HomeMy WebLinkAbout20181638 Ver 1_Addendum to application_20190522Homewood, Sue
From:
Miller, Alex <Alex.Miller@nexteraenergy.com>
Sent:
Thursday, May 23, 2019 11:11 AM
To:
David.E.Bailey2@usace.army.mil
Cc:
Salvador, Kathy; Higgins, Karen; Homewood, Sue
Subject:
[External] RE: MVP Southgate Project, NC Joint Permit Application Supplement
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Hello Mr. Bailey,
To clarify, this is not a revised submittal. The supplement is simply additional information to be considered for
jurisdictional determination purposes on the currently proposed route.
Thank you for your time,
Alex V. Miller
Environmental Permitting Lead
on behalf of Mountain Valley Pipeline, LLC
713-374-1599
rq MVP
SOUI"GATE
From: Patti, Heather <HPatti @trccompanies.com>
Sent: Wednesday, May 22, 2019 1:39 PM
To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil>; Higgins, Karen
<karen.higgins@ncdenr.gov>
Cc: Walker, Lisa <LWalker@trccompanies.com>; Zimmer, John <JZimmer@trccompanies.com>; Miller, Alex
<Alex.Miller@nexteraenergy.com>; Faul, Travis<Travis.Faul@nexteraenergy.com>; Miller, Todd M CIV USARMY CENAO
(US) <Todd.M.Miller@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov>; Hamberg, Alexis
<Alexis.Ham berg@ nexteraenergy.com>
Subject: MVP Southgate Project, NC Joint Permit Application Supplement
Hi Dave and Karen,
A supplement to the November 2018 MVP Southgate Project Joint Permit Application has been uploaded to the
project's Sharepoint site:
https://trcextranet.tresolutions.com/sites/CS-KM1/MVP-Southgate-
Agency/SitePages/Home.aspx?RootFolder=%2Fsites%2FCS-KM1%2FMVP-Southgate-
Agency%2FSha red%20Docu ments%2FMay% 202019%20J PA%20Su pplement&FolderCTI D=Ox012000BB735D23F68CBE43
BOEA67C7FE3D6E6E&View=%7BBCBB181D-F76D-460C-9A9F-7E063BA81F3E%7D
The supplementary PDF files are in a folder entitled "May 2019 JPA Supplement".
Please let me know if you have any trouble logging in or downloading the files.
Thankyou!
Heather Patti, PWS
Senior Ecologist
TIRC5540 Centerview Drive, Suite 100, Raleigh, NC 27606
T: 919-256-6236 F: 919-838-9661 1 C: 262-623-1079
Linkedln I Twitter Blog Flickr www.TRCcompanies.com
Please note that our domain name and email addresses have changed
P1 MVP
SOUTHGATE
May 22, 2019
Mr. David Bailey
United States Army Corps of Engineers -Wilmington District
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
SAW -2018-00887
Ms. Karen Higgins
North Carolina Department of Environmental Quality
Division of Water Resources
401 & Buffer Permitting Unit, Wetlands Branch
1617 Mail Service Center
Raleigh, North Carolina 27699 -1617
625 Liberty Avenue, Suite 1700 1 Pittsburgh, PA 15222
833 -MV -SOUTH I mail@mvpsouthgate.com
www.mvpsouthgate.com
RE: MVP Southgate Project, Rockingham and Alamance Counties, North Carolina
Addendum to Pre -Construction Notification for Nationwide Permit 12 (SAW -2018-00887)
Addendum to Application for Individual 401 Water Quality Certification (DWR# 20181638)
Authorization for Buffer Impacts in Jordan Lake Watershed
Dear Mr. Bailey and Ms. Higgins:
Mountain Valley Pipeline, LLC ("Mountain Valley") is providing an addendum to the Joint Permit Application ("JPA")
for the MVP Southgate Project ("Project"). Mountain Valley is proposing to construct and operate the Project to
provide timely, cost-effective access to new natural gas supplies to meet the growing needs of natural gas users in
the southeastern United States ("U.S."). The Project is a separate project from the 303 -mile Mountain Valley Pipeline
that is currently under construction.
Subsequent to the initial submittal of the JPA, as well as the application to the Federal Energy Regulatory
Commission ("FERC') for a Certificate of Public Convenience and Necessity, in November 2018, Mountain Valley
has continued to evaluate the pipeline alignment and submitted a Supplemental Filing to FERC in March of 2019
reflecting modifications incorporated based on FERC review and stakeholder / agency comments. Mountain Valley
is now providing this addendum to the JPA which reflects those changes as well as additional biological field surveys
along with updated wetland and waterbody impact tables and drawings.
In March of 2019, the Southgate Project submitted a Wetland Delineation Addendum to FERC summarizing the
second round of field surveys within the North Carolina Project survey area based on additional survey access to
identify the presence and delineate the boundaries of wetlands and other waters potentially subject to regulation by
the USACE and North Carolina Department of Environmental Quality. In summary, Mountain Valley identified and
delineated 17 additional wetlands, 15 extensions of previously delineated wetlands, 2 approximated wetlands, 3 new
ponds, 29 new streams and 40 extended streams. Since the submittal of the March 2019 addendum to FERC,
additional field surveys have occurred, and the enclosed information reflects the most recent data.
As you know, a preliminary jurisdictional determination (PJD) review process is currently ongoing with the USACE-
Wilmington District and NC Department of Water Resources to review the delineated resources. To -date, several
field visits have occurred with the USACE and NCDWR (in September of 2018) with additional field visits planned
for the summer of 2019.
In addition to the PJD, Mountain Valley submitted a major variance application to the NCDWR on February 81h, 2019
for non -perpendicular stream crossings within the Jordan Lake Watershed (NC DWR# 20181638). This application
is currently under review, and an addendum was submitted to NCDWR reflecting the supplemental information on
May 3rd, 2019.
Mountain Valley appreciates the opportunity to provide this information in support of its request for the Joint USACE
Section 404/NCDEQ Section 401 authorization of the Project pursuant to Nationwide Permit 12. Should you have
any additional questions or further information to complete your review of the Project, please do not hesitate to
contact Alex Miller at 713-374-1599 or via email at alex.miller(a)nexteraenergy.com or me at 561-691-7054 or via
email kathy.salvador(a�nexteraenergy.com. Thank you for your continued consideration.
Sincerely,
Mountain Valley Pipeline, LLC
Kathy Salvador
Senior Director, Environmental Services
Attachments
CC: Todd Miller, Corps, NAO
Travis Faul, MVP
John Zimmer, TRC
Lisa Walker, TRC
Heather Patti, TRC
MVP
SOUTHGATE
M Mountain Valley
PIPELINE uc
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Table 4-1
Summary of Proposed Wetland Impacts in North Carolina - Updated May 2019
Cowardin
Temporary Construction
Permanent PFO Converstion
Permanent Fill for Access
Milepost (MP)/Watershed
Classification a/
Number of Affected Resources
Pipeline Crossing Length (feet) b/
Workspace Impacts (acres) b/
to PEM/PSS (acres) c/
Road (acre) d/
PEM
55
1,979.17
5.81
0.00
0.00
MP: 26.1-39.7 HUC 8: Upper Dan
(03010103) HUC 10: Cascade Creek -
PSS
14
153.72
0.31
0.00
0.00
Dan River (0301010309)
PFO
22
1,778.91
3.30
1.18
0.00
Subtotal
91
3,911.80
9.42
1.18
0.00
PEM
5
0.00
0.05
0.00
0.00
MP: 39.7 - 48.36 HUC 8: Lower Dan
PSS
0
0.00
0.00
0.00
0.00
(03010104) HUC 10: Hogans Creek-
PFO
4
136.07
0.25
0.11
0.00
Dan River (0301010401)
Subtotal
9
136.07
0.30
0.11
0.00
PEM
9
186.67
0.35
0.00
0.00
MP: 48.36 - 56.12 HUC 8: Haw River
PSS
6
56.42
0.18
0.00
0.00
(03030002) HUC 10: Headwaters
PFO
5
179.82
0.43
0.12
0.00
Haw River (0303000202)
Subtotal
20
422.92
0.96
0.12
0.00
PEM
23
145.85
1.61
0.00
0.00
MP: 56.12 - 73.11 HUC 8: Haw River
(03030002) HUC 10: Back Creek -Haw
PSS
1
52.16
0.07
0.00
0.00
River (0303000204)
PFO
22
1,626.70
2.72
1.12
0.00
Subtotal
46
1,824.71
4.40
1.12
0.00
PEM
92
2,311.69
7.82
0.00
0.00
PSS
21
262.30
0.56
0.00
0.00
Total
PFO
53
3,721.50
6.69
2.53
0.00
North Carolina
166
6,295.50
15.07
2.53
0.00
Total
a/ Classification of Deepwater Habitats (Ca/ Classification of Wetlands and Deepwater Habitats of
the United States (Cowardin, 1979)
b/ Construction impacts based on a 75 -foot construction workspace within wetlands.
c/ Vegetation cover type change will only occur within PFO wetlands. The maintained area within the
permanent easement will be kept in a
PEM/PSS cover type. PEM= Palustrine Emergent, PSS=Palustrine
Scrub -Shrub, PFO=Palustrine
Forested
d/ Permanent wetland loss associated with access roads. Where wetlands are identified within permanent access roads, permanent impacts are not anticipated.
1� Mountain Valley
PIPELI
Updated Table 4-2
Summary of Proposed Waterbody Impacts in North Carolina - Updated May 2019
Milepost (MP)N1latershed
Waterbody Type
Number of
Affected
Resources
Waterbody Width at
Pipeline Crossing (feet)
b/
Waterbody Length within Construction
Workspace (In feet) c/
MP: 26.1-39.7 HUC 8: Upper Dan
(03010103) HUC 10: Cascade Creek-
Dan River (0301010309)
Ephemeral
14
16.00
1,021.97
Intermittent 21 55.52
1,778.51
Perennial 39 851.69
3,364.39
Pond 1 0.00
30.84
Subtotal 75 923.21
6,195.71
MP: 39.7 - 48.36 HUC 8: Lower Dan
(03010104) HUC 10: Hogans Creek-
Dan River (0301010401)
Ephemeral
6
12.00
389.78
Intermittent 12 14.00
690.92
Perennial 20 272.57
2,093.27
Pond 0 0.00
0.00
Subtotal 38 298.57
3,173.97
MP: 48.36 - 56.12 HUC 8: Haw River
(03030002) HUC 10: Headwaters
Haw River (0303000202)
Ephemeral
3
3.00
115.98
Intermittent 13 16.00
1,121.54
Perennial 19 79.21
1,922.39
Pond 0 0.00
0.00
Subtotal 35 98.21
3,159.91
MP: 56.12-73.11 HUC 8: Haw River
(03030002) HUC 10: Back Creek -Haw
River (0303000204)
Ephemeral
13
16.00
1,075.99
Intermittent 38 97.50
2,900.05
Perennial 43 619.03
3,947.92
Pond 1 31.40
79.07
Subtotal 95 763.93
8,003.03
Total
Ephemeral
36
47.00
2,603.73
Intermittent 84 183.02
6,491.01
Perennial 121 1,822.51
11, 327.97
Pond 2 31.40
109.92
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Permanent Stream Impact
(Linear ft) d/
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Pond within Construction
Workspace (Sq ft)
0.00
0.00
0.00
33.31
33.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,864.08
1,864.08
0.00
0.00
0.00
1,897.39
North Carolina 243 2,083.92 20,532.63 0.00 1,897.39 0.00
Total
Permanent Pond Impact
(Sq ft) d/
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
a/ Flow based on field evaluations using the NCDWR Stream Identification Form, Version 4.11 for delineated resources. For approximated waterbodies, flow type was estimated based on aerial imagery unless the approximated stream is directly
associated with a delineated waterbody in which the approximated waterbody was assigned the same flow type as the associated delineated waterbody.
b/ Width of the pond or stream channel (at ordinary high water mark) at the intersection of the pipeline or access road. For estimated waterbodies, aerial imagery was used to estimate the channel width if wide enough to discern, and defaulted to <6 feet if
too narrow to be measured using aerial imagery. Approxiamted soil survey streams are defualted to Unknown and are not included. If the crossing width is "0", the waterbody is not crossed by the centerline.
c/ Length of the waterbody within the construction workspace.
d/ No waterbody loss is proposed in North Carolina.
M Mountain Valley
PIPELINE uc
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-1
Proposed Impacts by Wetland ID and Type of Impact
May 2019
Feature I Wetland
e
Type
Wetland Type
Milepost
Latitude
Longitude
Watershed HUC 10
Pipeline Crossing
Length (g)
Temporary
Construction
Impacts (acres)
Permanent
Conversion PFO to
PSS/PEM
Construction
Method
H-650 Pipeline
W -C18-96
PFO
26.1
36.541688
-79.632557
0301010309
0.00
<0.01
<0.01*
Workspace Only
W -B18-98
PFO
26.5
36.536541
-79.637494
0301010309
15.04
0.03
0.01*
Open -cut
W -A18-22
PEM
26.7
36.534583
-79.639012
0301010309
77.33
0.17
0.00
Open -cut
W -A18-44
PEM
27.1
36.531343
-79.643646
0301010309
0.00
<0.01
0.00
Workspace Only
W -A18-44-2
PEM
27.2
36.529693
-79.644722
0301010309
1,176.72
3.55
0.00
Open -cut
W -A18-44
PFO
27.3
36.528099
-79.646143
0301010309
37.93
0.05
0.01*
Open -cut
W -A19-274
PEM
27.6
36.525575
-79.648779
0301010309
42.02
0.19
0.00
Open -cut
W -A19-274-2
PEM
27.6
36.525149
-79.649005
0301010309
38.12
0.04
0.00
Open -cut
W -A19-274-3
PEM
27.6
36.525173
-79.649581
0301010309
0.00
0.17
0.00
Workspace Only
W -A18-39
PEM
28
36.520859
-79.653331
0301010309
0.00
0.02
0.00
Workspace Only
W -A18-26
PEM
28.1
36.519132
-79.654783
0301010309
40.92
0.07
0.00
Open -cut
W -A18-30
PEM
28.3
36.517047
-79.656415
0301010309
26.16
0.04
0.00
Open -cut
W -A18-30
PFO
28.3
36.516646
-79.656467
0301010309
5.13
0.01
<0.01*
Open -cut
W -A18-33
PEM
28.3
36.516535
-79.656816
0301010309
0.00
0.01
0.00
Workspace Only
W -A18-38
PEM
28.6
36.513291
-79.660161
0301010309
28.83
0.04
0.00
Open -cut
W -A18-38
PFO
28.6
36.51324
-79.660042
0301010309
0.00
0.01
0.00*
Workspace Only
W-1318-48
PFO
29.1
36.508367
-79.665188
0301010309
23.43
0.05
0.02*
Open -cut
W -B18-48
PEM
29.1
36.508421
-79.665299
0301010309
0.00
0.01
0.00
Workspace Only
W -A18-18
PFO
29.8
36.500578
-79.672731
0301010309
934.84
1.87
0.64*
Open -cut
W -A18-18
PEM
29.9
36.499656
-79.673716
0301010309
49.52
0.07
0.00
Open -cut
W-1318-36-5
PEM
30.4
36.494219
-79.679657
0301010309
26.67
0.03
0.00
Workspace Only
W -B18-36-6
PEM
30.4
36.494116
-79.679934
0301010309
0.00
<0.01
0.00
Workspace Only
W -B18-34
PFO
30.5
36.49309
-79.680105
0301010309
179.81
0.45
0.12*
Open -cut
W -A18-54
PEM
30.7
36.490849
-79.683335
0301010309
11.24
0.01
0.00
Open -cut
W -B18-103
PEM
31.1
36.485665
-79.68523
0301010309
0.00
<0.01
0.00
Workspace Only
W -A18-141
PFO
32
36.476993
-79.696049
0301010309
182.61
0.34
0.13*
Open -cut
W -A18-141
PEM
32
36.477148
-79.696159
0301010309
0.00
0.02
0.00
Workspace Only
W -A18-149
PSS
32.2
36.474593
-79.698263
0301010309
51.49
0.07
0.00
Open -cut
W -A18-149
PEM
32.2
36.474621
-79.698334
0301010309
52.96
0.16
0.00
Open -cut
W -A18-152
PEM
32.6
36.4698
-79.702487
0301010309
21.14
0.06
0.00
Open -cut
W -A18-152
PFO
32.6
36.46964
-79.702513
0301010309
29.40
0.03
0.02*
Open -cut
W -A18-155
PEM
33.1
36.464024
-79.702911
0301010309
0.00
0.06
0.00
Workspace Only
W -A18-155
PSS
33.1
36.463768
-79.702847
0301010309
0.00
<0.01
0.00
Workspace Only
W -A18-155-2
PSS
33.1
36.463484
-79.702655
0301010309
68.48
0.16
0.00
Open -cut
W -A18-222
PFO
33.4
36.459381
-79.700236
0301010309
42.61
0.08
0.03*
Open -cut
W -A18-222
PEM
33.4
36.459274
-79.700288
0301010309
0.00
<0.01
0.00
Workspace Only
W -A18-224
PFO
33.7
36.455977
-79.697766
0301010309
10.58
0.02
0.01*
Open -cut
W -A18-224
PEM
33.7
36.455931
-79.697819
0301010309
0.00
<0.01
0.00
Workspace Only
W -C18-40
PEM
34.6
36.445616
-79.689527
0301010309
0.00
<0.01
0.00
Workspace Only
W -A18-95
PEM
37
36.425012
-79.657628
0301010309
7.55
0.02
0.00
Open -cut
W -A18-98
PFO
37.2
36.423306
-79.65623
0301010309
0.00
0.01
0.00*
Workspace Only
W -S18-1
PFO
37.3
36.422114
-79.655108
0301010309
8.34
0.01
0.01*
Open -cut
W -A18-6
PFO
38.5
36.407396
-79.649469
0301010309
129.65
0.15
0.08*
Open -cut
W -A18-6-2
PFO
38.5
36.407067
-79.649165
0301010309
0.00
<0.01
0.00*
Workspace Only
W -A18-6-3
PFO
38.5
36.406781
-79.648669
0301010309
91.73
0.09
0.06*
Open -cut
W -A18-6
PEM
38.5
36.406695
-79.648415
0301010309
45.87
0.09
0.00
Open -cut
W -A18-7
PFO
38.6
36.405557
-79.648122
0301010309
0.00
<0.01
0.00*
Workspace Only
W -A18-7
PEM
38.6
36.40538
-79.648206
0301010309
75.79
0.18
0.00
Open -cut
W -A18-7
PSS
38.6
36.40525
-79.648097
0301010309
33.74
0.08
0.00
Open -cut
W -A18-7-2
PEM
38.6
36.405113
-79.648149
0301010309
0.00
<0.01
0.00
Workspace Only
W -A18-7-3
PEM
38.7
36.404994
-79.647869
0301010309
16.28
0.05
0.00
Open -cut
W -A18-7-4
PEM
38.7
36.404784
-79.647599
0301010309
28.70
0.07
0.00
Open -cut
W -A18-7-5
PEM
38.7
36.404414
-79.647238
0301010309
16.09
0.04
0.00
Open -cut
W -A19-270
PFO
38.8
36.40362
-79.646599
0301010309
0.00
0.02
<0.01*
Workspace Only
W-1318-78
PFO
39.7
36.39375
-79.638317
0301010309
55.99
0.06
0.03*
Open -cut
W -B18-112
PEM
40.1
36.387125
-79.636599
0301010401
0.00
0.01
0.00
Workspace Only
W-1318-110
PFO
40.2
36.386777
-79.63634
0301010401
0.00
0.02
0.01*
Workspace Only
W -B18-55
PEM
41.1
36.378086
-79.625234
0301010401
0.00
<0.01
0.00
Workspace Only
W-1318-55
PFO
41.1
36.377936
-79.625312
0301010401
83.65
0.13
0.06*
Open -cut
W -B18-46
PFO
41.7
36.371464
-79.620671
0301010401
5.85
0.02
0.01*
Open -cut
W -C18-77
PFO
47
36.305304
-79.587735
0301010401
46.56
0.08
0.03*
Open -cut
W -B18-139
PFO
48.5
36.290957
-79.572486
0303000202
24.40
0.03
0.02*
Open -cut
W -A18-62
PSS
48.6
36.288909
-79.571666
0303000202
39.55
0.11
0.00
Open -cut
M Mountain Valley
PIPELINE uc
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-1
Proposed Impacts by Wetland ID and Type of Impact
May 2019
Feature I Wetland
e
Type
Wetland Type
Milepost
Latitude
Longitude
Watershed HUC 10
Pipeline Crossing
Length (g)
Temporary
Construction
Impacts (acres)
Permanent
Conversion PFO to
PSS/PEM
Construction
Method
W -A18-62-2
PSS
48.6
36.288605
-79.571621
0303000202
0.00
<0.01
0.00
Workspace Only
W -A18-61
PEM
48.7
36.288426
-79.571447
0303000202
0.85
0.01
0.00
Workspace Only
W -A18-184
PEM
49.9
36.275271
-79.55896
0303000202
56.98
0.12
0.00
Open -cut
W -A18-184-2
PEM
49.9
36.274967
-79.558856
0303000202
0.00
0.01
0.00
Workspace Only
W -A18-184
PFO
49.9
36.274931
-79.558876
0303000202
0.00
0.02
0.00*
Workspace Only
W-1318-140
PEM
50.2
36.271313
-79.555966
0303000202
0.00
<0.01
0.00
Workspace Only
AW -A19-284
PSS
51.2
36.258422
-79.546585
0303000202
0.00
<0.01
0.00
Workspace Only
W -A19-284
PSS
51.2
36.258284
-79.546624
0303000202
16.88
0.03
0.00
Workspace Only
W -C18-20
PFO
51.4
36.256448
-79.545371
0303000202
15.54
0.05
0.02*
Open -cut
W -C18-20
PEM
51.4
36.256395
-79.545178
0303000202
54.70
0.08
0.00
Open -cut
W -A18-83
PEM
53.3
36.23401
-79.529164
0303000202
26.09
0.06
0.00
Open -cut
W -A18-85
PEM
53.6
36.230085
-79.527424
0303000202
8.98
0.03
0.00
Open -cut
W -A18-85
PSS
53.7
36.230004
-79.527419
0303000202
0.00
0.04
0.00
Workspace Only
W -A18-85-2
PEM
53.7
36.229981
-79.52711
0303000202
0.00
<0.01
0.00
Workspace Only
W -C18-67
PFO
54.3
36.221387
-79.521613
0303000202
102.88
0.26
0.07*
Open -cut
W -C18-69
PFO
55.3
36.209331
-79.51679
0303000202
37.01
0.07
0.03*
Open -cut
W-1318-60
PSS
55.3
36.208809
-79.515957
0303000202
0.00
<0.01
0.00
Workspace Only
W-1318-61
PEM
55.5
36.20826
-79.512175
0303000202
39.07
0.06
0.00
Open -cut
W -A18-119
PFO
56.4
36.19942
-79.500733
0303000204
95.35
0.11
0.06*
Open -cut
W -A18-119
PEM
56.4
36.199328
-79.500803
0303000204
0.00
0.06
0.00
Workspace Only
W -A18-119-2
PFO
56.5
36.198118
-79.499222
0303000204
297.23
0.47
0.21*
Open -cut
W -A18-119-2
PEM
56.5
36.198372
-79.499667
0303000204
0.00
0.06
0.00
Workspace Only
W -A18-127
PEM
56.6
36.197454
-79.498675
0303000204
0.00
0.02
0.00
Workspace Only
W -A18-127
PFO
56.6
36.196999
-79.498416
0303000204
61.32
0.07
0.04*
Open -cut
W -A18-127-2
PEM
56.6
36.19697
-79.498533
0303000204
0.00
0.02
0.00
Workspace Only
W -A18-130
PEM
56.8
36.19409
-79.497683
0303000204
0.00
0.01
0.00
Workspace Only
W -A18-130
PFO
56.9
36.193874
-79.497418
0303000204
17.04
0.09
0.03*
Open -cut
W -A18-133
PFO
57.1
36.191046
-79.496608
0303000204
56.05
0.10
0.04*
Open -cut
W -A18-133
PEM
57.1
36.190868
-79.496659
0303000204
0.00
0.02
0.00
Workspace Only
W -A18-133-2
PEM
57.1
36.190481
-79.49655
0303000204
0.00
0.01
0.00
Workspace Only
W -A18-135
PFO
57.2
36.189488
-79.496096
0303000204
145.79
0.20
0.10*
Open -cut
W -A18-135
PEM
57.2
36.189625
-79.49626
0303000204
0.00
0.02
0.00
Workspace Only
W -A18-254
PFO
57.6
36.184749
-79.493161
0303000204
151.62
0.22
0.10*
Open -cut
W -C18-3
PEM
57.8
36.181163
-79.494328
0303000204
13.05
0.04
0.00
Open -cut
W -C18-3
PFO
57.9
36.181041
-79.494472
0303000204
0.00
<0.01
0.00*
Workspace Only
W -C18-3-2
PEM
57.9
36.180874
-79.494341
0303000204
12.60
0.02
0.00
Open -cut
W -C18-3-2
PFO
57.9
36.180844
-79.494345
0303000204
7.57
0.01
0.01*
Open -cut
W -C18-5
PSS
58
36.178724
-79.493947
0303000204
52.16
0.07
0.00
Open -cut
W -C18-5
PEM
58
36.178665
-79.494059
0303000204
0.00
0.03
0.00
Workspace Only
W -C18-29
PFO
60.8
36.160629
-79.454215
0303000204
317.38
0.55
0.21*
Open -cut
W -A18-79
PFO
61.8
36.156382
-79.439241
0303000204
0.00
<0.01
0.00*
Workspace Only
W -A18-73
PFO
62.5
36.150406
-79.430217
0303000204
0.00
<0.01
<0.01*
Workspace Only
W -A18-74
PFO
62.5
36.149929
-79.429316
0303000204
8.41
0.01
0.01*
Open -cut
W -A18-80
PEM
62.7
36.149688
-79.426785
0303000204
63.68
0.09
0.00
Open -cut
W-1318-32
PEM
62.9
36.148216
-79.423966
0303000204
0.00
<0.01
0.00
Workspace Only
W-1318-28
PFO
63.1
36.147383
-79.420695
0303000204
313.50
0.50
0.21*
Open -cut
AW -1318-19
PFO
63.8
36.146437
-79.407138
0303000204
49.89
0.08
0.03*
Open -cut
W -A19-320
PEM
65.ORR
36.145863
-79.387233
0303000204
0.00
0.03
0.00
Workspace Only
W -A19-326
PFO
65.1 RR
36.145383
-79.384036
0303000204
5.51
0.02
0.01*
Open -cut
W -A19-323
PEM
65.3RR
36.144017
-79.383002
0303000204
0.00
0.33
0.00
Workspace Only
W-1319-168
PEM
65.6
36.139849
-79.381373
0303000204
0.00
0.28
0.00
Workspace Only
W-1319-164
PFO
66.6
36.130739
-79.369009
0303000204
8.26
0.03
0.01*
Open -cut
AW -1319-164
PFO
66.6
36.130669
-79.368993
0303000204
32.24
0.07
0.02*
Open -cut
W-1318-5
PFO
68.4
36.106095
-79.371151
0303000204
15.68
0.02
0.01*
Workspace Only
W-1319-146
PFO
69.7
36.091034
-79.362321
0303000204
0.00
0.11
0.00*
Workspace Only
W-1319-173
PEM
69.8
36.089334
-79.362724
0303000204
0.00
0.13
0.00
Workspace Only
W -A18-67
PFO
71.8
36.062807
-79.361499
0303000204
0.00
<0.01
0.00*
Open -cut
W -A18-67-2
PFO
71.8
36.062821
1 -79.361357
1 0303000204 1
43.87
0.04
0.03* 1
Workspace Only
W -A18-208
PEM
72.2
36.056285
-79.364482
0303000204
0.00
<0.01
0.00
Workspace Only
W-1319-151
PEM
73
36.046734
-79.366401
0303000204
0.00
0.15
0.00
Workspace Only
W -A18-111
PEM
73
36.046225
-79.365967
0303000204
56.52
0.25
0.00
Open -cut
W-1319-151-3
PEM
73
36.046408
-79.366515
0303000204
0.00
0.04
0.00
Workspace Only
H-650 Pipeline - HDD
W-1318-39 I
PEM
30.2
36.496101
-79.677639
0301010309
24.63
<0.01
0.00
HDD
rl Mountain Valley
PIPELINE uc
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-1
Proposed Impacts by Wetland ID and Type of Impact
May 2019
Feature I Wetland
e Wetland Type
Type
Milepost
Latitude
Longitude
Pipeline Crossing
Watershed HUC 10 Length (ft)
Temporary
Construction
Impacts (acres)
Permanent
Conversion PFO to
PSS/PEM
Construction
Method
W -B18-39-2
PEM
30.2
36.495973
-79.677734
0301010309
40.47
<0.01
0.00
HDD
W-1318-39-3
PEM
30.2
36.495819
-79.677892
0301010309
29.86
<0.01
0.00
HDD
W -B18-39-4
PEM
30.2
36.49571
-79.678008
0301010309
31.56
<0.01
0.00
HDD
W-1318-36
PEM
30.2
36.495507
-79.678228
0301010309
36.44
<0.01
0.00
HDD
W -B18-36-2
PEM
30.3
36.495364
-79.678402
0301010309
16.34
<0.01
0.00
HDD
W-1318-36
PFO
30.3
36.495171
-79.678559
0301010309
31.83
0.01
0.00'
HDD
W -B18-36-3
PEM
30.3
36.494746
-79.679118
0301010309
17.92
<0.01
0.00
HDD
W-1318-36-4
PEM
30.4
36.49434
-79.679615
0301010309
0.00
<0.01
0.00
HDD
Meter Stations
W -A18-39-2
PEM
28
36.520902
-79.653396
0301010309
0.00
<0.01
0.00
Workspace
Only
W -B18-36-7
PEM
30.3
36.495345
-79.680027
0301010309
0.00
0.47
0.00
Workspace
Only
AW -B18-36
PEM
30.3
36.495217
-79.679527
0301010309
0.00
<0.01
0.00
Workspace
Only
W -B18-36-8
PEM
30.3
36.495739
-79.680659
0301010309
0.00
<0.01
0.00
Workspace
Only
W -B18-36-9
PEM
30.4
36.494389
-79.679702
0301010309
0.00
0.05
0.00
Workspace
Only
W -B18-36-10
PEM
30.4
36.494208
-79.679948
0301010309
0.00
0.01
0.00
Workspace
Only
W-1318-36-11 I
PEM
30.4
36.494116
-79.679626
0301010309
0.00
<0.01
0.00
Workspace
Only
Cathodic Protection Ground
Bed
W -A19-277 1
PEM
41.8
36.368744
-79.621619
0301010401
0.00
0.02
0.00
Workspace
Only
Permanent Access Roads
W -A19-280
PEM
28.7
36.519196
-79.669802
0301010309
0.00
0.01
0.00
Workspace
Only
W -A19-280-2
PEM
28.7
36.519109
-79.670171
0301010309
0.00
0.02
0.00
Workspace
Only
W-1318-34-2
PFO
30.5
36.493242
-79.680406
0301010309
0.00
<0.01
<0.01'
Workspace
Only
W -B18-43
PEM
41.8
36.369693
-79.619872
0301010401
0.00
<0.01
0.00
Workspace
Only
W -B18-43-2
PEM
41.8
36.36968
-79.619791
0301010401
0.00
0.02
0.00
Workspace
Only
Temporary Access Roads
W -B18-97
PEM
26.1
36.540307
-79.631871
0301010309
0.00
0.01
0.00
Workspace
Only
W -A18-44-3
PEM
27.1
36.530142
-79.643957
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A18-44-4
PEM
27.1
36.530021
-79.64359
0301010309
0.00
0.01
0.00
Workspace
Only
W -A18-44-5
PEM
27.1
36.529953
-79.642381
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A19-282
PSS
27.4
36.528321
-79.649727
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A19-282-2
PSS
27.4
36.528259
-79.649711
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A19-282-3
PSS
27.5
36.528172
-79.650336
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A19-282-4
PSS
27.5
36.528114
-79.650316
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A19-282-5
PSS
27.5
36.528097
-79.650639
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A19-282-6
PSS
27.5
36.528043
-79.650594
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A19-282-7
PSS
27.5
36.528014
-79.651025
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A19-282-8
PSS
27.5
36.527936
-79.651075
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A19-282-9
PSS
27.5
36.527959
-79.651484
0301010309
0.00
<0.01
0.00
Workspace
Only
AW -A19-282
PSS
27.5
36.527975
-79.651456
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A19-282
PEM
27.5
36.529178
-79.651731
0301010309
0.00
0.01
0.00
Workspace
Only
W -A18-39-3
PEM
28.1
36.519849
-79.654743
0301010309
0.00
<0.01
0.00
Workspace
Only
W -A18-39-4
PEM
27.9
36.522214
-79.654436
0301010309
0.00
0.01
0.00
Workspace
Only
W -A18-75
PEM
62.5
36.150767
-79.429736
0303000204
0.00
0.01
0.00
Workspace
Only
W -A18-75-2
PEM
62.5
36.150788
-79.429667
0303000204
0.00
0.01
0.00
Workspace
Only
a/ Classification of Deepwater Habitats (Ca/ Classification of Wetlands and Deepwater Habitats of the United States (Cowardin, 1979)
b/ Construction impacts based on a 75 -foot construction workspace within wetlands.
c/ Vegetation cover type change will only occur within PFO wetlands. The maintained area within the permanent easement will be kept
Shrub; PFO=Palustrine Forested.
in a PEM/PSS
cover type. PEM= Palustrine
Emergent; PSS=Palustrine Scrub -
Mountain Valley
PIPELI
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-2
Proposed Impacts by Waterbody ID and Type of Impact
May 2019
Feature ID
Milepost
Waterbody Name
Waterbody Type
Latitude
Longitude
Watershed HUC 10
Pipeline Crossing Length
(ft)
Temporary Construction Impacts -
Streams (In ft)
Permanent Stream Impact (In ft)
Construction Method
H-650 Pipeline
S -B18-99
26.5
Trib. To Cascade Creek
Intermittent
36.536539
-79.637489
0301010309
1.00
88.74
0.00
Open Cut- Dam and pump, Flume
S -A18-42
27.3
Trib. To Cascade Creek
Intermittent
36.527984
-79.646186
0301010309
20.52
95.70
0.00
Open Cut- Dam and pump, Flume
S -A18-40
27.5
Cascade Creek
Perennial
36.526022
-79.648104
0301010309
108.54
106.03
0.00
Conventional Bore
S -A19-273
27.5
Dry Creek
Perennial
36.52591
-79.648314
0301010309
28.95
50.45
0.00
Open Cut- Dam and pump, Flume
S -A18-31
28.3
Trib. To Dan River
Intermittent
36.516791
-79.656437
0301010309
0.00
23.68
0.00
N/A
S -A18-34
28.4
Trib. To Dan River
Intermittent
36.516213
-79.656865
0301010309
0.00
17.75
0.00
N/A
S -A18-32
28.4
Trib. To Dan River
Perennial
36.516252
-79.656963
0301010309
6.60
87.10
0.00
Open Cut- Dam and pump, Flume
S -A18-36
28.4
Trib. To Dan River
Perennial
36.51547
-79.657626
0301010309
0.00
73.50
0.00
N/A
S -A18-37
28.6
Trib. To Dan River
Perennial
36.513228
-79.660059
0301010309
0.00
19.36
0.00
N/A
S -B18-49
28.8
Trib. To Dan River
Perennial
36.511358
-79.662142
0301010309
3.00
79.65
0.00
Open Cut- Dam and pump, Flume
S -B18-47
29.1
Trib. To Dan River
Ephemeral
36.508401
-79.665234
0301010309
1.00
70.90
0.00
Open Cut- Dam and pump, Flume
S -A18-160
29.3RR
Tnb. To Dan River
Ephemeral
36.505396
-79.66757
0301010309
0.00
31.84
0.00
N/A
S -A18-47
29.6
Trib. To Dan River
Perennial
36.502865
-79.670501
0301010309
3.00
85.45
0.00
Open Cut- Dam and pump, Flume
S -B18-104
30.8
Trib. To Rock Creek
Perennial
36.488765
-79.683931
0301010309
3.00
81.43
0.00
Open Cut- Dam and pump, Flume
S -B19-153
30.9
Trib. To Rock Creek
Intermittent
36.487872
-79.684067
0301010309
2.00
76.46
0.00
Open Cut- Dam and pump, Flume
S -B18-105
31.1
Trib. To Rock Creek
Intermittent
36.485991
-79.68454
0301010309
1.00
79.26
0.00
Open Cut- Dam and pump, Flume
S -B18-102
31.1
Trib. To Rock Creek
Perennial
36.485605
-79.685131
0301010309
2.00
82.33
0.00
Open Cut- Dam and pump, Flume
S -B18-95
31.3
Rock Creek
Perennial
36.483373
-79.686713
0301010309
28.34
76.02
0.00
Open Cut- Dam and pump, Flume
S -A18-143
31.9
Trib. To Machine Creek
Intermittent
36.478398
-79.694914
0301010309
2.00
150.89
0.00
Open Cut- Dam and pump, Flume
S -A18-140
31.9
Trib. To Machine Creek
Perennial
36.477695
-79.695546
0301010309
4.00
201.59
0.00
Open Cut- Dam and pump, Flume
S -A18-144
32
Trib. To Machine Creek
Intermittent
36.477286
-79.695799
0301010309
2.00
102.21
0.00
Open Cut- Dam and pump, Flume
S -A18-140-2
32
Trib. To Machine Creek
Perennial
36.476929
-79.696134
0301010309
4.00
100.95
0.00
Open Cut- Dam and pump, Flume
S -A18-148
32.1
Trib. To Machine Creek
Ephemeral
36.475536
-79.697258
0301010309
0.00
110.76
0.00
N/A
S -A18-147
32.2
Machine Creek
Perennial
36.475033
-79.697892
0301010309
102.60
184.89
0.00
Open Cut- Dam and pump, Flume
S -A18-150
32.5
Trib. To Town Creek
Ephemeral
36.471383
-79.700955
0301010309
2.00
100.59
0.00
Open Cut- Dam and pump, Flume
S -A18-153
32.6
Trib. To Town Creek
Intermittent
36.469633
-79.702555
0301010309
2.00
113.52
0.00
Open Cut- Dam and pump, Flume
S -A18-151
32.7
Town Creek
Perennial
36.469434
-79.702789
0301010309
55.39
117.65
0.00
Open Cut- Dam and pump, Flume
S -A18-151-2
33
Town Creek
Perennial
36.465271
-79.703248
0301010309
47.92
84.66
0.00
Open Cut- Dam and pump, Flume
S -A18-154
33
Trib. To Town Creek
Intermittent
36.465094
-79.703075
0301010309
0.00
43.14
0.00
N/A
S -A18-154-2
33
Trib. To Town Creek
Intermittent
36.464931
-79.703061
0301010309
2.00
128.68
0.00
Open Cut- Dam and pump, Flume
S -A18-154-3
33
Trib. To Town Creek
Intermittent
36.464799
-79.702976
0301010309
0.00
14.04
0.00
N/A
S -A18-220
33.3
Trib. To Town Creek
Ephemeral
36.461329
-79.701621
0301010309
3.00
60.06
0.00
Open Cut- Dam and pump, Flume
S -A18-221
33.3
Trib. To Town Creek
Perennial
36.460709
-79.701207
0301010309
4.00
80.68
0.00
Open Cut- Dam and pump, Flume
1� Mountain Valley
PIPELI
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-2
Proposed Impacts by Waterbody ID and Type of Impact
May 2019
Feature ID
Milepost
Waterbody Name
Waterbody Type
Latitude
Longitude
Watershed HUC 10
Pipeline Crossing Length
(ft)
Temporary Construction Impacts -
Streams (In ft)
Permanent Stream Impact (In ft)
Construction Method
S -C18-52
33.4
Trib. To Town Creek
Intermittent
36.459368
-79.700165
0301010309
5.00
71.88
0.00
Open Cut- Dam and pump, Flume
S -C18-51
33.5
Trib. To Town Creek
Intermittent
36.458243
-79.699369
0301010309
4.00
87.10
0.00
Open Cut- Dam and pump, Flume
S -A18-223
33.7
Trib. To Town Creek
Intermittent
36.456022
-79.697744
0301010309
4.00
81.07
0.00
Open Cut- Dam and pump, Flume
S -A18-225
33.7
Trib. To Town Creek
Perennial
36.455521
-79.697347
0301010309
5.00
102.37
0.00
Open Cut- Dam and pump, Flume
S -C18-49
33.9
Trib. To Town Creek
Intermittent
36.453061
-79.695572
0301010309
4.00
87.01
0.00
Open Cut- Dam and pump, Flume
S -C18-48
34
Trib. To Town Creek
Ephemeral
36.451822
-79.694401
0301010309
0.00
1.70
0.00
N/A
S -C18-38
34.2RR
Trib. To Town Creek
Perennial
36.449557
-79.693228
0301010309
32.88
82.18
0.00
Open Cut- Dam and pump, Flume
S -C18-39
34.5
Trib. To Town Creek
Ephemeral
36.445668
-79.689734
0301010309
2.00
107.50
0.00
Open Cut- Dam and pump, Flume
S -C18-38-2
34.6
Trib. To Town Creek
Perennial
36.444718
-79.688704
0301010309
16.74
333.02
0.00
Open Cut- Dam and pump, Flume
S -C18-53
34.7
Trib. To Town Creek
Intermittent
36.44428
-79.688347
0301010309
2.00
214.88
0.00
Open Cut- Dam and pump, Flume
S -C18-38-3
34.8
Trib. To Town Creek
Perennial
36.442885
-79.686924
0301010309
23.31
87.35
0.00
Open Cut- Dam and pump, Flume
S -C18-74
34.8
Trib. To Town Creek
Ephemeral
36.442723
-79.686773
0301010309
3.00
71.55
0.00
Open Cut- Dam and pump, Flume
S -C18-38-4
35
Trib. To Town Creek
Perennial
36.44081
-79.68451
0301010309
7.50
60.14
0.00
Open Cut- Dam and pump, Flume
S -C18-57
35.1
Trib. To Town Creek
Intermittent
36.439586
-79.682695
0301010309
2.00
84.49
0.00
Open Cut- Dam and pump, Flume
S -C18-35
36
Trib. To Town Creek
Perennial
36.433264
-79.670869
0301010309
9.94
72.87
0.00
Open Cut- Dam and pump, Flume
S -A18-94
37
Trib. To Wolf Island Creek
Perennial
36.425044
-79.657717
0301010309
3.00
125.00
0.00
Open Cut- Dam and pump, Flume
S -A18-97
37.2
Trib. To Wolf Island Creek
Perennial
36.423293
-79.656083
0301010309
3.00
86.64
0.00
Open Cut- Dam and pump, Flume
S -A18-101
37.3
Trib. To Wolf Island Creek
Perennial
36.42209
-79.655133
0301010309
2.00
83.86
0.00
Open Cut- Dam and pump, Flume
S -B19-157
37.6
Trib. To Wolf Island Creek
Perennial
36.418238
-79.651901
0301010309
3.00
79.69
0.00
Open Cut- Dam and pump, Flume
AS -B18-117
37.7
Trib. To Wolf Island Creek
Perennial
36.416265
-79.65082
0301010309
12.08
75.58
0.00
Open Cut- Dam and pump, Flume
S -A18-2
38.2
Trib. To Wolf Island Creek
Perennial
36.410622
-79.650775
0301010309
20.49
86.73
0.00
Open Cut- Dam and pump, Flume
S -A18-9
38.4
Trib. To Wolf Island Creek
Perennial
36.407871
-79.649861
0301010309
3.00
122.40
0.00
Open Cut- Dam and pump, Flume
S -A18-4
38.5
Trib. To Wolf Island Creek
Perennial
36.407314
-79.649133
0301010309
0.00
26.78
0.00
N/A
S -A18-4-2
38.5
Trib. To Wolf Island Creek
Perennial
36.407118
-79.648874
0301010309
0.00
41.47
0.00
N/A
S -A18-8
38.8
Wolf Island Creek
Perennial
36.403928
-79.646811
0301010309
53.13
97.69
0.00
Conventional Bore
S -A19-269
38.8
Trib. To Wolf Island Creek
Intermittent
36.403781
-79.64669
0301010309
2.00
103.50
0.00
Open Cut- Dam and pump, Flume
S -B18-72
39
Trib. To Wolf Island Creek
Ephemeral
36.402381
-79.64372
0301010309
2.00
81.32
0.00
Open Cut- Dam and pump, Flume
S -B18-73
39.1
Trib. To Wolf Island Creek
Ephemeral
36.401434
-79.643287
0301010309
0.00
7.59
0.00
N/A
S -B18-74
39.1
Trib. To Wolf Island Creek
Perennial
36.400716
-79.643007
0301010309
4.00
86.09
0.00
Open Cut- Dam and pump, Flume
S -B18-74-2
39.6
Trib. To Wolf Island Creek
Perennial
36.393964
-79.638293
0301010309
4.00
88.97
0.00
Open Cut- Dam and pump, Flume
S -B18-108
40.2
Trib. To Lick Fork
Perennial
36.386944
-79.636394
0301010401
26.88
80.36
0.00
Open Cut- Dam and pump, Flume
S -B18-109
40.2
Trib. To Lick Fork
Ephemeral
36.386891
-79.636289
0301010401
3.00
37.28
0.00
Open Cut- Dam and pump, Flume
S -A18-210
40.4
Trib. To Lick Fork
Intermittent
36.384175
-79.63296
0301010401
0.00
38.09
0.00
N/A
1� Mountain Valley
PIPELI
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-2
Proposed Impacts by Waterbody ID and Type of Impact
May 2019
Feature ID
Milepost
Waterbody Name
Waterbody Type
Latitude
Longitude
Watershed HUC 10 Pipeline
Crossing Length
(ft)
Temporary Construction Impacts -
Streams (In ft)
Permanent Stream Impact (In ft)
Construction Method
S -A18-210-2
40.4
Trib. To Lick Fork
Intermittent
36.38418
-79.632786
0301010401
2.00
60.94
0.00
Open Cut- Dam and pump, Flume
S -B18-51
40.6
Trib. To Lick Fork
Perennial
36.383717
-79.630887
0301010401
4.00
76.85
0.00
Open Cut- Dam and pump, Flume
S -B18-52
40.7
Trib. To Lick Fork
Perennial
36.382694
-79.628502
0301010401
4.00
97.09
0.00
Open Cut- Dam and pump, Flume
S -B18-57
41.1
Trib. To Lick Fork
Perennial
36.377703
-79.625129
0301010401
2.00
85.96
0.00
Open Cut- Dam and pump, Flume
S -B18-56
41.2
Lick Fork
Perennial
36.377551
-79.625037
0301010401
39.06
82.67
0.00
Open Cut- Dam and pump, Flume
S -A18-171
41.2
Trib. To Lick Fork
Intermittent
36.377448
-79.624979
0301010401
2.00
79.02
0.00
Open Cut- Dam and pump, Flume
AS -B18-44
41.6
Trib. To Lick Fork
Intermittent
36.371801
-79.621785
0301010401
0.00
57.90
0.00
N/A
S -B18-45
41.7
Trib. To Lick Fork
Ephemeral
36.371466
-79.62065
0301010401
0.00
34.47
0.00
N/A
S -B18-44
41.7
Trib. To Lick Fork
Intermittent
36.371445
-79.620603
0301010401
3.00
80.28
0.00
Open Cut- Dam and pump, Flume
S -B18-41
41.8
Trib. To Lick Fork
Perennial
36.369436
-79.620609
0301010401
19.47
83.90
0.00
Open Cut- Dam and pump, Flume
S -B18-89
42.3
Trib. To Jones Creek
Ephemeral
36.365523
-79.614749
0301010401
1.00
77.82
0.00
Open Cut- Dam and pump, Flume
S -A18-256
42.9
Trib. To Jones Creek
Intermittent
36.357068
-79.613617
0301010401
2.00
85.39
0.00
Open Cut- Dam and pump, Flume
S -B18-92
43.1
Trib. To Jones Creek
Perennial
36.354763
-79.611735
0301010401
12.04
128.10
0.00
Open Cut- Dam and pump, Flume
S -A18-176
43.3
Jones Creek
Perennial
36.352122
-79.610979
0301010401
25.85
88.63
0.00
Open Cut- Dam and pump, Flume
S -A18-181
43.3
Trib. To Jones Creek
Perennial
36.351797
-79.61089
0301010401
2.00
111.80
0.00
Open Cut- Dam and pump, Flume
S -C18-80
43.7
Trib. To Jones Creek
Perennial
36.34734
-79.606823
0301010401
4.00
77.19
0.00
Open Cut- Dam and pump, Flume
S -A18-105
43.7
Trib. To Jones Creek
Perennial
36.347164
-79.606666
0301010401
53.47
181.80
0.00
Open Cut- Dam and pump, Flume
S -C18-25
44.1
Trib. To Jones Creek
Perennial
36.342508
-79.605795
0301010401
4.00
85.27
0.00
Open Cut- Dam and pump, Flume
S -A18-102
44.1
Trib. To Jones Creek
Perennial
36.341526
-79.605701
0301010401
3.00
112.45
0.00
Open Cut- Dam and pump, Flume
S -A18-226
44.4
Trib. To Jones Creek
Ephemeral
36.338067
-79.603947
0301010401
3.00
78.69
0.00
Open Cut- Dam and pump, Flume
S -A18-228
44.5
Trib. To Jones Creek
Ephemeral
36.336045
-79.60292
0301010401
5.00
90.63
0.00
Open Cut- Dam and pump, Flume
S -A18-213
45.7
Trib. To Hogans Creek
Intermittent
36.322151
-79.594083
0301010401
0.00
99.31
0.00
Open Cut- Dam and pump, Flume
S -B18-71
45.7
Trib. To Hogans Creek
Perennial
36.321842
-79.593981
0301010401
22.88
97.13
0.00
Open Cut- Dam and pump, Flume
S -B18-68
45.8
Trib. To Hogans Creek
Perennial
36.320378
-79.593663
0301010401
3.00
96.18
0.00
Open Cut- Dam and pump, Flume
S -A18-231
46.4
Trib. To Hogans Creek
Ephemeral
36.313276
-79.589363
0301010401
0.00
70.89
0.00
N/A
S -A18-235
46.5
Trib. To Hogans Creek
Perennial
36.312488
-79.589461
0301010401
3.00
105.64
0.00
Open Cut- Dam and pump, Flume
S -A18-234
46.5
Trib. To Hogans Creek
Intermittent
36.312334
-79.589534
0301010401
2.00
120.56
0.00
Open Cut- Dam and pump, Flume
S -C18-76
47
Hogans Creek
Perennial
36.305688
-79.587967
0301010401
18.81
81.01
0.00
Open Cut- Dam and pump, Flume
S -C18-79
47.4
Trib. To Hogans Creek
Perennial
36.300793
-79.585578
0301010401
4.00
216.49
0.00
Open Cut- Dam and pump, Flume
S -A18-90
47.6
Trib. To Hogans Creek
Perennial
36.299431
-79.583033
0301010401
2.00
102.96
0.00
Open Cut- Dam and pump, Flume
S -B19-167
47.7
Trib. To Hogans Creek
Intermittent
36.297594
-79.581347
0301010401
3.00
50.11
0.00
Open Cut- Dam and pump, Flume
S -A18-242
47.7
Trib. To Hogans Creek
Perennial
36.297588
-79.581258
0301010401
19.10
101.79
0.00
Open Cut- Dam and pump, Flume
S -A18-60
48.7
Giles Creek
Perennial
36.28843
-79.571456
0303000202
4.00
87.80
0.00
Open Cut- Dam and pump, Flume
1� Mountain Valley
PIPELI
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-2
Proposed Impacts by Waterbody ID and Type of Impact
May 2019
Feature ID
Milepost
Waterbody Name
Waterbody Type
Latitude
Longitude
Watershed HUC 10
Pipeline Crossing Length
(ft)
Temporary Construction Impacts -
Streams (In ft)
Permanent Stream Impact (In ft)
Construction Method
S -A18-55
49.3
Trib. To Giles Creek
Perennial
36.282886
-79.563744
0303000202
3.00
79.71
0.00
Open Cut- Dam and pump, Flume
S -A18-183
49.9
Trib. To Haw River
Perennial
36.27532
-79.559043
0303000202
4.00
115.11
0.00
Open Cut- Dam and pump, Flume
S -A18-185
49.9
Trib. To Haw River
Intermittent
36.275063
-79.55899
0303000202
0.00
7.63
0.00
N/A
S -A18-182 / S -A18-18
49.9
Trib. To Haw River
Intermittent
36.274516
-79.558465
0303000202
1.00
81.31
0.00
Open Cut- Dam and pump, Flume
S -A18-244
50.2
Trib. To Haw River
Perennial
36.271284
-79.556128
0303000202
3.00
49.43
0.00
Open Cut- Dam and pump, Flume
SS-SOIL18-02
50.5
Trib. To Haw River
Perennial
36.267634
-79.553571
0303000202
< 6 ft (Unknown)
178.61
0.00
Open Cut- Dam and pump, Flume
S -A19-289
50.7
Trib. To Haw River
Intermittent
36.264566
-79.551301
0303000202
3.00
233.23
0.00
Open Cut- Dam and pump, Flume
S -A19-286
50.8
Trib. To Haw River
Perennial
36.26425
-79.550994
0303000202
21.36
97.26
0.00
Open Cut- Dam and pump, Flume
S -A19-285
51.2
Trib. To Haw River
Intermittent
36.258287
-79.546617
0303000202
2.00
117.25
0.00
Open Cut- Dam and pump, Flume
S -C18-22
51.2
Trib. To Haw River
Ephemeral
36.258192
-79.546542
0303000202
3.00
67.71
0.00
Open Cut- Dam and pump, Flume
S -C18-21
51.4
Trib. To Haw River
Perennial
36.256565
-79.545346
0303000202
7.00
75.28
0.00
Open Cut- Dam and pump, Flume
S -C18-15
52.1
Trib. To Haw River
Intermittent
36.247736
-79.539102
0303000202
3.00
359.88
0.00
Open Cut- Dam and pump, Flume
S -A18-217
52.1
Trib. To Haw River
Intermittent
36.247838
-79.539125
0303000202
0.00
15.11
0.00
N/A
S -A18-219
52.4
Trib. To Haw River
Perennial
36.243988
-79.536284
0303000202
4.85
72.69
0.00
Open Cut- Dam and pump, Flume
SS-USGS19-01
52.5
Trib. To Haw River
Perennial
36.243215
-79.534637
0303000202
< 6 ft (Unknown)
101.97
0.00
Open Cut- Dam and pump, Flume
S -B18-94
52.7
Trib. To Haw River
Perennial
36.241697
-79.530936
0303000202
4.00
123.51
0.00
Open Cut- Dam and pump, Flume
S -A18-84
53.7
Trib. To Haw River
Perennial
36.229893
-79.527187
0303000202
4.00
83.67
0.00
Open Cut- Dam and pump, Flume
S -A18-87
53.7
Trib. To Haw River
Perennial
36.229072
-79.526605
0303000202
5.00
172.22
0.00
Open Cut- Dam and pump, Flume
S -A18-89
54
Trib. To Haw River
Intermittent
36.225888
-79.524627
0303000202
0.00
58.46
0.00
N/A
S -C18-63
54.5
Trib. To Haw River
Perennial
36.219428
-79.520167
0303000202
4.00
144.73
0.00
Open Cut- Dam and pump, Flume
S -C18-62
54.6
Trib. To Haw River
Perennial
36.217766
-79.519092
0303000202
4.00
118.07
0.00
Open Cut- Dam and pump, Flume
S -C18-60
54.9
Trib. To Haw River
Intermittent
36.214322
-79.516736
0303000202
4.00
82.19
0.00
Open Cut- Dam and pump, Flume
S -B18-143
54.9
Trib. To Haw River
Ephemeral
36.213707
-79.516255
0303000202
0.00
46.22
0.00
N/A
S -B18-142
54.9
Trib. To Haw River
Intermittent
36.213587
-79.516285
0303000202
1.00
53.38
0.00
Open Cut- Dam and pump, Flume
S -C18-61
54.9
Trib. To Haw River
Intermittent
36.213546
-79.516288
0303000202
2.00
47.49
0.00
Open Cut- Dam and pump, Flume
S -C18-68
55.2
Trib. To Haw River
Perennial
36.209694
-79.516783
0303000202
5.00
77.68
0.00
Open Cut- Dam and pump, Flume
S -B18-59
55.3
Trib. To Haw River
Perennial
36.209278
-79.516806
0303000202
3.00
158.00
0.00
Open Cut- Dam and pump, Flume
S -B18-59-2
55.3
Trib. To Haw River
Perennial
36.208956
-79.516248
0303000202
3.00
113.70
0.00
Open Cut- Dam and pump, Flume
S -B18-59-3
55.3
Trib. To Haw River
Perennial
36.208832
-79.516026
0303000202
0.00
47.72
0.00
N/A
SS-SOIL18-05
55.8
Trib. To Haw River
Perennial
36.20558
-79.508162
0303000204
< 6 ft (Unknown)
101.82
0.00
Open Cut- Dam and pump, Flume
S -B18-65
56.4
Trib. To Haw River
Intermittent
36.199421
-79.500794
0303000204
2.00
79.71
0.00
Open Cut- Dam and pump, Flume
S -A18-120
56.4
Trib. To Haw River
Perennial
36.199325
-79.500686
0303000204
2.00
95.17
0.00
Open Cut- Dam and pump, Flume
WB -A18-121
56.5
Trib. To Haw River
Pond
36.198697
-79.49982
0303000204
31.40
79.07
0.00
Open Cut- Dam and pump, Flume
1� Mountain Valley
PIPELI
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-2
Proposed Impacts by Waterbody ID and Type of Impact
May 2019
Feature ID
Milepost
Waterbody Name
Waterbody Type
Latitude
Longitude
Watershed HUC 10
Pipeline Crossing Length
(ft)
Temporary Construction Impacts -
Streams (In ft)
Permanent Stream Impact (In ft)
Construction Method
S -A18-125
56.5
Trib. To Haw River
Perennial
36.198091
-79.499355
0303000204
0.00
16.02
0.00
N/A
S -A18-1252
56.6
Trib. To Haw River
Perennial
36.197619
-79.498697
0303000204
5.00
87.18
0.00
Open Cut- Dam and pump, Flume
S -A18-1253
56.6
Trib. To Haw River
Perennial
36.197462
-79.498522
0303000204
0.00
60.71
0.00
N/A
S -A18-126
56.6
Trib. To Haw River
Ephemeral
36.19729
-79.498495
0303000204
1.00
44.92
0.00
Open Cut- Dam and pump, Flume
S -A18-132
57.1
Trib. To Haw River
Perennial
36.19048
-79.496431
0303000204
5.00
120.02
0.00
Open Cut- Dam and pump, Flume
S -A19-290
57.5
Trib. To Haw River
Ephemeral
36.18552
-79.494106
0303000204
0.00
98.23
0.00
Open Cut- Dam and pump, Flume
S -C18-2
57.9
Trib. To Haw River
Intermittent
36.18076
-79.494282
0303000204
1.00
92.62
0.00
Open Cut- Dam and pump, Flume
SS-SOIL18-07
58.4
Trib. To Haw River
Perennial
36.174081
-79.489117
0303000204
< 6 ft (Unknown)
100.03
0.00
Open Cut- Dam and pump, Flume
S -C18-13
58.7
Trib. To Haw River
Intermittent
36.172575
-79.4859
0303000204
2.00
89.98
0.00
Open Cut- Dam and pump, Flume
S -C18-11
58.7
Trib. To Haw River
Perennial
36.172473
-79.485639
0303000204
78.91
254.02
0.00
Open Cut- Dam and pump, Flume
S -C18-12
58.7
Trib. To Haw River
Intermittent
36.172415
-79.485732
0303000204
0.00
5.93
0.00
N/A
SS-SOIL19-02
59.3
Trib. To Haw River
Perennial
36.169091
-79.47562
0303000204
0.00
195.29
0.00
N/A
AS-NHD-1549
59.6
Trib. To Haw River
Intermittent
36.164607
-79.473414
0303000204
5.00
88.77
0.00
Open Cut- Dam and pump, Flume
S -C18-30
60.7
Trib. To Haw River
Intermittent
36.160639
-79.454874
0303000204
12.95
79.23
0.00
Open Cut- Dam and pump, Flume
S -C18-28
60.8
Trib. To Haw River
Intermittent
36.160651
-79.453668
0303000204
3.00
157.32
0.00
Open Cut- Dam and pump, Flume
SS-SOIL18-08
61.3
Trib. To Haw River
Perennial
36.160468
-79.444316
0303000204
< 6 ft (Unknown)
100.27
0.00
Open Cut- Dam and pump, Flume
S -A18-78
61.8
Trib. To Haw River
Intermittent
36.156312
-79.439294
0303000204
2.00
87.42
0.00
Open Cut- Dam and pump, Flume
S -A18-77
61.8
Trib. To Haw River
Ephemeral
36.155835
-79.438985
0303000204
0.00
35.18
0.00
N/A
S -A18-70
62.4
Trib. To Haw River
Perennial
36.150606
-79.430342
0303000204
19.70
133.78
0.00
Open Cut- Dam and pump, Flume
S -A18-72
62.5
Trib. To Haw River
Intermittent
36.150409
-79.430079
0303000204
2.00
82.44
0.00
Open Cut- Dam and pump, Flume
S -B18-23
63
Trib. To Stony Creek
Ephemeral
36.147447
-79.421045
0303000204
4.00
64.12
0.00
Open Cut- Dam and pump, Flume
S -B18-24
63
Trib. To Stony Creek
Perennial
36.147405
-79.421018
0303000204
0.00
38.75
0.00
N/A
S -B18-22
63
Trib. To Stony Creek
Intermittent
36.147382
-79.421024
0303000204
0.00
30.12
0.00
N/A
S -B18-12
63.1
Trib. To Stony Creek
Perennial
36.147385
-79.42086
0303000204
6.00
132.84
0.00
Open Cut- Dam and pump, Flume
S -B18-22-2
63.1
Trib. To Stony Creek
Intermittent
36.147364
-79.420906
0303000204
0.00
53.05
0.00
N/A
S -B18-26
63.1
Trib. To Stony Creek
Intermittent
36.147487
-79.420857
0303000204
0.00
32.36
0.00
N/A
S -B18-12-2
63.1
Trib. To Stony Creek
Perennial
36.147295
-79.420408
0303000204
6.00
141.93
0.00
Open Cut- Dam and pump, Flume
S -B18-29
63.1
Trib. To Stony Creek
Ephemeral
36.147327
-79.420349
0303000204
0.00
49.78
0.00
N/A
S -B18-12-3
63.1
Trib. To Stony Creek
Perennial
36.146973
-79.419975
0303000204
6.00
97.27
0.00
Open Cut- Dam and pump, Flume
S -B18-14
63.2
Trib. To Stony Creek
Ephemeral
36.146544
-79.419177
0303000204
0.00
0.54
0.00
N/A
S -B18-14-2
63.2
Trib. To Stony Creek
Ephemeral
36.146527
-79.418963
0303000204
0.00
25.10
0.00
N/A
S -B18-12-4
63.2
Trib. To Stony Creek
Perennial
36.146477
-79.418883
0303000204
0.00
48.97
0.00
N/A
S -B18-12-5
63.2
Trib. To Stony Creek
Perennial
36.146418
-79.418577
0303000204
21.04
128.35
0.00
Open Cut- Dam and pump, Flume
1� Mountain Valley
PIPELI
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-2
Proposed Impacts by Waterbody ID and Type of Impact
May 2019
Feature ID
Milepost
Waterbody Name
Waterbody Type
Latitude
Longitude
Watershed HUC 10
Pipeline Crossing Length
(ft)
Temporary Construction Impacts -
Streams (In ft)
Permanent Stream Impact (In ft)
Construction Method
AS -B18-20
63.8
Trib. To Deep Creek
Intermittent
36.146452
-79.407099
0303000204
2.00
96.35
0.00
Open Cut- Dam and pump, Flume
AS-NHD-1547
64
Deep Creek
Perennial
36.146373
-79.403981
0303000204
8.40
110.58
0.00
Conventional Bore
AS-NHD-3040
64.5
Trib. To Deep Creek
Intermittent
36.146327
-79.395938
0303000204
5.00
79.58
0.00
Open Cut- Dam and pump, Flume
S -A19-319
65.ORR
Trib. To Boyds Creek
Intermittent
36.145888
-79.387221
0303000204
0.00
18.88
0.00
N/A
S -A19-321
65.1RR
Trib. To Boyds Creek
Intermittent
36.145512
-79.385241
0303000204
2.00
180.35
0.00
Open Cut- Dam and pump, Flume
S -A19-324
65.1RR
Trib. To Boyds Creek
Perennial
36.145481
-79.384078
0303000204
3.00
181.62
0.00
Open Cut- Dam and pump, Flume
S -A18-251
65.6
Trib. To Boyds Creek
Intermittent
36.139001
-79.380363
0303000204
2.00
33.27
0.00
Open Cut- Dam and pump, Flume
S -A18-250
65.6
Trib. To Boyds Creek
Perennial
36.138984
-79.380327
0303000204
4.00
91.74
0.00
Open Cut- Dam and pump, Flume
SS-SOIL19-07
65.8
Trib. To Boyds Creek
Perennial
36.137762
-79.377223
0303000204
< 6 ft (Unknown)
112.73
0.00
Open Cut- Dam and pump, Flume
SS-SOIL19-08
66.2
Trib. To Boyds Creek
Perennial
36.13608
-79.37085
0303000204
< 6 ft (Unknown)
70.34
0.00
Open Cut- Dam and pump, Flume
AS-NHD-3025
66.8
Trib. To Boyds Creek
Intermittent
36.128382
-79.370041
0303000204
5.00
90.11
0.00
Open Cut- Dam and pump, Flume
SS-SOIL19-03
67.1
Trib. To Boyds Creek
Perennial
36.123451
-79.371317
0303000204
< 6 ft (Unknown)
144.47
0.00
Open Cut- Dam and pump, Flume
AS -A18-177
67.2
Tnb. To Boyds Creek
Perennial
36.121835
-79.371809
0303000204
14.16
76.25
0.00
Open Cut- Dam and pump, Flume
S -A18 -233/S -A18-23
67.6
Boyds Creek
Perennial
36.116799
-79.372619
0303000204
24.84
87.29
0.00
Open Cut- Dam and pump, Flume
SS-SOIL19-10
67.6
Trib. To Boyds Creek
Perennial
36.116519
-79.372164
0303000204
0.00
90.44
0.00
N/A
SS-SOIL19-11
67.8
Trib. To Boyds Creek
Perennial
36.113629
-79.37232
0303000204
< 6 ft (Unknown)
104.72
0.00
Open Cut- Dam and pump, Flume
SS-SOIL19-12
67.9
Trib. To Boyds Creek
Perennial
36.112125
-79.371692
0303000204
< 6 ft (Unknown)
122.55
0.00
Open Cut- Dam and pump, Flume
AS-NHD-1551
68.1
Trib. To Boyds Creek
Intermittent
36.109669
-79.371795
0303000204
5.00
88.18
0.00
Open Cut- Dam and pump, Flume
S -B18-7
68.4
Trib. To Boyds Creek
Perennial
36.10542
-79.370885
0303000204
2.81
77.09
0.00
Open Cut- Dam and pump, Flume
AS-NHD-1552
68.6
Trib. To Boyds Creek
Intermittent
36.103285
-79.370132
0303000204
5.00
85.65
0.00
Open Cut- Dam and pump, Flume
S -B18-8
68.8
Trib. To Haw River
Intermittent
36.100034
-79.370776
0303000204
12.55
92.92
0.00
Open Cut- Dam and pump, Flume
S -B18-11
68.9
Trib. To Haw River
Intermittent
36.098882
-79.370531
0303000204
3.00
90.69
0.00
Open Cut- Dam and pump, Flume
S -A18-10
69.1
Trib. To Haw River
Ephemeral
36.096273
-79.369777
0303000204
2.00
81.49
0.00
Open Cut- Dam and pump, Flume
S -A18-15
69.2
Trib. To Haw River
Intermittent
36.094442
-79.369062
0303000204
4.00
84.42
0.00
Open Cut- Dam and pump, Flume
AS -B18-132
69.5
Trib. To Haw River
Perennial
36.093663
-79.365325
0303000204
8.05
78.60
0.00
Open Cut- Dam and pump, Flume
S -B19-147
69.7
Trib. To Haw River
Ephemeral
36.090858
-79.362434
0303000204
1.00
223.12
0.00
Open Cut- Dam and pump, Flume
S -B19-148
69.8
Trib. To Haw River
Intermittent
36.090805
-79.362106
0303000204
0.00
97.58
0.00
Open Cut- Dam and pump, Flume
S -B19-174
69.8
Trib. To Haw River
Intermittent
36.089304
-79.362603
0303000204
0.00
176.88
0.00
N/A
AS -A18-115
69.9
Trib. To Haw River
Perennial
36.088644
-79.36239
0303000204
18.27
91.24
0.00
Open Cut- Dam and pump, Flume
S -B18-135
70.3
Trib. To Haw River
Ephemeral
36.083658
-79.360561
0303000204
2.00
129.61
0.00
Open Cut- Dam and pump, Flume
S -B18-134
70.3
Trib. To Haw River
Intermittent
36.083612
-79.360483
0303000204
3.00
92.44
0.00
Open Cut- Dam and pump, Flume
S -B18-133
70.3
Trib. To Haw River
Perennial
36.083497
-79.360496
0303000204
11.53
82.61
0.00
Open Cut- Dam and pump, Flume
&C18-82
70.4
Trib. To Haw River
Intermittent
36.081679
-79.359706
0303000204
3.00
92.31
0.00
Open Cut- Dam and pump, Flume
1� Mountain Valley
PIPELI
May 2019 Supplement to the Joint Permit Application
USACE - Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-2
Proposed Impacts by Waterbody ID and Type of Impact
May 2019
Feature ID
Milepost
Waterbody Name
Waterbody Type
Latitude
Longitude
Watershed HUC 10
Pipeline Crossing Length
(ft)
Temporary Construction Impacts -
Streams (In ft)
Permanent Stream Impact (In ft)
Construction Method
S -C18-81
70.7
Trib. To Haw River
Perennial
36.077154
-79.357777
0303000204
24.18
83.02
0.00
Open Cut- Dam and pump, Flume
S -A18-109
70.9
Trib. To Haw River
Perennial
36.074856
-79.357646
0303000204
5.00
104.25
0.00
Open Cut- Dam and pump, Flume
S -A18-108
71
Trib. To Haw River
Intermittent
36.073911
-79.357977
0303000204
2.00
115.56
0.00
Open Cut- Dam and pump, Flume
S -A18-107
71
Trib. To Haw River
Ephemeral
36.073237
-79.358191
0303000204
1.00
118.36
0.00
Open Cut- Dam and pump, Flume
S -A18-64
71.5
Trib. To Haw River
Perennial
36.066507
-79.360355
0303000204
25.88
74.95
0.00
Open Cut- Dam and pump, Flume
S -A18-65
71.6
Trib. To Haw River
Intermittent
36.064646
-79.360872
0303000204
1.00
109.91
0.00
Open Cut- Dam and pump, Flume
S -A18-68
71.8
Trib. To Haw River
Perennial
36.061848
-79.361649
0303000204
3.00
80.35
0.00
Open Cut- Dam and pump, Flume
AS-NHD-1560
72.1
Trib. To Haw River
Intermittent
36.057851
-79.364004
0303000204
5.00
76.03
0.00
Open Cut- Dam and pump, Flume
S -A18-207
72.2
Trib. To Haw River
Intermittent
36.056247
-79.364535
0303000204
0.00
6.71
0.00
N/A
S -B18-125
72.4
Trib. To Haw River
Intermittent
36.054639
-79.36458
0303000204
3.00
100.14
0.00
Open Cut- Dam and pump, Flume
S -B18-127
72.5
Trib. To Haw River
Intermittent
36.052274
-79.36528
0303000204
5.00
121.15
0.00
Open Cut- Dam and pump, Flume
S -B18-128
72.5
Trib. To Haw River
Ephemeral
36.052152
-79.365172
0303000204
2.00
124.70
0.00
Open Cut- Dam and pump, Flume
S -B18-129
72.6
Trib. To Haw River
Ephemeral
36.051604
-79.365282
0303000204
3.00
80.83
0.00
Open Cut- Dam and pump, Flume
Meter Station: T-15 Dan River Interconnect / MLV 4
S -B18-38-2
30.3
Trib. To Dan River
Ephemeral
36.495619
-79.680082
0301010309
0.00
231.44
0.00
N/A
Contractor Yard 05
S -A18-248 / S -A18-24
30.6 1
Trib. To Dry Creek
Ephemeral
36.518798
-79.721212
0301010309
0.00
87.65
0.00
N/A
H-650 Pipeline - HDD
S -A18-17
30.1
Dan River
Perennial
36.497312
-79.676251
0301010309
247.29
51.53
0.00
HDD
S -B18-38
30.3
Trib. To Dan River
Ephemeral
36.49528
-79.678502
0301010309
3.00
54.24
0.00
HDD
S -B18-15
63.5
Trib. To Stony Creek
Intermittent
36.146424
-79.413362
0303000204
0.00
2.66
0.00
N/A
AS -B18 -16/S -B18-16
63.6
Stony Creek
Perennial
36.146476
-79.411247
0303000204
304.73
60.62
0.00
HDD
Permanent Access Roads
Temporary Access Roads
AS -Al 8 -40/S -A18-40
27.4
Cascade Creek
Perennial
36.528267
-79.648501
0301010309
0.00
25.87
0.00
Bridge or Flume
S -A19-283
27.4
Trib. To Cascade Creek
Intermittent
36.528148
-79.648697
0301010309
0.00
100.10
0.00
Bridge or Flume
WB -A19-281
27.5
Trib. To Cascade Creek
Pond
36.52922
-79.651694
0301010309
0.00
30.84
0.00
N/A
S -A18-23
28.3
Trib. To Dan River
Perennial
36.517519
-79.6579
0301010309
0.00
10.71
0.00
N/A
S -A18-27
28.4
Trib. To Dan River
Intermittent
36.517179
-79.658601
0301010309
0.00
14.42
0.00
N/A
S -A18-19
29.7
Trib. To Dan River
Perennial
36.503339
-79.675523
0301010309
0.00
14.29
0.00
N/A
S -A18-19-2
29.8
Trib. To Dan River
Perennial
36.501467
-79.674965
0301010309
0.00
11.42
0.00
N/A
S -A18-1
38.1
Trib. To Wolf Island Creek
Ephemeral
36.412475
-79.649948
0301010309
0.00
4.82
0.00
Bridge or Flume
S -B18-42
41.8
Trib. To Lick Fork
Intermittent
36.369658
-79.61993
0301010401
0.00
13.17
0.00
N/A
S -A18-239
46.7
Trib. To Hogans Creek
Intermittent
36.308476
-79.593451
0301010401
0.00
5.91
0.00
N/A
S -A18-238
46.7
Trib. To Hogans Creek
Intermittent
36.308519
-79.594753
0301010401
0.00
0.23
0.00
N/A
S -C18-71
50.2
Trib. To Haw River
Ephemeral
36.269615
-79.559552
0303000202
0.00
2.05
0.00
N/A
S -C18-15-2
52.2
Trib. To Haw River
Intermittent
36.246228
-79.539291
0303000202
0.00
11.25
0.00
N/A
SS-SOIL19-13
54.2
Trib. To Haw River
Intermittent
36.22226
-79.522999
0303000202
0.00
28.77
0.00
Bridge or Flume
S -A18-216
54.6
Trib. To Haw River
Intermittent
36.216925
-79.52017
0303000202
0.00
25.58
0.00
Bridge or Flume
S -A18-215
54.6
Trib. To Haw River
Perennial
36.216918
-79.520281
0303000202
0.00
25.25
0.00
Bridge or Flume
SS-SOIL19-05
57.9
Trib. To Haw River
Perennial
36.180064
-79.492339
0303000204
0.00
18.44
0.00
N/A
S -A18-70-262.4
Trib. To Haw River
Perennial
1 36.151005
1 -79.430449
1 0303000204
0.00
5.87
0.00
N/A
S -A18-72-2
62.5
Trib. To Haw River
Intermittent
1 36.150843
1 -79.429739
1 0303000204
0.00
19.79
0.00
N/A
1� Mountain Valley
PIPELI
May 2019 Supplement to the Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Updated Appendix L-2
Proposed Impacts by Waterbody ID and Type of Impact
May 2019
Pipeline Crossing Length
Temporary Construction Impacts -
Feature ID
Milepost
Waterbody Name
Waterbody Type
Latitude
Longitude Watershed HUC 10
(ft)
Streams (In ft)
Permanent Stream Impact (In ft)
Construction Method
S -B18-138
63.7
Trib. To Stony Creek
Perennial
36.149442
-79.40883 0303000204 0.00
25.77
0.00
Bridge or Flume
63.7
Trib. To Stony Creek
Intermittent
36.151288
-79.408944 0303000204 0.00
28.05
0.00
Bridge or Flume
5SB18�-137
66.5
Trib. To Boyds Creek
Intermittent
36.132284
-79.36504 0303000204 0.00
25.98
0.00
Bridge or Flume
70.9
Trib. To Haw River
Perennial
36.073553
-79.354916 0303000204 0.00
12.22
0.00
N.
Legend
o Mileposts (MP, 0.5 'Y Delineated PFO
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
Temporary Access
ED Road
Limits of
Qconstruction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C__! County Boundary
Streams:
Wetlands:
_ Delineated Wetland
Boundary
Delineated PEM
o 0) r) m �Ird
Note: GW
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
* = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
** = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------------------------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC 0neMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Aalntia�\
\ Q
Rockingham
County
0
P i t t s y I v a n i a
County
4NJ ';.
va Ana a
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 1 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
i
0
Road b913moo y y60 o 550 510
�o
h
y90 � y2o S
i 4Q,
� � TA-RO-071
od
I a
I
1
Seo
C) 580— — ---- — -- — - -- - -
— -- — -— — - — -— -
o :Ic i
LO
I I
I �
'M
O N
i
00r -
L0
N
'U
! lac
�I 1Q TA-RO-073 z
Ci � •yY i �.
U`
QI i
! I
-----------
.- ----------------------------- L - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
-----------
♦
♦ I j
Ln
♦ TA-RO-072A
♦ W -A118-22: PEM
6.5 ♦ ♦ Con./Op. Pipeline Crossing Ft.: 77.33 I
-
0- - - Construction Acres: 0.17 a /
Operational Acres: 0.00
I I �
S-1318-99: Int. o I 539 i
Con./Op. Pipeline Crossing Ft.: 1.00
Construction Crossing Ft.: 88.74 TA-RO-072
Operational Crossing Ft.: 44.54 7.
W-1318-98: PFO
Con./Op. Pipeline Crossing Ft.: 15.04
Construction Acres: 0.03
Operational Acres: 0.01 **
y�o
s�
0
Legend
O Mileposts (MP, 0.5 —Delineated Pond
mi) Pond
Temporary Access Wetlands:
Road
Delineated Wetland
- - H-650 Pipeline —Boundary
--,Operational 0'j:4Delineated PEM
L - -'Workspace
�` Delineated PFO
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
—Approximated
Intermittent
_ Delineated
Intermittent I
® soy
IM an
lm
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC 0--n--e--M--a--p-,--T--R--C-,--U--S--G--S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County
yi7 4 �
PitV'gylvania*,\
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 2 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
[::]Construction Right
of -Way
_ Delineated
Intermittent
_ Delineated
Perennial
— Delineated Pond
Approximated Pond
Intermittent Surface
Water
- Perennial Surface
Water
M Pond
Wetlands:
Survey Area
Delineated Wetland
L _ Adjacent Sheet — Boundary
C1 County Boundary �Delineated PEM
Streams: K> Delineated PFO
—Approximated Pond � Delineated PSS
_ Delineated
Ephemeral
0 5n in
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County
_■J
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 3 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
TA-RO-073A
00
1
W -A19-282: PEM (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.01
Operational Acres: 0.00
1
1
WB -A19-281: Pond (Temporary Access Road) k1
Con./Op. Pipeline Crossing Ft.: 0.00 1
Construction Crossing Ft.: 30.84
Construction Sq. Ft.: 33.31
Operational Sq. Ft.: 0.00 1
�O.
t 1
1
_ 1
^\ 11
W -A19-282-5: PSS (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
W -A19-282-3: PSS (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
W -A19-282: PSS (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
AS -A18-40 / S -A18-40: Per. (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 25.87
Construction Sq. Ft.: 1,254.68
Operational Sq. Ft.: 0.00
S-A18-42:Int.
19-282-9: PSS (Temporary Access Road) _ Con./Op. Pipeline CrossingFt.: 20.52
Con./Op. Pipeline Crossing Ft.: 0.00 _ Construction Crossing Ft.: 95.009
70
Constructon Acres: <0.0nstruction Sq. Operatiolnal Acres: 0.001
AaLac�ht Sheet 3 CoOperational SgFtFtZ 011
0021 0/
♦'
All
All
111
S -A19-283: Int. (Temporary Access Road)
\ Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 100.10
Operational Crossing Ft.: 0.00
W -A19-282-2: PSS (Temporary Access Road)
` Con./Op. Pipeline Crossing Ft.: 0.00
o , Construction Acres: <0.01
`Oo Operational Acres: 0.00
I
j W -A19-282-4: PSS (Temporary Access Road)
t Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
AW -A19-282: PSS (Temporary Access Road) h Operational Acres: 0.00
Con./Op. Pipeline Crossing Ft.: 0.00 1�
Construction Acres: <0.01 4g0 ''
Operational Acres: 0.00 kl�F _
1� W -A19-282-6: PSS (Temporary Access Road)
1 Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
1 Operational Acres: 0.00 M P`
W -A19-282-7: PSS (Temporary Access Road) k1
Con./Op. Pipeline Crossing Ft.: 0.00 1
1
Construction Acres: <0.01 48p
Operational Acres: 0.00 +
1 W -A19-274: PEM
1 Con./Op. Pipeline Crossing Ft.: 42.02
Construction Acres: 0.19 "
W -A19-282-8: PSS (Temporary Access Road) Operational Acres: 0.00
' Con./Op. Pipeline Crossing Ft.: 0.00 ■ ■ ■
Construction Acres: <0.01 �g� ■ ■ ■
Operational Acres: 0.00 13
,
'•:,. ,
1 '
W -A19-274-3: PEM '
1 '
Con./Op. Pipeline Crossing Ft.: 0.00 ■
1 Construction Acres: 0.17 ■ ■ 1 ► ■
/
i Operational Acres: 0.00 ■ 1 ► ■ 1
■■ 11■ i ♦
W -A18-44: PFO
Con./Op. Pipeline Crossing Ft.: 37.93
Construction Acres: 0.05
Operational Acres: 0.01 **
i 11
♦ Intl
.��0 ■
S -A18-40: Per.
Con./Op. Pipeline Crossing Ft.: 108.54
♦ Construction Crossing Ft.: 106.03
Construction Sq. Ft.: 7,677.69
Operational Sq. Ft.: 0.00
4• �
S -A19-273: Per.
Con./Op. Pipeline Crossing Ft.: 28.95
Construction Crossing Ft.: 50.45
Construction Sq. Ft.: 2,133.93
Operational Sq. Ft.: 0.00
W -A19-274-2: PEM
Con./Op. Pipeline Crossing Ft.: 38.12
Construction Acres: 0.04
Operational Acres: 0.00
Legend
111111111■ ■■ I.
■ ■ 111 1 111 ■ ■ ■♦1 ■
W -A18-44-2: PEM
Con./0P• Pipeline Crossing Ft.: 1,176.72
► ► ► ►1► ■ ► ► ► ► ► ■ a ►
■►■I►►111►►111■
Construction Acres: 3.55
/ ►■ ► ► ■ ► ► ► ■ I ■ ► ■ ►
Operational Acres: 0.00
■ ►III ■ ■ I I ■ ■ ■ j"? I I
W -A19-282: PSS (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
AS -A18-40 / S -A18-40: Per. (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 25.87
Construction Sq. Ft.: 1,254.68
Operational Sq. Ft.: 0.00
S-A18-42:Int.
19-282-9: PSS (Temporary Access Road) _ Con./Op. Pipeline CrossingFt.: 20.52
Con./Op. Pipeline Crossing Ft.: 0.00 _ Construction Crossing Ft.: 95.009
70
Constructon Acres: <0.0nstruction Sq. Operatiolnal Acres: 0.001
AaLac�ht Sheet 3 CoOperational SgFtFtZ 011
0021 0/
♦'
All
All
111
S -A19-283: Int. (Temporary Access Road)
\ Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 100.10
Operational Crossing Ft.: 0.00
W -A19-282-2: PSS (Temporary Access Road)
` Con./Op. Pipeline Crossing Ft.: 0.00
o , Construction Acres: <0.01
`Oo Operational Acres: 0.00
I
j W -A19-282-4: PSS (Temporary Access Road)
t Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
AW -A19-282: PSS (Temporary Access Road) h Operational Acres: 0.00
Con./Op. Pipeline Crossing Ft.: 0.00 1�
Construction Acres: <0.01 4g0 ''
Operational Acres: 0.00 kl�F _
1� W -A19-282-6: PSS (Temporary Access Road)
1 Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
1 Operational Acres: 0.00 M P`
W -A19-282-7: PSS (Temporary Access Road) k1
Con./Op. Pipeline Crossing Ft.: 0.00 1
1
Construction Acres: <0.01 48p
Operational Acres: 0.00 +
1 W -A19-274: PEM
1 Con./Op. Pipeline Crossing Ft.: 42.02
Construction Acres: 0.19 "
W -A19-282-8: PSS (Temporary Access Road) Operational Acres: 0.00
' Con./Op. Pipeline Crossing Ft.: 0.00 ■ ■ ■
Construction Acres: <0.01 �g� ■ ■ ■
Operational Acres: 0.00 13
,
'•:,. ,
1 '
W -A19-274-3: PEM '
1 '
Con./Op. Pipeline Crossing Ft.: 0.00 ■
1 Construction Acres: 0.17 ■ ■ 1 ► ■
/
i Operational Acres: 0.00 ■ 1 ► ■ 1
■■ 11■ i ♦
W -A18-44: PFO
Con./Op. Pipeline Crossing Ft.: 37.93
Construction Acres: 0.05
Operational Acres: 0.01 **
i 11
♦ Intl
.��0 ■
S -A18-40: Per.
Con./Op. Pipeline Crossing Ft.: 108.54
♦ Construction Crossing Ft.: 106.03
Construction Sq. Ft.: 7,677.69
Operational Sq. Ft.: 0.00
4• �
S -A19-273: Per.
Con./Op. Pipeline Crossing Ft.: 28.95
Construction Crossing Ft.: 50.45
Construction Sq. Ft.: 2,133.93
Operational Sq. Ft.: 0.00
W -A19-274-2: PEM
Con./Op. Pipeline Crossing Ft.: 38.12
Construction Acres: 0.04
Operational Acres: 0.00
Legend
Mileposts (MP, 0.5
j Delineated PEM
0
mi)
_Delineated
Ephemeral
UDelineated PFO
Temporary Access
_Delineated
" Delineated PSS
Road
Intermittent
H-650 Pipeline
Operational
-Delineated
Perennial
Workspace
-Delineated Pond
Temporary Access
- Approximated
Road
Perennial
Limits of
Approximated Pond
QConstruction Right-
Intermittent Surface
of -Way
Water
Survey Area
-'Adjacent
- Perennial Surface
L Sheet
Water
[County Boundary
Pond
Streams: Wetlands:
Wetland
_Approximated
Perennial
_Delineated
Boundary
-Approximated Pond ®Approximated PSS
0 9b C) an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
----------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
'I
Rockingham
Count ,
y
Q
Q /
M Mountain Valley
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 4 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
Q Construction Right
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Perennial
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
- Approximated
Perennial
Intermittent Surface
Water
- Perennial Surface
Water
Wetlands:
_ Delineated Wetland
Boundary
® Approximated PSS
Delineated PEM
5e% Delineated PFO
0 W C) an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County
quo
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 5 of 107
600 Willowbrook Ln
CTRC West Chester, PA 19382
Date: May 2019
r
I o so 500 W -A18-30: PFO S -A18-34: Int. +
o Con./Op. Pipeline Crossing Ft.: 5.13 Con./Op. Pipeline Crossing Ft.: 0.00 411
Construction Acres: 0.01 Construction Crossing Ft.: 17.75 PF 1 x .
S -A18-31: Int. Operational Acres: <0.01** Operational Crossing Ft.: 0.00 S -A18-36: Per.
W -A18-26: PEM so Con./Op. Pipeline Crossing Ft.: 0.00
Con./Op. Pipeline Crossing Ft.: 40.92 0 Construction Crossing Ft.: 23.68
Construction Acres: 0.07 Operational Crossing Ft.: 23.68
Operational Acres: 0.00
W -A18-30: PEM
_Con./Op. Pipeline Crossing Ft.: 26.16
0 - - - =-- Construction Acres: 0.04
_ _ _ Operational Acres: 0.00 i
4 s
TA-RO-075
3600
I Interconnect -�
N•
rl
r
N.
m!
QI
W -A18-39-3: PEM (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
i
1'
X30
6Q0
l 550:
560
i
i 5�0
• rr. 0
�g0
600
0
4,1 1
57163560
-,
TA-RO-076
PA-RO-000
t
_ ,t r.YS I a
or..�r�IncaA+ .
IF��� WTI
O
Legend
Con./Op. Pipeline Crossing Ft.: 0.00
Mileposts (MP, 0.5
Construction Crossing Ft.: 73.50
-Approximated
Intermittent
Permanent Access
Operational Crossing Ft.: 33.97
_
Road
Delineated
_ Temporary Access
4
I
v,
- - H-650 Pipeline
-
M P_28.5
S -A18-32: Per.
- -'Workspace
OO Con./Op. Pipeline Crossing Ft.: 6.60
Permanent Access
5 Construction Crossing Ft.: 87.10
Road
Water
W -A18-33: PEM
Construction Sq. Ft.: 739.05
Road
Wetlands:
Con./Op. Pipeline Crossing Ft.: 0.00
Operational Sq. Ft.: 0.00
of -Way
Boundary
Construction Acres: 0.01
' • ' Approximated PEM
i
�.� Delineated PEM
Operational Acres: 0.00
x Delineated PFO
+
O
r
Note:
March 2019 Workspace
S -A18-27: Int. (Temporary Access Road)
-
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
Con./Op. Pipeline Crossing Ft.: 0.00
.. = Buffer Impacts Under Review
-
Construction Crossing Ft.: 14.42
'oo
i
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Operational Crossing Ft.: 0.00
D ,
N
�h0 560
z
Q
1
0
�r
' 580
f
S-A18-23: Per. (Temporary Access Road)
o
co ,I ;
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 10.71
: `O
Operational Crossing Ft.: 0.00
r
1
•r
_
or..�r�IncaA+ .
IF��� WTI
O
Legend
Mileposts (MP, 0.5
O
mi)
-Approximated
Intermittent
Permanent Access
-Approximated Pond
_
Road
Delineated
_ Temporary Access
_
Intermittent
Road
Delineated
- - H-650 Pipeline
_
Perennial
- -, Operational
- Delineated Pond
- -'Workspace
Approximated Pond
Permanent Access
Perennial Surface
Road
Water
EDTemporary Access
pond
Road
Wetlands:
Limits of
[::]Construction Right-
- Delineated Wetland
of -Way
Boundary
Survey Area
' • ' Approximated PEM
L Adjacent Sheet
�.� Delineated PEM
_
County Boundary
x Delineated PFO
Streams:
0 W
Note:
March 2019 Workspace
1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review
Per DWR# 20181638
Major Variance
----------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County
,a
a
\ w
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 6 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
600
590 590
610
o°
0
600
66°
600 �
t
t
i
r
0
t
h t
t
t
PA-RO-000
opo �
t
0
s'o +
o
560
S�10 i
S(9
k(n
Sg0 ego �
t
60 /
0
610 +
6�O
/
W -A19-280: PEM (Permanent Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.01 7
Operational Acres: 0.00
610
r,
11
W -A19-280-2: PEM (Permanent Access Road) 62b
Con./Op. Pipeline Crossing Ft.: 0.00 0
Construction Acres: 0.02 630 6
Operational Acres: 0.00
Y;
640
10 �O
rn `� 650
Legend
O Mileposts (MP, 0.5 ,10�e' Delineated PEM
mi)
_ Permanent Access
Road
EDPermanent Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C_,County Boundary
Streams:
Approximated
Intermittent
_ Delineated
Intermittent
Wetlands:
_ Delineated Wetland
Boundary
® s�
in an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
11 Mountain Valley
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 7 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
cn
0
0
W -A18-38: PFO
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.01
Operational Acres: 0.00**
11
W -A18-38: PEM
Con./Op. Pipeline Crossing Ft.: 28.83 0, t`� V� P
ti
• r r + 11'
Operational 111;
'. ,
,' ,
'" k..
-�'r�r• .'� •. .. -�� P'L '� i �'' ' ''�•rA ,It
J.
��
r , •`,7. - 7+�:_ ilk. :�tl "� 1
190
w o
S-1318-49: Per.
Con./Op. Pipeline Crossing Ft.: 3.00 cDV
Construction Crossing Ft.:L
Operational Crossing Ft.: 555 93.93
a
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access Wetlands:
Road _ Delineated Wetland
- - H-650 Pipeline Boundary
--,Operational 10j' Delineated PEM
L - -'Workspace Delineated PFO
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Perennial
_ Delineated
Ephemeral
® W IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County
s
.o y
B�
e E 4 -
F b -_
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 8 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
_.""'°"""' Date: May 2019
S -A18-37: Per.
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 19.36
Operational Crossing Ft.: 0.00
{
i•
P _
cn
0
0
W -A18-38: PFO
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.01
Operational Acres: 0.00**
11
W -A18-38: PEM
Con./Op. Pipeline Crossing Ft.: 28.83 0, t`� V� P
ti
• r r + 11'
Operational 111;
'. ,
,' ,
'" k..
-�'r�r• .'� •. .. -�� P'L '� i �'' ' ''�•rA ,It
J.
��
r , •`,7. - 7+�:_ ilk. :�tl "� 1
190
w o
S-1318-49: Per.
Con./Op. Pipeline Crossing Ft.: 3.00 cDV
Construction Crossing Ft.:L
Operational Crossing Ft.: 555 93.93
a
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access Wetlands:
Road _ Delineated Wetland
- - H-650 Pipeline Boundary
--,Operational 10j' Delineated PEM
L - -'Workspace Delineated PFO
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Perennial
_ Delineated
Ephemeral
® W IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County
s
.o y
B�
e E 4 -
F b -_
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 8 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
_.""'°"""' Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Wetlands:
_ Delineated Wetland
Boundary
QApproximated PEM
Delineated PEM
K,> Delineated PFO
Approximated
Ephemeral
_ Delineated
Ephemeral
® soy in an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Lishni� t `
R o c kiltl g h a m
4 County
.t
alt ,/M^' `
Y Y
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 9 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
SAO
620
580
TA-RO-080 1 _
S)1
rn
0
550
690 570 i
630 6 0 ♦..�
00 �• 56 S -A18-160: Eph.
�. Con./Op. Pipeline Crossing Ft.: 0.00
620 rn • Construction Crossing Ft.: 31.84
0 10 Operational Crossing Ft.: 16.65 C'
n
CD h I' �r
` by `
o
14es'•tiiifi: r
t .. Uri
s6,
<r `
10
so �.. ... , . •= . _ ?� ... .�??�'�!� ghee �
- s _ No ♦ co
`o # t
TA-RO-079A*y4lyy► i
r / Ac
■
o . ♦,
orAt�, ♦, y
I
I
I
♦
co ,
co
Ln ,
o o i
--------.._...--------•-•••Adjacent Sheet 11• ------—•-�1--------- -� --------- ----,
♦ S -A18-47: Per.
Con./Op. Pipeline Crossing Ft.: 3.00
o'i lyo Construction Crossing Ft.: 85.45
i Operational Crossing Ft.: 58.45
TA-RO-079
S -A18-19: Per. (Temporary Access Road) W -A18-18: PFO ♦ ' - -
I
Con./Op. Pipeline Crossing Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 934.84
Construction Crossing Ft.: 14.29 Construction Acres: 1.87
Operational Crossing Ft.: 0.00 Operational Acres: 0.64**
♦ I
♦
� I
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Intermittent
_ Temporary Access _ Delineated
Road Perennial
— — H-650 Pipeline Wetlands:
- -, Operational _ Delineated Wetland
L --'Workspace Boundary
aTemporary Access Delineated PEM
RoadDelineated PFO
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Perennial
_ Delineated
Ephemeral
® f� IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--- ------------------------------------------N_W------------------------------------------------------------
Data Sources: EQT, ESRI, NC ap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
'F
o ,l
`1100 i
T Rockingham
County
Boa
v
/ cn�mr•6'
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 10 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
600
r 600
I 6�0
590
y60 1. C
-A18-19: Per. (Temporary Access Road) S A18 47: Per.
Con./Op. Pipeline Crossing Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 3.00
LnLO
Construction Crossing Ft.: 14.29 Construction Crossing Ft.: 85.45
I `
Operational Crossing Ft.: 0.00Operational Crossing Ft.: 58.45
o TA-RO-079
i o v
cr LOFib
o '
O
I
S6o so
L — ? - — - — . Adjacent Sheet 10 — — - — — - - - — — — — - - — — — -
SIV �Oo
S -A18-19-2: Per. (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 11.42
I Operational Crossing Ft.: 0.00
TA-RO-080
W-A1""P
-18: PEM
Con./Op. Pipeline Crossing Ft.: 49.52 -
Construction Acres: 0.07
Operational Acres: 0.00
r1►►■►►
01
fir,„ , -►
. ♦ .
y1C s � ♦ �
' I i
O
-- —_ — -— - —_—— - _ —_—_—_—_----
- — - — —
i
AdjacentSheetl2---— -— - — - — - —-
' —
- ♦
-
-
------------------
I ' — -— — _
I ' I
.
�. W -A18-18: PFO
Con./Op. Pipeline Crossing Ft.: 934.84
Construction Acres: 1.87
Operational Acres: 0.64**
•• 1
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access Wetlands:
Road _ Delineated Wetland
- - H-650 Pipeline Boundary
--,Operational 10j' Delineated PEM
L - -'Workspace Delineated PFO
Construction HDD
Operational HDD
[::]Temporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
E_1 County Boundary
Streams:
-Approximated
Perennial
® 5G�
IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
!
Rockingham
Co.u.nty qp
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 11 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
1
1
1 `
1
1 -
S -A18-17: Per. (H-650 Pipeline HDD)
Con./Op. Pipeline Crossing Ft.: 247.29
Construction Crossing Ft.: 51.53
Construction Sq. Ft.: 12,417.63
Operational Sq. Ft.: 0.00
600
490
k o W-1318-39-3: PEM (H-650 Pipeline HDD)
00
Con./Op. Pipeline Crossing Ft.: 29.86
Construction Acres: 0.03
Construction HDD Acres: <0.01
Operational Acres: 0.00
, W-1318-39-2: PEM (H-650 Pipeline HDD)
Con./Op. Pipeline Crossing Ft.: 40.47
Construction Acres: 0.04
Construction HDD Acres: <0.01
Operational Acres: 0.00
W-1318-39: PEM (H-650 Pipeline HDD)
Con./Op. Pipeline Crossing Ft.: 24.63
Construction Acres: 0.03
Construction HDD Acres: <0.01
Operational Acres: 0.00
W-1318-39-4: PEM (H-650 Pipeline HDD)
Con./Op. Pipeline Crossing Ft.: 31.56
Construction Acres: 0.04
Construction HDD Acres: <0.01
Operational Acres: 0.00
7 W-1318-36: PFO (H-650 Pipeline HDD)
Con./Op. Pipeline Crossing Ft.: 31.83
Construction Acres: 0.11
Construction HDD Acres: 0.01
Operational Acres: 0.00**
0
W-1318-36-9: PEM (Meter Station)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.05
Operational Acres: 0.00
' o
W-1318-36-47PEM(H�-650 Pipeline HDD)
Con./Op. sing Ft.: 0.00
Construction Acres: <0.01
Construction HDD Acres: 0.00
Operational Acres: 0.00
SAO
W-1318-36-11: PEM (Meter Station)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
W-1318-36-5: PEM
Con./Op. Pipeline Crossing Ft.: 26.67
Construction Acres: 0.03
Operational Acres: 0.00
JV W-1318-36-6: PEM
W-1318-36-3: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing Ft.: 0.00
Con./Op. Pipeline Crossing Ft.: 17.92 Construction Acres: <0.01
Construction Acres: 0.05 Operational Acres: 0.00
Construction HDD Acres: <0.01
Operational Acres: 0.00 W-1318-34: PFO
Con./Op. Pipeline Crossing Ft.: 179.81
Construction Acres: 0.45
� - Operational Acres: 0.12**
o ` PA-RO00
-082A
rn
W-1318-36: PEM (H-650 Pipeline HDD) IyI
Con./Op. Pipeline Crossing Ft.: 36.44 >.f.
Construction Acres: 0.04 T-15 Dan River
Construction HDD Acres: <0.01Interconnect / _
Operational Acres: 0.00 MLU 4
r W-1318-36-2: PEM (H-650 Pipeline HDD) `
t Con./Op. Pipeline Crossing Ft.: 16.34
- Construction Acres: 0.02
`.
Construction HDD Acres: <0.01
Operational Acres: 0.00 I ,, �♦
.MP.30.5
S-1318-38: Eph. (H-650 Pipeline HDD) 5� J
j Con./Op. Pipeline Crossing Ft.: 3.00 \66 U
j Construction Crossing Ft.: 54.24 �e Icu
��
Operational Crossinq Ft.: 0.00 _ S� .<
AW -1318-36: PEM (Meter Station)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
� PA-RO-082 I
TA-RO-081
I
W-1318-36-10: PEM (Meter Station)
Con./Op. Pipeline Crossing Ft.: 0.00 i
Construction Acres: 0.01
Operational Acres: 0.00
I
W-1318-34-2: PFO (Permanent Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: <0.01 **
I
I
SO
O
Legend
o Mileposts (MP, 0.5 '__; County Boundary
mi) Streams:
_ Permanent Access_ Delineated
Road Ephemeral
_ Temporary Access_ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace Perennial Surface
Construction HDD Water
Operational HDD Wetlands:
ED
Permanent Access _ Delineated Wetland
Road Boundary
ED
Temporary AccessQApproximated PEM
Road Approximated PFO
Limits of 10j' Delineated PEM
[::]Construction Right -
of -Way` Delineated PFO
Survey Area
L _ Adjacent Sheet
® f� an
iiiia
I�
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
0 Rockingf am
C o u n t y"
nn _
ay
x e
- k�o
m 1ysvF
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 12 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
W-1318-36-7: PEM (Meter Station)
0
S-1318-38-2: Eph. (Meter Station)J
Con./Op. Pipeline Crossing Ft.: 0.00
Ai. Construction Crossing Ft.: 231.44
0 o Operational Crossing Ft.: 0.00
y0°
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.47
Operational Acres: 0.00
W-1318-36-8: PEM (Meter Station)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
� PA-RO-082 I
TA-RO-081
I
W-1318-36-10: PEM (Meter Station)
Con./Op. Pipeline Crossing Ft.: 0.00 i
Construction Acres: 0.01
Operational Acres: 0.00
I
W-1318-34-2: PFO (Permanent Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: <0.01 **
I
I
SO
O
Legend
o Mileposts (MP, 0.5 '__; County Boundary
mi) Streams:
_ Permanent Access_ Delineated
Road Ephemeral
_ Temporary Access_ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace Perennial Surface
Construction HDD Water
Operational HDD Wetlands:
ED
Permanent Access _ Delineated Wetland
Road Boundary
ED
Temporary AccessQApproximated PEM
Road Approximated PFO
Limits of 10j' Delineated PEM
[::]Construction Right -
of -Way` Delineated PFO
Survey Area
L _ Adjacent Sheet
® f� an
iiiia
I�
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
0 Rockingf am
C o u n t y"
nn _
ay
x e
- k�o
m 1ysvF
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 12 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
Q) atie
W-1318-34: PFO
o Con./Op. Pipeline Crossing Ft.: 179.81
113 Construction Acres: 0.45
Operational Acres: 0.12**
� os
1� �
0
o
.4"
• 61313
,113
�0 5 v
0 00
00
oo
61313
1100
Soo
so
0
lam #
+Q , 540
S00 7 41 6
'
0
h
. ,'9
CD ^o
� h
0
00
Ln
\ s90—
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
- - H-650 Pipeline - Approximated
--,Operational Perennial
L --'Workspace -Perennial Surface
Limits of Water
[::]Construction Right- Wetlands:
of -Way _ Delineated Wetland
Survey Area Boundary
L _ Adjacent Sheet Approximated PFO
L__. County Boundary Oj;,Delineated PEM
Streams: ;X, Delineated PFO
Approximated
Intermittent
Approximated
Perennial
_ Delineated
Ephemeral
_ Delineated
Intermittent
an
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--- --n--e--M--a--p-,--T--R--C-,--U--S--G--S
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
• E A C
0,
s Rockingham
County
� 1S
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 13 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
MP3
♦ I
W -A18-54: PEM
S-1319-153: Int.
Sg0
♦ I
Con./Op. Pipeline Crossing Ft.: 11.24
/Con./0 Pipeline Crossin
P• P 9 Ft.: 2.00
♦♦c
Construction Acres: 0.01
1 Construction Crossing Ft.: 76.46
S3i�,
0
♦Q
Operational Acres: 0.00
p
+�3o Operational Crossing Ft.: 51.13
510
MP 30.5 `♦♦
t. I suo
Iy. r
i
♦ I!1'
♦ `4 ���
S-1318-104: Per.
4.0•�
w Con./Op. Pipeline Crossing Ft.: 3.00
�` ♦;
�.
F
/ Construction Crossing Ft.: 81.43
Operational Crossing Ft.: 56.15
�0 5 v
0 00
00
oo
61313
1100
Soo
so
0
lam #
+Q , 540
S00 7 41 6
'
0
h
. ,'9
CD ^o
� h
0
00
Ln
\ s90—
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
- - H-650 Pipeline - Approximated
--,Operational Perennial
L --'Workspace -Perennial Surface
Limits of Water
[::]Construction Right- Wetlands:
of -Way _ Delineated Wetland
Survey Area Boundary
L _ Adjacent Sheet Approximated PFO
L__. County Boundary Oj;,Delineated PEM
Streams: ;X, Delineated PFO
Approximated
Intermittent
Approximated
Perennial
_ Delineated
Ephemeral
_ Delineated
Intermittent
an
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--- --n--e--M--a--p-,--T--R--C-,--U--S--G--S
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
• E A C
0,
s Rockingham
County
� 1S
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 13 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
0
h
Co
S-1319-153: Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 76.46
Operational Crossing Ft.: 51.13
600
590
600
o
",7 Ln
i
s
a � ,Qo
$� o W_
m . 6� 530 •.
101113 1 O 6 s
N 00 00
S-1318-95: Per. 5j0
■
Con./Op. Pipeline Crossing Ft.: 28.34
i
S-1318-104: Per.
Con./Op. Pipeline Crossing Ft.: 3.00
Construction Crossing Ft.: 81.4343
♦♦
Operational Crossing Ft.: 56.15
0.
0� 500
Construction Crossing Ft.: 76.02 i
S - Int. Construction Sq. Ft.: 2,002.95
Con./Op. Pipeelineline C5: Crossing Ft.: 1.00 Operational S Ft.: 0.00
Construction Crossing Ft.: 79.26 Speline 02: Per. P q
Operational Crossing Ft.: 52.01 Con./Op. Pipeline Crossing Ft.: 2.00 1
Construction Crossing Ft.: 82.33
�o Operational Crossing Ft.: 53.62
1
--------------
TM /_
MP31.0p♦ ■- ------ __-
r
i
'S
i 540 .530.
550 �• V
f
�t h
i 570
1 S90
'S
W-1318-103: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
w
0
rn
0
OFt
560
i 5j0
o rn
h`O / 580 �g0
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
- - H-650 Pipeline - Approximated
Operational Perennial
'Workspace - Perennial Surface
Limits of Water
[::]Construction Right- Wetlands:
of -Way _ Delineated Wetland
Survey Area Boundary
L _ Adjacent Sheet ,1j' Delineated PEM
L__. County Boundary
Streams:
Approximated
Intermittent
Approximated
Perennial
_ Delineated
Ephemeral
_ Delineated
Intermittent
ff�l
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
C :o u n t y
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 14 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
1 0 0
v
l
• MP 31.5
� � 1
•1
580 ".4
6)0. F yt
r�P0 560 S-1318-95: Per. 550
Con./Op. Pipeline Crossing Ft.: 28.34
Construction Crossing Ft.: 76.02
a1 Construction Sq. Ft.: 2,002.95 �O
Operational Sq. Ft.: 0.00
1
1
P1
...A r.V
I
.i�. •Y _�
1-10
.r
U+ o�, 620 f'
O J:
620
11 �. W i
•1 .... - +
1 �O i
1 600
CP ti 0
s�O o o y80-
O
S.;10 620 - O
1
X640
�t
640 0 0 r1
i
7-
,0
69 Sgq
60
♦♦ x
� � t
e
P
i ,
aF T
r
WE
------------
-----------------i
630
S90
. y 600
g
5%)
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Approximated
Road Perennial
- - H-650 Pipeline - Perennial Surface
--,Operational Water
L - -'Workspace Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Perennial
Delineated
Ephemeral
an
iiiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------------------------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
UtJ
Rockingha,-T
County ff
pO°7 � •
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 15 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 201
Legend
O Mileposts (MP, 0.5
mi)
- - H-650 Pipeline
--,Operational
-
-'Workspace
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
E_1 County Boundary
Streams:
Approximated
Perennial
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
- Approximated
Perennial
- Perennial Surface
Water
Wetlands:
_ Delineated Wetland
Boundary
'QApproximated PEM
® Approximated PSS
10j; Delineated PEM
, Delineated PFO
Delineated PSS
0 5n in . f
ee
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
x
/
I
I
Rockingham
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 16 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
_ Delineated
Intermittent
_ Delineated
Perennial
- Approximated
Perennial
- Perennial Surface
EDTemporary Access
Water
Road
Wetlands:
Limits of
Delineated Wetland
QConstruction Right-
_
Boundary
of -Way
® Approximated PSS
^Survey Area
Oj: Delineated PEM
L _ Adjacent Sheet
� Delineated PFO
C1 County Boundary
, Delineated PSS
Streams:
Approximated
Perennial
Delineated
Ephemeral
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
a
c ;
Rockingham
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 17 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
520 '
530 IM
5Q0g ;A
01
0
TA-RO-087
S90 0
r�
�o
h
600
S10
540
570
580
660
sem,
O
560 550
t
♦ S60 60
5�0 a�
S5 ♦ :.:
580
■ + ♦ 590
♦ . - .. _ 610 <°
♦ Y 600 600
s ♦-
o
♦ r
} ,♦ Sheet 17 - — — d`
d>p
S-A18-151-2: Per. 90
— Con./Op. Pipeline Crossing Ft.: 47.92 5 0
Construction Crossing Ft.: 84.66 60
Construction Sq. Ft.: 3,770.31
♦ Operational Sq. Ft.: 0.00 -
♦, 620
♦ o0o iilrii;
♦ A 670
S20 11,70 �� r� 590
♦ _ --.
5 .
80
S -A18-154: In
Con./Op. Pipeline Crossing Ft.: 0.00 �*
Construction Crossing Ft.: 43.14 ,
Operational Crossing Ft.: 0.00 550
O
q W -A18-155: PEM 600
MP 33.0 �� \ "'O Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.06 590
_ Operational Acres: 0.00
S -A18-154-2: Int. 510
o Con./Op. Pipeline Crossing Ft.: 2.00 •� ; " X60
Construction Crossing Ft.: 128.68W -A18-155: PSS
Operational Crossing Ft.: 56.04 ' ' Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
S -A18-154-3: Int. ♦ `�
Con./Op. Pipeline Crossing Ft.: 0.00 /
Construction Crossing Ft.: 14.04 ♦ �� F, . cook
S2
Sg0 ... 53p 0
• sem,
0
670
Operational Crossing Ft.: 3.72
W -A18-155-2: PSS
Con./Op. Pipeline Crossing Ft.: 68.48
Construction Acres: 0.16
Operational Acres: 0.00
580
' -a�n°i`4'4 n�� ♦ 590 ..
600
56 .. ♦,
Rd 1945 \
550 • -` �,
Legend
0 Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Approximated
Road Perennial
- - H-650 Pipeline - Perennial Surface
--,Operational Water
L - -'Workspace Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of ,1j' Delineated PEM
[::]Construction Right- i Delineated PSS
of -Way
Survey Area
L _ Adjacent Sheet
-
L
__J County Boundary
Streams:
Approximated
Perennial
_ Delineated
Intermittent
® 5G�
IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
UF I " _tri he' Iy
9E�k
Rockingham „M+
O COU,ty m
eem+fi�"' p
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 18 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
S9
O
69
0
600
640
TA-RO-085 .
7630:-�T.
do
6
W
E
h
-
i
O - Srr
ti
640
650
660ra
. r.
'+9 :s 0
. i � it • ����
.530
O
ons ruc on cres. < . S'\ o S -A18-221: Per.
Operational Acres: 0.00 hP"e G Con./Op. Pipeline Crossing Ft.: 4.00
5y0 620Construction Crossing Ft.: 80.68
6p6 W -A18-155-2: PSS Operational Crossing Ft.: 52.24
Con./Op. Pipeline Crossing Ft.: 68.48 O
Construction Acres: 0.16 coo „
Operational Acres: 0.00
600
00
I � -
¢ Q r O
CZF ,•PFat,;3��nR
O
Nco i s`SO �
h 00 530 �
W-A18-222: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
TA-RO-088
i
a
0 1
� I 6q0
620
I
k .P
, m �..
IR
'N
CD
CD
o � CD Po
Jk
62�
S-C18-51:Int.
Con./Op. Pipeline Crossing Ft.: 4.00
QO
6
Construction Crossing Ft.: 87.10
640
Operational Crossing Ft.: 61.96
S-C18-52:Int.
Con./Op. Pipeline Crossing Ft.: 5.00
Construction Crossing Ft.: 71.88
O
6 ♦5�0. - ;�
1 0�
- --
yoo
i
/ 1
i
MP 33.5
•
_-- --0-"-
by
6�0
�
0 1
h
�
640
1}
O
coo
:•- - . , �
W -A18-155: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
S -A18-220: Eph.
Construction Acres: 0.06
Con./Op. Pipeline Crossing Ft.: 3.00
580
Operational Acres: 0.00
Construction Crossing Ft.: 60.06
,��
Operational Crossing Ft.: 54.03
h6
O •mak
W -A18-155: PSS
Q'',
✓dC
Con./Op. Pipeline Crossing Ft.: 0.00
C t t A 001
\
^O
ons ruc on cres. < . S'\ o S -A18-221: Per.
Operational Acres: 0.00 hP"e G Con./Op. Pipeline Crossing Ft.: 4.00
5y0 620Construction Crossing Ft.: 80.68
6p6 W -A18-155-2: PSS Operational Crossing Ft.: 52.24
Con./Op. Pipeline Crossing Ft.: 68.48 O
Construction Acres: 0.16 coo „
Operational Acres: 0.00
600
00
I � -
¢ Q r O
CZF ,•PFat,;3��nR
O
Nco i s`SO �
h 00 530 �
W-A18-222: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
TA-RO-088
i
a
0 1
� I 6q0
620
I
k .P
, m �..
IR
'N
CD
CD
o � CD Po
Jk
5IO W -A18-222: PFO
Con./Op. Pipeline Crossing Ft.: 42.61
s�o Construction Acres: 0.08
Operational Acres: 0.03**
Legend
O Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Temporary Access _ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
-
-'Workspace Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of ,1j' Delineated PEM
QConstruction Right Delineated PFO
of -Way
j
Survey Area Delineated PSS
^
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Ephemeral
Approximated
Intermittent
an
iiiia
f�a!
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
--- ------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
9a 4°
f
• �a
�9Ilk
Rockingham ;.
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 19 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
62�
S-C18-51:Int.
Con./Op. Pipeline Crossing Ft.: 4.00
Construction Crossing Ft.: 87.10
Operational Crossing Ft.: 61.96
S-C18-52:Int.
Con./Op. Pipeline Crossing Ft.: 5.00
Construction Crossing Ft.: 71.88
O
Operational Crossing Ft.: 30.63
1 0�
'I
i
/ 1
i
MP 33.5
1
_-- --0-"-
1
�
1}
5IO W -A18-222: PFO
Con./Op. Pipeline Crossing Ft.: 42.61
s�o Construction Acres: 0.08
Operational Acres: 0.03**
Legend
O Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Temporary Access _ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
-
-'Workspace Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of ,1j' Delineated PEM
QConstruction Right Delineated PFO
of -Way
j
Survey Area Delineated PSS
^
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Ephemeral
Approximated
Intermittent
an
iiiia
f�a!
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
--- ------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
9a 4°
f
• �a
�9Ilk
Rockingham ;.
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 19 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
o�
0
` q�
Ego
660
Om
rn
_>0`'o
U01
`'o
_-: O
oilO
0
o.
TA-RO-089 •��'
s 60
6 .- I 67 ,y °
60 }� f 620
670 —r }
-- to
R ; U
h� I U
o
S -A18-223: Int."
;on./Op. Pipeline Crossing Ft.: 4.00
Construction Crossing Ft.: 81.07
Operational Crossing Ft.: 41.75 o I o \
W -A18-224: PFO Con./Op. Pipeline Crossing Ft.: 4.00 S -C18-49: Int. S -C18-48: Eph. 6
�,
Con./Op. Pipeline Crossing Ft.: 10.58 �� Con./Op. Pipeline Crossing Ft.: 0.00 p>
�o
Construction Acres: 0.02 Construction Crossing Ft.: 1.70
Construction Crossing Ft.: 87.01
Operational Acres: 0.01** Operational Crossing Ft.: 58.04 Operational Crossing Ft.: 0.00 600
°0
i r
----- ------------------
MP 34.0
------------------------------ -------------------------- -- ------ --0----------------------
•----• -�--------------'
1 S -A18-225: Per. 5So
Con./Op. Pipeline Crossing Ft.: 5.00 !
Construction Crossing Ft.: 102.37 a
Operational Crossing Ft.: 76.87 o ��0 060
S I
ho 0..
Legend
O Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Temporary Access _ Delineated
Road Intermittent
— — H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of ,1j' Delineated PEM
QConstruction Right Delineated PFO
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Ephemeral
Approximated
Intermittent
0 W M an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
d
90
Rockingham
County
A`
x
5 �
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 20 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
TA -R -088
o
600 co
I
w
i0
I
A.
70
i
• r� .
I
- T - - - - - - - - - - - - - - - - - - -
I
i
W -A18-224: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
i
Construction Acres: <0.01
i y93
i
Operational Acres: 0.00 513
Ego
660
Om
rn
_>0`'o
U01
`'o
_-: O
oilO
0
o.
TA-RO-089 •��'
s 60
6 .- I 67 ,y °
60 }� f 620
670 —r }
-- to
R ; U
h� I U
o
S -A18-223: Int."
;on./Op. Pipeline Crossing Ft.: 4.00
Construction Crossing Ft.: 81.07
Operational Crossing Ft.: 41.75 o I o \
W -A18-224: PFO Con./Op. Pipeline Crossing Ft.: 4.00 S -C18-49: Int. S -C18-48: Eph. 6
�,
Con./Op. Pipeline Crossing Ft.: 10.58 �� Con./Op. Pipeline Crossing Ft.: 0.00 p>
�o
Construction Acres: 0.02 Construction Crossing Ft.: 1.70
Construction Crossing Ft.: 87.01
Operational Acres: 0.01** Operational Crossing Ft.: 58.04 Operational Crossing Ft.: 0.00 600
°0
i r
----- ------------------
MP 34.0
------------------------------ -------------------------- -- ------ --0----------------------
•----• -�--------------'
1 S -A18-225: Per. 5So
Con./Op. Pipeline Crossing Ft.: 5.00 !
Construction Crossing Ft.: 102.37 a
Operational Crossing Ft.: 76.87 o ��0 060
S I
ho 0..
Legend
O Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Temporary Access _ Delineated
Road Intermittent
— — H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of ,1j' Delineated PEM
QConstruction Right Delineated PFO
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Ephemeral
Approximated
Intermittent
0 W M an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
d
90
Rockingham
County
A`
x
5 �
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 20 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
s9
0
610
i
�o
0
tig0
I S90
VIA
5
MP 34.0 ------ 1-1
I =r
- � -- -- - - - -- --
------------ -----jMP'5v�
I i
---------------- _ AdjacentS eet201
- - s
S -C18-48: Eph. 610 6`1° ° 1
Con./Op. Pipeline Crossing Ft.: 0.00 ' t pyo co
Construction Crossing Ft.: 1.70 O �, r ;J,
Operational Crossing Ft.: 0.00 .-
S -C18-38: Per.
590 Con./Op. Pipeline Crossing Ft.: 32.88 0
Construction Crossing Ft.: 82.18
Construction Sq. Ft.: 2,078.77
-- Operational Sq. Ft.: 0.00 Ali - + t
640 69 • 1
S70 rl
G/ass i
610 s
0
700 00
- 550
570 4lirrp� \o
...i •' � 1 (O
c
O
590 O 5 °
590 0 580 �. 660
0 660 ^o
90 O s, _ ^ co
610 5 Sg o 560 570 650 co`Oo�N Cb o(3J co co co ho co 0
6 TO 0
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Perennial Surface
Road Water
- - H-650 Pipeline Wetlands:
- -, Operational _ Delineated Wetland
--'Workspace Boundary
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Ephemeral
_ Delineated
Ephemeral
0 W M an
lm
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
- --------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, INC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, INC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
Co4Anty
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 21 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Lto
680
670 .
•.680 �o0 0 %
6$0: ;
6i
State Rd 1979 Hamlet Rd
0
+� 680
1'
A
0 a 00
NAA"PEE-
k
-
a.
�a 1
I` YYiQ+
PPPP
�-• -�; �S:. � � 1 a' � - �; �, . * �:' •.,,�, � '., a ,�,s.:� _a"' ., •� - ,.�• -- - -
CO
S -C18-38-3: Per. 10
Con./Op. Pipeline Crossing Ft.: 23.31 6,0 r . 1P_
Construction Crossing Ft.: 87.35 _ Ap
_Construction Sq. Ft.: 1,220.29
t. Operational Sq. Ft.: 0.00_
.w
MP 35.0p�
t i
•_------------ - - - -------------------- - - - - --------------- - - - - -- J.
----------------------.-J.
W -C18-40: PEM% ^o
Con./Op. Pipeline Crossing Ft.: 0.00 co
Construction Acres: <0.01 AL
i
S-C18-53:Int. S -C18-74: Eph. S -C18-38-4: Per.
Operational Acres: 0.00 1
S -C18-38-2: Per. Con./Op. Pipeline Crossing Ft.: 2.00 Con./Op. Pipeline Crossing Ft.: 3.00 Con./Op. Pipeline Crossing Ft.: 7.50
A. Con./Op. Pipeline Crossing Ft.: 16.74 Construction Crossing Ft.: 214.88 Construction Crossing Ft.: 71.55 Construction Crossing Ft.: 60.14 1
S -C18-39: Eph. Construction Crossing Ft.: 333.02 Operational Crossing Ft.: 138.35 Operational Crossing Ft.: 59.45 Construction Sq. Ft.: 467.25
m./Op. Pipeline Crossing Ft.: 2.00 660 Construction Sq. Ft.: 3,961.44 Operational Sq. Ft.: 0.00 '
:onstruction Crossing Ft.: 107.50 Operational Sq. Ft.: 0.00 O
Operational Crossing Ft.: 71.35 6113 66 10 0 1
6) o
- 1
0
LO
6$0
620 r0 1
J RO 1
O o
6g0 0 130 S
h
700"
0
6,0
�0 110 0
0 00 c°D 000 610 0 0 660 66, c°'r oM M 0Loc0o r" o rn o N0 30 p0 �O 60 10 ^0 0 0 Mo 11
66 650 610 0 0 o (DcD d 0cD 0� 0 n ^ 1 I 1 n o n n 120
Legend
O Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Temporary Access _ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace Approximated
EDTemporary Access Intermittent
Road - Perennial Surface
Limits of Water
[::]Construction Right- Wetlands:
of -Way _ Delineated Wetland
Survey Area Boundary
L _ Adjacent Sheet 0j;4 Delineated PEM
County Boundary
Streams:
Approximated
Ephemeral
Approximated
Intermittent
® f� IM an
am
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
' = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
- --------------------------Application------------------------------------------------------------------------------
Data Sources: EDT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
..Y
x
Rockingham
9' m County _
4 �
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 22 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
_ Delineated
Intermittent
_ Delineated
Perennial
- Perennial Surface
Water
Wetlands:
_ Delineated Wetland
Boundary
0 W 0)
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
CSJ
Fr
Hata
Rockingham F`
County a. w
Harnaa„
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 23 of 107
600 Willowbrook Ln
CTRC West Chester, PA 19382
Date: May 2019
z �
760
770
o�
�Y A�
r
TA-RO-092
r
i
Mr
N- t
ter'
yo
X80
0
0
0
0
0
O
�Q
0
750 0
760 1�
790 790
rn
o \ TA-RO-093
800
S-: Per.
Con./Op. Pipelineeline Crossing Ft.: 9.94 : �,.
s 790 Construction Crossing Ft.: 72.87 � `
f Construction Sq. Ft.: 600.26
Operational Sq. Ft.: 0.00
MP 355!
o.. r o
40
r � �
%%
fff • •
r 740 r
r -
r
r W
fO
r
f _
r 760 rl M'
"il •,
750 .'� }�- .r _
Legend
O Mileposts (MP, 0.5 —Delineated Pond
mi) Approximated
_ Temporary Access Intermittent
Road - Perennial Surface
- - H-650 Pipeline Water
--,Operational Pond
L - -'Workspace Wetlands:
ED
Temporary Access —Delineated Wetland
Road Boundary
Limits of ;.; Approximated PEM
[—]Construction Right- Delineated PEM
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
—Approximated
Intermittent
_ Delineated
Perennial
® 5G�
IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
DataSources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County,a
g
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 24 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
0
0
0
0
0
c CP
860
1o
820
fR
f
o
00
o
ca
co
wo
00
LO
o
s5°
o
m
0
S�0
u2n
r
800
S-: Per.
Con./Op. Pipelineeline Crossing Ft.: 9.94 : �,.
s 790 Construction Crossing Ft.: 72.87 � `
f Construction Sq. Ft.: 600.26
Operational Sq. Ft.: 0.00
MP 355!
o.. r o
40
r � �
%%
fff • •
r 740 r
r -
r
r W
fO
r
f _
r 760 rl M'
"il •,
750 .'� }�- .r _
Legend
O Mileposts (MP, 0.5 —Delineated Pond
mi) Approximated
_ Temporary Access Intermittent
Road - Perennial Surface
- - H-650 Pipeline Water
--,Operational Pond
L - -'Workspace Wetlands:
ED
Temporary Access —Delineated Wetland
Road Boundary
Limits of ;.; Approximated PEM
[—]Construction Right- Delineated PEM
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
—Approximated
Intermittent
_ Delineated
Perennial
® 5G�
IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
DataSources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County,a
g
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 24 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5 Wetlands:
mi) _ Delineated Wetland
_ Temporary Access Boundary
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
_ Delineated
Intermittent
— Delineated Pond
Pond
® soy IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
+t
Roc ' i n g h a m
ount-y,,
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 25 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
AL
A
0
tJO
"VO
a4o
d11
�y0
800
8"
O
E
W
J
0
S -A18-94: Per. I
Con./Op. Pipeline Crossing Ft.: 3.00
Construction Crossing Ft.: 125.00 I
CD Operational Crossing Ft.: 50.10
730
.�fto.
MP -310 . I
,80
W -A18-95: PEM
Con./Op. Pipeline Crossing Ft.: 7.55
Construction Acres: 0.02
Operational Acres: 0.00
X60
770
r
Iw
It 730
17 50
140
I•
lrP�2
Legend
o Mileposts (MP, 0.5 —Delineated Pond
mi) Pond
_ Temporary Access Wetlands:
Road
Delineated Wetland
- - H-650 Pipeline —Boundary
--,Operational 0'j:4Delineated PEM
-
-'Workspace
aTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
_ Delineated
Intermittent
_ Delineated
Perennial
® f� IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�e
¢,Rockingh:am
Count
,.
y •
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 26 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5 —Delineated Pond
mi) - Perennial Surface
_ Temporary Access Water
Road Pond
- - H-650 Pipeline Wetlands:
--,Operational Delineated Wetland
-
-'Workspace — Boundary
EDTemporary Access Delineated PFO
Road
Limits of
Q Construction Right-
of-Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Delineated
Ephemeral
_ Delineated
Perennial
® soy IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
~2
Rockingham
..0 ,o u n t y
� Rd 94
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 27 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
it
CIO,
O
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Approximated
Road Perennial
- - H-650 Pipeline - Perennial Surface
--,Operational Water
-
-'Workspace Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Perennial
_ Delineated
Ephemeral
® soy
IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County
M `♦
6 ♦♦
v
4
4
FIa�4
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 28 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
0
•a
LO J
♦
3'8.0
moo,.
'o
TA-RO-103
0
r^�
0
680 690
w S -A18-1: Eph. (Temporary Access Road)
O Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 4.82
Operational Crossing Ft.: 0.00
j_f
S-A18-2: Per.
on./Op. Pipeline Crossing Ft.: 20.49
Construction Crossing Ft.: 86.73
Construction Sq. Ft.: 1,452.84
Operational Sq. Ft.: 0.00 Y
N 4'
0 730 r
6. J-
s X40
Gari �r
oil
' �6S QO o
66 ' 0
80
1 �
0
1. rn
1 `O
I 660
1
lay 690
680..
jo T,
0
W -A18-6: PEM
£, s Con./Op. Pipeline Crossing Ft.: 45.87
6 Construction Acres: 0.09
¢Q Operational Acres: 0.00
S -A18-4: Per.
Con./Op. Pipeline Crossing Ft.: 0.0
- Construction Crossing Ft.: 26.77
*. Construction Sq. Ft.: 34.90
Operational Sq. Ft.: 0.00
S -A18-9: Per.
Con./Op. Pipeline Crossing Ft.: 3.00
Construction Crossing Ft.: 122.40 \
Operational Crossing Ft.: 74.90
S -A18-4-2: Per.
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 41.47
Construction Sq. Ft.: 116.58
Operational Sq. Ft.: 0.00
1
0 1
.1
620 1
1
-
A-
-�,� MP 38.5
I -
I -
I -
I -
I
I -
- I
I -
0.y(,
W -A18-6: PFO 650
Con./Op. Pipeline Crossing Ft.: 129.65
Construction Acres: 0.15
Operational Acres: 0.08**
"!
y0
O
680
49.
r`
1�
N 4'
0 730 r
6. J-
s X40
Gari �r
oil
' �6S QO o
66 ' 0
80
1 �
0
1. rn
1 `O
I 660
1
lay 690
680..
jo T,
0
W -A18-6: PEM
£, s Con./Op. Pipeline Crossing Ft.: 45.87
6 Construction Acres: 0.09
¢Q Operational Acres: 0.00
S -A18-4: Per.
Con./Op. Pipeline Crossing Ft.: 0.0
- Construction Crossing Ft.: 26.77
*. Construction Sq. Ft.: 34.90
Operational Sq. Ft.: 0.00
S -A18-9: Per.
Con./Op. Pipeline Crossing Ft.: 3.00
Construction Crossing Ft.: 122.40 \
Operational Crossing Ft.: 74.90
S -A18-4-2: Per.
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 41.47
Construction Sq. Ft.: 116.58
Operational Sq. Ft.: 0.00
1
0 1
.1
620 1
1
-
A-
-�,� MP 38.5
I -
I -
I -
I -
I
I -
- I
I -
0.y(,
W -A18-6: PFO 650
Con./Op. Pipeline Crossing Ft.: 129.65
Construction Acres: 0.15
Operational Acres: 0.08**
"!
y0
O
W -A18-6-2: PFO
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00**
W -A18-6-3: PFO
Con./Op. Pipeline Crossing Ft.: 91.73
Construction Acres: 0.09
Operational Acres: 0.06**
Legend
o Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Perennial Surface
Road Water
- - H-650 Pipeline Wetlands:
- -, Operational _ Delineated Wetland
L - -'Workspace Boundary
ED
Temporary Access ,, je Delineated PEM
RoadDelineated PFO
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Ephemeral
Delineated
Ephemeral
® f� an
ff�l
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
DataSources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
90L
P
!;6" ,
H11 Rd
Roc king ham's
CountyyA
ey %
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 29 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
1�
i
O
00
0
rn
�
0
W -A18-6-2: PFO
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00**
W -A18-6-3: PFO
Con./Op. Pipeline Crossing Ft.: 91.73
Construction Acres: 0.09
Operational Acres: 0.06**
Legend
o Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Perennial Surface
Road Water
- - H-650 Pipeline Wetlands:
- -, Operational _ Delineated Wetland
L - -'Workspace Boundary
ED
Temporary Access ,, je Delineated PEM
RoadDelineated PFO
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Ephemeral
Delineated
Ephemeral
® f� an
ff�l
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
DataSources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
90L
P
!;6" ,
H11 Rd
Roc king ham's
CountyyA
ey %
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 29 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
66 0)rn 1 630 -
0 0 o U, P o k o
o- 0-
1
>.
Ew.
ai r
S -A18-4-2: Per. 00ir1�;�;.
Con./Op. Pipeline Crossing Ft.: 0.00 ro!
Construction Crossing Ft.: 41.47 A #
Construction Sq. Ft.: 116.58 Tj
Operational Sq. Ft.: 0.00 0
1 �
O
6�0
W -A18-6-3: PFO rn , k';•
Con./Op. Pipeline Crossing Ft.: 91.73 0
Construction Acres: 0.09
Operational Acres: 0.06**
660 0 `o [
co
}
W -A18-6: PEM °moo
7 Con./Op. Pipeline Crossing Ft.: 45.87 66(
I Construction Acres: 0.09
Operational Acres: 0.00 9 W
0
670 - TA-RO-104 =
W -A18-7-5: PEM
6 I I Con./Op. Pipeline Crossing Ft.: 16.09
1 Construction Acres: 0.04 >>'
Operational Acres: 0.00
1 11 rn 1111 St J.
ateRa7 .... ,♦ ,..
1 1 1 1 9�
MP 38.5 1�1 1
J.
M1W-A18-6-2: PFO` 1 1 1 1 1 ----
Con./Op. Pipeline Crossing Ft.: 0.00 1 1 1 1 1 1 1 1
Construction Acres: <0.01 1 1 1 1 1 1 1 1
Operational Acres: 0.00**
1 W -A18-7: PFO g
Con./Op. Pipeline Crossing Ft.: 0.00 so
Construction Acres: <0.01
Operational Acres: 0.00**
W -A18-7: PEM
Con./Op. Pipeline Crossing Ft.: 75.79 '
Construction Acres: 0.18
Operational Acres: 0.00
680
W -A18-7: PSS
01 Con./Op. Pipeline Crossing Ft.: 33.74
L0 Construction Acres: 0.08
^po Operational Acres: 0.00
W -A18-7-2: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
W -A18-7-4: PEM
Con./Op. Pipeline Crossing Ft.: 28.70
Construction Acres: 0.07
Operational Acres: 0.00
W -A18-7-3: PEM
Con./Op. Pipeline Crossing Ft.: 16.28
Construction Acres: 0.05
Operational Acres: 0.00
o�
0
0
oar.
4
S: Eph.
Con./Op. Pipelinepeline CCrossing Ft.: 2.00
Construction Crossing Ft.: 81.32
Operational Crossing Ft.: 55.24
TA-RO-106
W -A19-270: PFO
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.02
Operational Acres: <0.01 **
S -A19-269: Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 103.50
Operational Crossing Ft.: 51.62
S -A18-8: Per.
Con./Op. Pipeline Crossing Ft.: 53.13
Construction Crossing Ft.: 97.69
Construction Sq. Ft.: 3,866.09
Operational Sq. Ft.: 0.00
o° % 0�o
0
S-1318-73: Eph. r
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 7.59
Operational Crossing Ft.: 0.00
t^
OHO ,,v
t ami
lam
620 i
1:1-e: 630 640
650 1
660 k,
If
610 r
r 680
i
I
0
l �
0
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Perennial Surface
Road Water
- - H-650 Pipeline Wetlands:
- -, Operational _ Delineated Wetland
L - -'Workspace Boundary
ED
Temporary Access ,, je Delineated PEM
RoadDelineated PFO
Limits of e Delineated PSS
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Delineated
Ephemeral
_ Delineated
Intermittent
® f� IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�, 4u
Rockingham
�Couhnty
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 30 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
— Delineated Pond
- Perennial Surface
Water
M Pond
Wetlands:
--,Operational Delineated Wetland
-
-'Workspace — Boundary
Temporary Access i
ED
Road ,,:,Delineated PEM
Limits of x Delineated PFO
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
_ Delineated
Ephemeral
_ Delineated
Perennial
0 W IM an
'1141k
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
4
kill Rd
�Rn Rockingham
County
m
o — —�- —
0
w
s
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 31 of 107
600 Willowbrook Ln
CTRC West Chester, PA 19382
Date: May 2019
1
)80 C
U)
W-1318-78: PFO N
Con./Op. Pipeline Crossing Ft.: 55.99 w
Construction Acres: 0.06
'� Operational Acres: 0.03**
'� S-1318-74-2: Per.
Con./Op. Pipeline Crossing Ft.: 4.00
X0A Construction Crossing Ft.: 88.97
2-: P
60 0 , Operational Crossing Ft.: 35.86 6100
-1 750 �--
P1 '♦`
CDS,, ,, w �T- ♦♦
v
7401.
,00
1}
♦ _ -
o 00
�asp w r.
IVIP 39.5 TA-RO-108
TA-RO-107 �`' • \ 90 .
s '• J \�7p 76o
k cj \rh
x� o
Road
it
' 3 o J •\
a
a)
1g0 o O•••\
J ,
o
do
740 ��� CP o o lip
Legend
O Mileposts (MP, 0.5 Streams:
mi) _ Delineated
_ Permanent Access Intermittent
Road _ Delineated
_ Temporary Access Perennial
Road Wetlands:
- - H-650 Pipeline _ Delineated Wetland
--,Operational Boundary
L__1
Workspace Delineated PEM
QOperational Bore Delineated PFO
EDPermanent Access
Road
Temporary Access
ED Road
Limits of
[—]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
an
iiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
D
Roc king han),
C°®aunty
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 32 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
00 ♦ / -
♦
♦ /.
X10 ♦ ♦ /.
MP 4'0.0'♦♦♦
0
r-
ee '
5r- ♦
e
Paoa�
/ ♦ /� c
*
r W-1318-112: PEM 110
• Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.01 140 /
Operational Acres: 0.00
�o
S-1318-109: Eph.
Con./Op. Pipeline Crossing Ft.: 3.00
Construction Crossing Ft.: 37.28
Operational Crossing Ft.: 6.46
%60 750 ,t
�O
r'
o
co -
n -
P
^c
I50
750
'� 1p
770
S-1318-108: Per.
Con./Op. Pipeline Crossing Ft.: 26.88
Construction Crossing Ft.: 80.36
Construction Sq. Ft.: 1,676.44
Operational Sq. Ft.: 0.00
ren
^
1 W-1318-110: PFO
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.02
Operational Acres: 0.01 **
Y�n`4,.
1
1po �^p o
720
730 730
N
3 ^
S -A18-210-2: Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 60.94
Operational Crossing Ft.: 45.94
-—''�
p -----
I,
I
S -A18-210: Int. a
Con./Op. Pipeline Crossing Ft.: 0.00 Mo
Construction Crossing Ft.: 38.09
Operational Crossing Ft.: 11.88 0 .
Av
c 10 '
� O
TA-RO-111 7�y
�0 0
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Perennial Surface
Road Water
- - H-650 Pipeline Wetlands:
- -, Operational _ Delineated Wetland
--'Workspace Boundary
ED
Temporary Access ,, je Delineated PEM
RoadDelineated PFO
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
_ Delineated
Ephemeral
_ Delineated
Intermittent
® 5G�
IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
-------- -------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County
tir
dam,
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 33 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
aw.a ywae M•M
Date: May 2019
4 �
770
S-1318-108: Per.
Con./Op. Pipeline Crossing Ft.: 26.88
Construction Crossing Ft.: 80.36
Construction Sq. Ft.: 1,676.44
Operational Sq. Ft.: 0.00
ren
^
1 W-1318-110: PFO
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.02
Operational Acres: 0.01 **
Y�n`4,.
1
1po �^p o
720
730 730
N
3 ^
S -A18-210-2: Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 60.94
Operational Crossing Ft.: 45.94
-—''�
p -----
I,
I
S -A18-210: Int. a
Con./Op. Pipeline Crossing Ft.: 0.00 Mo
Construction Crossing Ft.: 38.09
Operational Crossing Ft.: 11.88 0 .
Av
c 10 '
� O
TA-RO-111 7�y
�0 0
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Perennial Surface
Road Water
- - H-650 Pipeline Wetlands:
- -, Operational _ Delineated Wetland
--'Workspace Boundary
ED
Temporary Access ,, je Delineated PEM
RoadDelineated PFO
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
_ Delineated
Ephemeral
_ Delineated
Intermittent
® 5G�
IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
-------- -------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County
tir
dam,
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 33 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
aw.a ywae M•M
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
_ Delineated
Intermittent
_ Delineated
Perennial
Wetlands:
_ Delineated Wetland
Boundary
Delineated PEM
0 W in
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rocking ham
Counfy
l
a'
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 34 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
610
600
- AN
S-1318-57: Per.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 85.96
Operational Crossing Ft.: 51.54
W-1318-55: PFO
Con./Op. Pipeline Crossing Ft.: 83.65
Construction Acres: 0.13
Operational Acres: 0.06**
10
W-1318-55: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
I ss0 w
0
I
i
I
I
i
I
I
Cl) 670
NI. M.
N,
�I
a�
QI
I 620
I
- t
640
i --
650
I
i_
660
I
I
I
I 660
I
i
S-1318-56: Per.
Con./Op. Pipeline Crossing Ft.: 39.06
Construction Crossing Ft.: 82.67
Construction Sq. Ft.: 2,708.02
Operational Sq. Ft.: 0.00
rn00 a�0
�... o A
650
S -A18-171: Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 79.02
Operational Crossing Ft.: 10.39
0",
o
650
c'o 6�?0 640
SS'O
6�0
o�
0
61
i�l►vwr;, -s o
Legend
0 Mileposts (MP, 0.5 _ Delineated
mi) Intermittent
_ Temporary Access _ Delineated
Road Perennial
- - H-650 Pipeline - Approximated
--,Operational Perennial
L - -'Workspace -Perennial Surface
EDTemporary Access Water
Road Wetlands:
Limits of _ Delineated Wetland
QConstruction Right- Boundary
of -Way ,Approximated PFO
^Survey Area Oj: Delineated PEM
L _ Adjacent Sheet Delineated PFO
C1 County Boundary
Streams:
Approximated
Perennial
_ Delineated
Ephemeral
® 5G�
IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--- --n--e--M--a--p-,--T--R--C-,--U--S--G--S
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
rc
A Rockingham
County
hMW
aMA3!71
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 35 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
s0
660
W -A19-277: PEM (Ground Bed) j e6
Con./0p. Pipeline Crossing Ft.: 0.00 O
680 Construction Acres: 0.02
670 Operational Acres: 0.00
US qwy 29
�" r�� — 670 US Hwy 29
y i
i
� I1.
640 1
A
i,
' Ir
i'
�.
_Adjacent Sheet
- AZO
ry;
• — � _,nes. �� _ �
goo
1 1840
�o
4 -
1840
>,o
680
670
660
640
s
730
�O
°' l50 -rxST?
M _
760
'189
770
RR
��
0
700
r0
s
�
O
670
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
--,Operational
L - -'Workspace
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
L_-1 County Boundary
Streams:
Wetlands:
_ Delineated Wetland
Boundary
Oj;� Delineated PEM
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------------------------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
w aha•ee• sn
! '6
Rockingham p1�;
County,
x
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 36 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
Wropo
f
rye
r
Ll r �.
)70 ,
690 �0
6i0,
660
0
goo
1 1840
�o
4 -
1840
>,o
680
670
660
640
s
730
�O
°' l50 -rxST?
M _
760
'189
770
RR
��
0
700
r0
s
�
O
670
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
--,Operational
L - -'Workspace
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
L_-1 County Boundary
Streams:
Wetlands:
_ Delineated Wetland
Boundary
Oj;� Delineated PEM
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------------------------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
w aha•ee• sn
! '6
Rockingham p1�;
County,
x
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 36 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
ti 640 630 660 680
Sso 60 690
-Q
r• U o State Rd 2580
(0 S -B18-45: Eph. 6>
Con./Op. Pipeline Crossing Ft.: 0.00 O
;• wr Construction Crossing Ft.: 34.47 AS,
�U��/ Operational Crossing Ft.: 29.25
PA-RO-113A
♦ `♦ M P 41.5 Q a> ? .; 680
O .X ..
� o
♦♦ r� o 0 0 -
� � rn
%% �, o o 6j0 0
`♦ / C° W -B18-46: PFO
rn
♦♦ �" 6� 6r, Con./Op. Pipeline Crossing Ft.: 5.85 0
♦ Construction Acres: 0.02
Operational Acres: 0.01 ** o
♦r" �
♦ S -B18-44: Int. _ `:-
`♦-- Con./Op. Pipeline Crossing Ft.: 3.00 '
♦ _ _ _ _ _ - -- Construction Crossing Ft.: 80.28
f - - - - - - - Operational Crossing Ft.: 42.57 _
o 650 :.
r W -B18-43: PEM (Permanent Access Road) 00 �
� Con./Op. Pipeline Crossing Ft.: 0.00
It=i. Construction Acres: <0.01
Operational Acres: 0.00
AS -B18-44: Int.
Adjacent S eet 3 — — ♦ / -
�
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 57.90
Operational Crossing Ft.: 0.00 3 i
_ _
(4 V) I i
11� o 1 1160
W -B18-43-2: PEM (Permanent Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.02
♦ '`� 630 Operational Acres: 0.00
0 690 �
S -B18-42: Int. (Permanent Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
♦ Construction Crossing Ft.: 13.17
o I `♦ TA-RO-113 Operational Crossing Ft.: 13.17
�^
I
W -A19-277: PEM (Ground Bed) I
Con./Op. Pipeline Crossing Ft.: 0.00 `♦
Construction Acres: 0.02
Operational Acres: 0.00
I `♦
I `
ITO
`'O I
L
S -B18-41: Per. - -
Con./Op. Pipeline Crossing Ft.: 19.47
Construction Crossing Ft.: 83.90
Construction Sq. Ft.: 1,619.40
Operational Sq. Ft.: 0.00
V.
r
X20
680 'qPw't
690
700
o
gib'• ...
e -a .MO
690
Legend
Mileposts (MP, 0.5
O
mi)
_Approximated
Intermittent
_ Permanent Access
_Approximated
Road
Perennial
Temporary Access
Delineated
_
Road
_
Ephemeral
- - H-650 Pipeline
_ Delineated
--,Operational
Intermittent
- -'Workspace
Delineated
a Permanent Access
_
Perennial
Road
- Approximated
Temporary Access
ED
Perennial
Road
- Perennial Surface
Limits of
Water
[::]Construction Right-
Wetlands:
of -Way
Delineated Wetland
Survey Area
_
Boundary
L _ Adjacent Sheet
Delineated PEM
C—! County Boundary
� Delineated PFO
Streams:
0 W in
412
Note: am
March 2019 Workspace
1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review
Per DWR# 20181638
Major Variance Application
-------- sources:Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
s
.� Rokingham
County
�foe
w.y rq
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 37 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
720_ `� :...... , ....
-ACJo Li
X20
1Zo
710
Legend
O Mileposts (MP, 0.5 _Approximated
mi) Ephemeral
_ Permanent Access _ Delineated
Road Ephemeral
_ Temporary Access _ Delineated
_ Road Perennial
H-650 Pipeline Wetlands:
---,Operational _Delineated Wetland
'Workspace Boundary
L�3Permanent Access
Road
EDTemporary Access
Road
Limits of
[::]Construction Right-
_ of -Way
Survey Area
L _ Adjacent Sheet
C—! County Boundary
Streams:
® soy r1� an
iiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
DataSources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County ,
•
i
�p
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 38 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
. I
.,alp. -
• \ - .'yam. =
i=i
�.
Si• t��.!'..
'�
•
•
'
!•L
-sir Y. e . �''
- _
f✓ •
'''.!�.
�.' �` " _ a �,�.'1 r
`AML''_
�•.'kY♦• 1
\\ •�°°••r'•' ' N ';}�•=_
_ _ _ _ -
•jig. -"w.'.
'7...•
•. s
- -- - $• ��
Ir '-��i1 :-
�p '$' •'I
Tia' S5'' %��,
Poe k
4
•---
It','
• I
kk
1'.
k k'
_
ljil , . _ ,.
'
- ; .SIF ' ,�tti 1�� � -'1k:=
••j,
f
{
- ; [• �
:' y
`Y 'Sti
-
it __ ••Y
•
,
'rIs _' 1 II 1• 1 1 11"
^T_
:a,
I
-",;,
f ..
•
— 1 .mak 'If
I -
1 1 1 1
x,, } `I
� 'r
-
1
- _-.•
II- 1 1 1
r
_ F'i
_-i."'.�'`�. ti+,A �r�l.� l ';
,. 1• '-
-
'1?f •, `. `` _
i�Lk
F �•
- •' �a,P,`�; :1:
G •\ \
:� '''f'','
-
11'f
.,S'i • �`
720_ `� :...... , ....
-ACJo Li
X20
1Zo
710
Legend
O Mileposts (MP, 0.5 _Approximated
mi) Ephemeral
_ Permanent Access _ Delineated
Road Ephemeral
_ Temporary Access _ Delineated
_ Road Perennial
H-650 Pipeline Wetlands:
---,Operational _Delineated Wetland
'Workspace Boundary
L�3Permanent Access
Road
EDTemporary Access
Road
Limits of
[::]Construction Right-
_ of -Way
Survey Area
L _ Adjacent Sheet
C—! County Boundary
Streams:
® soy r1� an
iiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
DataSources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County ,
•
i
�p
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 38 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
- Perennial Surface
Water
Wetlands:
_ Delineated Wetland
Boundary
Delineated PEM
0 W 0)
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
♦yCJy��J �
Cl�•J c` -
Rockinyham
p County
tia
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 39 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
I
/
590 +
s Dr
i"
600
) kt
o
C� k o
do
""660 - y 6
•,,. 70
6-90 6
� o 0
� oh 660 00.
630
ori• t_
I?
_ w
f
00 S -A18-105: Per.
Pipeline Crossing Ft.: 53.47
io Construction Crossing Ft.: 181.80
Construction Sq. Ft.: 2,619.61
'Operational Sq. Ft.: 0.00
.� �.
MP143.5
100 � ♦ I
TA-RO-117
w
co
� 6
o S -C18-80: Per. 0C
Con./Op. Pipeline Crossing Ft.: 4.00
S -A18-176: Per. Construction Crossing Ft.: 77.19
Con./Op. Pipeline Crossing Ft.: 25.85 °� Operational Crossing Ft.: 30.59
Construction Crossing Ft.: 88.63
Construction Sq. Ft.: 1,786.81 A
Operational Sq. Ft.: 0.00 a +�
S -A18-181: Per. '
Con./Op. Pipeline Crossing Ft.: 2.00 OP
Construction Crossing Ft.: 111.80 ' o
Operational Crossing Ft.: 79.32 - -
- cD
•.: opo
O
650
660
6jo
Ego
•.hee�A
Legend
O Mileposts (MP, 0.5 Wetlands:
mi) _ Delineated Wetland
_ Temporary Access Boundary
Road �j: Delineated PEM
— — H-650 Pipeline ><-> Delineated PFO
--,Operational
L - -'Workspace
EDTemporary Access
Road
Limits of
[:]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
_ Delineated
Perennial
Perennial Surface
Water
an
iiiia
ff�l
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------------------------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
,County ,
c,
a$
f °c
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 40 of 107
CD
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Approximated
Road Perennial
- - H-650 Pipeline - Perennial Surface
--,Operational Water
-
-'Workspace Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of ,1j' Delineated PEM
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Perennial
_ Delineated
Ephemeral
an
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
114y
w
Rockingham
County
s
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 41 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
S -A18-105: Per.
�_ t
Uon./Up. Pipeline l;rosslng Ft.: 4.UU
Construction Crossing Ft. : 85.27
690
! 'i
Con./Op. Pipeline Crossing Ft.: 53.47
Operational Crossing Ft.: 55.45
4"
1
Construction Crossing Ft.: 181.80
Construction Sq. Ft.: 2,619.61
-
Operational Sq. Ft.: 0.00
oo
1p
00 00
00
7o.
640 rn
o
♦ �'
♦ ,�
g
620
-
f
S -C18-80: Per.
S -A18-102: Per..
Con./Op. Pipeline Crossing Ft.: 3.00
'
o
Con./Op. Pipeline Crossing Ft.: 4.00 610
Construction Crossing Ft.: 112.45
620 6
�'o
�,
Construction Crossing Ft.: 77.19 610 :=-
Operational Crossing Ft.: 30.59 ado
Operational Crossing Ft.: 83.67
610
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Approximated
Road Perennial
- - H-650 Pipeline - Perennial Surface
--,Operational Water
-
-'Workspace Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of ,1j' Delineated PEM
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Perennial
_ Delineated
Ephemeral
an
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
114y
w
Rockingham
County
s
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 41 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Mlff
...............
P 11
S -A18-226: Eph.
W';•
U
770
t66 ' ho O '
6 6q0 6g0 6 O : ^o 0o co Mm'c •0. o .. o > 750
66 SO O 680 0 0 0 0 0 r, X10 0 o s0
0
Legend
O Mileposts (MP, 0.5 —Delineated Pond
mi) Pond
- - H-650 Pipeline Wetlands:
--,Operational Delineated Wetland
L - -'Workspace — Boundary
Limits of 0'j:t Delineated PEM
[::]Construction Right
of -Way
Survey Area
L _ Adjacent Sheet
L__. County Boundary
Streams:
Approximated
Ephemeral
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
® W 0 an
Note: 11
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
a,
Iy -
F�bckingham r"°"R°
County
r°
Mountain Valley
PIPELINE-LLc
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 42 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
""""'°'""•o-"' Date: May 2019
Construction Crossing Ft.: 78.69
Operational Crossing Ft.: 52.54
•.
• !r
r
' 1,
••Orr
•
alp,,. . ��__�I'.`:;
-
; -
■ �
_ ' �•,'1`• 1 i•S•�,�! .r ,r•-
_
-
:Gt' -. ..
- _
y, 1 �•__ `►1 fir.:: �_z.r
'-�•,'1
;,_•
-.-'Y,+w`�~`
"'''
--- ------
,
'-------
M1 1
Y
tJAe: �_ d'.`•t
w ,�_ - _- - �•y •rte
.i '.-•mac •;:.a�°•'-�----__.-.. �'i tai.:
�..— �_ - �-- -�;.A 114 _ -~ii
`•a 1° /.�4
5'_ ��•'
r ..
___ -
rll�a••�
-i'
- '`rte - __ - It ,•+-;'••!fir
�
_ _ _ � �'°: '�i' �`� ��•'�'}. tir7, 1 ''��. �j� .'f:e
�/IJ _
'I'
- -CJs-r,.$i•• 'ir J
1 •I.•
-.1.4t`•�.
r. !I •t `S .'' d - X14 �. f a
p'`
'Im_I
ell - - 11 1',' %%
'--
1
•1 + '• F ••
1 I I' i -
_ _
`o .
•, �;; "r
,'
...-Ir �.n r+fr .:,. .:�. _ .3-. -.'•
4 .. r,i,c •
r _
1 II 1.• 1 ��
-
_
P i 1 ii �lr„••, 'y1`N•° %• _
_.
` -
:/r ._ al'--.:
11
.:¢.fir -
Conztruction Crossing Ft.: 90.63_-_
' _ , _
kk
'`.ice•'•
W.
y---------
d N. i'� X115
II- 11
Crossing
..
------
1 i
__-�-- 11 '-
�.' •
kk
,•1
r="-"•'''
Srl3kk
s
-_- -- _ -'e �'•
-
ri'
---
,kkf=•
_
%r•'
41 4 11' Ir
IV V �4;'t' ' Ir �1! __ __ _.
IF' S, y
-
- _ ___
�__ __- �^
`111
IIF _ •
_
11 k
Pi
'11•'
rA '
I'
r' Ir' L' 11
_ I
111'
Y'I ''I• - -
--
t
r ,i r� •
•• _
•S-
T. uil
11 .•.yrs
-
_
�~•N --
- _
_ -
•'
'•p:
-
^` � ,'{ - '� ^
- •i�
- .,11 • '.'t • ' J'' '1' • 41 'll
''y-
der
•1..i.'i�',� - •err l' pis - __
• 11
-'7 n
_g
_ ,n 1 1,11 !-! -e --- ['. �R � - -
1 it -
•r�
� 1 ..tv it �� • • =•r'= -
r.. 'il '
- �s"''-.
_ -_ _ _ -
- -
-
-
1'IF', :'�' . 1 •11.
�`� • •'S , - - ;I,Iy
�' �� n. ,Ir llr• 4 '
' • _ •' �J+'I r 4r 1'S4r , 111 •'
1 ••�r
"
Ill 1'1 y 1
1
t66 ' ho O '
6 6q0 6g0 6 O : ^o 0o co Mm'c •0. o .. o > 750
66 SO O 680 0 0 0 0 0 r, X10 0 o s0
0
Legend
O Mileposts (MP, 0.5 —Delineated Pond
mi) Pond
- - H-650 Pipeline Wetlands:
--,Operational Delineated Wetland
L - -'Workspace — Boundary
Limits of 0'j:t Delineated PEM
[::]Construction Right
of -Way
Survey Area
L _ Adjacent Sheet
L__. County Boundary
Streams:
Approximated
Ephemeral
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
® W 0 an
Note: 11
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
a,
Iy -
F�bckingham r"°"R°
County
r°
Mountain Valley
PIPELINE-LLc
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 42 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
""""'°'""•o-"' Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Permanent Access
Road
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
aPermanent Access
Road
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Wetlands:
_ Delineated Wetland
Boundary
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�i
i
�0
Rockingham
County
b
2
E
8
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 43 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
i_ �- -' 55.1j 5-.-• Vie; _- ,_.. p•.c.' 'I � ':— •_ - _ •-•s� - -•
1 ,�• N._`y :+rte - _ .•� r*r r- f�.
-fy - /moi. t'-,:<<• 4__', _ _ �.t-„•.•x ,1,a 11`.•. Z'
,4 ..%;
'�7'• •1 �/.•e��•-- �� • - _ y" rYw 1' 11, }� •.Yti.Sr-•:i� Y. -:t.
•fS �; - -• .,yam • S.'`}. sRj •.� _ Y+..
r' k� '1��`�+� • i ice. 4 :+'ef'1 +:?: 1 _ �.
Yp
• � r',s 4r `� ' arT,y ,. r -ori,' ',I] •r'h, VV{`: r'•''.. ". .'•� •; ' \,i s --
,I •f l .1i; .•:r i`i'i 'S'''15'•1 'i•°}-
'PP; ? ;fir ;
- - -- _ _ �M.1, 1...:�1�5• _ .j^r;
'�!a. „F, ,,S 41 •-fir' - '41 '� IW ill'' '___ I.?�''' rya
`ice'• i.Y_:. _ -
11
- I; 111 1
'1•
z 'A
1 F --
`� : - -
- - rr Ir
�' �.4� - - - ,'r' - -_ __. _ 1 II 11• 1 1 111 __ �c', •;�-_-__--
i1 _ •fes - _ �:U' -
Construction Crossing _'✓{•�'- °'.� ---
-- _ _ Y• - - _s- _J--
Operational 1 1 111 _ -y:• rte-. �-• ryl [I�`__'••'
_��_.--ter-•ti _ - - _ .sem •'43` •" _ s`e _ -Y.--- s_' -- - � - _ - - ..,+-
IZ
- - - ':l� _ -1 Vii'',' ,•�:: ♦'• � '• "Y_ 'rp" '7 -
44
�'r � t i __•F•;fr •rery � _ - _ - � 1 _ -iia' • _ - -_- r
�� •a'1'_• _ _ _ 'f' •'�� --' �;a Ski .. moi.'
-
_ _ _ _ . ,Iw - ; i ' 3Li" � -� •i e'� i e' r • ' �s n i�fi.. j
�f�• fd irr. F'R't1.Ix�-�. - . T Y•. _ lx..• .tiF.;!'Yl'.S -•
i r/i �_,F. i•;i"- af.•I+Y s'
I�r_� r• .r .� I �Y .� -
��- -- _ � '.r ra � _ 'r'�'� __ - -i --ti?i - - _1-- ��._ •'�- �'•'/,':1�"�
1318-71: Per.
'Pi Pl • 1 1
m k' Construction Crossing Ft.: 97.13
vp
' II ' ''I•i11.' . Construction 1
111 '1 `'• v,lf'P --- '1� II• 1 1 11119
_ - '•• • y$.�• 1• __ iii, _.
_ }',7d:. _ _ "' - - r•� ��. ' . .z : ,•fit : c_ •
�'S - �___ _ °,! _ 'iZ• _•)i••s •fir,•. N•r'. / ••,YS'� - �.'�--+�N.,,
1-. _____• Ip, _.__ - �}, .may"' i� _'wr _ r� ti �••SI •• ,
;1 Yip','
r'
�+� ' 1
'��-
-- :r•- _ - 111. - ,'la , - I, - • '. 2�•�•„'
'1
- yr
r.
_ 1
4 I
- ',rl`'r • � j l '
- ' L
•<r== ' J
:y.l -
•y-;.�`�
i
YI
n• _ i�I -
'Y+-
I
1 f
�
_s.
P PP
Y _ 4
Y k' • LP P kt
•[ a.
- - •'I - - r!. �. .ys 1 1'I ii"'' i'lll '•' - 1� � t . ; ,
rt t.
/ P'i.'1
-
:;tP P:::::��1::::; �:•=:-:•:=::----=_ -_��� .... . .
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
Approximated
Intermittent
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
Wetlands:
_ Delineated Wetland
Boundary
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County
46
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 45 of 107
600 Willowbrook Ln
CTRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
—Approximated
Intermittent
—Approximated Pond
Delineated
— Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
Approximated Pond
Wetlands:
_ Delineated Wetland
Boundary
C-15� Delineated PSS
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
46
Rockingham
County
I
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 46 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
- - H-650 Pipeline
- Perennial Surface
Water
Wetlands:
- -, Operational _ Delineated Wetland
--'Workspace Boundary
EDTemporary Access � Delineated PFO
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
1 lCounty Boundary
Streams:
_ Delineated
Intermittent
_ Delineated
Perennial
- Intermittent Surface
Water
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Ar•a�w,�..�
,•I
i
Rockingham
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 47 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
-_=4�:� _ - ----- ,� _�y;,w.- �.yt•• •r_�* -�. ..r_$xY- - =.1, ,� _ ',.d. `tip' lel. - 'h :', -
••a•-=,..-1�`• --
--
+vNL
—
. Z, Li • - •C_ ='�, �'i' ii,i ^SZ c=Y:� _ y.l , '�`'7 ;; Ir 1'1''-- y'•�s
yt. ,
r -
.yF
r
_ - 1
xi.• -
1
ru
. _].\'+°•.tea• - _ - 'k,1 -o _ ,__.� a±r:- - `�i; •'� �+.f._=- ]..%;.�'.
_ - 4 . as _ i�.• i :r. ' - _ - •, - _ y, :.r.,' k --,P
I+r - •'i_
i':v' -P
ki' - r-. • ,., AHI •!f�`
':°SFr- _�.'• ":'[ •;r,`•'� ` ':�• - ,•- - I1'�:x Y�r Piy'-
JI 1
-_7. ^•1-' _ �a,�, - •={--�-" --- -_ -:i- - - - - ;1^+, ,1,
- -P k
\. o
s
_t
i•
r u
i '
-
_ ,,
i
- 1 V
- r
I'- 11' • SC
•r`rll' i
�,__ ,S
Ir �.
`9
"Y] 7 .'.-e ice.`--_• -
ti3--
.ca a
- .f
+,1�`'� .•.y ra„�` e• . �•,IT r ..r. 'Iir 1'-
'• i 1, i Ir 1.val _ .y-� , iC: ..e , 1 I 1 ' 1 • , 1 1 1 1 ” JY• • I ,
ii•.,,+•i_ f, 1� 'II'1. ,'1'' ''r', NR' ` Construction Crossing Ft.: 216.49°1�t ' ' �b y •r .. �..
P P.
kkk
P.
,�,' ,I r y'�i} �!r _ _ �, a • ,' Operational r�; , ; 1 •�qa'' 3
k.
xi
rH''A'Se l+:•1'' yam•, •1: �i -�H, -•@_• ys`• '�(T' I- -Yt I ` - - ''I�r �1 C Yrl ?$'..
','''
1 _ "'c ,'Ss•�a3' " �• _-- - ��• .4 +_ .2.',-1.`.r4 i•- Construction,51 1Ft
, 1
' 'll
'; ': Ai •b.'y 5` 1. t !',ti sy_ r: _:' -_ti `' -.,y Wit'' ti -+i^ •` '+',';"1'{,1,f'+' .: I'' r Operational Cr1 1
'i I• e, - -
�;,
Y -
T r
_1
e-}�
a. - i
1 „r
,r .,I
.s r 'IJ / - - •J'
I VF+'
• 1 1 , _ l i�
•1 11 '{ '�'•'
11 1
1
".1
- AI
•t� Tt"' - y '�
5'
1 y
Irl v, 1I
f
n+ -
1.,, itis i ,
e -
n
kk
j
h
It -:�_ Irl
y •'1' :il - - I 1
_� '•sr r ns.
e
• 1''r
}L - l
r•r}1 '
- _ ori
+
Ili,' �4. _ r-• `'II i i::'•`, '�' try i;�`; .ISI
•.li - ''If
r
' P '
- ie� Ili■ I'
' 1. s -ir••- •'•� III; ,` i",�•'.
- ,
ti •
z• v.
P � Ty Il
•r— y,' @�•l� T�', ',,, art _ - �' _ rayl �J 1 ' �" - r'i',.�•� •; i','
-14
a
1 •1 • 1
,yIkk.,k
•c' 'i .•1•
•`gip--�:l�+ _ '.;_— ,•1, `,P•il •e 11, -J"• - _- - 1-T, '1 +1'r '•'•r '''+ -
Ilk
-4y� r•i ,.11•
•�:+ •.� ,.tea. - , I �'��r '�'�r••`. .
■�
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C1 County Boundary
Streams:
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
- Perennial Surface
Water
Wetlands:
_ Delineated Wetland
Boundary
0 W C) an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
I 1w`
I.1
t Sim Na'+se Rd
$ea
Rockingham
C o u n t y
.y
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 49 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
Iree 1emn
I
4
760
ryo
v
47
a...
_>00 Sheet 51
j to ...
w
\ f o
0
goo
f W -A18-62: PSS
} Con./Op. Pipeline Crossing Ft.: 39.55
' Construction Acres: 0.11
i Operational Acres: 0.00
h�
� TA-RO-133
0
W-1318-139: PFO
I Con./Op. Pipeline Crossing Ft.: 24.40
` f Construction Acres: 0.03 Buffer Zone Impacts:
Operational Acres: 0.02** Zone 1 Construction Sq. Ft.: 0.00
\ ° Zone 1 Operational Sq. Ft.: 0.00
- 13 Zone 2 Construction Sq. Ft.: 101.73
.' Zone 2 Operational Sq. Ft.: 0.00
-----t-' -�--
4815
- O-
�; �•;:.
-
.'� i \ Tersiry��ri -
PP
° Ln
\ ov
n
0
rn
Legend
O Mileposts (MP, 0.5 Approximated Pond
mi) Pond
_ Temporary Access Wetlands:
Road Delineated Wetland
- - H-650 Pipeline —Boundary
--,Operational 0'j:4Delineated PEM
L - -'Workspace
V Delineated PFO
Temporary Access ED
Road moo' Delineated PSS
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
—Approximated Pond
— Delineated Pond
® soy
IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
s'r
rea niLri 6k.,
�R� o c kip n g h a m
y C0anty
N,
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 50 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
40 •.
.
Iree 1emn
I
4
760
ryo
v
47
a...
_>00 Sheet 51
j to ...
w
\ f o
0
goo
f W -A18-62: PSS
} Con./Op. Pipeline Crossing Ft.: 39.55
' Construction Acres: 0.11
i Operational Acres: 0.00
h�
� TA-RO-133
0
W-1318-139: PFO
I Con./Op. Pipeline Crossing Ft.: 24.40
` f Construction Acres: 0.03 Buffer Zone Impacts:
Operational Acres: 0.02** Zone 1 Construction Sq. Ft.: 0.00
\ ° Zone 1 Operational Sq. Ft.: 0.00
- 13 Zone 2 Construction Sq. Ft.: 101.73
.' Zone 2 Operational Sq. Ft.: 0.00
-----t-' -�--
4815
- O-
�; �•;:.
-
.'� i \ Tersiry��ri -
PP
° Ln
\ ov
n
0
rn
Legend
O Mileposts (MP, 0.5 Approximated Pond
mi) Pond
_ Temporary Access Wetlands:
Road Delineated Wetland
- - H-650 Pipeline —Boundary
--,Operational 0'j:4Delineated PEM
L - -'Workspace
V Delineated PFO
Temporary Access ED
Road moo' Delineated PSS
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
—Approximated Pond
— Delineated Pond
® soy
IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
s'r
rea niLri 6k.,
�R� o c kip n g h a m
y C0anty
N,
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 50 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
TA-RO-133
Oo
o ,`o
0
M
°
13 Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 0.00
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 101.73
Zone 2 Operational Sq. Ft.: 0.00
o
MP`48.5
4/7
mon `
W-1318-139: PFO
o Con./Op. Pipeline Crossing Ft.: 24.40
Construction Acres: 0.03
Operational Acres: 0.02**
n
W -A18-62: PSS L'?
Con./Op. Pipeline Crossing Ft.: 39.55 b '
Construction Acres: 0.11
Operational Acres: 0.00
700
Impact 1 VAR:
Zone 1 Construction Sq. Ft.: 5,224.94
C5 Zone 1 Operational Sq. Ft.: 3,276.62
^° Zone 2 Construction Sq. Ft.: 3,343.91
�,�,� Zone 2 Operational Sq. Ft.: 2,241.31
S -A18-60: Per.**
Con./Op. Pipeline Crossing Ft.: 4.00
Construction Crossing Ft.: 87.80
Operational Crossing Ft.: 11.13
.
. - ra
rn
Co
0
� I
6 f 740
O '
I
X30
00 ,2o
730
I
1
&gemMft
co !� 1
o
W -A18-62-2: PSS r r J,
Con./Op. Pipeline Crossing Ft.: 0.00oi
r r
Construction Acres: <0.01
Operational Acres: 0.00 r'
��. I
W -A18-61: PEM U,
Con./Op. Pipeline Crossing Ft.: 0.85; .� .
Construction Acres: 0.01 '
Operational Acres: 0.00 . la
,3
f(D
�' TA-RO-134
` . I
e
i
1
I
I
I
1
I
Legend
O Mileposts (MP, 0.5
—Delineated
mi)
Perennial
_ Temporary Access
M Approximated Pond
Road
Wetlands:
- - H-650 Pipeline
Delineated Wetland
--,Operational
_
Boundary
L - -'Workspace
_10j Delineated PEM
QTemporary Access
> Delineated PFO
Road
Delineated PSS
Limits of
[::]Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[:]County Boundary
QJordan Lake
Watershed
Streams:
—Approximated Pond
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
p�easartlt
ws
/' , Canty Llrt
Rockingham
County
y"
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 51 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
4
i
I
I
720 I
I
I
I
.�
i MP 49:0'
o00000.00000. _ 00000I O'
'
��
-a
Nz�'O'�
6 �r•' Yirs., '
Ll
rn
TA-RO-135
S -A18-55: Per.
4' Con./Op. Pipeline Crossing Ft.: 3.00 1
x�
Construction Crossing Ft.: 79.71 1.
Operational Crossing Ft.: 52.61
J _ 1/
1
i
mm1
111 _ 1
111
-5; �r f r r ` �, Buffer Zone Impacts:'-
Zone 1 Construction Sq. Ft.: 4,742.47
r f Zone 1 Operational Sq. Ft.: 3,166.66
Zone 2 Construction Sq. Ft.: 3,173.28
e� f Zone 2 Operational Sq. Ft.: 2,114.23
"Al
/
X//r
Jr
+r. -r
0
M
730 o }
- 1
730
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Intermittent
_ Temporary Access _ Delineated
Road Perennial
- - H-650 Pipeline Wetlands:
- -, Operational _ Delineated Wetland
--'Workspace Boundary
=Temporary Access Delineated PEM
Road
Limits of
=Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[:]County Boundary
=Jordan Lake
Watershed
Streams:
Approximated
Perennial?
® f� aniiiia
`
l�
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
----------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
cRa .
Rockingha>fn
y a Lin,
Count.
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 52 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
QTemporary Access
Road
Limits of
[::]Construction Right
of -Way
Q Survey Area
L _ Adjacent Sheet
F-iCounty Boundary
QJordan Lake
Watershed
Streams:
Approximated
Intermittent
Approximated
Perennial
_ Delineated
Intermittent
_ Delineated
Perennial
Wetlands:
_ Delineated Wetland
Boundary
QApproximated PEM
QApproximated PFO
,�j; Delineated PEM
VrN, Delineated PFO
0 W 0)
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rocki`Ty ['`hbm
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 53 of 107
600 Willowbrook Ln
CTRC West Chester, PA 19382
Date: May 2019
I
770 !
I
9p k�
t rJ )SO I +
I'
730
I _ _ i o.
1 I
I
Lo !
ail - X20
�d S -A18-244: Per. - W-1318-140: PEM
AS -A18-182 / S -A18-182: Int. Con./Op. Pipeline Crossing Ft.: 3.00 Con./Op. Pipeline Crossing Ft.: 0.00
v Con./Op. Pipeline Crossing Ft.: 1.00 Construction Crossing Ft.: 49.43 Construction Acres: <0.01
Construction Crossing Ft.: 81.31 7 - Operational Crossing Ft.: 43.43 i
Operational Acres: 0.00
a Ope� nal Crossing Ft.: 59.78
¢I
I
- -0— - — — - — —_-
--- ----f --------------------------------------------------------------
_
----,-;.s- - MP -50:0---- - -! _ ---------------------------- T---------
1
720 � •eyw Buffer Zone Impacts: ' e
U
'c -`C` Zone 1 Construction Sq. Ft.: 1,442.44 iiF
70 Gyt`� Zone 1 Operational Sq. Ft.: 0.00 la
a. Zone 2 Construction Sq. Ft.: 1,179.76
Zone 2 Operational Sq. Ft.: 0.00 '
l �• 6 � i
r TA-RO-139 90
t:. '•Z%
r• I
r S -C18-71: Eph. (Temporary Access Road)
6Q Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 2.05
�.J Operational Crossing Ft.: 0.00 7
�. 70
700 �• a I
Q)
Legend
O Mileposts (MP, 0.5 _Approximated
mi) Intermittent
—Temporary Access _Approximated
Road Perennial
- - H-650 Pipeline _ Delineated
--,Operational Ephemeral
L - -'Workspace _ Delineated
aTemporary Access Intermittent
Road _ Delineated
Limits of Perennial
QConstruction Right- Perennial Surface
of -Way Water
Survey Area Wetlands:
L _ Adjacent Sheet _ Delineated Wetland
County Boundary Boundary
Jordan Lake 0i:� Delineated PEM
Watershed
Streams:
_Approximated
Ephemeral
0 W IM
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
- -----------------EQ---- sR-I------------Map-,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
G R
a ,Ro,.ckingham
County
c+
A�
s�
s�
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 54 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
�o
{ Rp Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 1,442.44
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,179.76
Zone 2 Operational Sq. Ft.: 0.00
j
0
ti o
>o
.. +. ,
S -C18-71: Eph. (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
\ Construction Crossing Ft.: 2.05
m • \ Operational Crossing Ft.: 0.00
aX20
rn >>0 6g0
d .\
Buffer Zone Impacts: \
Zone 1 Construction Sq. Ft.: 922.95 ♦ • ti 700
3 Zone 1 Operational Sq. Ft.: 0.00
o Zone 2 Construction Sq. Ft.: 1,314.71
760 TA-RO-139 \
Zone 2 Operational Sq. Ft.: 0.00 \ ,/o
\ JO
�/Cdil7W •, \
750
_>g0
730
Legend
o Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Perennial Surface
Road Water
ED
Temporary Access Wetlands:
Road _ Delineated Wetland
Limits of Boundary
[::]Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[County Boundary
aJordan Lake
Watershed
Streams:
Approximated
Ephemeral
_ Delineated
Ephemeral
® 5G�
IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
- --------------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
COD
,
Rockingham
County ♦yn
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 55 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
0
•a
750
_>g0
730
Legend
o Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access - Perennial Surface
Road Water
ED
Temporary Access Wetlands:
Road _ Delineated Wetland
Limits of Boundary
[::]Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[County Boundary
aJordan Lake
Watershed
Streams:
Approximated
Ephemeral
_ Delineated
Ephemeral
® 5G�
IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
- --------------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
COD
,
Rockingham
County ♦yn
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 55 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
- - H-650 Pipeline
--,Operational
-
-'Workspace
Limits of
=Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
=County Boundary
=Jordan Lake
Watershed
Streams:
Approximated
Perennial
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
- Approximated
Perennial
Perennial Surface
Water
Approx_SS_Impact
Wetlands:
_ Delineated Wetland
Boundary
Oj' ,Delineated PEM
0 5n in
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
(:ounly L+ne RV `� k
foccingham
County
-ter- ' - - - -- -- --}- .
G
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 56 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
- - H-650 Pipeline
--,Operational
-
-'Workspace
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
E_1 County Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Perennial
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
— Delineated Pond
M Pond
Wetlands:
_ Delineated Wetland
Boundary
® Approximated PSS
,10j' Delineated PEM
Delineated PFO
!w, Delineated PSS
0 5n in an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Ih
CasWe] I
County
Rockingham
County
,i
i
i
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 57 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
r0•
0
00
co
6Rf)
6g0
"0'1^0
0
'
730
^moo
+�
5�
'
so
O
0
—
�O
- — - —
Zone 2 Construction Sq. Ft.: 3,372.62
i
Zone 2 Operational Sq. Ft.: 1,927.76
I
!
I
X30
------- -------------------------------------------------------------
----- - -- - o--- ------------------------------------------ -----
MP51.5 -' --------------------------------•------------------------------------- - - - - -
I
I JP
I
720 a 4
TA-RO-141
a`
W -C18-20: PFO
Con./Op. Pipeline Crossing Ft.: 15.54
Construction Acres: 0.05
Operational Acres: 0.02**
r-I«`�v�� ;;;R99 o i
CA 69� TA-RO-140
691 I
U,
a� I
QI I `�-1'o
i I
i � !
I o -
I I
1 I
I
I I
-- —- — -I o 1,313 I
�V0 �JS'3 I ^o
Legend
O Mileposts (MP, 0.5 —Approximated Pond
mi) _ Delineated
_ Temporary Access Perennial
Road — Delineated Pond
- - H-650 Pipeline Approximated Pond
--,Operational Pond
L - -'Workspace
Wetlands:
ED
Temporary Access Delineated Wetland
Road —
Boundary
Limits of
[::]Construction Right �#• Delineated PEM
of -Way >�N Delineated PFO
Survey Area Delineated PSS
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Perennial
an
iiiia
f�a!
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC 0--n--e--M--a--p-,--T--R--C-,--U--S--G--S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
\, CpSWe'II
\C o u rf t y
C n:,nK •. e Hit \ i
Rockingham
County
i
!Guilford
County
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 58 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
CD
730
I
I
Buffer Zone Impacts:
i
Zone 1 Construction Sq. Ft.: 5,191.87
7
Zone 1 Operational Sq. Ft.: 3,416.33
Zone 2 Construction Sq. Ft.: 3,372.62
i
Zone 2 Operational Sq. Ft.: 1,927.76
I
TA-RO-142
W -C18-20: PEM
-
X20
!
Con./Op. Pipeline Crossing Ft.: 54.70
0
^
a,
Construction Acres: 0.08
cSP
I Y
Operational Acres: 0.00
ayv
7701
Iz
r�
700
s. • • . ° . o
0
• •
�
111
1
I
------- -------------------------------------------------------------
----- - -- - o--- ------------------------------------------ -----
MP51.5 -' --------------------------------•------------------------------------- - - - - -
I
I JP
I
720 a 4
TA-RO-141
a`
W -C18-20: PFO
Con./Op. Pipeline Crossing Ft.: 15.54
Construction Acres: 0.05
Operational Acres: 0.02**
r-I«`�v�� ;;;R99 o i
CA 69� TA-RO-140
691 I
U,
a� I
QI I `�-1'o
i I
i � !
I o -
I I
1 I
I
I I
-- —- — -I o 1,313 I
�V0 �JS'3 I ^o
Legend
O Mileposts (MP, 0.5 —Approximated Pond
mi) _ Delineated
_ Temporary Access Perennial
Road — Delineated Pond
- - H-650 Pipeline Approximated Pond
--,Operational Pond
L - -'Workspace
Wetlands:
ED
Temporary Access Delineated Wetland
Road —
Boundary
Limits of
[::]Construction Right �#• Delineated PEM
of -Way >�N Delineated PFO
Survey Area Delineated PSS
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Perennial
an
iiiia
f�a!
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC 0--n--e--M--a--p-,--T--R--C-,--U--S--G--S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
\, CpSWe'II
\C o u rf t y
C n:,nK •. e Hit \ i
Rockingham
County
i
!Guilford
County
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 58 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
_ Delineated
Intermittent
_ Delineated
Perennial
- Approximated
Perennial
- Perennial Surface
EDTemporary Access Water
Road Wetlands:
Limits of _ Delineated Wetland
QConstruction Right- Boundary
of -Way -Delineated PEM
Q Survey Area
L _ Adjacent Sheet
[,County Boundary
aJordan Lake
Watershed
Streams:
Approximated
Perennial
0 W IM
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
\�\ C o s w e I I
""-<C6oun'ty
\,
"�° \,
Alamance
C o u n t y
• \`-
Rockingham
County
Guilford
County
i
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 59 of 107
600 Willowbrook Ln
CTRC West Chester, PA 19382
Date: May 2019
/5U
\
"30
720 r�..
o '♦
ao
goo 0
�N
0
+ 730 4IV� NIhL
.
t ,moo • • . IXii3y ♦
Lq' o
5
Ilk
- � 1
o {
, �
A
a
Q,
?� :� .
o .-
.-
`Y -
' �1
S -A18-219: Per.
Con./Op. Pipeline Crossing Ft.: 4.85
Construction Crossing Ft.: 72.69
Construction Sq. Ft.: 367.00
Operational Sq. Ft.: 0.00
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 4,701.28
Zone 1 Operational Sq. Ft.: 1,032.01
Zone 2 Construction Sq. Ft.: 3,135.71
Zone 2 Operational Sq. Ft.: 2,100.37
S-1318-94: Per.**
Con./Op. Pipeline Crossing Ft.: 4.00
Construction Crossing Ft.: 123.51
Operational Crossing Ft.: 89.48
`N N -
M
Impact7VAR:
Zone 1 Construction Sq. Ft.: 6,894.28
Zone 1 Operational Sq. Ft.: 4,511.15
Zone 2 Construction Sq. Ft.: 4,235.02
Zone 2 Operational Sq. Ft.: 2,879.53
o
�O
I' • o
^IV
o
. o" `
- , '' ,, --I
i � O
o.
Alp
� o"
♦ ' `�
♦ -
00
b'
M .5 680 TA-RO-146A
co`bo ; '•
SS-USGS19-01: Per. 7091
Con./Op. Pipeline Crossing ft.: Unknown
Construction Crossing ft.: 101.97 ��
Operational Crossing ft.: 50.52 %
,.
680
i:•
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 6,114.42
Zone 1 Operational Sq. Ft.: 3,030.73
Zone 2 Construction Sq. Ft.: 4,073.30
67Q
Zone 2 Operational Sq. Ft.: 2,023.36
lk
670-:-'
i
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 4,701.28
Zone 1 Operational Sq. Ft.: 1,032.01
Zone 2 Construction Sq. Ft.: 3,135.71
Zone 2 Operational Sq. Ft.: 2,100.37
S-1318-94: Per.**
Con./Op. Pipeline Crossing Ft.: 4.00
Construction Crossing Ft.: 123.51
Operational Crossing Ft.: 89.48
`N N -
M
Impact7VAR:
Zone 1 Construction Sq. Ft.: 6,894.28
Zone 1 Operational Sq. Ft.: 4,511.15
Zone 2 Construction Sq. Ft.: 4,235.02
Zone 2 Operational Sq. Ft.: 2,879.53
o
�O
I' • o
^IV
o
. o" `
- , '' ,, --I
i � O
o.
Alp
� o"
♦ ' `�
♦ -
00
b'
M .5 680 TA-RO-146A
co`bo ; '•
SS-USGS19-01: Per. 7091
Con./Op. Pipeline Crossing ft.: Unknown
Construction Crossing ft.: 101.97 ��
Operational Crossing ft.: 50.52 %
,.
680
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 6,114.42
Zone 1 Operational Sq. Ft.: 3,030.73
Zone 2 Construction Sq. Ft.: 4,073.30
Zone 2 Operational Sq. Ft.: 2,023.36
* .
�r
>v0 o
70
1 �
i
i
r
/0
I'�r MP 5 3.O o
.,�♦� ° Ian �
I o=
J �
Az I ♦ `
j
Ilk
,t 730
r r�
Legend
O Mileposts (MP, 0.5 _ Delineated
mi) Perennial
Temporary Access -Approximated
Road Perennial
– – H-650 Pipeline Perennial Surface
--,Operational Water
--'Workspace Approx_SS_Impact
a Temporary Access Wetlands:
Road _ Delineated Wetland
Limits of Boundary
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
Approximated
Perennial
® IM an
iiiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
______________________________---------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
N
v Caswell°°h
Courity ,
Alamance
„County
Guilford
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham and Alamance County, NC
Sheet 60 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
130
fico
�g0
4.
;a `..4
4 '; s
�. L.
-r Ato
Alf
f*.
<e
e
1 s ds W -A18-83: PEM
Con./Op.
Pipeline
Crossing Acres: 0 Otfi 26.09
Co
♦♦ ry Y.'•i ° Operational Acres: 0.00
♦ � `� '� � TA -AL -149
♦ TA-AL-147
_"So
♦ _"SSo o
♦ L
MP 5304 1
■►
1 1 710
730 k '_`- Buffer Zone Impacts:
Zone 1 Construction
�l
601
i
11 ,1
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,824.19
Zone 2 Operational Sq. Ft.: 89.68
-A �114
G4 man
# C°4t7t
—
�o
J
O 690 k Loo ,00
0
TA -AL -152
-11\0
Legend
O Mileposts (MP, 0.5
_ Delineated Wetland
mi)
Boundary
—Temporary Access
r.7. Approximated PEM
Road
�j: Delineated PEM
- - H-650 Pipeline
--,Operational
L - -'Workspace
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
Wetlands:
ff�l
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
DataSources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
HC Mip hw,y 9'V
/ AI'amance
/
County
Guilford
i
County
/
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 61 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
-�1
0
W -A18-85-2: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
S -A18-84: Per.
Con./Op. Pipeline Crossing Ft.: 4.00
Construction Crossing Ft.: 83.67
Operational Crossinq Ft.: 56.75
I
of
MP 53.5
o
�--
----------------
4� ----------
I
W -A18-85: PEM
Con./Op. Pipeline Crossing Ft.: 8.98
Construction Acres: 0.03
Operational Acres: 0.00
720
,20
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 5,006.18
Zone 1 Operational Sq. Ft.: 3,373.73
Zone 2 Construction Sq. Ft.: 3,297.73
Zone 2 Operational Sq. Ft.: 2,144.62
Impact 8VAR: o {
Zone 1 Construction Sq. Ft.: 10,168.79
Zone 1 Operational Sq. Ft.: 6,128.51
Zone 2 Construction Sq. Ft.: 5,729.05
Zone 2 Operational Sq. Ft.: 4,012.50
w
0
�O
1
'WOMV IE'0
S -A18-87: Per.** — - — - —
Con./Op. Pipeline Crossing Ft.: 5.00
Construction Crossing Ft.: 172.22 .1 f
Operational Crossing Ft.: 111.27 O
r j
- -- - - - --
- -
_----------. _baa - - - - - - - - - - - ---
---- - - - - - -- MP 54.0
W -A18-85: PSS
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.04
Operational Acres: 0.00
Jordan Lake
Watshed
er
r.
S-A18-89:Int.
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 58.46
Operational Crossing Ft.: 27.15
TA -AL -153
Ir'• -
�O
� 1
• 11Q � /O
N
�a0
!
i
Legend
O Mileposts (MP, 0.5 —Approximated
mi) Perennial
_ Temporary Access _ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace — Delineated Pond
aTemporary Access - Perennial Surface
Road Water
Limits of Pond
[::]Construction Right- Wetlands:
of -Way
Delineated Wetland
Survey Area — Boundary
L _ Adjacent Sheet .]Approximated PEM
]County Boundary op Delineated PEM
aJordan Lake rwDelineated PSS
Watershed
Streams:
—Approximated
Intermittent
an
iiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
F . = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�N
/ L
4
�L a
Alamance
�p County
i
Guilford
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 62 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
R;,��30 ,- -
JA5•
w
0
�O
1
'WOMV IE'0
S -A18-87: Per.** — - — - —
Con./Op. Pipeline Crossing Ft.: 5.00
Construction Crossing Ft.: 172.22 .1 f
Operational Crossing Ft.: 111.27 O
r j
- -- - - - --
- -
_----------. _baa - - - - - - - - - - - ---
---- - - - - - -- MP 54.0
W -A18-85: PSS
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.04
Operational Acres: 0.00
Jordan Lake
Watshed
er
r.
S-A18-89:Int.
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 58.46
Operational Crossing Ft.: 27.15
TA -AL -153
Ir'• -
�O
� 1
• 11Q � /O
N
�a0
!
i
Legend
O Mileposts (MP, 0.5 —Approximated
mi) Perennial
_ Temporary Access _ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace — Delineated Pond
aTemporary Access - Perennial Surface
Road Water
Limits of Pond
[::]Construction Right- Wetlands:
of -Way
Delineated Wetland
Survey Area — Boundary
L _ Adjacent Sheet .]Approximated PEM
]County Boundary op Delineated PEM
aJordan Lake rwDelineated PSS
Watershed
Streams:
—Approximated
Intermittent
an
iiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
F . = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�N
/ L
4
�L a
Alamance
�p County
i
Guilford
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 62 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
_ Delineated
Intermittent
_ Delineated
Perennial
— Delineated Pond
Approximated Pond
Pond
Approx_SS_Impact
Wetlands:
Limits of
[::]Construction Right--
Delineated Wetland
of -Way
Boundary
Q Survey Area
®Approximated PSS
L _ Adjacent Sheet
><-> Delineated PFO
[,County Boundary
y Delineated PSS
aJordan Lake
Watershed
Streams:
—Approximated Pond
0 W C) an "Irllk
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
JT �•
S L
Alamance_
County_,
Guilford
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 63 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
Impact 10VAR:
WZone 1 Construction Sq. Ft.: 6,403.51
—1 Zone 1 Operational Sq. Ft.: 4,530.00
o; Zone 2 Construction Sq. Ft.: 3,562.8
Zone 2 Operational Sq. Ft.: 2,397.11
i
i''•MP54.5
•---o:•�,--- -
jo
•s•
'` rn
p o S -C18-62: Per.** V S-1318-143: Eph.
�p CD Con./Op. Pipeline Crossing Ft.: 4.00 +� Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 118.07 Construction Crossing Ft.: 46.22
5 Operational Crossing Ft.: 89.97 Operational Crossing Ft.: 23.99
- - - - - - -16- - T - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - t.p. - - - - - - - - - - - - - - - - - - - - - - --- - - - - ^
•-------------------------------------------------- - - ------- - - - - --
I
S -C18-63: Per.** 0
Con./Op. Pipeline Crossing Ft.: 4.00 18$
1 Construction Crossing Ft.: 144.73
Operational Crossing Ft.: 108.56
Impact 9VAR:
Zone 1 Construction Sq. Ft.: 8,507.07
Zone 1 Operational Sq. Ft.: 6,046.76
Zone 2 Construction Sq. Ft.: 5,198.93
Zone 2 Operational Sq. Ft.: 3,501.39
700
S -A18-215: Per. (Temporary Access Road)
ad Con./Op. Pipeline Crossing Ft.: 0.00
vY Construction Crossing Ft.: 25.25
c; Construction Sq. Ft.: 152.06
61 Operational Sq. Ft.: 0.00:.
Q�
JA
1
I '120
nN
TA -AL -155
110
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 1,516.97
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,011.86
Zone 2 Operational Sq. Ft.: 0.00
Jordan Lake
Watershed
X70
by
-O
O
680
6�>0
S-1318-142: Int.
Con./Op. Pipeline Crossing Ft.: 1.00
Construction Crossing Ft.: 53.38
Operational Crossing Ft.: 48.74
6)O
S-C18-61:Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 47.49
Operational Crossing Ft.: 37.77
tp
0
R:N�
Legend
r
Impact 11 VAR:
/
S -A18-216: Int. (Temporary Access Road)
Zone 1 Construction Sq. Ft.: 4,925.42
—Approximated Pond
Road
Con./Op. Pipeline Crossing Ft.: 0.00
Zone 1 Operational Sq. Ft.: 3,302.44
_
Ephemeral
- -, Operational
Construction Crossing Ft.: 25.58
Zone 2 Construction Sq. Ft.: 3,277.20
Intermittent
Temporary Access
ED
Operational Crossing Ft.: 0.00
Zone 2 Operational Sq. Ft.: 2,201.21
S -C18-60: Int.**
Perennial
Limits of
—Delineated Pond
Con./Op. Pipeline Crossing Ft.: 4.00
Approximated
of -Way
Perennial
Construction Crossing Ft.: 82.19
Approximated Pond
_
Perennial Surface
Operational Crossing Ft.: 55.09
Water
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 1,516.97
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,011.86
Zone 2 Operational Sq. Ft.: 0.00
Jordan Lake
Watershed
X70
by
-O
O
680
6�>0
S-1318-142: Int.
Con./Op. Pipeline Crossing Ft.: 1.00
Construction Crossing Ft.: 53.38
Operational Crossing Ft.: 48.74
6)O
S-C18-61:Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 47.49
Operational Crossing Ft.: 37.77
tp
0
R:N�
Legend
Mileposts (MP, 0.5
O
mi)
—Approximated
Perennial
—Temporary Access
—Approximated Pond
Road
Delineated
- - H-650 Pipeline
_
Ephemeral
- -, Operational
_ Delineated
--'Workspace
Intermittent
Temporary Access
ED
—Delineated
Road
Perennial
Limits of
—Delineated Pond
[::]Construction Right-
Approximated
of -Way
Perennial
Survey Area
Approximated Pond
L _ Adjacent Sheet
Perennial Surface
[:]County Boundary
Water
a Jordan Lake
Pond
Watershed
Wetlands:
Streams:
Delineated Wetland
—Approximated
_
Boundary
Intermittent
Delineated PFO
0 W IM
an
Note: am
March 2019 Workspace
1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review
Per DWR# 20181638
Major Variance Application
---------------------------------------------Map-,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
County •
Guilford
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 64 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
+ sA... f■
L
QiMP 55.0
�a
ARM
1 : � � ✓�h''s c
MLV 6 . Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 4,655.16
Zone 1 Operational Sq. Ft.: 3,112.99
Zone 2 Construction Sq. Ft.: 3,086.36
rnl Zone 2 Operational Sq. Ft.: 2,056.67
U1
,70 ,`� �♦
S
S -C18-68: Per.
Con./Op. Pipeline Crossing Ft.: 5.00
Construction Crossing Ft.: 77.68
Operational Crossinq Ft.: 51.95
W -C18-69: PFO
Con./Op. Pipeline Crossing Ft.: 37.01
Construction Acres: 0.07
Operational Acres: 0.03**
S-1318-59: Per.**
680 o Con./Op. Pipeline Crossing Ft.: 3.00
co Construction Crossing Ft.: 158.00
Operational Crossing Ft.: 68.24
G,
O co
hill
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 0.00
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,066.40
Zone 2 Operational Sq. Ft.: 0.00
X00
W-1318-61: PEM
_ Con./Op. Pipeline Crossing Ft.: 39.07 -
Construction Acres: 0.06
KL Operational Acres: 0.00
.-. ^O
MP 55.5 ♦'
♦' .
,
1-10
W-1318-60: PSS
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: <0.01
Operational Acres: 0.00
I
Impact 12VAR
Zone 1 Construction Sq. Ft.: 19,487.62
Zone 1 Operational Sq. Ft.: 11,533.88
Zone 2 Construction Sq. Ft.: 10,734.71
Zone 2 Operational Sq. Ft.: 8,422.16
S-1318-59-3: Per.**
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 47.72
Operational Crossing Ft.: 0.00
S-1318-59-2: Per.**
Con./Op. Pipeline Crossing Ft.: 3.00
Construction Crossing Ft.: 113.70
Operational Crossing Ft.: 74.61
i
�So i
�6'0(9
j�l
Legend
O Mileposts (MP, 0.5
Jordan Lake
ED
mi)
Watershed
Permanent Access
Streams:
_
Road
—Approximated
Temporary Access
Perennial
Road
Delineated
- - H-650 Pipeline
_
Ephemeral
- -, Operational
Delineated
--'Workspace
_
Intermittent
aPermanent Access
_ Delineated
Road
Perennial
a Temporary Access
Wetlands:
Road
Delineated Wetland
Limits of
_
Boundary
QConstruction Right-
i� Delineated PEM
of -Way
Delineated PFO
Survey Area
t Delineated PSS
L _ Adjacent Sheet
C1 County Boundary
0 W IM an 11�7
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
N uj
l•J�) I
u
Alamance
County
.s
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 65 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
SS-SOIL18-05: Per.
Con./Op. Pipeline Crossing ft.: Unknown
Construction Crossing ft.: 101.82
Operational Crossing ft.: 50.97
X60
4---------------------
750
' I
I
I
iT I
` o,
w �=
_ r o i
� p i
I
I
0 00
0
-
� -- --ter--- �• � - -- i
-------------------- --------------------------------------o-------------------------- I----
MP 56.0 --
--------------------
I
180 Buffer Zone Impacts: Ito
Zone 1 Construction Sq. Ft.: 6,108.97
Zone 1 Operational Sq. Ft.: 3,058.45 810
std t Zone 2 Construction Sq. Ft.: 4,072.60 IN
Zone 2 Operational Sq. Ft.: 2,038.94
61 cu
! X80
C I
X80 0 I
t
770 -' - - ��
,� . ari7o I
,� ,Jill � 780
Legend
0 Mileposts (MP, 0.5 —Delineated
mi) Intermittent
_ Temporary Access — Delineated Pond
Road Approximated Pond
- - H-650 Pipeline pond
--,Operational Approx_SS_Impact
-
-'Workspace
Wetlands:
ED
Temporary Access Delineated Wetland
Road —
Boundary
Limits of x Delineated PFO
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
[—]County Boundary
aJordan Lake
Watershed
Streams:
—Approximated Pond
an 114s.
iiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
" = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------S:_E T,_EsR-I-------------_ap-,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
c�
Alamance
County''"
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 66 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
_.-_.""'°"""' Date: May 2019
cp I
!>
`o
I
I
I
I
I
I
I
I
I
I
I
o
0
0
' �0 a7}6
P
�r
WNMLII'�' "J-
r.
BWBuffer Zone Impacts:
c�> '�"""" Zone 1 Construction Sq. Ft.: 1,160.43
CY)^d�ir Zone 1 Operational Sq. Ft.: 0.00
f'a Zone 2 Construction Sq. Ft.: 1,204.29
Zone 2 Operational Sq. Ft.: 0.00
W -A18-119: PFO
s� Con./0p. Pipeline Crossing Ft.: 95.35
die Construction Acres: 0.11
Operational Acres: 0.06**
TA -AL -159
750
S -A18-125-3: Per.**
S -A18-120: Per.** Con./Op. Pipeline Crossing Ft.: 0.00
Con./Op. Pipeline Crossing Ft.: 2.00 Construction Crossing Ft.: 60.71
Construction Crossing Ft.: 95.17 Construction Sq. Ft.: 727.31
Operational Crossing Ft.: 41.41 Operational Sq. Ft.: 0.00
Impact 13VAR: Impact 14VAR:
Zone 1 Construction Sq. Ft.: 5,679.61 Zone 1 Construction Sq. Ft.: 17,174.67
'ne
Operational Sq. Ft.: 2,705.99 Zone 1 Operational Sq. Ft.: 7,548.95
onstruction Sq. Ft.: 1,923.50 Zone 2 Construction Sq. Ft.: 12,846.76
Operational Sq.Ft.: 1,342.19 Zone 2 Operational Sq. Ft.: 9,901.90 730
WB -A18-121: Pond
Con./Op. Pipeline Crossing Ft.: 31.40 p
Construction Crossing Ft.: 79.07 1'
- - Construction Sq. Ft.: 1,864.08
Operational Sq. Ft.: 0.00
- � - 69
State Rd 1
- - - - - - - - A. - - - - - - -
iiiiZone
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 3,393.42
Zone 1 Operational Sq. Ft.: 1,186.85
Zone 2 Construction Sq. Ft.: 1,735.31
2 Operational Sq. Ft.: 1,172.63
W -A18-119: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.06
Operational Acres: 0.00
moon
`I I■J■■■■
1, \ ■■■■■■■■
W -A18-119-2: PFO
Con./Op. Pipeline Crossing297.23
Construction Acres: 0.4.4 7
iL Operational Acres: 0.21 **
W -A18-119-2: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.06
Operational Acres: 0.00
S-1318-65: Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 79.71
Operational Crossing Ft.: 32.14
O 1
S -A18-125: Per.**
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 16.02
Operational Crossing Ft.: 0.00
S -A18-125-2: Per.**
F
pPipeline Crossing Ft.: 5.00
truction Crossing Ft.: 87.18
rational Crossing Ft.: 54.71
1
W -A18-127: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.02
Operational Acres: 0.00
S -A18-126: Eph.
Con./Op. Pipeline Crossing Ft.: 1.00
Construction Crossing Ft.: 44.92
1. Operational Crossing Ft.: 36.95
1
TA -AL -159A
Legend
o Mileposts (MP, 0.5 -Delineated
mi) Intermittent
_ Temporary Access _ Delineated
Road Perennial
- - H-650 Pipeline -Delineated Pond
--,Operational -Perennial Surface
L - -'Workspace Water
ED
Temporary Access Pond
Road Wetlands:
Limits of Delineated Wetland
[::]Construction Right- - Boundary
of -Way
10j;
Survey Area Delineated PEM
Delineated PFO
L _ Adjacent Sheet
� Delineated PSS
County Boundary
aJordan Lake
Watershed
Streams:
_ Delineated
Ephemeral
® s�
IM an
iiiia
Note: I1
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
County
JP ' 0
P
v ssr
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 67 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
730
Impact 14VAR:
Zone 1 Construction Sq. Ft.: VbM.67
Zone 1 Operational Sq. Ft.: 7,548.95
Zone 2 Construction Sq. Ft.: 12,846.76
Zone 2 Operational Sq. Ft.: 9,901.90
S -A18-125-3: Per.**
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 60.71
Construction Sq. Ft.: 727.31
Operational Sq. Ft.: 0.00
i
E
W -A18-130: PFO
Ego Con./Op. Pipeline Crossing Ft.: 17.04
Construction Acres: 0.09
Operational Acres: 0.03**
W -A18-127: PFO
Con./Op. Pipeline Crossing Ft.: 61.32
Construction Acres: 0.07
Operational Acres: 0.04**
W -A18-127-2: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.02
Operational Acres: 0.00
S -A18-126: Eph.
Con./Op. Pipeline Crossing Ft.: 1.00
Construction Crossing Ft.: 44.92
Operational Crossing Ft.: 36.95
740
W A18 127 PEM
TA -AL -1598
ryo
j
TA -AL -159A o
Con./Op. Pipeline Crossing Ft.: 0.00 �.
Construction Acres: 0.02
Operational Acres: 0.00
0
W -A18-130: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.01
Operational Acres: 0.00
`10o
O
J10
700
700
Impact 15VAR:
Zone 1 Construction Sq. Ft.: 8,209.36
680I x680 Zone 1 Operational Sq. Ft.: 4,961.84
1 Zone 2 Construction Sq. Ft.: 8,724.82
Zone 2 Operational Sq. Ft.: 4,133.63
S -A18-132: Per.** I y
Con./Op. Pipeline Crossing Ft.: 5.00
Construction Crossing Ft.: 120.02 cn;
Operational Crossing Ft.: 83.91 I c'
I m'
goo
W -A18-133: PFO
Con./Op. Pipeline Crossing Ft.: 56.05
Construction Acres: 0.10
Operational Acres: 0.04**
I�
1►
I
W -A18-133: PEM i
o Con./Op. Pipeline Crossing Ft.: 0.00 6>
Construction Acres: 0.02
Operational Acres: 0.00
f'
W -A18-133-2: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
+ Construction Acres: 0.01
Operational Acres: 0.00
I
I
0
be
A 6a I
Legend
O Mileposts (MP, 0.5 -Delineated
mi) Perennial
_ Temporary Access - Delineated Pond
Road - Perennial Surface
- - H-650 Pipeline Water
--,Operational Pond
L - -'Workspace Wetlands:
ED
Temporary -Delineated Wetland
Road Boundary
Limits of �j: Delineated PEM
[::]Construction Right -
of -Way . Delineated PFO
Q Survey Area
L _ Adjacent Sheet
[:]County Boundary
QJordan Lake
Watershed
Streams:
_ Delineated
Ephemeral
0 W C) an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
C 0 u n,�y
� Cnurcry�
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 68 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
rno
I o
Co.
�I
LI Impact 15VAR:
N' Zone 1 Construction Sq. Ft.: 8,209.36
C: Zone 1 Operational Sq. Ft.: 4,961.84
UI Zone 2 Construction Sq. Ft.: 8,724.82
Zone 2 Operational Sq. Ft.: 4,133.63
¢I
I
Y
S -A18-132: Per.**
Con./Op. Pipeline Crossing Ft.: 5.00
Construction Crossing Ft.: 120.02
Operational Crossing Ft.: 83.91
W -A18-133-2: PEM ,�
Con./Op. Pipeline Crossing Ft.: 0.00 �'
Construction Acres: 0.01 0
Operational Acres: 0.00
I {
rn -
I 0
6yO
i
.- .
700
0
W -A18-135: PFO �Oo
Con./Op. Pipeline Crossing Ft.: 145.79
Construction Acres: 0.20 ��
Operational Acres: 0.10** • • . Wall
Impact 17VAR:
Zone 1 Construction Sq. Ft.: 7,218.16
Zone 1 Operational Sq. Ft.: 2,972.37
Zone 2 Construction S Ft • 5 741 34
F q. ..
Zone 2 Operational Sq. Ft.: 2,381.63
-- - - - - --
oo
►►► 1 �''
1
Impact 16VAR:
Zone 1 Construction Sq. Ft.: 651.47
Zone 1 Operational Sq. Ft.: 136.08
Zone 2 Construction Sq. Ft.: 2,846.10
Zone 2 Operational Sq. Ft.: 1,755.41
W -A18-135: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.02
Operational Acres: 0.00 670
� 6
PV 670 )O
1
680 1.
I.
II•
1�
0
00
CD
0
6�
0
I 6->0
O
mi)
—Delineated
Intermittent
d
e Sij�
a�
6g0
Perennial
- -'Workspace
610
Limits of
Approximated Pond
QConstruction Right-
Perennial Surface
1
680 1.
I.
II•
1�
0
00
CD
0
W -A18-254: PFO
Con./Op. Pipeline Crossing Ft.: 151.62
Construction Acres: 0.22
Operational Acres: 0.10**
S -A19-290: Eph.**
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 98.23
Operational Crossing Ft.: 26.68
6S.
O
Legend
Mileposts (MP, 0.5
O
mi)
—Delineated
Intermittent
d
e Sij�
s 680
oh
�d
6g0
Perennial
- -'Workspace
— Delineated Pond
Limits of
Approximated Pond
QConstruction Right-
W -A18-254: PFO
Con./Op. Pipeline Crossing Ft.: 151.62
Construction Acres: 0.22
Operational Acres: 0.10**
S -A19-290: Eph.**
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 98.23
Operational Crossing Ft.: 26.68
6S.
O
Legend
Mileposts (MP, 0.5
O
mi)
—Delineated
Intermittent
- - H-650 Pipeline
_ Delineated
--,Operational
Perennial
- -'Workspace
— Delineated Pond
Limits of
Approximated Pond
QConstruction Right-
Perennial Surface
of -Way
Water
Survey Area
Pond
L _ Adjacent Sheet
Wetlands:
E_;County Boundary
Delineated Wetland
aJordan Lake
_
Boundary
Watershed
j:. Delineated PEM
Streams:
><-> Delineated PFO
—Approximated'@rdDelineated
PSS
Intermittent
—Approximated Pond
Delineated
_
Ephemeral
Note:
rl�
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
----------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
bounty
7a- r
P
w Clielrli 5! _
a
r'
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 69 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
" Date: May 2019
670
r
OW=fF
r
-� � �� r tie � � � • / _ � !
Claude Sim son Rd State Rd 1590 a ode Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 1,747.23
680 c �`S" Zone 1 Operational Sq. Ft.: 0.00 9'
Zone 2 Construction Sq. Ft.: 1,092.97
Zone 2 Operational Sq. Ft.: 0.00
�c
- _ F
•SS-SOIL19-05: Per. (Temporary Access Road)
O TA -AL -161 Con./Op. Pipeline Crossing ft.: 0.00
W -A18-254: PFO 69 Construction Crossing ft.: 18.44
Con./Op. Pipeline Crossing Ft.: 151.62 Operational Crossing ft.: 0.00
Construction Acres: 0.22
Operational Acres: 0.10**
TA -AL -162 _
• • . I Y l,l�3� f \
j W W -C18-3: PEM
o Con./Op. Pipeline Crossing Ft.: 13.05
Construction Acres: 0.04
Operational Acres: 0.00 \`
S -C18-2: Int. • \ �' '
Con./Op. Pipeline Crossing Ft.: 1.00
b _OOti Construction Crossing Ft.: 92.62 aAll
Operational Crossing Ft.: 67.61
tom..:.,• , ; ;t ` \
---------------- -- - --- - - W-58,0--
----------------
F
P58:0•
�fl\ / W -C18-5: PEM
W -C18-5: PSS
Con./Op. Pipeline Crossing Ft.: 0.00
6v Con./Op. Pipeline Crossing Ft.: 52.16 Construction Acres: 0.03
W -C18-3: PFO O Operational Acres: 0.00
Construction Acres: 0.07
so Con./Op. Pipeline Crossing Ft.: 0.00 Operational Acres: 0.00
Construction Acres: <0.01 _
Operational Acres: 0.00** W -C18-3-2: PEM
FOperational
Op. Pipeline Crossing Ft.: 12.60 Buffer Zone Impacts:W-C18-3-2: PFO Construction Acres: 0.02 Zone 1 Construction Sq. Ft.: 000
Con./Op. Pipeline Crossing Ft.: 7.57 Acres: 0.00 Zone 1 Operational Sq. Ft.: 0.00
Construction Acres: 0.01 Zone 2 Construction Sq. Ft.: 159.56
6 - Operational Acres: 0.01** d Zone 2 Operational Sq. Ft.: 0.00
610
rno a X60
• 640. �.
�y6
Legend
O Mileposts (MP, 0.5 -Approximated Pond
mi) Delineated
_ Temporary Access a Ephemeral
Road _ Delineated
- - H-650 Pipeline Intermittent
- -, Operational _ Delineated
-
-'Workspace Perennial
QTemporary Access Approximated Pond
Road - Perennial Surface
Limits of Water
QConstruction Right- Approx_SS_Impact
of -Way
Wetlands:
Q Survey Area Delineated Wetland
L _ Adjacent Sheet - Boundary
QCounty Boundary op Delineated PEM
QJordan Lake Y\> Delineated PFO
Watershed
Xi Delineated PSS
Streams:
-Approximated
Intermittent
in
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------- -------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
1,s
.w
AN°m a nuc e
ounty
,r IS]�j�odrap Q
��
e B 7k PIO
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 70 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
' assn
670
660
t . _ ori 1594
TA -AL -162 ,•: �✓ 660
' r
` ".�,.;y. ;'£..-� r' v - ,.•o ;� art : ` k �, ,•s _• � �
,•�• I
-------------------------
r; -- - -
62
Jordan Lake
Watershed
640
t Y
00 :' ..
Gs"
0
�k T
1
jI
640
51.
s
.
P1
i
I
Pt
660
�t
.i
i
1
s
P
V
\
e•.
i
o
\
i
' assn
670
660
t . _ ori 1594
TA -AL -162 ,•: �✓ 660
' r
` ".�,.;y. ;'£..-� r' v - ,.•o ;� art : ` k �, ,•s _• � �
,•�• I
-------------------------
r; -- - -
62
Jordan Lake
Watershed
640
t Y
00 :' ..
Gs"
0
�k T
1
jI
640
51.
.
P1
i
I
Pt
�t
.i
1
s
P
V
a�P
i
o
i
i
�1
i
i
i
It
i
640
--------------- - - -- ---�- -- - -- - -- - MP�58'5
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 6,001.90
Zone 1 Operational Sq. Ft.: 3,000.95
Zone 2 Construction Sq. Ft.: 4,001.22
' Zone 2 Operational Sq. Ft.: 2,000.60
SS-SOIL18-07: Per. 630
Con./Op. Pipeline Crossing ft.: Unknown
Construction Crossing ft.: 100.03
Operational Crossing ft.: 50.02
Legend
O Mileposts (MP, 0.5 —Delineated
mi) Intermittent
_ Temporary Access M Approximated Pond
Road Approx_SS_Impact
- - H-650 Pipeline Wetlands:
--,Operational Delineated Wetland
L - -'Workspace — Boundary
ED Road
.Approximated PEM
Road
;x Delineated PFO
Limits of
[::]Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[:]County Boundary
QJordan Lake
Watershed
Streams:
—Approximated Pond
0 W IM an Ilk
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
---------------------------------------------ap-,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
0
Alamance
County
�v
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 71 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
51.
.
i
640
--------------- - - -- ---�- -- - -- - -- - MP�58'5
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 6,001.90
Zone 1 Operational Sq. Ft.: 3,000.95
Zone 2 Construction Sq. Ft.: 4,001.22
' Zone 2 Operational Sq. Ft.: 2,000.60
SS-SOIL18-07: Per. 630
Con./Op. Pipeline Crossing ft.: Unknown
Construction Crossing ft.: 100.03
Operational Crossing ft.: 50.02
Legend
O Mileposts (MP, 0.5 —Delineated
mi) Intermittent
_ Temporary Access M Approximated Pond
Road Approx_SS_Impact
- - H-650 Pipeline Wetlands:
--,Operational Delineated Wetland
L - -'Workspace — Boundary
ED Road
.Approximated PEM
Road
;x Delineated PFO
Limits of
[::]Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[:]County Boundary
QJordan Lake
Watershed
Streams:
—Approximated Pond
0 W IM an Ilk
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
---------------------------------------------ap-,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
0
Alamance
County
�v
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 71 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
w
0
O
0
S -C18-13: Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 89.98
W
Operational Crossing Ft.: 17.42
S -C18-11: Per...
sing Ft.: 78.91
g Ft.: 254.02
.: 4,762.38
Con./Op. Pipeline Cros
Construction Crossin
Construction Sq. Ft
Operational Sq. Ft.: 0.00
°°
ca Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 1,622.11
Zone 1 Operational Sq. Ft.: 1,622.11
�3 • • .� : Zone 2 Construction Sq. Ft.: 1,169.04
6 Zone 2 Operational Sq. Ft.: 1,169.04
1 - •
Ort'' ►
i- - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
---------------------
1' 3 -
f I
S-C18-12: Int.
Con./Op. Pipeline Crossing Ft.: 0.00 `
Construction Crossing Ft.: 5.93 H
630 ...
Operational Crossing
Impact 18VAR:
Zone 1 Construction Sq. Ft.: 10,255.53
Zone 1 Operational Sq. Ft.: 1,808.42
Zone 2 Construction Sq. Ft.: 4,441.86 1'
Zone 2 Operational Sq. Ft.: 2,759.99 -
oil
Legend
o Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Permanent Access _ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace -Perennial Surface
ED
Permanent Access Water
Road Wetlands:
Limits of _ Delineated Wetland
QConstruction Right- Boundary
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
Approximated
Intermittent
® soy
IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�a
[tonne ii rl
n Alamance
¢a
County
�n
�m
Pp
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 72 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
650
S�
7 .
0
630
63 Basin Creek Rd
State Rd 1594
1 Q&
m
1
QUO
AS-NHD-1554: Int. (Permanent Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 25.51
S.
Operational Crossing Ft.: 25.51WN
a
d
M
LO
PA -AL -164
620
°°
ca Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 1,622.11
Zone 1 Operational Sq. Ft.: 1,622.11
�3 • • .� : Zone 2 Construction Sq. Ft.: 1,169.04
6 Zone 2 Operational Sq. Ft.: 1,169.04
1 - •
Ort'' ►
i- - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
---------------------
1' 3 -
f I
S-C18-12: Int.
Con./Op. Pipeline Crossing Ft.: 0.00 `
Construction Crossing Ft.: 5.93 H
630 ...
Operational Crossing
Impact 18VAR:
Zone 1 Construction Sq. Ft.: 10,255.53
Zone 1 Operational Sq. Ft.: 1,808.42
Zone 2 Construction Sq. Ft.: 4,441.86 1'
Zone 2 Operational Sq. Ft.: 2,759.99 -
oil
Legend
o Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Permanent Access _ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace -Perennial Surface
ED
Permanent Access Water
Road Wetlands:
Limits of _ Delineated Wetland
QConstruction Right- Boundary
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
Approximated
Intermittent
® soy
IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�a
[tonne ii rl
n Alamance
¢a
County
�n
�m
Pp
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 72 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
+;• 690lM1
E:
S to Rd
St
Creek �.- n:: �. co N. �•.
Basin Rd
Co
A0
""` W.
6$ �. . ��. `may . �'"• i:A- .. �� , �.
.f 10- _.,r ' i.. ..
SS-SOIL19-02: Per.** 1
Con./Op. Pipeline Crossing ft.: Unknown .:' 'A'�
Construction Crossing ft.: 195.29 Impact 20VAR: 1
`" • Operational Crossing ft.: 0.00 Zone 1 Construction Sq. Ft.: 9,717.40 s 1
Zone 2 Construction Sq. Ft.: 4,666.37
- - 1
,1
'v
,_` •ilt 1�
O
1 m ♦
n�
•
1
1 ♦
Impact 19VAR:
i' •
;Q
♦
J.
1
'
♦
Zone 2 Construction Sq. Ft.: 4,568.39
. ♦ .
`
1
tela
- _ _ _ _3-
1
7S9S
- _
1
1
I♦
4P
4,1
P
t
i
4" ',
rn
% %
�o
I"�.'
♦
Buffer Zone Impacts:
a}
v ,
t
♦
.•;
Zone 1 Construction Sq. Ft.: 0.00
`
O
'' ♦ '
Zone 1 Operational Sq. Ft.: 0.00
,
Gs
,;_�,♦♦�
.� `
Zone 2 Construction Sq. Ft.: 119.91
Zone 2 Operational Sq. Ft.: 0.00
`4,
Zone 1 Operational Sq. Ft.: 3,495.42
g
O
1 m ♦
n�
•
1
1 ♦
Impact 19VAR:
i' •
`,
♦
Zone 1 Construction Sq. Ft.: 685.65
'
♦
Zone 2 Construction Sq. Ft.: 4,568.39
-.
1
tela
- _ _ _ _3-
1
7S9S
- _
1
1
'1
t
i
rn
a}
v ,
Impact 21 VAR:
1
'#
1 6)O
O
Zone 1 Construction Sq. Ft.: 5,321.10
Ni
d
Zone 1 Operational Sq. Ft.: 3,495.42
i
1
6
Zone 2 Construction Sq. Ft.: 3,512.62
�'}
tpo
Zone 2 Operational Sq. Ft.: 2,352.85
1
AS-NHD-1549: Int.**
t
�o
Con./Op. Pipeline Crossing Ft.: 5.00
Construction Crossing Ft.: 88.77
6g0
i
,1
Operational Crossing Ft.: 58.00
6
90
61,
P
650
0
660
1
6g0
6,
0
640
ll �° ASO 610 104' *+ l
Legend
O Mileposts (MP, 0.5 —Delineated Wetland
mi) Boundary
- - H-650 Pipeline
--,Operational
-
-'Workspace
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
L__. County Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Intermittent
—Approximated Pond
Approximated Pond
Approx_SS_Impact
Wetlands:
® soy IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
KJ
i
46 t ��
Alamance �Pa
County
�b
a
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 73 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5 _ Delineated Wetland
mi) Boundary
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
Wetlands:
0 W IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
µ[11i e1 Mefl;cyi;i r,l ii :I, lx�
4pph 'mn/
u u
I�
I �
A I a r ya, (Se
Countm
Aid
C ,¢
M Mountain Valley
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 74 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
PA -AL -166
680
6l0
6'�
0
LOO
SAO
620 1
Legend
O Mileposts (MP, 0.5 Wetlands:
mi) _ Delineated Wetland
_ Permanent Access Boundary
Road
- - H-650 Pipeline
--,Operational
L - -'Workspace
EDPermanent Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
Delineated
Ephemeral
® soy IM an
Note:
am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-----------------------------------------------ap-,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
rir,- r
�n".cli +trc
Alamance
County 9
� AM'alprgd
6
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 75 of 107
600 Willowbrook Ln
? TRC West Chester, PA 19382
Date: May 2019
0
0
11
610
650
W -C18-29: PFO
Con./Op. Pipeline Crossing Ft.: 317.38
Construction Acres: 0.55
Operational Acres: 0.21 **
S -C18-30: Int.**
Con./Op. Pipeline Crossing Ft.: 12.95
Construction Crossing Ft.: 79.23
Construction Sq. Ft.: 1,181.68
Operational Sq. Ft.: 0.00
� r _
Impact 22VAR
Zone 1 Construction Sq. Ft.: 4,931.11
Zone 1 Operational Sq. Ft.: 1,002.02
Zone 2 Construction Sq. Ft.: 3,395.99
Zone 2 Operational Sq. Ft.: 1,875.64
0
660
10
650
660
Jordan Lake
Watershed
660
�I
Buffer Zone Impacts:
S -C18-28: Int.** Zone 1 Construction Sq. Ft.: 0.00
Con./Op. Pipeline Crossing Ft.: 3.00 Zone 1 Operational Sq. Ft.: 0.00
Construction Crossing Ft.: 157.32 Zone 2 Construction Sq. Ft.: 723.27
Operational Crossing Ft.: 44.80 1 Zone 2 Operational Sq. Ft.: 0.00
..--------------------------------- M P 61.0
1
Impact 23VAR:
Zone 1 Construction Sq. Ft.: 8,321.62 y
Zone 1 Operational Sq. Ft.: 3,596.16
Zone 2 Construction Sq. Ft.: 5,383.08
Zone 2 Operational Sq. Ft.: 2,854.81
,Zo
TA -AL -167
Legend
O Mileposts (MP, 0.5 —Delineated Pond
mi) Intermittent Surface
_ Temporary Access Water
Road Pond
- - H-650 Pipeline Wetlands:
--,Operational Delineated Wetland
L - -'Workspace — Boundary
EDTemporary Access IN/ Delineated PFO
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
_ Delineated
Intermittent
® soy
IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
v �°G.src�rc
' AlamancR"e
County
FRI
x Q�'arer Rv
_ a
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 76 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
-�-
Date: May 2019
..
19
r
a
o i r
0
0 0
SS-SOIL18-08: Per.
Con./Op. Pipeline Crossing ft.: Unknown
Construction Crossing ft.: 100.27 sr
Operational Crossing ft.: 50.13 0
1'
'L_ ;.Aw
tl
0.10'
00
A '
I
680
00 00 `♦;`. TA -AL -168 690
.0�..;
0o MP 61'5. r
• • . . `♦
Buffer Zone Impacts: `
Zone 1 Construction Sq. Ft.: 6,016.15 `
Zone 1 Operational Sq. Ft.: 3,007.94 `♦
Zone 2 Construction Sq. Ft.: 4,010.80 `♦`� /
Zone 2 Operational Sq. Ft.: 2,005.31
o `
670 `�° ♦♦�` /
\ ♦
Q /
Impact 24VAR:
t* � 6� Zone 1 Construction Sq. Ft.: 581.01
c0 Zone 1 Operational Sq. Ft.: 1.86 6
6 Zone 2 Construction Sq. Ft.: 2,611.26 0
80 Zone 2 Operational Sq. Ft.: 1,152.07
I^�
r�
•cam
/o0
680
Legend
o Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
_ Delineated
Perennial
Approx_SS_Impact
Wetlands:
_ Delineated Wetland
Boundary
0 W r) an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--------- -------------------------------------ap-,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
P.clhel Melhatl�sf._ r` c..
Alamance
Qe� County
� a =
p W oL-r Rd
P �O`
v rse''ry S�nvoi Ada �e
� Y
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 77 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
nz
Legend
O Mileposts (MP, 0.5
mi)
- - H-650 Pipeline
--,Operational
-
-'Workspace
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
E_1 County Boundary
aJordan Lake
Watershed
Streams:
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
Wetlands:
_ Delineated Wetland
Boundary
V, Delineated PFO
0 W IM
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
¢a
:1
.i
Asa -
fi
A14amance f
6�0 Y ii t yP%
oa
M Mountain Valley
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 78 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
1,
t
650
65°
Construction Acres: 0.09
Operational Acres: 0.00
o'
63°
�o
YY
f20
6
S -A18-70-2: Per. (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
rIf Construction Crossing Ft.: 5.87
c� Construction Sq. Ft.: 34.76
Operational Sq. Ft.: 0.00
Buffer Zone Impacts: 6°°
Zone 1 Construction Sq. Ft.: 2,631.37 61313
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,610.22
Zone 2 Operational Sq. Ft.: 0.00
C
00
-_--- f Impact26VAR: +'
.. • _ Zone 1 Construction Sq. Ft.: 7,768.24
Zone 1 Operational Sq. Ft.: 1,415.28
Zone 2 Construction Sq. Ft.: 3,391.12
��r •z Zone 2 Operational Sq. Ft.: 2,468.51^p
Buffer Zone Impacts: S -A18-70: Per.**
o Zone 1 Construction Sq. Ft.: 0.00
zal
Zone 1 Operational Sq. Ft.: 0.00 Con./Op. Pipeline Crossing Ft.: 19.70
Construction Crossing Ft.: 133.78
Zone 2 Construction Sq. Ft.: 234.82 Co .
Zone 2 Operational Sq. Ft.: 0.00 630 Construction Sq. Ft.:
Operational Sq. Ft.:.: 0.00771
1
0.00
t
61
m
W -A18-73: PFO
6, Con./Op. Pipeline Crossing Ft.: 0.00
6v'o o Construction Acres: <0.01
Operational Acres: <0.01 **
ALS -A18-72: Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 82.44
Operational Crossing Ft.: 52.12
Air
q
=•Jordan Lake
Watershed
W -A18-75-2: PEM (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.01
Operational Acres: 0.00
S -A18-72-2: Int. (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 9.79
Operational Crossing Ft.: 0.00
418-75: PEM (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.01
Operational Acres: 0.00
5,00,1100-0
MP 62
,°%
W -A18-74: PFO
Con./Op. Pipeline Crossing Ft.: 8.41
Construction Acres: 0.01
Operational Acres: 0.01 **
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 0.00
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 434.69
Zone 2 Operational Sq. Ft.: 0.00
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 4,922.94
Zone 1 Operational Sq. Ft.: 3,081.60
Zone 2 Construction Sq. Ft.: 2,982.67
Zone 2 Operational Sq. Ft.: 1,879.17
I
t
650
65°
Construction Acres: 0.09
Operational Acres: 0.00
W -A18-74: PFO
Con./Op. Pipeline Crossing Ft.: 8.41
Construction Acres: 0.01
Operational Acres: 0.01 **
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 0.00
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 434.69
Zone 2 Operational Sq. Ft.: 0.00
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 4,922.94
Zone 1 Operational Sq. Ft.: 3,081.60
Zone 2 Construction Sq. Ft.: 2,982.67
Zone 2 Operational Sq. Ft.: 1,879.17
I
Legend
O Mileposts (MP, 0.5 -Delineated
mi) Intermittent
_ Temporary Access _ Delineated
Road Perennial
- - H-650 Pipeline -Delineated Pond
- -, Operational - Approximated
L - -'Workspace Perennial
QTemporary Access - Perennial Surface
Road Water
Limits of Pond
[::]Construction Right- Wetlands:
of -Way
Delineated Wetland
Q Survey Area - Boundary
L _ Adjacent Sheet ','�j Delineated PEM
QCounty Boundary X^�x Delineated PFO
QJordan Lake
Watershed
Streams:
-Approximated
Perennial
® f� IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
----------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alam„ance
County
8 sem"
r srneel Rd� �
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 79 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
t
W -A18-80: PEM
Con./Op. Pipeline Crossing Ft.: 63.68
Construction Acres: 0.09
Operational Acres: 0.00
k
r ram
00
f
I
I
f
f
o
I o
Legend
O Mileposts (MP, 0.5 -Delineated
mi) Intermittent
_ Temporary Access _ Delineated
Road Perennial
- - H-650 Pipeline -Delineated Pond
- -, Operational - Approximated
L - -'Workspace Perennial
QTemporary Access - Perennial Surface
Road Water
Limits of Pond
[::]Construction Right- Wetlands:
of -Way
Delineated Wetland
Q Survey Area - Boundary
L _ Adjacent Sheet ','�j Delineated PEM
QCounty Boundary X^�x Delineated PFO
QJordan Lake
Watershed
Streams:
-Approximated
Perennial
® f� IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
----------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alam„ance
County
8 sem"
r srneel Rd� �
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 79 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
Delineated
— Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
— Delineated Pond
QTemporary Access - Perennial Surface
Road Water
Limits of
[::]Construction Right
of -Way
Q Survey Area
L _ Adjacent Sheet
[,County Boundary
QJordan Lake
Watershed
Streams:
—Approximated
Intermittent
M Pond
Wetlands:
_ Delineated Wetland
Boundary
"fie Delineated PEM
>e"'> Delineated PFO
0 W C) an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
00 t�
I
♦ `
W'0- *&0
•i Rd A I a mia n c e
C 0 u%n try
R
8 �
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 80 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
Construction HDD
Operational HDD
[::]Temporary Access
Road
Limits of
Q Construction Right
of -Way
Survey Area
L _ Adjacent Sheet
E_1 County Boundary
aJordan Lake
Watershed
Approximated
Perennial
_ Delineated
Intermittent
_ Delineated
Perennial
- Approximated
Perennial
- Perennial Surface
Water
Wetlands:
_ Delineated Wetland
Boundary
Delineated PFO
Streams:
0 W IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
c
9�eN
n
a`
Alamance
County
3
Q,
`a
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 81 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
610
h 550 540 Impact 29VAR: '♦ �„ AS-NHD-1547: Per.
1 Zone 1 Construction Sq. Ft.: 6,573.65 ♦ _ o Con./Op. Pipeline Crossing Ft.: 8.40
Zone 1 Operational Sq. Ft.: 1,552.81_ �iConstruction Crossing Ft.: 110.58
540 Zone 2 Construction Sq. Ft.: 4,347.55 ♦ MP 64.0 Construction Sq. Ft.: 1,363.41
1 540 Zone 2 Operational Sq. Ft.: 2,841.51 _ , Operational Sq. Ft.: 0.00 570
.1 SQO c_ � ♦ s
♦ 1° sso
1 •-7,
550 ! 1 eo�r�e�t83 - ♦♦♦ ;, o
'1 Pia = ♦
s610
1 —
1 � ♦
d� o
o ♦,
LO
so
o
AS -1318-20: Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 96.35
Operational Crossinq Ft.: 41.92
560
550
:. ', ;;•
_ o
o
�o ss
o ,
.,mow►-' •
♦
AW -1318-19: PFO
LOO
Con./Op. Pipeline Crossing Ft.: 49.89 ♦
O Construction Acres: 0.08 ,
600
O
S-1318-138: Per. (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Operational Crossing Ft.: 0.00
o t„
�
540
Operational Acres: 0.03**
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 1,548.58
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,057.18
Zone 2 Operational Sq. Ft.: 0.00
600
,
J/ eetal Impact 28VAR: ♦♦
Zone 1 Construction Sq. Ft.: 377.37
570 Zone 2 Construction Sq. Ft.: 242.42 ,♦
\ 560.
La
w AS -1318-16 / S-1318-16: Per.** (H-650 Pipeline HDD)
Con./Op. Pipeline Crossing Ft.: 304.73
IAS Construction Crossing Ft.: 60.62
`i Construction Sq. Ft.: 15,216.90
Operational Sq. Ft.: 0.00
1 550 Silo
Legend
0 Mileposts (MP, 0.5 _Approximated
mi) Intermittent
—Temporary Access _Approximated
Road Perennial
- - H-650 Pipeline _ Delineated
--,Operational Intermittent
L - -'Workspace _ Delineated
Construction HDD Perennial
Operational HDD -Approximated
Temporary Access Perennial
Road - Perennial Surface
Limits of
Water
[::]Construction Right- Wetlands:
of -Way _ Delineated Wetland
Survey Area Boundary
L _ Adjacent Sheet Approximated PFO
�__; County Boundary VN Delineated PFO
[::iJordan Lake
Watershed
Streams:
an
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
CJF3
\
� as
1J 0
0c L�
Alamance C:&,
County \
:1 lsau�aa�l
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 82 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
600
Construction Crossing Ft.: 25.77
rn
S-1318-137: Int. (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
n
Construction Crossing Ft.: 28.05 Co
�
Operational Crossing Ft.: 0.00
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 1,659.11
0
Zone 1 Operational Sq. Ft.: 0.00
690
Zone 2 Construction Sq. Ft.: 1,065.78
Zone 2 Operational Sq. Ft.: 0.00
TA -AL -172
-
SAO
6,60
540
Operational Acres: 0.03**
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 1,548.58
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,057.18
Zone 2 Operational Sq. Ft.: 0.00
600
,
J/ eetal Impact 28VAR: ♦♦
Zone 1 Construction Sq. Ft.: 377.37
570 Zone 2 Construction Sq. Ft.: 242.42 ,♦
\ 560.
La
w AS -1318-16 / S-1318-16: Per.** (H-650 Pipeline HDD)
Con./Op. Pipeline Crossing Ft.: 304.73
IAS Construction Crossing Ft.: 60.62
`i Construction Sq. Ft.: 15,216.90
Operational Sq. Ft.: 0.00
1 550 Silo
Legend
0 Mileposts (MP, 0.5 _Approximated
mi) Intermittent
—Temporary Access _Approximated
Road Perennial
- - H-650 Pipeline _ Delineated
--,Operational Intermittent
L - -'Workspace _ Delineated
Construction HDD Perennial
Operational HDD -Approximated
Temporary Access Perennial
Road - Perennial Surface
Limits of
Water
[::]Construction Right- Wetlands:
of -Way _ Delineated Wetland
Survey Area Boundary
L _ Adjacent Sheet Approximated PFO
�__; County Boundary VN Delineated PFO
[::iJordan Lake
Watershed
Streams:
an
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
CJF3
\
� as
1J 0
0c L�
Alamance C:&,
County \
:1 lsau�aa�l
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 82 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
o to 1,
o � �
e
0 1
LO ,
1
1
1
i
0
^o
4j 1
0 1
r
1
0
cn j
cn
o r �
0 0l
ck
o �1
a
r
vo r Ir
Zone 1 Cons
Zone 1 Opel
' Zone 2 Cons
Zone 2 Opel
i
160
e
580
590
Watershed
01
0
Impact 30VAR:
Zone 1 Construction Sq. Ft.: 4,763.49
Zone 1 Operational Sq. Ft.: 3,158.10
Zone 2 Construction Sq. Ft.: 3,150.22
Zone 2 Operational Sq. Ft.: 2,114.50
r.30
,• — — - — — - — — - — — - — — - — — - — — - — — - — — - — —
f- — — - — — - — — - — — — — - — — - — — - - — — - — — - — — - -------------
r r
1 590 600 AS-NHD-3040: Int."
w N Con./Op. Pipeline Crossing Ft.: 5.00
AS-NHD-1547: Per." '_ 610 N o Construction Crossing Ft.: 79.58
1 Con./Op. Pipeline Crossing Ft.: 8.40 =• GO Operational Crossing Ft.: 52.63
y5o Construction Crossing Ft.: 110.58 t
Construction Sq. Ft.: 1,363.41
Operational Sq. Ft.: 0.00
160
6�0
600
010
S6
O
X80
05
0
6"?O
n
r
610
a I
k'
-M P -64:5
- — — i - — -L--= -0—+-
f
,,
r+
o
rU
�
� n1
,Q
I+
w i
o �
r
r
Ir 070
o-
16,0
'� r
�LO ,
`.
o
;s
00
LO
t`
A.
s,
0
620
0
0000
01
0
Impact 30VAR:
Zone 1 Construction Sq. Ft.: 4,763.49
Zone 1 Operational Sq. Ft.: 3,158.10
Zone 2 Construction Sq. Ft.: 3,150.22
Zone 2 Operational Sq. Ft.: 2,114.50
r.30
,• — — - — — - — — - — — - — — - — — - — — - — — - — — - — —
f- — — - — — - — — - — — — — - — — - — — - - — — - — — - — — - -------------
r r
1 590 600 AS-NHD-3040: Int."
w N Con./Op. Pipeline Crossing Ft.: 5.00
AS-NHD-1547: Per." '_ 610 N o Construction Crossing Ft.: 79.58
1 Con./Op. Pipeline Crossing Ft.: 8.40 =• GO Operational Crossing Ft.: 52.63
y5o Construction Crossing Ft.: 110.58 t
Construction Sq. Ft.: 1,363.41
Operational Sq. Ft.: 0.00
160
6�0
600
010
S6
O
X80
05
0
6"?O
n
r
610
Legend
o Mileposts (MP, 0.5 - Approximated
mi) Perennial
- - H-650 Pipeline Approximated Pond
--,Operational Wetlands:
L - -'Workspace _ Delineated Wetland
Limits of Boundary
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
L__. County Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Intermittent
—Approximated
Perennial
—Approximated Pond
0 W IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. - Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
C 0 U t
a t
3
5� Grrt
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 83 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
a I
k'
-M P -64:5
- — — i - — -L--= -0—+-
f
,,
r+
rU
�
� n1
,Q
I+
w i
o �
r
r
Ir 070
o-
'� r
�LO ,
Legend
o Mileposts (MP, 0.5 - Approximated
mi) Perennial
- - H-650 Pipeline Approximated Pond
--,Operational Wetlands:
L - -'Workspace _ Delineated Wetland
Limits of Boundary
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
L__. County Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Intermittent
—Approximated
Perennial
—Approximated Pond
0 W IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. - Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
C 0 U t
a t
3
5� Grrt
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 83 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
�o
h
1
0
rn
w
0
600
Road
0
0
0
M
Q
o ■.
■
610
r•
r�
■ MP,65.ORR'"__
PA -AL -175A _ - _ - - ,y, .o-
---------------
----- r'
C) r r S -A19-319: Int.
W -A19-320: PEM r Con./Op. Pipeline Crossing Ft.: 0.00
Con./Op. Pipeline Crossing Ft.: 0.00 r • Construction Crossing Ft.: 18.88
Construction Acres: 0.03 �, Operational Crossing Ft.: 0.00
Operational Acres: 0.00
r�
6 r�
`0 r
SSO 660
0 1Prj
680 c \S
610 t
,l
6)0
V 1•t
0
Go
�a t
0l t
Legend
o Mileposts (MP, 0.5 Wetlands:
mi) _ Delineated Wetland
_ Permanent Access Boundary
Road �j: Delineated PEM
- - H-650 Pipeline ><-> Delineated PFO
--,Operational
-
-'Workspace
EDPermanent Access
Road
Limits of
[:]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
_ Delineated
Intermittent
® f� IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
m%COunt:;y
P
t
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 84 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
66o
r�
r�
r�
63p r
N `
� r
r�
r'
S -A19-324: Per. o r
Con./Op. Pipeline Crossing Ft.: 3.00 r'r
Construction Crossing Ft.: 181.62 r'
Operational Crossing Ft.: 113.50
------------------------- -------- -- - - -- -- r
-- - - - - - - - - - -
Road . ---- -- --- -- --- - -- - - -- . �eew
41
41
rje,�w
630 l l l t l l i l l l' �. Pa�ao
lit
� l It l
620 i ' , ♦ ,
�O 1 l ♦ �� \ W -B : PEM
� ' �� � ' `O � �� ♦ �� � Con./Op. Pipelineline Crossing Ft.: 0.00
4'W -A19-326: PFO �. ♦ Construction Acres: 0.28
i O ��'�.� Operational Acres: 0.00 0
Con./Op. Pipeline Crossing Ft.: 5.51
Construction Acres: 0.02
Operational Acres: 0.01**
�qj • ��. ti
660
11
♦��'• rn� W -A19-323: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
J# 41' Construction Acres: 0.33 670 \
; i Operational Acres: 0.00
•-.MP'65.5RR
•
MP 68'.5
MP 65.ORR'
• � Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 0.00p
Zone 1 Operational Sq. Ft.: 0.00 t
�♦ S -A19-321: Int.** Zone 2 Construction Sq. Ft.: 1,183.99 i
ti Con./Op. Pipeline Crossing Ft.: 2.00 Zone 2 Operational Sq. Ft.: 5.85
Construction Crossing Ft.: 180.351777
OHO �aac Operational Crossing Ft.: 100.62 err Rd State Rd
07� Fineb - r
Pone
.�
Impact 31 VAR: 6zO
Zone 1 Construction Sq. Ft.: 8,056.14 �.
Zone 1 Operational Sq. Ft.: 4,139.57
Zone 2 Construction Sq. Ft.: 4,473.93
Zone 2 Operational Sq. Ft.: 2,311.87 ♦ 6g0
�O
J Duke Rone Tri �O
� o
'• � o0 0�
0
rn
O
6jo 10 wo
Legend
O Mileposts (MP, 0.5
mi)
- - H-650 Pipeline
--,Operational
L - -'Workspace
Limits of
[::]Construction Right -
of -Way
= Survey Area
L _ Adjacent Sheet
=County Boundary
=Jordan Lake
Watershed
Streams:
—Approximated
Intermittent
—Approximated Pond
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
Approximated Pond
Wetlands:
_ Delineated Wetland
Boundary
=Approximated PFO
10j; Delineated PEM
,x, Delineated PFO
I�
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. - Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
� sa:
s
3
4
Alamance 4a
Count
u„
4* nw
A a
G
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 85 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
bo
6
i
S -A18-251: Int.
F
Pipeline Crossing Ft.: 2.00
uction Crossing Ft.: 33.27
tional Crossing Ft.: 33.27
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 0.00
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,183.99
Zone 2 Operational Sq. Ft.: 5.85
N
62o
630
6'
0
620
W-1319-168: PEM - - - - - - - - - - - - - - - - - - - -
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.28 rn
Operational Acres: 0.00 60
I
620
I
I �
I 0
680
Ln
S -A18-250: Per.**
loo
i
S -A18-251: Int.
F
Pipeline Crossing Ft.: 2.00
uction Crossing Ft.: 33.27
tional Crossing Ft.: 33.27
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 0.00
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,183.99
Zone 2 Operational Sq. Ft.: 5.85
N
62o
630
6'
0
620
W-1319-168: PEM - - - - - - - - - - - - - - - - - - - -
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.28 rn
Operational Acres: 0.00 60
I
620
Zone 1 Construction Sq. Ft.: 5,419.33 & f1 �,M1 %
Zone 1 Operational Sq. Ft.: 3,439.79 L'�lwly Impact 33VAR: ?.
Zone 2 Construction Sq. Ft.: 4,062.36 Zone 1 Construction Sq. Ft.: 6,766.40
Zone 2 Operational Sq. Ft.: 2,609.74 - Zone 1 Operational Sq. Ft.: 3,311.43
Zone 2 Construction Sq. Ft.: 4,513.79
,- Zone 2 Operational Sq. Ft.: 2,226.55 6,0
�`�,
� I 610
I
0
� I �
I
l
610
660
Legend
0 Mileposts (MP, 0.5 —Delineated
mi) Perennial
- - H-650 Pipeline Approximated Pond
--,Operational Approx_SS_Impact
L - -'Workspace Wetlands:
Limits of Delineated Wetland
[::]Construction Right- — Boundary
of -Way
Oj; Delineated PEM
Survey Area
;x Delineated PFO
L _ Adjacent Sheet
L__. County Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Intermittent
—Approximated Pond
_ Delineated
Intermittent
® f� IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
` •b� • S�p�c H3
Alamance
C o u n f y
Y
v t
bj •
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 86 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
I
I �
I 0
680
g0
S -A18-250: Per.**
loo
Con./Op. Pipeline Crossing Ft.: 4.00
•
Construction Crossing Ft.: 91.74
Operational Crossing Ft.: 56.12
6
�,
SS-SOIL19-07: Per.**
N
I..,
p
Con./Op. Pipeline Crossing ft.: Unknown
I
Construction Crossing ft.: 112.73
w
Operational Crossing ft.: 54.91
----------
. ,
�
- -
- ---•-----------I60 --------------- ----o-
-
-- - - - - - - -
Impact32VAR:
Zone 1 Construction Sq. Ft.: 5,419.33 & f1 �,M1 %
Zone 1 Operational Sq. Ft.: 3,439.79 L'�lwly Impact 33VAR: ?.
Zone 2 Construction Sq. Ft.: 4,062.36 Zone 1 Construction Sq. Ft.: 6,766.40
Zone 2 Operational Sq. Ft.: 2,609.74 - Zone 1 Operational Sq. Ft.: 3,311.43
Zone 2 Construction Sq. Ft.: 4,513.79
,- Zone 2 Operational Sq. Ft.: 2,226.55 6,0
�`�,
� I 610
I
0
� I �
I
l
610
660
Legend
0 Mileposts (MP, 0.5 —Delineated
mi) Perennial
- - H-650 Pipeline Approximated Pond
--,Operational Approx_SS_Impact
L - -'Workspace Wetlands:
Limits of Delineated Wetland
[::]Construction Right- — Boundary
of -Way
Oj; Delineated PEM
Survey Area
;x Delineated PFO
L _ Adjacent Sheet
L__. County Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Intermittent
—Approximated Pond
_ Delineated
Intermittent
® f� IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
` •b� • S�p�c H3
Alamance
C o u n f y
Y
v t
bj •
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 86 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
- - H-650 Pipeline
--,Operational
L - -'Workspace
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
E_1 County Boundary
aJordan Lake
Watershed
Streams:
—Approximated Pond
_ Delineated
Ephemeral
— Delineated Pond
Approximated Pond
Pond
Approx_SS_Impact
Wetlands:
_ Delineated Wetland
Boundary
><—> Delineated PFO
ff�l
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--------- ------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
ply
Y �
Alamance
County
Sim7... H[I
L lTT
,ta �
a�
y� •
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 87 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
i
66
4
/
fp
1 sip L�
Impact 34VAR:.
Zone 1 Construction Sq. Ft.: 5,636.26
Zone 1 Operational Sq. Ft.: 2,368.17
Zone 2 Construction Sq. Ft.: 5,203.38
_
Zone 2 Operational Sq. Ft.: 3,089.87
s_>o
l 6610
�.
o
oof
WMP'
---
66.0------------------- ---''
----- L - - - --
- --
-
f r,
6SO-0----------
--- - - - ---
-----------
- - -
-w
♦.
SS-SOIL19-08: Per.**
r� _
♦ ♦ r
N
Con./Op. Pipeline Crossing ft.: UnknownVIIIIIIIII
�r♦
Construction Crossing ft.: 70.34
A
Operational Crossing ft.: 13.15
/
I
♦
9 ♦
I
�
d ♦.
♦
00
♦ ♦ ��
Nl
UlM
R
sso
San Cross
d
L
♦,,
Rd 1252
l
I
state
660
\
'I.
I
660
zc r4.
1
660 660 I
\ r
�t
I
!
MP 66.5°
o
I
�
i
�l
w
640
0
w
N
Legend
O Mileposts (MP, 0.5
mi)
- - H-650 Pipeline
--,Operational
L - -'Workspace
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
E_1 County Boundary
aJordan Lake
Watershed
Streams:
—Approximated Pond
_ Delineated
Ephemeral
— Delineated Pond
Approximated Pond
Pond
Approx_SS_Impact
Wetlands:
_ Delineated Wetland
Boundary
><—> Delineated PFO
ff�l
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--------- ------S:_E T,_EsR-I---------_eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
ply
Y �
Alamance
County
Sim7... H[I
L lTT
,ta �
a�
y� •
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 87 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
6`?0
N
0
620
co Qa
•0.. i
406
640
AS-NHD-7000: Int. (Temporary Access Road)
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Crossing Ft.: 25.98
Operational Crossing Ft.: 0.00
620
Jordan Lake
Watershed
w
0
610
610
TA -AL -179A
600
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 1,542.6E
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 1,021.9'
Zone 2 Operational Sq. Ft.: 0.00
0
0
660
660 6110
�� r SS-SOIL19-09: Per. (Temporary Access Road)
/ Con./Op. Pipeline Crossing ft.: 0.00
r' Construction Crossing ft.: 25.12
Operational Crossing ft.: 0.00
U01
Buffer Zone Impacts: 620
W-1319-164: PFO �'
Zone 1 Construction Sq. Ft.: 1,507.01
T Con./Op. Pipeline Crossing Ft.: 8.26 f. Zone 1 Operational Sq. Ft.: 0.00
Construction Acres: 0.03 Zone 2 Construction Sq. Ft.: 1,004.76
Operational Acres: 0.01** Zone 2 Operational Sq. Ft.: 0.00
0.
•� F MP'66.5 ' /' AW -1319-164: PFO
Con./Op. Pipeline Crossing Ft.: 32.24
k` • •� ; "'�' _ 4 . -*� Construction Acres: 0.07
Operational Acres: 0.02**
rn
0
0
Legend
0 Mileposts (MP, 0.5 —Approximated Pond
mi) —Delineated Pond
Temporary Access - Approximated Pond
Road
� Pond
- - H-650 Pipeline Approx_SS_Impact
--,Operational Wetlands:
- -'Workspace
Temporary Access — Delineated Wetland
ED Road Boundary
Limits of ®Approximated PFO
QConstruction Right- Delineated PFO
of -Way
Survey Area
L _ Adjacent Sheet
[:]County Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Intermittent
0 W r) an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
------------------------------------------------ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USES
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance"
County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 88 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
S20 510 yg0
S40 530
560 550 ` Buffer Zone Impacts:
580 570 Zone 1 Construction Sq. Ft.: 1,507.01
590 00 Zone 1 Operational Sq. Ft.: 0.00
6 , Zone 2 Construction Sq. Ft.: 1,004.76
Zone 2 Operational Sq. Ft.: 0.00
650
660
bo
SS-SOIL19-09: Per. (Temporary Access Road)
Con./Op. Pipeline Crossing ft.: 0.00
Construction Crossing ft.: 25.12
Operational Crossing ft.: 0.00
620
q
0
TA -AL -179A
• 3 •,
61'0 ti
0
5,�eei
AW -1319-164: PFO!
Con./Op. Pipeline Crossing Ft.: 32.24 �
Construction Acres: 0.07
Operational Acres: 0.02**
620
V
W-1319-164: PFO
Con./Op. Pipeline Crossing Ft.: 8.26
Construction Acres: 0.03
Operational Acres: 0.01 **
620
00
h
6201* a++
600�� w: �� a ••y `
16
yf
AS-NHD-3025: Int.**
Con./Op. Pipeline Crossing Ft.: 5.00 yw
Construction Crossing Ft.: 90.11 _
Operational Crossing Ft.: 60.33 AV
ii
* y. -s
6o3ARL
620
Impact 100VAR:
Zone 1 Construction Sq. Ft.: 5,401.07
Zone 1 Operational Sq. Ft.: 3,617.81
Zone 2 Construction Sq. Ft.: 3,645.54
Zone 2 Operational Sq. Ft.: 2,422.22
12O 610
7700110�_
_
. ire o
t.
l 590
yg0
0
I 0
I m
•r':
^il
Legend
0 Mileposts (MP, 0.5 —Approximated Pond
mi) _ Delineated
_ Temporary Access Ephemeral
Road Approximated Pond
- - H-650 Pipeline Approx_SS_Impact
--,Operational Wetlands:
L - -'Workspace
Delineated Wetland
ED Road
—Boundary
Road
=Approximated PFO
Limits of x Delineated PFO
=Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[:]County Boundary
=Jordan Lake
Watershed
Streams:
—Approximated
Intermittent
an
iiiia
ff�l
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�a
a
m°
N
Alamance
County
a�
t�1'
" i a quay •,e•,;,,,nis
}
4Zn
� x s
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 89 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
-��
Date: May 2019
I
I
I
I
0
ILO
s
cP0
I
I
i
Legend
0 Mileposts (MP, 0.5 —Approximated Pond
mi) _ Delineated
_ Temporary Access Ephemeral
Road Approximated Pond
- - H-650 Pipeline Approx_SS_Impact
--,Operational Wetlands:
L - -'Workspace
Delineated Wetland
ED Road
—Boundary
Road
=Approximated PFO
Limits of x Delineated PFO
=Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[:]County Boundary
=Jordan Lake
Watershed
Streams:
—Approximated
Intermittent
an
iiiia
ff�l
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�a
a
m°
N
Alamance
County
a�
t�1'
" i a quay •,e•,;,,,nis
}
4Zn
� x s
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 89 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
-��
Date: May 2019
• n
..17`
N
yg0
0
570 1
Adjacent Sheet.89 _ _ _ _ - —• - — — t
Impact 101VAR:
Zone 1 Construction Sq. Ft.: 8,630.30 1
Zone 1 Operational Sq. Ft.: 4,088.80 1
Zone 2 Construction Sq. Ft.: 5,569.20 1
Zone 2 Operational Sq. Ft.: 2,902.79 1
ti 1 A
Buffer Zone Impacts: o
Zone 1 Construction Sq. Ft.: 3,133.77 0
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 5,241.59
Zone 2 Operational Sq. Ft.: 0.00
61� 413
��''
510 • • . ISia,3�
' O
l�
TA -AL -180
Y �
ee�oN
Sr
. e
•1 _
Road "
� o
1
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 4,698.61
Zone 1 Operational Sq. Ft.: 1,020.74
Zone 2 Construction Sq. Ft.: 3,080.87
Zone 2 Operational Sq. Ft.: 2,052.53
AS -A18-177: Per.
Con./Op. Pipeline Crossing Ft.: 14.16
Construction Crossing Ft.: 76.25
Construction Sq. Ft.: 1,066.58
Operational Sq. Ft.: 0.00
1 SS-SOIL19-03: Per."
err„ _ 1 Con./Op. Pipeline Crossing ft.: Unknown
1,= Construction Crossing ft.: 144.47
1 Operational Crossing ft.: 64.78
1 ,
1
1
1
1
1
1
1
1
1
1
1
1 e
1
. 1
1 "
o
1
1
_ 1
1
1
1
1 �
1 �•
1
1
1 -
1
1
1
1
1
- 1
1
1
1
1
1
1
1
1
� 1
1
1 A
1
1
1
1
1
1
1
yD� 1
1
1
1
1
1
1
1
Legend
O Mileposts (MP, 0.5 —Approximated Pond
mi) _ Delineated
_ Temporary Access Ephemeral
Road _ Delineated
— — H-650 Pipeline Intermittent
-- Operational _ Delineated
1—Workspace Perennial
Temporary Access —Delineated Pond
ED RoadM1Approximated
Limits of Perennial
[::]Construction Right- - Approximated Pond
of -Way
Perennial Surface
Survey Area Water
L Adjacent Sheet - pond
Qcounty Boundary Approx_SS—Impact
aJordan Lake Wetlands:
Watershed
Delineated Wetland
Streams: — Boundary
—Approximated Delineated PFO
Intermittent
—Approximated
Perennial
® 5n an
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
CRV
C.J_lJ Md
P
1�
rea
o-
•0 1
c� a
AIane
C06,1nty
a�
„c
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 90 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
- - H-650 Pipeline
--,Operational
-
-'Workspace
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
E_1 County Boundary
aJordan Lake
Watershed
Streams:
Approximated
Perennial
_ Delineated
Perennial
- Approximated
Perennial
- Perennial Surface
Water
Approx_SS_Impact
Wetlands:
_ Delineated Wetland
Boundary
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Ny
Ror baro R p
Al^a7mance
County
Yom_
•o �
rp � 3°ro
m
a �=
$ g NoPed�e
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 91 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Intermittent
—Approximated Pond
Approximated Pond
Approx_SS_Impact
Wetlands:
_ Delineated Wetland
Boundary
0 W C) an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
p '
• � 5:ii,S�son Nrl
4a ; G� eert Lr.�c
• 0 }
1 Lr
•
"4. Alamance
.,County y
7
a ♦ {
5�
�,�,n,nuc,dep� c, �� ♦ t'il°J
� � z
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 92 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5 —Delineated
mi) Intermittent
_ Permanent Access _ Delineated
Road Perennial
- - H-650 Pipeline —Delineated Pond
--,Operational ' Perennial Surface
-
-'Workspace Water
ED
Permanent Access Pond
Road Wetlands:
Limits of Delineated Wetland
[::]Construction Right- — Boundary
of -Way
Survey Area ;X, Delineated PFO
L _ Adjacent Sheet
uCounty Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Intermittent
® soy
IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�o 1
•0 j
aaL' 1 �
1
Rha
$ _ 4
l - e
t'it`J
Alamance �•,
s5 County
µa ♦ .
ry N"0511 `'4 •
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 93 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
P,
.. o
vtLO
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 5,598.18
Zone 1 Operational Sq. Ft.: 3,554.33
Zone 2 Construction Sq. Ft.: 4,631.59
Zone 2 Operational Sq. Ft.: 2,967.51
AS-NHD-1552: Int. M
Con./Op. Pipeline Crossing Ft.: 5.00
Construction Crossing Ft.: 85.65
Operational Crossing Ft.: 51.58
{
owl quo •.
VIT M-2
S-1318-8: Int.
;fCon./p. Pipeline Crossing Ft.: 12.55
struction Crossing Ft.: 92.92
nstruction Sq. Ft.: 1,377.59
Operational Sq. Ft.: 0.00
e TA -AL -185
Z L
Impact 43VAR:
Zone 1 Construction Sq. Ft.: 5,847.49
Zone 1 Operational Sq. Ft.: 3,476.34
Zone 2 Construction Sq. Ft.: 4,056.77
Zone 2 Operational Sq. Ft.: 2,953.00
Ila
�o
Lo
C)
LO
580
550
5q0
530
, I �
=� MP 69.0 ,
S-1318-11: Int.**
Con./Op. Pipeline Crossing Ft.: 3.00
Construction Crossing Ft.: 90.69
Operational Crossinq Ft.: 54.08
Legend
o Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Temporary Access _ Delineated
Road Intermittent
- - H-650 Pipeline - Intermittent Surface
--,Operational Water
L - -'Workspace Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
F-iCounty Boundary
aJordan Lake
Watershed
Streams:
Approximated
Intermittent
® f� an
iiiia
l�
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
----------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
5
Bh �
Yh
• -� Rmbwa Rd
Vq M-aH
00
Alamancb
s County
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 94 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
—Approximated
Perennial
_ Delineated
Ephemeral
_ Delineated
Intermittent
Delineated
Temporary Access Perennial
ED
Road — Delineated Pond
Limits of - Approximated
Q Construction Right- Perennial
of -Way
Q Survey Area
L _ Adjacent Sheet
F-iCounty Boundary
aJordan Lake
Watershed
Streams:
—Approximated
Intermittent
- Perennial Surface
Water
M Pond
Wetlands:
_ Delineated Wetland
Boundary
�j14 Delineated PEM
*6
0 W C) an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�JU
s
°y
o-
• � si
F�
♦ w
rya �``•' .` .:w g
Alam anCe
County `
wm���, si a ♦ • •
Fp ♦
3
Gr�� 54
0
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 95 of 107
600 Willowbrook Ln
C? TRC West Chester, PA 19382
Date: May 2019
Y �? ss0
S,0
t
W-1319-146: PFO
p8o Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.11 +,-
-A% Operational Acres: 0.00** �a
Road _ Sj,0
570 S-1319-148: Int.
Con./Op. Pipeline Crossing Ft.: 0.00
g Construction Crossing Ft.: 97.58
Operational Crossing Ft.: 0.00 =
0
St
pelham St
�Y.
580
.o'
1�x-. to Rd 1935 'Ali, W
S-1319-147: Eph.
Con./Op. Pipeline Crossing Ft.: 1.00 ;
i r _ o • Construction Crossing Ft.: 223.12
'• ,��' � � 00 � Operational Crossing Ft.: 50.35
W-1319-173: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
S-1319-174: Int. Construction Acres: 0.13
Con./Op. Pipeline Crossing Ft.: 0.00 Operational Acres: 0.00
Impact 45VAR
Zone 1 Construction Sq. Ft.: 5,675.22
Zone 1 Operational Sq. Ft.: 1,242.12
Zone 2 Construction Sq. Ft.: 3,839.50
Zone 2 Operational Sq. Ft.: 2,398.32
x•'. �, -� r �; " ' Construction Crossing Ft.: 176.88 S70 l
'.:Operational Crossing
:'.SSO 40
70.0-
m 0 — —
AS -A18-115: Per.**
Con./Op. Pipeline Crossing Ft.: 18.27
Construction Crossing Ft.: 91.24
Construction Sq. Ft.: 985.54
Operational SQ. Ft.: 0.00
s�
O
ttiL• �
TA -AL -187 w ;aq►. t
R+tii=
15'
O
� o
Sqo ,•
5 :
1�
qo s2o
Legend
Mileposts (MP, 0.5
O
mi)
_Approximated
Intermittent
—Temporary Access
_Approximated
Road
Perennial
- - H-650 Pipeline
Delineated
--,Operational
_
Ephemeral
L - -'Workspace
Delineated
QOperational Bore
_
Intermittent
Temporary Access
ED
_ Delineated
Road
Perennial
Limits of
- Approximated
[::]Construction Right-
Perennial
of -Way
- Perennial Surface
F-1 Survey Area
Water
L _ Adjacent Sheet
Wetlands:
County Boundary
_ Delineated Wetland
Jordan Lake
Boundary
moi;
Watershed
Delineated PEM
Streams:
X^�x Delineated PFO
® f�
an
1�
Note:
iiiia
March 2019 Workspace
1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review
Per DWR# 20181638
Major Variance
----------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
aasPn.o �n �
AIamapce_ ••
C 0 U nhJ y
rte` • _ J • -
�G �{
_ �m
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 96 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 2,497.13
Zone 1 Operational Sq. Ft.: 590.16
Zone 2 Construction Sq. Ft.: 1,641.58
Zone 2 Operational Sq. Ft.: 1,118.82
S-1318-134: Int.**
Con./Op. Pipeline Crossing Ft.: 3.00
Construction Crossing Ft.: 92.44
Operational Crossing Ft.: 29.62
S-C18-82:Int.
Con./Op. Pipeline Crossing Ft.: 3.00
Construction Crossing Ft.: 92.31
Operational Crossing Ft.: 60.67
IWA•J
---------------vti --- ---------------------------
�. N�-t2
- 1
S-1318-135: Eph. �k S-1318-133: Per.
Con./Op. Pipeline Crossing Ft.: 2.00 Con./Op. Pipeline Crossing Ft.: 11.53
I Construction Crossing Ft.: 129.61 Construction Crossing Ft.: 82.61
+ ;? Operational Crossing Ft.: 75.18 Construction Sq. Ft.: 1,226.39
�3 Operational Sq. Ft.: 0.00
�.- Impact46VAR:-�
sj Zone 1 Construction Sq. Ft.: 5,980.41
Zone 1 Operational Sq. Ft.: 2,458.47 • • . ISi�3�
Zone 2 Construction Sq. Ft.: 5,794.29 W
Zone 2 Operational Sq. Ft.: 4,303.37 S'
U, 10
N
o •.r _
4013
490
T..
• 660'
.f 660
f -
I
Impact 47VAR:
Zone 1 Operational Sq. Ft.: 1,356.59
Zone 2 Operational Sq. Ft.: 2,698.47
oma- ---- r
r
490 . _490. .: r 4g0
MILL &P. - �':-A=.
Legend
0 Mileposts (MP, 0.5 - Perennial Surface
mi) Water
- - H-650 Pipeline Wetlands:
- -, Operational _ Delineated Wetland
L --'Workspace Boundary
Limits of
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
E_1 County Boundary
aJordan Lake
Watershed
Streams:
_ Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
® f� an
iiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
--- --n--e----a--p-,Data Sources: EQT, ESRI, NC OneMap, TRC, G--U--S----S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
W
�p3
Alamance r wee
County31� �e
d
Ea. �
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 97 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
1� x S6 �^ f
Buffer Zone Impacts: �� •r' „ �t
o , Zone 1 Construction Sq. Ft.: 1,725.58,��� j
Zone 1 Operational Sq. Ft.: 0.00
0 h� `' Zone 2 Construction Sq. Ft.: 1,211.29 1
Zone 2 Operational Sq. Ft.: 0.00
`sop
SSO
SS-SOIL18-09: Per. (Temporary Access Road)
r Con./Op. Pipeline Crossing ft.: 0.00Adjac +
Construction Crossing ft.: 12.22 550 ." • 1 - nt Sheet 99 -
Operational Crossing ft.: 0.00 5 i
40 550
f
' Mp 570
h TA -AL -189
TA -AL -188 i — 540
Legend
O Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Temporary Access _ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace -Perennial Surface
QTemporaryAccess Water
Road Approx_SS_Impact
Limits of Wetlands:
[::]Construction Right- _ Delineated Wetland
of -Way Boundary
Q Survey Area
L _ Adjacent Sheet
[:]County Boundary
QJordan Lake
Watershed
Streams:
Approximated
Perennial
an
iiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
----------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
0 Urn t y
b-nw4E
n�
S=
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 98 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
0
0
74
Impact 48VAR:
I
Zone 1 Construction Sq. Ft.: 4,973.68
4
+
Zone 1 Operational Sq. Ft.: 1,106.43
Q.
Zone 2 Construction Sq. Ft.: 3,311.06
`�
+
Zone 2 Operational Sq. Ft.: 2,207.74
"'�' - •. '
47
S -A18-107: Eph.
Con./Op. Pipeline Crossing Ft.: 1.00
i
Construction Crossing Ft.: 118.36
Operational Crossing Ft.: 72.88
a O
!
SSD .
S -A18-109: Per.
t
Con./Op. Pipeline Crossing Ft.: 5.00
480
1 .
Construction Crossing Ft.: 104.25
490
-
Operational Crossing Ft.: 54.25
480
+
480
480
S -C18-81: Per.**
T
Con./Op. Pipeline Crossing Ft.: 24.18
i 480 480
Construction Crossing Ft.: 83.02
-
480
; 480
Construction Sq. Ft.: 1,761.82
480
10
Operational Sq. Ft.: 0.00
S -A18-108: Int.
Con./Op. Pipeline Crossing Ft.: 2.00
Construction Crossing Ft.: 115.56
48
I�
Operational Crossing Ft.: 84.04
_
d��:.
U
+ate
•-
. ,
..
00
Legend
O Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Temporary Access _ Delineated
Road Intermittent
- - H-650 Pipeline _ Delineated
--,Operational Perennial
L - -'Workspace -Perennial Surface
QTemporaryAccess Water
Road Approx_SS_Impact
Limits of Wetlands:
[::]Construction Right- _ Delineated Wetland
of -Way Boundary
Q Survey Area
L _ Adjacent Sheet
[:]County Boundary
QJordan Lake
Watershed
Streams:
Approximated
Perennial
an
iiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance
----------------------------Application------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
0 Urn t y
b-nw4E
n�
S=
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 98 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
vim
s�
. 570 O O O
�o
oo,
�q
0
• o
M
h
V l
r
ry '
'.. .r 560 SS
Ralph Scott Elf
7.
41
Y+� 1
I � >R 570 ro
r
`S>o BOO
TA -AL -188
e n
---------------
* ;
L air
r ;
�. A;
;qtr
0
h
y2o
520
so
0
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[County Boundary
aJordan Lake
Watershed
Streams:
Wetlands:
_ Delineated Wetland
Boundary
0 W IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------S:_E T,_EsR-I-------------_ap-,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
County
c t
: cna 1 1
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 99 of 107
600 Willowbrook Ln
C TRC West Chester, PA 19382
�..,.w
" Date: May 2019
.1
,
0'
�s
110,5 '
�
ti
a
I.
P,
C
,t
lloomE
�14L_
1
s�
. 570 O O O
�o
oo,
�q
0
• o
M
h
V l
r
ry '
'.. .r 560 SS
Ralph Scott Elf
7.
41
Y+� 1
I � >R 570 ro
r
`S>o BOO
TA -AL -188
e n
---------------
* ;
L air
r ;
�. A;
;qtr
0
h
y2o
520
so
0
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[County Boundary
aJordan Lake
Watershed
Streams:
Wetlands:
_ Delineated Wetland
Boundary
0 W IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------S:_E T,_EsR-I-------------_ap-,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Alamance
County
c t
: cna 1 1
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 99 of 107
600 Willowbrook Ln
C TRC West Chester, PA 19382
�..,.w
" Date: May 2019
co
O
O '
5 0'
P cn
W
0
0
0
s
Aw
r.
s�o a Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 0.00
r
Zone 1 Operational Sq. Ft.: 0.00
oE SAO tt . �;. Zone 2 Construction Sq. Ft.: 879.51
o Zone 2 Operational Sq. Ft.: 879.51
a
CS,
`�-------- - -
---------- - - - - -- MP, 71.5 �T
...,
480 - S-A18-65:Int. 1�
q80 S -A18-64: Per. Con./Op. Pipeline Crossing Ft.: 1.00 480
Con./Op. Pipeline Crossing Ft.: 25.88 Construction Crossing Ft.: 109.91 r�
Construction Crossing Ft.: 74.95 Operational Crossing Ft.: 91.15 !�
Construction Sq. Ft.: 1,221.66
` 480 Operational Sq. Ft.: 0.00 i
x Y 480 F
1 Y 15
4: ..
A80 11
5.
o ar.
o _
LO
OI to Rd 22
O o 3 7
Valle IDr Sta
t
S 00 530
Legend
o Mileposts (MP, 0.5 —Delineated
mi) Perennial
_ Temporary Access — Delineated Pond
Road - Perennial Surface
- - H-650 Pipeline Water
--,Operational Pond
L - -'Workspace Wetlands:
ED
Temporary Access —Delineated Wetland
Road Boundary
Limits of
[::]Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
_ Delineated
Intermittent
® f� an
iiiia
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
-------------------------------------------eM__ p -,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
•• Alamance mV
County
' ��•— — 10— — 1 � 90� 0
•
4
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 100 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
_ Delineated
Intermittent
_ Delineated
Perennial
- Perennial Surface
Water
Wetlands:
ED
Temporary Access _ Delineated Wetland
Road Boundary
Limits of K,� Delineated PFO
Q Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
F-iCounty Boundary
aJordan Lake
Watershed
Streams:
Approximated
Intermittent
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
7
• amance
a�
o u n t y
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 101 of 107
600 Willowbrook Ln
CTRC West Chester, PA 19382
Date: May 2019
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
- - H-650 Pipeline
--,Operational
-
-'Workspace
Delineated
Ephemeral
_ Delineated
Intermittent
_ Delineated
Perennial
- Perennial Surface
EDTemporary Access Water
Road Wetlands:
Limits of _ Delineated Wetland
QConstruction Right- Boundary
of -Way -Delineated PEM
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
Approximated
Intermittent
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
J
Alamance
County
00 _ _ 0 0 ,
o �
x b
i•
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 102 of 107
600 Willowbrook Ln
CTRC West Chester, PA 19382
Date: May 2019
.r..
Buffer Zone Impacts:
Zone 1 Construction Sq. Ft.: 0.00
Zone 1 Operational Sq. Ft.: 0.00
Zone 2 Construction Sq. Ft.: 13.75
Zone 2 Operational Sq. Ft.: 0.00
W-1319-151: PEM J. J
Con./Op. Pipeline Crossing Ft.: 0.00 . J#�>0 0
Construction Acres: 0.15 ■■ 41, 0J. Q$°
Operational Acres: 0.00 ■■ ■■ ■ ■ MP 73.0
Q$o
4900
480
W-1319-151-3: PEM
Con./Op. Pipeline Crossing Ft.: 0.00
Construction Acres: 0.04
Operational Acres: 0.00
S�
0
0
rn
Legend
O Mileposts (MP, 0.5 Delineated
mi) Ephemeral
_ Permanent Access _ Delineated
Road Perennial
- - H-650 Pipeline - Approximated
--,Operational Perennial
--'Workspace -Perennial Surface
OPermanent Access Water
Road Wetlands:
Limits of _ Delineated Wetland
QConstruction Right- Boundary
of -Way -Delineated PEM
Survey Area
L _ Adjacent Sheet
County Boundary
aJordan Lake
Watershed
Streams:
Approximated
Perennial
an
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
o pd
Alamance
County
11
—uvly_�__r '1 �/
5
na,�mo�
A
S
C
ti
M Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Alamance County, NC
Sheet 103 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
640
i'
-AEW��
0
630
v
630
4e
g30
640
Legend
O Mileposts (MP, 0.5 M Approximated Pond
mi) Wetlands:
_ Temporary Access_ Delineated Wetland
Road Boundary
EDTemporary Access QApproximated PEM
Road
0'*;4 Delineated PEM
Limits of
[::]Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
QCounty Boundary
Streams:
Approximated
Ephemeral
—Approximated
Intermittent
—Approximated Pond
_ Delineated
Ephemeral
an
Note:
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC 0--n--e--M--a--p-,--T--R--C-,--U--S--G--S
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
41
O
Roc lingham ny
C o u,P-1 y
5`
d'
p@. M
4a
M
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 104 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
�..,.w
" Date: May 2019
ti t3� 1
owe o
00
0
cp
rO
10
00
h
00
0
TA-RO-082A
00
h
��o 0
O �
�O
AIN
s�
d
41 eco
0
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _ Adjacent Sheet
C_,County Boundary
Streams:
Wetlands:
_ Delineated Wetland
Boundary
0 W IM an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
- --------------------------------------------------------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
Rockingham
County"'e. 4�
9
¢ m
J! �
F
6T
�e
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 105 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
N
n
740
1928j-57105'Ke
Watershed
�S
O
C
Lr
O
n0
a t..
O
n
n
ego
190
0
_03
`140
J
Rd State Rd 2647
Legend
O Mileposts (MP, 0.5
mi)
_ Temporary Access
Road
EDTemporary Access
Road
Limits of
Q Construction Right -
of -Way
Q Survey Area
L _ Adjacent Sheet
[County Boundary
aJordan Lake
Watershed
Streams:
Wetlands:
Delineated Wetland
_
Boundary
Oj;� Delineated PEM
\^ Delineated PFO
0 W C) an
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
�i
� r
RI Rockingham
County
rtd
�Lanr�
rhr�Il
d -
a
g � 8
1-nr z - !�•
o-
n Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Rockingham County, NC
Sheet 106 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019
' t
goo
d
Rd 291 fl
Or Stiar,a N
r
eeK 750
Cedar C
w�
State Rd 2821 Harvest R
n -
NO
W
0
w�
a
0
760
�o
X146
� Stiatie
Rd
r Rd
C�urc
0
n
Friede so
m
_6111
• • . L' lwly
N
Z. -
m -
TA -G U-000
CY 09
Iro
0
W
O
� yo
Ito
3�
1
0
Bethel Church Rd State Rd 2930
ASO
Legend
O Mileposts (MP, 0.5 QApproximated PFO
mi) Delineated PFO
_ Temporary Access
Road
EDTemporary Access
Road
Limits of
[::]Construction Right -
of -Way
Survey Area
L _I Adjacent Sheet
lCounty Boundary
aJordan Lake
Watershed
Streams:
_ Delineated
Intermittent
Wetlands:
_ Delineated Wetland
Boundary
® soy
IM an
iiiia
Note: am
March 2019 Workspace 1 inch = 200 Feet
Construction (Con.) = Temporary Impacts
Operational (Op.) = Conversion Impacts for Wetlands
(Due to Vegetation Maintenance)
. = Permanent Conversion of Vegetation Cover Type From
PFO to PEM/PSS
.. = Buffer Impacts Under Review Per DWR# 20181638
Major Variance Application
----------------S:_E T,_EsR-I-------------_ap-,-------------------------------------------------------
Data Sources: EQT, ESRI, NC OneMap, TRC, USGS
Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour,
Project Imagery 412018, ESRI World Imagery
r �c
Guilford
County
RS
Ul!JU
MCLeansvlll
1'1 Mountain Valley
PIPELINE
Section 404/401 Permit Application Addendum
Proposed Pipeline Route and Impacts
Guilford County, NC
Sheet 107 of 107
600 Willowbrook Ln
TRC West Chester, PA 19382
Date: May 2019