HomeMy WebLinkAbout20181638 Ver 1_Appx C Construction Drawings_20181130M Mountain Valley Joint Permit Application
PIPELINEJu USACE — Wilmington District and NCDEQ
SAW -2018-008887
MVP Southgate Project
Standard Joint Permit Application
U.S. Army Corps of Engineers —
Wilmington District (SAW -2018-00887)
North Carolina Department of
Environmental Quality,
Division of Water Resources
Appendix C
Typical Construction Detail Drawings
November 2018
rl Mountain Valley
PIVELINE Lc
DRAWING NO.
DRAWING TITLE
REV.
CONST-TYP
MOUNTAIN VALLEY PIPELINE PROJECT PROPOSED H650 PIPELINE CONSTRUCTION TYPICALS
P1
MVP -3
MAINLINE CONSTRUCTION NON -PARALLEL CONSTRUCTION NO TOP SOIL SEGREGATION 100' R.O.W.
P
MVP -5
MAINLINE CONSTRUCTION ROAD CROSSING BORED 100' R.O.W.
P
MVP -7
MAINLINE CONSTRUCTION RAILROAD CROSSING BORED 100' R.O.W.
P
MVP -9
MAINLINE CONSTRUCTION WATERBODY CROSSING OPEN CUT- FLUME
P
MVP -10
MAINLINE CONSTRUCTION TYPICAL DIRECTIONAL DRILL ENTRY SITE PLAN & PROFILE
P
MVP -11
MAINLINE CONSTRUCTION TYPICAL DIRECTIONAL DRILL EXIT SITE PLAN & PROFILE
P
MVP -12
MAINLINE CONSTRUCTION HORIZONTAL DIRECTIONAL DRILL (HDD)
P
MVP -13
MAINLINE CONSTRUCTION PARALLEL TO POWER LINES 1 00'R.O.W.
P
MVP -17
MAINLINE CONSTRUCTION PARALLEL TO FOREIGN LINES 1 00'R.O.W.
P
MVP -25
MAINLINE CONSTRUCTION ROAD CROSSING BORED WITH PARALLEL PIPELINES 100' R.O.W.
P
MVP -27
MAINLINE CONSTRUCTION RAILROAD CROSSING BORED WITH PARALLEL PIPELINES 100' R.O.W.
P
MVP -29
MAINLINE CONSTRUCTION WATERBODY CROSSING WITH PARALLEL PIPELINES OPEN CUT - FLUME
P
MVP -SG -17
SLOPE BREAKER/RIGHT-OF-WAY DIVERSION/WATERBAR
P1
MVP -SG -17.1
SLOPE BREAKER/RIGHT-OF-WAY DIVERSION/WATERBAR
P1
MVP -SG -17.2
SLOPE BREAKER/RIGHT-OF-WAY DIVERSION/WATERBAR
P1
MVP -SG -17.3
WATERBAR END TREATMENT PERPENDICULAR TO SLOPE EXAMPLE
P1
MVP -SG -17.4
WATERBAR END TREATMENT CROSS SLOPE EXAMPLE
P1
MVP -SG -17.7
WATERBAR END TREATMENT DETAIL
P1
MVP -SG -20
TYPICAL TRENCH BREAKER REQUIREMENTS
P1
MVP -SG -24
SIDEHILL LOW -POINTS DRAIN TYPICAL
P1
MVP -SG -24
SIDEHILL LOW -POINTS DRAIN TYPICAL
P1
MVP -SG -31
MAINLINE CONSTRUCTION STEEP HILL PARALLEL CONSTRUCTION NO TOP SOIL SEGREGATION
P1
MVP SOUTHGATE PROJECT
PROPOSED H-650 PIPELINE
ENGINEERING SERVICES DESIGN; JOB NUMBERS 300423
CONSTRUCTION TYPICAL DRAWINGS
DRAWING NO.
DRAWING TITLE
REV.
MVP -SG -32
MAINLINE CONSTRUCTION STEEP HILL STOVE PIPE CONSTRUCTION NO TOP SOIL SEGREGATION
P1
MVP -SG -35
TRENCH BREAKER DAYLIGHT DRAIN
P1
MVP -SG -36A
CUTOFF DRAIN-SIDEHILL
P1
MVP -SG -36B
CUTOFF DRAIN-SIDEHILL
P1
MVP -SG -37
CUTOFF DRAIN -PLANAR
P1
MVP -SG -38A
TRANSVERSE TRENCH DRAIN
P1
MVP -SG -38B
TRANSVERSE TRENCH DRAIN
P1
MVP -SG -39
ROCK LINED SWALE
P1
MVP -SG -40
RIP -RAP NATURAL DRAIN
P1
MVP -SG -41
RIP -RAP SLOPE BREAKERS
P1
MVP -SG -42A
GEOGRID-SIDEHILL
P1
MVP -SG -42B
GEOGRID-PLANAR
P1
MVP -SG -42C
GEOGRID-NOTES
P1
MVP -SG -43A
TRENCH BREAKER PASS-THROUGH DRAIN
P1
MVP -SG -43B
TRENCH BREAKER PASS-THROUGH DRAIN
P1
MVP -SG -44A
SLIDE MITIGATION HIGHWALL REVETMENT SIDE VIEW
P1
MVP -SG -44B
SLIDE MITIGATION HIGHWALL REVETMENT FRONT VIEWAND DRAIN DETAIL
P1
MVP -SG -45
STEEP SLOPE REVETMENT
P1
MVP -SG -46
BROW DITCH DETAIL
P1
MVP -SG -47
TIMBER MATAND PIPE BUNDLE TEMPORARY STREAM CROSSING
P1
MVP -SG -48
TIMBER MAT AND JERSEY BARRIER TEMPORARY STREAM CROSSING
P1
MVP -SG -49
MOBILE BRIDGE
P1
MVP -SG -50
MODULAR TEMPORARY BAILEY BRIDGE
P1
MVP -SG -53
WETLAND CROSSING TYPICAL FOR USACE NORFOLK (VA) DISTRICT
P1
ff
D FOR
RC
/18
M kibi_Incr.;- MOUNTAIN VALLEY PIPELINE
SOUTHGATE PROJECT
PROPOSED H-650 PIPELINE
CONSTRUCTION TYPICALS
PROJECT ID
300423 FAni IN I STATF I IUNTIFIcATinN I SFRIFS I SHF
MVP IVA/NCI CONST-TYP I - 1 1 1 P1
WORKING AREA
File Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-3.dwg
NOTE:
1. DRAWING DEPICTS SOIL SWELL OF 20% AND
ROCK SWELL OF 40%.
2. DRAWING ASSUMES TYPE "C" SOIL
THIS TYPICAL CONSTRUCTION DETAIL IS
INTENDED TO PROVIDE GUIDANCE TO THE
PIPELINE CONTRACTOR. THE ACTUAL
CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
REFERENCE DRAWINGS
NO. DATE REVISION BY CHK APPD
NO. DATE
REVISION BY CHK APPD
TO THE BEST OF MY KNOWLEDGE, ALL COMPONENTS OF THIS DRAWING ARE
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS
ALINA LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE
ELECTRICALDESIGNENGINEER DATE
ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE
APPROVED BY THE DESIGN ENGINEER.
p Mountain Valle
DESIGNENGINEERING
DRAWING TITLE:
MAINLINE CONSTRUCTION
NON—PARALLEL CONSTRUCTION
WITH TOP SOIL SEGREGATION
100' RIGHT OF WAY
o DRAWING NUMBER DRAWING TITLE
P 05/07/2018 PRELIMINARY FOR RENEW JIL AAL NFF
—
P1 11/02/2018 ISSUED FOR FERC MEM AAL NFF
—
[
_
—
—
—
—
—
PROJECT ID
— — — —IFACILITY1
E
—
—
STATE
I IDENTIFICATION
SERIES
I SHEET
IREVISION
—
— P11NOTE:
!DRAWING 316" = 1 1-0"
MVP
VR/NC
H-650
3
1
P1
—
File Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-3.dwg
0
0
0
0
0
0
0
0
0
I
0
E
Q
s
SPOIL SIDE
PROPOSED
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PIPELINE
�
w
WORKING
o
SIDE I
I
o
3
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
0
0
0
I
0
E
Q
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
REFERENCE DRAWINGS
NO. DATE REVISION BY CHK APPD
NO. DATE
REVISION BY CHK APPD
TO THE BEST OF MY KNOWLEDGE, ALL COMPONENTS OF THIS DRAWING ARE
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS
ALINA LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE
ELECTRICALDESIGNENGINEER DATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE
4 Mountain VaNy
DESIGN ENGINEERING
DRAWING TITLE:
MAINLINE CONSTRUCTION
ROAD CROSSING BORED
1003 RIGHT OF WAY
DRAWING NUMBER DRAWING TITLE
P1 0502/2018 PRELIMISSINARYEW
FOR FERC MEN AAL NFF
-
c
-
-
PROJECTID
— — — —
E
-
-
FACILITY
I STATE
I IDENTIFICATION
SERIES
SHEET
REVISION
-
-
DRAWING SCALE:
MVP
VR/NC
H-650
5
1
P 1
APPROVED BY THE DESIGN ENGINEER.
- 11-0.
3th: CAVault Working\Systems\MVP\South(iate\Construction Typicals\MVP-5.dwg
3
o �
ICL
M CL
REFERENCE DRAWINGSA N0. 1 DATE REVISION
DRAWING NUMBER DRAWING TITLE P 05/07/2018 PRELNMIN
ile Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-7.dwg
DATE REVISION BY CHK IAPPDI IU IME BES I Ur MT KNUWLEUUE, ALL LUMYUNEN I b OF I MIb UKAWINU Alit DRAWING TITLE:
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS 4 Mountain Valley
ALINA LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE DESIGN ENGINEERING
PROJECT ID
ELECTRICAL DESIGN ENGINEER DATE FACILITY I STATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE DRAWINGALE:
GALE: - 11-0, MVP VR/NC
APPROVED BY THE DESIGN ENGINEER.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
MAINLINE CONSTRUCTION
RAILROAD CROSSING BORED
100' RIGHT OF WAY
H-650 1 7 1 1 1 P1
0
0
xX
ADDITIONAL
TEMPORARY
WORKSPACE
DITCH
SPOIL
STORAGE
TRENCH PLUG
50'-0" 11 1 1 / 50'-0"
( I �
SANDBAGS & II I
IMPERMEABLE CULVERTS
LINER __\
DITCH
SPOIL
STORAGE
0
-o
0
JRARY BRIDGE
NEEDED) TRENCH PLUG +
WORKING SID / I I
100'—O"
50'-0" I / 50'-0"
I�
0
0
E
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
REFERENCE DRAWINGS
NO. DATE REVISION BY CHK APPT
NO. DATE
REVISION BY CHK ppo
TO THE BEST OF MY KNOWLEDGE, ALL COMPONENTS OF THIS DRAWING ARE
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS
ALINA LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE
ELECTRICAL DESIGN ENGINEER DATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE
APPROVED
APPROVED BY THE DESIGN ENGINEER.
4 MountainValle
DESIGN ENGINEERING
DRAWING TITLE:
MAINLINE CONSTRUCTION
WATERBODY CROSSING
OPEN CUT - FLUME
DRAWING NUMBER DRAWING TITLE
P 05/07/2018 PRELIMINARY FOR REVIEW JIL AAL NFF
—
P, 11/02/2018 ISSUED FOR FERC MEM AAL NFF
-
E
_
_
—
—
PROJECT ID
FACILITY
I STATE
I IDENTIFICATION
SERIES
SHEET
REVISION
—
—
DRAWING SCALE -
MVP
VR/NC
H - 650
9
1
P 1
the CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-9.dwg
EQUIPMENT:
1. SPOIL CONTAINER: 8' X 20'
2. SHAKER: 8' X 12'
3. DESILTER: 8' X 8'
4. MUD RIG: 8' X 25'
5. SUPPLY TRAILER: 8' X 25'
6. ENTRY PIT: 8' X 20'
7. STORAGE: 30' X 30'
8. VEHICLE PARKING: 15' X 50'
9. POWER UNIT: 8' X 10'
10. DRILL PIPE: 30' X 30'
11. CRANE: 8' X 8'
12. DRILLING RIG: 8' X 45'
13. SURVEY TRAILER: 8' X 25'
SUPPORT
EQUIPMENT
LIGHT
PLANT
DESILTER
SHAKER
2
SPIL1
CONTAINER
MUD RIG
STORAGE
FOR BULK
MUD AND
AUXILIARY
EQUIPMENT
7
350'-0"
IONS MAY
POWER
LIGHT UNIT
PLANT DRILLING
SUPPLY ,.�.,,_ RIG
SURVEY
TRAILER
TRAILER
ARKING
f VEHICLE
5 9 13
4 I 12 I { 6
11 I� II
DRILL
PIPE
CRANE 10
TYPICAL WORKSPACE LIMITS
DRILL RIG
{� LIGHT
PLANT
z —CONTAINMENT
ENTRY PIT
ENTRY SITE PLAN
SCALE: N.T.S.
DRILLED PATH
CENTERLINE
ENTRY/ SIDE
SIDE EXIT
WATERCOURSE
MINIMUM REQUIRED
CLEARANCE
PROFILE
SCALE: N.T.S.
CONCEPTUAL
PIPE
PROFILE
REFERENCE DRAWINGS
NO. DATE REVISION BY I CHK OP11
N0. I DATE I REVISION BY I CHK jkPPD
TO THE BEST OF MY KNOWLEDGE, ALL COMPONENTS OF THIS DRAWING ARE
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS
ALINA LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE
ELECTRICAL DESIGN ENGINEER DATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE
APPROVED BY THE DESIGN ENGINEER.
M Mountain Valle y
°^°•°
DESIGN ENGINEERING
DRAWING TITLE:
DRAWING TITLE
P 05/07/2018 PREUMINARY FOR REVIEW AL AAL NFF
—
P1 11/02/2018 ISSUED FOR FERC MEM AAL NFF
—
_
_
—
—
PROJECT ID
FACILITY
STATE
—
—
DRAWING SCALE:MVP
I NTS
VR/NC
—
—
ile Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-10.dwg
NOTES:
1. EQUIPMENT ORIENTATION MAY VARY DEPENDING
ON CONTRACTOR OR SITE CONDITIONS.
2. EQUIPMENT TO BE SUPPORTED ON THE GROUND
SURFACE OR TIMBER MATS AS CONDITIONS DICTATE.
3. SILT FENCE, BERMS AND/OR STRAW BALE BARRIER
TO BE USED AS REQUIRED TO PREVENT IMPACTS
FROM OCCURRING OUTSIDE OF PROJECT LIMITS.
4. HAND CLEARED ACCESS PATH WILL BE USED TO
OBTAIN WATER FROM SOURCE WHERE PERMITTED.
5. ENTRANCE & EXIT ANGLES VARY BY LOCATION.
REFER TO BORE PROFILE FOR DETAILED
INFORMATION.
GENERAL NOTES:
1. PIPE DEPTHS MAY VARY.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
MAINLINE CONSTRUCTION
TYPICAL DIRECTIONAL DRILL
ENTRY SITE PLAN & PROFILE
H-650 1 10 1 1 1 P1
EQUIPMENT:
1. SPOIL CONTAINER: 8' X 20'
375'-0"
2. SHAKER: 8' X 12'
(DIMENSIONS MAY VARY)
3. DESILTER: 8' X 8'
4. MUD RIG: 8' X 25'
w
c�
5. SUPPLY TRAILER: 8' X 25'
o
VEHICLE
6. EXIT PIT: 8' X 10'
N
I
PARKING
8
7. STORAGE: 30' X 30'
i
8. VEHICLE PARKING: 15' X 50'
3
9. DEWATERING UNIT: 8' X 20'
10. PIPE TRAILER: 8' X 40'
I
DEWATERING
i
� IT
9
I
----------------------
I
�---
--
1
SPOIL CONTAINER
^>
3o
IG
MUD RIG—]
4 3 2
❑
a
C5
r
a
w
SEE NOTE
CONTAINMENT BERMPIPE
ROLLERS
w
o
Z
EXIT PIT—
SPACING
Z
N
z
o
DESILTER77�SHAKER
a
"
a
w
<=
5
10 LIGHT
LIGHT
PLANT
----------�
_
PLANT SUPPLY PIPE
—
—
I
TRAILER i
TRAILER
i
STORAGE
i
FOR
BULK
I
i
MUD
AND
AUXILIARY
i
EQUIPMENT
7
— — — —-----------------------------
— ------------------------------------
TYPICAL
WORKSPACE
LIMITS
SUPPORT
EQUIPMENT
REFERENCE DRAWINGS
ile Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-11.dwg
ENTRY
SIDE
DRILL RIG
EXIT SITE PLAN
SCALE: N.T.S.
WATERCOURSE
PROFILE
SCALE: N.T.S.
EXIT
SIDE
CONCEPTUAL
PIPE
PROFILE
I U I M[ C[�, I OF MT RMUWL[UU[, ALL LUMYUM[AN I b OF I MIb UKAWIINU AK[ DRAWING TITLE:
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS M Mountain Valley
ALINA LAWRENCE 06/11/18 ".
MECHANICAL DESIGN ENGINEER DATE DESIGN ENGINEERING
PROJECT ID
ELECTRICAL DESIGN ENGINEER DATE FACILITY STATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE DRAWING SCALE -
1' -0, MVP VR/NC
APPROVED BY THE DESIGN ENGINEER.
NOTES:
1. EQUIPMENT ORIENTATION MAY VARY DEPENDING
ON CONTRACTOR OR SITE CONDITIONS.
2. EQUIPMENT TO BE SUPPORTED ON THE GROUND
SURFACE OR TIMBER MATS AS CONDITIONS
DICTATE.
3. SILT FENCE, BERMS AND/OR STRAW BALE BARRIER
TO BE USED AS REQUIRED TO PREVENT
IMPACTS FROM OCCURRING OUTSIDE OF
PROJECT LIMITS.
4. HAND CLEARED ACCESS PATH WILL BE USED TO
OBTAIN WATER FROM SOURCE WHERE PERMITTED.
GENERAL NOTES:
1. PIPE DEPTHS MAY VARY.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
MAINLINE CONSTRUCTION
TYPICAL DIRECTIONAL DRILL
EXIT SITE PLAN & PROFILE
H-650 1 11 1 1 1 P1 �
EQUIPMENT:
1. SPOIL CONTAINER: 8' X 20'
2. SHAKER: 8' X 12'
3. DESILTER: 8' X 8'
4. MUD RIG: 8' X 25'
5. SUPPLY TRAILER: 8' X 25'
6. EXIT PIT: 8' X 10'
7. STORAGE: 30' X 30'
8. VEHICLE PARKING: 15' X 50'
9. DEWATERING UNIT: 8' X 20'
10. PIPE TRAILER: 8' X 40'
NOTES:
1. SET UP DRILLING EQUIPMENT A MINIMUM OF 100 FEET FROM THE EDGE OF THE WATERCOURSE.
DO NOT CLEAR OR GRADE WITHIN THE 100 FOOT ZONE.
2. ENSURE THAT ONLY BENTONITE BASED DRILLING MUD IS USED. DO NOT ALLOW THE USE OF
ANY ADDITIVES TO THE DRILLING MUD WITHOUT THE APPROVAL OF COMPANY INSPECTOR.
3. INSTALL SUITABLE DRILLING MUD TANKS OR SUMPS TO PREVENT CONTAMINATION OF WATERCOURSE.
4. INSTALL BERMS DOWNSLOPE FROM THE DRILL ENTRY AND ANTICIPATED EXIT POINTS TO CONTAIN
ANY RELEASE OF DRILLING MUD.
5. DISPOSE OF DRILLING MUD IN ACCORDANCE WITH THE APPROPRIATE REGULATORY AUTHORITY
REQUIREMENTS.
E
Q
6. A SEDIMENT BARRIER SHALL BE PLACED ON THE DOWN SLOPE SIDE OF RIGHT—OF—WAY, PER THE
PROJECT NARRATIVE.
REFERENCE DRAWINGS N0. DATE R
DRAWING NUMBER DRAWING TITLE P 1 05/07/2018 1
P1 11/02 2018
ile Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-12.dwg
HORIZONTAL DIRECTIONAL DRILL METHOD 7
PLAN
ENTRY
POINT WATERBODY
CONCEPTUAL
PIPE PROFILE
REQUIRED DEPTH
m f") /'\ r l l T—
EXIT
POINT
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS
M Mountain Valley
..
ALINA LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE
DESIGN ENGINEERING
PROJECT ID
ELECTRICAL DESIGN ENGINEER DATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE
DRAWING SCALE:
APPROVED BY THE DESIGN ENGINEER.
1/64" = 1'-0"
NOTES:
1. EQUIPMENT ORIENTATION MAY VARY DEPENDING
ON CONTRACTOR OR SITE CONDITIONS.
2. EQUIPMENT TO BE SUPPORTED ON THE GROUND
SURFACE OR TIMBER MATS AS CONDITIONS DICTATE.
3. SILT FENCE, BERMS AND/OR STRAW BALE BARRIER
TO BE USED AS REQUIRED TO PREVENT IMPACTS
FROM OCCURRING OUTSIDE OF PROJECT LIMITS.
4. HAND CLEARED ACCESS PATH WILL BE USED TO
OBTAIN WATER FROM SOURCE WHERE PERMITTED.
5. ENTRANCE & EXIT ANGLES VARY BY LOCATION.
REFER TO BORE PROFILE FOR DETAILED
INFORMATION.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
DRAWING TITLE:
MAINLINE CONSTRUCTION
HORIZONTAL DIRECTIONAL DRILL
(HDD)
=ACILITY I STATE I IDENTIFICATION I SERIES I SHEET IREVISION
MVP VA/NC H-650 1 12 1 1 1 P1
REFERENCE DRAWINGS �� N0. DATEREVISION
DRAWING NUMBER I DRAWING TITLE P 05/07/2018 PRELIMIN
File Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-13.dwg
DATE
REVISION
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS
ALINA LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE
ELECTRICAL DESIGN ENGINEER DATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE
DRAWING TITLE:
M Mountain Valley
DESIGN ENGINEERING
ECT ID
-- FACILITY
ONG SCALE:
1/8° = 1'-0• MVP
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
MAINLINE CONSTRUCTION
PARALLEL TO POWER LINES
100' RIGHT OF WAY
H-650 1 13 1 1 1 P1
WORKING
AREA
SIDEBOOM
WITH
COUNTERWEIGHT
EXTENDED
REFERENCE DRAWINGS
NO. DATE REVISION BY CHK APPD
NO. DATE REVISION BY I CHK JAPPI)l
TO THE BEST OF MY KNOWLEDGE, ALL COMPONENTS OF THIS DRAWING ARE
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS
ALINA LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE
ELECTRICAL DESIGN ENGINEER DATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE
APPROVED BY THE DESIGN ENGINEER.
M Mountain Valley
^°—,
DESIGN ENGINEERING
DRAWING TITLE:
DRAWING NUMBER DRAWING TITLE
P 05/07/2018 PRELIMINARY FOR REVIEW UIL AAL NFF
—
P1 11/02/2018 ISSUED FOR FERC MDA AAL NFF
—
_
_
—
—
PROJECT ID
FACILITY
STATE
—
—
DRAWING SCALE:— 1 —D"
MVP
VR/NC
File Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-17.dwg
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
MAINLINE CONSTRUCTION
PARALLEL TO FORIEGN LINES
100' RIGHT OF WAY
H-650 1 17 1 1 1 P1
O
O
E
Q
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
REFERENCE DRAWINGS
NO. DATE REVISION BY CHL APPD
NO. DATE
REVISION BY CHK APPD
TO THE BEST OF MY KNOWLEDGE, ALL COMPONENTS OF THIS DRAWING ARE
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS
LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE
ELECTRICAL DESIGN ENGINEER DATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE
Q Mountain Valle r
DESIGN ENGINEERING
DRAWING TITLE:
MAINLINE CONSTRUCTION
ROAD CROSSING BORED WITH PARALLEL PIPELINES
100' RIGHT OF WAY
DRAWING NUMBER DRAWING TITLE
2018 PR LIMINA FOR EC Lw
P1 05/02/
018 FOR FERMEN AAL NFF
ISSEALINA
—
c
—
—
PROJECTID
— — — —
E
—
—
FACILITY
STATE
IDENTIFICATION
T SERIES
SHEET
REVISION
—
—
!DRAWING
MVP
VR/NC
H-650
25
1 1
1 P1
APPROVED BY THE DESIGN ENGINEER.
— 1 -D"
ile Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-25.dwg
C
CI
O
O
E
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
REFERENCE DRAWINGS
No. DATE REVISION BY tRN APPD
No. DATE
REVISION sr [MN APPD
TO THE BEST OF MY KNOWLEDGE, ALL COMPONENTS OF THIS DRAWING ARE
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS
ALINA LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE
ELECTRICALDESIGNENGINEER DATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BEDRAWING1C32"
APPROVED BY THE DESIGN ENGINEER.
P Mountain Valle
DESIGN ENGINEERING
DRAWING TITLE:
MAINLINE CONSTRUCTION
RAILROAD CROSSING BORED WITH PARALLEL PIPELINES
100 RIGHT OF WAY
o DRAWING NUMBER DRAWING TITLE
P 05/07/2018 PRELIMINARY FOR RENEW JIL AAL NFF
-
P, 11/02/2018 ISSUED FOR FERC MEM AAL NFF
—
[
_
_
—
—
PROJECTID
— — — —
E
—
—
FACILITY
STATE
IDENTIFICATION
I SERIES
I SHEET
IREVISION
-
-
= 1'-0"
MVP
VR/NC
H-650
27
1
P1
-
ile Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-2T.dwg
G
u
I
REFERENCE DRAWINGS
File Path: CAVault Working\Systems\MVP\SouthGate\Construction Typicals\MVP-I9.dwg
TO THE BEST OF MY KNOWLEDGE, ALL COMPONENTS OF THIS DRAWING ARE
DESIGNED IN ACCORDANCE WITH APPLICABLE GUIDELINES AND SPECIFICATIONS
ALINA LAWRENCE 06/11/18
MECHANICAL DESIGN ENGINEER DATE
ELECTRICAL DESIGN ENGINEER DATE
NOTE: ANY CHANGES TO THE DESIGN SHOWN ON THIS DRAWING MUST BE
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "C" SOIL
DRAWING TITLE:
171 Mountainvallex
MAINLINE CONSTRUCTION
WATERBODY CROSSING WITH PARALLEL PIPELINES
OPEN CUT — FLUME
DESIGN ENGINEERING
20JECT ID
FACILITYI
STATE
I IDENTIFICATION
I SERIES
I SHEET
REVISION
tAWl1�8ALE:1 0"
MVP
VA/NC
H-650
29
1
1 P1
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR. LIMITS OF
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER R.O.W.
DEPENDING UPON FIELD CONDITIONS AND OR R.O.W. DISTURBED R.O.W.
REGULATORY REQUIREMENTS. BOUNDARY 5%, BOUNDARY
MAX. r
r
'L' OR 'J' HOOK L
SILT FENCE EDGE ❑F
ENERGY$ DISTURBED
DISSIPATOR DIST
KEY SILT FENCE
INTO WATER
BAR
TEMPORARY BMPS
FLOW +
i
STRAW BALE 6
ENERGY $'
DISSIPATOR
KEY STRAW BALE
INTO WATER BAR
11 1
FLOW
ROCK
ENERGY
DISSIPATOR
KEY ROCKS INTO
WATER BAR
PERMANENT BMPS
STABLE
VEGETATED
AREA
PLAN VIEW
2' MINI, 'UtAof
18,
/ � /�' ��• /\ 5' MIS'
NOTES'
1, SLOPE BREAKERS SHALL BE CONSTRUCTED OF COMPACTED NATIVE SOIL AND INSTALLED AT LOCATIONS AS SHOWN ON THE
CONSTRUCTION DRAWINGS OR AS DIRECTED BY THE COMPANY'S INSPECTOR,
2, SLOPE BREAKERS SHALL BE ORIENTED AS SHOWN OR OTHER PATTERN AS DIRECTED BY THE COMPANY'S INSPECTOR TO DIRECT THE
WATER OFF THE R,O,W,
3, SLOPE BREAKERS SHALL BE CONSTRUCTED AT A 5% MAXIMUM GRADIENT ACROSS THE SLOPE,
4. THE SLOPE BREAKERSSHALL BE 18' DEEP (AS MEASURED FROM THE TROUGH TO THE TOP OF THE SLOPE BREAKER), THE TROUGH
WILL BE A MINIMUM OF 5' WIDE ACROSS THE WIDTH OF THE RIGHT—OF—WAY,
5. THE OUTLET OF THE SLOPE BREAKER MUST FREELY DISCHARGE RUNOFF OFF FROM THE DISTURBED RIGHT—OF—WAY INTO A STABLE,
WELL VEGETATED AREA OR INTO AN ENERGY DISSIPATER,
6, WHERE SLOPE BREAKERS EXTEND BEYOND THE EDGE OF THE CONSTRUCTION R,O,W, DIRECT RUNOFF INTO STABLE, WELL VEGETATED
AREAS, THESE LOCATIONS MUST BE APPROVED BY THE COMPANY'S INSPECTOR,
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
CHECKED XXX DATE X/X/2018 M Mountain Valley
APP'D XXX DATE X/X/2018 PIPELINE uc
SCALE N.T.S. SHEET 1 of 1 SLOPE BREAKER/RIGHT—OF—WAY
DIVERS ION/WATERBAR
JOB NO.
PROJECT ID:
DRAWING NO. REV.
H-650-TYP MVP -SG -17 P1
9" MINIMUM
COMP
FINISHED GRADE
18" MINIMUM AFTER
COMPACTION
FINISHED GRADE
SECTION A -A
(TEMPORARY INSTALLATION)
SECTION A -A
(PERMANENT INSTALLATION)
JNDED
JFIGURATION
,ULAR
JFIGURATION
ROUNDED
CONFIGURATION
ANGULAR
CONFIGURATION
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
M Mountain Valley
PIPELINE uc
SKETCH
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL I
SLOPE BREAKER/RIGHT-OF-WAY
DIVERS ION/WATERBAR
DRAWING NO. REV.
MVP -SG -17.1 1 P1
RECOMMENDED MAXIMUM SPACING FOR
PERMANENT SLOPE BREAKERS
PIPELINE GRADE DISTANCE (FEET)
<2% - 1,2
2-5% 400
6-15% 200
16-30% 100
>31% 503
1 PERMANENT SL❑PE BREAKERS WILL BE INSTALLED AS NEEDED BASED
❑N FIELD C❑NDITI❑NS,
2 PERMANENT SL❑PE BREAKERS WILL BE INSTALLED 25 FEET FR❑M
EACH WATERB❑DY BOUNDARY REGARDLESS ❑F SL❑PE C❑NDITI❑NS,
3 SL❑PES GREATER THAN 65% MAY REQUIRE SITE SPECIFIC
STABILIZATI❑N MEASURES BASED ❑N FIELD C❑NDITI❑NS AS APPROVED
BY MVP DESIGN ENGINEERING AND MVP ENVIRONMENTAL INSPECT❑R,
N❑TES;
WATERBARS SHALL BE INSPECTED WEEKLY (DAILY ❑N ACTIVE R❑ADS) AND
AFTER EACH RUN❑FF EVENT, DAMAGED ❑R ER❑DED WATERBARS SHALL BE
REST❑RED T❑ ORIGINAL DIMENSI❑NS WITHIN 24 H❑URS ❑F INSPECTI❑N
MAINTENANCE ❑F WATERBARS SHALL BE PROVIDED UNTIL ROADWAY,
SKIDTRAIL, ❑R RIGHT -❑F -WAY HAS ACHIEVED PERMANENT STABILIZATI❑N
WATERBARS ❑N RETIRED ROADWAYS, SKIDTRAILS, AND RIGHT -❑F -WAYS
SHALL BE LEFT IN PLACE AFTER PERMANENT STABILIZATI❑N HAS BEEN
ACHIEVED
SUMP FILTERS T❑ BE INSTALLED AT END ❑F WATERBARS, REFER T❑ SUMP
FILTER DETAIL ❑N SHEET 0,09 F❑R M❑RE DETAIL,
OUTLET PR❑TECTI❑N/C❑MP❑ST FILTER S❑CK SH❑ULD BE INSTALLED AT THE
OUTLET ❑F ALL WATERBARS,
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
M Mountain Valley
PIPELINE u,
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
SLOPE BREAKER/RIGHT-OF-WAY
DIVERSION/WATERBAR
DRAWING NO. REV.
MVP -SG -17.2 1 P1
100' TEMPORARY RIGHT-OF-WAY
ATR B P I G AB ;�4 I TLOPE O T PI D TAI M P- 7.50'PERMANENT
' 1 RIGHT-OF-WAY
T
DRAWN TRC
DATE
8/7/2018
M
Mountain Valley
PIPELINE uc
CHECKED XXX DATE X/X/2018
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
E T YVATEl
a/OLT—
NS
WATER BAR END
TREATMENT
(TYP. )
YPICAL CONSTRUCTION DETAI
WATERBAR END TREATMENT
PERPENDICULAR TO SLOPE EXAMPLE
DRAWING N"VP-SG-1 7.3 I REP
L
DRAWN TRC
CHECKED XXX
APP'D XXX
SCALE N.T.S.
JOB NO.
PROJECT ID:
50' PERMANENT
RIGHT-OF-WAY
DATE 8/7/2018
DATE X/X/2018
DATE X/X/2018
SHEET 1 OF 1
H-650-TYP
WATER BAR SPACING PER TABLE
ON TYPICAL DETAIL MVP -17.2
PERMANENT WATER BAR
@ 2 TO 5% TRANSVERSE SLOPE
M Mountain Valley
PIPELINE LLC
100' TEMPORARY RIGHT-OF-WAY
TYPICAL CONSTRUCTION DETAIL
WATERBAR END TREATMENT
CROSS SLOPE EXAMPLE
DRAWING NO.
VP - SO- 1 7.4 I REP1
WATER BAR
(REFER TO MVP -17
AND MVP -18 DETAILS)
FLOW
WATER BAR END TREATMENT LEVEL WEIR
TO BE KEYED (4 INCHES SECTION (L) A
MINIMUM) INTO EXISTING
GROUND THAT IS 6" MIN LLL
HIGHER GRADE THAN LEVEL
WEIR SECTION
DRAWN TRC DATE 8/7/2018
CHECKED XXX DATE X/X/2018
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
CI
LEVEL WEIR
SECTION
LENGTHS
D.A. LENGTH
[AC] (L) [FT]
<0.5 10
0.5 < 1.0 15
1.0 < 1.5 20
> 1.5 SITE
SPECIFIC
3' MIN.
A WELL
1 FLS VEGETATED
T AREA
NATIVE ROCK/SOIL MIX WITH
MAX 0 = 6" OR VDOT #1
Irl Mountain Valley
PIPELINE
18" TRANSITION -
LEVEL WEIR
6" MIN. SECTION (L)
6" MIN. -i
KEY 4" MIN.
TYPICAL CONSTRUCTION DETAIL
WATERBAR END
TREATMENT DETAIL
DRAWING NO. REV.
MVP -SG -17.7 P1
OPTIONAL 0" TO 4"
SOIL TOPCOAT.
REVEGETATED
PER PSS&S.
F18" MIN.
OPTIONAL 0" TO 4"
SOIL TOPCOAT.
12" MIN.
REVEGETATED
PER PSS&S.
KEY 4" MIN.
VARIES
FLOW
36" MIN.
XS: A -A'
18" TRANSITION -
LEVEL WEIR
6" MIN. SECTION (L)
6" MIN. -i
KEY 4" MIN.
TYPICAL CONSTRUCTION DETAIL
WATERBAR END
TREATMENT DETAIL
DRAWING NO. REV.
MVP -SG -17.7 P1
OPTIONAL 0" TO 4"
SOIL TOPCOAT.
REVEGETATED
PER PSS&S.
F18" MIN.
SLOPF X DISTANCE PLUG MATERIAL THIS TYPICAL CONSTRUCTION DETWL IS INTENDED TO
O% - 519 SEE NOTE 8 QQW- RETE FlLLXr SACKS PROVIDE GUIDANCE TO THE PIPELINE CONI-RA TOR.
51X - 15% 500 FT SANDBAGS OR CONCRETE FILLED SACKS THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDIN; UPON FIELD CONDITIONS AND CR
15% - 25% 300 FT SANDBAGS OR CONCRETE FILLED SACKS REGULATORY REQUIREMENTS.
NTS.
25% - 35% 200 FT SANDBAGS OR CONCRETE FILLED SACKS
35% - 10O% 100 FT SANDBAGS OR CONCRETE FILLED SACKS
a 100% 55 fT OONcFETE FILLED BAGS (W-nm)
e �
■
v d
TRENCH PUJG v ❑ ORAIN PIPE DIYUG rS
O a AT R.O.W EDGE
rade � o
DLEEOER ORAN TO BE
CONSTRUCTED VP DIP OF 11HE
T.Ra CH PLUG PFR {1EIAl M v p VC PIPE CONNECTED
OR EY.1WALEN'f TO TRENCH PWG DRAIN
G co OUTLET.
PIPETINF'
v
TOPSOIL
OR NATVE
MATERIAL
17'
TOPSOL OR
NATIVE YATERAL
T2" WIN. SM:1< uw"�
RIP-RAP OEIAII OPER
TRENCH LNT DE:AIL8.1OOR
KEY AOT SLOT L11/T EQUIVAdW1
(STEEP X 12' ADE) _
NTi1 IIWISRAiDF➢ KEY BREAKER a COAAPQST FILTER
T"CH 8#I- MOW PAOONG SOCK OR EGMALENT
ANO BQTTOM --f N ROOK OR
NOTES.
CROSS SECTION e°`1°pt AREAS SIDE VIEW
1. TRENICH BREAKERS SHALL BE IMALLED:
• ON SLOPES ALONG THE TRENCH UNE WHERE THE NATURAL DRAINAGE PATTERN, PROFILE, AND TYPE OF BACKFILL NA"ERIAL WAY RESULT IN LOSS OF
BACKFILL MATERIAL OR ALTERATION OF THE NATURAL PATTERN;
• AT THE BASE OF SLOPES ADJACENT TO WATER90DIE5 AND WETLANDS;
• WHERE NEEDED TD AVOID DRAINING A iE IMI),
• ON UPLAND SLOPES, AT THE SAME SPACING AS SLOPE BREAKERS AND UP SLOPE QF SLOPE BREAKERS
. IN CULTIVATED LAND AND RESIDENTIAL AREAS WERE PERMANENT SLOPE BREAKERS ARE NOT TYPICALLY INSTALLED, AT THE SAME SPACING AS IF
PERMANENT SLOPE BREAKERS WHERE REQUIRM
2. MATERIALS APPROPRIATE FOR USE AS PERMANENT TRENCH BREAKERS INCLUDE SANDBAGS OR CONCRETE FILLED SACKS. TOPSOL SHALL NOT BE USED
FOR TRENCH BREAKERS
3. TRENCH BREAKERS INSTALLED AT WATERHODY AND YETLAND CROSSINGS SHALL 8E CONSTRUCTED OF IMPERVIOUS MATERIALS (CONCRETE FILLED SACKS).
4, BREAKER SPACING AND CONFIGURATION MAY BE CHANGED AS DIRECTED BY MVP. DEPTH OF DITCH MAY VARY WITH SITE CONDITIONS.
5. ALL MATERIALS SHALL BE SUPPLED BY CONTRACTOR.
6. TRENCH BREAKERS ARE REWIRED AT ALL WATEABODY CROSSINGS RECARBLESS OF TRENCH SLOPE ORIERUSE NOTE REQLKD AT SLOPES t 51
7. SINGLE TRENCH BREAKERS GULL BE A MINIMUM WIDTH OF 24' AND DOUBLE TRENCH BREAKERS WILL BE A MINIMUM WIDTH OF 38'.
8. FOR SUBSURFACE AND TRENCH BREAKER DRANAGE DETAILS INCLUDING THD6E FOR STEEP SLOPES, SEE LANDSLIDE MITIGATION TYPICAL DETAILS.
9. FOR SLOPES CXCEEDING 50K CONCRETE FILLED SACKS ARE REWIRED UNLESS OTHERWISE APPROVED BY MVP.
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
M Mountain Valley
PIPELINE
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
TYPICAL TRENCH BREAKER
REQUIREMENTS
DRAWING NO. REV.
MVP -SG -20 I P1
42" PIPE
6" PERFORATED,
CORRUGATED
DRAIN PIPE
4" TO 6"
�Ai
W^A t"J
MAINLINE CROSS SECTION
16" TO 18"
—STANDARD TRENCH
BACKFILL
\777-
\x\/ \ \x\/`
SECTION A—A
o �A
0
z
0
w_
Z
U) T.O.P.
of
X
w
cn
of B.O.P.
4" TO 6"
�Ai
W^A t"J
MAINLINE CROSS SECTION
16" TO 18"
—STANDARD TRENCH
BACKFILL
\777-
\x\/ \ \x\/`
SECTION A—A
16" TO 18"
B.O.P.
'HY
'ARD OF
RAP FOR
PERSION
" TO 6"
SECTION B—B
SOIL BACKFILL(TYP)I
6" SOLID
DRAIN PIPE
NOTES
1. LOW POINT DITCH DRAINS SHALL BE INSTALLED AT LOCATIONS SPECIFIED IN THE APPROVED EROSION & SEDIMENTATION
CONTROL PLAN, AND AS DIRECTED BY THE ENVIRONMENTAL INSPECTOR.
2. FILL STONE SHOULD BE 1" AGGREGATE WITHOUT FINES, CRUSHER RUN WITHOUT FINES, OR EQUIVALENT.
3. DRAIN PIPE TO BE CONNECTED USING STANDARD PIPE COLLARS.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
CHECKED XXX DATE X/X/2018
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
1'1 Mountain Valley
PIPELINE
SIDEHILL LOW—POINT DRAIN
TYPICAL
DRAWING NO. REV.
MVP -SG -24 P1
0
z
Z)
0
of
OVERLAP GEOTEXTILE
cn
0
FILTER FABRIC
Z
UN–COMPACTED
>
~
N
1" STONE (TYP)
w
0
-6" PERFORATED
~
CORRUGATED
DRAIN PIPE
16" TO 18"
B.O.P.
'HY
'ARD OF
RAP FOR
PERSION
" TO 6"
SECTION B—B
SOIL BACKFILL(TYP)I
6" SOLID
DRAIN PIPE
NOTES
1. LOW POINT DITCH DRAINS SHALL BE INSTALLED AT LOCATIONS SPECIFIED IN THE APPROVED EROSION & SEDIMENTATION
CONTROL PLAN, AND AS DIRECTED BY THE ENVIRONMENTAL INSPECTOR.
2. FILL STONE SHOULD BE 1" AGGREGATE WITHOUT FINES, CRUSHER RUN WITHOUT FINES, OR EQUIVALENT.
3. DRAIN PIPE TO BE CONNECTED USING STANDARD PIPE COLLARS.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
CHECKED XXX DATE X/X/2018
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
1'1 Mountain Valley
PIPELINE
SIDEHILL LOW—POINT DRAIN
TYPICAL
DRAWING NO. REV.
MVP -SG -24 P1
COM
N OTES:
1. WINCHES MAY BE REQUIRED FOR MOVING EQUIPMENT AND MATERIAL, AND DURING
CONSTRUCTION ON STEEP LONGITUDINAL SLOPES.
2. WINCHES WILL EITHER BE FIXED WINCHES OR TRACKED EQUIPMENT WITH WINCHES.
3. WINCHES WILL TYPICALLY BE REQUIRED FOR SLOPES OF 3DB (1T) AND UP
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
M
Mountain Valley
APP'D
XXX
DATE
X/X/2018
PIPELINE uc
SCALE
N.T.S.
SHEET
1 OF 1
I JOB NO.
I PROJECT ID:
H-650-TYP
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "B" SOIL
TYPICAL CONSTRUCTION DETAIL
MAINLINE CONSTRUCTION
STEEP HILL PARALLEL CONSTRUCTION
NO TOP SOIL SEGREGATION
DRAWING NO. REV.
MVP -SG -31 I P1
a
=i d
a
PVC PIPE CONNECTED o -
TO TRENCH BREAKER a Q
DRAIN OUTLET
Q
DRAIN PIPE DAYLIGHTS �{}�
� (�J � y j d
AT R.Q.W EDGE �I � ]
COMPOST FILTER SOCK O + �
DR EQUIVALENT Ics
O RIP—RAP 1 CJ
{AS NEEDED)_
SPOIL PILE� ❑ 4L_-v�`:��--
.
� v ate•, a �;.--.;� ��i 11
0 4 • ���iF� ��� --O �rY I.
� •0
• � d
NOTES:
1. WINCHES MAY BE REQUIRED FOR MOVING EQUIPMENT AND MATERIAL, AND DURING
CONSTRUCTION ON STEEP LONGITUDINAL SLOPES.
2. WINCHES WILL EITHER BE FIXED WINCHES OR TRACKED EQUIPMENT WITH WINCHES.
3. WINCHES WILL TYPICALLY BE REQUIRED FOR SLOPES OF 30% (17) AND UP
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
M Mountain Valley
APP'D
XXX
DATE
X/X/2018
T PIPELINE uc
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT
ID:
H-650-TYP
THIS TYPICAL CONSTRUCTION DETAIL IS 114TENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWING ASSUMES TYPE "Bp S01
TYPICAL CONSTRUCTION DETAIL I
MAINLINE CONSTRUCTION
STEEP HILL STOVE PIPE CONSTRUCTION
NO TOP SOIL SEGREGATION
DRAWING NO. REV.
MVP -SG -32 I P1
TRENCH
BREAKER
PIPELINE
PLAN
SCALE: NOT TO SCALE
PERMEABLE
TRENCH
BREAKER
�
PERFORATED
DRAIN PIPE
SOLID
DRAIN PIPE
RIP—RAP APRON
(6"-12" ROCK)
AT OUTLET
APRON LENGTH — 13'
INITIAL WIDTH — 1.5'
TERMINAL WIDTH — 13.5'
DRAWN TRC DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
PERFORATED SOLID
DRAIN PIPE DRAIN PIPE
SECTION A -A
SCALE: NOT TO SCALE
M Mountain Valley
PIPELINE uc
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
TRENCH BREAKER DAYLIGHT DRAIN
DRAWING NO. REV.
MVP -SG -35 I P1
SEE NOTE 1
SEE NOTE 2
SEE NOTE 1
2
DAYLIGHT TO
ROCK
APRON
TCA50'mM d
6"0 DRAIN PIPE
�hO/STUReFO
AUT
LOCATE CUT OFF DRAI
+/— 2' BELOW SEEP{
AREAS #57 TO EXTEN
INTO SEEP AREA
SCALE: NOT TO SCALE
PIPELINE
DAYLIGHT TO
ROCK
APRON
SECTION C -C
SCALE:NOT TO SCALE
NOTES:
1. PERFORATED PIPE SURROUNDED BY #57 STONE.
s 2. SOLID PIPE (IN TRENCH) SURROUNDED BY TRENCH BACKFILL.
a
'a DRAWN TRC DATE 8/7/2018
i
CHECKED XXX DATE X/X/2018
0
m APP'D XXX DATE X/X/2018
E5
m
n SCALE N.T.S. SHEET 1 OF 2
w
EL JOB NO.
E
m
n PROJECT ID:
T
0
0
0
H-650-TYP
M Mountain Valley
PIPELINE uc
3
kYLIGHT TO
P—RAP
'RON
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
CUTOFF DRAIN-SIDEHILL
DRAWING NO. REV.
MVP -SC -36A P1
ile Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-36A.dwg
Z_
N
00
:I
00
onnvrlli Tn nonnE
18"-24"
SECTION A -A
SCALE: NOT TO SCALE
FROM MVP -34A
'oma+
FILTER FABRIC iV
TRC DATE 8/7/2018
AROUND STONE
(OVERLAP 12") _
0
i�
AASHTO #57 STONE
v
C
(UNCOMPACTED)
XXX DATE X/X/2018
m
SCALE
m
v
EL
En
6"0 PERFORATED a
DIDC �
18"-24"
SECTION A -A
SCALE: NOT TO SCALE
FROM MVP -34A
'oma+
DRAWN
TRC DATE 8/7/2018
0
CHECKED
XXX DATE X/X/2018
v
C
APP'D
XXX DATE X/X/2018
IO
SCALE
N.T.S. SHEET 2 OF 2
v
EL
JOB NO.
E
to
0
PROJECT
ID:
o
H-650—TYP
IT'1 Mountain Valley
PIPELINE eer
18"-24"
r� �1
SECTION B -B
SCALE:NOT TO SCALE
FROM MVP -34A
JCH BACKFILL
SOLID PIPE
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL I
CUTOFF DRAIN-SIDEHILL
DRAWING No AVP—SG-36B IREV.
Pi
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-36B.dwg
PERFORATED DRAIN PIPE SOLID DRAIN PIPE SOLID DRAIN PIPE PERFORATED DRAIN PIPE
A C
PERFORATED ---------------------
DRAIN PIPE - - - - - - - --- -------------------
SOLID
DRAIN PIPE 3
o z
m
m
B THIS DWG THIS DWG B
A
3
0
N_
2
H
C
DAYLIGHT INTO BOTTOM WIDTH
RIP -RAP APRON OF TRENCH DAYLIGHT INTO
RIP -RAP APRON
TOP WIDTH OF TRENCH
z BACKFILL TO GRADE PLAN
SCALE:NOT TO SCALE
N
FILTER FABRIC NOTES:
(OVERLAP 12") 1. EACH CUTOFF DRAIN SHALL UTILIZE A TRENCH BREAKER DRAIN
ww V v� (SEE DETAIL 1) TO DRAIN THE TRENCH.
AASHTO #57 STONE
00 (UNCOMPACTED) PERMEABLE
TRENCH BREAKER
V) 6"0 PERFORATED
a / PIPE
tO 6"0 SOLID PIPE
z
18"-24"
I� 'l
SECTION A -A N
SCALE:NOT TO SCALE
z
BACKFILL TO GRADE
Oil PIPELINE
TRENCH BACKFILL TRENCH BREAKER DRAIN
(SEE MVP -41A)
w 6"0 SOLID PIPE SECTION C -C
SCALE:NOT TO SCALE
f
a THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
^� PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
18"-24" I THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
SECTION B -B REGULATORY REQUIREMENTS.
SCALE:NOT TO SCALE
N
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
oCHECKED XXX DATE X/X/2018 M Mountain Valley
T APP'D XXX DATE X/X/2018 T PIPELINE uc
c
1"
N SCALE N.T.S. SHEET 1 OF 1
CUTOFF DRAIN -PLANAR
a JOB NO.
E
PROJECT ID:
a DRAWING NO. REV.
v
} H-650-TYP MVP -SG -37 P1
E-,
.e Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-37.dwg
10,
4" CAP
4" TEE
= 4"0 PERFORATED
N DRAIN PIPE
0
L4
f
c�
I
I I
I I
x
0
� DAYLIGHT TO
ROCK
APRON
PLAN
SCALE:NOT TO SCALE
��o/SJ�RBFO
S�pF
co"
Q
m
M
CL
>
TRENCH FILL
m
m
M
I
PIPELINE ! �'�.,�
j BACKFILL TO
GRADE
DAYLIGHT TO
RIP -RAP
APRON
1-20 TO DRAIN
4"0 PERFORATED o \\
DRAIN PIPE
a
° Q m THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
C -C THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
N SCALE: NOT TO SCALE DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
N
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
cCHECKED XXX DATE X/X/2018 F1 Mountain Va I I ey
m APP'D XXX DATE X/X/2018 T PIPELINE uc
c
;� SCALE N.T.S. SHEET 1 of 2 TRANSVERSE TRENCH DRAIN
ai
n JOB NO.
E
to
'^ PROJECT ID:
DRAWING NO. REV.
a
} H-650-TYP MVP -SG -38A P1
0
a
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-38A.dwg
12"-16"
TRENCH FILL
V)
Uj
COMPACT
SOIL BACKFILL
00
FILTER 6
(OVERLAP 12")
J v v v l v v PERFORATED m\j\\/\\/\\\\\\\\
c PIPE > \\//\\// 4"0 SOLID PIPE
N AASHTO #57 STONE
(UNCOMPACTED)
18"-24"
f� 'l
SECTION A -A SECTION B -B
SCALEAOT TO SCALE SCALE:NOT TO SCALE
FROM MVP -36A FROM MVP -36A
E
a
^� THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
N DEPENDING UPON FIELD CONDITIONS AND OR
s REGULATORY REQUIREMENTS.
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
oCHECKED XXX DATE X/X/2018 M Mountain Va I I ey
v APP'D XXX DATE X/X/2018 PIPELINE uc
m
.o
;j SCALE N.T.S. SHEET 2 of 2 TRANSVERSE TRENCH DRAIN
a
a JOB NO.
E
m
PROJECT ID:
DRAWING NO. REV.
a
} H-650-TYP MVP -38B P1
0
a
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-38B.dwg
I I
10,
ROW j ----
I
I
I
A THIS DWG I � � THIS DWG A
i ^
I
j
I
ROW I ----
PLAN
SCALE:NOT TO SCALE
N
DRAWN TRC DATE 8/7/2018
CHECKED XXX DATE X/X/2018
0
T APP'D XXX DATE X/X/2018
c
m
`n SCALE N.T.S. SHEET 1 OF 1
EL JOB NO.
E
m
PROJECT ID:
T
0
0
0
H-650-TYP
C-12" ROCK,
12" THICK
h
SECTION A -A
SCALE:NOT TO SCALE
M Mountain Valley
PIPELINE uc
GEOTEXTILE
FABRIC
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
ROCK LINED SWALE
DRAWING NO. REV.
MVP -SG -39 P1
=ile Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-39.dwg
NATURAL DRAIN
RESTORE NATURAL DRAIN
AND ADD RIP -RAP
ROW I ------ --
i
I
i
ATHIS DWG I THIS DWG A
I
I
I
I i
ROW I ----
NATURAL DRAIN
PLAN
SCALE:NOT TO SCALE
1' MIN 1' MIN
2 12" ROCK,
1'
w
GEOTEXTILE
FABRIC
VARIES
DEPENDING ON
DIMENSIONS OF
NATURAL DRAIN
SECTION A -A
SCALE:NOT TO SCALE
E
T THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
o DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
cCHECKED XXX DATE X/X/2018 M Mountain Va I I ey
w APP'D XXX DATE X/X/2018 T PIPELINE uc
c
to
SCALE N.T.S. SHEET 1 OF 1
RIP -RAP NATURAL DRAIN
n JOB NO.
E
m
PROJECT ID:
a DRAWING NO. REV.
v
El H-650-TYP MVP -SG -40 P1
E-,
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-40.dwg
3 3
O O
DOWN HILL
ti
s
o�
SLOPE BREAKER
(PER ESCP DRAWINGS)
s
o�
9
PIPELINE
PLAN
SCALE: NOT TO SCALE
SLOPE BREAKER
(PER ESCP DRAWINGS)
ADD 3"-6" ROCK
TO LINE SLOPE
BREAKER
a
m SECTION A -A THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
SCALE: NOT TO SCALE THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
N DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
N
DRAWN TRC DATE 8/7/2018 TYPICAL CONSTRUCTION DETAIL
cCHECKED XXX DATE X/X/2018 M Mountain Valley
m APP'D XXX DATE X/X/2018 PIPELINE uc
c
to
SCALE N.T.S. SHEET 1 OF 1
RIP -RAP SLOPE BREAKERS
n JOB NO.
E
o
PROJECT ID:
DRAWING NO. REV.
v
} H-650-TYP MVP -SG -41 P1
0
a
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-41.dwg
COMPACTED BACKFILL
(SEE NOTES SHEET)
MAINTAIN 2'
CLEARANCE BET
PIPE AND GE(
COMPA
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 3
JOB NO.
PROJECT ID:
H-650-TYP
M Mountain Valley
PIPELINE uc
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
GEOGRID-SIDEHILL
DRAWING NO. REV.
MVP -SG -42A I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-42A.dwg
MAINTAIN 2' MIN. \
CLEARANCE BETWEEN \
PIPE AND GEOGRID
COMPACTION
MIRAFI 3XT
GEOGRID
(OR EQUIVALENT)
COMPACTED BACKFILL
(SEE NOTES SHEET)
DRAWN
TRC
DATE
8/7/2018
s
CHECKED
0
XXX
DATE
X/X/2018
w APP'D
c
XXX
DATE
X/X/2018
A
SCALE
N.T.S.
SHEET
2 OF 3
v
n JOB NO.
E
PROJECT
ID:
H-650—TYP
SECTION VIEW
SCALE:NOT TO SCALE
M Mountain Valley
PIPELINE u
YP.)
PIPELINE
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
SLIDE MITIGATION DETAIL
GEOGRID-PLANAR
DRAWING NO. REV.
MVP—SG-42B P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-42B.dwg
COMPACTION NOTES
1) ALL ROCKS LARGER THAN 6 INCHES IN SIZE, AND MORE THAN 10 PERCENT BY VOLUME SHOULD BE REMOVED AND PROPERLY
DISPOSED FROM THE BACKFILL MATERIAL.
2) THE SUBGRADE AT THE BASE OF THE EXCAVATION SHOULD BE PROOFROLLED WITH A PNEUMATIC TIRED ROLLER OR VEHICLE.
3) THE EXCAVATED AREA SHALL BE BACKFILLED WITH THE CLEANED EXCAVATED SOIL MATERIAL AND COMPACTED IN PLACE.
4) BACKFILL OPERATIONS SHALL BE PERFORMED WHEN SOIL IS SUITABLE FOR COMPACTION (I.E., NOT IMMEDIATELY FOLLOWING A
LARGE RAIN, SNOW, OR ICE EVENT). FROZEN FILL SHALL NOT BE USED.
5) THE BACKFILL SHALL BE PLACED IN COMPACTED LIFTS NO GREATER THAN 12 INCHES.
6) MAINTAIN A MINIMUM 2FT CLEARANCE BETWEEN COMPACTION ACTIVITY AND THE GAS PIPELINE.
GRAVEL DRAIN NOTES
1) GEOTEXTILE FABRIC SHALL BE TENCATE MIRAFI 140N OR APPROVED EQUIVALENT.
2) THE GEOTEXTILE FABRIC SHALL BE STORED UNDAMAGED PURSUANT TO MANUFACTURERS RECOMMENDATIONS.
3) DO NOT OPERATE CONSTRUCTION EQUIPMENT DIRECTLY ON THE GEOTEXTILE FABRIC.
4) DRAINAGE AGGREGATE SHALL MEET THE REQUIREMENTS OF PASHTO NO. 57 STONE.
5) DRAINAGE AGGREGATE SHALL NOT BE COMPACTED.
GEOGRID NOTES
1) GEOGRID REINFORCEMENT SHALL BE TENCATE MIRAFI 3XT OR APPROVED EQUIVALENT.
2) THE GEOGRID MATERIAL SHALL BE STORED UNDAMAGED PURSUANT TO MANUFACTURERS RECOMMENDATIONS.
3) GEOGRID SHALL BE PLACED HORIZONTALLY ON THE BACKFILL WITH THE PRINCIPAL STRENGTH DIRECTION PERPENDICULAR TO THE
FACE OF THE SLOPE. ADJACENT PIECES OF PRIMARY GEOGRID SHALL NOT OVERLAP BUT ARE TO BE BUTTED SIDE TO SIDE.
4) REMOVE ALL SLACK IN THE GEOGRID MATERIAL AND ANCHOR AS NECESSARY WITH PINS, OR BAGS TO PREVENT SLACK FROM
DEVELOPMENT DURING FILL PLACEMENT AND COMPACTION.
5) FILL IS TO BE PLACED AND SPREAD DIRECTLY ON THE GEOGRID MATERIAL WITH RUBBER TIRED EQUIPMENT ONLY. SPEEDS ARE TO
BE KEPT SLOW WITH AS FEW STOPS AND TURNS AS PRACTICAL.
6) DO NOT OPERATE TRACKED EQUIPMENT DIRECTLY ON THE GEOGRID MATERIAL.
7) MAINTAIN A MINIMUM 2FT CLEARANCE BETWEEN GEOGRID MATERIAL AND THE GAS PIPELINE.
DRAWN TRC DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
M
Mountain Va I I ey
APP'D
XXX
DATE
X/X/2018
T
PIPELINE uc
SCALE
N.T.S.
SHEET
3 OF 3
JOB NO.
PROJECT ID:
H-650-TYP
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
GEOGRID NOTES
DRAWING NO. REV.
MVP -SG -42C I P1
File Path: OAProjects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-42C.dwg
AASHTO #57 STONE
OR EQUIVALENT
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 2
JOB NO.
PROJECT ID:
H-650-TYP
c w )VLIU rv,, nrr
BOTTOM WIDTH OF TRENCH
FRONT VIEW
SCALE:NOT TO SCALE
6" MIN.
TRENCH BREAKER BAGS
SECTION VIEW
SCALE:NOT TO SCALE
NOTES:
1. PLACE PVC DRAIN PIPE ON FIRST LAYER OF TRENCH BREAKER
BAGS.
2. PLACE PVC DRAIN PIPE EQUADISTANT FROM THE OUTSIDE EDGE OF
THE 30" GAS PIPE AND THE BOTTOM LIMITS OF THE TRENCH.
3. EXTEND PVC PIPE THROUGH ENTIRE TRENCH BREAKER AND EXTEND
APPROX. 1" PAST END OF BREAKER.
4. AASHTO#57 STONE SHALL BE PLACED TO A MINIMUM 6" THICKNESS
UPSLOPE OF THE DRAIN PIPE.
2"0 SOLID PVC PIPE
(25" LONG)
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
M Mountain Valley
PIPELINE uc
TRENCH BREAKER
PASS-THROUGH DRAIN
DRAWING NO. REV.
MVP -SG -43A I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-43A.dwg
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-43B.dwg
PIPELINE
AASHTO #57 STONEAASHTO
OR EQUIVALENT
6'
#57 STONE
6' OR EQUIVALENT
TRENCH BREAKER BAGS
2"0 SOLID PVC PIPE
2"0 SOLID
PVC PIPE
PLAN VIEW
SCALEAOT TO SCALE
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN TRC DATE 8/7/2018
M Mountain Valley
T PIPELINE uc
TYPICAL CONSTRUCTION DETAIL
CHECKED XXX DATE X/X/2018
TRENCH BREAKER
PASS-THROUGH DRAIN
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 2 OF 2
JOB NO.
PROJECT ID:
DRAWING NO.
REV.
H-650-TYP
MVP -SG -43B
P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-43B.dwg
GROUND SURFACE
WEEPHOLE
DRAINS
SAKRETE REVETMENT
(MIN 2' THICK)
MIN 6° BATTER
#5 EPDXY—COATED
REBAR
DOUBLE
SAKRETE TRENCH
BREAKER W/DRAIN
WRAP PIPE
IN ROCKSHIELD AND SURROUNDED
BY FABRIC SAND BAGS
ROCK TRENCH
BACKFILL TRENCH
W/SAND BAGS OR
CRUSHED ROCK
ROAD OR STREAM �—
CROSSING
MAINTAIN MIN. 2' CLEARANCE T —
BETWEEN REBAR AND PIPELINE -
SAKRETE TOE KEY
— — — — _ TOE KEY FULLY ENCASED
/ T _F T_ —F! IN SAKRETE BAGS
GAS PIPE
EQT NOTES:
1. SAKRETE BAGS SHOULD EXTEND 4 BAGS DEEP PIPE SHOULD BE
COMPLETELY SURROUNDED BY SAND BAGS, OR CRUSHED ROCK
(MAX 6").
2. SAKRETE BAGS SHOULD BE STAGGERED IN A MASONRY FASHION.
THE FACE OF THE WELL SHALL BE INCLINED 6'-10' FROM
VERTICAL.
3. #5 REBAR SHOULD BE DRIVEN THROUGH THE SAKRETE BAGS (SEE
i DETAIL 1).
4. 2"0 PVC WEEPHOLE DRAINS SHALL BE INSTALLED EVERY 15 FT.
b
7
V
r
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 2
JOB NO.
PROJECT ID:
H-650-TYP
12" GRAVEL
LEVELING BASE
USE STONE FOR LEVELING ROCK BASE.
IF BASE IS NOT IN ROCK, USE 12"
STONE LAYER FOR BASE.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
M Mountain Valley
PIPELINE SLIDE MITIGATION
HIGHWALL REVETMENT
SIDE VIEW
DRAWING NO. REV.
MVP -SG -44A I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-44A.dwg
#5 EPDXY—COATED
REBAR DRIVEN INTO
PLACE. OVERLAP
REBAR MIN. 3 BAGS.
SPACE REBAR 12"
HORIZONTALLY.
2"0 SCH. 40 SOLID
PVC PIPE
DRAWN TRC
CHECKED XXX
APP'D XXX
SCALE N.T.S.
JOB NO.
PROJECT ID:
GAS PIPE
I
(SPACE REBAR TO
MAINTAIN
MIN. 2'
FRONT VIEW
CLEARANCE
SCALE: NOT TO SCALE
FROM PIPELINE)
SAKRETE BAGS
(MIN 2' THICK)
SAND BAGS _/
OR CRUSHED ROCK. SAND
BAGS SHALL BE OF A
MATERIAL THAT DOES NOT
SHIELD CATHODIC
PROTECTION CURRENT
(CLOTH BAGS PREFERRED).
DRAIN DETAIL
SCALE:NOT TO SCALE
DATE 8/7/2018
DATE X,X,2018 M Mountain Valley
DATE X/X/2018 PIPELINE uc
SHEET 2 OF 2
H-650-TYP
2"0 PVC WEEPHOLE
DRAINS (SEE DETAIL #2)
I
12" STONE
LEVELING BASE
GAS PIPE
1"0 GRAVEL SURROUND PIPE
INLET. EXTEND PVC PIPE
INTO GRAVEL MIN 3"
',— BACK OF ROCK TRENCH
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
SLIDE MITIGATION
HIGHWALL REVETMENT
FRONT VIEW AND DRAIN DETAIL
DRAWING NO. REV.
MVP -SG -44B I P1
File Path: OAProjects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-44B.dwg
SAKRETE OR RIPRAP REVETMENT
(MIN 2' THICK)
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
SIDE VIEW
SCALE: NOT TO SCALE
M Mountain Valley
PIPELINE uc
SANDB BACKFIL RUSHED
ROCK
COMPETENT SOIL OR ROCK
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
STEEP SLOPE REVETMENT
DRAWING NO. REV.
MVP -SG -45 I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-45.dwg
DRAWN TRC DATE 8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
M Mountain Valley
PIPELINE uc
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
BROW DITCH DETAIL
DRAWING NO. REV.
MVP -SG -46 I P1
File Path: 0:\Projects\300423 - NextEra MVP Southgate\CA - CADD\Pipeline\Drawings\Typicals\MVP-SG-46.dwg
SLOPE
_y
TIMBER
MATS
SL❑PE
XISTING GRADE
PIPE BUNDLES - PIPES CONNECTED
BY WELDING ❑R GALVANIZED STEEL
CABLES.
N❑TE;
CFS T❑ BE INSTALLED AT THE END ❑F EACH WORKING DAY.
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
M Mountain Valley
PIPELINE uc
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL I
TIMBER MAT AND PIPE BUNDLE
TEMPORARY STREAM CROSSING
DRAWING NO. REV.
MVP -SG -47 I P1
TIMBER
MATS
SL❑PE
GE❑TEXTIL
SL❑PE
JERSEY BARRIER
N❑TE;
CFS T❑ BE INSTALLED AT THE END ❑F EACH WORKING DAY,
DRAWN
TRC
DATE
8/7/2018
CHECKED
XXX
DATE
X/X/2018
APP'D
XXX
DATE
X/X/2018
SCALE
N.T.S.
SHEET
1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
M Mountain Valley
PIPELINE uc
XISTING GRADE
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL I
TIMBER MAT AND JERSEY BARRIER
TEMPORARY STREAM CROSSING
DRAWING NO. REV.
MVP -SG -48 I P1
STREAM CROSSING
BANK TO BANK
CHANNEL
/
s� WIDTH
F
WATER
FLOW
Is
BAR
10 FT
N 10 FT
MIN.
MIN.
TEMP,
I
I
I
I
TEMP.
ACCESS
SLOPE
I
TIMBER
BRIDG
i
�
SLOPE
ACCESS
ROAD
I
I
I
I
ROAD
WATER
TN SILT FENCE
N 12 BAR
Fs CTYPJ
SA
�C❑MP❑ST
TIMBER MATJ
N TIMBER MAT FILTER SOCK
(TYP.)
PLAN VIEW
M❑BILE BRIDGE
SIDEB❑ARD
10 FT BANK TO BANK
10 FT
MIN,
MIN,
WATER
TIMBER
WATER BAR
BAR
BRIDGE
SLOPE
SL❑PE
GE❑TEXTILE
APPROXIMATE
�CHANNEL�
EXISTING
GROUND
WIDTH
CROSS SECTION - MOBILE BRIDGE
NOTES:
1.
INSTALL WATER BARS OR SILT FENCE AT APPROACHES
TO STREAM CROSSING AND COMPOST
FILTER SOCKS ALONG
STREAM BANKS, INSTALL COMPOST
FILTER SOCK AT OUTLET OF WATER
BARS,
2.
MAINTAIN SURFACE OF TEMPORARY EQUIPMENT CROSSING
TO PREVENT S❑IL
DISCHARGES TO STREAM,
3.
APPROACHES TO CROSSINGS ARE NOT TO EXCEED A DEPTH OF 6 INCHES ABOVE ORIGINAL GRADE,
4.
GE❑TEXTILE LINER TO COME UP ON THE SIDES OF THE
BRIDGE A MINIMUM OF 181,
5.
SIDEB❑ARDS TO BE ATTACHED
TO THE UPPER DECK, GE❑TEXTILE TO BE WRAPPED AROUND
SIDEB❑ARDS PRI❑R TO FASTENING,
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN
TRC DATE 8/7/2018
M Mountain Valley
PIPELINE uc
TYPICAL CONSTRUCTION DETAIL
CHECKED XXX DATE X/X/2018
MOBILE BRIDGE
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 1 OF 1
JOB NO.
PROJECT ID:
DRAWING NO.
REV.
H-650-TYP
MVP-SG-49
P1
APPROXIMATE
EXISTING
GROUND
CHANNEL /
WIDTH
BAILEY PANEL da
FLAW
TEMPORARY
�
ACCESS
R❑AD
TEMPORARY
ACCESS
ROAD
SUPPORT
S❑LID
DECK
BAILEY PANEL—
SUPPORT
REINFORCED
FILTRATI❑N
DEVICE
I
S❑LID BRIDIae-1
DECK
I
a REINF❑RCEa
FILTRATION 1k
DEVICE
(TYP.)
PLAN VIEW
PROFILE
DRAWN TRC DATE 8/7/2018
M Mountain Valley
PIPELINE uc
CHECKED XXX DATE X/X/2018
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 1 OF 1
JOB NO.
PROJECT ID:
H-650-TYP
APPROXIMATE
TOP OF BANK
EXISTING
GROUND
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
TYPICAL CONSTRUCTION DETAIL
MODULAR TEMPORARY
BAILEY BRIDGE
DRAWING NO. REV.
MVP -SG -50 P1
U)
U)
J
J
zo TOPSOIL DITCH
oz
P7- STORAGE SPOIL
STORAGE
N 12"
v
zo TOPSOIL
a o
U (MAX.)
O
kAl Al
7,,717
CONSTRUCTION
MATS
REFER TO
REFER TO
NOTES 1, 2, 6'
NOTES 1, 2,
AND 3 I
AND 3
12.5' 50'
12.5'
TEMP. PERM. ROW WIDTH
TEMP.
ROW
ROW
WIDTH 37.5'
37.5' WIDTH
SPOIL SIDE
WORKING SIDE
75'
CONSTRUCTION ROW WIDTH
NOTES:
1. TOPSOIL SEGREGATION/REMOVAL WILL ONLY BE CONDUCTED WITHIN THE
PERMANENT EASEMENT AT ALL WETLAND
CROSSINGS IN VIRGINIA.
2. GRUBBING ACTIVITIES SHALL BE LIMITED TO THE PERMANENT EASEMENT AT ALL WETLAND CROSSINGS IN VIRGINIA.
OUTSIDE OF THE PERMANENT EASEMENT, WETLAND VEGETATION SHALL ONLY BE REMOVED AT OR ABOVE THE GROUND
SURFACE. WOODY VEGETATION WITHIN THE TEMPORARY EASEMENT SHALL
BE CUT AT GROUND SURFACE WITH THE STUMPS
TO REMAIN IN-PLACE.
3. WETLAND CROSSINGS IN VIRGINIA SHALL BE CONDUCTED IN ACCORDANCE WITH NWP12 GENERAL AND NORFOLK DISTRICT
REGIONAL CONDITIONS.
THIS TYPICAL CONSTRUCTION DETAIL IS INTENDED TO
PROVIDE GUIDANCE TO THE PIPELINE CONTRACTOR.
THE ACTUAL CONSTRUCTION TECHNIQUES MAY DIFFER
DEPENDING UPON FIELD CONDITIONS AND OR
REGULATORY REQUIREMENTS.
DRAWN TRC DATE 8/7/2018
Mountain Valley
PIPELINE uc
TYPICAL CONSTRUCTION DETAIL
CHECKED XXX DATE X/X/2018
WETLAND CROSSING TYPICAL FOR
APP'D XXX DATE X/X/2018
SCALE N.T.S. SHEET 1 OF 1
USACE NORFOLK (VA) DISTRICT
JOB NO.
PROJECT ID:
DRAWING NO.
REV.
H-650-TYP
MVP -SG -53
P1