April 15, 2019
Subject: Buffer Determination Letter
NBRRO #19-072 v2
Franklin County
This Buffer Determination letter for NBRRO #19-072 v2 replaces the buffer determination letter
NBRRO #19-072 v1 dated March 26, 2019.
Determination Type:
Buffer
Intermittent/Perennial
❑ Neuse (15A NCAC 213 .0233)
Start@
® Tar -Pamlico (15A NCAC 2B .0259)
El Intermittent/Perennial Determination (where local buffer'
ordinances apply)
❑ Jordan (15A NCAC 2B .0267).
Throughout X X
(governmental and/or interjurisdictional
projects)
X_
Project Name: Holden Farm (fka Brookfield)
Address/Location:
Alcock Lane, Youngsville
Stream(s): Brandy Creek
Determination Date: March 26, 2019 Staff: Stephanie Goss
Stream
E/I/P*
Not
Sub"ect
Subject
Start@
Stop@ Soil, j1JSGS
Surve o 0
A.
X
Throughout X X
B
X_
Off property
Flows into A X
C
X
X
*E/1/P = Ephemeral/Intermittent/Perennial
Ekplanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of
Wake County, North Carolina and/or the most, recent copy of the USGS Topographic map at a 1:24,000 scale.
Each stream that is checked "Not Subject" has been determined to not be at least intermittent or is not
r
WOM Nor-th (Car'olkw I)t.`p. ;u' meilt of EnvirOeitne,-?ta l Qua13ty 1}t Vi5lUit Oi L'VaYF':' RE�s{JtAE'E:E'4
Raleigh Regional Offt<:t: 3800 Bat; .11 Drive (IL�IciE}ir, Nortfi3 C"aratirux 2Tf.>OR
a<,paE<.a3aiu:e��oC anaE�t� +�.t 919.791.420(} - -
Holden Farm
Franklin County
April 15, 2019
Page 2 of 2
present. Streams that are checked "Subject" have been located on the property and possess characteristics
that qualify it to be at least an intermittent stream. There may be other streams located on the property that
do not show up on the maps referenced above but may be considered jurisdictional according to the US Army
Corps of Engineers.
This on-site determination shall expire five (5) years from the date of this letter. Landowners or
affected parties that dispute a determination made by the DWR may request a determination by the
Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a
determination by the Director shall be referred to the Director in writing. If sending via US Postal
Service: c/o Karen Higgins; DWR - 401 & Buffer Permitting Unit; 1617 Mail Service Center; Raleigh, NC
27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins; DWR - 401 & Buffer
Permitting Unit; 512 N. Salisbury Street; Raleigh, NC 27604.
This determination is final and binding unless, as detailed above, unless an appeal is requested within
sixty (60) days.
This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884.
If you have questions regarding this determination, please feel free to contact Stephanie Goss at (919)791-
4256.
Rick Bolich, LG
Assistant Supervisor, Water Quality Regional Operations Center
cc: RRO DWR File Copy
Kevin Martin via e-mail at kmartinPsandec.com
19-072: Holden Farm
Legend
Phase 5
Existing Phases
j u
�EASON CT
A: Subject
9th kY- SMAY
I
,0STATpo Map provided by NCDEQ
Legend:
yw� ' Division of Water Resources
a
Locations are approximate
Approximate Site boundary: = and are provided for
�� ,, reference only ::