 0.35 0.00 0.00 MP: 48.36 - 56.12 HUC 8: Haw River PSS 6 56.42 0.18 0.00 0.00 (03030002) HUC 10: Headwaters PFO 5 179.82 0.43 0.12 0.00 Haw River (0303000202) Subtotal 20 422.92 0.96 0.12 0.00 PEM 23 145.85 1.61 0.00 0.00 MP: 56.12 - 73.11 HUC 8: Haw River (03030002) HUC 10: Back Creek -Haw PSS 1 52.16 0.07 0.00 0.00 River (0303000204) PFO 22 1,626.70 2.72 1.12 0.00 Subtotal 46 1,824.71 4.40 1.12 0.00 PEM 92 2,311.69 7.82 0.00 0.00 PSS 21 262.30 0.56 0.00 0.00 Total PFO 53 3,721.50 6.69 2.53 0.00 North Carolina 166 6,295.50 15.07 2.53 0.00 Total a/ Classification of Deepwater Habitats (Ca/ Classification of Wetlands and Deepwater Habitats of the United States (Cowardin, 1979) b/ Construction impacts based on a 75 -foot construction workspace within wetlands. c/ Vegetation cover type change will only occur within PFO wetlands. The maintained area within the permanent easement will be kept in a PEM/PSS cover type. PEM= Palustrine Emergent, PSS=Palustrine Scrub -Shrub, PFO=Palustrine Forested d/ Permanent wetland loss associated with access roads. Where wetlands are identified within permanent access roads, permanent impacts are not anticipated. 1� Mountain Valley PIPELI Updated Table 4-2 Summary of Proposed Waterbody Impacts in North Carolina - Updated May 2019 Milepost (MP)N1latershed Waterbody Type Number of Affected Resources Waterbody Width at Pipeline Crossing (feet) b/ Waterbody Length within Construction Workspace (In feet) c/ MP: 26.1-39.7 HUC 8: Upper Dan (03010103) HUC 10: Cascade Creek- Dan River (0301010309) Ephemeral 14 16.00 1,021.97 Intermittent 21 55.52 1,778.51 Perennial 39 851.69 3,364.39 Pond 1 0.00 30.84 Subtotal 75 923.21 6,195.71 MP: 39.7 - 48.36 HUC 8: Lower Dan (03010104) HUC 10: Hogans Creek- Dan River (0301010401) Ephemeral 6 12.00 389.78 Intermittent 12 14.00 690.92 Perennial 20 272.57 2,093.27 Pond 0 0.00 0.00 Subtotal 38 298.57 3,173.97 MP: 48.36 - 56.12 HUC 8: Haw River (03030002) HUC 10: Headwaters Haw River (0303000202) Ephemeral 3 3.00 115.98 Intermittent 13 16.00 1,121.54 Perennial 19 79.21 1,922.39 Pond 0 0.00 0.00 Subtotal 35 98.21 3,159.91 MP: 56.12-73.11 HUC 8: Haw River (03030002) HUC 10: Back Creek -Haw River (0303000204) Ephemeral 13 16.00 1,075.99 Intermittent 38 97.50 2,900.05 Perennial 43 619.03 3,947.92 Pond 1 31.40 79.07 Subtotal 95 763.93 8,003.03 Total Ephemeral 36 47.00 2,603.73 Intermittent 84 183.02 6,491.01 Perennial 121 1,822.51 11, 327.97 Pond 2 31.40 109.92 May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Permanent Stream Impact (Linear ft) d/ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pond within Construction Workspace (Sq ft) 0.00 0.00 0.00 33.31 33.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,864.08 1,864.08 0.00 0.00 0.00 1,897.39 North Carolina 243 2,083.92 20,532.63 0.00 1,897.39 0.00 Total Permanent Pond Impact (Sq ft) d/ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 a/ Flow based on field evaluations using the NCDWR Stream Identification Form, Version 4.11 for delineated resources. For approximated waterbodies, flow type was estimated based on aerial imagery unless the approximated stream is directly associated with a delineated waterbody in which the approximated waterbody was assigned the same flow type as the associated delineated waterbody. b/ Width of the pond or stream channel (at ordinary high water mark) at the intersection of the pipeline or access road. For estimated waterbodies, aerial imagery was used to estimate the channel width if wide enough to discern, and defaulted to <6 feet if too narrow to be measured using aerial imagery. Approxiamted soil survey streams are defualted to Unknown and are not included. If the crossing width is "0", the waterbody is not crossed by the centerline. c/ Length of the waterbody within the construction workspace. d/ No waterbody loss is proposed in North Carolina. M Mountain Valley PIPELINE uc May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-1 Proposed Impacts by Wetland ID and Type of Impact May 2019 Feature I Wetland e Type Wetland Type Milepost Latitude Longitude Watershed HUC 10 Pipeline Crossing Length (g) Temporary Construction Impacts (acres) Permanent Conversion PFO to PSS/PEM Construction Method H-650 Pipeline W -C18-96 PFO 26.1 36.541688 -79.632557 0301010309 0.00 <0.01 <0.01* Workspace Only W -B18-98 PFO 26.5 36.536541 -79.637494 0301010309 15.04 0.03 0.01* Open -cut W -A18-22 PEM 26.7 36.534583 -79.639012 0301010309 77.33 0.17 0.00 Open -cut W -A18-44 PEM 27.1 36.531343 -79.643646 0301010309 0.00 <0.01 0.00 Workspace Only W -A18-44-2 PEM 27.2 36.529693 -79.644722 0301010309 1,176.72 3.55 0.00 Open -cut W -A18-44 PFO 27.3 36.528099 -79.646143 0301010309 37.93 0.05 0.01* Open -cut W -A19-274 PEM 27.6 36.525575 -79.648779 0301010309 42.02 0.19 0.00 Open -cut W -A19-274-2 PEM 27.6 36.525149 -79.649005 0301010309 38.12 0.04 0.00 Open -cut W -A19-274-3 PEM 27.6 36.525173 -79.649581 0301010309 0.00 0.17 0.00 Workspace Only W -A18-39 PEM 28 36.520859 -79.653331 0301010309 0.00 0.02 0.00 Workspace Only W -A18-26 PEM 28.1 36.519132 -79.654783 0301010309 40.92 0.07 0.00 Open -cut W -A18-30 PEM 28.3 36.517047 -79.656415 0301010309 26.16 0.04 0.00 Open -cut W -A18-30 PFO 28.3 36.516646 -79.656467 0301010309 5.13 0.01 <0.01* Open -cut W -A18-33 PEM 28.3 36.516535 -79.656816 0301010309 0.00 0.01 0.00 Workspace Only W -A18-38 PEM 28.6 36.513291 -79.660161 0301010309 28.83 0.04 0.00 Open -cut W -A18-38 PFO 28.6 36.51324 -79.660042 0301010309 0.00 0.01 0.00* Workspace Only W-1318-48 PFO 29.1 36.508367 -79.665188 0301010309 23.43 0.05 0.02* Open -cut W -B18-48 PEM 29.1 36.508421 -79.665299 0301010309 0.00 0.01 0.00 Workspace Only W -A18-18 PFO 29.8 36.500578 -79.672731 0301010309 934.84 1.87 0.64* Open -cut W -A18-18 PEM 29.9 36.499656 -79.673716 0301010309 49.52 0.07 0.00 Open -cut W-1318-36-5 PEM 30.4 36.494219 -79.679657 0301010309 26.67 0.03 0.00 Workspace Only W -B18-36-6 PEM 30.4 36.494116 -79.679934 0301010309 0.00 <0.01 0.00 Workspace Only W -B18-34 PFO 30.5 36.49309 -79.680105 0301010309 179.81 0.45 0.12* Open -cut W -A18-54 PEM 30.7 36.490849 -79.683335 0301010309 11.24 0.01 0.00 Open -cut W -B18-103 PEM 31.1 36.485665 -79.68523 0301010309 0.00 <0.01 0.00 Workspace Only W -A18-141 PFO 32 36.476993 -79.696049 0301010309 182.61 0.34 0.13* Open -cut W -A18-141 PEM 32 36.477148 -79.696159 0301010309 0.00 0.02 0.00 Workspace Only W -A18-149 PSS 32.2 36.474593 -79.698263 0301010309 51.49 0.07 0.00 Open -cut W -A18-149 PEM 32.2 36.474621 -79.698334 0301010309 52.96 0.16 0.00 Open -cut W -A18-152 PEM 32.6 36.4698 -79.702487 0301010309 21.14 0.06 0.00 Open -cut W -A18-152 PFO 32.6 36.46964 -79.702513 0301010309 29.40 0.03 0.02* Open -cut W -A18-155 PEM 33.1 36.464024 -79.702911 0301010309 0.00 0.06 0.00 Workspace Only W -A18-155 PSS 33.1 36.463768 -79.702847 0301010309 0.00 <0.01 0.00 Workspace Only W -A18-155-2 PSS 33.1 36.463484 -79.702655 0301010309 68.48 0.16 0.00 Open -cut W -A18-222 PFO 33.4 36.459381 -79.700236 0301010309 42.61 0.08 0.03* Open -cut W -A18-222 PEM 33.4 36.459274 -79.700288 0301010309 0.00 <0.01 0.00 Workspace Only W -A18-224 PFO 33.7 36.455977 -79.697766 0301010309 10.58 0.02 0.01* Open -cut W -A18-224 PEM 33.7 36.455931 -79.697819 0301010309 0.00 <0.01 0.00 Workspace Only W -C18-40 PEM 34.6 36.445616 -79.689527 0301010309 0.00 <0.01 0.00 Workspace Only W -A18-95 PEM 37 36.425012 -79.657628 0301010309 7.55 0.02 0.00 Open -cut W -A18-98 PFO 37.2 36.423306 -79.65623 0301010309 0.00 0.01 0.00* Workspace Only W -S18-1 PFO 37.3 36.422114 -79.655108 0301010309 8.34 0.01 0.01* Open -cut W -A18-6 PFO 38.5 36.407396 -79.649469 0301010309 129.65 0.15 0.08* Open -cut W -A18-6-2 PFO 38.5 36.407067 -79.649165 0301010309 0.00 <0.01 0.00* Workspace Only W -A18-6-3 PFO 38.5 36.406781 -79.648669 0301010309 91.73 0.09 0.06* Open -cut W -A18-6 PEM 38.5 36.406695 -79.648415 0301010309 45.87 0.09 0.00 Open -cut W -A18-7 PFO 38.6 36.405557 -79.648122 0301010309 0.00 <0.01 0.00* Workspace Only W -A18-7 PEM 38.6 36.40538 -79.648206 0301010309 75.79 0.18 0.00 Open -cut W -A18-7 PSS 38.6 36.40525 -79.648097 0301010309 33.74 0.08 0.00 Open -cut W -A18-7-2 PEM 38.6 36.405113 -79.648149 0301010309 0.00 <0.01 0.00 Workspace Only W -A18-7-3 PEM 38.7 36.404994 -79.647869 0301010309 16.28 0.05 0.00 Open -cut W -A18-7-4 PEM 38.7 36.404784 -79.647599 0301010309 28.70 0.07 0.00 Open -cut W -A18-7-5 PEM 38.7 36.404414 -79.647238 0301010309 16.09 0.04 0.00 Open -cut W -A19-270 PFO 38.8 36.40362 -79.646599 0301010309 0.00 0.02 <0.01* Workspace Only W-1318-78 PFO 39.7 36.39375 -79.638317 0301010309 55.99 0.06 0.03* Open -cut W -B18-112 PEM 40.1 36.387125 -79.636599 0301010401 0.00 0.01 0.00 Workspace Only W-1318-110 PFO 40.2 36.386777 -79.63634 0301010401 0.00 0.02 0.01* Workspace Only W -B18-55 PEM 41.1 36.378086 -79.625234 0301010401 0.00 <0.01 0.00 Workspace Only W-1318-55 PFO 41.1 36.377936 -79.625312 0301010401 83.65 0.13 0.06* Open -cut W -B18-46 PFO 41.7 36.371464 -79.620671 0301010401 5.85 0.02 0.01* Open -cut W -C18-77 PFO 47 36.305304 -79.587735 0301010401 46.56 0.08 0.03* Open -cut W -B18-139 PFO 48.5 36.290957 -79.572486 0303000202 24.40 0.03 0.02* Open -cut W -A18-62 PSS 48.6 36.288909 -79.571666 0303000202 39.55 0.11 0.00 Open -cut M Mountain Valley PIPELINE uc May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-1 Proposed Impacts by Wetland ID and Type of Impact May 2019 Feature I Wetland e Type Wetland Type Milepost Latitude Longitude Watershed HUC 10 Pipeline Crossing Length (g) Temporary Construction Impacts (acres) Permanent Conversion PFO to PSS/PEM Construction Method W -A18-62-2 PSS 48.6 36.288605 -79.571621 0303000202 0.00 <0.01 0.00 Workspace Only W -A18-61 PEM 48.7 36.288426 -79.571447 0303000202 0.85 0.01 0.00 Workspace Only W -A18-184 PEM 49.9 36.275271 -79.55896 0303000202 56.98 0.12 0.00 Open -cut W -A18-184-2 PEM 49.9 36.274967 -79.558856 0303000202 0.00 0.01 0.00 Workspace Only W -A18-184 PFO 49.9 36.274931 -79.558876 0303000202 0.00 0.02 0.00* Workspace Only W-1318-140 PEM 50.2 36.271313 -79.555966 0303000202 0.00 <0.01 0.00 Workspace Only AW -A19-284 PSS 51.2 36.258422 -79.546585 0303000202 0.00 <0.01 0.00 Workspace Only W -A19-284 PSS 51.2 36.258284 -79.546624 0303000202 16.88 0.03 0.00 Workspace Only W -C18-20 PFO 51.4 36.256448 -79.545371 0303000202 15.54 0.05 0.02* Open -cut W -C18-20 PEM 51.4 36.256395 -79.545178 0303000202 54.70 0.08 0.00 Open -cut W -A18-83 PEM 53.3 36.23401 -79.529164 0303000202 26.09 0.06 0.00 Open -cut W -A18-85 PEM 53.6 36.230085 -79.527424 0303000202 8.98 0.03 0.00 Open -cut W -A18-85 PSS 53.7 36.230004 -79.527419 0303000202 0.00 0.04 0.00 Workspace Only W -A18-85-2 PEM 53.7 36.229981 -79.52711 0303000202 0.00 <0.01 0.00 Workspace Only W -C18-67 PFO 54.3 36.221387 -79.521613 0303000202 102.88 0.26 0.07* Open -cut W -C18-69 PFO 55.3 36.209331 -79.51679 0303000202 37.01 0.07 0.03* Open -cut W-1318-60 PSS 55.3 36.208809 -79.515957 0303000202 0.00 <0.01 0.00 Workspace Only W-1318-61 PEM 55.5 36.20826 -79.512175 0303000202 39.07 0.06 0.00 Open -cut W -A18-119 PFO 56.4 36.19942 -79.500733 0303000204 95.35 0.11 0.06* Open -cut W -A18-119 PEM 56.4 36.199328 -79.500803 0303000204 0.00 0.06 0.00 Workspace Only W -A18-119-2 PFO 56.5 36.198118 -79.499222 0303000204 297.23 0.47 0.21* Open -cut W -A18-119-2 PEM 56.5 36.198372 -79.499667 0303000204 0.00 0.06 0.00 Workspace Only W -A18-127 PEM 56.6 36.197454 -79.498675 0303000204 0.00 0.02 0.00 Workspace Only W -A18-127 PFO 56.6 36.196999 -79.498416 0303000204 61.32 0.07 0.04* Open -cut W -A18-127-2 PEM 56.6 36.19697 -79.498533 0303000204 0.00 0.02 0.00 Workspace Only W -A18-130 PEM 56.8 36.19409 -79.497683 0303000204 0.00 0.01 0.00 Workspace Only W -A18-130 PFO 56.9 36.193874 -79.497418 0303000204 17.04 0.09 0.03* Open -cut W -A18-133 PFO 57.1 36.191046 -79.496608 0303000204 56.05 0.10 0.04* Open -cut W -A18-133 PEM 57.1 36.190868 -79.496659 0303000204 0.00 0.02 0.00 Workspace Only W -A18-133-2 PEM 57.1 36.190481 -79.49655 0303000204 0.00 0.01 0.00 Workspace Only W -A18-135 PFO 57.2 36.189488 -79.496096 0303000204 145.79 0.20 0.10* Open -cut W -A18-135 PEM 57.2 36.189625 -79.49626 0303000204 0.00 0.02 0.00 Workspace Only W -A18-254 PFO 57.6 36.184749 -79.493161 0303000204 151.62 0.22 0.10* Open -cut W -C18-3 PEM 57.8 36.181163 -79.494328 0303000204 13.05 0.04 0.00 Open -cut W -C18-3 PFO 57.9 36.181041 -79.494472 0303000204 0.00 <0.01 0.00* Workspace Only W -C18-3-2 PEM 57.9 36.180874 -79.494341 0303000204 12.60 0.02 0.00 Open -cut W -C18-3-2 PFO 57.9 36.180844 -79.494345 0303000204 7.57 0.01 0.01* Open -cut W -C18-5 PSS 58 36.178724 -79.493947 0303000204 52.16 0.07 0.00 Open -cut W -C18-5 PEM 58 36.178665 -79.494059 0303000204 0.00 0.03 0.00 Workspace Only W -C18-29 PFO 60.8 36.160629 -79.454215 0303000204 317.38 0.55 0.21* Open -cut W -A18-79 PFO 61.8 36.156382 -79.439241 0303000204 0.00 <0.01 0.00* Workspace Only W -A18-73 PFO 62.5 36.150406 -79.430217 0303000204 0.00 <0.01 <0.01* Workspace Only W -A18-74 PFO 62.5 36.149929 -79.429316 0303000204 8.41 0.01 0.01* Open -cut W -A18-80 PEM 62.7 36.149688 -79.426785 0303000204 63.68 0.09 0.00 Open -cut W-1318-32 PEM 62.9 36.148216 -79.423966 0303000204 0.00 <0.01 0.00 Workspace Only W-1318-28 PFO 63.1 36.147383 -79.420695 0303000204 313.50 0.50 0.21* Open -cut AW -1318-19 PFO 63.8 36.146437 -79.407138 0303000204 49.89 0.08 0.03* Open -cut W -A19-320 PEM 65.ORR 36.145863 -79.387233 0303000204 0.00 0.03 0.00 Workspace Only W -A19-326 PFO 65.1 RR 36.145383 -79.384036 0303000204 5.51 0.02 0.01* Open -cut W -A19-323 PEM 65.3RR 36.144017 -79.383002 0303000204 0.00 0.33 0.00 Workspace Only W-1319-168 PEM 65.6 36.139849 -79.381373 0303000204 0.00 0.28 0.00 Workspace Only W-1319-164 PFO 66.6 36.130739 -79.369009 0303000204 8.26 0.03 0.01* Open -cut AW -1319-164 PFO 66.6 36.130669 -79.368993 0303000204 32.24 0.07 0.02* Open -cut W-1318-5 PFO 68.4 36.106095 -79.371151 0303000204 15.68 0.02 0.01* Workspace Only W-1319-146 PFO 69.7 36.091034 -79.362321 0303000204 0.00 0.11 0.00* Workspace Only W-1319-173 PEM 69.8 36.089334 -79.362724 0303000204 0.00 0.13 0.00 Workspace Only W -A18-67 PFO 71.8 36.062807 -79.361499 0303000204 0.00 <0.01 0.00* Open -cut W -A18-67-2 PFO 71.8 36.062821 1 -79.361357 1 0303000204 1 43.87 0.04 0.03* 1 Workspace Only W -A18-208 PEM 72.2 36.056285 -79.364482 0303000204 0.00 <0.01 0.00 Workspace Only W-1319-151 PEM 73 36.046734 -79.366401 0303000204 0.00 0.15 0.00 Workspace Only W -A18-111 PEM 73 36.046225 -79.365967 0303000204 56.52 0.25 0.00 Open -cut W-1319-151-3 PEM 73 36.046408 -79.366515 0303000204 0.00 0.04 0.00 Workspace Only H-650 Pipeline - HDD W-1318-39 I PEM 30.2 36.496101 -79.677639 0301010309 24.63 <0.01 0.00 HDD rl Mountain Valley PIPELINE uc May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-1 Proposed Impacts by Wetland ID and Type of Impact May 2019 Feature I Wetland e Wetland Type Type Milepost Latitude Longitude Pipeline Crossing Watershed HUC 10 Length (ft) Temporary Construction Impacts (acres) Permanent Conversion PFO to PSS/PEM Construction Method W -B18-39-2 PEM 30.2 36.495973 -79.677734 0301010309 40.47 <0.01 0.00 HDD W-1318-39-3 PEM 30.2 36.495819 -79.677892 0301010309 29.86 <0.01 0.00 HDD W -B18-39-4 PEM 30.2 36.49571 -79.678008 0301010309 31.56 <0.01 0.00 HDD W-1318-36 PEM 30.2 36.495507 -79.678228 0301010309 36.44 <0.01 0.00 HDD W -B18-36-2 PEM 30.3 36.495364 -79.678402 0301010309 16.34 <0.01 0.00 HDD W-1318-36 PFO 30.3 36.495171 -79.678559 0301010309 31.83 0.01 0.00' HDD W -B18-36-3 PEM 30.3 36.494746 -79.679118 0301010309 17.92 <0.01 0.00 HDD W-1318-36-4 PEM 30.4 36.49434 -79.679615 0301010309 0.00 <0.01 0.00 HDD Meter Stations W -A18-39-2 PEM 28 36.520902 -79.653396 0301010309 0.00 <0.01 0.00 Workspace Only W -B18-36-7 PEM 30.3 36.495345 -79.680027 0301010309 0.00 0.47 0.00 Workspace Only AW -B18-36 PEM 30.3 36.495217 -79.679527 0301010309 0.00 <0.01 0.00 Workspace Only W -B18-36-8 PEM 30.3 36.495739 -79.680659 0301010309 0.00 <0.01 0.00 Workspace Only W -B18-36-9 PEM 30.4 36.494389 -79.679702 0301010309 0.00 0.05 0.00 Workspace Only W -B18-36-10 PEM 30.4 36.494208 -79.679948 0301010309 0.00 0.01 0.00 Workspace Only W-1318-36-11 I PEM 30.4 36.494116 -79.679626 0301010309 0.00 <0.01 0.00 Workspace Only Cathodic Protection Ground Bed W -A19-277 1 PEM 41.8 36.368744 -79.621619 0301010401 0.00 0.02 0.00 Workspace Only Permanent Access Roads W -A19-280 PEM 28.7 36.519196 -79.669802 0301010309 0.00 0.01 0.00 Workspace Only W -A19-280-2 PEM 28.7 36.519109 -79.670171 0301010309 0.00 0.02 0.00 Workspace Only W-1318-34-2 PFO 30.5 36.493242 -79.680406 0301010309 0.00 <0.01 <0.01' Workspace Only W -B18-43 PEM 41.8 36.369693 -79.619872 0301010401 0.00 <0.01 0.00 Workspace Only W -B18-43-2 PEM 41.8 36.36968 -79.619791 0301010401 0.00 0.02 0.00 Workspace Only Temporary Access Roads W -B18-97 PEM 26.1 36.540307 -79.631871 0301010309 0.00 0.01 0.00 Workspace Only W -A18-44-3 PEM 27.1 36.530142 -79.643957 0301010309 0.00 <0.01 0.00 Workspace Only W -A18-44-4 PEM 27.1 36.530021 -79.64359 0301010309 0.00 0.01 0.00 Workspace Only W -A18-44-5 PEM 27.1 36.529953 -79.642381 0301010309 0.00 <0.01 0.00 Workspace Only W -A19-282 PSS 27.4 36.528321 -79.649727 0301010309 0.00 <0.01 0.00 Workspace Only W -A19-282-2 PSS 27.4 36.528259 -79.649711 0301010309 0.00 <0.01 0.00 Workspace Only W -A19-282-3 PSS 27.5 36.528172 -79.650336 0301010309 0.00 <0.01 0.00 Workspace Only W -A19-282-4 PSS 27.5 36.528114 -79.650316 0301010309 0.00 <0.01 0.00 Workspace Only W -A19-282-5 PSS 27.5 36.528097 -79.650639 0301010309 0.00 <0.01 0.00 Workspace Only W -A19-282-6 PSS 27.5 36.528043 -79.650594 0301010309 0.00 <0.01 0.00 Workspace Only W -A19-282-7 PSS 27.5 36.528014 -79.651025 0301010309 0.00 <0.01 0.00 Workspace Only W -A19-282-8 PSS 27.5 36.527936 -79.651075 0301010309 0.00 <0.01 0.00 Workspace Only W -A19-282-9 PSS 27.5 36.527959 -79.651484 0301010309 0.00 <0.01 0.00 Workspace Only AW -A19-282 PSS 27.5 36.527975 -79.651456 0301010309 0.00 <0.01 0.00 Workspace Only W -A19-282 PEM 27.5 36.529178 -79.651731 0301010309 0.00 0.01 0.00 Workspace Only W -A18-39-3 PEM 28.1 36.519849 -79.654743 0301010309 0.00 <0.01 0.00 Workspace Only W -A18-39-4 PEM 27.9 36.522214 -79.654436 0301010309 0.00 0.01 0.00 Workspace Only W -A18-75 PEM 62.5 36.150767 -79.429736 0303000204 0.00 0.01 0.00 Workspace Only W -A18-75-2 PEM 62.5 36.150788 -79.429667 0303000204 0.00 0.01 0.00 Workspace Only a/ Classification of Deepwater Habitats (Ca/ Classification of Wetlands and Deepwater Habitats of the United States (Cowardin, 1979) b/ Construction impacts based on a 75 -foot construction workspace within wetlands. c/ Vegetation cover type change will only occur within PFO wetlands. The maintained area within the permanent easement will be kept Shrub; PFO=Palustrine Forested. in a PEM/PSS cover type. PEM= Palustrine Emergent; PSS=Palustrine Scrub - Mountain Valley PIPELI May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-2 Proposed Impacts by Waterbody ID and Type of Impact May 2019 Feature ID Milepost Waterbody Name Waterbody Type Latitude Longitude Watershed HUC 10 Pipeline Crossing Length (ft) Temporary Construction Impacts - Streams (In ft) Permanent Stream Impact (In ft) Construction Method H-650 Pipeline S -B18-99 26.5 Trib. To Cascade Creek Intermittent 36.536539 -79.637489 0301010309 1.00 88.74 0.00 Open Cut- Dam and pump, Flume S -A18-42 27.3 Trib. To Cascade Creek Intermittent 36.527984 -79.646186 0301010309 20.52 95.70 0.00 Open Cut- Dam and pump, Flume S -A18-40 27.5 Cascade Creek Perennial 36.526022 -79.648104 0301010309 108.54 106.03 0.00 Conventional Bore S -A19-273 27.5 Dry Creek Perennial 36.52591 -79.648314 0301010309 28.95 50.45 0.00 Open Cut- Dam and pump, Flume S -A18-31 28.3 Trib. To Dan River Intermittent 36.516791 -79.656437 0301010309 0.00 23.68 0.00 N/A S -A18-34 28.4 Trib. To Dan River Intermittent 36.516213 -79.656865 0301010309 0.00 17.75 0.00 N/A S -A18-32 28.4 Trib. To Dan River Perennial 36.516252 -79.656963 0301010309 6.60 87.10 0.00 Open Cut- Dam and pump, Flume S -A18-36 28.4 Trib. To Dan River Perennial 36.51547 -79.657626 0301010309 0.00 73.50 0.00 N/A S -A18-37 28.6 Trib. To Dan River Perennial 36.513228 -79.660059 0301010309 0.00 19.36 0.00 N/A S -B18-49 28.8 Trib. To Dan River Perennial 36.511358 -79.662142 0301010309 3.00 79.65 0.00 Open Cut- Dam and pump, Flume S -B18-47 29.1 Trib. To Dan River Ephemeral 36.508401 -79.665234 0301010309 1.00 70.90 0.00 Open Cut- Dam and pump, Flume S -A18-160 29.3RR Tnb. To Dan River Ephemeral 36.505396 -79.66757 0301010309 0.00 31.84 0.00 N/A S -A18-47 29.6 Trib. To Dan River Perennial 36.502865 -79.670501 0301010309 3.00 85.45 0.00 Open Cut- Dam and pump, Flume S -B18-104 30.8 Trib. To Rock Creek Perennial 36.488765 -79.683931 0301010309 3.00 81.43 0.00 Open Cut- Dam and pump, Flume S -B19-153 30.9 Trib. To Rock Creek Intermittent 36.487872 -79.684067 0301010309 2.00 76.46 0.00 Open Cut- Dam and pump, Flume S -B18-105 31.1 Trib. To Rock Creek Intermittent 36.485991 -79.68454 0301010309 1.00 79.26 0.00 Open Cut- Dam and pump, Flume S -B18-102 31.1 Trib. To Rock Creek Perennial 36.485605 -79.685131 0301010309 2.00 82.33 0.00 Open Cut- Dam and pump, Flume S -B18-95 31.3 Rock Creek Perennial 36.483373 -79.686713 0301010309 28.34 76.02 0.00 Open Cut- Dam and pump, Flume S -A18-143 31.9 Trib. To Machine Creek Intermittent 36.478398 -79.694914 0301010309 2.00 150.89 0.00 Open Cut- Dam and pump, Flume S -A18-140 31.9 Trib. To Machine Creek Perennial 36.477695 -79.695546 0301010309 4.00 201.59 0.00 Open Cut- Dam and pump, Flume S -A18-144 32 Trib. To Machine Creek Intermittent 36.477286 -79.695799 0301010309 2.00 102.21 0.00 Open Cut- Dam and pump, Flume S -A18-140-2 32 Trib. To Machine Creek Perennial 36.476929 -79.696134 0301010309 4.00 100.95 0.00 Open Cut- Dam and pump, Flume S -A18-148 32.1 Trib. To Machine Creek Ephemeral 36.475536 -79.697258 0301010309 0.00 110.76 0.00 N/A S -A18-147 32.2 Machine Creek Perennial 36.475033 -79.697892 0301010309 102.60 184.89 0.00 Open Cut- Dam and pump, Flume S -A18-150 32.5 Trib. To Town Creek Ephemeral 36.471383 -79.700955 0301010309 2.00 100.59 0.00 Open Cut- Dam and pump, Flume S -A18-153 32.6 Trib. To Town Creek Intermittent 36.469633 -79.702555 0301010309 2.00 113.52 0.00 Open Cut- Dam and pump, Flume S -A18-151 32.7 Town Creek Perennial 36.469434 -79.702789 0301010309 55.39 117.65 0.00 Open Cut- Dam and pump, Flume S -A18-151-2 33 Town Creek Perennial 36.465271 -79.703248 0301010309 47.92 84.66 0.00 Open Cut- Dam and pump, Flume S -A18-154 33 Trib. To Town Creek Intermittent 36.465094 -79.703075 0301010309 0.00 43.14 0.00 N/A S -A18-154-2 33 Trib. To Town Creek Intermittent 36.464931 -79.703061 0301010309 2.00 128.68 0.00 Open Cut- Dam and pump, Flume S -A18-154-3 33 Trib. To Town Creek Intermittent 36.464799 -79.702976 0301010309 0.00 14.04 0.00 N/A S -A18-220 33.3 Trib. To Town Creek Ephemeral 36.461329 -79.701621 0301010309 3.00 60.06 0.00 Open Cut- Dam and pump, Flume S -A18-221 33.3 Trib. To Town Creek Perennial 36.460709 -79.701207 0301010309 4.00 80.68 0.00 Open Cut- Dam and pump, Flume 1� Mountain Valley PIPELI May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-2 Proposed Impacts by Waterbody ID and Type of Impact May 2019 Feature ID Milepost Waterbody Name Waterbody Type Latitude Longitude Watershed HUC 10 Pipeline Crossing Length (ft) Temporary Construction Impacts - Streams (In ft) Permanent Stream Impact (In ft) Construction Method S -C18-52 33.4 Trib. To Town Creek Intermittent 36.459368 -79.700165 0301010309 5.00 71.88 0.00 Open Cut- Dam and pump, Flume S -C18-51 33.5 Trib. To Town Creek Intermittent 36.458243 -79.699369 0301010309 4.00 87.10 0.00 Open Cut- Dam and pump, Flume S -A18-223 33.7 Trib. To Town Creek Intermittent 36.456022 -79.697744 0301010309 4.00 81.07 0.00 Open Cut- Dam and pump, Flume S -A18-225 33.7 Trib. To Town Creek Perennial 36.455521 -79.697347 0301010309 5.00 102.37 0.00 Open Cut- Dam and pump, Flume S -C18-49 33.9 Trib. To Town Creek Intermittent 36.453061 -79.695572 0301010309 4.00 87.01 0.00 Open Cut- Dam and pump, Flume S -C18-48 34 Trib. To Town Creek Ephemeral 36.451822 -79.694401 0301010309 0.00 1.70 0.00 N/A S -C18-38 34.2RR Trib. To Town Creek Perennial 36.449557 -79.693228 0301010309 32.88 82.18 0.00 Open Cut- Dam and pump, Flume S -C18-39 34.5 Trib. To Town Creek Ephemeral 36.445668 -79.689734 0301010309 2.00 107.50 0.00 Open Cut- Dam and pump, Flume S -C18-38-2 34.6 Trib. To Town Creek Perennial 36.444718 -79.688704 0301010309 16.74 333.02 0.00 Open Cut- Dam and pump, Flume S -C18-53 34.7 Trib. To Town Creek Intermittent 36.44428 -79.688347 0301010309 2.00 214.88 0.00 Open Cut- Dam and pump, Flume S -C18-38-3 34.8 Trib. To Town Creek Perennial 36.442885 -79.686924 0301010309 23.31 87.35 0.00 Open Cut- Dam and pump, Flume S -C18-74 34.8 Trib. To Town Creek Ephemeral 36.442723 -79.686773 0301010309 3.00 71.55 0.00 Open Cut- Dam and pump, Flume S -C18-38-4 35 Trib. To Town Creek Perennial 36.44081 -79.68451 0301010309 7.50 60.14 0.00 Open Cut- Dam and pump, Flume S -C18-57 35.1 Trib. To Town Creek Intermittent 36.439586 -79.682695 0301010309 2.00 84.49 0.00 Open Cut- Dam and pump, Flume S -C18-35 36 Trib. To Town Creek Perennial 36.433264 -79.670869 0301010309 9.94 72.87 0.00 Open Cut- Dam and pump, Flume S -A18-94 37 Trib. To Wolf Island Creek Perennial 36.425044 -79.657717 0301010309 3.00 125.00 0.00 Open Cut- Dam and pump, Flume S -A18-97 37.2 Trib. To Wolf Island Creek Perennial 36.423293 -79.656083 0301010309 3.00 86.64 0.00 Open Cut- Dam and pump, Flume S -A18-101 37.3 Trib. To Wolf Island Creek Perennial 36.42209 -79.655133 0301010309 2.00 83.86 0.00 Open Cut- Dam and pump, Flume S -B19-157 37.6 Trib. To Wolf Island Creek Perennial 36.418238 -79.651901 0301010309 3.00 79.69 0.00 Open Cut- Dam and pump, Flume AS -B18-117 37.7 Trib. To Wolf Island Creek Perennial 36.416265 -79.65082 0301010309 12.08 75.58 0.00 Open Cut- Dam and pump, Flume S -A18-2 38.2 Trib. To Wolf Island Creek Perennial 36.410622 -79.650775 0301010309 20.49 86.73 0.00 Open Cut- Dam and pump, Flume S -A18-9 38.4 Trib. To Wolf Island Creek Perennial 36.407871 -79.649861 0301010309 3.00 122.40 0.00 Open Cut- Dam and pump, Flume S -A18-4 38.5 Trib. To Wolf Island Creek Perennial 36.407314 -79.649133 0301010309 0.00 26.78 0.00 N/A S -A18-4-2 38.5 Trib. To Wolf Island Creek Perennial 36.407118 -79.648874 0301010309 0.00 41.47 0.00 N/A S -A18-8 38.8 Wolf Island Creek Perennial 36.403928 -79.646811 0301010309 53.13 97.69 0.00 Conventional Bore S -A19-269 38.8 Trib. To Wolf Island Creek Intermittent 36.403781 -79.64669 0301010309 2.00 103.50 0.00 Open Cut- Dam and pump, Flume S -B18-72 39 Trib. To Wolf Island Creek Ephemeral 36.402381 -79.64372 0301010309 2.00 81.32 0.00 Open Cut- Dam and pump, Flume S -B18-73 39.1 Trib. To Wolf Island Creek Ephemeral 36.401434 -79.643287 0301010309 0.00 7.59 0.00 N/A S -B18-74 39.1 Trib. To Wolf Island Creek Perennial 36.400716 -79.643007 0301010309 4.00 86.09 0.00 Open Cut- Dam and pump, Flume S -B18-74-2 39.6 Trib. To Wolf Island Creek Perennial 36.393964 -79.638293 0301010309 4.00 88.97 0.00 Open Cut- Dam and pump, Flume S -B18-108 40.2 Trib. To Lick Fork Perennial 36.386944 -79.636394 0301010401 26.88 80.36 0.00 Open Cut- Dam and pump, Flume S -B18-109 40.2 Trib. To Lick Fork Ephemeral 36.386891 -79.636289 0301010401 3.00 37.28 0.00 Open Cut- Dam and pump, Flume S -A18-210 40.4 Trib. To Lick Fork Intermittent 36.384175 -79.63296 0301010401 0.00 38.09 0.00 N/A 1� Mountain Valley PIPELI May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-2 Proposed Impacts by Waterbody ID and Type of Impact May 2019 Feature ID Milepost Waterbody Name Waterbody Type Latitude Longitude Watershed HUC 10 Pipeline Crossing Length (ft) Temporary Construction Impacts - Streams (In ft) Permanent Stream Impact (In ft) Construction Method S -A18-210-2 40.4 Trib. To Lick Fork Intermittent 36.38418 -79.632786 0301010401 2.00 60.94 0.00 Open Cut- Dam and pump, Flume S -B18-51 40.6 Trib. To Lick Fork Perennial 36.383717 -79.630887 0301010401 4.00 76.85 0.00 Open Cut- Dam and pump, Flume S -B18-52 40.7 Trib. To Lick Fork Perennial 36.382694 -79.628502 0301010401 4.00 97.09 0.00 Open Cut- Dam and pump, Flume S -B18-57 41.1 Trib. To Lick Fork Perennial 36.377703 -79.625129 0301010401 2.00 85.96 0.00 Open Cut- Dam and pump, Flume S -B18-56 41.2 Lick Fork Perennial 36.377551 -79.625037 0301010401 39.06 82.67 0.00 Open Cut- Dam and pump, Flume S -A18-171 41.2 Trib. To Lick Fork Intermittent 36.377448 -79.624979 0301010401 2.00 79.02 0.00 Open Cut- Dam and pump, Flume AS -B18-44 41.6 Trib. To Lick Fork Intermittent 36.371801 -79.621785 0301010401 0.00 57.90 0.00 N/A S -B18-45 41.7 Trib. To Lick Fork Ephemeral 36.371466 -79.62065 0301010401 0.00 34.47 0.00 N/A S -B18-44 41.7 Trib. To Lick Fork Intermittent 36.371445 -79.620603 0301010401 3.00 80.28 0.00 Open Cut- Dam and pump, Flume S -B18-41 41.8 Trib. To Lick Fork Perennial 36.369436 -79.620609 0301010401 19.47 83.90 0.00 Open Cut- Dam and pump, Flume S -B18-89 42.3 Trib. To Jones Creek Ephemeral 36.365523 -79.614749 0301010401 1.00 77.82 0.00 Open Cut- Dam and pump, Flume S -A18-256 42.9 Trib. To Jones Creek Intermittent 36.357068 -79.613617 0301010401 2.00 85.39 0.00 Open Cut- Dam and pump, Flume S -B18-92 43.1 Trib. To Jones Creek Perennial 36.354763 -79.611735 0301010401 12.04 128.10 0.00 Open Cut- Dam and pump, Flume S -A18-176 43.3 Jones Creek Perennial 36.352122 -79.610979 0301010401 25.85 88.63 0.00 Open Cut- Dam and pump, Flume S -A18-181 43.3 Trib. To Jones Creek Perennial 36.351797 -79.61089 0301010401 2.00 111.80 0.00 Open Cut- Dam and pump, Flume S -C18-80 43.7 Trib. To Jones Creek Perennial 36.34734 -79.606823 0301010401 4.00 77.19 0.00 Open Cut- Dam and pump, Flume S -A18-105 43.7 Trib. To Jones Creek Perennial 36.347164 -79.606666 0301010401 53.47 181.80 0.00 Open Cut- Dam and pump, Flume S -C18-25 44.1 Trib. To Jones Creek Perennial 36.342508 -79.605795 0301010401 4.00 85.27 0.00 Open Cut- Dam and pump, Flume S -A18-102 44.1 Trib. To Jones Creek Perennial 36.341526 -79.605701 0301010401 3.00 112.45 0.00 Open Cut- Dam and pump, Flume S -A18-226 44.4 Trib. To Jones Creek Ephemeral 36.338067 -79.603947 0301010401 3.00 78.69 0.00 Open Cut- Dam and pump, Flume S -A18-228 44.5 Trib. To Jones Creek Ephemeral 36.336045 -79.60292 0301010401 5.00 90.63 0.00 Open Cut- Dam and pump, Flume S -A18-213 45.7 Trib. To Hogans Creek Intermittent 36.322151 -79.594083 0301010401 0.00 99.31 0.00 Open Cut- Dam and pump, Flume S -B18-71 45.7 Trib. To Hogans Creek Perennial 36.321842 -79.593981 0301010401 22.88 97.13 0.00 Open Cut- Dam and pump, Flume S -B18-68 45.8 Trib. To Hogans Creek Perennial 36.320378 -79.593663 0301010401 3.00 96.18 0.00 Open Cut- Dam and pump, Flume S -A18-231 46.4 Trib. To Hogans Creek Ephemeral 36.313276 -79.589363 0301010401 0.00 70.89 0.00 N/A S -A18-235 46.5 Trib. To Hogans Creek Perennial 36.312488 -79.589461 0301010401 3.00 105.64 0.00 Open Cut- Dam and pump, Flume S -A18-234 46.5 Trib. To Hogans Creek Intermittent 36.312334 -79.589534 0301010401 2.00 120.56 0.00 Open Cut- Dam and pump, Flume S -C18-76 47 Hogans Creek Perennial 36.305688 -79.587967 0301010401 18.81 81.01 0.00 Open Cut- Dam and pump, Flume S -C18-79 47.4 Trib. To Hogans Creek Perennial 36.300793 -79.585578 0301010401 4.00 216.49 0.00 Open Cut- Dam and pump, Flume S -A18-90 47.6 Trib. To Hogans Creek Perennial 36.299431 -79.583033 0301010401 2.00 102.96 0.00 Open Cut- Dam and pump, Flume S -B19-167 47.7 Trib. To Hogans Creek Intermittent 36.297594 -79.581347 0301010401 3.00 50.11 0.00 Open Cut- Dam and pump, Flume S -A18-242 47.7 Trib. To Hogans Creek Perennial 36.297588 -79.581258 0301010401 19.10 101.79 0.00 Open Cut- Dam and pump, Flume S -A18-60 48.7 Giles Creek Perennial 36.28843 -79.571456 0303000202 4.00 87.80 0.00 Open Cut- Dam and pump, Flume 1� Mountain Valley PIPELI May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-2 Proposed Impacts by Waterbody ID and Type of Impact May 2019 Feature ID Milepost Waterbody Name Waterbody Type Latitude Longitude Watershed HUC 10 Pipeline Crossing Length (ft) Temporary Construction Impacts - Streams (In ft) Permanent Stream Impact (In ft) Construction Method S -A18-55 49.3 Trib. To Giles Creek Perennial 36.282886 -79.563744 0303000202 3.00 79.71 0.00 Open Cut- Dam and pump, Flume S -A18-183 49.9 Trib. To Haw River Perennial 36.27532 -79.559043 0303000202 4.00 115.11 0.00 Open Cut- Dam and pump, Flume S -A18-185 49.9 Trib. To Haw River Intermittent 36.275063 -79.55899 0303000202 0.00 7.63 0.00 N/A S -A18-182 / S -A18-18 49.9 Trib. To Haw River Intermittent 36.274516 -79.558465 0303000202 1.00 81.31 0.00 Open Cut- Dam and pump, Flume S -A18-244 50.2 Trib. To Haw River Perennial 36.271284 -79.556128 0303000202 3.00 49.43 0.00 Open Cut- Dam and pump, Flume SS-SOIL18-02 50.5 Trib. To Haw River Perennial 36.267634 -79.553571 0303000202 < 6 ft (Unknown) 178.61 0.00 Open Cut- Dam and pump, Flume S -A19-289 50.7 Trib. To Haw River Intermittent 36.264566 -79.551301 0303000202 3.00 233.23 0.00 Open Cut- Dam and pump, Flume S -A19-286 50.8 Trib. To Haw River Perennial 36.26425 -79.550994 0303000202 21.36 97.26 0.00 Open Cut- Dam and pump, Flume S -A19-285 51.2 Trib. To Haw River Intermittent 36.258287 -79.546617 0303000202 2.00 117.25 0.00 Open Cut- Dam and pump, Flume S -C18-22 51.2 Trib. To Haw River Ephemeral 36.258192 -79.546542 0303000202 3.00 67.71 0.00 Open Cut- Dam and pump, Flume S -C18-21 51.4 Trib. To Haw River Perennial 36.256565 -79.545346 0303000202 7.00 75.28 0.00 Open Cut- Dam and pump, Flume S -C18-15 52.1 Trib. To Haw River Intermittent 36.247736 -79.539102 0303000202 3.00 359.88 0.00 Open Cut- Dam and pump, Flume S -A18-217 52.1 Trib. To Haw River Intermittent 36.247838 -79.539125 0303000202 0.00 15.11 0.00 N/A S -A18-219 52.4 Trib. To Haw River Perennial 36.243988 -79.536284 0303000202 4.85 72.69 0.00 Open Cut- Dam and pump, Flume SS-USGS19-01 52.5 Trib. To Haw River Perennial 36.243215 -79.534637 0303000202 < 6 ft (Unknown) 101.97 0.00 Open Cut- Dam and pump, Flume S -B18-94 52.7 Trib. To Haw River Perennial 36.241697 -79.530936 0303000202 4.00 123.51 0.00 Open Cut- Dam and pump, Flume S -A18-84 53.7 Trib. To Haw River Perennial 36.229893 -79.527187 0303000202 4.00 83.67 0.00 Open Cut- Dam and pump, Flume S -A18-87 53.7 Trib. To Haw River Perennial 36.229072 -79.526605 0303000202 5.00 172.22 0.00 Open Cut- Dam and pump, Flume S -A18-89 54 Trib. To Haw River Intermittent 36.225888 -79.524627 0303000202 0.00 58.46 0.00 N/A S -C18-63 54.5 Trib. To Haw River Perennial 36.219428 -79.520167 0303000202 4.00 144.73 0.00 Open Cut- Dam and pump, Flume S -C18-62 54.6 Trib. To Haw River Perennial 36.217766 -79.519092 0303000202 4.00 118.07 0.00 Open Cut- Dam and pump, Flume S -C18-60 54.9 Trib. To Haw River Intermittent 36.214322 -79.516736 0303000202 4.00 82.19 0.00 Open Cut- Dam and pump, Flume S -B18-143 54.9 Trib. To Haw River Ephemeral 36.213707 -79.516255 0303000202 0.00 46.22 0.00 N/A S -B18-142 54.9 Trib. To Haw River Intermittent 36.213587 -79.516285 0303000202 1.00 53.38 0.00 Open Cut- Dam and pump, Flume S -C18-61 54.9 Trib. To Haw River Intermittent 36.213546 -79.516288 0303000202 2.00 47.49 0.00 Open Cut- Dam and pump, Flume S -C18-68 55.2 Trib. To Haw River Perennial 36.209694 -79.516783 0303000202 5.00 77.68 0.00 Open Cut- Dam and pump, Flume S -B18-59 55.3 Trib. To Haw River Perennial 36.209278 -79.516806 0303000202 3.00 158.00 0.00 Open Cut- Dam and pump, Flume S -B18-59-2 55.3 Trib. To Haw River Perennial 36.208956 -79.516248 0303000202 3.00 113.70 0.00 Open Cut- Dam and pump, Flume S -B18-59-3 55.3 Trib. To Haw River Perennial 36.208832 -79.516026 0303000202 0.00 47.72 0.00 N/A SS-SOIL18-05 55.8 Trib. To Haw River Perennial 36.20558 -79.508162 0303000204 < 6 ft (Unknown) 101.82 0.00 Open Cut- Dam and pump, Flume S -B18-65 56.4 Trib. To Haw River Intermittent 36.199421 -79.500794 0303000204 2.00 79.71 0.00 Open Cut- Dam and pump, Flume S -A18-120 56.4 Trib. To Haw River Perennial 36.199325 -79.500686 0303000204 2.00 95.17 0.00 Open Cut- Dam and pump, Flume WB -A18-121 56.5 Trib. To Haw River Pond 36.198697 -79.49982 0303000204 31.40 79.07 0.00 Open Cut- Dam and pump, Flume 1� Mountain Valley PIPELI May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-2 Proposed Impacts by Waterbody ID and Type of Impact May 2019 Feature ID Milepost Waterbody Name Waterbody Type Latitude Longitude Watershed HUC 10 Pipeline Crossing Length (ft) Temporary Construction Impacts - Streams (In ft) Permanent Stream Impact (In ft) Construction Method S -A18-125 56.5 Trib. To Haw River Perennial 36.198091 -79.499355 0303000204 0.00 16.02 0.00 N/A S -A18-1252 56.6 Trib. To Haw River Perennial 36.197619 -79.498697 0303000204 5.00 87.18 0.00 Open Cut- Dam and pump, Flume S -A18-1253 56.6 Trib. To Haw River Perennial 36.197462 -79.498522 0303000204 0.00 60.71 0.00 N/A S -A18-126 56.6 Trib. To Haw River Ephemeral 36.19729 -79.498495 0303000204 1.00 44.92 0.00 Open Cut- Dam and pump, Flume S -A18-132 57.1 Trib. To Haw River Perennial 36.19048 -79.496431 0303000204 5.00 120.02 0.00 Open Cut- Dam and pump, Flume S -A19-290 57.5 Trib. To Haw River Ephemeral 36.18552 -79.494106 0303000204 0.00 98.23 0.00 Open Cut- Dam and pump, Flume S -C18-2 57.9 Trib. To Haw River Intermittent 36.18076 -79.494282 0303000204 1.00 92.62 0.00 Open Cut- Dam and pump, Flume SS-SOIL18-07 58.4 Trib. To Haw River Perennial 36.174081 -79.489117 0303000204 < 6 ft (Unknown) 100.03 0.00 Open Cut- Dam and pump, Flume S -C18-13 58.7 Trib. To Haw River Intermittent 36.172575 -79.4859 0303000204 2.00 89.98 0.00 Open Cut- Dam and pump, Flume S -C18-11 58.7 Trib. To Haw River Perennial 36.172473 -79.485639 0303000204 78.91 254.02 0.00 Open Cut- Dam and pump, Flume S -C18-12 58.7 Trib. To Haw River Intermittent 36.172415 -79.485732 0303000204 0.00 5.93 0.00 N/A SS-SOIL19-02 59.3 Trib. To Haw River Perennial 36.169091 -79.47562 0303000204 0.00 195.29 0.00 N/A AS-NHD-1549 59.6 Trib. To Haw River Intermittent 36.164607 -79.473414 0303000204 5.00 88.77 0.00 Open Cut- Dam and pump, Flume S -C18-30 60.7 Trib. To Haw River Intermittent 36.160639 -79.454874 0303000204 12.95 79.23 0.00 Open Cut- Dam and pump, Flume S -C18-28 60.8 Trib. To Haw River Intermittent 36.160651 -79.453668 0303000204 3.00 157.32 0.00 Open Cut- Dam and pump, Flume SS-SOIL18-08 61.3 Trib. To Haw River Perennial 36.160468 -79.444316 0303000204 < 6 ft (Unknown) 100.27 0.00 Open Cut- Dam and pump, Flume S -A18-78 61.8 Trib. To Haw River Intermittent 36.156312 -79.439294 0303000204 2.00 87.42 0.00 Open Cut- Dam and pump, Flume S -A18-77 61.8 Trib. To Haw River Ephemeral 36.155835 -79.438985 0303000204 0.00 35.18 0.00 N/A S -A18-70 62.4 Trib. To Haw River Perennial 36.150606 -79.430342 0303000204 19.70 133.78 0.00 Open Cut- Dam and pump, Flume S -A18-72 62.5 Trib. To Haw River Intermittent 36.150409 -79.430079 0303000204 2.00 82.44 0.00 Open Cut- Dam and pump, Flume S -B18-23 63 Trib. To Stony Creek Ephemeral 36.147447 -79.421045 0303000204 4.00 64.12 0.00 Open Cut- Dam and pump, Flume S -B18-24 63 Trib. To Stony Creek Perennial 36.147405 -79.421018 0303000204 0.00 38.75 0.00 N/A S -B18-22 63 Trib. To Stony Creek Intermittent 36.147382 -79.421024 0303000204 0.00 30.12 0.00 N/A S -B18-12 63.1 Trib. To Stony Creek Perennial 36.147385 -79.42086 0303000204 6.00 132.84 0.00 Open Cut- Dam and pump, Flume S -B18-22-2 63.1 Trib. To Stony Creek Intermittent 36.147364 -79.420906 0303000204 0.00 53.05 0.00 N/A S -B18-26 63.1 Trib. To Stony Creek Intermittent 36.147487 -79.420857 0303000204 0.00 32.36 0.00 N/A S -B18-12-2 63.1 Trib. To Stony Creek Perennial 36.147295 -79.420408 0303000204 6.00 141.93 0.00 Open Cut- Dam and pump, Flume S -B18-29 63.1 Trib. To Stony Creek Ephemeral 36.147327 -79.420349 0303000204 0.00 49.78 0.00 N/A S -B18-12-3 63.1 Trib. To Stony Creek Perennial 36.146973 -79.419975 0303000204 6.00 97.27 0.00 Open Cut- Dam and pump, Flume S -B18-14 63.2 Trib. To Stony Creek Ephemeral 36.146544 -79.419177 0303000204 0.00 0.54 0.00 N/A S -B18-14-2 63.2 Trib. To Stony Creek Ephemeral 36.146527 -79.418963 0303000204 0.00 25.10 0.00 N/A S -B18-12-4 63.2 Trib. To Stony Creek Perennial 36.146477 -79.418883 0303000204 0.00 48.97 0.00 N/A S -B18-12-5 63.2 Trib. To Stony Creek Perennial 36.146418 -79.418577 0303000204 21.04 128.35 0.00 Open Cut- Dam and pump, Flume 1� Mountain Valley PIPELI May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-2 Proposed Impacts by Waterbody ID and Type of Impact May 2019 Feature ID Milepost Waterbody Name Waterbody Type Latitude Longitude Watershed HUC 10 Pipeline Crossing Length (ft) Temporary Construction Impacts - Streams (In ft) Permanent Stream Impact (In ft) Construction Method AS -B18-20 63.8 Trib. To Deep Creek Intermittent 36.146452 -79.407099 0303000204 2.00 96.35 0.00 Open Cut- Dam and pump, Flume AS-NHD-1547 64 Deep Creek Perennial 36.146373 -79.403981 0303000204 8.40 110.58 0.00 Conventional Bore AS-NHD-3040 64.5 Trib. To Deep Creek Intermittent 36.146327 -79.395938 0303000204 5.00 79.58 0.00 Open Cut- Dam and pump, Flume S -A19-319 65.ORR Trib. To Boyds Creek Intermittent 36.145888 -79.387221 0303000204 0.00 18.88 0.00 N/A S -A19-321 65.1RR Trib. To Boyds Creek Intermittent 36.145512 -79.385241 0303000204 2.00 180.35 0.00 Open Cut- Dam and pump, Flume S -A19-324 65.1RR Trib. To Boyds Creek Perennial 36.145481 -79.384078 0303000204 3.00 181.62 0.00 Open Cut- Dam and pump, Flume S -A18-251 65.6 Trib. To Boyds Creek Intermittent 36.139001 -79.380363 0303000204 2.00 33.27 0.00 Open Cut- Dam and pump, Flume S -A18-250 65.6 Trib. To Boyds Creek Perennial 36.138984 -79.380327 0303000204 4.00 91.74 0.00 Open Cut- Dam and pump, Flume SS-SOIL19-07 65.8 Trib. To Boyds Creek Perennial 36.137762 -79.377223 0303000204 < 6 ft (Unknown) 112.73 0.00 Open Cut- Dam and pump, Flume SS-SOIL19-08 66.2 Trib. To Boyds Creek Perennial 36.13608 -79.37085 0303000204 < 6 ft (Unknown) 70.34 0.00 Open Cut- Dam and pump, Flume AS-NHD-3025 66.8 Trib. To Boyds Creek Intermittent 36.128382 -79.370041 0303000204 5.00 90.11 0.00 Open Cut- Dam and pump, Flume SS-SOIL19-03 67.1 Trib. To Boyds Creek Perennial 36.123451 -79.371317 0303000204 < 6 ft (Unknown) 144.47 0.00 Open Cut- Dam and pump, Flume AS -A18-177 67.2 Tnb. To Boyds Creek Perennial 36.121835 -79.371809 0303000204 14.16 76.25 0.00 Open Cut- Dam and pump, Flume S -A18 -233/S -A18-23 67.6 Boyds Creek Perennial 36.116799 -79.372619 0303000204 24.84 87.29 0.00 Open Cut- Dam and pump, Flume SS-SOIL19-10 67.6 Trib. To Boyds Creek Perennial 36.116519 -79.372164 0303000204 0.00 90.44 0.00 N/A SS-SOIL19-11 67.8 Trib. To Boyds Creek Perennial 36.113629 -79.37232 0303000204 < 6 ft (Unknown) 104.72 0.00 Open Cut- Dam and pump, Flume SS-SOIL19-12 67.9 Trib. To Boyds Creek Perennial 36.112125 -79.371692 0303000204 < 6 ft (Unknown) 122.55 0.00 Open Cut- Dam and pump, Flume AS-NHD-1551 68.1 Trib. To Boyds Creek Intermittent 36.109669 -79.371795 0303000204 5.00 88.18 0.00 Open Cut- Dam and pump, Flume S -B18-7 68.4 Trib. To Boyds Creek Perennial 36.10542 -79.370885 0303000204 2.81 77.09 0.00 Open Cut- Dam and pump, Flume AS-NHD-1552 68.6 Trib. To Boyds Creek Intermittent 36.103285 -79.370132 0303000204 5.00 85.65 0.00 Open Cut- Dam and pump, Flume S -B18-8 68.8 Trib. To Haw River Intermittent 36.100034 -79.370776 0303000204 12.55 92.92 0.00 Open Cut- Dam and pump, Flume S -B18-11 68.9 Trib. To Haw River Intermittent 36.098882 -79.370531 0303000204 3.00 90.69 0.00 Open Cut- Dam and pump, Flume S -A18-10 69.1 Trib. To Haw River Ephemeral 36.096273 -79.369777 0303000204 2.00 81.49 0.00 Open Cut- Dam and pump, Flume S -A18-15 69.2 Trib. To Haw River Intermittent 36.094442 -79.369062 0303000204 4.00 84.42 0.00 Open Cut- Dam and pump, Flume AS -B18-132 69.5 Trib. To Haw River Perennial 36.093663 -79.365325 0303000204 8.05 78.60 0.00 Open Cut- Dam and pump, Flume S -B19-147 69.7 Trib. To Haw River Ephemeral 36.090858 -79.362434 0303000204 1.00 223.12 0.00 Open Cut- Dam and pump, Flume S -B19-148 69.8 Trib. To Haw River Intermittent 36.090805 -79.362106 0303000204 0.00 97.58 0.00 Open Cut- Dam and pump, Flume S -B19-174 69.8 Trib. To Haw River Intermittent 36.089304 -79.362603 0303000204 0.00 176.88 0.00 N/A AS -A18-115 69.9 Trib. To Haw River Perennial 36.088644 -79.36239 0303000204 18.27 91.24 0.00 Open Cut- Dam and pump, Flume S -B18-135 70.3 Trib. To Haw River Ephemeral 36.083658 -79.360561 0303000204 2.00 129.61 0.00 Open Cut- Dam and pump, Flume S -B18-134 70.3 Trib. To Haw River Intermittent 36.083612 -79.360483 0303000204 3.00 92.44 0.00 Open Cut- Dam and pump, Flume S -B18-133 70.3 Trib. To Haw River Perennial 36.083497 -79.360496 0303000204 11.53 82.61 0.00 Open Cut- Dam and pump, Flume &C18-82 70.4 Trib. To Haw River Intermittent 36.081679 -79.359706 0303000204 3.00 92.31 0.00 Open Cut- Dam and pump, Flume 1� Mountain Valley PIPELI May 2019 Supplement to the Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-2 Proposed Impacts by Waterbody ID and Type of Impact May 2019 Feature ID Milepost Waterbody Name Waterbody Type Latitude Longitude Watershed HUC 10 Pipeline Crossing Length (ft) Temporary Construction Impacts - Streams (In ft) Permanent Stream Impact (In ft) Construction Method S -C18-81 70.7 Trib. To Haw River Perennial 36.077154 -79.357777 0303000204 24.18 83.02 0.00 Open Cut- Dam and pump, Flume S -A18-109 70.9 Trib. To Haw River Perennial 36.074856 -79.357646 0303000204 5.00 104.25 0.00 Open Cut- Dam and pump, Flume S -A18-108 71 Trib. To Haw River Intermittent 36.073911 -79.357977 0303000204 2.00 115.56 0.00 Open Cut- Dam and pump, Flume S -A18-107 71 Trib. To Haw River Ephemeral 36.073237 -79.358191 0303000204 1.00 118.36 0.00 Open Cut- Dam and pump, Flume S -A18-64 71.5 Trib. To Haw River Perennial 36.066507 -79.360355 0303000204 25.88 74.95 0.00 Open Cut- Dam and pump, Flume S -A18-65 71.6 Trib. To Haw River Intermittent 36.064646 -79.360872 0303000204 1.00 109.91 0.00 Open Cut- Dam and pump, Flume S -A18-68 71.8 Trib. To Haw River Perennial 36.061848 -79.361649 0303000204 3.00 80.35 0.00 Open Cut- Dam and pump, Flume AS-NHD-1560 72.1 Trib. To Haw River Intermittent 36.057851 -79.364004 0303000204 5.00 76.03 0.00 Open Cut- Dam and pump, Flume S -A18-207 72.2 Trib. To Haw River Intermittent 36.056247 -79.364535 0303000204 0.00 6.71 0.00 N/A S -B18-125 72.4 Trib. To Haw River Intermittent 36.054639 -79.36458 0303000204 3.00 100.14 0.00 Open Cut- Dam and pump, Flume S -B18-127 72.5 Trib. To Haw River Intermittent 36.052274 -79.36528 0303000204 5.00 121.15 0.00 Open Cut- Dam and pump, Flume S -B18-128 72.5 Trib. To Haw River Ephemeral 36.052152 -79.365172 0303000204 2.00 124.70 0.00 Open Cut- Dam and pump, Flume S -B18-129 72.6 Trib. To Haw River Ephemeral 36.051604 -79.365282 0303000204 3.00 80.83 0.00 Open Cut- Dam and pump, Flume Meter Station: T-15 Dan River Interconnect / MLV 4 S -B18-38-2 30.3 Trib. To Dan River Ephemeral 36.495619 -79.680082 0301010309 0.00 231.44 0.00 N/A Contractor Yard 05 S -A18-248 / S -A18-24 30.6 1 Trib. To Dry Creek Ephemeral 36.518798 -79.721212 0301010309 0.00 87.65 0.00 N/A H-650 Pipeline - HDD S -A18-17 30.1 Dan River Perennial 36.497312 -79.676251 0301010309 247.29 51.53 0.00 HDD S -B18-38 30.3 Trib. To Dan River Ephemeral 36.49528 -79.678502 0301010309 3.00 54.24 0.00 HDD S -B18-15 63.5 Trib. To Stony Creek Intermittent 36.146424 -79.413362 0303000204 0.00 2.66 0.00 N/A AS -B18 -16/S -B18-16 63.6 Stony Creek Perennial 36.146476 -79.411247 0303000204 304.73 60.62 0.00 HDD Permanent Access Roads Temporary Access Roads AS -Al 8 -40/S -A18-40 27.4 Cascade Creek Perennial 36.528267 -79.648501 0301010309 0.00 25.87 0.00 Bridge or Flume S -A19-283 27.4 Trib. To Cascade Creek Intermittent 36.528148 -79.648697 0301010309 0.00 100.10 0.00 Bridge or Flume WB -A19-281 27.5 Trib. To Cascade Creek Pond 36.52922 -79.651694 0301010309 0.00 30.84 0.00 N/A S -A18-23 28.3 Trib. To Dan River Perennial 36.517519 -79.6579 0301010309 0.00 10.71 0.00 N/A S -A18-27 28.4 Trib. To Dan River Intermittent 36.517179 -79.658601 0301010309 0.00 14.42 0.00 N/A S -A18-19 29.7 Trib. To Dan River Perennial 36.503339 -79.675523 0301010309 0.00 14.29 0.00 N/A S -A18-19-2 29.8 Trib. To Dan River Perennial 36.501467 -79.674965 0301010309 0.00 11.42 0.00 N/A S -A18-1 38.1 Trib. To Wolf Island Creek Ephemeral 36.412475 -79.649948 0301010309 0.00 4.82 0.00 Bridge or Flume S -B18-42 41.8 Trib. To Lick Fork Intermittent 36.369658 -79.61993 0301010401 0.00 13.17 0.00 N/A S -A18-239 46.7 Trib. To Hogans Creek Intermittent 36.308476 -79.593451 0301010401 0.00 5.91 0.00 N/A S -A18-238 46.7 Trib. To Hogans Creek Intermittent 36.308519 -79.594753 0301010401 0.00 0.23 0.00 N/A S -C18-71 50.2 Trib. To Haw River Ephemeral 36.269615 -79.559552 0303000202 0.00 2.05 0.00 N/A S -C18-15-2 52.2 Trib. To Haw River Intermittent 36.246228 -79.539291 0303000202 0.00 11.25 0.00 N/A SS-SOIL19-13 54.2 Trib. To Haw River Intermittent 36.22226 -79.522999 0303000202 0.00 28.77 0.00 Bridge or Flume S -A18-216 54.6 Trib. To Haw River Intermittent 36.216925 -79.52017 0303000202 0.00 25.58 0.00 Bridge or Flume S -A18-215 54.6 Trib. To Haw River Perennial 36.216918 -79.520281 0303000202 0.00 25.25 0.00 Bridge or Flume SS-SOIL19-05 57.9 Trib. To Haw River Perennial 36.180064 -79.492339 0303000204 0.00 18.44 0.00 N/A S -A18-70-262.4 Trib. To Haw River Perennial 1 36.151005 1 -79.430449 1 0303000204 0.00 5.87 0.00 N/A S -A18-72-2 62.5 Trib. To Haw River Intermittent 1 36.150843 1 -79.429739 1 0303000204 0.00 19.79 0.00 N/A 1� Mountain Valley PIPELI May 2019 Supplement to the Joint Permit Application USACE — Wilmington District and NCDEQ SAW -2018-008887 Updated Appendix L-2 Proposed Impacts by Waterbody ID and Type of Impact May 2019 Pipeline Crossing Length Temporary Construction Impacts - Feature ID Milepost Waterbody Name Waterbody Type Latitude Longitude Watershed HUC 10 (ft) Streams (In ft) Permanent Stream Impact (In ft) Construction Method S -B18-138 63.7 Trib. To Stony Creek Perennial 36.149442 -79.40883 0303000204 0.00 25.77 0.00 Bridge or Flume 63.7 Trib. To Stony Creek Intermittent 36.151288 -79.408944 0303000204 0.00 28.05 0.00 Bridge or Flume 5SB18�-137 66.5 Trib. To Boyds Creek Intermittent 36.132284 -79.36504 0303000204 0.00 25.98 0.00 Bridge or Flume 70.9 Trib. To Haw River Perennial 36.073553 -79.354916 0303000204 0.00 12.22 0.00 N. Legend o Mileposts (MP, 0.5 'Y Delineated PFO mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace Temporary Access ED Road Limits of Qconstruction Right - of -Way Survey Area L _ Adjacent Sheet C__! County Boundary Streams: Wetlands: _ Delineated Wetland Boundary Delineated PEM o 0) r) m �Ird Note: GW March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS ** = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ---------------------------------------------------------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC 0neMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Aalntia�\ \ Q Rockingham County 0 P i t t s y I v a n i a County 4NJ ';. va Ana a M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 1 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 i 0 Road b913moo y y60 o 550 510 �o h y90 � y2o S i 4Q, � � TA-RO-071 od I a I 1 Seo C) 580— — ---- — -- — - -- - - — -- — -— — - — -— - o :Ic i LO I I I � 'M O N i 00r - L0 N 'U ! lac �I 1Q TA-RO-073 z Ci � •yY i �. U` QI i ! I ----------- .- ----------------------------- L - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----------- ♦ ♦ I j Ln ♦ TA-RO-072A ♦ W -A118-22: PEM 6.5 ♦ ♦ Con./Op. Pipeline Crossing Ft.: 77.33 I - 0- - - Construction Acres: 0.17 a / Operational Acres: 0.00 I I � S-1318-99: Int. o I 539 i Con./Op. Pipeline Crossing Ft.: 1.00 Construction Crossing Ft.: 88.74 TA-RO-072 Operational Crossing Ft.: 44.54 7. W-1318-98: PFO Con./Op. Pipeline Crossing Ft.: 15.04 Construction Acres: 0.03 Operational Acres: 0.01 ** y�o s� 0 Legend O Mileposts (MP, 0.5 —Delineated Pond mi) Pond Temporary Access Wetlands: Road Delineated Wetland - - H-650 Pipeline —Boundary --,Operational 0'j:4Delineated PEM L - -'Workspace �` Delineated PFO EDTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: —Approximated Intermittent _ Delineated Intermittent I ® soy IM an lm Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC 0--n--e--M--a--p-,--T--R--C-,--U--S--G--S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County yi7 4 � PitV'gylvania*,\ County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 2 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of [::]Construction Right of -Way _ Delineated Intermittent _ Delineated Perennial — Delineated Pond Approximated Pond Intermittent Surface Water - Perennial Surface Water M Pond Wetlands: Survey Area Delineated Wetland L _ Adjacent Sheet — Boundary C1 County Boundary �Delineated PEM Streams: K> Delineated PFO —Approximated Pond � Delineated PSS _ Delineated Ephemeral 0 5n in Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County _■J M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 3 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 TA-RO-073A 00 1 W -A19-282: PEM (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.01 Operational Acres: 0.00 1 1 WB -A19-281: Pond (Temporary Access Road) k1 Con./Op. Pipeline Crossing Ft.: 0.00 1 Construction Crossing Ft.: 30.84 Construction Sq. Ft.: 33.31 Operational Sq. Ft.: 0.00 1 �O. t 1 1 _ 1 ^\ 11 W -A19-282-5: PSS (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 W -A19-282-3: PSS (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 W -A19-282: PSS (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 AS -A18-40 / S -A18-40: Per. (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 25.87 Construction Sq. Ft.: 1,254.68 Operational Sq. Ft.: 0.00 S-A18-42:Int. 19-282-9: PSS (Temporary Access Road) _ Con./Op. Pipeline CrossingFt.: 20.52 Con./Op. Pipeline Crossing Ft.: 0.00 _ Construction Crossing Ft.: 95.009 70 Constructon Acres: <0.0nstruction Sq. Operatiolnal Acres: 0.001 AaLac�ht Sheet 3 CoOperational SgFtFtZ 011 0021 0/ ♦' All All 111 S -A19-283: Int. (Temporary Access Road) \ Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 100.10 Operational Crossing Ft.: 0.00 W -A19-282-2: PSS (Temporary Access Road) ` Con./Op. Pipeline Crossing Ft.: 0.00 o , Construction Acres: <0.01 `Oo Operational Acres: 0.00 I j W -A19-282-4: PSS (Temporary Access Road) t Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 AW -A19-282: PSS (Temporary Access Road) h Operational Acres: 0.00 Con./Op. Pipeline Crossing Ft.: 0.00 1� Construction Acres: <0.01 4g0 '' Operational Acres: 0.00 kl�F _ 1� W -A19-282-6: PSS (Temporary Access Road) 1 Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 1 Operational Acres: 0.00 M P` W -A19-282-7: PSS (Temporary Access Road) k1 Con./Op. Pipeline Crossing Ft.: 0.00 1 1 Construction Acres: <0.01 48p Operational Acres: 0.00 + 1 W -A19-274: PEM 1 Con./Op. Pipeline Crossing Ft.: 42.02 Construction Acres: 0.19 " W -A19-282-8: PSS (Temporary Access Road) Operational Acres: 0.00 ' Con./Op. Pipeline Crossing Ft.: 0.00 ■ ■ ■ Construction Acres: <0.01 �g� ■ ■ ■ Operational Acres: 0.00 13 , '•:,. , 1 ' W -A19-274-3: PEM ' 1 ' Con./Op. Pipeline Crossing Ft.: 0.00 ■ 1 Construction Acres: 0.17 ■ ■ 1 ► ■ / i Operational Acres: 0.00 ■ 1 ► ■ 1 ■■ 11■ i ♦ W -A18-44: PFO Con./Op. Pipeline Crossing Ft.: 37.93 Construction Acres: 0.05 Operational Acres: 0.01 ** i 11 ♦ Intl .��0 ■ S -A18-40: Per. Con./Op. Pipeline Crossing Ft.: 108.54 ♦ Construction Crossing Ft.: 106.03 Construction Sq. Ft.: 7,677.69 Operational Sq. Ft.: 0.00 4• � S -A19-273: Per. Con./Op. Pipeline Crossing Ft.: 28.95 Construction Crossing Ft.: 50.45 Construction Sq. Ft.: 2,133.93 Operational Sq. Ft.: 0.00 W -A19-274-2: PEM Con./Op. Pipeline Crossing Ft.: 38.12 Construction Acres: 0.04 Operational Acres: 0.00 Legend 111111111■ ■■ I. ■ ■ 111 1 111 ■ ■ ■♦1 ■ W -A18-44-2: PEM Con./0P• Pipeline Crossing Ft.: 1,176.72 ► ► ► ►1► ■ ► ► ► ► ► ■ a ► ■►■I►►111►►111■ Construction Acres: 3.55 / ►■ ► ► ■ ► ► ► ■ I ■ ► ■ ► Operational Acres: 0.00 ■ ►III ■ ■ I I ■ ■ ■ j"? I I W -A19-282: PSS (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 AS -A18-40 / S -A18-40: Per. (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 25.87 Construction Sq. Ft.: 1,254.68 Operational Sq. Ft.: 0.00 S-A18-42:Int. 19-282-9: PSS (Temporary Access Road) _ Con./Op. Pipeline CrossingFt.: 20.52 Con./Op. Pipeline Crossing Ft.: 0.00 _ Construction Crossing Ft.: 95.009 70 Constructon Acres: <0.0nstruction Sq. Operatiolnal Acres: 0.001 AaLac�ht Sheet 3 CoOperational SgFtFtZ 011 0021 0/ ♦' All All 111 S -A19-283: Int. (Temporary Access Road) \ Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 100.10 Operational Crossing Ft.: 0.00 W -A19-282-2: PSS (Temporary Access Road) ` Con./Op. Pipeline Crossing Ft.: 0.00 o , Construction Acres: <0.01 `Oo Operational Acres: 0.00 I j W -A19-282-4: PSS (Temporary Access Road) t Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 AW -A19-282: PSS (Temporary Access Road) h Operational Acres: 0.00 Con./Op. Pipeline Crossing Ft.: 0.00 1� Construction Acres: <0.01 4g0 '' Operational Acres: 0.00 kl�F _ 1� W -A19-282-6: PSS (Temporary Access Road) 1 Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 1 Operational Acres: 0.00 M P` W -A19-282-7: PSS (Temporary Access Road) k1 Con./Op. Pipeline Crossing Ft.: 0.00 1 1 Construction Acres: <0.01 48p Operational Acres: 0.00 + 1 W -A19-274: PEM 1 Con./Op. Pipeline Crossing Ft.: 42.02 Construction Acres: 0.19 " W -A19-282-8: PSS (Temporary Access Road) Operational Acres: 0.00 ' Con./Op. Pipeline Crossing Ft.: 0.00 ■ ■ ■ Construction Acres: <0.01 �g� ■ ■ ■ Operational Acres: 0.00 13 , '•:,. , 1 ' W -A19-274-3: PEM ' 1 ' Con./Op. Pipeline Crossing Ft.: 0.00 ■ 1 Construction Acres: 0.17 ■ ■ 1 ► ■ / i Operational Acres: 0.00 ■ 1 ► ■ 1 ■■ 11■ i ♦ W -A18-44: PFO Con./Op. Pipeline Crossing Ft.: 37.93 Construction Acres: 0.05 Operational Acres: 0.01 ** i 11 ♦ Intl .��0 ■ S -A18-40: Per. Con./Op. Pipeline Crossing Ft.: 108.54 ♦ Construction Crossing Ft.: 106.03 Construction Sq. Ft.: 7,677.69 Operational Sq. Ft.: 0.00 4• � S -A19-273: Per. Con./Op. Pipeline Crossing Ft.: 28.95 Construction Crossing Ft.: 50.45 Construction Sq. Ft.: 2,133.93 Operational Sq. Ft.: 0.00 W -A19-274-2: PEM Con./Op. Pipeline Crossing Ft.: 38.12 Construction Acres: 0.04 Operational Acres: 0.00 Legend Mileposts (MP, 0.5 j Delineated PEM 0 mi) _Delineated Ephemeral UDelineated PFO Temporary Access _Delineated " Delineated PSS Road Intermittent H-650 Pipeline Operational -Delineated Perennial Workspace -Delineated Pond Temporary Access - Approximated Road Perennial Limits of Approximated Pond QConstruction Right- Intermittent Surface of -Way Water Survey Area -'Adjacent - Perennial Surface L Sheet Water [County Boundary Pond Streams: Wetlands: Wetland _Approximated Perennial _Delineated Boundary -Approximated Pond ®Approximated PSS 0 9b C) an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance ----------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 'I Rockingham Count , y Q Q / M Mountain Valley Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 4 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of Q Construction Right of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Perennial _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial - Approximated Perennial Intermittent Surface Water - Perennial Surface Water Wetlands: _ Delineated Wetland Boundary ® Approximated PSS Delineated PEM 5e% Delineated PFO 0 W C) an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County quo M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 5 of 107 600 Willowbrook Ln CTRC West Chester, PA 19382 Date: May 2019 r I o so 500 W -A18-30: PFO S -A18-34: Int. + o Con./Op. Pipeline Crossing Ft.: 5.13 Con./Op. Pipeline Crossing Ft.: 0.00 411 Construction Acres: 0.01 Construction Crossing Ft.: 17.75 PF 1 x . S -A18-31: Int. Operational Acres: <0.01** Operational Crossing Ft.: 0.00 S -A18-36: Per. W -A18-26: PEM so Con./Op. Pipeline Crossing Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 40.92 0 Construction Crossing Ft.: 23.68 Construction Acres: 0.07 Operational Crossing Ft.: 23.68 Operational Acres: 0.00 W -A18-30: PEM _Con./Op. Pipeline Crossing Ft.: 26.16 0 - - - =-- Construction Acres: 0.04 _ _ _ Operational Acres: 0.00 i 4 s TA-RO-075 3600 I Interconnect -� N• rl r N. m! QI W -A18-39-3: PEM (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 i 1' X30 6Q0 l 550: 560 i i 5�0 • rr. 0 �g0 600 0 4,1 1 57163560 -, TA-RO-076 PA-RO-000 t _ ,t r.YS I a or..�r�IncaA+ . IF��� WTI O Legend Con./Op. Pipeline Crossing Ft.: 0.00 Mileposts (MP, 0.5 Construction Crossing Ft.: 73.50 -Approximated Intermittent Permanent Access Operational Crossing Ft.: 33.97 _ Road Delineated _ Temporary Access 4 I v, - - H-650 Pipeline - M P_28.5 S -A18-32: Per. - -'Workspace OO Con./Op. Pipeline Crossing Ft.: 6.60 Permanent Access 5 Construction Crossing Ft.: 87.10 Road Water W -A18-33: PEM Construction Sq. Ft.: 739.05 Road Wetlands: Con./Op. Pipeline Crossing Ft.: 0.00 Operational Sq. Ft.: 0.00 of -Way Boundary Construction Acres: 0.01 ' • ' Approximated PEM i �.� Delineated PEM Operational Acres: 0.00 x Delineated PFO + O r Note: March 2019 Workspace S -A18-27: Int. (Temporary Access Road) - Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From Con./Op. Pipeline Crossing Ft.: 0.00 .. = Buffer Impacts Under Review - Construction Crossing Ft.: 14.42 'oo i Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Operational Crossing Ft.: 0.00 D , N �h0 560 z Q 1 0 �r ' 580 f S-A18-23: Per. (Temporary Access Road) o co ,I ; Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 10.71 : `O Operational Crossing Ft.: 0.00 r 1 •r _ or..�r�IncaA+ . IF��� WTI O Legend Mileposts (MP, 0.5 O mi) -Approximated Intermittent Permanent Access -Approximated Pond _ Road Delineated _ Temporary Access _ Intermittent Road Delineated - - H-650 Pipeline _ Perennial - -, Operational - Delineated Pond - -'Workspace Approximated Pond Permanent Access Perennial Surface Road Water EDTemporary Access pond Road Wetlands: Limits of [::]Construction Right- - Delineated Wetland of -Way Boundary Survey Area ' • ' Approximated PEM L Adjacent Sheet �.� Delineated PEM _ County Boundary x Delineated PFO Streams: 0 W Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance ----------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County ,a a \ w M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 6 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 600 590 590 610 o° 0 600 66° 600 � t t i r 0 t h t t t PA-RO-000 opo � t 0 s'o + o 560 S�10 i S(9 k(n Sg0 ego � t 60 / 0 610 + 6�O / W -A19-280: PEM (Permanent Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.01 7 Operational Acres: 0.00 610 r, 11 W -A19-280-2: PEM (Permanent Access Road) 62b Con./Op. Pipeline Crossing Ft.: 0.00 0 Construction Acres: 0.02 630 6 Operational Acres: 0.00 Y; 640 10 �O rn `� 650 Legend O Mileposts (MP, 0.5 ,10�e' Delineated PEM mi) _ Permanent Access Road EDPermanent Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C_,County Boundary Streams: Approximated Intermittent _ Delineated Intermittent Wetlands: _ Delineated Wetland Boundary ® s� in an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 11 Mountain Valley Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 7 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 cn 0 0 W -A18-38: PFO Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.01 Operational Acres: 0.00** 11 W -A18-38: PEM Con./Op. Pipeline Crossing Ft.: 28.83 0, t`� V� P ti • r r + 11' Operational 111; '. , ,' , '" k.. -�'r�r• .'� •. .. -�� P'L '� i �'' ' ''�•rA ,It J. �� r , •`,7. - 7+�:_ ilk. :�tl "� 1 190 w o S-1318-49: Per. Con./Op. Pipeline Crossing Ft.: 3.00 cDV Construction Crossing Ft.:L Operational Crossing Ft.: 555 93.93 a Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access Wetlands: Road _ Delineated Wetland - - H-650 Pipeline Boundary --,Operational 10j' Delineated PEM L - -'Workspace Delineated PFO EDTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Perennial _ Delineated Ephemeral ® W IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County s .o y B� e E 4 - F b -_ n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 8 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 _.""'°"""' Date: May 2019 S -A18-37: Per. Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 19.36 Operational Crossing Ft.: 0.00 { i• P _ cn 0 0 W -A18-38: PFO Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.01 Operational Acres: 0.00** 11 W -A18-38: PEM Con./Op. Pipeline Crossing Ft.: 28.83 0, t`� V� P ti • r r + 11' Operational 111; '. , ,' , '" k.. -�'r�r• .'� •. .. -�� P'L '� i �'' ' ''�•rA ,It J. �� r , •`,7. - 7+�:_ ilk. :�tl "� 1 190 w o S-1318-49: Per. Con./Op. Pipeline Crossing Ft.: 3.00 cDV Construction Crossing Ft.:L Operational Crossing Ft.: 555 93.93 a Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access Wetlands: Road _ Delineated Wetland - - H-650 Pipeline Boundary --,Operational 10j' Delineated PEM L - -'Workspace Delineated PFO EDTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Perennial _ Delineated Ephemeral ® W IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County s .o y B� e E 4 - F b -_ n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 8 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 _.""'°"""' Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Wetlands: _ Delineated Wetland Boundary QApproximated PEM Delineated PEM K,> Delineated PFO Approximated Ephemeral _ Delineated Ephemeral ® soy in an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Lishni� t ` R o c kiltl g h a m 4 County .t alt ,/M^' ` Y Y M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 9 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 SAO 620 580 TA-RO-080 1 _ S)1 rn 0 550 690 570 i 630 6 0 ♦..� 00 �• 56 S -A18-160: Eph. �. Con./Op. Pipeline Crossing Ft.: 0.00 620 rn • Construction Crossing Ft.: 31.84 0 10 Operational Crossing Ft.: 16.65 C' n CD h I' �r ` by ` o 14es'•tiiifi: r t .. Uri s6, <r ` 10 so �.. ... , . •= . _ ?� ... .�??�'�!� ghee � - s _ No ♦ co `o # t TA-RO-079A*y4lyy► i r / Ac ■ o . ♦, orAt�, ♦, y I I I ♦ co , co Ln , o o i --------.._...--------•-•••Adjacent Sheet 11• ------—•-�1--------- -� --------- ----, ♦ S -A18-47: Per. Con./Op. Pipeline Crossing Ft.: 3.00 o'i lyo Construction Crossing Ft.: 85.45 i Operational Crossing Ft.: 58.45 TA-RO-079 S -A18-19: Per. (Temporary Access Road) W -A18-18: PFO ♦ ' - - I Con./Op. Pipeline Crossing Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 934.84 Construction Crossing Ft.: 14.29 Construction Acres: 1.87 Operational Crossing Ft.: 0.00 Operational Acres: 0.64** ♦ I ♦ � I Legend O Mileposts (MP, 0.5 _ Delineated mi) Intermittent _ Temporary Access _ Delineated Road Perennial — — H-650 Pipeline Wetlands: - -, Operational _ Delineated Wetland L --'Workspace Boundary aTemporary Access Delineated PEM RoadDelineated PFO Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Perennial _ Delineated Ephemeral ® f� IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --- ------------------------------------------N_W------------------------------------------------------------ Data Sources: EQT, ESRI, NC ap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 'F o ,l `1100 i T Rockingham County Boa v / cn�mr•6' n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 10 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 600 r 600 I 6�0 590 y60 1. C -A18-19: Per. (Temporary Access Road) S A18 47: Per. Con./Op. Pipeline Crossing Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 3.00 LnLO Construction Crossing Ft.: 14.29 Construction Crossing Ft.: 85.45 I ` Operational Crossing Ft.: 0.00Operational Crossing Ft.: 58.45 o TA-RO-079 i o v cr LOFib o ' O I S6o so L — ? - — - — . Adjacent Sheet 10 — — - — — - - - — — — — - - — — — - SIV �Oo S -A18-19-2: Per. (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 11.42 I Operational Crossing Ft.: 0.00 TA-RO-080 W-A1""P -18: PEM Con./Op. Pipeline Crossing Ft.: 49.52 - Construction Acres: 0.07 Operational Acres: 0.00 r1►►■►► 01 fir,„ , -► . ♦ . y1C s � ♦ � ' I i O -- —_ — -— - —_—— - _ —_—_—_—_---- - — - — — i AdjacentSheetl2---— -— - — - — - —- ' — - ♦ - - ------------------ I ' — -— — _ I ' I . �. W -A18-18: PFO Con./Op. Pipeline Crossing Ft.: 934.84 Construction Acres: 1.87 Operational Acres: 0.64** •• 1 Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access Wetlands: Road _ Delineated Wetland - - H-650 Pipeline Boundary --,Operational 10j' Delineated PEM L - -'Workspace Delineated PFO Construction HDD Operational HDD [::]Temporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet E_1 County Boundary Streams: -Approximated Perennial ® 5G� IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery ! Rockingham Co.u.nty qp M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 11 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 1 1 1 ` 1 1 - S -A18-17: Per. (H-650 Pipeline HDD) Con./Op. Pipeline Crossing Ft.: 247.29 Construction Crossing Ft.: 51.53 Construction Sq. Ft.: 12,417.63 Operational Sq. Ft.: 0.00 600 490 k o W-1318-39-3: PEM (H-650 Pipeline HDD) 00 Con./Op. Pipeline Crossing Ft.: 29.86 Construction Acres: 0.03 Construction HDD Acres: <0.01 Operational Acres: 0.00 , W-1318-39-2: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing Ft.: 40.47 Construction Acres: 0.04 Construction HDD Acres: <0.01 Operational Acres: 0.00 W-1318-39: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing Ft.: 24.63 Construction Acres: 0.03 Construction HDD Acres: <0.01 Operational Acres: 0.00 W-1318-39-4: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing Ft.: 31.56 Construction Acres: 0.04 Construction HDD Acres: <0.01 Operational Acres: 0.00 7 W-1318-36: PFO (H-650 Pipeline HDD) Con./Op. Pipeline Crossing Ft.: 31.83 Construction Acres: 0.11 Construction HDD Acres: 0.01 Operational Acres: 0.00** 0 W-1318-36-9: PEM (Meter Station) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.05 Operational Acres: 0.00 ' o W-1318-36-47PEM(H�-650 Pipeline HDD) Con./Op. sing Ft.: 0.00 Construction Acres: <0.01 Construction HDD Acres: 0.00 Operational Acres: 0.00 SAO W-1318-36-11: PEM (Meter Station) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 W-1318-36-5: PEM Con./Op. Pipeline Crossing Ft.: 26.67 Construction Acres: 0.03 Operational Acres: 0.00 JV W-1318-36-6: PEM W-1318-36-3: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 17.92 Construction Acres: <0.01 Construction Acres: 0.05 Operational Acres: 0.00 Construction HDD Acres: <0.01 Operational Acres: 0.00 W-1318-34: PFO Con./Op. Pipeline Crossing Ft.: 179.81 Construction Acres: 0.45 � - Operational Acres: 0.12** o ` PA-RO00 -082A rn W-1318-36: PEM (H-650 Pipeline HDD) IyI Con./Op. Pipeline Crossing Ft.: 36.44 >.f. Construction Acres: 0.04 T-15 Dan River Construction HDD Acres: <0.01Interconnect / _ Operational Acres: 0.00 MLU 4 r W-1318-36-2: PEM (H-650 Pipeline HDD) ` t Con./Op. Pipeline Crossing Ft.: 16.34 - Construction Acres: 0.02 `. Construction HDD Acres: <0.01 Operational Acres: 0.00 I ,, �♦ .MP.30.5 S-1318-38: Eph. (H-650 Pipeline HDD) 5� J j Con./Op. Pipeline Crossing Ft.: 3.00 \66 U j Construction Crossing Ft.: 54.24 �e Icu �� Operational Crossinq Ft.: 0.00 _ S� .< AW -1318-36: PEM (Meter Station) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 � PA-RO-082 I TA-RO-081 I W-1318-36-10: PEM (Meter Station) Con./Op. Pipeline Crossing Ft.: 0.00 i Construction Acres: 0.01 Operational Acres: 0.00 I W-1318-34-2: PFO (Permanent Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: <0.01 ** I I SO O Legend o Mileposts (MP, 0.5 '__; County Boundary mi) Streams: _ Permanent Access_ Delineated Road Ephemeral _ Temporary Access_ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace Perennial Surface Construction HDD Water Operational HDD Wetlands: ED Permanent Access _ Delineated Wetland Road Boundary ED Temporary AccessQApproximated PEM Road Approximated PFO Limits of 10j' Delineated PEM [::]Construction Right - of -Way` Delineated PFO Survey Area L _ Adjacent Sheet ® f� an iiiia I� Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ----------------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 0 Rockingf am C o u n t y" nn _ ay x e - k�o m 1ysvF M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 12 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 W-1318-36-7: PEM (Meter Station) 0 S-1318-38-2: Eph. (Meter Station)J Con./Op. Pipeline Crossing Ft.: 0.00 Ai. Construction Crossing Ft.: 231.44 0 o Operational Crossing Ft.: 0.00 y0° Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.47 Operational Acres: 0.00 W-1318-36-8: PEM (Meter Station) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 � PA-RO-082 I TA-RO-081 I W-1318-36-10: PEM (Meter Station) Con./Op. Pipeline Crossing Ft.: 0.00 i Construction Acres: 0.01 Operational Acres: 0.00 I W-1318-34-2: PFO (Permanent Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: <0.01 ** I I SO O Legend o Mileposts (MP, 0.5 '__; County Boundary mi) Streams: _ Permanent Access_ Delineated Road Ephemeral _ Temporary Access_ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace Perennial Surface Construction HDD Water Operational HDD Wetlands: ED Permanent Access _ Delineated Wetland Road Boundary ED Temporary AccessQApproximated PEM Road Approximated PFO Limits of 10j' Delineated PEM [::]Construction Right - of -Way` Delineated PFO Survey Area L _ Adjacent Sheet ® f� an iiiia I� Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ----------------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 0 Rockingf am C o u n t y" nn _ ay x e - k�o m 1ysvF M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 12 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 Q) atie W-1318-34: PFO o Con./Op. Pipeline Crossing Ft.: 179.81 113 Construction Acres: 0.45 Operational Acres: 0.12** � os 1� � 0 o .4" • 61313 ,113 �0 5 v 0 00 00 oo 61313 1100 Soo so 0 lam # +Q , 540 S00 7 41 6 ' 0 h . ,'9 CD ^o � h 0 00 Ln \ s90— Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial - - H-650 Pipeline - Approximated --,Operational Perennial L --'Workspace -Perennial Surface Limits of Water [::]Construction Right- Wetlands: of -Way _ Delineated Wetland Survey Area Boundary L _ Adjacent Sheet Approximated PFO L__. County Boundary Oj;,Delineated PEM Streams: ;X, Delineated PFO Approximated Intermittent Approximated Perennial _ Delineated Ephemeral _ Delineated Intermittent an Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --- --n--e--M--a--p-,--T--R--C-,--U--S--G--S Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery • E A C 0, s Rockingham County � 1S n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 13 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 MP3 ♦ I W -A18-54: PEM S-1319-153: Int. Sg0 ♦ I Con./Op. Pipeline Crossing Ft.: 11.24 /Con./0 Pipeline Crossin P• P 9 Ft.: 2.00 ♦♦c Construction Acres: 0.01 1 Construction Crossing Ft.: 76.46 S3i�, 0 ♦Q Operational Acres: 0.00 p +�3o Operational Crossing Ft.: 51.13 510 MP 30.5 `♦♦ t. I suo Iy. r i ♦ I!1' ♦ `4 ��� S-1318-104: Per. 4.0•� w Con./Op. Pipeline Crossing Ft.: 3.00 �` ♦; �. F / Construction Crossing Ft.: 81.43 Operational Crossing Ft.: 56.15 �0 5 v 0 00 00 oo 61313 1100 Soo so 0 lam # +Q , 540 S00 7 41 6 ' 0 h . ,'9 CD ^o � h 0 00 Ln \ s90— Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial - - H-650 Pipeline - Approximated --,Operational Perennial L --'Workspace -Perennial Surface Limits of Water [::]Construction Right- Wetlands: of -Way _ Delineated Wetland Survey Area Boundary L _ Adjacent Sheet Approximated PFO L__. County Boundary Oj;,Delineated PEM Streams: ;X, Delineated PFO Approximated Intermittent Approximated Perennial _ Delineated Ephemeral _ Delineated Intermittent an Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --- --n--e--M--a--p-,--T--R--C-,--U--S--G--S Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery • E A C 0, s Rockingham County � 1S n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 13 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 0 h Co S-1319-153: Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 76.46 Operational Crossing Ft.: 51.13 600 590 600 o ",7 Ln i s a � ,Qo $� o W_ m . 6� 530 •. 101113 1 O 6 s N 00 00 S-1318-95: Per. 5j0 ■ Con./Op. Pipeline Crossing Ft.: 28.34 i S-1318-104: Per. Con./Op. Pipeline Crossing Ft.: 3.00 Construction Crossing Ft.: 81.4343 ♦♦ Operational Crossing Ft.: 56.15 0. 0� 500 Construction Crossing Ft.: 76.02 i S - Int. Construction Sq. Ft.: 2,002.95 Con./Op. Pipeelineline C5: Crossing Ft.: 1.00 Operational S Ft.: 0.00 Construction Crossing Ft.: 79.26 Speline 02: Per. P q Operational Crossing Ft.: 52.01 Con./Op. Pipeline Crossing Ft.: 2.00 1 Construction Crossing Ft.: 82.33 �o Operational Crossing Ft.: 53.62 1 -------------- TM /_ MP31.0p♦ ■- ------ __- r i 'S i 540 .530. 550 �• V f �t h i 570 1 S90 'S W-1318-103: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 w 0 rn 0 OFt 560 i 5j0 o rn h`O / 580 �g0 Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial - - H-650 Pipeline - Approximated Operational Perennial 'Workspace - Perennial Surface Limits of Water [::]Construction Right- Wetlands: of -Way _ Delineated Wetland Survey Area Boundary L _ Adjacent Sheet ,1j' Delineated PEM L__. County Boundary Streams: Approximated Intermittent Approximated Perennial _ Delineated Ephemeral _ Delineated Intermittent ff�l Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham C :o u n t y M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 14 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 1 0 0 v l • MP 31.5 � � 1 •1 580 ".4 6)0. F yt r�P0 560 S-1318-95: Per. 550 Con./Op. Pipeline Crossing Ft.: 28.34 Construction Crossing Ft.: 76.02 a1 Construction Sq. Ft.: 2,002.95 �O Operational Sq. Ft.: 0.00 1 1 P1 ...A r.V I .i�. •Y _� 1-10 .r U+ o�, 620 f' O J: 620 11 �. W i •1 .... - + 1 �O i 1 600 CP ti 0 s�O o o y80- O S.;10 620 - O 1 X640 �t 640 0 0 r1 i 7- ,0 69 Sgq 60 ♦♦ x � � t e P i , aF T r WE ------------ -----------------i 630 S90 . y 600 g 5%) Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Approximated Road Perennial - - H-650 Pipeline - Perennial Surface --,Operational Water L - -'Workspace Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Perennial Delineated Ephemeral an iiiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ---------------------------------------------------------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery UtJ Rockingha,-T County ff pO°7 � • n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 15 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 201 Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline --,Operational - -'Workspace Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet E_1 County Boundary Streams: Approximated Perennial _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial - Approximated Perennial - Perennial Surface Water Wetlands: _ Delineated Wetland Boundary 'QApproximated PEM ® Approximated PSS 10j; Delineated PEM , Delineated PFO Delineated PSS 0 5n in . f ee Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery x / I I Rockingham County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 16 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace _ Delineated Intermittent _ Delineated Perennial - Approximated Perennial - Perennial Surface EDTemporary Access Water Road Wetlands: Limits of Delineated Wetland QConstruction Right- _ Boundary of -Way ® Approximated PSS ^Survey Area Oj: Delineated PEM L _ Adjacent Sheet � Delineated PFO C1 County Boundary , Delineated PSS Streams: Approximated Perennial Delineated Ephemeral Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery a c ; Rockingham County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 17 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 520 ' 530 IM 5Q0g ;A 01 0 TA-RO-087 S90 0 r� �o h 600 S10 540 570 580 660 sem, O 560 550 t ♦ S60 60 5�0 a� S5 ♦ :.: 580 ■ + ♦ 590 ♦ . - .. _ 610 <° ♦ Y 600 600 s ♦- o ♦ r } ,♦ Sheet 17 - — — d` d>p S-A18-151-2: Per. 90 — Con./Op. Pipeline Crossing Ft.: 47.92 5 0 Construction Crossing Ft.: 84.66 60 Construction Sq. Ft.: 3,770.31 ♦ Operational Sq. Ft.: 0.00 - ♦, 620 ♦ o0o iilrii; ♦ A 670 S20 11,70 �� r� 590 ♦ _ --. 5 . 80 S -A18-154: In Con./Op. Pipeline Crossing Ft.: 0.00 �* Construction Crossing Ft.: 43.14 , Operational Crossing Ft.: 0.00 550 O q W -A18-155: PEM 600 MP 33.0 �� \ "'O Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.06 590 _ Operational Acres: 0.00 S -A18-154-2: Int. 510 o Con./Op. Pipeline Crossing Ft.: 2.00 •� ; " X60 Construction Crossing Ft.: 128.68W -A18-155: PSS Operational Crossing Ft.: 56.04 ' ' Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 S -A18-154-3: Int. ♦ `� Con./Op. Pipeline Crossing Ft.: 0.00 / Construction Crossing Ft.: 14.04 ♦ �� F, . cook S2 Sg0 ... 53p 0 • sem, 0 670 Operational Crossing Ft.: 3.72 W -A18-155-2: PSS Con./Op. Pipeline Crossing Ft.: 68.48 Construction Acres: 0.16 Operational Acres: 0.00 580 ' -a�n°i`4'4 n�� ♦ 590 .. 600 56 .. ♦, Rd 1945 \ 550 • -` �, Legend 0 Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Approximated Road Perennial - - H-650 Pipeline - Perennial Surface --,Operational Water L - -'Workspace Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of ,1j' Delineated PEM [::]Construction Right- i Delineated PSS of -Way Survey Area L _ Adjacent Sheet - L __J County Boundary Streams: Approximated Perennial _ Delineated Intermittent ® 5G� IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery UF I " _tri he' Iy 9E�k Rockingham „M+ O COU,ty m eem+fi�"' p M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 18 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 S9 O 69 0 600 640 TA-RO-085 . 7630:-�T. do 6 W E h - i O - Srr ti 640 650 660ra . r. '+9 :s 0 . i � it • ���� .530 O ons ruc on cres. < . S'\ o S -A18-221: Per. Operational Acres: 0.00 hP"e G Con./Op. Pipeline Crossing Ft.: 4.00 5y0 620Construction Crossing Ft.: 80.68 6p6 W -A18-155-2: PSS Operational Crossing Ft.: 52.24 Con./Op. Pipeline Crossing Ft.: 68.48 O Construction Acres: 0.16 coo „ Operational Acres: 0.00 600 00 I � - ¢ Q r O CZF ,•PFat,;3��nR O Nco i s`SO � h 00 530 � W-A18-222: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 TA-RO-088 i a 0 1 � I 6q0 620 I k .P , m �.. IR 'N CD CD o � CD Po Jk 62� S-C18-51:Int. Con./Op. Pipeline Crossing Ft.: 4.00 QO 6 Construction Crossing Ft.: 87.10 640 Operational Crossing Ft.: 61.96 S-C18-52:Int. Con./Op. Pipeline Crossing Ft.: 5.00 Construction Crossing Ft.: 71.88 O 6 ♦5�0. - ;� 1 0� - -- yoo i / 1 i MP 33.5 • _-- --0-"- by 6�0 � 0 1 h � 640 1} O coo :•- - . , � W -A18-155: PEM Con./Op. Pipeline Crossing Ft.: 0.00 S -A18-220: Eph. Construction Acres: 0.06 Con./Op. Pipeline Crossing Ft.: 3.00 580 Operational Acres: 0.00 Construction Crossing Ft.: 60.06 ,�� Operational Crossing Ft.: 54.03 h6 O •mak W -A18-155: PSS Q'', ✓dC Con./Op. Pipeline Crossing Ft.: 0.00 C t t A 001 \ ^O ons ruc on cres. < . S'\ o S -A18-221: Per. Operational Acres: 0.00 hP"e G Con./Op. Pipeline Crossing Ft.: 4.00 5y0 620Construction Crossing Ft.: 80.68 6p6 W -A18-155-2: PSS Operational Crossing Ft.: 52.24 Con./Op. Pipeline Crossing Ft.: 68.48 O Construction Acres: 0.16 coo „ Operational Acres: 0.00 600 00 I � - ¢ Q r O CZF ,•PFat,;3��nR O Nco i s`SO � h 00 530 � W-A18-222: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 TA-RO-088 i a 0 1 � I 6q0 620 I k .P , m �.. IR 'N CD CD o � CD Po Jk 5IO W -A18-222: PFO Con./Op. Pipeline Crossing Ft.: 42.61 s�o Construction Acres: 0.08 Operational Acres: 0.03** Legend O Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Temporary Access _ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial - -'Workspace Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of ,1j' Delineated PEM QConstruction Right Delineated PFO of -Way j Survey Area Delineated PSS ^ L _ Adjacent Sheet C1 County Boundary Streams: Approximated Ephemeral Approximated Intermittent an iiiia f�a! Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance --- ------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 9a 4° f • �a �9Ilk Rockingham ;. County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 19 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 62� S-C18-51:Int. Con./Op. Pipeline Crossing Ft.: 4.00 Construction Crossing Ft.: 87.10 Operational Crossing Ft.: 61.96 S-C18-52:Int. Con./Op. Pipeline Crossing Ft.: 5.00 Construction Crossing Ft.: 71.88 O Operational Crossing Ft.: 30.63 1 0� 'I i / 1 i MP 33.5 1 _-- --0-"- 1 � 1} 5IO W -A18-222: PFO Con./Op. Pipeline Crossing Ft.: 42.61 s�o Construction Acres: 0.08 Operational Acres: 0.03** Legend O Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Temporary Access _ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial - -'Workspace Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of ,1j' Delineated PEM QConstruction Right Delineated PFO of -Way j Survey Area Delineated PSS ^ L _ Adjacent Sheet C1 County Boundary Streams: Approximated Ephemeral Approximated Intermittent an iiiia f�a! Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance --- ------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 9a 4° f • �a �9Ilk Rockingham ;. County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 19 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 o� 0 ` q� Ego 660 Om rn _>0`'o U01 `'o _-: O oilO 0 o. TA-RO-089 •��' s 60 6 .- I 67 ,y ° 60 }� f 620 670 —r } -- to R ; U h� I U o S -A18-223: Int." ;on./Op. Pipeline Crossing Ft.: 4.00 Construction Crossing Ft.: 81.07 Operational Crossing Ft.: 41.75 o I o \ W -A18-224: PFO Con./Op. Pipeline Crossing Ft.: 4.00 S -C18-49: Int. S -C18-48: Eph. 6 �, Con./Op. Pipeline Crossing Ft.: 10.58 �� Con./Op. Pipeline Crossing Ft.: 0.00 p> �o Construction Acres: 0.02 Construction Crossing Ft.: 1.70 Construction Crossing Ft.: 87.01 Operational Acres: 0.01** Operational Crossing Ft.: 58.04 Operational Crossing Ft.: 0.00 600 °0 i r ----- ------------------ MP 34.0 ------------------------------ -------------------------- -- ------ --0---------------------- •----• -�--------------' 1 S -A18-225: Per. 5So Con./Op. Pipeline Crossing Ft.: 5.00 ! Construction Crossing Ft.: 102.37 a Operational Crossing Ft.: 76.87 o ��0 060 S I ho 0.. Legend O Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Temporary Access _ Delineated Road Intermittent — — H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of ,1j' Delineated PEM QConstruction Right Delineated PFO of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Ephemeral Approximated Intermittent 0 W M an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery d 90 Rockingham County A` x 5 � n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 20 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 TA -R -088 o 600 co I w i0 I A. 70 i • r� . I - T - - - - - - - - - - - - - - - - - - - I i W -A18-224: PEM Con./Op. Pipeline Crossing Ft.: 0.00 i Construction Acres: <0.01 i y93 i Operational Acres: 0.00 513 Ego 660 Om rn _>0`'o U01 `'o _-: O oilO 0 o. TA-RO-089 •��' s 60 6 .- I 67 ,y ° 60 }� f 620 670 —r } -- to R ; U h� I U o S -A18-223: Int." ;on./Op. Pipeline Crossing Ft.: 4.00 Construction Crossing Ft.: 81.07 Operational Crossing Ft.: 41.75 o I o \ W -A18-224: PFO Con./Op. Pipeline Crossing Ft.: 4.00 S -C18-49: Int. S -C18-48: Eph. 6 �, Con./Op. Pipeline Crossing Ft.: 10.58 �� Con./Op. Pipeline Crossing Ft.: 0.00 p> �o Construction Acres: 0.02 Construction Crossing Ft.: 1.70 Construction Crossing Ft.: 87.01 Operational Acres: 0.01** Operational Crossing Ft.: 58.04 Operational Crossing Ft.: 0.00 600 °0 i r ----- ------------------ MP 34.0 ------------------------------ -------------------------- -- ------ --0---------------------- •----• -�--------------' 1 S -A18-225: Per. 5So Con./Op. Pipeline Crossing Ft.: 5.00 ! Construction Crossing Ft.: 102.37 a Operational Crossing Ft.: 76.87 o ��0 060 S I ho 0.. Legend O Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Temporary Access _ Delineated Road Intermittent — — H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of ,1j' Delineated PEM QConstruction Right Delineated PFO of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Ephemeral Approximated Intermittent 0 W M an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery d 90 Rockingham County A` x 5 � n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 20 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 s9 0 610 i �o 0 tig0 I S90 VIA 5 MP 34.0 ------ 1-1 I =r - � -- -- - - - -- -- ------------ -----jMP'5v� I i ---------------- _ AdjacentS eet201 - - s S -C18-48: Eph. 610 6`1° ° 1 Con./Op. Pipeline Crossing Ft.: 0.00 ' t pyo co Construction Crossing Ft.: 1.70 O �, r ;J, Operational Crossing Ft.: 0.00 .- S -C18-38: Per. 590 Con./Op. Pipeline Crossing Ft.: 32.88 0 Construction Crossing Ft.: 82.18 Construction Sq. Ft.: 2,078.77 -- Operational Sq. Ft.: 0.00 Ali - + t 640 69 • 1 S70 rl G/ass i 610 s 0 700 00 - 550 570 4lirrp� \o ...i •' � 1 (O c O 590 O 5 ° 590 0 580 �. 660 0 660 ^o 90 O s, _ ^ co 610 5 Sg o 560 570 650 co`Oo�N Cb o(3J co co co ho co 0 6 TO 0 Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Perennial Surface Road Water - - H-650 Pipeline Wetlands: - -, Operational _ Delineated Wetland --'Workspace Boundary EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Ephemeral _ Delineated Ephemeral 0 W M an lm Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance - --------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, INC OneMap, TRC, USGS Basemap: Lidar 2' Contour, INC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham Co4Anty n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 21 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Lto 680 670 . •.680 �o0 0 % 6$0: ; 6i State Rd 1979 Hamlet Rd 0 +� 680 1' A 0 a 00 NAA"PEE- k - a. �a 1 I` YYiQ+ PPPP �-• -�; �S:. � � 1 a' � - �; �, . * �:' •.,,�, � '., a ,�,s.:� _a"' ., •� - ,.�• -- - - CO S -C18-38-3: Per. 10 Con./Op. Pipeline Crossing Ft.: 23.31 6,0 r . 1P_ Construction Crossing Ft.: 87.35 _ Ap _Construction Sq. Ft.: 1,220.29 t. Operational Sq. Ft.: 0.00_ .w MP 35.0p� t i •_------------ - - - -------------------- - - - - --------------- - - - - -- J. ----------------------.-J. W -C18-40: PEM% ^o Con./Op. Pipeline Crossing Ft.: 0.00 co Construction Acres: <0.01 AL i S-C18-53:Int. S -C18-74: Eph. S -C18-38-4: Per. Operational Acres: 0.00 1 S -C18-38-2: Per. Con./Op. Pipeline Crossing Ft.: 2.00 Con./Op. Pipeline Crossing Ft.: 3.00 Con./Op. Pipeline Crossing Ft.: 7.50 A. Con./Op. Pipeline Crossing Ft.: 16.74 Construction Crossing Ft.: 214.88 Construction Crossing Ft.: 71.55 Construction Crossing Ft.: 60.14 1 S -C18-39: Eph. Construction Crossing Ft.: 333.02 Operational Crossing Ft.: 138.35 Operational Crossing Ft.: 59.45 Construction Sq. Ft.: 467.25 m./Op. Pipeline Crossing Ft.: 2.00 660 Construction Sq. Ft.: 3,961.44 Operational Sq. Ft.: 0.00 ' :onstruction Crossing Ft.: 107.50 Operational Sq. Ft.: 0.00 O Operational Crossing Ft.: 71.35 6113 66 10 0 1 6) o - 1 0 LO 6$0 620 r0 1 J RO 1 O o 6g0 0 130 S h 700" 0 6,0 �0 110 0 0 00 c°D 000 610 0 0 660 66, c°'r oM M 0Loc0o r" o rn o N0 30 p0 �O 60 10 ^0 0 0 Mo 11 66 650 610 0 0 o (DcD d 0cD 0� 0 n ^ 1 I 1 n o n n 120 Legend O Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Temporary Access _ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace Approximated EDTemporary Access Intermittent Road - Perennial Surface Limits of Water [::]Construction Right- Wetlands: of -Way _ Delineated Wetland Survey Area Boundary L _ Adjacent Sheet 0j;4 Delineated PEM County Boundary Streams: Approximated Ephemeral Approximated Intermittent ® f� IM an am Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) ' = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance - --------------------------Application------------------------------------------------------------------------------ Data Sources: EDT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery ..Y x Rockingham 9' m County _ 4 � M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 22 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: _ Delineated Intermittent _ Delineated Perennial - Perennial Surface Water Wetlands: _ Delineated Wetland Boundary 0 W 0) Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery CSJ Fr Hata Rockingham F` County a. w Harnaa„ M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 23 of 107 600 Willowbrook Ln CTRC West Chester, PA 19382 Date: May 2019 z � 760 770 o� �Y A� r TA-RO-092 r i Mr N- t ter' yo X80 0 0 0 0 0 O �Q 0 750 0 760 1� 790 790 rn o \ TA-RO-093 800 S-: Per. Con./Op. Pipelineeline Crossing Ft.: 9.94 : �,. s 790 Construction Crossing Ft.: 72.87 � ` f Construction Sq. Ft.: 600.26 Operational Sq. Ft.: 0.00 MP 355! o.. r o 40 r � � %% fff • • r 740 r r - r r W fO r f _ r 760 rl M' "il •, 750 .'� }�- .r _ Legend O Mileposts (MP, 0.5 —Delineated Pond mi) Approximated _ Temporary Access Intermittent Road - Perennial Surface - - H-650 Pipeline Water --,Operational Pond L - -'Workspace Wetlands: ED Temporary Access —Delineated Wetland Road Boundary Limits of ;.; Approximated PEM [—]Construction Right- Delineated PEM of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: —Approximated Intermittent _ Delineated Perennial ® 5G� IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application DataSources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County,a g n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 24 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 0 0 0 0 0 c CP 860 1o 820 fR f o 00 o ca co wo 00 LO o s5° o m 0 S�0 u2n r 800 S-: Per. Con./Op. Pipelineeline Crossing Ft.: 9.94 : �,. s 790 Construction Crossing Ft.: 72.87 � ` f Construction Sq. Ft.: 600.26 Operational Sq. Ft.: 0.00 MP 355! o.. r o 40 r � � %% fff • • r 740 r r - r r W fO r f _ r 760 rl M' "il •, 750 .'� }�- .r _ Legend O Mileposts (MP, 0.5 —Delineated Pond mi) Approximated _ Temporary Access Intermittent Road - Perennial Surface - - H-650 Pipeline Water --,Operational Pond L - -'Workspace Wetlands: ED Temporary Access —Delineated Wetland Road Boundary Limits of ;.; Approximated PEM [—]Construction Right- Delineated PEM of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: —Approximated Intermittent _ Delineated Perennial ® 5G� IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application DataSources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County,a g n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 24 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 Wetlands: mi) _ Delineated Wetland _ Temporary Access Boundary Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: _ Delineated Intermittent — Delineated Pond Pond ® soy IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery +t Roc ' i n g h a m ount-y,, M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 25 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 AL A 0 tJO "VO a4o d11 �y0 800 8" O E W J 0 S -A18-94: Per. I Con./Op. Pipeline Crossing Ft.: 3.00 Construction Crossing Ft.: 125.00 I CD Operational Crossing Ft.: 50.10 730 .�fto. MP -310 . I ,80 W -A18-95: PEM Con./Op. Pipeline Crossing Ft.: 7.55 Construction Acres: 0.02 Operational Acres: 0.00 X60 770 r Iw It 730 17 50 140 I• lrP�2 Legend o Mileposts (MP, 0.5 —Delineated Pond mi) Pond _ Temporary Access Wetlands: Road Delineated Wetland - - H-650 Pipeline —Boundary --,Operational 0'j:4Delineated PEM - -'Workspace aTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: _ Delineated Intermittent _ Delineated Perennial ® f� IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �e ¢,Rockingh:am Count ,. y • M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 26 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 —Delineated Pond mi) - Perennial Surface _ Temporary Access Water Road Pond - - H-650 Pipeline Wetlands: --,Operational Delineated Wetland - -'Workspace — Boundary EDTemporary Access Delineated PFO Road Limits of Q Construction Right- of-Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Delineated Ephemeral _ Delineated Perennial ® soy IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery ~2 Rockingham ..0 ,o u n t y � Rd 94 M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 27 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 it CIO, O Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Approximated Road Perennial - - H-650 Pipeline - Perennial Surface --,Operational Water - -'Workspace Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Perennial _ Delineated Ephemeral ® soy IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County M `♦ 6 ♦♦ v 4 4 FIa�4 M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 28 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 0 •a LO J ♦ 3'8.0 moo,. 'o TA-RO-103 0 r^� 0 680 690 w S -A18-1: Eph. (Temporary Access Road) O Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 4.82 Operational Crossing Ft.: 0.00 j_f S-A18-2: Per. on./Op. Pipeline Crossing Ft.: 20.49 Construction Crossing Ft.: 86.73 Construction Sq. Ft.: 1,452.84 Operational Sq. Ft.: 0.00 Y N 4' 0 730 r 6. J- s X40 Gari �r oil ' �6S QO o 66 ' 0 80 1 � 0 1. rn 1 `O I 660 1 lay 690 680.. jo T, 0 W -A18-6: PEM £, s Con./Op. Pipeline Crossing Ft.: 45.87 6 Construction Acres: 0.09 ¢Q Operational Acres: 0.00 S -A18-4: Per. Con./Op. Pipeline Crossing Ft.: 0.0 - Construction Crossing Ft.: 26.77 *. Construction Sq. Ft.: 34.90 Operational Sq. Ft.: 0.00 S -A18-9: Per. Con./Op. Pipeline Crossing Ft.: 3.00 Construction Crossing Ft.: 122.40 \ Operational Crossing Ft.: 74.90 S -A18-4-2: Per. Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 41.47 Construction Sq. Ft.: 116.58 Operational Sq. Ft.: 0.00 1 0 1 .1 620 1 1 - A- -�,� MP 38.5 I - I - I - I - I I - - I I - 0.y(, W -A18-6: PFO 650 Con./Op. Pipeline Crossing Ft.: 129.65 Construction Acres: 0.15 Operational Acres: 0.08** "! y0 O 680 49. r` 1� N 4' 0 730 r 6. J- s X40 Gari �r oil ' �6S QO o 66 ' 0 80 1 � 0 1. rn 1 `O I 660 1 lay 690 680.. jo T, 0 W -A18-6: PEM £, s Con./Op. Pipeline Crossing Ft.: 45.87 6 Construction Acres: 0.09 ¢Q Operational Acres: 0.00 S -A18-4: Per. Con./Op. Pipeline Crossing Ft.: 0.0 - Construction Crossing Ft.: 26.77 *. Construction Sq. Ft.: 34.90 Operational Sq. Ft.: 0.00 S -A18-9: Per. Con./Op. Pipeline Crossing Ft.: 3.00 Construction Crossing Ft.: 122.40 \ Operational Crossing Ft.: 74.90 S -A18-4-2: Per. Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 41.47 Construction Sq. Ft.: 116.58 Operational Sq. Ft.: 0.00 1 0 1 .1 620 1 1 - A- -�,� MP 38.5 I - I - I - I - I I - - I I - 0.y(, W -A18-6: PFO 650 Con./Op. Pipeline Crossing Ft.: 129.65 Construction Acres: 0.15 Operational Acres: 0.08** "! y0 O W -A18-6-2: PFO Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00** W -A18-6-3: PFO Con./Op. Pipeline Crossing Ft.: 91.73 Construction Acres: 0.09 Operational Acres: 0.06** Legend o Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Perennial Surface Road Water - - H-650 Pipeline Wetlands: - -, Operational _ Delineated Wetland L - -'Workspace Boundary ED Temporary Access ,, je Delineated PEM RoadDelineated PFO Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Ephemeral Delineated Ephemeral ® f� an ff�l Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application DataSources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 90L P !;6" , H11 Rd Roc king ham's CountyyA ey % M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 29 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 1� i O 00 0 rn � 0 W -A18-6-2: PFO Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00** W -A18-6-3: PFO Con./Op. Pipeline Crossing Ft.: 91.73 Construction Acres: 0.09 Operational Acres: 0.06** Legend o Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Perennial Surface Road Water - - H-650 Pipeline Wetlands: - -, Operational _ Delineated Wetland L - -'Workspace Boundary ED Temporary Access ,, je Delineated PEM RoadDelineated PFO Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Ephemeral Delineated Ephemeral ® f� an ff�l Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application DataSources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 90L P !;6" , H11 Rd Roc king ham's CountyyA ey % M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 29 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 66 0)rn 1 630 - 0 0 o U, P o k o o- 0- 1 >. Ew. ai r S -A18-4-2: Per. 00ir1�;�;. Con./Op. Pipeline Crossing Ft.: 0.00 ro! Construction Crossing Ft.: 41.47 A # Construction Sq. Ft.: 116.58 Tj Operational Sq. Ft.: 0.00 0 1 � O 6�0 W -A18-6-3: PFO rn , k';• Con./Op. Pipeline Crossing Ft.: 91.73 0 Construction Acres: 0.09 Operational Acres: 0.06** 660 0 `o [ co } W -A18-6: PEM °moo 7 Con./Op. Pipeline Crossing Ft.: 45.87 66( I Construction Acres: 0.09 Operational Acres: 0.00 9 W 0 670 - TA-RO-104 = W -A18-7-5: PEM 6 I I Con./Op. Pipeline Crossing Ft.: 16.09 1 Construction Acres: 0.04 >>' Operational Acres: 0.00 1 11 rn 1111 St J. ateRa7 .... ,♦ ,.. 1 1 1 1 9� MP 38.5 1�1 1 J. M1W-A18-6-2: PFO` 1 1 1 1 1 ---- Con./Op. Pipeline Crossing Ft.: 0.00 1 1 1 1 1 1 1 1 Construction Acres: <0.01 1 1 1 1 1 1 1 1 Operational Acres: 0.00** 1 W -A18-7: PFO g Con./Op. Pipeline Crossing Ft.: 0.00 so Construction Acres: <0.01 Operational Acres: 0.00** W -A18-7: PEM Con./Op. Pipeline Crossing Ft.: 75.79 ' Construction Acres: 0.18 Operational Acres: 0.00 680 W -A18-7: PSS 01 Con./Op. Pipeline Crossing Ft.: 33.74 L0 Construction Acres: 0.08 ^po Operational Acres: 0.00 W -A18-7-2: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 W -A18-7-4: PEM Con./Op. Pipeline Crossing Ft.: 28.70 Construction Acres: 0.07 Operational Acres: 0.00 W -A18-7-3: PEM Con./Op. Pipeline Crossing Ft.: 16.28 Construction Acres: 0.05 Operational Acres: 0.00 o� 0 0 oar. 4 S: Eph. Con./Op. Pipelinepeline CCrossing Ft.: 2.00 Construction Crossing Ft.: 81.32 Operational Crossing Ft.: 55.24 TA-RO-106 W -A19-270: PFO Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.02 Operational Acres: <0.01 ** S -A19-269: Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 103.50 Operational Crossing Ft.: 51.62 S -A18-8: Per. Con./Op. Pipeline Crossing Ft.: 53.13 Construction Crossing Ft.: 97.69 Construction Sq. Ft.: 3,866.09 Operational Sq. Ft.: 0.00 o° % 0�o 0 S-1318-73: Eph. r Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 7.59 Operational Crossing Ft.: 0.00 t^ OHO ,,v t ami lam 620 i 1:1-e: 630 640 650 1 660 k, If 610 r r 680 i I 0 l � 0 Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Perennial Surface Road Water - - H-650 Pipeline Wetlands: - -, Operational _ Delineated Wetland L - -'Workspace Boundary ED Temporary Access ,, je Delineated PEM RoadDelineated PFO Limits of e Delineated PSS [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Delineated Ephemeral _ Delineated Intermittent ® f� IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �, 4u Rockingham �Couhnty M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 30 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline — Delineated Pond - Perennial Surface Water M Pond Wetlands: --,Operational Delineated Wetland - -'Workspace — Boundary Temporary Access i ED Road ,,:,Delineated PEM Limits of x Delineated PFO Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: _ Delineated Ephemeral _ Delineated Perennial 0 W IM an '1141k Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 4 kill Rd �Rn Rockingham County m o — —�- — 0 w s M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 31 of 107 600 Willowbrook Ln CTRC West Chester, PA 19382 Date: May 2019 1 )80 C U) W-1318-78: PFO N Con./Op. Pipeline Crossing Ft.: 55.99 w Construction Acres: 0.06 '� Operational Acres: 0.03** '� S-1318-74-2: Per. Con./Op. Pipeline Crossing Ft.: 4.00 X0A Construction Crossing Ft.: 88.97 2-: P 60 0 , Operational Crossing Ft.: 35.86 6100 -1 750 �-- P1 '♦` CDS,, ,, w �T- ♦♦ v 7401. ,00 1} ♦ _ - o 00 �asp w r. IVIP 39.5 TA-RO-108 TA-RO-107 �`' • \ 90 . s '• J \�7p 76o k cj \rh x� o Road it ' 3 o J •\ a a) 1g0 o O•••\ J , o do 740 ��� CP o o lip Legend O Mileposts (MP, 0.5 Streams: mi) _ Delineated _ Permanent Access Intermittent Road _ Delineated _ Temporary Access Perennial Road Wetlands: - - H-650 Pipeline _ Delineated Wetland --,Operational Boundary L__1 Workspace Delineated PEM QOperational Bore Delineated PFO EDPermanent Access Road Temporary Access ED Road Limits of [—]Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary an iiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ----------------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery D Roc king han), C°®aunty M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 32 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 00 ♦ / - ♦ ♦ /. X10 ♦ ♦ /. MP 4'0.0'♦♦♦ 0 r- ee ' 5r- ♦ e Paoa� / ♦ /� c * r W-1318-112: PEM 110 • Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.01 140 / Operational Acres: 0.00 �o S-1318-109: Eph. Con./Op. Pipeline Crossing Ft.: 3.00 Construction Crossing Ft.: 37.28 Operational Crossing Ft.: 6.46 %60 750 ,t �O r' o co - n - P ^c I50 750 '� 1p 770 S-1318-108: Per. Con./Op. Pipeline Crossing Ft.: 26.88 Construction Crossing Ft.: 80.36 Construction Sq. Ft.: 1,676.44 Operational Sq. Ft.: 0.00 ren ^ 1 W-1318-110: PFO Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.02 Operational Acres: 0.01 ** Y�n`4,.­ 1 1po �^p o 720 730 730 N 3 ^ S -A18-210-2: Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 60.94 Operational Crossing Ft.: 45.94 -—''� p ----- I, I S -A18-210: Int. a Con./Op. Pipeline Crossing Ft.: 0.00 Mo Construction Crossing Ft.: 38.09 Operational Crossing Ft.: 11.88 0 . Av c 10 ' � O TA-RO-111 7�y �0 0 Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Perennial Surface Road Water - - H-650 Pipeline Wetlands: - -, Operational _ Delineated Wetland --'Workspace Boundary ED Temporary Access ,, je Delineated PEM RoadDelineated PFO Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: _ Delineated Ephemeral _ Delineated Intermittent ® 5G� IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance -------- -------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County tir dam, M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 33 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 aw.a ywae M•M Date: May 2019 4 � 770 S-1318-108: Per. Con./Op. Pipeline Crossing Ft.: 26.88 Construction Crossing Ft.: 80.36 Construction Sq. Ft.: 1,676.44 Operational Sq. Ft.: 0.00 ren ^ 1 W-1318-110: PFO Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.02 Operational Acres: 0.01 ** Y�n`4,.­ 1 1po �^p o 720 730 730 N 3 ^ S -A18-210-2: Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 60.94 Operational Crossing Ft.: 45.94 -—''� p ----- I, I S -A18-210: Int. a Con./Op. Pipeline Crossing Ft.: 0.00 Mo Construction Crossing Ft.: 38.09 Operational Crossing Ft.: 11.88 0 . Av c 10 ' � O TA-RO-111 7�y �0 0 Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Perennial Surface Road Water - - H-650 Pipeline Wetlands: - -, Operational _ Delineated Wetland --'Workspace Boundary ED Temporary Access ,, je Delineated PEM RoadDelineated PFO Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: _ Delineated Ephemeral _ Delineated Intermittent ® 5G� IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance -------- -------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County tir dam, M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 33 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 aw.a ywae M•M Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: _ Delineated Intermittent _ Delineated Perennial Wetlands: _ Delineated Wetland Boundary Delineated PEM 0 W in Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rocking ham Counfy l a' M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 34 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 610 600 - AN S-1318-57: Per. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 85.96 Operational Crossing Ft.: 51.54 W-1318-55: PFO Con./Op. Pipeline Crossing Ft.: 83.65 Construction Acres: 0.13 Operational Acres: 0.06** 10 W-1318-55: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 I ss0 w 0 I i I I i I I Cl) 670 NI. M. N, �I a� QI I 620 I - t 640 i -- 650 I i_ 660 I I I I 660 I i S-1318-56: Per. Con./Op. Pipeline Crossing Ft.: 39.06 Construction Crossing Ft.: 82.67 Construction Sq. Ft.: 2,708.02 Operational Sq. Ft.: 0.00 rn00 a�0 �... o A 650 S -A18-171: Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 79.02 Operational Crossing Ft.: 10.39 0", o 650 c'o 6�?0 640 SS'O 6�0 o� 0 61 i�l►vwr;, -s o Legend 0 Mileposts (MP, 0.5 _ Delineated mi) Intermittent _ Temporary Access _ Delineated Road Perennial - - H-650 Pipeline - Approximated --,Operational Perennial L - -'Workspace -Perennial Surface EDTemporary Access Water Road Wetlands: Limits of _ Delineated Wetland QConstruction Right- Boundary of -Way ,Approximated PFO ^Survey Area Oj: Delineated PEM L _ Adjacent Sheet Delineated PFO C1 County Boundary Streams: Approximated Perennial _ Delineated Ephemeral ® 5G� IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --- --n--e--M--a--p-,--T--R--C-,--U--S--G--S Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery rc A Rockingham County hMW aMA3!71 n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 35 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 s0 660 W -A19-277: PEM (Ground Bed) j e6 Con./0p. Pipeline Crossing Ft.: 0.00 O 680 Construction Acres: 0.02 670 Operational Acres: 0.00 US qwy 29 �" r�� — 670 US Hwy 29 y i i � I1. 640 1 A i, ' Ir i' �. _Adjacent Sheet - AZO ry; • — � _,nes. �� _ � goo 1 1840 �o 4 - 1840 >,o 680 670 660 640 s 730 �O °' l50 -rxST? M _ 760 '189 770 RR �� 0 700 r0 s � O 670 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road --,Operational L - -'Workspace EDTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet L_-1 County Boundary Streams: Wetlands: _ Delineated Wetland Boundary Oj;� Delineated PEM Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ---------------------------------------------------------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery w aha•ee• sn ! '6 Rockingham p1�; County, x n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 36 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 Wropo f rye r Ll r �. )70 , 690 �0 6i0, 660 0 goo 1 1840 �o 4 - 1840 >,o 680 670 660 640 s 730 �O °' l50 -rxST? M _ 760 '189 770 RR �� 0 700 r0 s � O 670 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road --,Operational L - -'Workspace EDTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet L_-1 County Boundary Streams: Wetlands: _ Delineated Wetland Boundary Oj;� Delineated PEM Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ---------------------------------------------------------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery w aha•ee• sn ! '6 Rockingham p1�; County, x n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 36 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 ti 640 630 660 680 Sso 60 690 -Q r• U o State Rd 2580 (0 S -B18-45: Eph. 6> Con./Op. Pipeline Crossing Ft.: 0.00 O ;• wr Construction Crossing Ft.: 34.47 AS, �U��/ Operational Crossing Ft.: 29.25 PA-RO-113A ♦ `♦ M P 41.5 Q a> ? .; 680 O .X .. � o ♦♦ r� o 0 0 - � � rn %% �, o o 6j0 0 `♦ / C° W -B18-46: PFO rn ♦♦ �" 6� 6r, Con./Op. Pipeline Crossing Ft.: 5.85 0 ♦ Construction Acres: 0.02 Operational Acres: 0.01 ** o ♦r" � ♦ S -B18-44: Int. _ `:- `♦-- Con./Op. Pipeline Crossing Ft.: 3.00 ' ♦ _ _ _ _ _ - -- Construction Crossing Ft.: 80.28 f - - - - - - - Operational Crossing Ft.: 42.57 _ o 650 :. r W -B18-43: PEM (Permanent Access Road) 00 � � Con./Op. Pipeline Crossing Ft.: 0.00 It=i. Construction Acres: <0.01 Operational Acres: 0.00 AS -B18-44: Int. Adjacent S eet 3 — — ♦ / - � Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 57.90 Operational Crossing Ft.: 0.00 3 i _ _ (4 V) I i 11� o 1 1160 W -B18-43-2: PEM (Permanent Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.02 ♦ '`� 630 Operational Acres: 0.00 0 690 � S -B18-42: Int. (Permanent Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 ♦ Construction Crossing Ft.: 13.17 o I `♦ TA-RO-113 Operational Crossing Ft.: 13.17 �^ I W -A19-277: PEM (Ground Bed) I Con./Op. Pipeline Crossing Ft.: 0.00 `♦ Construction Acres: 0.02 Operational Acres: 0.00 I `♦ I ` ITO `'O I L S -B18-41: Per. - - Con./Op. Pipeline Crossing Ft.: 19.47 Construction Crossing Ft.: 83.90 Construction Sq. Ft.: 1,619.40 Operational Sq. Ft.: 0.00 V. r X20 680 'qPw't 690 700 o gib'• ... e -a .MO 690 Legend Mileposts (MP, 0.5 O mi) _Approximated Intermittent _ Permanent Access _Approximated Road Perennial Temporary Access Delineated _ Road _ Ephemeral - - H-650 Pipeline _ Delineated --,Operational Intermittent - -'Workspace Delineated a Permanent Access _ Perennial Road - Approximated Temporary Access ED Perennial Road - Perennial Surface Limits of Water [::]Construction Right- Wetlands: of -Way Delineated Wetland Survey Area _ Boundary L _ Adjacent Sheet Delineated PEM C—! County Boundary � Delineated PFO Streams: 0 W in 412 Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------- sources:Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery s .� Rokingham County �foe w.y rq M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 37 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 720_ `� :...... , .... -ACJo Li X20 1Zo 710 Legend O Mileposts (MP, 0.5 _Approximated mi) Ephemeral _ Permanent Access _ Delineated Road Ephemeral _ Temporary Access _ Delineated _ Road Perennial H-650 Pipeline Wetlands: ---,Operational _Delineated Wetland 'Workspace Boundary L�3Permanent Access Road EDTemporary Access Road Limits of [::]Construction Right- _ of -Way Survey Area L _ Adjacent Sheet C—! County Boundary Streams: ® soy r1� an iiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application DataSources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County , • i �p n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 38 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 . I .,alp. - • \ - .'yam. = i=i �. Si• t��.!'.. '� • • ' !•L -sir Y. e . �'' - _ f✓ • '''.!�. �.' �` " _ a �,�.'1 r `AML''_ �•.'kY♦• 1 \\ •�°°••r'•' ' N ';}�•=_ _ _ _ _ - •jig. -"w.'. '7...• •. s - -- - $• �� Ir '-��i1 :- �p '$' •'I Tia' S5'' %��, Poe k 4 •--- It',' • I kk 1'. k k' _ ljil , . _ ,. ' - ; .SIF ' ,�tti 1�� � -'1k:= ••j, f { - ; [• � :' y `Y 'Sti - it __ ••Y • , 'rIs _' 1 II 1• 1 1 11" ^T_ :a, I -",;, f .. • — 1 .mak 'If I - 1 1 1 1 x,, } `I � 'r - 1 - _-.• II- 1 1 1 r _ F'i _-i."'.�'`�. ti+,A �r�l.� l '; ,. 1• '- - '1?f •, `. `` _ i�Lk F �• - •' �a,P,`�; :1: G •\ \ :� '''f'',' - 11'f .,S'i • �` 720_ `� :...... , .... -ACJo Li X20 1Zo 710 Legend O Mileposts (MP, 0.5 _Approximated mi) Ephemeral _ Permanent Access _ Delineated Road Ephemeral _ Temporary Access _ Delineated _ Road Perennial H-650 Pipeline Wetlands: ---,Operational _Delineated Wetland 'Workspace Boundary L�3Permanent Access Road EDTemporary Access Road Limits of [::]Construction Right- _ of -Way Survey Area L _ Adjacent Sheet C—! County Boundary Streams: ® soy r1� an iiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application DataSources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County , • i �p n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 38 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial - Perennial Surface Water Wetlands: _ Delineated Wetland Boundary Delineated PEM 0 W 0) Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery ♦yCJy��J � Cl�•J c` - Rockinyham p County tia M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 39 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 I / 590 + s Dr i" 600 ) kt o C� k o do ""660 - y 6 •,,. 70 6-90 6 � o 0 � oh 660 00. 630 ori• t_ I? _ w f 00 S -A18-105: Per. Pipeline Crossing Ft.: 53.47 io Construction Crossing Ft.: 181.80 Construction Sq. Ft.: 2,619.61 'Operational Sq. Ft.: 0.00 .� �. MP143.5 100 � ♦ I TA-RO-117 w co � 6 o S -C18-80: Per. 0C Con./Op. Pipeline Crossing Ft.: 4.00 S -A18-176: Per. Construction Crossing Ft.: 77.19 Con./Op. Pipeline Crossing Ft.: 25.85 °� Operational Crossing Ft.: 30.59 Construction Crossing Ft.: 88.63 Construction Sq. Ft.: 1,786.81 A Operational Sq. Ft.: 0.00 a +� S -A18-181: Per. ' Con./Op. Pipeline Crossing Ft.: 2.00 OP Construction Crossing Ft.: 111.80 ' o Operational Crossing Ft.: 79.32 - - - cD •.: opo O 650 660 6jo Ego •.hee�A Legend O Mileposts (MP, 0.5 Wetlands: mi) _ Delineated Wetland _ Temporary Access Boundary Road �j: Delineated PEM — — H-650 Pipeline ><-> Delineated PFO --,Operational L - -'Workspace EDTemporary Access Road Limits of [:]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: _ Delineated Perennial Perennial Surface Water an iiiia ff�l Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ---------------------------------------------------------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham ,County , c, a$ f °c M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 40 of 107 CD 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Approximated Road Perennial - - H-650 Pipeline - Perennial Surface --,Operational Water - -'Workspace Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of ,1j' Delineated PEM Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Perennial _ Delineated Ephemeral an Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 114y w Rockingham County s M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 41 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 S -A18-105: Per. �_ t Uon./Up. Pipeline l;rosslng Ft.: 4.UU Construction Crossing Ft. : 85.27 690 ! 'i Con./Op. Pipeline Crossing Ft.: 53.47 Operational Crossing Ft.: 55.45 4" 1 Construction Crossing Ft.: 181.80 Construction Sq. Ft.: 2,619.61 - Operational Sq. Ft.: 0.00 oo 1p 00 00 00 7o. 640 rn o ♦ �' ♦ ,� g 620 - f S -C18-80: Per. S -A18-102: Per.. Con./Op. Pipeline Crossing Ft.: 3.00 ' o Con./Op. Pipeline Crossing Ft.: 4.00 610 Construction Crossing Ft.: 112.45 620 6 �'o �, Construction Crossing Ft.: 77.19 610 :=- Operational Crossing Ft.: 30.59 ado Operational Crossing Ft.: 83.67 610 Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Approximated Road Perennial - - H-650 Pipeline - Perennial Surface --,Operational Water - -'Workspace Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of ,1j' Delineated PEM Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Perennial _ Delineated Ephemeral an Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 114y w Rockingham County s M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 41 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Mlff ............... P 11 S -A18-226: Eph. W';• U 770 t66 ' ho O ' 6 6q0 6g0 6 O : ^o 0o co Mm'c •0. o .. o > 750 66 SO O 680 0 0 0 0 0 r, X10 0 o s0 0 Legend O Mileposts (MP, 0.5 —Delineated Pond mi) Pond - - H-650 Pipeline Wetlands: --,Operational Delineated Wetland L - -'Workspace — Boundary Limits of 0'j:t Delineated PEM [::]Construction Right of -Way Survey Area L _ Adjacent Sheet L__. County Boundary Streams: Approximated Ephemeral _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial ® W 0 an Note: 11 March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery a, Iy - F�bckingham r"°"R° County r° Mountain Valley PIPELINE-LLc Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 42 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 """"'°'""•o-"' Date: May 2019 Construction Crossing Ft.: 78.69 Operational Crossing Ft.: 52.54 •. • !r r ' 1, ••Orr • alp,,. . ��__�I'.`:; - ; - ■ � _ ' �•,'1`• 1 i•S•�,�! .r ,r•- _ - :Gt' -. .. - _ y, 1 �•__ `►1 fir.:: �_z.r '-�•,'1 ;,_• -.-'Y,+w`�~` "''' --- ------ , '------- M1 1 Y tJAe: �_ d'.`•t w ,�_ - _- - �•y •rte .i '.-•mac •;:.a�°•'-�----__.-.. �'i tai.: �..— �_ - �-- -�;.A 114 _ -~ii `•a 1° /.�4 5'_ ��•' r .. ___ - rll�a••� -i' - '`rte - __ - It ,•+-;'••!fir � _ _ _ � �'°: '�i' �`� ��•'�'}. tir7, 1 ''��. �j� .'f:e �/IJ _ 'I' - -CJs-r,.$i•• 'ir J 1 •I.• -.1.4t`•�. r. !I •t `S .'' d - X14 �. f a p'` 'Im_I ell - - 11 1',' %% '-- 1 •1 + '• F •• 1 I I' i - _ _ `o . •, �;; "r ,' ...-Ir �.n r+fr .:,. .:�. _ .3-. -.'• 4 .. r,i,c • r _ 1 II 1.• 1 �� - _ P i 1 ii �lr„••, 'y1`N•° %• _ _. ` - :/r ._ al'--.: 11 .:¢.fir - Conztruction Crossing Ft.: 90.63_-_ ' _ , _ kk '`.ice•'• W. y--------- d N. i'� X115 II- 11 Crossing .. ------ 1 i __-�-- 11 '- �.' • kk ,•1 r="-"•''' Srl3kk s -_- -- _ -'e �'• - ri' --- ,kkf=• _ %r•' 41 4 11' Ir IV V �4;'t' ' Ir �1! __ __ _. IF' S, y - - _ ___ �__ __- �^ `111 IIF _ • _ 11 k Pi '11•' rA ' I' r' Ir' L' 11 _ I 111' Y'I ''I• - - -- t r ,i r� • •• _ •S- T. uil 11 .•.yrs - _ �~•N -- - _ _ - •' '•p: - ^` � ,'{ - '� ^ - •i� - .,11 • '.'t • ' J'' '1' • 41 'll ''y- der •1..i.'i�',� - •err l' pis - __ • 11 -'7 n _g _ ,n 1 1,11 !-! -e --- ['. �R � - - 1 it - •r� � 1 ..tv it �� • • =•r'= - r.. 'il ' - �s"''-. _ -_ _ _ - - - - - 1'IF', :'�' . 1 •11. �`� • •'S , - - ;I,Iy �' �� n. ,Ir llr• 4 ' ' • _ •' �J+'I r 4r 1'S4r , 111 •' 1 ••�r " Ill 1'1 y 1 1 t66 ' ho O ' 6 6q0 6g0 6 O : ^o 0o co Mm'c •0. o .. o > 750 66 SO O 680 0 0 0 0 0 r, X10 0 o s0 0 Legend O Mileposts (MP, 0.5 —Delineated Pond mi) Pond - - H-650 Pipeline Wetlands: --,Operational Delineated Wetland L - -'Workspace — Boundary Limits of 0'j:t Delineated PEM [::]Construction Right of -Way Survey Area L _ Adjacent Sheet L__. County Boundary Streams: Approximated Ephemeral _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial ® W 0 an Note: 11 March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery a, Iy - F�bckingham r"°"R° County r° Mountain Valley PIPELINE-LLc Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 42 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 """"'°'""•o-"' Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Permanent Access Road _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace aPermanent Access Road EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Wetlands: _ Delineated Wetland Boundary Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �i i �0 Rockingham County b 2 E 8 M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 43 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 i_ �- -' 55.1j 5-.-• Vie; _- ,_.. p•.c.' 'I � ':— •_ - _ •-•s� - -• 1 ,�• N._`y :+rte - _ .•� r*r r- f�. -fy - /moi. t'-,:<<• 4__', _ _ �.t-„•.•x ,1,a 11`.•. Z' ,4 ..%; '�7'• •1 �/.•e��•-- �� • - _ y" rYw 1' 11, }� •.Yti.Sr-•:i� Y. -:t. •fS �; - -• .,yam • S.'`}. sRj •.� _ Y+.. r' k� '1��`�+� • i ice. 4 :+'ef'1 +:?: 1 _ �. Yp • � r',s 4r `� ' arT,y ,. r -ori,' ',I] •r'h, VV{`: r'•''.. ". .'•� •; ' \,i s -- ,I •f l .1i; .•:r i`i'i 'S'''15'•1 'i•°}- 'PP; ? ;fir ; - - -- _ _ �M.1, 1...:�1�5• _ .j^r; '�!a. „F, ,,S 41 •-fir' - '41 '� IW ill'' '___ I.?�''' rya `ice'• i.Y_:. _ - 11 - I; 111 1 '1• z 'A 1 F -- `� : - - - - rr Ir �' �.4� - - - ,'r' - -_ __. _ 1 II 11• 1 1 111 __ �c', •;�-_-__-- i1 _ •fes - _ �:U' - Construction Crossing _'✓{•�'- °'.� --- -- _ _ Y• - - _s- _J-- Operational 1 1 111 _ -y:• rte-. �-• ryl [I�`__'••' _��_.--ter-•ti _ - - _ .sem •'43` •" _ s`e _ -Y.--- s_' -- - � - _ - - ..,+- IZ - - - ':l� _ -1 Vii'',' ,•�:: ♦'• � '• "Y_ 'rp" '7 - 44 �'r � t i __•F•;fr •rery � _ - _ - � 1 _ -iia' • _ - -_- r �� •a'1'_• _ _ _ 'f' •'�� --' �;a Ski .. moi.' - _ _ _ _ . ,Iw - ; i ' 3Li" � -� •i e'� i e' r • ' �s n i�fi.. j �f�• fd irr. F'R't1.Ix�-�. - . T Y•. _ lx..• .tiF.;!'Yl'.S -• i r/i �_,F. i•;i"- af.•I+Y s' I�r_� r• .r .� I �Y .� - ��- -- _ � '.r ra � _ 'r'�'� __ - -i --ti?i - - _1-- ��._ •'�- �'•'/,':1�"� 1318-71: Per. 'Pi Pl • 1 1 m k' Construction Crossing Ft.: 97.13 vp ' II ' ''I•i11.' . Construction 1 111 '1 `'• v,lf'P --- '1� II• 1 1 11119 _ - '•• • y$.�• 1• __ iii, _. _ }',7d:. _ _ "' - - r•� ��. ' . .z : ,•fit : c_ • �'S - �___ _ °,! _ 'iZ• _•)i••s •fir,•. N•r'. / ••,YS'� - �.'�--+�N.,, 1-. _____• Ip, _.__ - �}, .may"' i� _'wr _ r� ti �••SI •• , ;1 Yip',' r' �+� ' 1 '��- -- :r•- _ - 111. - ,'la , - I, - • '. 2�•�•„' '1 - yr r. _ 1 4 I - ',rl`'r • � j l ' - ' L •<r== ' J :y.l - •y-;.�`� i YI n• _ i�I - 'Y+- I 1 f � _s. P PP Y _ 4 Y k' • LP P kt •[ a. - - •'I - - r!. �. .ys 1 1'I ii"'' i'lll '•' - 1� � t . ; , rt t. / P'i.'1 - :;tP P:::::��1::::; �:•=:-:•:=::----=_ -_��� .... . . Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: Approximated Intermittent _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial Wetlands: _ Delineated Wetland Boundary Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County 46 M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 45 of 107 600 Willowbrook Ln CTRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: —Approximated Intermittent —Approximated Pond Delineated — Ephemeral _ Delineated Intermittent _ Delineated Perennial Approximated Pond Wetlands: _ Delineated Wetland Boundary C-15� Delineated PSS Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 46 Rockingham County I M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 46 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline - Perennial Surface Water Wetlands: - -, Operational _ Delineated Wetland --'Workspace Boundary EDTemporary Access � Delineated PFO Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet 1 lCounty Boundary Streams: _ Delineated Intermittent _ Delineated Perennial - Intermittent Surface Water Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Ar•a�w,�..� ,•I i Rockingham County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 47 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 -_=4�:� _ - ----- ,� _�y;,w.- �.yt•• •r_�* -�. ..r_$xY- - =.1, ,� _ ',.d. `tip' lel. - 'h :', - ••a•-=,..-1�`• -- -- +vNL — . Z, Li • - •C_ ='�, �'i' ii,i ^SZ c=Y:� _ y.l , '�`'7 ;; Ir 1'1''-- y'•�s yt. , r - .yF r _ - 1 xi.• - 1 ru . _].\'+°•.tea• - _ - 'k,1 -o _ ,__.� a±r:- - `�i; •'� �+.f._=- ]..%;.�'. _ - 4 . as _ i�.• i :r. ' - _ - •, - _ y, :.r.,' k --,P I+r - •'i_ i':v' -P ki' - r-. • ,., AHI •!f�` ':°SFr- _�.'• ":'[ •;r,`•'� ` ':�• - ,•- - I1'�:x Y�r Piy'- JI 1 -_7. ^•1-' _ �a,�, - •={--�-" --- -_ -:i- - - - - ;1^+, ,1, - -P k \. o s _t i• r u i ' - _ ,, i - 1 V - r I'- 11' • SC •r`rll' i �,__ ,S Ir �. `9 "Y] 7 .'.-e ice.`--_• - ti3-- .ca a - .f +,1�`'� .•.y ra„�` e• . �•,IT r ..r. 'Iir 1'- '• i 1, i Ir 1.val _ .y-� , iC: ..e , 1 I 1 ' 1 • , 1 1 1 1 ” JY• • I , ii•.,,+•i_ f, 1� 'II'1. ,'1'' ''r', NR' ` Construction Crossing Ft.: 216.49°1�t ' ' �b y •r .. �.. P P. kkk P. ,�,' ,I r y'�i} �!r _ _ �, a • ,' Operational r�; , ; 1 •�qa'' 3 k. xi rH''A'Se l+:•1'' yam•, •1: �i -�H, -•@_• ys`• '�(T' I- -Yt I ` - - ''I�r �1 C Yrl ?$'.. ',''' 1 _ "'c ,'Ss•�a3' " �• _-- - ��• .4 +_ .2.',-1.`.r4 i•- Construction,51 1Ft , 1 ' 'll '; ': Ai •b.'y 5` 1. t !',ti sy_ r: _:' -_ti `' -.,y Wit'' ti -+i^ •` '+',';"1'{,1,f'+' .: I'' r Operational Cr1 1 'i I• e, - - �;, Y - T r _1 e-}� a. - i 1 „r ,r .,I .s r 'IJ / - - •J' I VF+' • 1 1 , _ l i� •1 11 '{ '�'•' 11 1 1 ".1 - AI •t� Tt"' - y '� 5' 1 y Irl v, 1I f n+ - 1.,, itis i , e - n kk j h It -:�_ Irl y •'1' :il - - I 1 _� '•sr r ns. e • 1''r }L - l r•r}1 ' - _ ori + Ili,' �4. _ r-• `'II i i::'•`, '�' try i;�`; .ISI •.li - ''If r ' P ' - ie� Ili■ I' ' 1. s -ir••- •'•� III; ,` i",�•'. - , ti • z• v. P � Ty Il •r— y,' @�•l� T�', ',,, art _ - �' _ rayl �J 1 ' �" - r'i',.�•� •; i',' -14 a 1 •1 • 1 ,yIkk.,k •c' 'i .•1• •`gip--�:l�+ _ '.;_— ,•1, `,P•il •e 11, -J"• - _- - 1-T, '1 +1'r '•'•r '''+ - Ilk -4y� r•i ,.11• •�:+ •.� ,.tea. - , I �'��r '�'�r••`. . ■� Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet C1 County Boundary Streams: _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial - Perennial Surface Water Wetlands: _ Delineated Wetland Boundary 0 W C) an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery I 1w` I.1 t Sim Na'+se Rd $ea Rockingham C o u n t y .y M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 49 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 Iree 1emn I 4 760 ryo v 47 a... _>00 Sheet 51 j to ... w \ f o 0 goo f W -A18-62: PSS } Con./Op. Pipeline Crossing Ft.: 39.55 ' Construction Acres: 0.11 i Operational Acres: 0.00 h� � TA-RO-133 0 W-1318-139: PFO I Con./Op. Pipeline Crossing Ft.: 24.40 ` f Construction Acres: 0.03 Buffer Zone Impacts: Operational Acres: 0.02** Zone 1 Construction Sq. Ft.: 0.00 \ ° Zone 1 Operational Sq. Ft.: 0.00 - 13 Zone 2 Construction Sq. Ft.: 101.73 .' Zone 2 Operational Sq. Ft.: 0.00 -----t-' -�-- 4815 - O- �; �•;:. - .'� i \ Tersiry��ri - PP ° Ln \ ov n 0 rn Legend O Mileposts (MP, 0.5 Approximated Pond mi) Pond _ Temporary Access Wetlands: Road Delineated Wetland - - H-650 Pipeline —Boundary --,Operational 0'j:4Delineated PEM L - -'Workspace V Delineated PFO Temporary Access ED Road moo' Delineated PSS Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: —Approximated Pond — Delineated Pond ® soy IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery s'r rea niLri 6k., �R� o c kip n g h a m y C0anty N, n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 50 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 40 •. . Iree 1emn I 4 760 ryo v 47 a... _>00 Sheet 51 j to ... w \ f o 0 goo f W -A18-62: PSS } Con./Op. Pipeline Crossing Ft.: 39.55 ' Construction Acres: 0.11 i Operational Acres: 0.00 h� � TA-RO-133 0 W-1318-139: PFO I Con./Op. Pipeline Crossing Ft.: 24.40 ` f Construction Acres: 0.03 Buffer Zone Impacts: Operational Acres: 0.02** Zone 1 Construction Sq. Ft.: 0.00 \ ° Zone 1 Operational Sq. Ft.: 0.00 - 13 Zone 2 Construction Sq. Ft.: 101.73 .' Zone 2 Operational Sq. Ft.: 0.00 -----t-' -�-- 4815 - O- �; �•;:. - .'� i \ Tersiry��ri - PP ° Ln \ ov n 0 rn Legend O Mileposts (MP, 0.5 Approximated Pond mi) Pond _ Temporary Access Wetlands: Road Delineated Wetland - - H-650 Pipeline —Boundary --,Operational 0'j:4Delineated PEM L - -'Workspace V Delineated PFO Temporary Access ED Road moo' Delineated PSS Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: —Approximated Pond — Delineated Pond ® soy IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery s'r rea niLri 6k., �R� o c kip n g h a m y C0anty N, n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 50 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 TA-RO-133 Oo o ,`o 0 M ° 13 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 0.00 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 101.73 Zone 2 Operational Sq. Ft.: 0.00 o MP`48.5 4/7 mon ` W-1318-139: PFO o Con./Op. Pipeline Crossing Ft.: 24.40 Construction Acres: 0.03 Operational Acres: 0.02** n W -A18-62: PSS L'? Con./Op. Pipeline Crossing Ft.: 39.55 b ' Construction Acres: 0.11 Operational Acres: 0.00 700 Impact 1 VAR: Zone 1 Construction Sq. Ft.: 5,224.94 C5 Zone 1 Operational Sq. Ft.: 3,276.62 ^° Zone 2 Construction Sq. Ft.: 3,343.91 �,�,� Zone 2 Operational Sq. Ft.: 2,241.31 S -A18-60: Per.** Con./Op. Pipeline Crossing Ft.: 4.00 Construction Crossing Ft.: 87.80 Operational Crossing Ft.: 11.13 . . - ra rn Co 0 � I 6 f 740 O ' I X30 00 ,2o 730 I 1 &gemMft co !� 1 o W -A18-62-2: PSS r r J, Con./Op. Pipeline Crossing Ft.: 0.00oi r r Construction Acres: <0.01 Operational Acres: 0.00 r' ��. I W -A18-61: PEM U, Con./Op. Pipeline Crossing Ft.: 0.85; .� . Construction Acres: 0.01 ' Operational Acres: 0.00 . la ,3 f(D �' TA-RO-134 ` . I e i 1 I I I 1 I Legend O Mileposts (MP, 0.5 —Delineated mi) Perennial _ Temporary Access M Approximated Pond Road Wetlands: - - H-650 Pipeline Delineated Wetland --,Operational _ Boundary L - -'Workspace _10j Delineated PEM QTemporary Access > Delineated PFO Road Delineated PSS Limits of [::]Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [:]County Boundary QJordan Lake Watershed Streams: —Approximated Pond Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery p�easartlt ws /' , Canty Llrt Rockingham County y" n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 51 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 4 i I I 720 I I I I .� i MP 49:0' o00000.00000. _ 00000I O' ' �� -a Nz�'O'� 6 �r•' Yirs., ' Ll rn TA-RO-135 S -A18-55: Per. 4' Con./Op. Pipeline Crossing Ft.: 3.00 1 x� Construction Crossing Ft.: 79.71 1. Operational Crossing Ft.: 52.61 J _ 1/ 1 i mm1 111 _ 1 111 -5; �r f r r ` �, Buffer Zone Impacts:'- Zone 1 Construction Sq. Ft.: 4,742.47 r f Zone 1 Operational Sq. Ft.: 3,166.66 Zone 2 Construction Sq. Ft.: 3,173.28 e� f Zone 2 Operational Sq. Ft.: 2,114.23 "Al / X//r Jr +r. -r 0 M 730 o } - 1 730 Legend O Mileposts (MP, 0.5 _ Delineated mi) Intermittent _ Temporary Access _ Delineated Road Perennial - - H-650 Pipeline Wetlands: - -, Operational _ Delineated Wetland --'Workspace Boundary =Temporary Access Delineated PEM Road Limits of =Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [:]County Boundary =Jordan Lake Watershed Streams: Approximated Perennial? ® f� aniiiia ` l� Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance ----------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery cRa . Rockingha>fn y a Lin, Count. n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 52 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace QTemporary Access Road Limits of [::]Construction Right of -Way Q Survey Area L _ Adjacent Sheet F-iCounty Boundary QJordan Lake Watershed Streams: Approximated Intermittent Approximated Perennial _ Delineated Intermittent _ Delineated Perennial Wetlands: _ Delineated Wetland Boundary QApproximated PEM QApproximated PFO ,�j; Delineated PEM VrN, Delineated PFO 0 W 0) Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rocki`Ty ['`hbm County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 53 of 107 600 Willowbrook Ln CTRC West Chester, PA 19382 Date: May 2019 I 770 ! I 9p k� t rJ )SO I + I' 730 I _ _ i o. 1 I I Lo ! ail - X20 �d S -A18-244: Per. - W-1318-140: PEM AS -A18-182 / S -A18-182: Int. Con./Op. Pipeline Crossing Ft.: 3.00 Con./Op. Pipeline Crossing Ft.: 0.00 v Con./Op. Pipeline Crossing Ft.: 1.00 Construction Crossing Ft.: 49.43 Construction Acres: <0.01 Construction Crossing Ft.: 81.31 7 - Operational Crossing Ft.: 43.43 i Operational Acres: 0.00 a Ope� nal Crossing Ft.: 59.78 ¢I I - -0— - — — - — —_- --- ----f -------------------------------------------------------------- _ ----,-;.s- - MP -50:0---- - -! _ ---------------------------- T--------- 1 720 � •eyw Buffer Zone Impacts: ' e U 'c -`C` Zone 1 Construction Sq. Ft.: 1,442.44 iiF 70 Gyt`� Zone 1 Operational Sq. Ft.: 0.00 la a. Zone 2 Construction Sq. Ft.: 1,179.76 Zone 2 Operational Sq. Ft.: 0.00 ' l �• 6 � i r TA-RO-139 90 t:. '•Z% r• I r S -C18-71: Eph. (Temporary Access Road) 6Q Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 2.05 �.J Operational Crossing Ft.: 0.00 7 �. 70 700 �• a I Q) Legend O Mileposts (MP, 0.5 _Approximated mi) Intermittent —Temporary Access _Approximated Road Perennial - - H-650 Pipeline _ Delineated --,Operational Ephemeral L - -'Workspace _ Delineated aTemporary Access Intermittent Road _ Delineated Limits of Perennial QConstruction Right- Perennial Surface of -Way Water Survey Area Wetlands: L _ Adjacent Sheet _ Delineated Wetland County Boundary Boundary Jordan Lake 0i:� Delineated PEM Watershed Streams: _Approximated Ephemeral 0 W IM Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application - -----------------EQ---- sR-I------------Map-,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery G R a ,Ro,.ckingham County c+ A� s� s� M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 54 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 �o { Rp Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 1,442.44 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,179.76 Zone 2 Operational Sq. Ft.: 0.00 j 0 ti o >o .. +. , S -C18-71: Eph. (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 \ Construction Crossing Ft.: 2.05 m • \ Operational Crossing Ft.: 0.00 aX20 rn >>0 6g0 d .\ Buffer Zone Impacts: \ Zone 1 Construction Sq. Ft.: 922.95 ♦ • ti 700 3 Zone 1 Operational Sq. Ft.: 0.00 o Zone 2 Construction Sq. Ft.: 1,314.71 760 TA-RO-139 \ Zone 2 Operational Sq. Ft.: 0.00 \ ,/o \ JO �/Cdil7W •, \ 750 _>g0 730 Legend o Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Perennial Surface Road Water ED Temporary Access Wetlands: Road _ Delineated Wetland Limits of Boundary [::]Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [County Boundary aJordan Lake Watershed Streams: Approximated Ephemeral _ Delineated Ephemeral ® 5G� IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application - --------------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery COD , Rockingham County ♦yn M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 55 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 0 •a 750 _>g0 730 Legend o Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Perennial Surface Road Water ED Temporary Access Wetlands: Road _ Delineated Wetland Limits of Boundary [::]Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [County Boundary aJordan Lake Watershed Streams: Approximated Ephemeral _ Delineated Ephemeral ® 5G� IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application - --------------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery COD , Rockingham County ♦yn M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 55 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline --,Operational - -'Workspace Limits of =Construction Right - of -Way Survey Area L _ Adjacent Sheet =County Boundary =Jordan Lake Watershed Streams: Approximated Perennial _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial - Approximated Perennial Perennial Surface Water Approx_SS_Impact Wetlands: _ Delineated Wetland Boundary Oj' ,Delineated PEM 0 5n in Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery (:ounly L+ne RV `� k foccingham County -ter- ' - - - -- -- --}- . G M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 56 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline --,Operational - -'Workspace Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet E_1 County Boundary aJordan Lake Watershed Streams: —Approximated Perennial _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial — Delineated Pond M Pond Wetlands: _ Delineated Wetland Boundary ® Approximated PSS ,10j' Delineated PEM Delineated PFO !w, Delineated PSS 0 5n in an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Ih CasWe] I County Rockingham County ,i i i M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 57 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 r0• 0 00 co 6Rf) 6g0 "0'1^0 0 ' 730 ^moo +� 5� ' so O 0 — �O - — - — Zone 2 Construction Sq. Ft.: 3,372.62 i Zone 2 Operational Sq. Ft.: 1,927.76 I ! I X30 ------- ------------------------------------------------------------- ----- - -- - o--- ------------------------------------------ ----- MP51.5 -' --------------------------------•------------------------------------- - - - - - I I JP I 720 a 4 TA-RO-141 a` W -C18-20: PFO Con./Op. Pipeline Crossing Ft.: 15.54 Construction Acres: 0.05 Operational Acres: 0.02** r-I«`�v�� ;;;R99 o i CA 69� TA-RO-140 691 I U, a� I QI I `�-1'o i I i � ! I o - I I 1 I I I I -- —- — -I o 1,313 I �V0 �JS'3 I ^o Legend O Mileposts (MP, 0.5 —Approximated Pond mi) _ Delineated _ Temporary Access Perennial Road — Delineated Pond - - H-650 Pipeline Approximated Pond --,Operational Pond L - -'Workspace Wetlands: ED Temporary Access Delineated Wetland Road — Boundary Limits of [::]Construction Right �#• Delineated PEM of -Way >�N Delineated PFO Survey Area Delineated PSS L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: —Approximated Perennial an iiiia f�a! Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC 0--n--e--M--a--p-,--T--R--C-,--U--S--G--S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery \, CpSWe'II \C o u rf t y C n:,nK •. e Hit \ i Rockingham County i !Guilford County n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 58 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 CD 730 I I Buffer Zone Impacts: i Zone 1 Construction Sq. Ft.: 5,191.87 7 Zone 1 Operational Sq. Ft.: 3,416.33 Zone 2 Construction Sq. Ft.: 3,372.62 i Zone 2 Operational Sq. Ft.: 1,927.76 I TA-RO-142 W -C18-20: PEM - X20 ! Con./Op. Pipeline Crossing Ft.: 54.70 0 ^ a, Construction Acres: 0.08 cSP I Y Operational Acres: 0.00 ayv 7701 Iz r� 700 s. • • . ° . o 0 • • � 111 1 I ------- ------------------------------------------------------------- ----- - -- - o--- ------------------------------------------ ----- MP51.5 -' --------------------------------•------------------------------------- - - - - - I I JP I 720 a 4 TA-RO-141 a` W -C18-20: PFO Con./Op. Pipeline Crossing Ft.: 15.54 Construction Acres: 0.05 Operational Acres: 0.02** r-I«`�v�� ;;;R99 o i CA 69� TA-RO-140 691 I U, a� I QI I `�-1'o i I i � ! I o - I I 1 I I I I -- —- — -I o 1,313 I �V0 �JS'3 I ^o Legend O Mileposts (MP, 0.5 —Approximated Pond mi) _ Delineated _ Temporary Access Perennial Road — Delineated Pond - - H-650 Pipeline Approximated Pond --,Operational Pond L - -'Workspace Wetlands: ED Temporary Access Delineated Wetland Road — Boundary Limits of [::]Construction Right �#• Delineated PEM of -Way >�N Delineated PFO Survey Area Delineated PSS L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: —Approximated Perennial an iiiia f�a! Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC 0--n--e--M--a--p-,--T--R--C-,--U--S--G--S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery \, CpSWe'II \C o u rf t y C n:,nK •. e Hit \ i Rockingham County i !Guilford County n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 58 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace _ Delineated Intermittent _ Delineated Perennial - Approximated Perennial - Perennial Surface EDTemporary Access Water Road Wetlands: Limits of _ Delineated Wetland QConstruction Right- Boundary of -Way -Delineated PEM Q Survey Area L _ Adjacent Sheet [,County Boundary aJordan Lake Watershed Streams: Approximated Perennial 0 W IM Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery \�\ C o s w e I I ""-<C6oun'ty \, "�° \, Alamance C o u n t y • \`- Rockingham County Guilford County i n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 59 of 107 600 Willowbrook Ln CTRC West Chester, PA 19382 Date: May 2019 /5U \ "30 720 r�.. o '♦ ao goo 0 �N 0 + 730 4IV� NIhL . t ,moo • • . IXii3y ♦ Lq' o 5 Ilk - � 1 o { , � A a Q, ?� :� . o .- .- `Y - ' �1 S -A18-219: Per. Con./Op. Pipeline Crossing Ft.: 4.85 Construction Crossing Ft.: 72.69 Construction Sq. Ft.: 367.00 Operational Sq. Ft.: 0.00 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 4,701.28 Zone 1 Operational Sq. Ft.: 1,032.01 Zone 2 Construction Sq. Ft.: 3,135.71 Zone 2 Operational Sq. Ft.: 2,100.37 S-1318-94: Per.** Con./Op. Pipeline Crossing Ft.: 4.00 Construction Crossing Ft.: 123.51 Operational Crossing Ft.: 89.48 `N N - M Impact7VAR: Zone 1 Construction Sq. Ft.: 6,894.28 Zone 1 Operational Sq. Ft.: 4,511.15 Zone 2 Construction Sq. Ft.: 4,235.02 Zone 2 Operational Sq. Ft.: 2,879.53 o �O I' • o ^IV o . o" ` - , '' ,, --I i � O o. Alp � o" ♦ ' `� ♦ - 00 b' M .5 680 TA-RO-146A co`bo ; '• SS-USGS19-01: Per. 7091 Con./Op. Pipeline Crossing ft.: Unknown Construction Crossing ft.: 101.97 �� Operational Crossing ft.: 50.52 % ,. 680 i:• Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 6,114.42 Zone 1 Operational Sq. Ft.: 3,030.73 Zone 2 Construction Sq. Ft.: 4,073.30 67Q Zone 2 Operational Sq. Ft.: 2,023.36 lk 670-:-' i Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 4,701.28 Zone 1 Operational Sq. Ft.: 1,032.01 Zone 2 Construction Sq. Ft.: 3,135.71 Zone 2 Operational Sq. Ft.: 2,100.37 S-1318-94: Per.** Con./Op. Pipeline Crossing Ft.: 4.00 Construction Crossing Ft.: 123.51 Operational Crossing Ft.: 89.48 `N N - M Impact7VAR: Zone 1 Construction Sq. Ft.: 6,894.28 Zone 1 Operational Sq. Ft.: 4,511.15 Zone 2 Construction Sq. Ft.: 4,235.02 Zone 2 Operational Sq. Ft.: 2,879.53 o �O I' • o ^IV o . o" ` - , '' ,, --I i � O o. Alp � o" ♦ ' `� ♦ - 00 b' M .5 680 TA-RO-146A co`bo ; '• SS-USGS19-01: Per. 7091 Con./Op. Pipeline Crossing ft.: Unknown Construction Crossing ft.: 101.97 �� Operational Crossing ft.: 50.52 % ,. 680 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 6,114.42 Zone 1 Operational Sq. Ft.: 3,030.73 Zone 2 Construction Sq. Ft.: 4,073.30 Zone 2 Operational Sq. Ft.: 2,023.36 * . �r >v0 o 70 1 � i i r /0 I'�r MP 5 3.O o .,�♦� ° Ian � I o= J � Az I ♦ ` j Ilk ,t 730 r r� Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access -Approximated Road Perennial – – H-650 Pipeline Perennial Surface --,Operational Water --'Workspace Approx_SS_Impact a Temporary Access Wetlands: Road _ Delineated Wetland Limits of Boundary Q Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: Approximated Perennial ® IM an iiiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ______________________________--------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery N v Caswell°°h Courity , Alamance „County Guilford County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham and Alamance County, NC Sheet 60 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 130 fico �g0 4. ;a `..4 4 '; s �. L. -r Ato Alf f*. <e e 1 s ds W -A18-83: PEM Con./Op. Pipeline Crossing Acres: 0 Otfi 26.09 Co ♦♦ ry Y.'•i ° Operational Acres: 0.00 ♦ � `� '� � TA -AL -149 ♦ TA-AL-147 _"So ♦ _"SSo o ♦ L MP 5304 1 ■► 1 1 710 730 k '_`- Buffer Zone Impacts: Zone 1 Construction �l 601 i 11 ,1 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,824.19 Zone 2 Operational Sq. Ft.: 89.68 -A �114 G4 man # C°4t7t — �o J O 690 k Loo ,00 0 TA -AL -152 -11\0 Legend O Mileposts (MP, 0.5 _ Delineated Wetland mi) Boundary —Temporary Access r.7. Approximated PEM Road �j: Delineated PEM - - H-650 Pipeline --,Operational L - -'Workspace EDTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: Wetlands: ff�l Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application DataSources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery HC Mip hw,y 9'V / AI'amance / County Guilford i County / M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 61 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 -�1 0 W -A18-85-2: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 S -A18-84: Per. Con./Op. Pipeline Crossing Ft.: 4.00 Construction Crossing Ft.: 83.67 Operational Crossinq Ft.: 56.75 I of MP 53.5 o �-- ---------------- 4� ---------- I W -A18-85: PEM Con./Op. Pipeline Crossing Ft.: 8.98 Construction Acres: 0.03 Operational Acres: 0.00 720 ,20 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 5,006.18 Zone 1 Operational Sq. Ft.: 3,373.73 Zone 2 Construction Sq. Ft.: 3,297.73 Zone 2 Operational Sq. Ft.: 2,144.62 Impact 8VAR: o { Zone 1 Construction Sq. Ft.: 10,168.79 Zone 1 Operational Sq. Ft.: 6,128.51 Zone 2 Construction Sq. Ft.: 5,729.05 Zone 2 Operational Sq. Ft.: 4,012.50 w 0 �O 1 'WOMV IE'0 S -A18-87: Per.** — - — - — Con./Op. Pipeline Crossing Ft.: 5.00 Construction Crossing Ft.: 172.22 .1 f Operational Crossing Ft.: 111.27 O r j - -- - - - -- - - _----------. _baa - - - - - - - - - - - --- ---- - - - - - -- MP 54.0 W -A18-85: PSS Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.04 Operational Acres: 0.00 Jordan Lake Watshed er r. S-A18-89:Int. Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 58.46 Operational Crossing Ft.: 27.15 TA -AL -153 Ir'• - �O � 1 • 11Q � /O N �a0 ! i Legend O Mileposts (MP, 0.5 —Approximated mi) Perennial _ Temporary Access _ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace — Delineated Pond aTemporary Access - Perennial Surface Road Water Limits of Pond [::]Construction Right- Wetlands: of -Way Delineated Wetland Survey Area — Boundary L _ Adjacent Sheet .]Approximated PEM ]County Boundary op Delineated PEM aJordan Lake rwDelineated PSS Watershed Streams: —Approximated Intermittent an iiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) F . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �N / L 4 �L a Alamance �p County i Guilford County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 62 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 R;,��30 ,- - JA5• w 0 �O 1 'WOMV IE'0 S -A18-87: Per.** — - — - — Con./Op. Pipeline Crossing Ft.: 5.00 Construction Crossing Ft.: 172.22 .1 f Operational Crossing Ft.: 111.27 O r j - -- - - - -- - - _----------. _baa - - - - - - - - - - - --- ---- - - - - - -- MP 54.0 W -A18-85: PSS Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.04 Operational Acres: 0.00 Jordan Lake Watshed er r. S-A18-89:Int. Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 58.46 Operational Crossing Ft.: 27.15 TA -AL -153 Ir'• - �O � 1 • 11Q � /O N �a0 ! i Legend O Mileposts (MP, 0.5 —Approximated mi) Perennial _ Temporary Access _ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace — Delineated Pond aTemporary Access - Perennial Surface Road Water Limits of Pond [::]Construction Right- Wetlands: of -Way Delineated Wetland Survey Area — Boundary L _ Adjacent Sheet .]Approximated PEM ]County Boundary op Delineated PEM aJordan Lake rwDelineated PSS Watershed Streams: —Approximated Intermittent an iiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) F . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �N / L 4 �L a Alamance �p County i Guilford County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 62 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road _ Delineated Intermittent _ Delineated Perennial — Delineated Pond Approximated Pond Pond Approx_SS_Impact Wetlands: Limits of [::]Construction Right-- Delineated Wetland of -Way Boundary Q Survey Area ®Approximated PSS L _ Adjacent Sheet ><-> Delineated PFO [,County Boundary y Delineated PSS aJordan Lake Watershed Streams: —Approximated Pond 0 W C) an "Irllk Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery JT �• S L Alamance_ County_, Guilford County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 63 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 Impact 10VAR: WZone 1 Construction Sq. Ft.: 6,403.51 —1 Zone 1 Operational Sq. Ft.: 4,530.00 o; Zone 2 Construction Sq. Ft.: 3,562.8 Zone 2 Operational Sq. Ft.: 2,397.11 i i''•MP54.5 •---o:•�,--- - jo •s• '` rn p o S -C18-62: Per.** V S-1318-143: Eph. �p CD Con./Op. Pipeline Crossing Ft.: 4.00 +� Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 118.07 Construction Crossing Ft.: 46.22 5 Operational Crossing Ft.: 89.97 Operational Crossing Ft.: 23.99 - - - - - - -16- - T - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - t.p. - - - - - - - - - - - - - - - - - - - - - - --- - - - - ^ •-------------------------------------------------- - - ------- - - - - -- I S -C18-63: Per.** 0 Con./Op. Pipeline Crossing Ft.: 4.00 18$ 1 Construction Crossing Ft.: 144.73 Operational Crossing Ft.: 108.56 Impact 9VAR: Zone 1 Construction Sq. Ft.: 8,507.07 Zone 1 Operational Sq. Ft.: 6,046.76 Zone 2 Construction Sq. Ft.: 5,198.93 Zone 2 Operational Sq. Ft.: 3,501.39 700 S -A18-215: Per. (Temporary Access Road) ad Con./Op. Pipeline Crossing Ft.: 0.00 vY Construction Crossing Ft.: 25.25 c; Construction Sq. Ft.: 152.06 61 Operational Sq. Ft.: 0.00:. Q� JA 1 I '120 nN TA -AL -155 110 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 1,516.97 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,011.86 Zone 2 Operational Sq. Ft.: 0.00 Jordan Lake Watershed X70 by -O O 680 6�>0 S-1318-142: Int. Con./Op. Pipeline Crossing Ft.: 1.00 Construction Crossing Ft.: 53.38 Operational Crossing Ft.: 48.74 6)O S-C18-61:Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 47.49 Operational Crossing Ft.: 37.77 tp 0 R:N� Legend r Impact 11 VAR: / S -A18-216: Int. (Temporary Access Road) Zone 1 Construction Sq. Ft.: 4,925.42 —Approximated Pond Road Con./Op. Pipeline Crossing Ft.: 0.00 Zone 1 Operational Sq. Ft.: 3,302.44 _ Ephemeral - -, Operational Construction Crossing Ft.: 25.58 Zone 2 Construction Sq. Ft.: 3,277.20 Intermittent Temporary Access ED Operational Crossing Ft.: 0.00 Zone 2 Operational Sq. Ft.: 2,201.21 S -C18-60: Int.** Perennial Limits of —Delineated Pond Con./Op. Pipeline Crossing Ft.: 4.00 Approximated of -Way Perennial Construction Crossing Ft.: 82.19 Approximated Pond _ Perennial Surface Operational Crossing Ft.: 55.09 Water Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 1,516.97 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,011.86 Zone 2 Operational Sq. Ft.: 0.00 Jordan Lake Watershed X70 by -O O 680 6�>0 S-1318-142: Int. Con./Op. Pipeline Crossing Ft.: 1.00 Construction Crossing Ft.: 53.38 Operational Crossing Ft.: 48.74 6)O S-C18-61:Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 47.49 Operational Crossing Ft.: 37.77 tp 0 R:N� Legend Mileposts (MP, 0.5 O mi) —Approximated Perennial —Temporary Access —Approximated Pond Road Delineated - - H-650 Pipeline _ Ephemeral - -, Operational _ Delineated --'Workspace Intermittent Temporary Access ED —Delineated Road Perennial Limits of —Delineated Pond [::]Construction Right- Approximated of -Way Perennial Survey Area Approximated Pond L _ Adjacent Sheet Perennial Surface [:]County Boundary Water a Jordan Lake Pond Watershed Wetlands: Streams: Delineated Wetland —Approximated _ Boundary Intermittent Delineated PFO 0 W IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ---------------------------------------------Map-,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance County • Guilford County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 64 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 + sA... f■ L QiMP 55.0 �a ARM 1 : � � ✓�h''s c MLV 6 . Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 4,655.16 Zone 1 Operational Sq. Ft.: 3,112.99 Zone 2 Construction Sq. Ft.: 3,086.36 rnl Zone 2 Operational Sq. Ft.: 2,056.67 U1 ,70 ,`� �♦ S S -C18-68: Per. Con./Op. Pipeline Crossing Ft.: 5.00 Construction Crossing Ft.: 77.68 Operational Crossinq Ft.: 51.95 W -C18-69: PFO Con./Op. Pipeline Crossing Ft.: 37.01 Construction Acres: 0.07 Operational Acres: 0.03** S-1318-59: Per.** 680 o Con./Op. Pipeline Crossing Ft.: 3.00 co Construction Crossing Ft.: 158.00 Operational Crossing Ft.: 68.24 G, O co hill Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 0.00 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,066.40 Zone 2 Operational Sq. Ft.: 0.00 X00 W-1318-61: PEM _ Con./Op. Pipeline Crossing Ft.: 39.07 - Construction Acres: 0.06 KL Operational Acres: 0.00 .-. ^O MP 55.5 ♦' ♦' . , 1-10 W-1318-60: PSS Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: <0.01 Operational Acres: 0.00 I Impact 12VAR Zone 1 Construction Sq. Ft.: 19,487.62 Zone 1 Operational Sq. Ft.: 11,533.88 Zone 2 Construction Sq. Ft.: 10,734.71 Zone 2 Operational Sq. Ft.: 8,422.16 S-1318-59-3: Per.** Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 47.72 Operational Crossing Ft.: 0.00 S-1318-59-2: Per.** Con./Op. Pipeline Crossing Ft.: 3.00 Construction Crossing Ft.: 113.70 Operational Crossing Ft.: 74.61 i �So i �6'0(9 j�l Legend O Mileposts (MP, 0.5 Jordan Lake ED mi) Watershed Permanent Access Streams: _ Road —Approximated Temporary Access Perennial Road Delineated - - H-650 Pipeline _ Ephemeral - -, Operational Delineated --'Workspace _ Intermittent aPermanent Access _ Delineated Road Perennial a Temporary Access Wetlands: Road Delineated Wetland Limits of _ Boundary QConstruction Right- i� Delineated PEM of -Way Delineated PFO Survey Area t Delineated PSS L _ Adjacent Sheet C1 County Boundary 0 W IM an 11�7 Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery N uj l•J�) I u Alamance County .s M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 65 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 SS-SOIL18-05: Per. Con./Op. Pipeline Crossing ft.: Unknown Construction Crossing ft.: 101.82 Operational Crossing ft.: 50.97 X60 4--------------------- 750 ' I I I iT I ` o, w �= _ r o i � p i I I 0 00 0 - � -- --ter--- �• � - -- i -------------------- --------------------------------------o-------------------------- I---- MP 56.0 -- -------------------- I 180 Buffer Zone Impacts: Ito Zone 1 Construction Sq. Ft.: 6,108.97 Zone 1 Operational Sq. Ft.: 3,058.45 810 std t Zone 2 Construction Sq. Ft.: 4,072.60 IN Zone 2 Operational Sq. Ft.: 2,038.94 61 cu ! X80 C I X80 0 I t 770 -' - - �� ,� . ari7o I ,� ,Jill � 780 Legend 0 Mileposts (MP, 0.5 —Delineated mi) Intermittent _ Temporary Access — Delineated Pond Road Approximated Pond - - H-650 Pipeline pond --,Operational Approx_SS_Impact - -'Workspace Wetlands: ED Temporary Access Delineated Wetland Road — Boundary Limits of x Delineated PFO [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet [—]County Boundary aJordan Lake Watershed Streams: —Approximated Pond an 114s. iiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS " = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ----------------S:_E T,_EsR-I-------------_ap-,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery c� Alamance County''" n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 66 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 _.-_.""'°"""' Date: May 2019 cp I !> `o I I I I I I I I I I I o 0 0 ' �0 a7}6 P �r WNMLII'�' "J- r. BWBuffer Zone Impacts: c�> '�"""" Zone 1 Construction Sq. Ft.: 1,160.43 CY)^d�ir Zone 1 Operational Sq. Ft.: 0.00 f'a Zone 2 Construction Sq. Ft.: 1,204.29 Zone 2 Operational Sq. Ft.: 0.00 W -A18-119: PFO s� Con./0p. Pipeline Crossing Ft.: 95.35 die Construction Acres: 0.11 Operational Acres: 0.06** TA -AL -159 750 S -A18-125-3: Per.** S -A18-120: Per.** Con./Op. Pipeline Crossing Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 60.71 Construction Crossing Ft.: 95.17 Construction Sq. Ft.: 727.31 Operational Crossing Ft.: 41.41 Operational Sq. Ft.: 0.00 Impact 13VAR: Impact 14VAR: Zone 1 Construction Sq. Ft.: 5,679.61 Zone 1 Construction Sq. Ft.: 17,174.67 'ne Operational Sq. Ft.: 2,705.99 Zone 1 Operational Sq. Ft.: 7,548.95 onstruction Sq. Ft.: 1,923.50 Zone 2 Construction Sq. Ft.: 12,846.76 Operational Sq.Ft.: 1,342.19 Zone 2 Operational Sq. Ft.: 9,901.90 730 WB -A18-121: Pond Con./Op. Pipeline Crossing Ft.: 31.40 p Construction Crossing Ft.: 79.07 1' - - Construction Sq. Ft.: 1,864.08 Operational Sq. Ft.: 0.00 - � - 69 State Rd 1 - - - - - - - - A. - - - - - - - iiiiZone Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 3,393.42 Zone 1 Operational Sq. Ft.: 1,186.85 Zone 2 Construction Sq. Ft.: 1,735.31 2 Operational Sq. Ft.: 1,172.63 W -A18-119: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.06 Operational Acres: 0.00 moon `I I■J■■■■ 1, \ ■■■■■■■■ W -A18-119-2: PFO Con./Op. Pipeline Crossing297.23 Construction Acres: 0.4.4 7 iL Operational Acres: 0.21 ** W -A18-119-2: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.06 Operational Acres: 0.00 S-1318-65: Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 79.71 Operational Crossing Ft.: 32.14 O 1 S -A18-125: Per.** Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 16.02 Operational Crossing Ft.: 0.00 S -A18-125-2: Per.** F pPipeline Crossing Ft.: 5.00 truction Crossing Ft.: 87.18 rational Crossing Ft.: 54.71 1 W -A18-127: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.02 Operational Acres: 0.00 S -A18-126: Eph. Con./Op. Pipeline Crossing Ft.: 1.00 Construction Crossing Ft.: 44.92 1. Operational Crossing Ft.: 36.95 1 TA -AL -159A Legend o Mileposts (MP, 0.5 -Delineated mi) Intermittent _ Temporary Access _ Delineated Road Perennial - - H-650 Pipeline -Delineated Pond --,Operational -Perennial Surface L - -'Workspace Water ED Temporary Access Pond Road Wetlands: Limits of Delineated Wetland [::]Construction Right- - Boundary of -Way 10j; Survey Area Delineated PEM Delineated PFO L _ Adjacent Sheet � Delineated PSS County Boundary aJordan Lake Watershed Streams: _ Delineated Ephemeral ® s� IM an iiiia Note: I1 March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ----------------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance County JP ' 0 P v ssr M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 67 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 730 Impact 14VAR: Zone 1 Construction Sq. Ft.: VbM.67 Zone 1 Operational Sq. Ft.: 7,548.95 Zone 2 Construction Sq. Ft.: 12,846.76 Zone 2 Operational Sq. Ft.: 9,901.90 S -A18-125-3: Per.** Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 60.71 Construction Sq. Ft.: 727.31 Operational Sq. Ft.: 0.00 i E W -A18-130: PFO Ego Con./Op. Pipeline Crossing Ft.: 17.04 Construction Acres: 0.09 Operational Acres: 0.03** W -A18-127: PFO Con./Op. Pipeline Crossing Ft.: 61.32 Construction Acres: 0.07 Operational Acres: 0.04** W -A18-127-2: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.02 Operational Acres: 0.00 S -A18-126: Eph. Con./Op. Pipeline Crossing Ft.: 1.00 Construction Crossing Ft.: 44.92 Operational Crossing Ft.: 36.95 740 W A18 127 PEM TA -AL -1598 ryo j TA -AL -159A o Con./Op. Pipeline Crossing Ft.: 0.00 �. Construction Acres: 0.02 Operational Acres: 0.00 0 W -A18-130: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.01 Operational Acres: 0.00 `10o O J10 700 700 Impact 15VAR: Zone 1 Construction Sq. Ft.: 8,209.36 680I x680 Zone 1 Operational Sq. Ft.: 4,961.84 1 Zone 2 Construction Sq. Ft.: 8,724.82 Zone 2 Operational Sq. Ft.: 4,133.63 S -A18-132: Per.** I y Con./Op. Pipeline Crossing Ft.: 5.00 Construction Crossing Ft.: 120.02 cn; Operational Crossing Ft.: 83.91 I c' I m' goo W -A18-133: PFO Con./Op. Pipeline Crossing Ft.: 56.05 Construction Acres: 0.10 Operational Acres: 0.04** I� 1► I W -A18-133: PEM i o Con./Op. Pipeline Crossing Ft.: 0.00 6> Construction Acres: 0.02 Operational Acres: 0.00 f' W -A18-133-2: PEM Con./Op. Pipeline Crossing Ft.: 0.00 + Construction Acres: 0.01 Operational Acres: 0.00 I I 0 be A 6a I Legend O Mileposts (MP, 0.5 -Delineated mi) Perennial _ Temporary Access - Delineated Pond Road - Perennial Surface - - H-650 Pipeline Water --,Operational Pond L - -'Workspace Wetlands: ED Temporary -Delineated Wetland Road Boundary Limits of �j: Delineated PEM [::]Construction Right - of -Way . Delineated PFO Q Survey Area L _ Adjacent Sheet [:]County Boundary QJordan Lake Watershed Streams: _ Delineated Ephemeral 0 W C) an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ----------------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance C 0 u n,�y � Cnurcry� M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 68 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 rno I o Co. �I LI Impact 15VAR: N' Zone 1 Construction Sq. Ft.: 8,209.36 C: Zone 1 Operational Sq. Ft.: 4,961.84 UI Zone 2 Construction Sq. Ft.: 8,724.82 Zone 2 Operational Sq. Ft.: 4,133.63 ¢I I Y S -A18-132: Per.** Con./Op. Pipeline Crossing Ft.: 5.00 Construction Crossing Ft.: 120.02 Operational Crossing Ft.: 83.91 W -A18-133-2: PEM ,� Con./Op. Pipeline Crossing Ft.: 0.00 �' Construction Acres: 0.01 0 Operational Acres: 0.00 I { rn - I 0 6yO i .- . 700 0 W -A18-135: PFO �Oo Con./Op. Pipeline Crossing Ft.: 145.79 Construction Acres: 0.20 �� Operational Acres: 0.10** • • . Wall Impact 17VAR: Zone 1 Construction Sq. Ft.: 7,218.16 Zone 1 Operational Sq. Ft.: 2,972.37 Zone 2 Construction S Ft • 5 741 34 F q. .. Zone 2 Operational Sq. Ft.: 2,381.63 -- - - - - -- oo ►►► 1 �'' 1 Impact 16VAR: Zone 1 Construction Sq. Ft.: 651.47 Zone 1 Operational Sq. Ft.: 136.08 Zone 2 Construction Sq. Ft.: 2,846.10 Zone 2 Operational Sq. Ft.: 1,755.41 W -A18-135: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.02 Operational Acres: 0.00 670 � 6 PV 670 )O 1 680 1. I. II• 1� 0 00 CD 0 6� 0 I 6->0 O mi) —Delineated Intermittent d e Sij� a� 6g0 Perennial - -'Workspace 610 Limits of Approximated Pond QConstruction Right- Perennial Surface 1 680 1. I. II• 1� 0 00 CD 0 W -A18-254: PFO Con./Op. Pipeline Crossing Ft.: 151.62 Construction Acres: 0.22 Operational Acres: 0.10** S -A19-290: Eph.** Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 98.23 Operational Crossing Ft.: 26.68 6S. O Legend Mileposts (MP, 0.5 O mi) —Delineated Intermittent d e Sij� s 680 oh �d 6g0 Perennial - -'Workspace — Delineated Pond Limits of Approximated Pond QConstruction Right- W -A18-254: PFO Con./Op. Pipeline Crossing Ft.: 151.62 Construction Acres: 0.22 Operational Acres: 0.10** S -A19-290: Eph.** Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 98.23 Operational Crossing Ft.: 26.68 6S. O Legend Mileposts (MP, 0.5 O mi) —Delineated Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial - -'Workspace — Delineated Pond Limits of Approximated Pond QConstruction Right- Perennial Surface of -Way Water Survey Area Pond L _ Adjacent Sheet Wetlands: E_;County Boundary Delineated Wetland aJordan Lake _ Boundary Watershed j:. Delineated PEM Streams: ><-> Delineated PFO —Approximated'@rdDelineated PSS Intermittent —Approximated Pond Delineated _ Ephemeral Note: rl� March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance ----------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance bounty 7a- r P w Clielrli 5! _ a r' M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 69 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 " Date: May 2019 670 r OW=fF r -� � �� r tie � � � • / _ � ! Claude Sim son Rd State Rd 1590 a ode Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 1,747.23 680 c �`S" Zone 1 Operational Sq. Ft.: 0.00 9' Zone 2 Construction Sq. Ft.: 1,092.97 Zone 2 Operational Sq. Ft.: 0.00 �c - _ F •SS-SOIL19-05: Per. (Temporary Access Road) O TA -AL -161 Con./Op. Pipeline Crossing ft.: 0.00 W -A18-254: PFO 69 Construction Crossing ft.: 18.44 Con./Op. Pipeline Crossing Ft.: 151.62 Operational Crossing ft.: 0.00 Construction Acres: 0.22 Operational Acres: 0.10** TA -AL -162 _ • • . I Y l,l�3� f \ j W W -C18-3: PEM o Con./Op. Pipeline Crossing Ft.: 13.05 Construction Acres: 0.04 Operational Acres: 0.00 \` S -C18-2: Int. • \ �' ' Con./Op. Pipeline Crossing Ft.: 1.00 b _OOti Construction Crossing Ft.: 92.62 aAll Operational Crossing Ft.: 67.61 tom..:.,• , ; ;t ` \ ---------------- -- - --- - - W-58,0-- ---------------- F P58:0• �fl\ / W -C18-5: PEM W -C18-5: PSS Con./Op. Pipeline Crossing Ft.: 0.00 6v Con./Op. Pipeline Crossing Ft.: 52.16 Construction Acres: 0.03 W -C18-3: PFO O Operational Acres: 0.00 Construction Acres: 0.07 so Con./Op. Pipeline Crossing Ft.: 0.00 Operational Acres: 0.00 Construction Acres: <0.01 _ Operational Acres: 0.00** W -C18-3-2: PEM FOperational Op. Pipeline Crossing Ft.: 12.60 Buffer Zone Impacts:W-C18-3-2: PFO Construction Acres: 0.02 Zone 1 Construction Sq. Ft.: 000 Con./Op. Pipeline Crossing Ft.: 7.57 Acres: 0.00 Zone 1 Operational Sq. Ft.: 0.00 Construction Acres: 0.01 Zone 2 Construction Sq. Ft.: 159.56 6 - Operational Acres: 0.01** d Zone 2 Operational Sq. Ft.: 0.00 610 rno a X60 • 640. �. �y6 Legend O Mileposts (MP, 0.5 -Approximated Pond mi) Delineated _ Temporary Access a Ephemeral Road _ Delineated - - H-650 Pipeline Intermittent - -, Operational _ Delineated - -'Workspace Perennial QTemporary Access Approximated Pond Road - Perennial Surface Limits of Water QConstruction Right- Approx_SS_Impact of -Way Wetlands: Q Survey Area Delineated Wetland L _ Adjacent Sheet - Boundary QCounty Boundary op Delineated PEM QJordan Lake Y\> Delineated PFO Watershed Xi Delineated PSS Streams: -Approximated Intermittent in Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------- -------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 1,s .w AN°m a nuc e ounty ,r IS]�j�odrap Q �� e B 7k PIO M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 70 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 ' assn 670 660 t . _ ori 1594 TA -AL -162 ,•: �✓ 660 ' r ` ".�,.;y. ;'£..-� r' v - ,.•o ;� art : ` k �, ,•s _• � � ,•�• I ------------------------- r; -- - - 62 Jordan Lake Watershed 640 t Y 00 :' .. Gs" 0 �k T 1 jI 640 51. s . P1 i I Pt 660 �t .i i 1 s P V \ e•. i o \ i ' assn 670 660 t . _ ori 1594 TA -AL -162 ,•: �✓ 660 ' r ` ".�,.;y. ;'£..-� r' v - ,.•o ;� art : ` k �, ,•s _• � � ,•�• I ------------------------- r; -- - - 62 Jordan Lake Watershed 640 t Y 00 :' .. Gs" 0 �k T 1 jI 640 51. . P1 i I Pt �t .i 1 s P V a�P i o i i �1 i i i It i 640 --------------- - - -- ---�- -- - -- - -- - MP�58'5 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 6,001.90 Zone 1 Operational Sq. Ft.: 3,000.95 Zone 2 Construction Sq. Ft.: 4,001.22 ' Zone 2 Operational Sq. Ft.: 2,000.60 SS-SOIL18-07: Per. 630 Con./Op. Pipeline Crossing ft.: Unknown Construction Crossing ft.: 100.03 Operational Crossing ft.: 50.02 Legend O Mileposts (MP, 0.5 —Delineated mi) Intermittent _ Temporary Access M Approximated Pond Road Approx_SS_Impact - - H-650 Pipeline Wetlands: --,Operational Delineated Wetland L - -'Workspace — Boundary ED Road .Approximated PEM Road ;x Delineated PFO Limits of [::]Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [:]County Boundary QJordan Lake Watershed Streams: —Approximated Pond 0 W IM an Ilk Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ---------------------------------------------ap-,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 0 Alamance County �v n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 71 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 51. . i 640 --------------- - - -- ---�- -- - -- - -- - MP�58'5 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 6,001.90 Zone 1 Operational Sq. Ft.: 3,000.95 Zone 2 Construction Sq. Ft.: 4,001.22 ' Zone 2 Operational Sq. Ft.: 2,000.60 SS-SOIL18-07: Per. 630 Con./Op. Pipeline Crossing ft.: Unknown Construction Crossing ft.: 100.03 Operational Crossing ft.: 50.02 Legend O Mileposts (MP, 0.5 —Delineated mi) Intermittent _ Temporary Access M Approximated Pond Road Approx_SS_Impact - - H-650 Pipeline Wetlands: --,Operational Delineated Wetland L - -'Workspace — Boundary ED Road .Approximated PEM Road ;x Delineated PFO Limits of [::]Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [:]County Boundary QJordan Lake Watershed Streams: —Approximated Pond 0 W IM an Ilk Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ---------------------------------------------ap-,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 0 Alamance County �v n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 71 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 w 0 O 0 S -C18-13: Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 89.98 W Operational Crossing Ft.: 17.42 S -C18-11: Per... sing Ft.: 78.91 g Ft.: 254.02 .: 4,762.38 Con./Op. Pipeline Cros Construction Crossin Construction Sq. Ft Operational Sq. Ft.: 0.00 °° ca Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 1,622.11 Zone 1 Operational Sq. Ft.: 1,622.11 �3 • • .� : Zone 2 Construction Sq. Ft.: 1,169.04 6 Zone 2 Operational Sq. Ft.: 1,169.04 1 - • Ort'' ► i- - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ --------------------- 1' 3 - f I S-C18-12: Int. Con./Op. Pipeline Crossing Ft.: 0.00 ` Construction Crossing Ft.: 5.93 H 630 ... Operational Crossing Impact 18VAR: Zone 1 Construction Sq. Ft.: 10,255.53 Zone 1 Operational Sq. Ft.: 1,808.42 Zone 2 Construction Sq. Ft.: 4,441.86 1' Zone 2 Operational Sq. Ft.: 2,759.99 - oil Legend o Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Permanent Access _ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace -Perennial Surface ED Permanent Access Water Road Wetlands: Limits of _ Delineated Wetland QConstruction Right- Boundary of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: Approximated Intermittent ® soy IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �a [tonne ii rl n Alamance ¢a County �n �m Pp M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 72 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 650 S� 7 . 0 630 63 Basin Creek Rd State Rd 1594 1 Q& m 1 QUO AS-NHD-1554: Int. (Permanent Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 25.51 S. Operational Crossing Ft.: 25.51WN a d M LO PA -AL -164 620 °° ca Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 1,622.11 Zone 1 Operational Sq. Ft.: 1,622.11 �3 • • .� : Zone 2 Construction Sq. Ft.: 1,169.04 6 Zone 2 Operational Sq. Ft.: 1,169.04 1 - • Ort'' ► i- - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ --------------------- 1' 3 - f I S-C18-12: Int. Con./Op. Pipeline Crossing Ft.: 0.00 ` Construction Crossing Ft.: 5.93 H 630 ... Operational Crossing Impact 18VAR: Zone 1 Construction Sq. Ft.: 10,255.53 Zone 1 Operational Sq. Ft.: 1,808.42 Zone 2 Construction Sq. Ft.: 4,441.86 1' Zone 2 Operational Sq. Ft.: 2,759.99 - oil Legend o Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Permanent Access _ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace -Perennial Surface ED Permanent Access Water Road Wetlands: Limits of _ Delineated Wetland QConstruction Right- Boundary of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: Approximated Intermittent ® soy IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �a [tonne ii rl n Alamance ¢a County �n �m Pp M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 72 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 +;• 690lM1 E: S to Rd St Creek �.- n:: �. co N. �•. Basin Rd Co A0 ""` W. 6$ �. . ��. `may . �'"• i:A- .. �� , �. .f 10- _.,r ' i.. .. SS-SOIL19-02: Per.** 1 Con./Op. Pipeline Crossing ft.: Unknown .:' 'A'� Construction Crossing ft.: 195.29 Impact 20VAR: 1 `" • Operational Crossing ft.: 0.00 Zone 1 Construction Sq. Ft.: 9,717.40 s 1 Zone 2 Construction Sq. Ft.: 4,666.37 - - 1 ,1 'v ,_` •ilt 1� O 1 m ♦ n� • 1 1 ♦ Impact 19VAR: i' • ;Q ♦ J. 1 ' ♦ Zone 2 Construction Sq. Ft.: 4,568.39 . ♦ . ` 1 tela - _ _ _ _3- 1 7S9S - _ 1 1 I♦ 4P 4,1 P t i 4" ', rn % % �o I"�.' ♦ Buffer Zone Impacts: a} v , t ♦ .•; Zone 1 Construction Sq. Ft.: 0.00 ` O '' ♦ ' Zone 1 Operational Sq. Ft.: 0.00 , Gs ,;_�,♦♦� .� ` Zone 2 Construction Sq. Ft.: 119.91 Zone 2 Operational Sq. Ft.: 0.00 `4, Zone 1 Operational Sq. Ft.: 3,495.42 g O 1 m ♦ n� • 1 1 ♦ Impact 19VAR: i' • `, ♦ Zone 1 Construction Sq. Ft.: 685.65 ' ♦ Zone 2 Construction Sq. Ft.: 4,568.39 -. 1 tela - _ _ _ _3- 1 7S9S - _ 1 1 '1 t i rn a} v , Impact 21 VAR: 1 '# 1 6)O O Zone 1 Construction Sq. Ft.: 5,321.10 Ni d Zone 1 Operational Sq. Ft.: 3,495.42 i 1 6 Zone 2 Construction Sq. Ft.: 3,512.62 �'} tpo Zone 2 Operational Sq. Ft.: 2,352.85 1 AS-NHD-1549: Int.** t �o Con./Op. Pipeline Crossing Ft.: 5.00 Construction Crossing Ft.: 88.77 6g0 i ,1 Operational Crossing Ft.: 58.00 6 90 61, P 650 0 660 1 6g0 6, 0 640 ll �° ASO 610 104' *+ l Legend O Mileposts (MP, 0.5 —Delineated Wetland mi) Boundary - - H-650 Pipeline --,Operational - -'Workspace Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet L__. County Boundary aJordan Lake Watershed Streams: —Approximated Intermittent —Approximated Pond Approximated Pond Approx_SS_Impact Wetlands: ® soy IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery KJ i 46 t �� Alamance �Pa County �b a n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 73 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 _ Delineated Wetland mi) Boundary _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: Wetlands: 0 W IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery µ[11i e1 Mefl;cyi;i r,l ii :I, lx� 4pph 'mn/ u u I� I � A I a r ya, (Se Countm Aid C ,¢ M Mountain Valley Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 74 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 PA -AL -166 680 6l0 6'� 0 LOO SAO 620 1 Legend O Mileposts (MP, 0.5 Wetlands: mi) _ Delineated Wetland _ Permanent Access Boundary Road - - H-650 Pipeline --,Operational L - -'Workspace EDPermanent Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: Delineated Ephemeral ® soy IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -----------------------------------------------ap-,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery rir,- r �n".cli +trc Alamance County 9 � AM'alprgd 6 n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 75 of 107 600 Willowbrook Ln ? TRC West Chester, PA 19382 Date: May 2019 0 0 11 610 650 W -C18-29: PFO Con./Op. Pipeline Crossing Ft.: 317.38 Construction Acres: 0.55 Operational Acres: 0.21 ** S -C18-30: Int.** Con./Op. Pipeline Crossing Ft.: 12.95 Construction Crossing Ft.: 79.23 Construction Sq. Ft.: 1,181.68 Operational Sq. Ft.: 0.00 � r _ Impact 22VAR Zone 1 Construction Sq. Ft.: 4,931.11 Zone 1 Operational Sq. Ft.: 1,002.02 Zone 2 Construction Sq. Ft.: 3,395.99 Zone 2 Operational Sq. Ft.: 1,875.64 0 660 10 650 660 Jordan Lake Watershed 660 �I Buffer Zone Impacts: S -C18-28: Int.** Zone 1 Construction Sq. Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 3.00 Zone 1 Operational Sq. Ft.: 0.00 Construction Crossing Ft.: 157.32 Zone 2 Construction Sq. Ft.: 723.27 Operational Crossing Ft.: 44.80 1 Zone 2 Operational Sq. Ft.: 0.00 ..--------------------------------- M P 61.0 1 Impact 23VAR: Zone 1 Construction Sq. Ft.: 8,321.62 y Zone 1 Operational Sq. Ft.: 3,596.16 Zone 2 Construction Sq. Ft.: 5,383.08 Zone 2 Operational Sq. Ft.: 2,854.81 ,Zo TA -AL -167 Legend O Mileposts (MP, 0.5 —Delineated Pond mi) Intermittent Surface _ Temporary Access Water Road Pond - - H-650 Pipeline Wetlands: --,Operational Delineated Wetland L - -'Workspace — Boundary EDTemporary Access IN/ Delineated PFO Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: _ Delineated Intermittent ® soy IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery v �°G.src�rc ' AlamancR"e County FRI x Q�'arer Rv _ a M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 76 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 -�- Date: May 2019 .. 19 r a o i r 0 0 0 SS-SOIL18-08: Per. Con./Op. Pipeline Crossing ft.: Unknown Construction Crossing ft.: 100.27 sr Operational Crossing ft.: 50.13 0 1' 'L_ ;.Aw tl 0.10' 00 A ' I 680 00 00 `♦;`. TA -AL -168 690 .0�..; 0o MP 61'5. r • • . . `♦ Buffer Zone Impacts: ` Zone 1 Construction Sq. Ft.: 6,016.15 ` Zone 1 Operational Sq. Ft.: 3,007.94 `♦ Zone 2 Construction Sq. Ft.: 4,010.80 `♦`� / Zone 2 Operational Sq. Ft.: 2,005.31 o ` 670 `�° ♦♦�` / \ ♦ Q / Impact 24VAR: t* � 6� Zone 1 Construction Sq. Ft.: 581.01 c0 Zone 1 Operational Sq. Ft.: 1.86 6 6 Zone 2 Construction Sq. Ft.: 2,611.26 0 80 Zone 2 Operational Sq. Ft.: 1,152.07 I^� r� •cam /o0 680 Legend o Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: _ Delineated Perennial Approx_SS_Impact Wetlands: _ Delineated Wetland Boundary 0 W r) an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --------- -------------------------------------ap-,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery P.clhel Melhatl�sf._ r` c.. Alamance Qe� County � a = p W oL-r Rd P �O` v rse''ry S�nvoi Ada �e � Y n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 77 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 nz Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline --,Operational - -'Workspace Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet E_1 County Boundary aJordan Lake Watershed Streams: _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial Wetlands: _ Delineated Wetland Boundary V, Delineated PFO 0 W IM Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery ¢a :1 .i Asa - fi A14amance f 6�0 Y ii t yP% oa M Mountain Valley Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 78 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 1, t 650 65° Construction Acres: 0.09 Operational Acres: 0.00 o' 63° �o YY f20 6 S -A18-70-2: Per. (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 rIf Construction Crossing Ft.: 5.87 c� Construction Sq. Ft.: 34.76 Operational Sq. Ft.: 0.00 Buffer Zone Impacts: 6°° Zone 1 Construction Sq. Ft.: 2,631.37 61313 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,610.22 Zone 2 Operational Sq. Ft.: 0.00 C 00 -_--- f Impact26VAR: +' .. • _ Zone 1 Construction Sq. Ft.: 7,768.24 Zone 1 Operational Sq. Ft.: 1,415.28 Zone 2 Construction Sq. Ft.: 3,391.12 ��r •z Zone 2 Operational Sq. Ft.: 2,468.51^p Buffer Zone Impacts: S -A18-70: Per.** o Zone 1 Construction Sq. Ft.: 0.00 zal Zone 1 Operational Sq. Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 19.70 Construction Crossing Ft.: 133.78 Zone 2 Construction Sq. Ft.: 234.82 Co . Zone 2 Operational Sq. Ft.: 0.00 630 Construction Sq. Ft.: Operational Sq. Ft.:.: 0.00771 1 0.00 t 61 m W -A18-73: PFO 6, Con./Op. Pipeline Crossing Ft.: 0.00 6v'o o Construction Acres: <0.01 Operational Acres: <0.01 ** ALS -A18-72: Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 82.44 Operational Crossing Ft.: 52.12 Air q =•Jordan Lake Watershed W -A18-75-2: PEM (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.01 Operational Acres: 0.00 S -A18-72-2: Int. (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 9.79 Operational Crossing Ft.: 0.00 418-75: PEM (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.01 Operational Acres: 0.00 5,00,1100-0 MP 62 ,°% W -A18-74: PFO Con./Op. Pipeline Crossing Ft.: 8.41 Construction Acres: 0.01 Operational Acres: 0.01 ** Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 0.00 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 434.69 Zone 2 Operational Sq. Ft.: 0.00 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 4,922.94 Zone 1 Operational Sq. Ft.: 3,081.60 Zone 2 Construction Sq. Ft.: 2,982.67 Zone 2 Operational Sq. Ft.: 1,879.17 I t 650 65° Construction Acres: 0.09 Operational Acres: 0.00 W -A18-74: PFO Con./Op. Pipeline Crossing Ft.: 8.41 Construction Acres: 0.01 Operational Acres: 0.01 ** Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 0.00 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 434.69 Zone 2 Operational Sq. Ft.: 0.00 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 4,922.94 Zone 1 Operational Sq. Ft.: 3,081.60 Zone 2 Construction Sq. Ft.: 2,982.67 Zone 2 Operational Sq. Ft.: 1,879.17 I Legend O Mileposts (MP, 0.5 -Delineated mi) Intermittent _ Temporary Access _ Delineated Road Perennial - - H-650 Pipeline -Delineated Pond - -, Operational - Approximated L - -'Workspace Perennial QTemporary Access - Perennial Surface Road Water Limits of Pond [::]Construction Right- Wetlands: of -Way Delineated Wetland Q Survey Area - Boundary L _ Adjacent Sheet ','�j Delineated PEM QCounty Boundary X^�x Delineated PFO QJordan Lake Watershed Streams: -Approximated Perennial ® f� IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance ----------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alam„ance County 8 sem" r srneel Rd� � M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 79 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 t W -A18-80: PEM Con./Op. Pipeline Crossing Ft.: 63.68 Construction Acres: 0.09 Operational Acres: 0.00 k r ram 00 f I I f f o I o Legend O Mileposts (MP, 0.5 -Delineated mi) Intermittent _ Temporary Access _ Delineated Road Perennial - - H-650 Pipeline -Delineated Pond - -, Operational - Approximated L - -'Workspace Perennial QTemporary Access - Perennial Surface Road Water Limits of Pond [::]Construction Right- Wetlands: of -Way Delineated Wetland Q Survey Area - Boundary L _ Adjacent Sheet ','�j Delineated PEM QCounty Boundary X^�x Delineated PFO QJordan Lake Watershed Streams: -Approximated Perennial ® f� IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance ----------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alam„ance County 8 sem" r srneel Rd� � M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 79 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace Delineated — Ephemeral _ Delineated Intermittent _ Delineated Perennial — Delineated Pond QTemporary Access - Perennial Surface Road Water Limits of [::]Construction Right of -Way Q Survey Area L _ Adjacent Sheet [,County Boundary QJordan Lake Watershed Streams: —Approximated Intermittent M Pond Wetlands: _ Delineated Wetland Boundary "fie Delineated PEM >e"'> Delineated PFO 0 W C) an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 00 t� I ♦ ` W'0- *&0 •i Rd A I a mia n c e C 0 u%n try R 8 � M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 80 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace Construction HDD Operational HDD [::]Temporary Access Road Limits of Q Construction Right of -Way Survey Area L _ Adjacent Sheet E_1 County Boundary aJordan Lake Watershed Approximated Perennial _ Delineated Intermittent _ Delineated Perennial - Approximated Perennial - Perennial Surface Water Wetlands: _ Delineated Wetland Boundary Delineated PFO Streams: 0 W IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery c 9�eN n a` Alamance County 3 Q, `a M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 81 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 610 h 550 540 Impact 29VAR: '♦ �„ AS-NHD-1547: Per. 1 Zone 1 Construction Sq. Ft.: 6,573.65 ♦ _ o Con./Op. Pipeline Crossing Ft.: 8.40 Zone 1 Operational Sq. Ft.: 1,552.81_ �iConstruction Crossing Ft.: 110.58 540 Zone 2 Construction Sq. Ft.: 4,347.55 ♦ MP 64.0 Construction Sq. Ft.: 1,363.41 1 540 Zone 2 Operational Sq. Ft.: 2,841.51 _ , Operational Sq. Ft.: 0.00 570 .1 SQO c_ � ♦ s ♦ 1° sso 1 •-7, 550 ! 1 eo�r�e�t83 - ♦♦♦ ;, o '1 Pia = ♦ s610 1 — 1 � ♦ d� o o ♦, LO so o AS -1318-20: Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 96.35 Operational Crossinq Ft.: 41.92 560 550 :. ', ;;• _ o o �o ss o , .,mow►-' • ♦ AW -1318-19: PFO LOO Con./Op. Pipeline Crossing Ft.: 49.89 ♦ O Construction Acres: 0.08 , 600 O S-1318-138: Per. (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Operational Crossing Ft.: 0.00 o t„ � 540 Operational Acres: 0.03** Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 1,548.58 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,057.18 Zone 2 Operational Sq. Ft.: 0.00 600 , J/ eetal Impact 28VAR: ♦♦ Zone 1 Construction Sq. Ft.: 377.37 570 Zone 2 Construction Sq. Ft.: 242.42 ,♦ \ 560. La w AS -1318-16 / S-1318-16: Per.** (H-650 Pipeline HDD) Con./Op. Pipeline Crossing Ft.: 304.73 IAS Construction Crossing Ft.: 60.62 `i Construction Sq. Ft.: 15,216.90 Operational Sq. Ft.: 0.00 1 550 Silo Legend 0 Mileposts (MP, 0.5 _Approximated mi) Intermittent —Temporary Access _Approximated Road Perennial - - H-650 Pipeline _ Delineated --,Operational Intermittent L - -'Workspace _ Delineated Construction HDD Perennial Operational HDD -Approximated Temporary Access Perennial Road - Perennial Surface Limits of Water [::]Construction Right- Wetlands: of -Way _ Delineated Wetland Survey Area Boundary L _ Adjacent Sheet Approximated PFO �__; County Boundary VN Delineated PFO [::iJordan Lake Watershed Streams: an Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery CJF3 \ � as 1J 0 0c L� Alamance C:&, County \ :1 lsau�aa�l M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 82 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 600 Construction Crossing Ft.: 25.77 rn S-1318-137: Int. (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 n Construction Crossing Ft.: 28.05 Co � Operational Crossing Ft.: 0.00 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 1,659.11 0 Zone 1 Operational Sq. Ft.: 0.00 690 Zone 2 Construction Sq. Ft.: 1,065.78 Zone 2 Operational Sq. Ft.: 0.00 TA -AL -172 - SAO 6,60 540 Operational Acres: 0.03** Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 1,548.58 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,057.18 Zone 2 Operational Sq. Ft.: 0.00 600 , J/ eetal Impact 28VAR: ♦♦ Zone 1 Construction Sq. Ft.: 377.37 570 Zone 2 Construction Sq. Ft.: 242.42 ,♦ \ 560. La w AS -1318-16 / S-1318-16: Per.** (H-650 Pipeline HDD) Con./Op. Pipeline Crossing Ft.: 304.73 IAS Construction Crossing Ft.: 60.62 `i Construction Sq. Ft.: 15,216.90 Operational Sq. Ft.: 0.00 1 550 Silo Legend 0 Mileposts (MP, 0.5 _Approximated mi) Intermittent —Temporary Access _Approximated Road Perennial - - H-650 Pipeline _ Delineated --,Operational Intermittent L - -'Workspace _ Delineated Construction HDD Perennial Operational HDD -Approximated Temporary Access Perennial Road - Perennial Surface Limits of Water [::]Construction Right- Wetlands: of -Way _ Delineated Wetland Survey Area Boundary L _ Adjacent Sheet Approximated PFO �__; County Boundary VN Delineated PFO [::iJordan Lake Watershed Streams: an Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery CJF3 \ � as 1J 0 0c L� Alamance C:&, County \ :1 lsau�aa�l M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 82 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 o to 1, o � � e 0 1 LO , 1 1 1 i 0 ^o 4j 1 0 1 r 1 0 cn j cn o r � 0 0l ck o �1 a r vo r Ir Zone 1 Cons Zone 1 Opel ' Zone 2 Cons Zone 2 Opel i 160 e 580 590 Watershed 01 0 Impact 30VAR: Zone 1 Construction Sq. Ft.: 4,763.49 Zone 1 Operational Sq. Ft.: 3,158.10 Zone 2 Construction Sq. Ft.: 3,150.22 Zone 2 Operational Sq. Ft.: 2,114.50 r.30 ,• — — - — — - — — - — — - — — - — — - — — - — — - — — - — — f- — — - — — - — — - — — — — - — — - — — - - — — - — — - — — - ------------- r r 1 590 600 AS-NHD-3040: Int." w N Con./Op. Pipeline Crossing Ft.: 5.00 AS-NHD-1547: Per." '_ 610 N o Construction Crossing Ft.: 79.58 1 Con./Op. Pipeline Crossing Ft.: 8.40 =• GO Operational Crossing Ft.: 52.63 y5o Construction Crossing Ft.: 110.58 t Construction Sq. Ft.: 1,363.41 Operational Sq. Ft.: 0.00 160 6�0 600 010 S6 O X80 05 0 6"?O n r 610 a I k' -M P -64:5 - — — i - — -L--= -0—+- f ,, r+ o rU � � n1 ,Q I+ w i o � r r Ir 070 o- 16,0 '� r �LO , `. o ;s 00 LO t` A. s, 0 620 0 0000 01 0 Impact 30VAR: Zone 1 Construction Sq. Ft.: 4,763.49 Zone 1 Operational Sq. Ft.: 3,158.10 Zone 2 Construction Sq. Ft.: 3,150.22 Zone 2 Operational Sq. Ft.: 2,114.50 r.30 ,• — — - — — - — — - — — - — — - — — - — — - — — - — — - — — f- — — - — — - — — - — — — — - — — - — — - - — — - — — - — — - ------------- r r 1 590 600 AS-NHD-3040: Int." w N Con./Op. Pipeline Crossing Ft.: 5.00 AS-NHD-1547: Per." '_ 610 N o Construction Crossing Ft.: 79.58 1 Con./Op. Pipeline Crossing Ft.: 8.40 =• GO Operational Crossing Ft.: 52.63 y5o Construction Crossing Ft.: 110.58 t Construction Sq. Ft.: 1,363.41 Operational Sq. Ft.: 0.00 160 6�0 600 010 S6 O X80 05 0 6"?O n r 610 Legend o Mileposts (MP, 0.5 - Approximated mi) Perennial - - H-650 Pipeline Approximated Pond --,Operational Wetlands: L - -'Workspace _ Delineated Wetland Limits of Boundary [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet L__. County Boundary aJordan Lake Watershed Streams: —Approximated Intermittent —Approximated Perennial —Approximated Pond 0 W IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. - Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance C 0 U t a t 3 5� Grrt M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 83 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 a I k' -M P -64:5 - — — i - — -L--= -0—+- f ,, r+ rU � � n1 ,Q I+ w i o � r r Ir 070 o- '� r �LO , Legend o Mileposts (MP, 0.5 - Approximated mi) Perennial - - H-650 Pipeline Approximated Pond --,Operational Wetlands: L - -'Workspace _ Delineated Wetland Limits of Boundary [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet L__. County Boundary aJordan Lake Watershed Streams: —Approximated Intermittent —Approximated Perennial —Approximated Pond 0 W IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. - Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance C 0 U t a t 3 5� Grrt M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 83 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 �o h 1 0 rn w 0 600 Road 0 0 0 M Q o ■. ■ 610 r• r� ■ MP,65.ORR'"__ PA -AL -175A _ - _ - - ,y, .o- --------------- ----- r' C) r r S -A19-319: Int. W -A19-320: PEM r Con./Op. Pipeline Crossing Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 0.00 r • Construction Crossing Ft.: 18.88 Construction Acres: 0.03 �, Operational Crossing Ft.: 0.00 Operational Acres: 0.00 r� 6 r� `0 r SSO 660 0 1Prj 680 c \S 610 t ,l 6)0 V 1•t 0 Go �a t 0l t Legend o Mileposts (MP, 0.5 Wetlands: mi) _ Delineated Wetland _ Permanent Access Boundary Road �j: Delineated PEM - - H-650 Pipeline ><-> Delineated PFO --,Operational - -'Workspace EDPermanent Access Road Limits of [:]Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: _ Delineated Intermittent ® f� IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance m%COunt:;y P t M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 84 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 66o r� r� r� 63p r N ` � r r� r' S -A19-324: Per. o r Con./Op. Pipeline Crossing Ft.: 3.00 r'r Construction Crossing Ft.: 181.62 r' Operational Crossing Ft.: 113.50 ------------------------- -------- -- - - -- -- r -- - - - - - - - - - - Road . ---- -- --- -- --- - -- - - -- . �eew 41 41 rje,�w 630 l l l t l l i l l l' �. Pa�ao lit � l It l 620 i ' , ♦ , �O 1 l ♦ �� \ W -B : PEM � ' �� � ' `O � �� ♦ �� � Con./Op. Pipelineline Crossing Ft.: 0.00 4'W -A19-326: PFO �. ♦ Construction Acres: 0.28 i O ��'�.� Operational Acres: 0.00 0 Con./Op. Pipeline Crossing Ft.: 5.51 Construction Acres: 0.02 Operational Acres: 0.01** �qj • ��. ti 660 11 ♦��'• rn� W -A19-323: PEM Con./Op. Pipeline Crossing Ft.: 0.00 J# 41' Construction Acres: 0.33 670 \ ; i Operational Acres: 0.00 •-.MP'65.5RR • MP 68'.5 MP 65.ORR' • � Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 0.00p Zone 1 Operational Sq. Ft.: 0.00 t �♦ S -A19-321: Int.** Zone 2 Construction Sq. Ft.: 1,183.99 i ti Con./Op. Pipeline Crossing Ft.: 2.00 Zone 2 Operational Sq. Ft.: 5.85 Construction Crossing Ft.: 180.351777 OHO �aac Operational Crossing Ft.: 100.62 err Rd State Rd 07� Fineb - r Pone .� Impact 31 VAR: 6zO Zone 1 Construction Sq. Ft.: 8,056.14 �. Zone 1 Operational Sq. Ft.: 4,139.57 Zone 2 Construction Sq. Ft.: 4,473.93 Zone 2 Operational Sq. Ft.: 2,311.87 ♦ 6g0 �O J Duke Rone Tri �O � o '• � o0 0� 0 rn O 6jo 10 wo Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline --,Operational L - -'Workspace Limits of [::]Construction Right - of -Way = Survey Area L _ Adjacent Sheet =County Boundary =Jordan Lake Watershed Streams: —Approximated Intermittent —Approximated Pond _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial Approximated Pond Wetlands: _ Delineated Wetland Boundary =Approximated PFO 10j; Delineated PEM ,x, Delineated PFO I� Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . - Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ----------------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery � sa: s 3 4 Alamance 4a Count u„ 4* nw A a G M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 85 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 bo 6 i S -A18-251: Int. F Pipeline Crossing Ft.: 2.00 uction Crossing Ft.: 33.27 tional Crossing Ft.: 33.27 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 0.00 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,183.99 Zone 2 Operational Sq. Ft.: 5.85 N 62o 630 6' 0 620 W-1319-168: PEM - - - - - - - - - - - - - - - - - - - - Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.28 rn Operational Acres: 0.00 60 I 620 I I � I 0 680 Ln S -A18-250: Per.** loo i S -A18-251: Int. F Pipeline Crossing Ft.: 2.00 uction Crossing Ft.: 33.27 tional Crossing Ft.: 33.27 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 0.00 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,183.99 Zone 2 Operational Sq. Ft.: 5.85 N 62o 630 6' 0 620 W-1319-168: PEM - - - - - - - - - - - - - - - - - - - - Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.28 rn Operational Acres: 0.00 60 I 620 Zone 1 Construction Sq. Ft.: 5,419.33 & f1 �,M1 % Zone 1 Operational Sq. Ft.: 3,439.79 L'�lwly Impact 33VAR: ?. Zone 2 Construction Sq. Ft.: 4,062.36 Zone 1 Construction Sq. Ft.: 6,766.40 Zone 2 Operational Sq. Ft.: 2,609.74 - Zone 1 Operational Sq. Ft.: 3,311.43 Zone 2 Construction Sq. Ft.: 4,513.79 ,- Zone 2 Operational Sq. Ft.: 2,226.55 6,0 �`�, � I 610 I 0 � I � I l 610 660 Legend 0 Mileposts (MP, 0.5 —Delineated mi) Perennial - - H-650 Pipeline Approximated Pond --,Operational Approx_SS_Impact L - -'Workspace Wetlands: Limits of Delineated Wetland [::]Construction Right- — Boundary of -Way Oj; Delineated PEM Survey Area ;x Delineated PFO L _ Adjacent Sheet L__. County Boundary aJordan Lake Watershed Streams: —Approximated Intermittent —Approximated Pond _ Delineated Intermittent ® f� IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery ` •b� • S�p�c H3 Alamance C o u n f y Y v t bj • M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 86 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 I I � I 0 680 g0 S -A18-250: Per.** loo Con./Op. Pipeline Crossing Ft.: 4.00 • Construction Crossing Ft.: 91.74 Operational Crossing Ft.: 56.12 6 �, SS-SOIL19-07: Per.** N I.., p Con./Op. Pipeline Crossing ft.: Unknown I Construction Crossing ft.: 112.73 w Operational Crossing ft.: 54.91 ---------- . , � - - - ---•-----------I60 --------------- ----o- - -- - - - - - - - Impact32VAR: Zone 1 Construction Sq. Ft.: 5,419.33 & f1 �,M1 % Zone 1 Operational Sq. Ft.: 3,439.79 L'�lwly Impact 33VAR: ?. Zone 2 Construction Sq. Ft.: 4,062.36 Zone 1 Construction Sq. Ft.: 6,766.40 Zone 2 Operational Sq. Ft.: 2,609.74 - Zone 1 Operational Sq. Ft.: 3,311.43 Zone 2 Construction Sq. Ft.: 4,513.79 ,- Zone 2 Operational Sq. Ft.: 2,226.55 6,0 �`�, � I 610 I 0 � I � I l 610 660 Legend 0 Mileposts (MP, 0.5 —Delineated mi) Perennial - - H-650 Pipeline Approximated Pond --,Operational Approx_SS_Impact L - -'Workspace Wetlands: Limits of Delineated Wetland [::]Construction Right- — Boundary of -Way Oj; Delineated PEM Survey Area ;x Delineated PFO L _ Adjacent Sheet L__. County Boundary aJordan Lake Watershed Streams: —Approximated Intermittent —Approximated Pond _ Delineated Intermittent ® f� IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery ` •b� • S�p�c H3 Alamance C o u n f y Y v t bj • M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 86 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline --,Operational L - -'Workspace Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet E_1 County Boundary aJordan Lake Watershed Streams: —Approximated Pond _ Delineated Ephemeral — Delineated Pond Approximated Pond Pond Approx_SS_Impact Wetlands: _ Delineated Wetland Boundary ><—> Delineated PFO ff�l Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --------- ------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery ply Y � Alamance County Sim7... H[I L lTT ,ta � a� y� • M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 87 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 i 66 4 / fp 1 sip L� Impact 34VAR:. Zone 1 Construction Sq. Ft.: 5,636.26 Zone 1 Operational Sq. Ft.: 2,368.17 Zone 2 Construction Sq. Ft.: 5,203.38 _ Zone 2 Operational Sq. Ft.: 3,089.87 s_>o l 6610 �. o oof WMP' --- 66.0------------------- ---'' ----- L - - - -- - -- - f r, 6SO-0---------- --- - - - --- ----------- - - - -w ♦. SS-SOIL19-08: Per.** r� _ ♦ ♦ r N Con./Op. Pipeline Crossing ft.: UnknownVIIIIIIIII �r♦ Construction Crossing ft.: 70.34 A Operational Crossing ft.: 13.15 / I ♦ 9 ♦ I � d ♦. ♦ 00 ♦ ♦ �� Nl UlM R sso San Cross d L ♦,, Rd 1252 l I state 660 \ 'I. I 660 zc r4. 1 660 660 I \ r �t I ! MP 66.5° o I � i �l w 640 0 w N Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline --,Operational L - -'Workspace Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet E_1 County Boundary aJordan Lake Watershed Streams: —Approximated Pond _ Delineated Ephemeral — Delineated Pond Approximated Pond Pond Approx_SS_Impact Wetlands: _ Delineated Wetland Boundary ><—> Delineated PFO ff�l Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --------- ------S:_E T,_EsR-I---------_eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery ply Y � Alamance County Sim7... H[I L lTT ,ta � a� y� • M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 87 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 6`?0 N 0 620 co Qa •0.. i 406 640 AS-NHD-7000: Int. (Temporary Access Road) Con./Op. Pipeline Crossing Ft.: 0.00 Construction Crossing Ft.: 25.98 Operational Crossing Ft.: 0.00 620 Jordan Lake Watershed w 0 610 610 TA -AL -179A 600 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 1,542.6E Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 1,021.9' Zone 2 Operational Sq. Ft.: 0.00 0 0 660 660 6110 �� r SS-SOIL19-09: Per. (Temporary Access Road) / Con./Op. Pipeline Crossing ft.: 0.00 r' Construction Crossing ft.: 25.12 Operational Crossing ft.: 0.00 U01 Buffer Zone Impacts: 620 W-1319-164: PFO �' Zone 1 Construction Sq. Ft.: 1,507.01 T Con./Op. Pipeline Crossing Ft.: 8.26 f. Zone 1 Operational Sq. Ft.: 0.00 Construction Acres: 0.03 Zone 2 Construction Sq. Ft.: 1,004.76 Operational Acres: 0.01** Zone 2 Operational Sq. Ft.: 0.00 0. •� F MP'66.5 ' /' AW -1319-164: PFO Con./Op. Pipeline Crossing Ft.: 32.24 k` • •� ; "'�' _ 4 . -*� Construction Acres: 0.07 Operational Acres: 0.02** rn 0 0 Legend 0 Mileposts (MP, 0.5 —Approximated Pond mi) —Delineated Pond Temporary Access - Approximated Pond Road � Pond - - H-650 Pipeline Approx_SS_Impact --,Operational Wetlands: - -'Workspace Temporary Access — Delineated Wetland ED Road Boundary Limits of ®Approximated PFO QConstruction Right- Delineated PFO of -Way Survey Area L _ Adjacent Sheet [:]County Boundary aJordan Lake Watershed Streams: —Approximated Intermittent 0 W r) an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ------------------------------------------------ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USES Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance" County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 88 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 S20 510 yg0 S40 530 560 550 ` Buffer Zone Impacts: 580 570 Zone 1 Construction Sq. Ft.: 1,507.01 590 00 Zone 1 Operational Sq. Ft.: 0.00 6 , Zone 2 Construction Sq. Ft.: 1,004.76 Zone 2 Operational Sq. Ft.: 0.00 650 660 bo SS-SOIL19-09: Per. (Temporary Access Road) Con./Op. Pipeline Crossing ft.: 0.00 Construction Crossing ft.: 25.12 Operational Crossing ft.: 0.00 620 q 0 TA -AL -179A • 3 •, 61'0 ti 0 5,�eei AW -1319-164: PFO! Con./Op. Pipeline Crossing Ft.: 32.24 � Construction Acres: 0.07 Operational Acres: 0.02** 620 V W-1319-164: PFO Con./Op. Pipeline Crossing Ft.: 8.26 Construction Acres: 0.03 Operational Acres: 0.01 ** 620 00 h 6201* a++ 600�� w: �� a ••y ` 16 yf AS-NHD-3025: Int.** Con./Op. Pipeline Crossing Ft.: 5.00 yw Construction Crossing Ft.: 90.11 _ Operational Crossing Ft.: 60.33 AV ii * y. -s 6o3ARL 620 Impact 100VAR: Zone 1 Construction Sq. Ft.: 5,401.07 Zone 1 Operational Sq. Ft.: 3,617.81 Zone 2 Construction Sq. Ft.: 3,645.54 Zone 2 Operational Sq. Ft.: 2,422.22 12O 610 7700110�_ _ . ire o t. l 590 yg0 0 I 0 I m •r': ^il Legend 0 Mileposts (MP, 0.5 —Approximated Pond mi) _ Delineated _ Temporary Access Ephemeral Road Approximated Pond - - H-650 Pipeline Approx_SS_Impact --,Operational Wetlands: L - -'Workspace Delineated Wetland ED Road —Boundary Road =Approximated PFO Limits of x Delineated PFO =Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [:]County Boundary =Jordan Lake Watershed Streams: —Approximated Intermittent an iiiia ff�l Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �a a m° N Alamance County a� t�1' " i a quay •,e•,;,,,nis } 4Zn � x s n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 89 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 -�� Date: May 2019 I I I I 0 ILO s cP0 I I i Legend 0 Mileposts (MP, 0.5 —Approximated Pond mi) _ Delineated _ Temporary Access Ephemeral Road Approximated Pond - - H-650 Pipeline Approx_SS_Impact --,Operational Wetlands: L - -'Workspace Delineated Wetland ED Road —Boundary Road =Approximated PFO Limits of x Delineated PFO =Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [:]County Boundary =Jordan Lake Watershed Streams: —Approximated Intermittent an iiiia ff�l Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �a a m° N Alamance County a� t�1' " i a quay •,e•,;,,,nis } 4Zn � x s n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 89 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 -�� Date: May 2019 • n ..17` N yg0 0 570 1 Adjacent Sheet.89 _ _ _ _ - —• - — — t Impact 101VAR: Zone 1 Construction Sq. Ft.: 8,630.30 1 Zone 1 Operational Sq. Ft.: 4,088.80 1 Zone 2 Construction Sq. Ft.: 5,569.20 1 Zone 2 Operational Sq. Ft.: 2,902.79 1 ti 1 A Buffer Zone Impacts: o Zone 1 Construction Sq. Ft.: 3,133.77 0 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 5,241.59 Zone 2 Operational Sq. Ft.: 0.00 61� 413 ��'' 510 • • . ISia,3� ' O l� TA -AL -180 Y � ee�oN Sr . e •1 _ Road " � o 1 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 4,698.61 Zone 1 Operational Sq. Ft.: 1,020.74 Zone 2 Construction Sq. Ft.: 3,080.87 Zone 2 Operational Sq. Ft.: 2,052.53 AS -A18-177: Per. Con./Op. Pipeline Crossing Ft.: 14.16 Construction Crossing Ft.: 76.25 Construction Sq. Ft.: 1,066.58 Operational Sq. Ft.: 0.00 1 SS-SOIL19-03: Per." err„ _ 1 Con./Op. Pipeline Crossing ft.: Unknown 1,= Construction Crossing ft.: 144.47 1 Operational Crossing ft.: 64.78 1 , 1 1 1 1 1 1 1 1 1 1 1 1 e 1 . 1 1 " o 1 1 _ 1 1 1 1 1 � 1 �• 1 1 1 - 1 1 1 1 1 - 1 1 1 1 1 1 1 1 1 � 1 1 1 A 1 1 1 1 1 1 1 yD� 1 1 1 1 1 1 1 1 Legend O Mileposts (MP, 0.5 —Approximated Pond mi) _ Delineated _ Temporary Access Ephemeral Road _ Delineated — — H-650 Pipeline Intermittent -- Operational _ Delineated 1—Workspace Perennial Temporary Access —Delineated Pond ED RoadM1Approximated Limits of Perennial [::]Construction Right- - Approximated Pond of -Way Perennial Surface Survey Area Water L Adjacent Sheet - pond Qcounty Boundary Approx_SS—Impact aJordan Lake Wetlands: Watershed Delineated Wetland Streams: — Boundary —Approximated Delineated PFO Intermittent —Approximated Perennial ® 5n an Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery CRV C.J_lJ Md P 1� rea o- •0 1 c� a AIane C06,1nty a� „c M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 90 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline --,Operational - -'Workspace Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet E_1 County Boundary aJordan Lake Watershed Streams: Approximated Perennial _ Delineated Perennial - Approximated Perennial - Perennial Surface Water Approx_SS_Impact Wetlands: _ Delineated Wetland Boundary Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Ny Ror baro R p Al^a7mance County Yom_ •o � rp � 3°ro m a �= $ g NoPed�e M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 91 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace EDTemporary Access Road Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: —Approximated Intermittent —Approximated Pond Approximated Pond Approx_SS_Impact Wetlands: _ Delineated Wetland Boundary 0 W C) an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery p ' • � 5:ii,S�son Nrl 4a ; G� eert Lr.�c • 0 } 1 Lr • "4. Alamance .,County y 7 a ♦ { 5� �,�,n,nuc,dep� c, �� ♦ t'il°J � � z M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 92 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 —Delineated mi) Intermittent _ Permanent Access _ Delineated Road Perennial - - H-650 Pipeline —Delineated Pond --,Operational ' Perennial Surface - -'Workspace Water ED Permanent Access Pond Road Wetlands: Limits of Delineated Wetland [::]Construction Right- — Boundary of -Way Survey Area ;X, Delineated PFO L _ Adjacent Sheet uCounty Boundary aJordan Lake Watershed Streams: —Approximated Intermittent ® soy IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �o 1 •0 j aaL' 1 � 1 Rha $ _ 4 l - e t'it`J Alamance �•, s5 County µa ♦ . ry N"0511 `'4 • M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 93 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 P, .. o vtLO Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 5,598.18 Zone 1 Operational Sq. Ft.: 3,554.33 Zone 2 Construction Sq. Ft.: 4,631.59 Zone 2 Operational Sq. Ft.: 2,967.51 AS-NHD-1552: Int. M Con./Op. Pipeline Crossing Ft.: 5.00 Construction Crossing Ft.: 85.65 Operational Crossing Ft.: 51.58 { owl quo •. VIT M-2 S-1318-8: Int. ;fCon./p. Pipeline Crossing Ft.: 12.55 struction Crossing Ft.: 92.92 nstruction Sq. Ft.: 1,377.59 Operational Sq. Ft.: 0.00 e TA -AL -185 Z L Impact 43VAR: Zone 1 Construction Sq. Ft.: 5,847.49 Zone 1 Operational Sq. Ft.: 3,476.34 Zone 2 Construction Sq. Ft.: 4,056.77 Zone 2 Operational Sq. Ft.: 2,953.00 Ila �o Lo C) LO 580 550 5q0 530 , I � =� MP 69.0 , S-1318-11: Int.** Con./Op. Pipeline Crossing Ft.: 3.00 Construction Crossing Ft.: 90.69 Operational Crossinq Ft.: 54.08 Legend o Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Temporary Access _ Delineated Road Intermittent - - H-650 Pipeline - Intermittent Surface --,Operational Water L - -'Workspace Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet F-iCounty Boundary aJordan Lake Watershed Streams: Approximated Intermittent ® f� an iiiia l� Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance ----------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 5 Bh � Yh • -� Rmbwa Rd Vq M-aH 00 Alamancb s County M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 94 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace —Approximated Perennial _ Delineated Ephemeral _ Delineated Intermittent Delineated Temporary Access Perennial ED Road — Delineated Pond Limits of - Approximated Q Construction Right- Perennial of -Way Q Survey Area L _ Adjacent Sheet F-iCounty Boundary aJordan Lake Watershed Streams: —Approximated Intermittent - Perennial Surface Water M Pond Wetlands: _ Delineated Wetland Boundary �j14 Delineated PEM *6 0 W C) an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �JU s °y o- • � si F� ♦ w rya �``•' .` .:w g Alam anCe County ` wm���, si a ♦ • • Fp ♦ 3 Gr�� 54 0 M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 95 of 107 600 Willowbrook Ln C? TRC West Chester, PA 19382 Date: May 2019 Y �? ss0 S,0 t W-1319-146: PFO p8o Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.11 +,- -A% Operational Acres: 0.00** �a Road _ Sj,0 570 S-1319-148: Int. Con./Op. Pipeline Crossing Ft.: 0.00 g Construction Crossing Ft.: 97.58 Operational Crossing Ft.: 0.00 = 0 St pelham St �Y. 580 .o' 1�x-. to Rd 1935 'Ali, W S-1319-147: Eph. Con./Op. Pipeline Crossing Ft.: 1.00 ; i r _ o • Construction Crossing Ft.: 223.12 '• ,��' � � 00 � Operational Crossing Ft.: 50.35 W-1319-173: PEM Con./Op. Pipeline Crossing Ft.: 0.00 S-1319-174: Int. Construction Acres: 0.13 Con./Op. Pipeline Crossing Ft.: 0.00 Operational Acres: 0.00 Impact 45VAR Zone 1 Construction Sq. Ft.: 5,675.22 Zone 1 Operational Sq. Ft.: 1,242.12 Zone 2 Construction Sq. Ft.: 3,839.50 Zone 2 Operational Sq. Ft.: 2,398.32 x•'. �, -� r �; " ' Construction Crossing Ft.: 176.88 S70 l '.:Operational Crossing :'.SSO 40 70.0- m 0 — — AS -A18-115: Per.** Con./Op. Pipeline Crossing Ft.: 18.27 Construction Crossing Ft.: 91.24 Construction Sq. Ft.: 985.54 Operational SQ. Ft.: 0.00 s� O ttiL• � TA -AL -187 w ;aq►. t R+tii= 15' O � o Sqo ,• 5 : 1� qo s2o Legend Mileposts (MP, 0.5 O mi) _Approximated Intermittent —Temporary Access _Approximated Road Perennial - - H-650 Pipeline Delineated --,Operational _ Ephemeral L - -'Workspace Delineated QOperational Bore _ Intermittent Temporary Access ED _ Delineated Road Perennial Limits of - Approximated [::]Construction Right- Perennial of -Way - Perennial Surface F-1 Survey Area Water L _ Adjacent Sheet Wetlands: County Boundary _ Delineated Wetland Jordan Lake Boundary moi; Watershed Delineated PEM Streams: X^�x Delineated PFO ® f� an 1� Note: iiiia March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance ----------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery aasPn.o �n � AIamapce_ •• C 0 U nhJ y rte` • _ J • - �G �{ _ �m M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 96 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 2,497.13 Zone 1 Operational Sq. Ft.: 590.16 Zone 2 Construction Sq. Ft.: 1,641.58 Zone 2 Operational Sq. Ft.: 1,118.82 S-1318-134: Int.** Con./Op. Pipeline Crossing Ft.: 3.00 Construction Crossing Ft.: 92.44 Operational Crossing Ft.: 29.62 S-C18-82:Int. Con./Op. Pipeline Crossing Ft.: 3.00 Construction Crossing Ft.: 92.31 Operational Crossing Ft.: 60.67 IWA•J ---------------vti --- --------------------------- �. N�-t2 - 1 S-1318-135: Eph. �k S-1318-133: Per. Con./Op. Pipeline Crossing Ft.: 2.00 Con./Op. Pipeline Crossing Ft.: 11.53 I Construction Crossing Ft.: 129.61 Construction Crossing Ft.: 82.61 + ;? Operational Crossing Ft.: 75.18 Construction Sq. Ft.: 1,226.39 �3 Operational Sq. Ft.: 0.00 �.- Impact46VAR:-� sj Zone 1 Construction Sq. Ft.: 5,980.41 Zone 1 Operational Sq. Ft.: 2,458.47 • • . ISi�3� Zone 2 Construction Sq. Ft.: 5,794.29 W Zone 2 Operational Sq. Ft.: 4,303.37 S' U, 10 N o •.r _ 4013 490 T.. • 660' .f 660 f - I Impact 47VAR: Zone 1 Operational Sq. Ft.: 1,356.59 Zone 2 Operational Sq. Ft.: 2,698.47 oma- ---- r r 490 . _490. .: r 4g0 MILL &P. - �':-A=. Legend 0 Mileposts (MP, 0.5 - Perennial Surface mi) Water - - H-650 Pipeline Wetlands: - -, Operational _ Delineated Wetland L --'Workspace Boundary Limits of Q Construction Right - of -Way Survey Area L _ Adjacent Sheet E_1 County Boundary aJordan Lake Watershed Streams: _ Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial ® f� an iiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application --- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery W �p3 Alamance r wee County31� �e d Ea. � M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 97 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 1� x S6 �^ f Buffer Zone Impacts: �� •r' „ �t o , Zone 1 Construction Sq. Ft.: 1,725.58,��� j Zone 1 Operational Sq. Ft.: 0.00 0 h� `' Zone 2 Construction Sq. Ft.: 1,211.29 1 Zone 2 Operational Sq. Ft.: 0.00 `sop SSO SS-SOIL18-09: Per. (Temporary Access Road) r Con./Op. Pipeline Crossing ft.: 0.00Adjac + Construction Crossing ft.: 12.22 550 ." • 1 - nt Sheet 99 - Operational Crossing ft.: 0.00 5 i 40 550 f ' Mp 570 h TA -AL -189 TA -AL -188 i — 540 Legend O Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Temporary Access _ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace -Perennial Surface QTemporaryAccess Water Road Approx_SS_Impact Limits of Wetlands: [::]Construction Right- _ Delineated Wetland of -Way Boundary Q Survey Area L _ Adjacent Sheet [:]County Boundary QJordan Lake Watershed Streams: Approximated Perennial an iiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance ----------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance 0 Urn t y b-nw4E n� S= M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 98 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 0 0 74 Impact 48VAR: I Zone 1 Construction Sq. Ft.: 4,973.68 4 + Zone 1 Operational Sq. Ft.: 1,106.43 Q. Zone 2 Construction Sq. Ft.: 3,311.06 `� + Zone 2 Operational Sq. Ft.: 2,207.74 "'�' - •. ' 47 S -A18-107: Eph. Con./Op. Pipeline Crossing Ft.: 1.00 i Construction Crossing Ft.: 118.36 Operational Crossing Ft.: 72.88 a O ! SSD . S -A18-109: Per. t Con./Op. Pipeline Crossing Ft.: 5.00 480 1 . Construction Crossing Ft.: 104.25 490 - Operational Crossing Ft.: 54.25 480 + 480 480 S -C18-81: Per.** T Con./Op. Pipeline Crossing Ft.: 24.18 i 480 480 Construction Crossing Ft.: 83.02 - 480 ; 480 Construction Sq. Ft.: 1,761.82 480 10 Operational Sq. Ft.: 0.00 S -A18-108: Int. Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 115.56 48 I� Operational Crossing Ft.: 84.04 _ d��:. U +ate •- . , .. 00 Legend O Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Temporary Access _ Delineated Road Intermittent - - H-650 Pipeline _ Delineated --,Operational Perennial L - -'Workspace -Perennial Surface QTemporaryAccess Water Road Approx_SS_Impact Limits of Wetlands: [::]Construction Right- _ Delineated Wetland of -Way Boundary Q Survey Area L _ Adjacent Sheet [:]County Boundary QJordan Lake Watershed Streams: Approximated Perennial an iiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance ----------------------------Application------------------------------------------------------------------------------ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance 0 Urn t y b-nw4E n� S= M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 98 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 vim s� . 570 O O O �o oo, �q 0 • o M h V l r ry ' '.. .r 560 SS Ralph Scott Elf 7. 41 Y+� 1 I � >R 570 ro r `S>o BOO TA -AL -188 e n --------------- * ; L air r ; �. A; ;qtr 0 h y2o 520 so 0 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road EDTemporary Access Road Limits of [::]Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [County Boundary aJordan Lake Watershed Streams: Wetlands: _ Delineated Wetland Boundary 0 W IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ----------------S:_E T,_EsR-I-------------_ap-,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance County c t : cna 1 1 n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 99 of 107 600 Willowbrook Ln C TRC West Chester, PA 19382 �..,.w " Date: May 2019 .1 , 0' �s 110,5 ' � ti a I. P, C ,t lloomE �14L_ 1 s� . 570 O O O �o oo, �q 0 • o M h V l r ry ' '.. .r 560 SS Ralph Scott Elf 7. 41 Y+� 1 I � >R 570 ro r `S>o BOO TA -AL -188 e n --------------- * ; L air r ; �. A; ;qtr 0 h y2o 520 so 0 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road EDTemporary Access Road Limits of [::]Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [County Boundary aJordan Lake Watershed Streams: Wetlands: _ Delineated Wetland Boundary 0 W IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ----------------S:_E T,_EsR-I-------------_ap-,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Alamance County c t : cna 1 1 n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 99 of 107 600 Willowbrook Ln C TRC West Chester, PA 19382 �..,.w " Date: May 2019 co O O ' 5 0' P cn W 0 0 0 s Aw r. s�o a Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 0.00 r Zone 1 Operational Sq. Ft.: 0.00 oE SAO tt . �;. Zone 2 Construction Sq. Ft.: 879.51 o Zone 2 Operational Sq. Ft.: 879.51 a CS, `�-------- - - ---------- - - - - -- MP, 71.5 �T ..., 480 - S-A18-65:Int. 1� q80 S -A18-64: Per. Con./Op. Pipeline Crossing Ft.: 1.00 480 Con./Op. Pipeline Crossing Ft.: 25.88 Construction Crossing Ft.: 109.91 r� Construction Crossing Ft.: 74.95 Operational Crossing Ft.: 91.15 !� Construction Sq. Ft.: 1,221.66 ` 480 Operational Sq. Ft.: 0.00 i x Y 480 F 1 Y 15 4: .. A80 11 5. o ar. o _ LO OI to Rd 22 O o 3 7 Valle IDr Sta t S 00 530 Legend o Mileposts (MP, 0.5 —Delineated mi) Perennial _ Temporary Access — Delineated Pond Road - Perennial Surface - - H-650 Pipeline Water --,Operational Pond L - -'Workspace Wetlands: ED Temporary Access —Delineated Wetland Road Boundary Limits of [::]Construction Right - of -Way Q Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: _ Delineated Intermittent ® f� an iiiia Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application -------------------------------------------eM__ p -,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery •• Alamance mV County ' ��•— — 10— — 1 � 90� 0 • 4 n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 100 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace _ Delineated Intermittent _ Delineated Perennial - Perennial Surface Water Wetlands: ED Temporary Access _ Delineated Wetland Road Boundary Limits of K,� Delineated PFO Q Construction Right - of -Way Survey Area L _ Adjacent Sheet F-iCounty Boundary aJordan Lake Watershed Streams: Approximated Intermittent Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 7 • amance a� o u n t y M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 101 of 107 600 Willowbrook Ln CTRC West Chester, PA 19382 Date: May 2019 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road - - H-650 Pipeline --,Operational - -'Workspace Delineated Ephemeral _ Delineated Intermittent _ Delineated Perennial - Perennial Surface EDTemporary Access Water Road Wetlands: Limits of _ Delineated Wetland QConstruction Right- Boundary of -Way -Delineated PEM Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: Approximated Intermittent Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery J Alamance County 00 _ _ 0 0 , o � x b i• M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 102 of 107 600 Willowbrook Ln CTRC West Chester, PA 19382 Date: May 2019 .r.. Buffer Zone Impacts: Zone 1 Construction Sq. Ft.: 0.00 Zone 1 Operational Sq. Ft.: 0.00 Zone 2 Construction Sq. Ft.: 13.75 Zone 2 Operational Sq. Ft.: 0.00 W-1319-151: PEM J. J Con./Op. Pipeline Crossing Ft.: 0.00 . J#�>0 0 Construction Acres: 0.15 ■■ 41, 0J. Q$° Operational Acres: 0.00 ■■ ■■ ■ ■ MP 73.0 Q$o 4900 480 W-1319-151-3: PEM Con./Op. Pipeline Crossing Ft.: 0.00 Construction Acres: 0.04 Operational Acres: 0.00 S� 0 0 rn Legend O Mileposts (MP, 0.5 Delineated mi) Ephemeral _ Permanent Access _ Delineated Road Perennial - - H-650 Pipeline - Approximated --,Operational Perennial --'Workspace -Perennial Surface OPermanent Access Water Road Wetlands: Limits of _ Delineated Wetland QConstruction Right- Boundary of -Way -Delineated PEM Survey Area L _ Adjacent Sheet County Boundary aJordan Lake Watershed Streams: Approximated Perennial an Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery o pd Alamance County 11 —uvly_�__r '1 �/ 5 na,�mo� A S C ti M Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Alamance County, NC Sheet 103 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 640 i' -AEW�� 0 630 v 630 4e g30 640 Legend O Mileposts (MP, 0.5 M Approximated Pond mi) Wetlands: _ Temporary Access_ Delineated Wetland Road Boundary EDTemporary Access QApproximated PEM Road 0'*;4 Delineated PEM Limits of [::]Construction Right - of -Way Q Survey Area L _ Adjacent Sheet QCounty Boundary Streams: Approximated Ephemeral —Approximated Intermittent —Approximated Pond _ Delineated Ephemeral an Note: March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC 0--n--e--M--a--p-,--T--R--C-,--U--S--G--S Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery 41 O Roc lingham ny C o u,P-1 y 5` d' p@. M 4a M n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 104 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 �..,.w " Date: May 2019 ti t3� 1 owe o 00 0 cp rO 10 00 h 00 0 TA-RO-082A 00 h ��o 0 O � �O AIN s� d 41 eco 0 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road EDTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _ Adjacent Sheet C_,County Boundary Streams: Wetlands: _ Delineated Wetland Boundary 0 W IM an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application - -------------------------------------------------------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery Rockingham County"'e. 4� 9 ¢ m J! � F 6T �e n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 105 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 N n 740 1928j-57105'Ke Watershed �S O C Lr O n0 a t.. O n n ego 190 0 _03 `140 J Rd State Rd 2647 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road EDTemporary Access Road Limits of Q Construction Right - of -Way Q Survey Area L _ Adjacent Sheet [County Boundary aJordan Lake Watershed Streams: Wetlands: Delineated Wetland _ Boundary Oj;� Delineated PEM \^ Delineated PFO 0 W C) an Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery �i � r RI Rockingham County rtd �Lanr� rhr�Il d - a g � 8 1-nr z - !�• o- n Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 106 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019 ' t goo d Rd 291 fl Or Stiar,a N r eeK 750 Cedar C w� State Rd 2821 Harvest R n - NO W 0 w� a 0 760 �o X146 � Stiatie Rd r Rd C�urc 0 n Friede so m _6111 • • . L' lwly N Z. - m - TA -G U-000 CY 09 Iro 0 W O � yo Ito 3� 1 0 Bethel Church Rd State Rd 2930 ASO Legend O Mileposts (MP, 0.5 QApproximated PFO mi) Delineated PFO _ Temporary Access Road EDTemporary Access Road Limits of [::]Construction Right - of -Way Survey Area L _I Adjacent Sheet lCounty Boundary aJordan Lake Watershed Streams: _ Delineated Intermittent Wetlands: _ Delineated Wetland Boundary ® soy IM an iiiia Note: am March 2019 Workspace 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) . = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS .. = Buffer Impacts Under Review Per DWR# 20181638 Major Variance Application ----------------S:_E T,_EsR-I-------------_ap-,------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour, Project Imagery 412018, ESRI World Imagery r �c Guilford County RS Ul!JU MCLeansvlll 1'1 Mountain Valley PIPELINE Section 404/401 Permit Application Addendum Proposed Pipeline Route and Impacts Guilford County, NC Sheet 107 of 107 600 Willowbrook Ln TRC West Chester, PA 19382 Date: May 2019