Loading...
HomeMy WebLinkAbout20181638 Ver 1_Appx M Route and Impact Maps_20181130M Mountain Valley Joint Permit Application PIPELINEJu USACE — Wilmington District and NCDEQ SAW -2018-008887 MVP Southgate Project Standard Joint Permit Application U.S. Army Corps of Engineers — Wilmington District (SAW -2018-00887) North Carolina Department of Environmental Quality, Division of Water Resources Appendix M North Carolina Proposed Impact Drawings November 2018 -- -------- -- -- -- - - �1 - - - _ --- ----- - a•' - -= ==- - -- -- - - - - - - -- -- _ _ _- 590 i -- - -- - - - - _ -- - - TA-RO-071 - - - - - - „ - -- NC i?neMa Coritour's'-. ; MVP LIDAR Contours - I ` - _ i - -' - - - 590 - ' - • ' - - - % _. - _ W-1318-97: PEM (Temporary Access Road) Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.006 TA -PI -068 - I - Operational Acres: 0.000 ro• - '- - - -- -------- - - - - -- I o r W -C18-96: PFO e _ •-_ - Con./Op. Pipeline Crossing ft.: 96.504 TA -R0-070 �Qy ?- -------_ I.•-- Construction Acres: 0.076 - Operational Acres: 0.052' z - - - - -_- 1p ' -- IN E - W -C18 96 2: PFO r ------- _ - i' - - - - ------ .r. _ 1. - _ i - Con./Op. Pipeline Crossing ft.: 0.000 -- Construction Acres: 0.001 + - `- Operational Acres: 0.001' ..__ _ _ I u =MP 26--' -- ---------------------------------,----------,--------- - ---------- -�-- -�=- ---==-- M13126.5 i�_v'==1d--L-- ---------- - q --- - _ - -- _- -- 0- -6.-___ - -----1--- --- ------------__T_ _ --_--------_ --- - - - - -_ _--------------------- i - -- O - I PP k 1P OP 1P • X60 `G L- ,.� - _ I - - �.s� _ W C18 96: PEM / i/ - _k Pk Con./Op. Pipeline Crossing ft.: 0.000 \l�l _ - -- I ' Construction Acres: 0.027 cl ' l0 Q I - I OperationalAcres: 0.000 _ 0 \�i - _ - -- - ���� - I 5- -o+:P Pk - �•P PPi C=- PP Ss� _ - ,' 4'' i Legend O Mileposts (MP, 0.5 mi) Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way Survey Area L_ Adjacent Sheet L__. County Boundary Streams: Wetlands: —Delineated Wetland Boundary Delineated PEM X; Delineated PFO o W ISM m GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour \ \� Rockingham County Aa iNti rt,�g PittSyIvania\ s County ❑a Ana r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 1 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 - = -- - - - P. IpkkP a- NC OneMap Contour - 2o MV LI on ours - - kt kk ♦I \ -4 = -- --- - - f- _ ------ - ---- ------ .- I ---- TA-RO-071 - - = _ - - - - I---------- - - - - _ -- - - I -- - ,_ �'�:t_ -.-•�: — - — — sir - - - q 1 - - �. a IM 00 S-1318-99:Int. - 1 - is - -__ ','' TA-RO-073 k t t PU - _ q. "' Con./Op. Pipeline Crossing ft.: 1.000 ICn '" _ - _ Construction Crossing ft.: 88.736 Operational Crossing ft.: 44.543 `, m 1a - _ _ - , — - ,� _ - _ d F♦♦ --- • _ - - .e a ♦ • -` vi:- 'JL——i--1--- ' 1 1 1 1 - - - I .. - • 1 1 • 1 • ��,-- -rr_-_ s - - - —, ,• 1 z-----r_�:--.•r------L?�r♦ � -':T r.--�-t--'--3�-�---------- - a __�._-'r W - - ��,L r r w __� r - --♦r-•- �--•�f - �. .�'�'- i ^♦��.' ♦�''i - - - �- , n• - -, _ , _ -• -, 1 Q �- I I � _____-------- ' • ' � _Z_ ------ — •'T Lar ' JJi� 1 -L ----�.-------Y---r----�-------- -- �s-�- r T i�-- L sr- L • - �� -- - - - — — - _----- ~ W -A18-22: PEM _ I TA-RO-072A -�.' ------ Con./Op. Pipeline Crossing ft.: 77.334 •- .-' _ - _ -'I' - - s ; Construction Acres: 0.168 - l I -- +dr - _ Operational Acres: 0.000 ------------- - 5,♦ - - J - - _ I♦ - _ _ --- - ---- I _ L - W-618-98: PFO _ �; - 7 Con./Op. Pipeline Crossing ft.: 15.039 `$A ' - ; ' _ _ _ __ - -:f, Construction Acres: 0.029 i "_- Operational Acres: 0.011' , ,, ;; - - - -r Pppp tIP - - TA RO 072 tp1k1 P 11 �''- ' _ •, ,' +. _ - - , -. tr - - - _ ' _ - - -- K •___ - _ __ - '''4 - - _�_— .,,' - - 510 WB -A18-45: Pond (Temporary Access Road) ; 3 - Con./Op. Pipeline Crossing ft.: 0.000 w P.' _ ------ - _�;, I Construction Crossingft.:56.854 r _ _, -• - Construction sq. ft.: 151.080 '', -I ''t _ s.' : C" Operational sq. ft.: 0.000 -- r,• a L' - —S _ —-a°�t •_ _ _ -I %'t. - - Q I -510 ^o Legend O Mileposts (MP, 0.5 ,,Oi' Delineated PEM mi) Delineated PFO Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access Road Limits of E::] Construction Right - of -Way Survey Area L_ Adjacent Sheet L__. County Boundary Streams: Delineated Intermittent —Delineated Pond = Pond Wetlands: _ Delineated Wetland Boundary o EM m p� G Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ---------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham County 41 11 Q Pit:ttyIvania'\\ County r9 Mountain Valley H .r° 0 Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 2 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 °'"" Date: November 2018 W -A18-44: PEM (Temporary Access Road) ' Con./Op. Pipeline Crossing ft.: 0.000--------- .000 Construction Acres: <0.001 - •--- a Operational Acres: 0.000 P v, W -A18-44-2: PEM (Temporary Access Road) ` 1P k P P Con./Op. Pipeline Crossing ft.: 0.000 _ _ _ _ _ _ Construction Acres: <0.001 Operational Acres: 0.000 - - PP k I TA-RO 073 P _ I q rPP - W -A18-44-3: PEM (Temporary Access Road) - - --- k Pt PPP _ Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.007 =- r'�=='__:;:��__. • =� PP I — �___ _ - �', Operational Acres: 0.000- ;` ------ I _ �' ---- -rr' �'1r� ��r _ ! _ _ ASA1842:Int. -•..'+t PP P— _ Con./Op. Pipeline Crossing ft.: 15.236 ' ---- __ -- .� _err-; _� _ ,__ __,r_�__ -I ' — — _ _ — Construction Crossing ft.: 90.705 i 1-- - i - I------- ' ' 0Construction sq. ft.: 1,139.805 k pp i M P'2 7- I Operational sq. ft.: 0.000 TA-RO 072A I s'' \ 4 f _ I -------- ------------- ------------- =- ------- *--?----=;-- -----------------------------r--V--- �. - --- I i---*-�---------------�r-------- ------------------ - - - - -- tr - - -- r►t:'".r'- - -- _ kkk "_ TA-RO-072 1 r '�F - AN PEM AS-NHD-6003: Per. (Temporary Access Road) NI Con./Op. Pipeline Crossing ft.: 30.525 Con./Op. Pipeline Crossing ft.: 0.000 - Construction Acres: 0.057 Construction Crossing ft.: 32.914 •, a l i Operational Acres: 0.000 Operational Crossing ft.: 0.000 Ni ' •' —R�' ' V a• z4 WB -A18-45: Pond (Temporary Access Road) k1 TA-RO 073A Con./Op. Pipeline Crossing ft.: 0.000 Construction Crossing ft.: 56.854 I :+1 - 10 % Construction sq. ft.: 151.080 k Operational sq. It.: 0.000 510 _ MVP FDAR Contourskk 1 tate%�y�"- - NC OneMap Conto 1 • - - 1 1 - 1 C l; :1 1t, kk- .1 Legend O Mileposts (MP, 0.5 M Pond mi) Wetlands: Temporary Access_ Delineated Wetland Road Boundary H-650 Pipeline Approximated PEM Operational Fj:� Delineated PEM Workspace 'V Delineated PFO Temporary Access Road Limits of E::] construction Right - of -Way Survey Area L _ j Adjacent Sheet _]County Boundary Streams: —Approximated Intermittent Approximated Perennial —Delineated Pond Approximated Intermittent 0 1m m anmm ©� Note; 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar T Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham County 9 it i �s V o ,oma n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 3 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 1 - / Jill 1AW-A18 44: PEM ■ r • Con./Op. Pipeline Crossing ft.: 30.525 ■ Construction Acres: 0.057 ♦ a, Operational Acres: 0.00% ♦ ■ d ■ 49,0 f ■ ------- - - - - -- \ 1 -- - - - -- -- P, P PP11 P I N ' s'%'�♦�' 1P AS -A18-42: Int. ' ♦ '' 1 ••- - Con./Op. Pipeline Crossing ft.: 15.236 _ - - - AS-NHD-6003: Per. (Temporary Access Road) Construction Crossing ft.: 90.705 _ _ _ : . Con./Op. Pipeline Crossing ft.: 0.000 Construction sq. ft.: 1,139.805 a ; : ♦ _ Construction Crossing ft.: 32.914 Operational sq. ft.: 0.000 ; - • - _ — Operational Crossing ft.: 0.000 ; • ' --- r t— — AS -A18-40-2: Per. (Temporary Access Road) dac_nt Ne 3 � _t - 11 k Con./Op. Pipeline Crossing ft.: 0.000 Construction Crossing ft.: 25.898 `pp - ` Construction sq. ft.: 918.985- _ _ f� ♦ ; \ Operational sq. ft.: 0.000 J `� .,t� ,; Q; kk ---------- - ----- - E 0 TA-RO-073A O L � — _ t ► — / 1 Aa%ace 1k a' ' ' k k pf r ♦ ' '' S1i1' AS -A18-40: _ _ ,Per. Con./Op. Pipeline Crossing ft.: 24.889 ` d♦ ♦ • f Construction Crossing ft.: 109.649 - _ _ _ _ _ _ - _ ;' Construction sq. ft.: 3,573.246 ; 'P�� ' , Operational sq. ft.: 0.000 `' ♦ / ' i MP 27.5♦ .` Pk K _ ti' -- 4' _ 4ao - - � ;; kk _ t ► — / 1 Aa%ace ; ♦ i a' ' ' k nt S r ♦ ' '' S1i1' AS -A18-40: _ _ ,Per. Con./Op. Pipeline Crossing ft.: 24.889 ` ♦ • f Construction Crossing ft.: 109.649 - _ _ _ _ _ _ - _ ;' Construction sq. ft.: 3,573.246 Operational sq. ft.: 0.000 i MP 27.5♦ .` PP K _ -- 4' _ 4ao - - � ;; kk kk 1p '•'" AS-NHD-4000: Per. - i i _ j s Con./Op. Pipeline Crossing ft.: 35.825kk _ ; ♦ i _' ;•: ' ' Construction Crossing ft.: 65.808 : ; ; "t== r -1 - Construction sq. ft.: 1,915.798 y-'� f c�`-r „ . L - 1 �• Operational sq. ft.: 0.000 •. , kP , - -k_r - P i ♦ - ' - 'u ' ♦ ' Legend O Mileposts (MP, 0.5 Approximated mi) Intermittent TemporaryAccess - Approximated Road Perennial -- H-650 Pipeline Approximated Pond Operational Perennial Surface Workspace Water �TemporaryAccess Wetlands: Road _ Delineated Wetland Limits of Boundary E::] construction Right- QApproximated PEM of -Way '�' Delineated PEM Survey Area L _ j Adjacent Sheet __.County Boundary Streams: —Approximated Intermittent Approximated Perennial —Approximated Pond _ Delineated Perennial 0 EM CA G= Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar T Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham Count ` o� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 4 of 108 TRC Willowbrook Ln We West Chester, PA 19352 Date: November 2018 • -- -- ------------ ----- --• ___• _ a ----------------- y+ -------- •---------- - F' -- - -- - - --- ----- _ - - - - 1 I P I", 40 _ -- - _ ---- - - - - -- - - -- - - - --- fp -- - 1� • .' ^' - L , ryt ' `a, _• , - - - -- - • "- -- - -- - PP PP PP AS -A18-40: Per. I. 'P PP - - - - -- IP Con./Op. Pipeline Crossing ft.: 24.889 -• a Construction Crossing ft.: 109.649 Construction sq. ft.: 3,573.246 _ Operational sq. ft.: 0.000 PP IpIp d PP 1 - P PP gi 1L' PP �1 i ------------ ------ - - - - - - ------f ---- --------------------------- --------r----- ---- ---------------- ------- -;rk - ------ ---- ;,� _ - -- ----- P28 -------- - -- __________________ __________ --- --- M �4 �, f •Via_ •-,t t ` - 1 9 'kke 1 k.1 1Pt PP AS-NHD-4000: Per. + - - Con./Op. Pipeline Crossing ft.: 35.825 - - Construction Crossing ft.: 65.808 y _ s Construction sq. ft.: 1,915.798 ..f t?- kk Operational sq. ft.: 0.000 s - TA RO 075- l s a� 1 Lz a 1 ti° MVP LIDAR Contours L• ' h 1 -- NC OneMap Contours kk -- - - - -- . h�a Legend Mileposts (MP, 0.5 Perennial Surface O mi) Water _ TemporaryAccess Wetlands: Road Delineated Wetland - - H-650 Pipeline _ Boundary Operational Workspace Temporary Access Road Limits of Construction Right - of -Way Survey Area L_ Adjacent Sheet L__. County Boundary Streams: Approximated Perennial Delineated _ Perennial Approximated Perennial 0 EM iiii-Ew GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham County II II � I n Mountain Valley PIPELINE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 5 of 108 TRC We Willowbrook Ln West Chester, PA 19382 Date: November 2018 • - _/ i a 500 W -A18-30: PFO W -A18-30: PEM Con./Op. Pipeline Crossing ft.: 5.129 S -A18-34: Int. .- Con./Op. Pipeline Crossing ft.: 26.165 Construction Acres: 0.011 ,Con./Op. Pipeline Crossing ft.: 0.000 ' S -A18-36: Per. W -A18-26: PEM �� * Construction Crossin ft.: 17.749 Construction Acres: 0.036 Operational Acres: 0.004 9 I Con./Op. Pipeline Crossing ft.: 0.000 Con./Op. Pipeline Crossing ft.: 21.580 Operational Acres: 0.000 Operational Crossing ft.: 0.000 Construction Crossing ft.: 73.498 kk Construction Acres: 0.022 Operational Crossing ft.: 33.970 Operational Acres: 0.000 IcaZzt I AW -A18-26: PEM �'_ Con./Op. Pipeline Crossing ft.: 20.964 _ _ _ Construction Acres: 0.042 =:_ „_ _ , ` OperationalAcres:0.000 - 1 I � � - * - �•� - -___sem--_ _ __ +- -_ '� - .i •j ., -_� ,•' - -Y_ - ► � '*- --�=_ _ -� - .' -MP. 28.5__ _ - - - - ,.�- ♦. moo- :a_ ,•�- -.:. -, . _ ! ' Y - --• - - LN 3600 ti•. ♦ '' - -- "• .r TA-RO' 075 a Interconnect �T - - ' ' - S -A18-32: Per. - - -1 ' W -A18-33: PEM • Con./Op. Pipeline Crossing ft.: 6.597 a - - Con./Op. Pipeline Crossing ft.: 0.000 Construction Crossing ft.: 87.098 ; t Construction sq. ft.: 739.053 Construction Acres: 0.007 _ �� - Operational sq. ft.: 0.000 -- / - - _ Operational Acres: 0.000 - a- S-A18-31:Int. N _ .s• -- - - u' - _ s Con./Op. Pipeline Crossing ft.: 0.000 ,- �m - ----- Construction Crossing ft.: 23.683 - Y_ __ _ _ - - Operational Crossing ft.: 23.683 , a _ PA-RO-000 - - •� - +� _k S -A18-27: Int. (Temporary Access Road) _ Con./Op. Pipeline Crossing - •1• Construction Crossing ft.:1.202 - --kOperational Crossing ft.: 0.000 •' - • = - - TA-RO-076 - 560 - o -r - - If - - +- S -A18-23: Per. Tem ora Access Road �' - f• - Con./0 . Pipeline Crossin ft.: 0.000 4 _ _ s• _ lk- 580 P P 9 Construction Crossing ft.: 10.312 - = i''-'• W -A18-28: PEM (Temporary Access Road) 5 Operational Crossing ft.: 0.000 - - kP ppk Pk 90 Con./0 . Pi eline Crossin ft.: 0.000 , - _ P P 9 - �' Construction Acres: 0.011 • 0 erational Acres: 0.000 - -- - ` A&P P --- --- LID''+ , -- - ' r- - AR Co 54 - ntour - - - s -. t - 0 Z'• - ,� `, �,'; - f V : - - - r - _- -'r _ - - ' - 6 2 \` '• - - \ - - - ar �_ - " -' =- --- - _ : _ - - - ss- _ ::: - - - - `. ` ktk'kIPPptk - .mac •_-- - ' •'' Y' Pk tk 'ti rk" f T , _ _ _ PPPk - `,-Adlac@ ,''o 'I } _`" - Legend Mileposts (MP, 0.5 Delineated O mi) _ Perennial Permanent Access Perennial Surface _ Road Water Temporary Access Wetlands: Road Delineated Wetland - - H-650 Pipeline _ Boundary Permanent Access QApproximated PEM Road Delineated PEM Operational 'X Delineated PFO Workspace Temporary Access Road Limits of =Construction Right - of -Way Survey Area L _ jAdjacent Sheet County Boundary Streams: Delineated Intermittent 0 an 0) CU �7I Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------. _................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockin9 ham Count Y �o ,a 9 a Fg � 4d 9� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 6 of 108 600 Willowbrook Ln TRIC West Chester, PA 19352 Date: November 2018 - - -- - - _ - - - -:-- - -- - - - - - -- _ - --- - - - -- - - _ - - - - -- _ - __ - _--- -- - -_. -- --- .� - - - _ - - ------- - - - - -- - - - ---- - - - - - ---- - - - - -_ - - - -- _:_: - - ; pp- - - --- -- - - 1: k pp -- - P pp -f-: - P. y._ • i _- ^9/ i PA-RO-000 `O i �' , , - - - - --,1 -' - - .- _- , _-r - - itpp pp pp k P -- _et _ S �.•--- AS-NHD-6002: Int. (Permanent Access Road) _ 80 - Con./Op. Pipeline Crossing ft.: 0.000 - - Construction Crossing ft.: 25.038 Permanent Fill Crossing ft.: 25.038 -. pp P s !„ - - . F-- '_ `P Pt pp P _ - - -_ - - A- - sOp P tt ,% _ - / s� - - - - - - - - -- - --- - pp pp pp - -c - 0 ` - - - • r "`^: -p P - Legend O Mileposts (MP, 0.5 mi) _ Permanent Access Road Permanent Access Road Limits of QConstruction Right - of -Way Survey Area L7 ;Adjacent Sheet County Boundary Streams: —Approximated Intermittent Wetlands: —Delineated Wetland Boundary 0 EM M GIM iiiiia Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour s� Rockingham County a 5 M Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 7 of 108 600 Willowbrook Ln TRC West Chester, PA 19382 Date: November 2018 pp PI I I NC OneMa Contours S2 P 'COo o t, tPpt.ppt MVP AR Contours _ tp P P • �.: _- P. W -- s o }, - rn P PP - z ''� _ - - •=S)0 580 0 ;; ; -- - ho t P -_ _ ,', P; z'tt PP 'k 'Ptttp :. .;;J. `. 1 _ _ _ - •' Y __ 1 - _ ' + _ __- - - z \, P I +'iikk - - - - - r \P..., I - -= - - - J-' _ - _ _ ------- W-A1838:PFO +� i; iP`-''?,p' - ;i;;V, ; it + - •' "- - - - �- - ,,_ } S -A18-37: Per. S-318-49: Per. Con./Op. Pipeline Crossing ft.: 0.000 Con./0 Pi eline Crossin ft.: 3.000 -- - -j-- - Con./Op. Pipeline Crossing ft.: 0.000 p• p 9 _ - - •1 Construction Acres: 0.013 ";";;' - Construction Crossing ft.: 19.362 + r';; Construction Crossing ft.: 79.648 - - „ } Operational Acres: 0.000* _P. r+ :;; Operational Crossin ft.: 55.930 - - Operational Crossing ft.: 0.000 , r, r, p 9 _ _ _ - '' r r• _ - - - -_ - •► -� - - iS�' i )p kk:;x , . , P ;'r - - - -- - 1P P - - �'I - S - P V -r"-- - _ -`a_' ,'i ���.'♦- - - ti_'r's` +r%•-•---��,..� '+ --- MP2.7 MP 28:5- - - - - -r-.r rT -T`'r rT' iT� .,s rv`��C _---___ -- __st-- �.��- - rr� �r� r,:• �� :�•r .�'� �'r '�•L'r .•,;t,.. l •. - . '- �•� `r ' .r ' .', .. . y .L 1• gas =�' .1.'.* '' �p _• _ - -_- _ - -- - yy ----- i ' , , '� ' 's Lei' ri ' ' —rte—.1:��-- •• r •'r�� — —��—J „T. T•'�r�Z�� ritit• ,STS^' ii T'` ' i—v yr",1' N� M•L� ��-{--�--�-rr-,- -rte- .ti ��-.'- i -•-----_-sic-.- - .-ter ----- '1.=�-•^ 1 - e. \., , PP pp 1 - PP - - ' - I k 'k;', ' ' F'- •. W -A18-38: PEM Con./0 . Pipeline Crossin ft.: 28.834 p p 9 _PP P - �+1 Construction Acres: 0.044 .k P- �_ r h a Operational Acres: 0.000 -. ;`; . ' =1a - 6 + 4 ', - �; rn =\PP P =�: rn o - O - W O Pk - t' = - _ r'kk - }- e4 • — 1_. ____S• _ ''t — _ 1- P PP _ `• 5- - TA-RO-076 - - - .� 7:. _ _ - 5: \; - 6 -- 1 - - p, -- -- - - _ 2 1- } - - ;•'. ti'+I k k �. S 3" , ; r _ - ;; , r �: ti'' ; + - i PPP P, - �i ,'',',' '' , ' S O PP P�' - -1 ' - - - - - k. =; _ •L - r-.:= ; : 6 - - - - - PP'pp I, 8o s� - _ - - - _: - - r 0 r ' _�1LVP ulD • �ntaurs - 90.. - ` tiPP -_--- } ` - -- rra e" o ----- - 61 S9 - '6O 00 62 " 6i?0 1{0 6S0 660 00 60 6gj - 0' - 0 0 0 0 Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access El Road Limits of QConstruction Right - of -Way Survey Area L_ Adjacent Sheet __.County Boundary Streams: Approximated Perennial Delineated Ephemeral _ Delineated Perennial Wetlands: _ Delineated Wetland Boundary Delineated PEM Delineated PFO o go m m Xd GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham County 4. A • y - a � a` B k � y V r9 Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 8 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 l. f1 4 ; , r' o I►vPi PlPI kPI kvk Pk PPP 'k1v'PkP k,";z C'kPP kkiPI,kl—0 kk 7�l-Ppk%%0- : -k - k--- -lk, - - "Pkk'k PP kPkP PP kP lPkk PPvPkkPp PPP P PPl kkp PPpp P( 1P kP PkkPk kk PP -Pk l kkk Pkk kk kkPkk % ,i • : S e'rt, ' 1 a 1 a i \ nq \ ' 7 \ ! ;i - ♦ - o _ - - 0 ;ti - _ b. =11AP 29 , " • \ ,.+' _ i 4 1 1 �1 9'• :'ti - 11, _ X"" •1 \ r . co - _ - \ ♦ o O 1 _ :_ v Co s ` r '. co co _ 6 - _ et i o �,' 1 �:-_;: e SB1847:E h. 1 i - - �� Con.lO . Pipeline Crossin ft.: 1.000 ` ♦ + �' `O C- _ �1 r p p 9 \♦ w _ - - '� - - f ; Construction Crossing ft.: 70.903 `\ - - `' \ ♦ 1 `° _ _ " Operational Crossing ft.: 30.389 \ ♦ _ - T; ♦ - \ • 1 - - - r W-1318-48: PEM - 1 1 \ - - - ---- -�''• Con.lO . Pipeline Crossin ft.: 0.000 p p ----- - - - 9 Construction Acres: 0.011 kk W-618-48: PFO _ _ _ _ Operational Acres: 0.000 �� Con./Op. Pipeline Crossing ft.: 23.432 - _ _ ♦ \ Construction Acres: 0.051 - \ Operational Acres: 0.018* \ ♦ p - - - -' �J 1 - �. -- _ 1 - \ ♦ 1 - 1 - - -_ ♦ - - - - - 1 t- - - _ ..' . _ !. __. ., ,• - ., • 4'' - _ - t t ♦.� 00 0 - 5 ,r:. _ •�:w,•" : �.;. Y kkV ,','. TA-RO 078 - - ' `` - �-,• �•h.' • a - Y• �. "r.. - - _ __ - _A .� . G = _ \ ♦ �: - �= - ♦ - e'' - N O - ♦ . 4 - a- r' �__ -♦ _ 9� .�\ K _ 6 (, t _ 3 O r __ O - - _ ?-, ]1 O ti. `4'1''-' -- - - - .. __ 3__ .• . r. G _ __ : i s N , N •te . _ _ _ ♦. �r 1 'f - _ - :- 1 1 �, M 1011 Y ,�• N - V •' r \ . . L - \ 4' ♦ �\ .' 4 ` a - L y' +' - - 1�K ,' 5' i ?''• 1,' i r _ 1 n '' ,': is - f e K '' 1!S1 - ._ - _ =� ', S A18 160: E h. P s' /i •'' 1111 - 1 , ✓ -_ Con./Op. Pipeline Crossin ft.: 0.000 9 L Construction Crossin ft.: 40.206 \ • 1 c - �� g a. 1 ♦ 1 Z •/, 0 erational Crossin ft.: 0.000 _, p 9 _.:.: \ 1 x. - ♦ o ei 1 1 i'" ' • 1 1 - a a 1 xi _ _ _ 1 1P u ' _ 4, _ 1 ar . 4' ♦ 1 _ _ 1 \ s - O 1 - ------ - - - , - - - - - - L s Y - - - Y Q L __ _ _ _ ._t. , - - _ �i • 0 6 ` - - r i Q` - 57 - _ _ P Ilk, L • _ __. moi- _. ` ♦ riY i - 8 .e &- - t- 0 _- 5 S 1 590 Ave- -pp '; ] - Legend O Mileposts (MP, 0.5 mi) Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way Survey Area L7 Adjacent Sheet _]County Boundary Streams: Delineated Ephemeral Wetlands: _ Delineated Wetland Boundary Delineated PEM ,x, Delineated PFO 0 010 0) M Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour �� L Rockr,'ng ham Count. d 5p,dd`'�r r9 Mountain Valle - Y � PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 9 of 108 600 Willowbrook Ln iC TRC West Chester, PA 19382 Date: November 2018 - I-,. , . - ; I I . - . I', - - , — -- _,:=t' - a , - ' - 7 o - • 'k 60 " . ♦' 1k P t_- YY ♦ aY _ 7 PP t'--', ; S -A18-160: Eph. . , ♦ ; _- - -------- Con./Op. Pipeline Crossing ft.: 0.000 k. - Construction Crossing ft.: 40.206 J. ; 'P. - - Operational Crossing ft.: 0.000 �' , h - 1;'' _ I' ` k, I - 1" �- _ kk � h - !-9_ \ ,PPPP .1• P P,- :c - _ 5' _ V it kk O''' .4• -a-- 11 PP It t, Pt P __. �r _ - ' - ' o - • =_ :•s o - - o • - - - r• _ - - ' �• - Y, • - w , - - -_ - , o - _ > ' - - • - t N _ y .: t ' f! i t0 - - �0 , , f y.' _ r r•. _ I - I •:.'' 1 I �l , tS'kkkIt n q. _ _ - - - • 5, ' - - • 3^• ' •-: I - ' - x - r" - • TA-RO-079 • . -- _ •s - " r ti a ' - I I - J -PP , t I _ x - P • ,. - a - ' • •, - - ki PPt cS - ; • - - o - • - - - - - ,'if,- - r - - - h - , - -- r • - - y r 1, - w ONt • 2 Q I I _ '� 2 , •'i ,�_� -_ _ • •I •-"f _ --.k;kk - _ I • , •�e' _ :4i , �, , +: i • '�' i i..1' -i V _ t• I , P I cegi• et1r -- -- _ ' , •'T ;. S -A18 47: Per. s' „ f • - I - f ♦ f Con./Op. Pipeline Crossing ft.: 3.000 s • i • I Construction Crossin ft.: 85.451 - - �.• ' , 9 ,. -� _ z ,: - \ 0 erational Crossin ft 58 450 -O \ S -A18-19-2: Per. (Temporary Access Road) 'Con./Op. Pipeline Crossing ft.: 0.000 W A18-18: PFO TA-RO-080 Construction Crossing ft.: 13.992 Con./Op. Pipeline Crossing ft.: 934.838 - _ _ _ _ _ - Operational Crossing ft.: 0.000 Construction Acres: 1.866 Operational Acres: 0.644* �- _- r""P11, PP PP PP Pp P d - - - o T '� -00 _ Y a . _ C w0 r. O c r p �m As ' OC Legend O Mileposts (MP, 0.5 Delineated PFO mi) Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way — Survey Area L _ Adjacent Sheet i ---.County Boundary Streams: Delineated Ephemeral _ Delineated Perennial Wetlands: _ Delineated Wetland Boundary GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _......................................_...................................... _........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Z✓J UlJ _ Rockingham County 99 cn�mr•�'y n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 10 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 TA-RO 079 a - =: -1. atie� W -A18-20-3: PEM (Temporary Access Road) 590 - +; ' ♦ i Con./Op. Pipeline Crossing ft.: 0.000 3�d - Construction Acres: 0.006 S -A18-47: Per. x i ♦ _ i Operational Acres: 0.000 _ p _ _ Con./Op. Pipeline Crossing ft.: 3.000 -. 00 1 , , ,, - ---• PkPPP „ ,, .. Construction Crossingft.:85.451 0 - IOperational Crossing ft.: 58.450 / ; ♦ + W -A18-20-2: PEM (Temporary Access Road) I _- ___ _ . S-A18-19-21Per. (Temporary Access Road) Con./Op. Pipeline Crossing ft.: 0.000 Con./Op. Pipeline Crossing ft.: 0.000 W -A18-18: PFO , Construction Acres: <0.001 P P k Construction Crossing ft.: 13.992 Con./Op. Pipeline Crossing ft.: 934.838 , OperationalAcres: 0.000 ;; Operational Crossing ft.: 0.000 =_ ;I';' ; Construction Acres: 1.866 ; ♦ ; -- Operational Acres: 0.644* W -A18-20: PEM (Temporary Access Road) 1_ - • Con./Op. Pipeline Crossing ft.: 0.000 _\ 10_ - _ _ - �; • Construction Acres: 0.002 c PPPPP ; • Operational Acres: 0.000 I I�INP ; ♦ ; w '� ' w L J{ �Adiacent Sheet 10'., T � _ �• .}'1 _ h Construction Acres: 0.012 ■ ■ Operational Acres: 0.000 ■ ♦' _ l i �' ♦�� t .� ' - TA-RO-080 ,� , W A18 18: PEM ------/ Con./Op. Pipeline Crossing ft.: 49.522 _ - Construction Acres: 0.073 -_ / Operational Acres: 0.000 r - — — —♦ 1. ik _ i — _ — I ` Adjacent Sheet 12 — " — - — — - — _ _I 1k -�P. pp P. I i Legend O Mileposts (MP, 0.5 mi) Temporary Access Road H-650 Pipeline Operational Workspace Operational HDD Temporary Access E] Road Limits of E::] Construction Right - of -Way Survey Area L _ j Adjacent Sheet _]County Boundary Streams: _ Delineated Perennial Wetlands: _ Delineated Wetland Boundary Delineated PEM 'Y Delineated PFO o m m Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS .--------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour R.ockingK:am C oj.a In t y •'qp Chum�'•�L� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 11 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 14�1►Iii►�gd�%►►I►�►q.► �� - •.. - -..• ■►■ ,lr�y+Ij■1111■■► . rr;rr pi ►► ivq� /AU-4WA ►■ Uy, FAWq A I■►■► ,►■711■■■■1111 1111►~� ►►►►■►■►► ■►►��►�9'�►►►1111► ►►►I►■I��4�p�'►�■■I►■I►►►►►► I►►■Ii sig►/I►►►►I►I _ h Construction Acres: 0.012 ■ ■ Operational Acres: 0.000 ■ ♦' _ l i �' ♦�� t .� ' - TA-RO-080 ,� , W A18 18: PEM ------/ Con./Op. Pipeline Crossing ft.: 49.522 _ - Construction Acres: 0.073 -_ / Operational Acres: 0.000 r - — — —♦ 1. ik _ i — _ — I ` Adjacent Sheet 12 — " — - — — - — _ _I 1k -�P. pp P. I i Legend O Mileposts (MP, 0.5 mi) Temporary Access Road H-650 Pipeline Operational Workspace Operational HDD Temporary Access E] Road Limits of E::] Construction Right - of -Way Survey Area L _ j Adjacent Sheet _]County Boundary Streams: _ Delineated Perennial Wetlands: _ Delineated Wetland Boundary Delineated PEM 'Y Delineated PFO o m m Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS .--------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour R.ockingK:am C oj.a In t y •'qp Chum�'•�L� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 11 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 1 ,�• i �5 1 L- 1 r S -A18-17: Per. (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 247.286 Construction Crossing ft.: 51.525 Construction sq. ft.: 12,417.546 ' Operational sq. ft.: 0.000 1 _ikk P rPMr., It P. [r o C'O A0 ;;;• _ Mlfp M p C W-1318-39-4: PEM (H-650 Pipeline HDD)J. `' ,i Cbnto4 - Con./Op. Pipeline Crossing ft.: 31.559 - _ Co�7to4 is '- 4 Construction AcrP P es: 0.038 rs ` ki Operational Acres: 0.000 P. . _ s „ r P W-1318-39-3: PEM (H-650 Pipeline HDD) ; r - Con./Op. Pipeline Crossing ft.: 29.861 - n; Construction Acres: 0.034 t P PP Operational Acres: 0.000 P- __ --- - - ------ -- ' W-1318-39-2: PEM (H-650 Pipeline HDD) S 618-38: Eph. (H-650 Pipeline HDD) - - W-1318-36-5: PEM Con./Op. Pipeline Crossing ft.: 40.475 r ; ; Con./Op. Pipeline Crossing ft.: 3.000 - Con./Op. Pipeline Crossing ft.: 26.670 �•` . '- Construction Acres: 0.042 Construction Crossing ft.: 54.238 Construction Acres: 0.033 - i- "- Operational Acres: 0.000 Operational Crossing ft.: 0.000 Operational Acres: 0.000 tp - xppco W-1318-36-10: PEM (Meter Station) W-1318-36: PFO (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 0.000 • -P P Con./Op. Pipeline Crossing ft.: 31.830 Construction Acres: 0.004 tp W-1318-39: PEM (H-650 Pipeline HDD) Construction Acres: 0.113 Operational Acres: 0.000 _ o \pt Operational Acres: 0.000* - ao Con./Op. Pipeline Crossing ft.: 24.628 Construction Acres: 0.027 \ W-1318-34: PFO Operational Acres: 0.000 P P P P W-1318-364: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 179.288 Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.454 r _ Construction Acres: 0.001 Operational Acres: 0.123* • . t Operational Acres: 0.000 •.� , �= • •P .. F I• r •" 7 W-1318-36: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 36.442 J . Construction Acres: 0.042 •j� Operational Acres: 0.000PP W-618-36-2: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 16.337 Construction Acres: 0.016 PP - Operational Acres: 0.000 W-618-36-3: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 17.920 Construction Acres: 0.050 Operational Acres: 0.000 P.Y AW -1318-36: PEM (Meter Station) Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.055 ' Operational Acres: 0.000 S-618-38-2: Eph. (Meter Station) .N LC s Con./Op. Pipeline Crossing ft.: 0.000 Construction Crossing ft.: 113.367 Operational Crossing ft.: 0.000 • T-15 Dan River 'r Interconnect W \' PA-RO-082% ` stater W-618-36-8: PEM (Meter Station) Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.048 Operational Acres: 0.000 exp•• ••SFS t -W -B18-36-7: PEM (Meter Station) -_ _ Con./Op. Pipeline Crossing ft.: 0.000 • ,: I Construction Acres: 0.060 Operational Acres: 0.000 MP 30.5 ♦:�' I ♦ W-1318-36-6: PEM , _ Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.002 Operational Acres: 0.000 W-618-36-9: PEM (Meter Station) , Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.015 Operational Acres: 0.000 r iy TA-RO-081 � y I� t SOD v> I� U I� Q i I I I I Legend O Mileposts (MP, 0.5 Delineated mi) Intermittent _ Permanent Access _ Delineated Road Perennial Temporary Access Perennial Surface Road Water - - H-650 Pipeline Wetlands: Permanent Access _ Delineated Wetland Road Boundary Operational MApproximated PEM Workspace QApproximated PFO Operational HDD '.*'Delineated PEM Temporary Access Delineated PFO 0 Road Limits of OConstruction Right - of -Way Survey Area L7_ Adjacent Sheet L__'County Boundary Streams: Delineated Ephemeral 0 EM CA fr� GIM r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -------------------------------------------------------------------------------._................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 0 Rockingam County 419 9B sb a 2. ay '6 ` a 8 �6 k m `ysvF n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 12 of 108 600 Willowbrook Ln TRIC West Chester, PA 19352 Date: November 2018 ♦1 - 1 r r MP 30 r _ I'o. r •;.r 11 --- CDl ;�; ; CD P =° I - S. _s. 1 1 1 it 1 _ O' - � 1 1 �. 1 i "P -- :_ }•- -----• 1 j 1Pt rPMr., It P. [r o C'O A0 ;;;• _ Mlfp M p C W-1318-39-4: PEM (H-650 Pipeline HDD)J. `' ,i Cbnto4 - Con./Op. Pipeline Crossing ft.: 31.559 - _ Co�7to4 is '- 4 Construction AcrP P es: 0.038 rs ` ki Operational Acres: 0.000 P. . _ s „ r P W-1318-39-3: PEM (H-650 Pipeline HDD) ; r - Con./Op. Pipeline Crossing ft.: 29.861 - n; Construction Acres: 0.034 t P PP Operational Acres: 0.000 P- __ --- - - ------ -- ' W-1318-39-2: PEM (H-650 Pipeline HDD) S 618-38: Eph. (H-650 Pipeline HDD) - - W-1318-36-5: PEM Con./Op. Pipeline Crossing ft.: 40.475 r ; ; Con./Op. Pipeline Crossing ft.: 3.000 - Con./Op. Pipeline Crossing ft.: 26.670 �•` . '- Construction Acres: 0.042 Construction Crossing ft.: 54.238 Construction Acres: 0.033 - i- "- Operational Acres: 0.000 Operational Crossing ft.: 0.000 Operational Acres: 0.000 tp - xppco W-1318-36-10: PEM (Meter Station) W-1318-36: PFO (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 0.000 • -P P Con./Op. Pipeline Crossing ft.: 31.830 Construction Acres: 0.004 tp W-1318-39: PEM (H-650 Pipeline HDD) Construction Acres: 0.113 Operational Acres: 0.000 _ o \pt Operational Acres: 0.000* - ao Con./Op. Pipeline Crossing ft.: 24.628 Construction Acres: 0.027 \ W-1318-34: PFO Operational Acres: 0.000 P P P P W-1318-364: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 179.288 Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.454 r _ Construction Acres: 0.001 Operational Acres: 0.123* • . t Operational Acres: 0.000 •.� , �= • •P .. F I• r •" 7 W-1318-36: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 36.442 J . Construction Acres: 0.042 •j� Operational Acres: 0.000PP W-618-36-2: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 16.337 Construction Acres: 0.016 PP - Operational Acres: 0.000 W-618-36-3: PEM (H-650 Pipeline HDD) Con./Op. Pipeline Crossing ft.: 17.920 Construction Acres: 0.050 Operational Acres: 0.000 P.Y AW -1318-36: PEM (Meter Station) Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.055 ' Operational Acres: 0.000 S-618-38-2: Eph. (Meter Station) .N LC s Con./Op. Pipeline Crossing ft.: 0.000 Construction Crossing ft.: 113.367 Operational Crossing ft.: 0.000 • T-15 Dan River 'r Interconnect W \' PA-RO-082% ` stater W-618-36-8: PEM (Meter Station) Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.048 Operational Acres: 0.000 exp•• ••SFS t -W -B18-36-7: PEM (Meter Station) -_ _ Con./Op. Pipeline Crossing ft.: 0.000 • ,: I Construction Acres: 0.060 Operational Acres: 0.000 MP 30.5 ♦:�' I ♦ W-1318-36-6: PEM , _ Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.002 Operational Acres: 0.000 W-618-36-9: PEM (Meter Station) , Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.015 Operational Acres: 0.000 r iy TA-RO-081 � y I� t SOD v> I� U I� Q i I I I I Legend O Mileposts (MP, 0.5 Delineated mi) Intermittent _ Permanent Access _ Delineated Road Perennial Temporary Access Perennial Surface Road Water - - H-650 Pipeline Wetlands: Permanent Access _ Delineated Wetland Road Boundary Operational MApproximated PEM Workspace QApproximated PFO Operational HDD '.*'Delineated PEM Temporary Access Delineated PFO 0 Road Limits of OConstruction Right - of -Way Survey Area L7_ Adjacent Sheet L__'County Boundary Streams: Delineated Ephemeral 0 EM CA fr� GIM r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -------------------------------------------------------------------------------._................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 0 Rockingam County 419 9B sb a 2. ay '6 ` a 8 �6 k m `ysvF n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 12 of 108 600 Willowbrook Ln TRIC West Chester, PA 19352 Date: November 2018 cPP O I PP i O PP P iF% o% 600 I Q �0 c§',' 'c m atie , o r n '' 1'.:: , ,', j ',', MVp L/ Ma ' cont - - , I . C °n o urs ' •.a, , urs -- • et _ - k pp -;, �Sr :•r - -Y-- - �''i i t''• - + 4 - j W -B18-34: PFO - ► -% - Con./Op. Pipeline Crossing ft.: 179.288 _ Construction Acres: 0.454 -- ,'• '' Operational Acres: 0.123* - - - 11 -- .fr a ` ;I >°- 4 ;' ` MP'.31 ;lop � . 4- - ♦ ♦ l - =- AS -B18-104: Per. - - r , .� ♦ - -- .} �`. - Con.lOp. Pipeline Crossing ft.: 3.000 ;L�' `� ♦ - - - ; „ ♦ - - �• Construction Crossing ft.: 102.856 ! i �`� ♦ ���`. - _ _ Operational Crossing ft.: 50.8951 _ _ P pp cl m 16r • _ •sem i -- - -, _ _ ♦ _ __ •r••-. al • P P P - - - W A18 54: PEM - a i Con./Op. Pipeline Crossing ft.: 11.244 ._-_�_ _ _ - - i Construction Acres: 0.014 = _ _ _ _ _ -z ,� �` r _ - - _ k k 4I Operational Acres: 0.000 I' ; :sss,• r_________ _ _ _• I _:_' ' - - Ques� --- 5 - - - --- 3� ----- -- - - �o State -- --- - - - --I `'' ,, _--- RQ�t9s�' - ' kk �]- s• - Legend x. -P_ MJ Approximated PFO O mi) Oj:• Delineated PEM - - H-650 Pipeline Delineated PFO Operational Workspace Limits of - - 1p pp Survey Area k L _ j Adjacent Sheet ,County Boundary �' - Approximated Perennial Delineated _ Perennial Approximated Perennial Perennial Surface Pv Water - -- Wetland y'T' - _ s D ', !, - 9O VP ;� ; ,;;' - = 0o N 0� /DqR cO eMap ,�5,' ' - ------------ - - _ C°nt °urs �' 1 ; °urs _ -- - -• -� ' '� ` • o ''pp - 1 - pp Legend Mileposts (MP, 0.5 MJ Approximated PFO O mi) Oj:• Delineated PEM - - H-650 Pipeline Delineated PFO Operational Workspace Limits of Construction Right - of -Way Survey Area L _ j Adjacent Sheet ,County Boundary Streams: Approximated Perennial Delineated _ Perennial Approximated Perennial Perennial Surface Water Wetlands: Wetland —Delineated Boundary 0 EM M fr� GIM r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour °r C' s I t C' ow _ I Rockingham County n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 13 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 ` - - - - - - `r'o -- P.•,,1'. IV k - k PP-kk I - ' - - +; , PP 11 PP k . - - 600- ar - - - r •�:== �o /. -- -- - -- -1ppkkk - : " _-------- - - - - -- - e� P k f } �S d - at Y -r 5 O .} - - I ? - tJ� G = �' - - - ne r+► S-1318-95: Per. - - Con./Op. Pipeline Crossing ft.: 28.344 --- 4 _ Construction Crossing ft.: 76.018tp : AS -1318-105: Ink Constructions . ft.: 2,002.962 ........ AS-1318-102.Per. -- _- _ Con./Op. Pipeline Crossing ft.: 1.000 Operational sq. ft.: 0.000 Con./op. Pipeline Crossing ft.: 0.000 't --- _ U Construction Crossing ft.: 75.489 ;� . 5 - �' Construction Crossing ft.: 59.270 - - Operational Crossing ft.: 50.175 9 :•i', � Operational Crossing ft.: 0.000 - _ - ' §s ' �'" �'' az' 4, - :�;;. I e -x �p P - - o ^ Jia- 7 - P , • S - 7 ttt1k kr ' - - -- - - r,. - - J ----- lir +. '•'r ' 1- `art �•,'•� - -• �I 1•� � � � �ti'� 'iI- �____ t 'MP v3 k 1k t • ",ten, • r i~ ``. I I ' e -r t AS -1318-104: Per. ' ' � ' ._--- - - • n'..T..�� w ; �' __ -a ♦ .-•rte __' � o Con./Op. Pipeline Crossin ft.: 3.000 • _ I--/_ A, Construction Crossing ft.: 102.856 _ Operational Crossing ft.: 50.895 ,, {, ;•,,.. _ _ _ - - , , I: ;, s - x - M' , _ i �� '•, f 5' I -r - :t i' o ♦ - `J i ' - y, , - r •I; _- A_. •s e 4 s .',' - i AS -618-102 /'S-618-102: Per. - f, A - Con./0 . Pi eline Crossin ft.: 2.000 7 - ♦ - -� P P 9 _ - -_-_:.��-4 X520 ,e •,�: L 5 ; -=; _ Construction Crossing ft.: 81.911 - _ - " 0 erational Crossing ft.: 53.622 - W 618-103: PEM - =_ -z ==+: Irkt -'.� - P 9 .�: `" Con./Op. Pipeline Crossing ft.: 0.000 , - .:°:' - t.•'y, w ! ' 11 PP Pt P = Construction Acres: 0.002 .' _•-`•`' d 5 O Operational Acres: 0.000 .; - - - 1P 1P N, kk r - - = - __ - - - kk - D' - I :♦ tp -- _ PP PP P PP _�__ skkk"_ _ ' +t w •n _ O __ - .. S - _ _ „I 4 u - _ j - S ' _ _ _ •l uesrf bet - _ h h _ :L'•_ to Rr - _ - �- Contours - - - - - - --- -�•.. OneMap 'kO - y' . 0 Y ri. L +', - - o - •j r --- - +, _ d 1 -S _ r o i r' _ 0 ' S - _�.,• , hyo ; ' ,' 580 O + - i �; _ 59 Legend O Mileposts (MP, 0.5 _ Delineated Wetland mi) Boundary - - H-650 Pipeline Delineated PEM Operational Workspace Limits of OConstruction Right - of -Way Survey Area L _ Adjacent Sheet -__;County Boundary Streams: Approximated Intermittent Approximated Perennial _ Delineated Perennial Approximated Perennial Perennial Surface Water Wetlands: y 0 go i) VW' GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basema : Lidar 2' Contour NC OneMa 2' Contour VA USGS 10' Contour p p Rockingham N Co u n t y tYVI\ n� 1 c' 5 n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 14 of 108 90k% 600QTRC We Willowbrook Ln West Chester, PA 19352 Date: November 2018 ki t O _.1 k- A O S' kk S a, ; - k . tM w is - - - fD --� .a' r -P P f' - - ti. r' - r t -Y 5 P r .•c�� .' f_- • :: r = - C - tip'' d t .` '•• - _ - _ ',, r ir, -- - - - - -- - - - r -- - _ :;;;,' ., it "r: r - _ _ TA-RO 084 a r �" - .1 P' - �.' - -. ..�: -pp pp �s- '� - tir - - - .MP 31:'5__:: _ +'.: _ - .s- ' . _ �s -- 60 - !moi~ - �.t' ';�•w ^�. Y• =a �e ..4'• .mss•. -_ _ -- - kk 1� -. 4� 1„' ' -. ' e - _h .r .:MS _ Ott •- ♦` 'R4 J ' s' - m i` w - + r. F _ b - �t .. •� 4 a 5` - - stir• � 5' r R S -B18-95: Per. .: • s• r L� . t , w y -�t _ S ?y -'4t+'ro 1 Con./Op. Pipeline Crossing ft.: 28.344 ",:� ±' _ ' 9' - P.i Construction Crossing ft.: 76.018 -',_ �x -; - ❑'• ' - _ S 1P 1P I"Constructions . ft.: 2,002.962 ,s. - S q - _ ,•• s:s r fd ,t �. f Operational s . ft.: 0.000 - e p q r: _ - e - ' a -- s �a- 9 - :, { O O _ 9 J ,. - - - - 1 e _ - %` - _ - 4 ' + r A' - 5; ' P 'kr4� - j-- 1 x' _ - r , r" ' _ ley „ ` d •F,�'.r. 1P, t; - _ •gid"„•� ++ a'P. .�, r . - T c'. _ _ �- .r -7_.r '-- --' pp I 'r'' _ _ _ ' �rii 'i - - _ ppt ,P� r _ - _____ - a i s a _ - m. l % - - -N•• _ - ` 1P t` - ---- ---- - - ,— 6 i. s - 'o N _ .35 -- -- --- �,� O _ ;.{' `P _P _ -% ••sa= __ _ -tt pp _ VP LIDAR Contours - 'r, -;;% c; NC Orl Contours - -t tp - - _ - r ti,'k -- - - ` - - r_ -• _-- ` r _ ' ,t2 - d: -' - - - •'L•- _ - S a'• fq X•b So o 5 OQ' -Cn -_ - - - 0 0�� - ` - LP co tp r • -' pp -1, t ; ; - - ---- P , t pp _ - - _ 8 `' Legend Mileposts (MP, 0.5 Perennial Surface O mi) Water Tem ora Access p rY Wetlands: Road Delineated Wetland H-650 Pipeline _ Boundary Y Operational Workspace Temporary Access Road Limits of E::] construction Right - of -Way Survey Area L7 Adjacent Sheet _]County Boundary Streams: Approximated Ephemeral Delineated Ephemeral Delineated _ Perennial 0IMEMMMMMIM ===WW CU r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands Due to Vegetation Maintenance ( 9 ) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -......................................-......................................-........................ Data Sources: EQT ESRI NC OneMap, TRC USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 410 Rockingham County �o n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 15 of 108 TRC We Willowbrook Ln West Chester, PA 19382 Date: November 2018 660 NC �h _ - - - - X60 — —r L rto4rs _ ��;• - �� •'� 5 - ti a - �- _ . 'O 'o C `O - = - - MVP LIDAR Contours °ht - - - - 5 - qo -- - " - - - - - �Q C Ors - 'c = - _ _ - • - - s _ _ - - ti - _ - J'. �o— - a 6 '`• - " - " 4'_ - _ - - - ` r - :a - - PP % - - _ - PPP, PP P PP P PP;i; :PP I ; - - ---- - �' 'P P - P. - Pk P 'P;:.' e yi f ♦ P _t s' ti't':: - • L• 'r r 1 1 7 a kk _ - c v " r O '•�r - o- _ , - ..1 ':s :-PP o v' r ' S -A18!140-2: Per. - 19 r ,'r' - S -A18-148: E h.t r. Con.lO . Pipeline Crossin ft.: 4.000 - - d P P g Con./O . Pi eline Crossin ft.: 0.000 ;: 1 - [' P P 9 _ n_ Qr Construction Crossing ft.: 100.954 ra`= - �A 9 Construction Crossing ft.: 110.761 - . -:..,,1;- - g1 R ti Operational Crossing ft.: 53.669 Operational Crossin ft.: 51.792 �'•, S -A18-140: Per. 5,k ti; 9 - . 1 tem ' Con./Op. Pipeline Crossing ft.: 4.000 ; _ - W -A18-149: PSS Construction Crossing ft.: 201.587 S -A18-144: Int. - -_ " Con./0 . Pi Pipeline Crossing ft.: 51.493 - r. Operational Crossing ft.: 178.875 Con./Op. Pipeline Crossing ft.: 2.000 •=:- Construction Acres: 0.070 + a : rl _ Construction Crossing ft.: 102.207 =r:= = Operational Acres: 0.000 AS -A18-143 / S -A18-143: Int. =a , Operational Crossing ft.: 41.884 li ` F - .. Con./Op. Pipeline Crossing ft.: 2.000 - _ ;5; "'. "�- ' '� :'; _ - - - 5; Construction Crossingft.: 161.475 =580 _ _ - c _ .; - o . _ PP s. k. Operational Crossin ft.: 118.854 F-=---" � ---- ;11 - r� ----------------- - y�•yy� �,'r _ 5 �0 • - `PP I • , t' s'z 's- _ ' _ _ ':`•' - _.F _ _ _ - W -A18-141 PFO ---- -- - - --� — - =_-_3-2 - -`i�r ' y Con.lO . Pipeline Crossingft.: 182.605 � — . - -'i+ Construction Acres: 0.338 '� r - W -A18-149: PEM _ ., •, : - Operational Acres: 0.131 - _ _ . - - - - ' Con./Op. Pipeline Crossing ft.: 52.957 W -A18-141: PEM = - - _ _ Construction Acres: 0.159 S -A18-147: Per. Operational Acres: 0.000 Con./0 . Pipeline Crossin ft.: 0.000 - - _ - P P P 1 M - - -Con./Op.- - - _ Pi eline Crossing ft.: 102.604 - p 9 - Construction Acres: 0.023 _ • 7= ♦ : 3- - t 0 _ r 2 _ - _ Construction Crossing ft.: 184.890 • 5 0 - _ 3 - Operational Acres: 0.000 �r - - 5 s - r - _ = - - • _ • - Constructions ft.: 3,870.120 L i--- ,'1 -t Operational sq. ft.: 0.000 R :g - - r- _t 1 - - - :v- - -k k- _ - P,' E ' P. iRq l _ __ _ __ •t• - Y11' _ •i_� _ t t1 - •� '- a - - - PP _ t� ` 'k P -, M..', - �' _ - i %:k P- r - �• a,• 'r, i i - _ _ - - - i i '''' i' 'i 'il' S!` ' 's r'. _ - .r - -- - - _ - ,1 r _ - r r' ' T L _ 1' ♦n _ : r J _ _ '1� • t• ___ Ir i' r r r' l' t' .rl ' 11. s. 1 r' r _ c 1'c' �' - nn - - - rl tit -p Y - - _ - r - - :• �1 it .• , R £. - 'r' ,' 1 r r' u - '' - 1• P0 + s P. Y - L \_ ..4__-__-:__ _ _ 'P Pt- - ;:t t_-= 6 - - - ;,♦ c ur• - - - 0 to _ Con - - AR VP L neMap ontours-=_: :�'♦'� __ s - - x n 1 a _ - "- 00 0 520530 �, . 0 570 ;r. 5 0 5 ' a' o Legend Mileposts (MP, 0.5 Perennial Surface O mi) Water - - H-650 Pipeline Wetlands: --,Operational _Delineated Wetland L --'Workspace Boundary Limits of ®Approximated PSS QConstruction Right- �i� Delineated PEM of -Way Delineated PFO Survey Area Delineated PSS L _ j Adjacent Sheet '__;County Boundary Streams: Approximated Ephemeral —Approximated Intermittent Delineated Ephemeral Delineated _ Intermittent Delineated _ Perennial Y'X! ff� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS _......................................—........_............................—........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour f�J • 7 9a o a� Rockingham County PjA�$ Mountain Valle Y PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 16 of 108 G 600 Willowbrook Ln TRC �..a West Chester, PA 19352 Date: November 2018 - - - _ - - - D 1. P,' - - - 520 o ss - - - 4 ~ - o o -- k Ilk -P I P, k"t'.-- -- ------ �: - / ,-- - ;_: TA-RO 085 _ - ---- ' .�; ;: '%-- i'1 - _ I - - - �_�: - k 41P - O -i: a T - t w S _ 0 A n �4 , til R' °5 a w - 0 C, A 1` h W, r•• - - O C :� - - O 4 r' � - t ter: - -?: 4 r' - - 5 P- F -- - qI.t" •5 yyIq-.' v v :f- y ...... , __ S P pp S - i. - - I•- s 0 0 r t - - 0 O "ikk 5 y r - ''r=c.' i.'. t• 'r - S 3 0 pp t . ' O O 0 r,J,= 1 - CO h T 0_ _ O j,.kkkk O h h' Ci _ L vas a r__ - •- - .raj - - ra, a. i t`ti -k k k pp P YPtr; J!, �. - r' __ ---- - is r TA -R �•`a-- O 086 - _ •a W -A18-152: PFO - - o - - '71 ti i, - ` - _ Con./0 . Pipeline Crossing ft.: 29.398 ' '{ "•�•••' - p p 9 a Construction Acres: 0.030 ,,'• - +'; ' Q • - - / . -�: - - _ •r z;• Operational Acres: 0.017' - - - - - - - - • 1'•'-.'4 pt '+', - - y' �L _ r' _- - 5 _ ♦,` ' tip' h_ "�� J - :r= S_ 08-153: Int. I 11 r - • z' _ Pp %P P PP1p k ♦ ♦� �;.'=a.': ; , - Con./Op. Pipeline Crossing ft.: 2.000 , ` , '' ♦ ` h ♦ , _ Construction Crossin ft.: 113.520 t 9 - - _ ♦AMP 3.2.5 _ Operational Crossing ft.: 76.515 I P- - _ -_ •• - _ . - AS-Al8 150 / S A18-150: Eph. r ♦ ♦ • ♦•' r - - S -A18-151: Per. - --:- Con./0 .Pi Pipeline ft.: 55.385 Con /Op. Pipeline Crossing ft.: 2.000 / ,,;.- _ c p p 9 '/ Construction Crossing ft.: 100.935 ♦ • ♦ - Construction Crossing ft.: 117.654 _ - 1k- Operational Crossing ft.: 68.976 ; {; ; o ♦ ♦ - •'�`=' - Construction sq. ft.: 4,387.101 - - s;'ti,t ♦ ♦� ' s, ". Operational sq. ft.: 0.000 .. - • - __ - - /•1, ._ - - 111 ♦ Z:•i. _ _ _ — ••f 111:- 'f'• sties_- - 580 - _ - ~.cr: - :s•• oY 1 If u .'7;,� :jar •-• zz - e - ;•p; ••'' _ -Sf `� .•,, -i': - - of =-� W -A18-152: PEM - ',y' :� r - r �"` r_ '• Con./Op. Pipeline Crossing ft.: 21.137 �= - - Construction Acres: 0.057 - ` P Operational Acres: 0.000 J i - 4 ' �*-----~jai - _I k '!' - w it • - _ - '' "r:''��,'S�.�. kk F , 04W'1.03� Legend O Mileposts (MP, 0.5 Delineated mi) -_ Temporary Access Delineated Operational Acres: 0.000 J i - 4 ' �*-----~jai - _I k '!' - w it • - _ - '' "r:''��,'S�.�. kk F , 04W'1.03� Legend O Mileposts (MP, 0.5 Delineated mi) Intermittent Temporary Access Delineated Road _ Perennial - - H-650 Pipeline -Approximated Operational Perennial Workspace Perennial Surface Temporary Access p rY 0 Water Road Wetlands: Limits of Wetland E::] construction Right- _Delineated Boundary of -Way Approximated PSS Survey Area Y i ♦. Delineated PEM — Sheet L - > *Adjacent,x, Delineated PFO _]County Boundary W. Delineated PSS Streams: Approximated Ephemeral Approximated Perennial Delineated Ephemeral GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational 0 . = Conversion Impacts for Wetlands p ( p) p (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT ESRI NC OneMap, TRC USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 9d , Rockingham County W A� n Mountain Valley PIPELINE'uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 17 of 108 TRC We Willowbrook Ln West Chester, PA 19382 Date: November 2018 P 6o P P,i .y P PP kk .PP ♦ ____ - �' _ ._ - d 5 - 8 - - 0 rv- _ .o i O :1 ♦ r . - 0 590 o N - s �. 4 y+ 6 �.- ! :, s 52 :M1' . w-. 0 - a. ♦` - i .e; • 60 •> -� - 0 0 530 _' 0 ` 0 - 4 - �' 5 'r� ..• -.• - '1 . ' _ -, - `•, \' ,�� - ♦ ,'I •',r• ,_w wr,.' - -�' - �' tai a'• �' ••�`, `; - 0 :1 - 0 e J / ` e ' n • _ ;r +a + :_: 5 :i'- hP. P,P P P k k k w O TA RO 087 �� _ } ='n �' > „l �. - - - _ - i `T5 �:.' r, - - Stt,' _ - �v ` a / - a �.• r ' i. 0 T" - 9 a :y r� a - 5 .t kk o - 6 - r' - M., .__ a` •'''4 w 'PP 2 t J ` s ■,� a . 'a . Ploy'. v1 - �. z ._ ti r - k 'k PP_ r - P� _ a +P.P t k k'Y: • - pk - - - - `._" :' ,' S -A18-154-2: Int. _ - - . - r �k; Con./Op. Pipeline Crossing ft.: 2.000 " ' -- a'.� -� - ' -:� kk `'s'• .t,r' Construction Crossing ft.: 128.681 _ _ - •. -e - - - �. `r' r Operational Crossing ft.: 56.044 :ar•• _�-_ S -A18-151-2: Per. - -ar -�" •,- - - _ a. _, _ _ Con./Op. Pipeline Crossing ft.: 47.916 Construction Crossin ft.: 84.662`=' +--` �0 '` ■z' ?� 9 r S -A18-154-3: Int. - ` + ';;•',r GA Construction sq. ft.: 3,770.332 - , ; ,'' ~Con./Op. Pipeline Crossing ft.: 0.000 550 'k - ;�k -kI �i0 Operational sq. ft.: 0.000 _ Construction Crossing ft.: 14.042 d'o ;1;,';�,,9 A+ ' ' Operational Crossing ft.: 3.720 - - d r - ti' ;;� ;, A O C; a ` o .� as Ik - G W -A18-155: PEM 6 4 0 ♦ a ,' cP �J S1 PPP ppkkk' pp P. ti; ; ," ,;' ;'� , oG pis } - M P 33 o Con./Op. Pipeline Crossing ft.: 0.000 = _ _ _ _ _ _ _: _ : =: `_ _ - S -A18-154: Int. ` "s ,'� a _ Construction Acres: 0.064 - " - _ Con./Op. Pipeline Crossing ft.: 0.000 a ♦ • a ' = - Construction Crossing ft.: 43.135 `a P% Operational Acres: 0.000 - - - PPkP: t' Operational Crossing ft.: 0.000 aa.. _.'''� - - - - =� as ,, �a = .,k6I P. kk '•�, '�' „ 510 ;?. ♦ - W -A18-155-2: PSS ;'r , a 's Con./Op. Pipeline Crossing ft.: 0.000 ;' 'f;;' ; _ �v ■� f Construction Acres: 0.001 _ - ,' ■ `a; Operational Acres: 0.000 - ' '} • ` _ - ■ r+ W A18 155: PSS P. a rr Con./Op. Pipeline Crossing ft.: 68.479 5" :-- a r Construction Acres: 0.155 - 1 I 1: i v- �Operational Acres: 0.000 yr 'P ?' / n� _ .� - _ 580 r e - +aw d ♦ ■a rn ------------ i; _ - +`t, `q �h` r�rg` as s !. - r' ■/\ a - - Sh h� O .R $;.as . i, - �,` .; - k -� - - :s-- - ':ar: - Legend Mileposts (MP, 0.5 Approximated o mi) Perennial Temporary Access Perennial Surface Road Water - - H-650 Pipeline Wetlands: Operational Delineated Wetland Workspace _ Boundary Temporary Access Delineated PEM Road Delineated PSS Limits of E::] construction Right - of -Way Survey Area L _j Adjacent Sheet _]County Boundary Streams: Approximated Perennial Delineated Intermittent Delineated _ Perennial 0 t) M Gtr Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS .--------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, INC OneMap, TRC, USGS Basemap: Lidar 2' Contour, INC OneMap 2' Contour, VA USGS 10' Contour z' >b , Rockingham Cou'ty i sem+fi�"' p n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 18 of 108 glikkk TR� 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 ------ _ - •;moo!•• - - -- - - ___ - - - - •'-- ------- ' 1;, - - - - ----- `r. -- --- - ' - ----- ------ - _ ____ - _ ----- -3 ---- -- w- ------ -- �� - • - - - - -- _ _ i r ., „ - - - , IIP,PPPIP 620 - - _ - - - - - - - - -� - _ - TA-RO-085 - - = - - - - PP _ -- - - ---- - - t' - _ - - - - - ------ P. - - - - ----1, • - - - -- �• pp - _ j _ - -- - j ;. -- pp - �o 5------ --- - I. TA-RO-088 -- -- i t --- - - - - -- - _ o - - i - - 0 _ �0 0 - i9�.P. O 'P P f' �O �. o o • _'.r' - Contours - - h� w p INC'OneM p h �y ?." - on ours - a S' U - - o .. r. I p cMo S t'• to 0 „. 0 r ry 6 �7 r pp t �r i ii -,p I i - S , 0 �o -1 �• it - �== - == ' ry . _ - t, �_• ti • ' ;'� ' A Mry '_- - 0 1 M- - , �ti ' r' 640 1 - kk ; - \ - Si:;'1 \ +pc' - �.� O - M - - C- O ; [�l1 ,. 1. � • - , i' � fes` - N - _ _ O - S-C18-51:Int. - _ �10 41Con./0 . Pipeline Crossing ft.: 4.000 - ) `• S -A18-221: Per. p p g „ „• _ - r ,_ _ _ Con./Op. Pipeline Crossingft.: 4.000 Construction Crossing ft.: 87.104 =' Construction Crossin ft.: 80.682 1: Operational Crossing ft.: 61.957 - W-A18-155:PEM —�- 9 _�}. Operational Crossing ft.: 52.243 _ • _ _ _ Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.064 Operational Acres: 0.000 W -A18-155-2: PSS =4y Con./Op. Pipeline Crossing ft.: 0.000 - Construction Acres: 0.001 Operational Acres: 0.000 ❑ r y z" a n S -C18-52: Int. •+'ti j 4' - - W -A18-222: PFO 1 Con./0 . Pipeline Crossing ft.: 5.000 'I I IF S A18,220: E ,h.p p g �r� _ Con.lOp. Pipeline Crossing ft.: 3.000 Con.lOp. Pipeline Crossing ft.: 42.611 Construction Crossing ft.: 71.877 t� S• o' 6P `-.__ - Construction Crossing ft.: 60.057 3 Construction Acres: 0.079 Operational Crossing ft.: 30.633 :' ,'l ` o��620 Operational Crossing ft.: 54.0251 ', Operational Acres: 0.029' W -A18-155: PSS tiJ,; :? ' a �: <. +r, ; Con./Op. Pipeline Crossing ft.: 68.479 0_ , , ; _ t .:, - Construction Acres: 0.155 h_ ;,__ ';,', _ - ti Operational Acres: 0.000 _ _ ti i ;tb ti r _MP -33.5 ;.:P,00 -- :f.''.•.''.; o� ', X51' I h _ _ •�`'-.i '!_-. -i,. 3 - �• - .,y '' ',tt � y. t, , �', '�- s Yr ^' . f jr � � .�_tT sr• r e _ kkk 'k - - •,j� •' � - _ - tit •sS,. •` _ _ _ =r - y�-ti'•.sc �, - `.ice+s _'P �, R„.. •r ,,. �i, ,i ,� - yti r_'•t'- �� - - :''. t .'tom _•, ----LT `r :�' ar..,r .r _ :,4 `- - - t ' - t "4 - �” 1 r. t .i ' e • kkk rk + - ppW-A18-222: PEM Legend O Mileposts (MP, 0.5 Con./Op. Pipeline Crossing ft.: 0.000 Ip I s Temporary Access - ._ Construction Acres: 0.001 _ Perennial - - H-650 Pipeline Wetlands: -- - o 0 erational Acres: 0.000 p I ' ' - - - Legend O Mileposts (MP, 0.5 Delineated mi) Intermittent Temporary Access Delineated Road _ Perennial - - H-650 Pipeline Wetlands: Operational Delineated Wetland Workspace _ Boundary Temporary Access Delineated PEM Road Delineated PFO Limits of i Delineated PSS E::] construction Right - of -Way Survey Area L_ Adjacent Sheet L__. County Boundary Streams: Approximated Ephemeral _ Approximated Intermittent Delineated Ephemeral ff� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 917 4a Cl v�q ' a r � 1JLJ ok Rockingham Y County r9 Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts p p p Rockingham County, NC Sheet 19 of 108 600 Willowbrook Ln West Chester, PA 19382 TRC Date: November 2018 _ - - - - - - ='=-P PP P PP _: - - -- i A �'R. .P P P P P. P . " - .M: d - - - ; -- -- - - - - - g - - =1- °° . - - - - -- ° --- -- - - - :;;; - " ,- 0 PP - •!- ' P '. -- - -- �' S -C18-50: Eph. (Temporary Access Road) " - i , - - ' 'PPP - Con./Op. Pipeline Crossing ft.: 0.000 Construction Crossing ft.: 11.502 I'' - - - _ _ _ Operational Crossing ft.: 0.000 -_ „ P PP ;�'. pt - �'. % k k tp 't ? " - - Pt -P - _ r - --P PP P - 4; �'' - - - - rn 0 �P', o - - 1 - Pp tPP 1 P. '',ptP - _ pt - NC OneMa Contours ____ MVP LIDAR Contours _ - ._ - P P P P C"w ?', 600 ' - CJIk ,' a. >» -- __ - �' - - s _ - 6 - t' R , - ,'; I rn� I .. P P,_ - o i'. l .$'. N I« TA-RO-089 _ - ;; d d t . 5'. - �tk P P1m I _ c 11 TARO 0881 - - - w _ Ip a ' r' ' - -- Q.r a _ - r5Pp pP` .p _ S -A18-223 Int. " �s�•, P j, 1P PP � Con./0 . Pipeline Crossin ft.: 4.000 - - � rP, I - 1 :11 5' ' Construction Crossin ft.• 8 .069 9 7 Operational Crossing.: 41.745 P 9 l'r• ,at' '»r'' �� -- 14 rn o - `r ' 7` ;1 S -C18-48: E h. ;;',•; W -A18 224: PFO P a o " p• p g •S -A18-225: Per. ;rj� :'. Con./Op. Pipeline Crossing ft.: 0.000 •� �o ;;� ;{, ; .� Con.lO Pi eline Crossin ft.: 10.582 S -C18 49: Int. ;z ; T= .'r `r ' Con./0 . Pi eline Crossin ft.: 5.000 Con./0 . Pi eline Crossin ft.'4.000 Construction Crossin ft.: 1.704 "n ;' Construction Acres: 0.022 P P 9 P P 9 9 ;rt Pp ? `•; r ' Operational Acres: 0.007' Construction Crossing ft.: 102.369 Construction Crossing ft.: 87.011 o Operational Crossing ft.: 0.000 PPPP?t ,,, �_r §;•, Operational Crossing ft.: 76.872 Operational Crossing ft.: 58.044 ;, ; .% p'e f' s, - •'s S , y 'P -P' , :' i { 6 •t'i r • '1 , _P. r - f ' P P P.. a '1' , '','- . �'. , •4•,. '' . S,i'e .S, S, _ -� --- _- _st _-"" - --- , i •l•• ••G-�' 'L'•' ,•Via '-TU+i�,; - ,`•n' •y4 ,* - �- - - -rte• -- -T-'--'rte-�-- - -�- ^ - - - - - " - r � �r:Pr iS �' � is as ii�;r_r. i'r r r r r;{+ �.4,. , � r-�• ,-,.: .�••'.Y ;*�' T'r'' �^; '•,{ia'-�,.j.• .�,� r r ''•,r`��� 777-7- ---- - "-. -A� P P- W -A18-224: PEM -- +- ;, - Con./0 . Pipeline Crossin ft.: 0.000 - • �•' _ _ _ _ . - 1S' - P P 9 Construction Acres: <0.001 s - _ " ;i - = a 2 Operational Acres: 0.000 , _ b �; @_;:• ;; •;;:.' ;;: = _ - O - :t - •'r ` 't ti 20 I S __ 'r, 90 - - - 5 - O - - ` ae,= i. s� Legend o Mileposts (MP, 0.5 Delineated mi) Intermittent Temporary Access _ Delineated Road Perennial - - H-650 Pipeline Wetlands: Operational Delineated Wetland Workspace _ Boundary Temporary Access Delineated PEM Road Delineated PFO Limits of E::] construction Right - of -Way Survey Area L _ j Adjacent Sheet L'County Boundary Streams: Approximated Ephemeral —Approximated Intermittent Delineated Ephemeral Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -""""""""""""""""""""""""""""""""""""""-""""""""""""""""""""""""..............-........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basema : Lidar 2' Contour NC OneMa 2' Contour VA USGS 10' Contour p p pa • v rc Rockingham �7 County UU -0 x � 6 ; 7 R n Mountain Valle Y PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 20 of 108 TR�600 Willowbrook Ln _.-_. West Chester, PA 19382 Date: November 2018 Is' n o u rs - C.aont OneM ---C tours f,'.•:'; P 11 - - __ '•t''• - _ - P 7,._ i I P 'kkk 1P •' ' - - - - ! - - Rd - - tet ki P. Nam I �' ;i,''" i' ----- - 19`1 6 <<, 1','. t'4 • - - �•. -P P ------- S ate S I _ ere_ _ tV IP m _IV I - - ;w+ PP r - - - - i - d _= F - - _ t 4 _ I t e. Z_ }' I%k k k. •'J� 'r' � -s•, - - - "� -=- - r - - P. _ 1% -mz =a:.. S -C18-48: E h. M� � TA-RO-089 _ - •i•rr - - P I e - - - Con./Op. Pipeline Crossing ft.: 0.000 _ - - - _ Construction Crossing ft.: 1.704 a� _ - Operational Crossing ft.: 0.000 _k k P 1: '�'-^'i '�_ _ - _ tir�r°�c• X94= _ Q i _ + '' - 1k I - - '-_ - r _ 'J I :. . _ "s = kk e." k,- I - -- --- - - - -i-_:_• --• --- __ - - --- - - -- =t M P 34:5 _�_.•_•. i r.; .•-�,i, •sG;� ,,.ter '!r. y,r - `i'� i R" .•�+: 'rte "t• f". - r • �•-r - �S'•, - rS S'- - - 1 s.. 4.. V •.2 , rt, i. :-� i i' U :�' k J r - sol t;'1. �' - %_ 'I '' �. iii ,' _ if '1,• ! .J ; i. ,'I� i 11 _ _ .1. p•, :t'a'i - T"'�• �' ' - ' - 1 S -C18-38: Int. - - ` ' jk �. ~ ,� _ _ :_=- � Con./Op.PipelineCrossing ft.: 24.821 ~=::-_ •.•,•, Construction Crossin ft.: 93.302 _ - 9 - _ _ _ _ •is- _ tp _ - - - Constructionsq. ft.: 2,115.008 - - rte' .-'•• �;: ; - _ �. "kS,,; ' ' Operational sq. ft.: 0.000 '= _ - J. - _ - .1k kk, ti'P. s. f to _ : J _ s. _ to __ - - I� Ss '' - - - - - - R - - - -_ ' - - - - �. - - s'. ------ - - -_' - - ' L,.' - 4 t. It 4 -1' • P - - • 4 �-CO r t - - ti: - 1 I �- -- 4 i• - s r - - o `o a: - - -o -8 5 V 6 P -- - 0 kkkk,. kko 0 o -- - R ^ <o --- n c 1 - 000 o rn v co 0 0 - - - ------ - - - __ 5 e on •i ,'�i' --- 650 ^ cp � co co �o �0 d tour - & °urg 640 Legend O Mileposts (MP, 0.5 mi) Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access Road Limits of 0 9 Construction Right - of -Way ht- of -Way Survey Area L_ 'Adjacent Sheet l 1 __.County Boundary Streams: Approximated Ephemeral Delineated Ephemeral Delineated Intermittent _ Delineated Perennial Intermittent Surface Water Perennial Surface Water Wetlands: _ Delineated Wetland Boundary o = 0) m GIM Note:1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -......................................-......................................-........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour I I Rockingham Coil my 7 r9 Mountain Valley 'r PIPELIN. - Section 404/401 Permit Application Proposed Pipeline Route and Impacts p p p Rockingham County, NC Sheet 21 of 108 600 Willowbrook Ln r— TRC T w West Chester, PA 19382 Date: November 2018 g o00 0 00 o NC 690 ---------- 0') =_ • _ _ _ _ - 0neMa ours - - W. - - _ - MVP R 79lieml - Contours _�= d 1 e Rd' - _ - _ _ - - tti �-; ,State• - - - rn - - - c� - _ _ - __-- a - r, - " - - - - r. - - o -- - =__ - - -P :pt - __ +tet'. - _ 4 ~t - i =►, TA-RO-091 : r - R' - �. 1 ,' �• -- a•'- - - } , �T •_.. -i: ,�•, i' - - _ .r y,• R, ' ,4 _ - - :f - ' - s: - - - - F - i ` " - -- _ •.�@_: tea\ -I I I - 1 Ss i• S -C18-38-2: Int. •-t, _ -. •.' _ : 's' '- >.�. Con./Op. Pipeline Crossin ft.: 16.744 - - - _ - " - - '- - Construction Crossin ft.: 333.026 • s _ - '' 9 - f, - - Construction sq. ft.: 3,961.442 _ - ' '' 1 Operational sq. ft.: 0.000 ' � ' - - � - " y;; • _k. k. I t .r..,:= ,-r•`. - _ ------•- __ tom: _ •� _ _ _- •�, - _ _ _ S-C18-53:Int. _ - •6, -- ---Pipeline- - - - ' •� " - :'r:• Con./0 . Crossin ft.: 2.000 _ ' p9 - ' = Ft Construction Crossin ft.: 214.877 - --- - - N, 9 :r=. _ - a ,, Operational Crossing ft.: 138.348 - I 1Pt�.s: - - - It - • •4',. - _ . P I +'- Q - MP 35♦ - ' - - _ - _ . - _-1 o -- MP 34:5 ;':, i-- - =- - = - - -•_ ;:, - :�.��� -6; _ - - - - - - �..� �' -_ -- -- -- - - -----_ ----;r 1 -- - ------------ ----sem - !' -- _- -- 'r- _ ate;`F i -- - - .lr. �.4 ti-�- .-��V.r•r-�'y:'• •F�• •-- - - - --_ -4,Y- - - _kk, low-• • - ;'ti TP It rt, S_ 18-39: E'h" _ W -C18-40: PEM a„ n': S -C18-38-3: Int. •- ''" Con./Op. Pipeline Crossing ft.: 2.000 Con./Op. Pipeline Crossing ft.: 23.311 �k.ti Construction Crossingft.: 107.500 Con./Op. Pipeline Crossing ft.: 0.000 ti`, ; Construction Crossing ft.: 87.354 S -C18 38-4: Int. Construction Acres: 0.004 S -C18-74: Eph. Operational Crossing ft.: 71.350 rN Constructions ft.: 1,220.279 __ ;;+ Con./0 Pipeline Crossing ft.: 7.500 Operational Acres: 0.000 q' Con./Op. Pipeline Crossing ft.: 3.000 P• P 9 1 0 P 630 Operational sq. ft.: 0.000 "t syr Construction Crossing ft.: 71.548 Construction Crossing ft.: 60.136 • ''� 1 - ,.\,;1 .-� _-_ , 6,50 64p s, d_, _ 4 Constructions ft.:467.247 FJ V��� + , 'I Operational Crossing ft.: 59.446 q ' r _ + ;'` Operational sq. ft.: 0.000 " _•t +,'1 .. _J .,4_..-- - - + ,'fit ,•�•� 1 pp_ , • _ 'r • �•'• r: r: _a 5 i, _It - _ _ _ IV •S I - _ _ _ _ t' r i' S'. r � 1 . SI N P. I I,P pp pp ..kk '+; r. • - r,. ' ". - - - / 5i%% d 6 s %s ri' B �� r' '1 OIII - a L•-, O - O 6 SYS" • �'�' f d _ -pp r 11 Ik -• 'r _ +e 0 Y'= I 4• - - •t .9 5 i P r' f.' O ' 6 0 MVP - LIDA R Con tours �r INC Un a Con tours .'. , 0 cokk °j ' oo coo 67 o O 1 :4?= �zI' -- Ern cin v Cl) Cl) 0,�m o rno O O 0 0 0 0 0 0 r - 66 - 6�0 • o o co m co �y 0co co o n (� 1� 16 I� ^ ^o 120 Legend Mileposts (MP, 0.5 Delineated O mi) Intermittent Temporary Access Delineated Road _ Perennial - - H-650 Pipeline Approximated Operational Intermittent Workspace Intermittent Surface Temporary Access 0 Water Road Wetlands: Limits of Wetland E::] construction Right- _Delineated Boundary of -Way j.4 Delineated PEM Survey Area L7_ Adjacent Sheet _]County Boundary Streams: Approximated Ephemeral —Approximated Intermittent Delineated Ephemeral Note:1 inch = 200 Feet — Construction (Con.) Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour atA� �a Rockingham 90 County r9 Mountain Valle - Y � PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham Count NC 9 Y� Sheet 22 of 108 600 Willowbrook Ln TRC West Chester, PA 19382 °-"" Date: November 2018 .f. _ :- - -� Q - .: _ }'.:_- - - - _ _------- - - ` - - ' - III PP I, ' '�� - - -- -- --- - ••'-----�- - -- ! , - _ - - - t,' 9' _ - - - One1Wa _ °,Q ; - p% x t l COnto a� urg ' - - - "a : 9 - on - _ -k k k$9 °urs - ��',s'' _ _ r,'PP __ - - - Ha PP - - _ - f' - =i " - meet - a :e * - -+ - - - - - - f ' s 'i=- PP r-'' - - :'>s v - - - s:' - ;y ; 4 y TA-RO-092 [ _ »�_. , t -___•• ` - �'�y f•l `, r - - . - r - - �' - o.' _ - -PP - .r• O it=+=� `-.• ' �' 1 _ - - ii; N - _ C• •'a: i - f. s S -C18-57: Int. _ - r }#'- - r • - - at . - p `. Con./Op. Pipeline Crossingft.: 2.000 tP PP -=ice Pi _ _ Construction Crossin ft.: 84.495 r;l - -- 9 _ Q' 11 a __ _ - _ ` 0 erational Crossin ft.: 54.784 " 1 - P 9 + _ - - _ pp p .ti . pp K �., �--�'-- :r -=rr - iri• - pp P P _ 5 t _ � •-MP-35.5 TrP kI PP jh - ejti!'�S - Lit'1 : i 1 - ww ♦ •,mow MP 35.. - ; j; 1 •' ♦ , '1 -E'. IT 11�;�;�L' 1�'1 •\ •�, •R-1,` • - - �Pww. ♦'!, ♦w ''P ,4 : �' 'Y Pkk PP -k PftP 'P"�- k Pp pp,i V "• t- �' :y• - P : _ �: ♦ _ - :g1P pp :. - - = - a. .. �. .•4w • __-_ I,�•11�111 & S -C18-38-4: Int. _ •_ • _ _ - k PP Con.lO . Pipeline Crossing ft.: 7.500 ,'. S• -- 1 P P 9 - °•� I' Construction Crossingft.: 60.136 - -- - w - - Construction s . ft.: 467.247 �' '� , _. t q "' i! 4 Operational s . ft.: 0.000 d. _ :'4 , t' , p Q -''.. , -51 s, - P r-_ a i 7 - - �. 1 - r ' 4' _ r - r�:•. Ikk .a �- - - - 'S •_P kkkkkk'i ` P 'P ar _ i is - _ _ A -N :L i - % d.. - 1 - O t - r0 - _ S -• AJ F' .S. ,`�tl'` � 11 1 � Ftp. r r" ' r - _ _o _ r 7 ,•i' - die. :,y �i •-4 Z .5"' 'r .i•� _ r. 5 � S , �' a 1' - 1 Y - e r' � _ :s ry 1 L. x • r� ' 1 i • •- _ 5i i' _ :II: - _ z• _ ».k pp =t - t r - - i�1 n --s P" _ _ •5 � ! -' �' - _ +; `, - O' _ _ _ - 'S y'' S. 1 T -a+ P' �t - gip.k 1P ti.: ' - _ - ;`,:; S _ - :3�. S°' PP Z ' - - > rr'• :: . rI. '3 1 D s __ +1 E_ x- _ 4 < •. a G s.: ;. - O ti - Q + G i'SP kk _ e O` '1 _ _ �, a h M' = VP : :r• L:'�-' if 1 SOAR `r" = _ s-... a ` - • = O,PP oN C - a X20 O ontou '._ +s - .-, , o ap rS -pp s " - Legend O Mileposts (MP, 0.5 mi) Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way Survey Area L_ Adjacent Sheet __.County Boundary Streams: Delineated Intermittent _ Delineated Perennial Intermittent Surface Water Wetlands: _ Delineated Wetland Boundary 0 go EM Note:1 inch = 200 Feet - Construction (Con.) Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ------------------------------------------------------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour pa 4a ri 4D Rockingham a Count Y r9 Mountain Valley 'r PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 23 of 108 600 Willowbrook Ln TRC West Chester, PA 19382 °•"" Date: November 2018 . ♦s- _,.♦'i� .i:' ' '��' ,'wide!- .. _ _ _ _ _ J.' "►�� 1_!i �s�a r kk - ` i .__ ♦ _kkkkP '' - j -h, vs -r i'e • _ - - a� • �`-�v1♦-'a_ _•``.� -` • - _- - :: _ MP -36, ♦ , - 1 .,. • _ -: _�� ♦ ♦ ,,•�� % ` -- AW -AWB -01: PFO s , - ♦ ♦ :�`�ti:%' �s �,-- _ - - - Con./0 . Pipeline Crossingft.: 0.000=g�' " " o� Construction Acres: 0.016 kkk.- o Operational Acres: 0.000PP : 11 - --- y L - 5 5 b . y' - F �1 I n g' s ;{ - a . - r•r• r K 1 �M i.• _ ' :i. .1�1 ff _ r' j rF - }' tr �`• `- _ -- _ - .c _ a `y=,. o kk u_ :�' :''' -- _ ,1. K s O. u.11 ;�\ �kk P k,- 6' 5 i - 2 1 i.=it' � i 1'' o X1'1 -- -- ..._ _ • - _ '- - ' , y 5-1�'•• w.l ice• t• �'� 111 » sa - '----------- - - :� ''s' w i -.s "k o � -- _-. a G L bx � :�': •: _ _ N00 - - b at i ___ �. _ - _ r :r - �. ri ' _ _ /1pp - - ;:5-' . +:.'` - r . �. - - - _ i O _ - - - - �. �' ' - is Legend PP PP =.�a':;'::• Mileposts (MP, 0.5 f � ro - - o - - Water Temporary Access = Pond Road Wetlands: - - H-650 Pipeline Wetland Operational _Delineated Boundary Workspace - - - ''- Delineated r�: Delineated PEM Road - Limits of o ' E::] construction Right - O W ' - " - oars - - °rt - _ - i i - O ` - - - = eM a - - - - - Or R c° - - - N� tOP ` - $ ao - - '---'=k Streams: - P �' - - - - - —Approximated ,'� - 'k1 - _. 830 ; _ Perennial - 1 �: :; .-. - - TA-RO-094 _. Intermittent - --- - -�_ TA-RO-092---- - 9 1 9 _ - :F: d 1 _ to R - ._ - -_ --- - a 1 - Sta - - et Rd - - - - Nan't - 1 -- ` - - 1, _ ____- ------ - _- -- -- i '',. eat . �- - - - -_ - r S -C18-35: Per. - - ; Con./Op.PipelineCrossingft.:9.938 - (Qf - _ _ . _ _ _ _ .. Construction Crossin ft.: 72.872 - •-__ c'_ - - Construction sq. ft.: 600.255 - _ _ _ _ Operational sq. ft.: 0.000 m �. k PP -- �r 1P 1P•-•--- TA-RO-093 •-----_ _ ---- ♦♦' 1 • 'MP 35.5•' O♦' - - - •- _ ; - �tlj-?-ice ,N`,,... �4kk . ♦s- _,.♦'i� .i:' ' '��' ,'wide!- .. _ _ _ _ _ J.' "►�� 1_!i �s�a r kk - ` i .__ ♦ _kkkkP '' - j -h, vs -r i'e • _ - - a� • �`-�v1♦-'a_ _•``.� -` • - _- - :: _ MP -36, ♦ , - 1 .,. • _ -: _�� ♦ ♦ ,,•�� % ` -- AW -AWB -01: PFO s , - ♦ ♦ :�`�ti:%' �s �,-- _ - - - Con./0 . Pipeline Crossingft.: 0.000=g�' " " o� Construction Acres: 0.016 kkk.- o Operational Acres: 0.000PP : 11 - --- y L - 5 5 b . y' - F �1 I n g' s ;{ - a . - r•r• r K 1 �M i.• _ ' :i. .1�1 ff _ r' j rF - }' tr �`• `- _ -- _ - .c _ a `y=,. o kk u_ :�' :''' -- _ ,1. K s O. u.11 ;�\ �kk P k,- 6' 5 i - 2 1 i.=it' � i 1'' o X1'1 -- -- ..._ _ • - _ '- - ' , y 5-1�'•• w.l ice• t• �'� 111 » sa - '----------- - - :� ''s' w i -.s "k o � -- _-. a G L bx � :�': •: _ _ N00 - - b at i ___ �. _ - _ r :r - �. ri ' _ _ /1pp - - ;:5-' . +:.'` - r . �. - - - _ i O _ - - - - �. �' ' - is Legend Mileposts (MP, 0.5 Perennial Surface O mi) Water Temporary Access = Pond Road Wetlands: - - H-650 Pipeline Wetland Operational _Delineated Boundary Workspace Approximated PFO E::] Delineated r�: Delineated PEM Road Limits of E::] construction Right - of -Way Survey Area L_ Adjacent Sheet L__. County Boundary Streams: —Approximated Intermittent Delineated _ Perennial —Delineated Pond Approximated Intermittent 0 ISM CA m Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS .--------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham r, County G a� 4� �o- n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 24 of 108 600 Willowbrook Ln TRC West Chester, PA 19382 Date: November 2018 8s0 60 PP State Rd 9982 Wo P. f s.= peMa- - 's? _ c �o C 4r -r . rs + - - r - -- s JP - - 1' P P1 a t- 1 ; s% ---- ra. ` • L -'ti . .Vp _ -- ei ear '�a:•, r.• - V r :G+: ;t.� - - :i !^ - •s `tip, '�'='p�- - - r,,- - :;..••' ref - ' _: � Pt �• I .I .5� _ kk -Pt It 8 fa ) R t PP ��.� ' •. ::-`_ _. 01 ,MP 36.5 _ -40i' ' .t E _ •��`` •ice'' �1kP 1 ��it •'`PP ' - ,' ;:: - .:rr r"' ,,y - _ _ L '�`' , , _ • ` r TA RO-095 ��'` ms's 1 1'• - -- - - -• -- G - - - _ 1 _ �' •1 %_ �` _ - - - i a _ - -- - - tN- - -- -- --- -- - - -- - - _. . pt t Mt , +' �•__ - j r••-_- HC G/ ` - u O q. w h R r - Maio °nto `rf%+' = COh Ors dre ;a.: ;y++y' tg _ t° - V 4 ti 0 - r t s •s' •r � � d s 7 t o co 9 - - ' `Qpm orti° Mo A - r �J re - 800P. .A ;P Pt t_ P PP- Legend O Mileposts (MP, 0.5 mi) Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way Survey Area L _ j Adjacent Sheet _]County Boundary Streams: Delineated Intermittent —Delineated Pond = Pond Wetlands: _ Delineated Wetland Boundary 0 � EM CA Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour r3 ml Rock,�iIng ham o u n H�.risci r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 25 of 108 600 Willowbrook Ln rTRC West Chester, PA 19382 °-"" Date: November 2018 r s'''• !'` '-� - 11 W A18 95: PEM - ,' ;fes••�,M;w :�• - - ;h'l-; �. k, ; ,.�• - - - 1 : ' ^"' • , • ,�'. Con./Op. Pipeline Crossing ft.: 7.551 x_ --- vI . / "+"+ Construction Acres: 0.020 ,�.' >', _ • - Operational Acres: 0.000 P Pp +� TA-RO-099 - _ _►;� -:_.,� i �: i -rte ♦.� .k P %."'+, •atis k P o' - _♦ �A mss_==_ so X60 IT pp 11V I •_ •.- x --- -. „L• , < -- _ -- - �� y' , - - - ' --- a ;r=====__ t' - _ - ;'rtL_ ' - �� - - - - P TA-RO-100 1 1 730 _ - - �!n s :• :�P.-: =00, o D :;;'P �P- ;,,, P .:, Y�, _ ; :.' :•;:; ' y; , f^ k ';: - :§. ;•' �'k Pk=.' ": 't P pp ' 7 - - 1 c r:, y P _ - - --P. _ _ _ - - y' - t. - il': '; 'i; P. ; v _. _ - ti _ ----- - . ;-y S -A18-94: Per. p Pk -- f - - Con./0 . Pi eline Crossin ft.: 3'000pp p p 9 , f' I _ ! ♦ - - Construction Crossing ft.: 125.000 'o _ '_z - - .21 - - - '+.-^ Operational Crossing ft.: 50.102 - r s'''• !'` '-� - 11 W A18 95: PEM - ,' ;fes••�,M;w :�• - - ;h'l-; �. k, ; ,.�• - - - 1 : ' ^"' • , • ,�'. Con./Op. Pipeline Crossing ft.: 7.551 x_ --- vI . / "+"+ Construction Acres: 0.020 ,�.' >', _ • - Operational Acres: 0.000 P Pp +� TA-RO-099 - _ _►;� -:_.,� i �: i -rte ♦.� .k P %."'+, •atis k P o' - _♦ �A mss_==_ so X60 IT pp 11V I •_ •.- x --- -. „L• , < -- _ -- - �� y' , - - - ' --- a ;r=====__ t' - _ - ;'rtL_ ' - �� - - - - P TA-RO-100 1 1 730 Legend O Mileposts (MP, 0.5 —Delineated Wetland mi) Boundary Temporary Access Delineated PEM Road H-650 Pipeline Operational Workspace EDTemporary Access Road Limits of E::] construction Right - of -Way Survey Area L_ Adjacent Sheet L__JCounty Boundary Streams: Delineated Intermittent _ Delineated Perennial —Delineated Pond M Pond Wetlands: 0 1m m m GIM i6i–ma Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour �Roc king h:.am County L 6 a r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 26 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 °-"" Date: November 2018 D �P- ' I,'� ' 1 , f^ k - - ' ,r - - - 1 c r:, y - ' -_ _ - _. - -- - - - i • - _ - ��•• 6 _ - _ - - - yY� Ste• Pk -- f k kiC\J•__ _ _ •_ __ _ f' I c-. ti O ''`o" NCO �'4R _ '_z - - .21 - - - .- n C a - e M a 0 n t - o c• - - - - - - '_�_ – - - - - a - p 4 t __ S - - •` _rs - -- pp - - _ - -- _:_ pp _ _ - - - - - - - a= ------------ 1• --- -._ ---- - -- - - - - - "7 - - = - - _ - - t�', - '- - _ - i5•f - Legend O Mileposts (MP, 0.5 —Delineated Wetland mi) Boundary Temporary Access Delineated PEM Road H-650 Pipeline Operational Workspace EDTemporary Access Road Limits of E::] construction Right - of -Way Survey Area L_ Adjacent Sheet L__JCounty Boundary Streams: Delineated Intermittent _ Delineated Perennial —Delineated Pond M Pond Wetlands: 0 1m m m GIM i6i–ma Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour �Roc king h:.am County L 6 a r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 26 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 °-"" Date: November 2018 kk, . � - . - . - . . . � . � . . . - ___ -. , II � , I) . � , P,: , I",I, ,, ,� , , , , ,, , , ,. , � , , ,� " .I -,$ II� , 1 III I , - - -, -, ,-- ,, ,, ,1� k , , , , � � , ,� ,, ,, �-�� - , - - � , ,- ,, ,, , , ,., , ,— -6P NC OneMap Contours MVP LIDAR Contours - ,,,, I-- , - , P _- � , I, ;. It.-., ...I - .,. .-- I , � - -'- -- PI , I., - .- I ---, , t .,I - ::P - II,: - I--- � I - , ,- I -. -, �,-t - ,, -- -.�,, ,_ : t -I.: - . _,,-%-1�-,, . - -1 - --I,,-. -,;:,. - .1,, - I.-,,.-_- : -I ,,-, I,-- :._I-,, tk :- -, , - 1 ", I I ---_I --- ,, - -:-I-. :-,tI I W ,- . ' -.I :- _- -II_I� W � _-, ,I .,-- _-I --- "-, :P : V- :-- . - I, ", -�I, -­- :--, -I k _--._-. -(.-, .- ,I- -I\: - -- - .0,� :-, I ;: �,-- - ,I-: ,_M I, II". -k. -..- II---- ". I . � . I ­, ,-I,:II W- I - I _�,- ---_ -I,% k1% ;: -�',I,.- , :II ._",-- , , I,v1:,- P:I kW -,, ,_ II ,---, ",: I,,,,-- , III z , :;- - :-,a I k -I, . II",,,-- I- . , I ,----_- t"-l,:I -- ': --I" -,.. I - I : I . , I�� -: -I,.- W"- I1 --_I --_- ­,,: I- I.II: i -- � ---1 )I -.,I l. - I " . .-I-k - IM- !-z_-.,A - , , I?I I ,---II I " 1 ,-; 1 II ,k -,-- It -_�- WI.I__:t"_ 2 I t PI .P,III - I tIk-_,,., -� , 1 , -- t -p, I 7 I ,I kI,.pI I, tI -;I II�-I -,I,t ,, ,���I , - tP- --I.:-- , I" , I -- ,- I -I 'P_P " ,, .-. I W I,tI-,.,-PI- 1 . I II .I I : �-k�t I .- II I I I II I ,-- I It -I- II*1I -- _ LJ - - - -W , :IP IPI -I . I kkt k ,- -I , -- I.--.- -., - -/-. I.t I - I --, : . t -: k- ,I,,tk. W, r ,.- PP, --,I.. W , - -- ,', I - .-"I. I �.t--.t, --,kIt II P,I-.-- :: :- -, . III.:l,-',I , , t ,W--tt,,t - -, I '".- - t. , -%W "., --I---. It,- 'I,, % J.- I,I:I, I�,,I.-Itk -, p. I ,t , 'I - - P -,I ,- , � k,.,1;.W I,It , I k I I ,_-- ,I,PI II , % II:.-�I -A K - I ,I.. " ,.""", P- I ;. -.IP , , � i,- I k,--,�,I. ,I. i.II kk.- ' - _ - ---- . ,,- : "Pk - .-. r - p _ I,I---- . - -pk-:P : , - � -; 1- * ,, - �-k- - - , I , , -: - -_'-,- : 7 ,*',7 , -.- -P _,.-- ,�I - - -.I :,--- _I , - .I �- %,, ,-W- -I, , , -- 7 .I -,*P ,- '., - -- *-- -W ., - :, I , ---7-kP -,�- I--,,.- -, - 1, t,�_I ,I -..-t--1,7- . ?.- -.. ,I - - -�, % P W - _- - --.. j- -- -- --,- - ­ - - �� , , - .- � ,----I ", I., �--- - - . ___--. --k-W IkI i . ., I- - m'- I- - ,"--'--/ - -. -- -.. _ I , :- ,�..--- I - - ,- :-. -- _- ,"P-- -,- - ,;� ,-- - I -- , - - - .,-II- - :, :--,,i_� I P -, - - , ,-'- --kk � -- ­ .- -.- I --,�. , --- - _ -,k:-, -I-I, , _ I.-II-I--- -- ,- , I1:., % - -. , -- -l' ., _ .P ---,k-, _ -e -., ,I-- -. " :-� W. - -' ,- - )k, . � SI., - - - -II- --. ,k- - .IIP:- - - W ' - - - p-- �,t.,- I,,:I -Z.;-;"- 1 tII -:--- . -I,- , -. "- I I ,I:II ,P ,.--- , ,- II. ,- -.P- % P- , - - - --- - - - - IIII - - - - - -- ---- .------ = r ;I - -- -- - - _ E - -- - ---- --;1` - - , __"_ _ _ . _ - 6. �Z-"_ ' - - -t.-• 'e'' - ,+; . ti.•• - - -- .5 __ - ____ •��. ' - • •:. - - ' _ _ _ - "-. -- _ fae _ - - " _ _---------- _ - -- -:.- - •f _ .z r}}r_r - _ _ `_ �-=tip=-- - .f = r - s _ S -A18-97: Per. p0 xa:' -_ _ - - S -A18-101: Per. - _:___-- - Con./Op. Pipeline Crossingft.:3.000 - -�t _ - - - Con./Op. Pipeline Crossin ft.: 2.000 - - - - - - 6 Construction Crossing ft.: 86.640 = _ 9 - - _ - _ f Construction Crossin ft.: 83.858 • - = - Operational Crossingft.:52.276 9 _ -'r_______________ _ - ) _ _ _ - - Operational Crossing ft.: 56.825 - _ :-: r___; : - _ _ _ _ _ - _ 1, ;:.):'•,t,:1 ' ..'.. - _ __ +� P ' :, - • - .ti .�- Y - __ _ __ __ ____L _L_��,___-____ __ __i•____i__i_-,__ J-J_�_a- -� yy, -: 4r �; '.r 1� 'E �! r, �' �'t, 'i r' ,?rI Ir.�.•f' .a ti's• .i , '� v -�i i ` _ �__ .- *1 II - '-• 'M P _37'_5 z s: _ _ �� - - s• r_�� .! tI -' n�';rte' r. "i>"' +�' - __-__�''- - ____ __�_ '�_-; __� -r — -✓^'' _.•Jr'+- r"'---__ `I L -.i ,., t 4 +'e' ' `'�''-. A r' - - I, ;, ,ASO .••, """r ♦•�2: ..'l •,Q't,. i '!••-.• ••�,� ♦ .' 1'. �• TA RO 100 ` ,-ti - s_y. .tis - W -A18-98: PFO - ? ;" �'• 'e�` -" s'i ,. V 5' 51' _ a 5'' ' .1 Con.lO . Pipeline Crossing ft.: 0.000 r. Construction Acres: 0.007 r . _ 'P, - . - -- f, ♦ 4„ Operational Acres: 0.000' •�' i ' _ �,.-. :� 9' .11 _ _ 5'•1 0: r Tt .s d'. �� 5' -2` .. 'tint Cf . 'tn!1 ♦+ t if ^ ____. - ro.. q5• {•r,••:•� ,� N •` N - �'\ i5; - - �'i' - k -'- _ - ._ - _ + y ;', _ _ ,_�- - - - , ,--"'- - - _ - - v _ - �' _ - - - ----C. - - - - _ - ": -- - __ - - -\ ,p r_ ,, „ • _.. ----- -- ----- - -.- - -•' - --. - - _ _. - ,` -- mc' ., . -- - - - , -� --- _. II , - - _ _ _ _1P _ - I - - :` _; ' - - f Island Rd - 1t ` :3" _ 9 82 Wol _-- _ _ _ .-- - 3~ _ tate Rd 1 ♦� ._,` TA-RO-102 _ �- - IDAR Contours _ _ _ rr t ; . ��- NC neMap ontours o o _ Legend O Mileposts (MP, 0.5 mi) Temporary Access Road - - H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way Survey Area L _ I Adjacent Sheet _]County Boundary Streams: Approximated Perennial Delineated Ephemeral _ Delineated Perennial —Delineated Pond Approximated Perennial Perennial Surface Water M Pond Wetlands: _ Delineated Wetland Boundary �V Delineated PFO o sm 0) m '1�1%k Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) t_ - Permanent Conversion of Type Vegetation Cover T e From 9 PFO to PEMIPSS -""""""""""""""""""""""""""""""""""""""-""""""""""""""""""""""""""""""""...... _........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 1. Rockingham -��.,,, Count}y p� 5 CSU .M J 1 r d I g. r d E kn r9 Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 27 of 108 .11 TRC 600 Willowbrook Ln West Chester, PA 19352 °•"" — ""." Date: November 2018 - i . �;'; Y • _ __ P.1)P\tItttk 1PP kP4' tk"P Pp' P PkPPPPP1PP�'kP . P kPpPPP1PP PP IP P PI""P.kPtk -P P- -P k- I ---k JP P kvP Pk kkkk `1.-�♦� `, 2 �� ice.---•-�, _• ____• i1s'�•-'•�,- Q _ ti _ - Ory kP tP tk Ptk PtPkk KI kktI kP Pt k. Pk .' oto rs - ♦' ` - Z' ..♦ ;' -- - ♦- ---------- "i' - ♦ ♦ =`.; - i'' -,i ; ,. '.-- . - '• "' - -'y, - 'MP 37..5\_ �' :�'; ��-�- ,A . - AS -B18-111: Per. _ - _ - _,_ _!: _ _ _ - Con./Op. Pipeline Crossing ft.: 1.683 ' '` h-'� ,.'. ;k'y Construction Crossing ft.: 80.056 . 4_ .-',' ♦_- <' �.'-�► ' r'' Construction sq. ft.: 215.577 -Y;1i ; - �3c ._x,�">"' 0 erationals .ft.:0.000 .�, �;1 b `� `!� i ♦ �S';/- - •' - -► w ti .,sz' �•. �.' aa• 1+ , tis• " / ''� _ _ Qom' \\ 1st - - - - c ";.. ,. oma• • ; -- - --- ----- q§V} =� - - v - - / ♦` - 1 - ♦ `i - -i _- - - - - �' - r' a.'* yW' t' ''� : ; 1 :w ;, - Ik TA-RO 102 _ AS -318-117-2: Per. Loop. _ / Con.,up. Pipeline Crossing ft.: 9.815 `';• •- Construction Crossing ft.: 76.130 . _ 9 - `y 1 � Construction sq. ft.: 614.749 - �_ _ �-• �'--' _ I _ " �':.' , ' Operational sq. ft.: 0.000 : �: , r_' , - tit ` ` i _f - o ��q - \ ' e R C 'r - - r o - J•+'' r - is +'. ;, , - 6 . _ -,I — - - - - - -- .- V _1 PP4 t .:r '4a - a - . N; ': P k , peg ` - - - - _ - y 1 ip ''•I, - - =e=� - - S, ,rF•, PPk t- Pk tk PkI PkkPk PP _ Iy4. I 5' ' �„ PP;6 -P P PP P kk k" t. 'k k k- kk k k k k k P 11P pp, z S 5 Pp k -= 1 "• , 1P P. . ' --_ - Legend Mileposts (MP, 0.5 Perennial Surface o mi) Water TemporaryAccess Wetlands: Road Delineated Wetland - - H-650 Pipeline _ Boundary Operational Workspace Temporary Access Road Limits of E::] construction Right - of -Way Survey Area L_ Adjacent Sheet L__. County Boundary Streams: Approximated Perennial Delineated _ Perennial Approximated Perennial 0 EM M GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS --------------------------------------------------------------------------------._................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour `Rockingham County 1's a r1a+Q n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham Count NC 9 Y, Sheet 28 of 108 TRC Willowbrook Ln We West Chester, PA 19352 Date: November 2018 - 6' a' ---- ---- _ 17 AIC 0 --------- - - MVP neMa o to Rd 1941 - - - ---�'� 3: ` �, o - - - �/ Conto -- Sta -- _ _ - o Ors CrutchfieldR - `' Ors d �. '-'2s _ -Pt - - -- j A, ' TA -R 1 O 03ZP - - �� S6� kk k 'k'k .__ - -- _ 1'. _ c ' _ -------- _ 1' PPP P iPP%P kP 1 ' L ` �;5;';' _ - ae` j - o+ e S -A18-1: Eph. (Temporary Access Road) _ • _ _ �y_ _ _ • `- . Con./0 . Pipeline Crossin ft.: 0.000 i ` ' g • P P 9 ,. Construction Crossingft.:24.053 �,. =" C - s _ Operational Crossing ft.: 0.000 - - :$ ;'yT W -A18-6: PEM t. - ,'t-. - x. Con./0 . Pipeline Crossingft.: 45.874 'f' " - p p - Construction Acres: 0.092 - - ,', _ Operational Acres: 0.000 PP "-s; . - _ _ _ _ - - - S -A18-4-2: Per. - .` _ N` w 5' I- -�Con /Op. Pipeline Crossing ft.: 0.000 '•�' k r . . .r• _ _ _ Construction Crossing ft.: 41.469 • • ! • -r_; _: --- - _ - - Constructions . ft.: 116.582 f� `�•�. +___ _ _ _ __ Operational sq. ft.: 0.000 -!. --- _ _ S -A18-4: Per. _ -1 - "`'=•. : "'' a=" Con./Op. Pipeline Crossing ft.: 0.000 - - • . - Construction Crossing ft.: 26.775 - __1., ;i - =` - Construction sq. ft.: 34.904 ;1 .-'. ` • r•��^;�;: `�4: k: = Operational sq. ft.: 0.000 -; ,•e.: - ;' - .•.4 ,�'� n :r `;.. S -A18-9: Per. f " ��'� '. "ra;' Con./Op.PipelineCrossingft.:3.000 2� p _ MP'3.8.5p♦ • - _ _+:• Construction Crossing ft.: 122.400 •_ �� �♦ r - Operational Crossing ft.: 74.902 ;r= i' ='.;' : _ - _ Z �� . ^�:. - ♦ - % __g _ �. ♦ . - - - --- :•,�- 670 �. ��.- - - :� r'� 5 Con./Op. Pikkk peline Crossing ft.: 20.487 68p _�" - _ %* - i «! ;k 690 66 c. - :e'` �_ ,r' Construction Crossing ft.: 86.727 - • . >' .. ..• - mss' V - - Constructions . ft.: 1 452.840 rs - q era -- 0 tional s . ft.: 0.000 P q - �= i" - - .� kk 1 `_ • - - 4 - s 0 --• - h WA1R 62: PFO co O .:' r 'i Con./0 �i e Crossing ft.: 0.000 P� P 9 - - CRstruction /tires: 0.004 • -Operational Qes: 0.000' _ = W -A18-6: PFO o I o - - ; l' • ; 0 0 _ - - Con./Op. Pipeline Crossing ft.: 129.655 --k- Construction Acres: 0.152 - - - - - k k kk. ". "k", k -k - - ` - Ik Operational Acres: 0.084' W A18 6 3: PFO - ` - - Con./Op. Pipeline Crossing ft.: 91.729 ----- Construction Acres: 0.088 _ - %' �; ` ; ; Operational Acres: 0.058' 73 ----- ------ - - -- _ :;K - _ M V - - - - - - --a. .� ne a (.'onto - _ r\ X40 p on Ors ; ' S - ---- ; ; tours Ln ` - - - ` dart - - Legend Mileposts (MP, 0.5 Delineated Wetland O mi) _ Boundary Temporary Access Delineated PEM Road Delineated PFO H-650 Pipeline Operational Workspace Temporary Access El Road Limits of Qconstruction Right - of -Way Survey Area L _ Adjacent Sheet _]County Boundary Streams: Delineated Ephemeral Delineated _ Perennial Perennial Surface Water Wetlands: Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ."""""""""""""""""""""""""""""""""""""-""""""""""""""""""""""""""""""""......_........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rd Roc king hamw," C o u n t pNIN, n Mountain Valley PIPELINE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 29 of 108 TRC We t Willowbrook P Ln West Chester, PA 19382 Date: November 2018 1 1 '' . P. 11 ' I _ 6y� 6_0 �� rn rn 1 630 � - - - _ _ - 6c90 o .'N o _ _ _ 001 - - - - k. {' - -- - ;, oh - - Vp e , <�� C Nt ;, - • SRC ohto a; 0 4 �.t.' f' p Ors - - - - �" I _ �' - �4 _ of s a, - _ - - S -A18-4-2: Per. Q' r '' S' .. �- �`'< - - - �t - - " Con./Op. Pipeline Crossingft.: 0.000 ti o S' - Construction Crossingft.: 41.469 n -'•-- S' ;I; _ _ z=: 1 : s" a"- `------ ------------ --------------- C ----- O • Y f- - Construction sq. ft.: 116.582 � py_ _ _ _ - - ' ,• _ _ - .5 r. _ - O L' Operational sq. ft.: 0.000 n k?, <<, ,4 . s:_��s�4 _ W -A1816-3: PFO co , ` - A 1 Con./0 . Pipeline Crossin ft.: 91.729 0 5 �:. _'' : a ' kk - --- P P 9 k_� Construction Acres: 0.088 rn moo.''` gib`' - rr+` ,1 + k1 kkk k 1 Operational Acres: 0.058* o g IE - p s' - :k 7: __P_ § r -ppk _ ti' J; W -A18 6: PEM a Y = sa'ktk - _ _ _ _ - Cor lOp. Pipeline Crossing ft.: 45.874 • _ _ _ _ _ - _ ; ; W -A18-7-6: PEM (Temporary Access Road) Con.lOp. Pipeline Crossing ft.: 2.000 " - " _ _ _ Construction Acres: 0.092`' - '; 0 erational Acres: 0.000 Con./Op. Pipeline Crossing ft.: 0.000 - Construction Crossing ft.: 81.324 _ _ ; V^ P Construction Acres: <0.001 Operational Crossing ft.: 55.235 - - - .ti�; = - ' Operational Acres: 0.000 I /k6 - _ - 1, -.. - r� - _ ti TA-RO-104 111 �r� 'w _- _:."` 1- 1 - W A18 7: PSS .:P - I Con./Op. Pipeline Crossing ft.: 33.744 t- 111 _ _ 7.. �f & 5 = s Construction Acres: 0.076 , _ 1 r4 r s�=�___. tom" .�'-k�-'= 1 1 - ;'; Operational Acres: 0.000 s ti =4 _. 11 1 11 11 t' s W -A1875: PEM �'r - - - ::;r� ^•4r �'��� 1 1 .+ 111 Con./Op.Pipeline Crossing ft.: 16.092 �.'_._ 1 11 - :. rt.;� ` > _ 1 �s 1 1 1 Construction Acres: 0.038 �• +; � •' �='' ,C?;.'- _ - M P-30. �} _ ; ti 1 1 1 1 Operational Acres: 0.000 ,' TA -1 - M P,r3'9` : _ •� r o', - . , O 106 •7 1 ♦ t. rr s. 1 1;1 1 1 +:--, S ; I, r LQ k ���n•��;.-ci,' +-f 47 �� ',t: _ -------- ------ �Y - %� `♦�cOy 1 1 1 W 1 H - - - -y P c6. 1 r 11- - . . `i W -A18-6-2: PFO 1 1 1 1 1 -- ---- -` ------ :-r� �. - _ - - - -- Con./Op. Pipeline Crossing ft.: 0.000 k,. Construction Acres: 0.004 1 1 I 1 ,i • _ _ - _ _ _ _ _ _ - Operational Acres: 0.000 6:.'• 1 1 , 1 -•k - .' `, c "cam W -A18-7: PFO AS -A18 8: Per. _;= »• , • - 1 Con./Op. Pipeline Crossing ft.: 0.000 Con./Op. Pipeline Crossing 1' Construction Acres: 0.001 W -A18-7-4: PEM Con./Op. Pipeline Crossing ft.: 28.705 Construction Crossing ft.: 95.397 Operational Acres: 0.000* +; Construction sq. ft.: 2,755.714 W -A18-7-3: PEM Construction Acres: 0.069 =a- _ ' Con./Op. Pipeline Crossing ft.: 16.284 Operational Acres: 0.000 Operational sq. ft.: 0.000 - . ------ Construction Acres: 0.046 - 620 _ %� • W -A18-7: PEM Operational Acres: 0.000 630 640 �{ '%'' P pp Cor lop. Pipeline Crossing ft.: 75.794 ;9s - -r'' Construction Acres: 0.183 ';'r,' - "�. �"' - 650 ----•_ _ --- _ Operational Acres: 0.000 W -A18-7-2: PEM :�;• ;s; _ 6 Con./0 . Pipeline Crossingft.: 0.000 + s , 5., k.. 60 -�"- - Construction Acres: 0.001 4 _ - -- Operational Acres: 0.000 r� '. -,% s:' rn _ `, - - r:- - 1, kk `_-pp pp s �. 1 :�-. - 610 `•• Legend 0 Mileposts (MP, 0.5 _ Delineated mi) Perennial Temporary Access - Approximated Road Perennial - - H-650 Pipeline Perennial Surface ,---,Operational Water L -'Workspace Wetlands: =Temporary Access _ Delineated Wetland Road Boundary Limits of ,*'i' Delineated PEM =Construction Right- `V Delineated PFO of -Way Delineated PSS =Survey Area L7 Adjacent Sheet =County Boundary Streams: Approximated Ephemeral _ Approximated Perennial Delineated I _ Ephemeral Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS ------------------------------------------------- ----------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour olle.. Rockingham ou.nty �q n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 30 of 108 600 Willowbrook Ln TRC West Chester, PA 19352 Date: November 2018 - -- -- } - -- - - _ _ - - - - - -- - - - -' - - .-"-, , -I --, P - _-. P_ --k. ,�-", .-. ,.,--, ;,��-P- ,. P', ',- k -, k -k,-�k ..,,-- , --1 -,P k - ,--1 - , P-, :- -.�. - -. , _- --.. �� - �P .' . :' " . - - - _ _ - ' - - - - - -- - • ---- - - - -- - - - - - - - ------------ -- - - - - - - NC OneMa Contours' _ - -- MVP tours -- - -- - LIDAR � n- --- "" - -_-- -: 1 -- -- - - - - r ---- - - - -- - - - _ - - -- ' -� , ----- - - - - -- - - •� , 0 - - _ - --- - - --- _ - - -- - - �' - - :,. J- _ •1 P. • - -- - -_ - -- - ,'I- o I ti' - '1' 1' - - - :� 1.: - __ - - - ; ;'�; st'' - �; I �: ' :� - .J',' _% - y ' • - 1 -'a•. S-318-73: Eph. _ 1 Con./Op. Pipeline Crossing ft.: 0.000 _ _: -- - - ------ - - d Construction Crossing ft.: 7.595 _ _ _ _ _ - - :i Operational Crossin ft.: 0.000 S -B18-74: Per. .---- - - -__- t-__ • - Www p 9 - - - - - -'. ; ---- - 't' - _ _ Con./Op. Pipeline Crossing ft.: 4.000 _ ,•�, ' _ - - _ _ _ _ _ _ _ - , ^� Construction Crossin ft.: 86.094 _ _ _ - - - - 9 - _ - Operational Crossin ft.: 52.943 - - - _ _ _ -1-._ 9 _ - . - ' - ti� - _ - .' - - _ - - - i r _ - _ ,• - _ , r�+ - - - _ J __ . - '-i- _ -_ ��__•• _ rr_: 'rt, '1'' _ - - �i�3, - - - :i 'Sii 'mitis s'_-- -,t- s / '�,', - _ r. _ _ =: { 5? ' 'S� - a='r=:': _ =x==.- t - r', _ _ - - - _ - - 1 s F tia - 1 :r: r: 's= - , I - - 1 •` - - - - - - �_`• _ ;�. -1 - r - - - - �: - _ a, -'s' ___ - - _ "i - - - c - 't - - r_ -Z4--Z'- _ _ - - - _ _ - _ _ _ _ — ♦ —t_-—:.— T—•,�- -�---r-- - —_—'—r---- •• _ z: =� T;'14 -- - ------ _ :z___::� --'�: f=_: =MP 395--:, ' r r r r r r r 'r, - w - --�- - --7_.--- ,•SI�;S - -;---- �:: - _ ' i r •�,V ,f r r r �!�_. r • r -- ,{;L4 -CEJ_ -,_-- -��--- _ . .Pi - r r.r's'r Rr 1 Ja -! .a -7i•^ Jam- '�•s{ __ -�'- ,-' - _r --f---�----^ _���' ___ __ _ _-_ _ __-___--_ 4 -- - - - _ ---- I--.''` - _ --- ' - _-- .y .-•- i-tea r--- _r . N - N . �o 1 W ' .r _ __ . . ;:1:'. - .� - 1 - fSa'.,. ae.. - C 1 �°It � i S '- r [ C P 11 V 1� 6 t s _ ---- m t" a ti% t" R . " s'. '� . _ _ TA-RO-107 r' j,' _ 1 -�It -" } - i_ 1 . _ _ _ _ " ; i °�, =t Ct _ - f _ �., _%_ - - - -•- -_ s;__ _ - _ v� ' --- - - •s - t ' _ "•� "' a - -_ -. - - - - moi•:', :ea -•-- ,' 1 �' - % L •'% ' J _ ____ _ZZ A �, `, ,,'4 ', _ 'Y , 6 " - - - - - - -' - - - ' - 720 ' 0 - _ -i - - ry, - _____1-c _- s --- --:: _ - o - - r' _ r• R - .__ �.� ` n: =o - - - r�= - - - �oI .'- - . . I t . P . I . - - - _� '. . � .. , , P - N : Legend Mileposts (MP, 0.5 M Pond 0 mi) Wetlands: Temporary Access_ Delineated Wetland Road Boundary - - H-650 Pipeline ,`Oj' Delineated PEM Operational K,> Delineated PFO Workspace Temporary Access Road Limits of E::] construction Right - of -Way Survey Area L _ j Adjacent Sheet __.County Boundary Streams: Delineated Ephemeral Delineated _ Perennial —Delineated Pond Perennial Surface Water o w ISM M mi Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -----------------------------------------------------------------------••••••-•••••••••••••••......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Baseni Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour 4 +11 Rd I Rockingham N County 9 x fD tI 9Q,wui `* F''1 -'U r9Mountain Valley 'r YIPELIN6 uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 31 of 108 600 TRC WesWillowbrookesPAt Chter, 1Ln 9382 Date: November 2018 _ - - ` 180 - 11P P - - -- _ -_- - -=- - _ - o _ '' `' �' - o ;';- NC - - - - -- - _ 1� RIVAOhe - - --- ------ -- - -- - - _ - �tO�a ----- - - -- - °hto °orsP. - Ors - - - r P, PPA-RO-109 -•' - _____ :. pt F s• - f P PP - ? f f 1 �' - f P. Pt 1'1 S-318-74-2: Per. c'• + : Con./Op. Pipeline Crossing ft.: 4.000 =', tP I•- - Construction Crossing ft.: 88.970 "; j • Operational Crossing ft.: 35.855 �, - !. - 'ti{ _ - W a - f tP w, f -7 " _ -� - - sr iy'" ♦L ♦ ♦�' f -- ii _ _- y r ♦ w -'<o .+ "� ; ♦ `•, �P. '�`� ♦L�,`�i �• _ V. .� _ _ ''>r� ��••.'!!':_ _`c' ♦r -r-��� - ! := _ - :'sem: �::'•: • 4 ' - _ ♦ s_-•-= ._ e W n _,'j•:�yyr` yi_Y j-'�„ _ - - :~;'$2�PP - `. ♦�; ♦�=��-i� ���.aa• -: y • -- o eye. i--' _ _ N i, Ll __ o' y 10 -t' ' ---- �:'T .r W-618 78: PFO w '+PP -j r-MPM39.5 y' Con./Op. Pipeline Crossing ft.: 55.990 `+. V k. - �r.% j Construction Acres: 0.060 'meq', L % r-� ,, Operational Acres: 0.032' I.' - -- 1 TA-RO-108 p, �' ' L{ tS L • -_. • •f - ''•1 �J ' i'1i�'P •'.',,' _ ` 'i" ''1`x'1'' - `�: N0, _ _• y _ P PP tp P P P �:.-. TA RO 107 P. •, Wit_1 5 - ~r `t-•- N r �• 7• f 1`, ' y �Y PP L _ - �-' +� 1 -� PP PP C• I ' Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial _ Permanent Access Wetlands: Road _ Delineated Wetland Temporary Access Boundary Road lfj; Delineated PEM - - H-650 Pipeline Delineated PFO Permanent Access L Road Operational Workspace =Operational Bore Temporary Access 0 Road Limits of =Construction Right - of -Way Survey Area L7_ Adjacent Sheet L__'County Boundary Streams: Delineated Intermittent 0 1m m 4Wiiiia Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS .--------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour LLp Rock iIng haA County nS+ Q 0 e I, r9 Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 32 of 108 600 Willowbrook Ln TRC West Chester, PA 19382 °'"" Date: November 2018 < k •^_ ' _ ♦ - k"0 kI kkk ----__'1 kP f _ e�Y�p ��_/ - M gip' - - o kV ,�.. - _ - Vp Co f - 73 PI k kk kP kk 1 ., `.' ;�- - !OqR Ours ♦„1.�♦ :�' Con w r _ - t0 t ♦P _ y Urs - A �• - �- _ L iJ D♦ ♦ ; v= _ I k! - -- - ••+. �•'' mss'' ";_:-_ -- s r'�'. _ •'I' •,' ♦♦ ,, ♦'1'.` ' ••�ia� `4 _moo,,•••_•'•-�_ r. +-• O'� r = :' i.t ` ♦`**''1;��*; �' W-1318-112: PEM' r �. <<s` a, �� ' > �, . Con./Op. Pipeline Crossing ft.: 0.000 a - �''♦ • ' �' _ Construction Acres: 0.011 _ �a • _ �,• < � :t. 0 erational Acres: 0.000 � �.. ; •'. - S-618-109: Eph. - Con./Op. Pipeline Crossing ft.: 3.000 ' -! y _ • �.,� Construction Crossing ft.: 37.283 _ _ r� zzfr• �•a� Operational Crossing ft.: 6.459 - F: s. c - z� - r- __ , i Win` `Y� - - a S-A18-210-2:tlnt 4: - y'i: _ _ - , . Con./Op. Pipeline Crossing ft.: 2.000 .1 I _ - r✓� 'i'i_��` _ Construction Crossing ft.: 60.942 s- ;: �i:. .� . �= A; Operational Crossing ft.: 45.942 / i S-1318-108: Per. - -� - _ - s _ 'Con./Op. Pipeline Crossing ft.: 26.880 , ��� --7- - `•,- z' _ �•; Construction Crossing ft.: 80.359 _ 9 - - :.:r Construction sq. ft.: 1,676.444 a _ �� Operational s . ft.:0.000 -- --- _ `'• PP P q - • :� :."•+''' - .�; W-1318-110: PFO ` y '`=--------- - �:_, sr_ _ Con./Op. Pipeline Crossing ft.: 0P. 000 1k =" :s§.•• Construction Acres: 0.016 -_ kkkk kk Pk Pkk kPP kI L • . s ' Operational Acres: 0.007 ' ' ; 54 - .♦ y Es. _ ti av S -A18-210: Int. _ r; •' w� Con./Op. Pipeline Crossing ft.: 0.000 y z - - _ _ �; = z m ' �k , Construction Crossing ft.: 38.093 - - _ _ _ _ _ • - - Operational Crossing ft.: 11.884 'i : , • - - o L _ a�, 720. ' �C 1 Y,`.:'`';::, tom• �` ` �. _ - as hro TA -Po -111 oOto `iS ' ' "b ♦ ' L4�3 - - = - - ------_. --- - - _- _-------- .... K PP -• b` L- r-. ' kk S - 5 ' �,t, i i ' O k co __ --- - +� Legend Mileposts (MP, 0.5 Perennial Surface O mi) Water Temporary Access Wetlands: Road Delineated Wetland - - H-650 Pipeline _ Boundary Operational Oj; Delineated PEM Workspace Delineated PFO Temporary Access Road Limits of E::] construction Right - of -Way Survey Area L_ Adjacent Sheet L__jCounty Boundary Streams: Delineated Ephemeral Delineated Intermittent Delineated _ Perennial o m an GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -------------------------------------------------------------------------------..................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham County ti� t n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 33 of 108 600 Willowbrook Ln TRC West Chester, PA 19352 Date: November 2018 == - 67 0 - _ - -- ,. :'• , 6 - - -- - - - -- 6 0 w _ - - - - 1 1 - -_ kk - kk -- - 1 - - - - - s - i'" - - •��. - +:'•:; - :s.• - - - - ---- - _ - _ r-t!.i r is ♦ ♦ ♦ - - _ _y• �•'.tr�' '• _ r r r . .•�+�-� �i----- - - - - - - •� ••_- ♦ ``` /'' - - - - - - i3'. fit'-• _Y•.rj---- --- ♦: �i3 - kMP 41-= ''i' �♦ gyp'- _ _ �, _ , �, 5..� ,'e 1 _ _ 'I i, - _pP PPPPk ri ---- * - = ,� @' �_ . mow' - ' %•s- - s' > '- _ A J S-1318-51: Per. �: - Con.lOp. Pipeline Crossing ft.: 4.000 _ _ • :c _,' - - i - !f ' S-1318-52! Per. It k Pk Construction Crossingft.: 76.853 ,z _ , - ,k s -- =a ' ; • r , �' ; =.% Con.lOp. Pipeline Crossing ft.: 4.000 '' ;'r ' - PkP M Operational Crossing ft.: 50.622 : s _r , _ - - J 5 Construction Crossing ft.: 97.085 :` r - - y'; Operational Crossing ft.: 71.009 - `�: '•;' ' - - - # _ ` ♦ r' . m J 'i' • v e" a ' I 1. a -t. ` Q �F: -.. r' I rI� — _ P pp ♦'kk - _ :'s - - _ �- ¢' : L - .- ' S1j. I - 1_ I 4 IVI P- 40:5-' - z PN Pke S.% - t. = - - _ - r - - - - -- sr , ''. _ i' , ':r'. r -moi:,-. �________ 'i � 4•' S _ > a• - - � S - S` F• „ S -A18-210-2: Int. _ _ Con./0 . Pipeline Crossingft.: 2.000 6' P P J ^. - - - - 5 •' t Construction Crossing ft.: 60.942 - 9 > �' " 0 erational Crossin ft.: 45.942 - P 9 - • 4 ti - -4 I — — — — 4 - - y ;'yr 1 _ — •s �__- — n- - I . _. - =ti - e - _ Con./Op. Pipeline Crossing ft.: 0.000 S -A18-210: Int. _ ��'tppp P �. ' - ` __: kkkk Construction Crossingft.:38.093 r .r. .? . 5 __ �_P, kt PtIPP +' Operational Crossing.: 11.884 - - - ; kk 9 i . gyp'' _ I / ' .dn, J ly s,' r _ i �i t pp s== - ",5•;' - .z ------ tp ♦��Oe - TA-RO-111 % J .a:.. S _ _-...- _ -- --- ___________ _p. o • , - Q , - ' P. P. _ - ,o _-kk/ kki; :k1k :kkk ki.k kk ' 6Lt i• i erf . - ' ala -_ , - P' r' - P pp �' i -. t X Legend o Mileposts (MP, 0.5 ,moi' Delineated PEM mi) Temporary Access Road - - H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way Survey Area L7 Adjacent Sheet _]County Boundary Streams: Delineated Intermittent _ Delineated Perennial Wetlands: —Delineated Wetland Boundary o go m m iiiia GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * : Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rocking ham County ! I =pt w . n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 34 of 108 TR�600 Willowbrook Ln _. West Chester, PA 19382 Date: November 2018 610 ' - - - _ O rn o ' `?: a r:'' _ 6 00 0 00 �O p0 O O 6 6 6 i' O 0 6 0 t - L O 0 O O O ..,, N o tI C O :- 600 -tP,M P Ma Contours 65 _ :1 ont - : a ours +,. ,; c'o 63 640 kkk,i PP5 -t _ s - 'g _ J r, 7 '•• t. 6 r j'z O - __ _ ,: i= 640 - r o _ _ •�:: - i.a y- •rt' - - s `u- _ . G S -B18-57: Per. N . ' - Con./0 . Pipeline Crossin �2000P P 9- - 6 - - Construction Crossing ft.: 85.963 - 9 N o - .� Operational Crossing ft.: 51.538 _ - - �. P 9 - rn - _ - W-618-55: PFO - Con./0 . Pipeline Crossing ft.: 83.654 '== p p , 9 S -B18-56: Per. - - - Construction Acres: 0.129 --- ' - Con./0 . Pipeline Crossing ft.: 39.064 Operational Acres: 0.059* p p 9 �� 6 Construction Crossing ft.: 82.665 _ _ _ _ _ _ _ _ 0 • Vis=: _ r" r : ___ :[ r' _ Constructions . ft.: 2 708.018 -:.- W-1318-55: PEM Operational sq. ft.: 0.000 r;; _ 10 Con./0 . Pipeline Crossing ft.: 0.000' �� : ti • ' ; r'; ;•r' o P P g ' r' ' ,�. Construction Acres: 0.001 r `'; %Operational Acres: 0.000 rn S -A18-171: Int --_ - "-�' ��' s o Con./Op. Pipeline Crossing ft.: 2.000 ---__- ,- Construction Crossin ft.: 79.018 _ _ . _ - �: a s. =r 0 erational Crossin ft.: 10.395 . _ _ .i• ^w :. �:, ` . -1` _ 'y� ,e 0 ` - - '_ a�.'. - ' r� yi _ 1_ Y- --1' • ;' _-_-- - _ t 4 �- - I' Vii= ��:: +` � - - - _ _ P _ :'.' - `P -A , �P. 1 mak- __ - _ -kk _.-----_Pk 'ter' .lil�` "-:.'• '� P t aI _ - - - *~ I' iP Pit - P.P rn - M4 p,4 r 'I- r:_. I ,S.' - - _' _ _ ''1 •' y. 4' •9 - _ _ _ I ; t. - - - P co %41k ' - I - =pp o - - - - f i _ .x. i _ e _ - :Y ' 11 >' 7. D - :4' - 5'• ���¢ 5. a - I - ;.4 _ Q - -. tii . - - _ ;ra . - - - _ - - ; I - -' ` --gi' ]a P Pk ''r ` - s's - 9 = P %4I - - - ,4 =_-', k - -PP.P;P -- +' - - �' [� I 11P_ ,:'- `° �,' � a: ;'b. P., g , _ tkIlk, isP ••�' - -- � t\ O MVP LiI P, . - I DAR C --` 7r,' � o rn rn ap Contours r, - t., SO QO 0 62 6 - - �.- .,.. - - - - - �� -- O O '0 rn, 6 rn 670 s ;: h, O `'O "'0 6'tz 6S0 Oj 1� ,kk �, �'•,' .Prr;.r„', Legend Mileposts (MP, 0.5 Delineated O mi) _ Perennial Temporary Access p rY Approximated pP Road Perennial - - H-650 Pipeline Perennial Surface Operational Water Workspace Wetlands: Temporary Access 0 _ Delineated Wetland Road Boundary Limits of Approximated PFO Construction Right- �Delineated PEM of -Way X. Delineated PFO Survey Area L_Adjacent Sheet __.County Boundary Streams: Approximated Perennial Delineated Ephemeral Delineated Intermittent r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS —______________________________________—________________________________......—........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour rc R o c k i n ham € County �v aYG rk� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 35 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 660 _ _--- _ _----------- _ - ----_------------- -, d - - -- -- " US Nw 29 - -- - "-- -- - ` - - - _ - - _ _ - _ _ _ -, ____ _ _ _ _ _ __ -4 _ - •iz - �• •_ _______ _ _ _ ___ __________________ _ h' _ _ __ ({ 1 • S _ _- \i- - - __ __ _ •_ - ''•'''' ___-________ - - �P, - - - 680 _ - - - _ _ _ - - - - - - - - -- - -- - - _ - - - -'' - - PP - `- - - - -- - P k'- t� - ---------- - - - -- - _ - - PP" r' - 1 2' ,,. .... - - - i r' - ---- - - ---- PPP (03)_ _ - - - - - - = J y •:: -- - - cw Aif}8�errt__SMeet 3�-.� �' -- - - — — - . - kk -' 1,1 - - Qv e� - - - ` - 1. 1 -- ` „1 - - . �, - -- -- ___ TA-RO-112 -- PP "------ - - -- --- - _ I PPk PP- :" ,fa -'� ' - - - s - - 1• ------------ '; - Q - - "� - - P 6 f- - - PrK - - - -P - -".----_ -- -- - --- - - - - - _- - - - - -- - - 21 o - P P - - `' - - - - f ;; - - a - - - - �; - '' - - r - - - „+ - - - :'� ' - - - - -- - --- - -- _ i- - - '- - - - - -= _ _ o' - :s so - - o -- o - - - - o -- 9 -- 6 - .t r 6 0 - a, 6 o' ---- ::ire - 6 60 6 _ - - 66 0 _ - - - - - rr - - - - - - �: - - �. - - �: ; - - } P,'• r �, Ir � - ,:r _ - s =s - -r - - - =r r' T 1' { r' r' _ - _ - r.• _ - - - - - �• r sae - _r. s -- 0 r' 1 - - - - ;r - r' - - - r - - - o - r' - - - rl' - - r - r o - r - _- " 0 pp = _ - - - r' - r- - t - -- - 4:: __ _ _ r - - - _ _ :�. - _ _ - - -__- - - - r1 - _ - - P1 kk;1 ..... - - - ':.'> - - iii •�' -- -- , i' - - - - "r' - __ " - - _ - - - k. _ r' _ Legend O Mileposts (MP, 0.5 mi) Temporary Access Road Operational Workspace Operational Ground 0 Bed =Temporary Access Road Limits of =Construction Right - of -Way Survey Area L_ Adjacent Sheet L__, County Boundary Streams: Wetlands: _ Delineated Wetland Boundary o w EM m mm Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ------------------------------------------------------------------------------------------------------. Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour r9 Mountain Valley 'r PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 36 of 108 600 Willowbrook Ln iC TRC West Chester, PA 19382 Date: November 2018 kk S - y r •a 6 _ 1 _ vkk nS' kk . P. 6g rr-41 0 IN ' =�t - State Rd 2580 _•r'' ' ^�y'r i �' 'r' W-1318-46: PFO _ S;' .'• - -kk ;$ ;�; '' �/ y; ,� Con./Op. Pipeline Crossing ft.: 5.850 p�i"'�,' �•' , gr Construction Acres: 0.019 _-5;: - -- _I PP% - so ♦♦ �pf 5i; ;, Operational Acres: 0.008* - - - _ - - - -%0 ,'r a:�. ,� ♦♦ - - .al� ., ____------------------ i ♦ _ _ `na - f Q ♦`.'MP 4.1,:5: - - S 6181451 Epht - -- __ - - ! a"" :r _ r `3 Con./Op. Pipeline Crossing ft.: 0.000 -"" - �' <" * r: 1 Construction Crossing ft.: 34.474 _ _ - - - - _ .� ♦� - },Operational Crossing ft.: 29.261 s "� r • 'i"kk S-B18-44:Int. Con.lOp. Pipeline Crossing ft.: 3.000 -pp _ - •t- -t" ;s I pp pp Construction Crossing ft.: 80.279 R• _ =s. - t y . • ; 5; Operational Crossing ft.: 53.417 _ - _� �-=ice_ � P. pp o _: , t S• ZZ ♦ tt ;r,, - - - -- Adjacent Sheet 36 — — ?' — L - tt / / _ - _ ;. •r AS -61844: Int. r; 1 0 _ -------- _ - ------- - Con./Op. Pipeline Crossing ft.: 0.000 ;--, - - - - 9 - - - °c♦� a Construction Crossing ft.: 57.903 ; 1, ;;,: ; �; ', , ,• --- __ • _ ___ - - Operational Crossing ft.: 0.000 ' - -- - ,P Ik + i , �;,, W-1318-43: PEM (Permanent Access Road) ;r ' '' '�'ti� , 1 i I - - - - - - II . ,' ti,' , ; i; , , Con./Op. Pipeline Crossing ft.: 0.000 ' 4 IP''P' ' Construction Acres: 0.025 -""- - =- _ =_. ' ' ---- --- - - ;+ r ti ti, ' ; �, ' L • Permanent Fill Acres: 0.025 - - - _ _ _ _ , - - kk }. ♦1 � S-618-42:Int. (Permanent Access Road -pp } Con./0 . Pipeline Crossing ft.: 0.000 - P P 9 f ; Construction Crossing ft.: 15.172 - %- - --- - Permanent Fill Crossing ft.. 16.172 ;; _ 11 k IV Ik ); ♦ .� - - _TA-RO-113 _ < .a Pk l'��� ko— - - -_ _ kk - %d Y ♦, n -- - -- o ? pp PY Xp: ►� - - _ _ _- _Spee It I P, t '• 1 :� , SB1841:Per. r: - �•:'�•�.� _?`-i.��._-= 1- - :r-_- z 120 rr - `r - �. .�- Con.lop. Pipeline Crossing ft.: 19.474 ' _ _ _ _ - _ _ - '-pp 1k .o' Construction Crossing ft.: 83.898 _ " ` .D t ;;S ; Construction sq. ft.: 1, 619.401 +;_ Operational sq. ft.: 0.000 _ - - - - •a: ` •fie+ -- pp I. op k I I, 1k~S : i= Legend Mileposts (MP, 0.5 o mi) _Approximated Intermittent _ Permanent Access _Approximated Road Perennial Temporary Access Delineated Road Ephemeral - - H-650 Pipeline Delineated Permanent Access Intermittent Road Delineated --,Operational _ Perennial L - 'Workspace - Approximated Operational Ground OBed Perennial ' Perennial Surface Temporary Access Water Road Wetlands: Limits of Wetland E::] Construction Right- _Delineated Boundary of -Way 0 j Delineated PEM Survey Area Delineated PFO L _ Adjacent Sheet __;County Boundary Streams: 0 t� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _......................................-........-............................-........................ Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour rye I V Ro kin 9 ham I Count s n Mountain Valley PIPELINE u Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 37 of 108 600 Willowbrook Ln TRC West Chester, PA 19352 Date: November 2018 6, -'0, ` l 6 l rn 8 D ao --- (5)Q 0 q '.'�• '� - � -� o0 0 690 -z '�z ;�: , " _-'� �, .`• _ 680 4 s _ V G 5 - O _ u O i M O05. `II, e G = r - 1' P- O : t. PP N P M _ Q 7 Li.a kk s_ r� - _'- kk - r 'r ` + - +.. - 1' - - ••, O 6 6 1 _ 6 e i _ _ '.s s s; :,: _ .;�• - :z '== - k3' r J •'is . s ,'r _=r . ♦'moi - i - r' r r PA-RO-114A k PP s' M 2t ./t ♦ i1 •= _ nn _ MLV'5. • V -� - ♦ 3: k _. rn - 0P P- 5 6 - sf _ 660t, , PP y' ' .- 0 1 h : ;' 1, Y, , 1!♦ 0 kP 6 - HC he a A 1 _ ,'S i C.1 o _ htO !'I1i 5' O S� h {� V w rt,} y k' k IS 17 • i,p ti 1'' w, '� 1' o' PP P _P_ , - y yk k _ F! - �,w - PP N - __ m_ g• N - PP .s ' •a' 1 ' - ii z' E. - �u_PP P - �i•- :: F ''�I' r s- + — O 5 L '�'R . - Legend O Mileposts (MP, 0.5 _ Delineated Wetland mi) Boundary _ Permanent Access Road Temporary Access Road - - H-650 Pipeline Permanent Access Road Operational Workspace Temporary Access Road Limits of =Construction Right - of -Way Survey Area _ L _ *Adjacent Sheet County Boundary Streams: Delineated Ephemeral Wetlands: 0 SID 0) CA GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational 0 . = Conversion Impacts for Wetlands p ( p) p (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -------------------------------------------------------------------------------..................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham County �9•�S.i n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 38 of 108 600 Willowbrook Ln West Chester, PA 19352 Date: November 2018 =� - :•t'1�. r' SB1889:Eph. - - `•` • Con./Op. Pipeline Crossing ft.: 1.000 `to `:.�. `` y%tS -pk -" - sS = . +' Construction Crossing ft.: 77.821 .+♦ .--'-` . z.:•__._•. "MP -42:5'';»' : ,;. -- ._ _ - - 700 , - s 1 '• - - Operational Crossing ft.: 52.750 - %_• ~ ...moi i.p• •r'!'.. -- _. .'� • .t ��. ----- - ' �L•'-`• - -- - - a - - - - _ - - •� pp I ,� _ _ - _ 9 . ♦ Qin `• _ '' r• - _-' - _ - A ;I r w. .. - - - - 4 - �f. - kk - -- ..Qa• --_____.__ _ , _ - ti- - = - - - - _ ,'1', O '` - - - CYC • - -' - __ Legend O Mileposts (MP, 0.5 _ Delineated Wetland mi) Boundary _ Permanent Access Road Temporary Access Road - - H-650 Pipeline Permanent Access Road Operational Workspace Temporary Access Road Limits of =Construction Right - of -Way Survey Area _ L _ *Adjacent Sheet County Boundary Streams: Delineated Ephemeral Wetlands: 0 SID 0) CA GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational 0 . = Conversion Impacts for Wetlands p ( p) p (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -------------------------------------------------------------------------------..................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham County �9•�S.i n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 38 of 108 600 Willowbrook Ln West Chester, PA 19352 Date: November 2018 ,, -_. - - - -- - - - --::::::__�- �-. -- - -, '.�,', `-L ' r, I O - _ - ''''�''' �� - / ,' _ rn 6 Q o -- - % % 11% % % % % % % % % % J1P I o - o - -1 _ __ _i ,,.+ �' - - -- �' ' ") - - - m ` - _ _ _ NC On Ma Contours ' - o MVP LIDAR Contours M' - - -Y - Cp _� �.. _ _ -- - -- - " 4"_ !'- _-_ co - s co - - - - - s_=__ - r I'� •_ cD ------ .a �' 1 -_ - O% - - %- `O -% %- co 1 - :;, ' �' 0 o� o - - i' . CD 1- - - - - 0 ' r'. ', W M ' :� o w! - _ Ik Q, ' s. - 'I: _ } u _ '+ , %- - +, .t '•.',; r �. _ + ' C� r u rr%% ,% S -B18-92: Per. m� r. , --- - - Con./0 . Pipeline Crossing ft.: 12.038 �• a> o - p p 9 ■ Q� Construction Crossing ft.: 128.098 ;. 1■� ' - - Construction sq. ft.: 1,456.584 1Sa•, i 5' - -% ', _ - Operational sq. ft.: 0.000 •; p;'' I" ' `r -- - - _ - ;1� `-� - - - - -- ----- - - S -A18-256: Int. -%P I Y%;� ------ - r '. _ -F `- -- Con./Op. Pipeline Crossing ft.: 2.000 I% - % .'�: _ - _ • - Construction Crossing ft.: 91.952 I y •' a --- Operational Crossing ft.: 52.984 - ? "� P _:m - __ _% I -1 .1 I : , I I , - - - - I , I% - , I I ; � I % I I , . . � I , P - - , - r I r, I I , - - _.' . ::::: ! _-P -P.. YV. , I -' .- %�t^'' ''Y r • i1f'r'' tsa''i.. ' .-;. - _PZ4 .-P e - - - -- - - 1�• �"r•.. !Jaa��,.._ - - +•-s---•rte,-rr�11-"-�s-�'.'-' - .ri,��'�j j4 i� •SSS �II 7P , `r -, -- - ---- ----- -a_�ti }"• '��,r _- + I �,1{- '4 ♦ -f y��� TA-RO-115A % +• _ f. .- - - -- - e •" i ---- �: - --% `�-: L y i %t, ' - - - - - - - - o ►� _ I'' I 1 r•'. ,. - Ir, i%s - •' ` - _ - 1 .X-"__ a -=� ___' 11 • ''�, i'' -- '`- ---- -_• �11 ,.• %_' - - - . Ott - - -% - - --- - _ - - - - - "% c, - - - - - - - - _ - - ------ w - - - - wm - - - - "ry' _ - - - - - - - - - - - s _ Y• -_ - - --ft ----- 1 }t': mss, •• - -- �i-�•,- �r= r - Q -% - _ -- - - o p r + t 1.I. Op 9-• - - -- _ - -- - - _"' f -�._ _ .1 - 6 - 6 0 �- _ - ; I t' r is 'r e' 67 0 0 = _ t - "' -_, o ,ti'% -- - - - ' ~•E �'- I I __. . z""'..:.:.'. ,.--.. I � I _ _ •,� , ' 1 g, _ S{ ,! I' :' - f ` reg ,S i _ _ .�• S'•' ;' ' , _ ;•�• . I ' iti• ' 1��,, ] ods - - - -- ' . -- - -- - -.- - - -- - - - - - �::= q ,,• _= - ----- _ :;•. - _ - r: %t . - Legend O Mileposts (MP, 0.5 _ Delineated Wetland mi) Boundary Temporary Access ,�j Delineated PEM Road - - H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way Survey Area L_Sheet l*Adjacent _]County Boundary Streams: Delineated Intermittent _ Delineated Perennial Perennial Surface Water Wetlands: o go ISM CA rM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 1. Cff . 1 Rockin" @@9 ham %,,1 .1 I,.,. County 1�$ 'N . 'os, r9 Mountain Valley 'r PIPELINIE u Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 39 of 108 iTRC 600 Willowbrook Ln a West Chester, PA 19382 ` °'""' •' - Date: November 2018 -- - 0 r• 'P[P' Goy` :Q - - Z Oq oij- - kk 'Q i' fli■ ,} -- - _ ;ii'R - -___ may. :� __i..yti'_ ��. � ••S 1_'•, - kk ' s" 1 tape '' _ 'rte = - _ - - F'• - s�'. y :> .S .1 I 0 =x s =_ a - _ q • s s.�?: - - M - Ikkk- - ti '�a• S 90 7 -- k Pt r'- - P,ps "' - - i i �ti �` - - - - 4 _ - _ °8 i '- i "TA RO 118 - - : t� rn co - - - - - r'P, P - --- :__• j :P Pp - _ •t ' S -m 1P A18-181: Per. - - - - - Con./Op. Pipeline Crossing ft.: 2.000 - = - - _ �.�.;' r' x' Construction Crossing ft.: 141.474 ----- ; I ,. P11P �- � ` -_, ._ __--- S -A18-105: Per. Operational Crossing ft.: 79.322 v, �"`_, _ _ �; >v Con./Op. Pipeline Crossing ft.: 53.465 , _ k- „ _ ; Construction Crossing ft.: 181.797 ,� , �;' *V ; + ' P • �.�{' '''r' - `•. _ Construction sq. ft.: 2,619.606 11 `i I 'vit 'k pp - '� 't'� , ' - MP'43:5�. Operational sq. ft.: 0.000 - ., > ```. `� �. k PY �. w L.i i� a ��.� -4 lyy', ��• -`� .i,` �r �,� _' _ � '*'may' �` ' �'~ 'v`t ice TA RO 117 0 ' y� r r �t�� it - - T 'y ' ' + S -A18-176: Per. ��,� 7� pp Con./0 . Pipeline Crossing ft.: 25.853 •z p p 9 0- r - •s Construction Crossing ft.: 88.634 �;. ; o Construction sq. ft.: 1,786.797 �• = ;'� - Operational sq. ft.: 0.000 ., N - S -C18-80: Per. ��She -11 � P ' k k k k k - Con./Op. Pipeline Crossing ft.: 4.000 et 4 e m Construction Crossing ft.: 77.190 . 7 Operational Crossing ft.: 30.587 c N ___ 5 n N• Y' t. 11' _ Ik, k _ v iq t• ! r II' P.,P '1,;5,' °n `;`,: pp, k I t P. __ - �x da• y - - - -— I c - _ - - _ 4, - :': - - - - - Y - Pk kP L -0� - 5 •6 1k 1111 .11 - a, 1 4• - -J 6 ' 'P': - - 6 - i 6 0 • - 2r• ',-' - ,_„•, - _ - `' �t - til • y• - - p Legend O Mileposts (MP, 0.5 ,,Oi' Delineated PEM mi) Delineated PFO Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access El Road Limits of Construction Right - of -Way Survey Area L_Sheet l*Adjacent _]County Boundary Streams: _ Delineated Perennial Perennial Surface Water Wetlands: —Delineated Wetland Boundary 0 EM 0) GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham County h � S$ n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts p p p Rockingham Count NC 9 Y� Sheet 40 of 108 TRC We Willowbrook Ln West Chester, PA 19382 Date: November 2018 ---------- .',' -"----------- ---------------_- - - tate Rd'2579 740 Brooks' - - _____________ --- •---- - - - - -- - -- , - -- - __ - - Ps',PPP - - - __- - 720 �: ; .; - - - \�--_---- - - - - - -- - - - - - - -- - -- - �_ �j , - P P _ _ , ---+ t M OP . I — , " :�' ;/ ::, ne4l " - .. V� p Cont 0 1 P.-_ s ' _ - i ! -G v - i' ''' " i ' -- - - - - - = - ` t - - -. kk J - __ kP PP I - - --j:-_,,PP -�, pti TA RO 119 _- , - - �, " - - �`'. ,'y,. ' _____ I �- %`' ` - - - - n ,. _ - - „15 �� - ¢.,- ' 1 • .•i _ - _ -__ f' 1 s ' A r?. _'� - P P „� - �., i. 1�••. • •' s' ,'i' '' _ - _ 1 ._ 5 9 y O ! 5 1 . f - O PP tai _ '• _ 'S' •' {t ' i ;'�+ ��.. O` S -C18-25: Per. I _ , s= $' � �- - - Con.lO . Pipeline Crossin ft.: 4.000 P P 9 pp =� Construction Crossing ft.: 85.267 1 -z _ n 9a kkkt- �' _0 erational Crossingft.: 55.449 ' M& . S A18 105: Per. - - - - r' •�s Con./Op. Pipeline Crossing ft.: 53.465 - it s - - Construction Crossing ft.: 181.797 _ _ s"•' �- - Constructions . ft.: 2,619.606 r" s:' _ �♦ ;" n� _ �- 5-,:_�; - is Operational sq. ft.: 0.000 :v' ♦ ►� r' r i' �. -<- I - .moi ' _ :•1� ''f9 �' � Wit: . •y:'+ 5 i '� •- 'f�i ±r o• .^ter,' %r y•- _ _ , • - .•�ti �i.' - '♦♦ r+p_, ;•,r� .� ',4 is - _ - �; _ -�'•- ,.� � �+` � rF '♦ ♦ - - � _ ' h !'•'�C :PP PT ria=' _ - 'i+�. ''� .,•.� • ? - ♦ '�'•�� i 'i r. .y. _ _ - - -c - � Y� _ _ _ - _ S -A18-102: Per. �, - - r - a - t r, . • 6 - _ _ r, 1'• Con./0 . Pipeline Crossing ft.: 3.000 - - P P 9 Legend •::::. _. _ -t= Approximated Construction Crossing ft.: 112.451 "a .•: Perennial Temporary Access Perennial Surface Road Water rr:: Operational Crossing ft.: 83.667 1 Con./Op. Pipeline Crossin ft.: 4.000 Construction Crossin ft.: 77.190 - -- - -- - - - -_ _ _ = - """ ,_ _ _ e- j, Road _ _ _ _ _ ._ _' } Operational Crossing ft.: 30.587 Survey Area P - -� zL -0- __.County Boundary -% r t'- '' - Legend Mileposts (MP, 0.5 Approximated o mi) Perennial Temporary Access Perennial Surface Road Water H-650 Pipeline Wetlands: Operational Delineated Wetland Workspace _ Boundary Temporary Access Road Limits of E::] construction Right - of -Way Survey Area L_ Adjacent Sheet __.County Boundary Streams: Approximated Perennial Delineated Ephemeral Delineated _ Perennial Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational 0 . = Conversion Impacts for Wetlands p ( p) p (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour a�Y �r n Rockingham County 47U Mountain Valle Y PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 41 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 NC OneMa Contours _ • ---- 80 MVP LIDA ontours -- -00 - o 'i:• - - - - - :f: - - - - -- - ° n - ,_ :,r V - - - :.'r _ PPk - --- - kk 1 s': - - ~r ; '' >i, l - �+ - r '•n ' 'k, aIIk k l'PP 1 kk Ik - s -- ' ;ml - - c+' _ - - t = _ i" - - y� - ---- - - - --- IZ a S -A18-226: Eph. ; ' Con./Op. Pipeline Crossing ft.: 3.000 - ` ' S -A18-228: Eph. ; aq I Construction Crossing ft.: 78.689 _ .; Con.lOp. Pipeline Crossing ft.: 5.000t kkkP " -'k :k kkk k PPktP,k kk/ P k i q'a`- •'`_ _= - Construction Crossin ft.: 90.630 P s` Operational Crossing ft.: 52.544 - ; ,� 9 kk tPtk K' Operational Crossing ft.: 62.117 " -- - . �• - - - - -- - - - -- - _ - - - T ' - -PP +; _ - ! - ` - - - - I - - - rr - r __ '`'' pp 'P P ' 1�F r _ Rte_ Y..'. `r P pp it_ •I: P , - r - - -- - - -- -� __1' i_ • .____ _ r �__' r_ ` r . _ _ ' _�__ r _ _,r_ _ _ - - rte--,-=---rr=_ ;-.. __ �_r• ',rti ';�-MP-44-5 - �.- r r r i'1- -0- - - - - r r �_i �.'r� rim `S r �r r'i. r r r f•�r r rr r ��r T �r r r r' 'r _ r ' , rr r, .r-`. • . --r- -- - - _ �_ rrr `st=s►.-ter_._ _-i-�-s-' rTLr'--uu,'rr - -- --- - --- - - - -- ------ - _ ter- ----�-J� _ { ._____ 4 ____ kk •� _ ___ 1 s- ---- - - 7. 1 co- -- `r' _ _ AW -618-67: PEM Yrn -_ - PP P •M _ . Con./Op. Pipeline Crossing ft.: 0.000 - .■- f ' `: -, o _ sc• - �r�� h Construction Acres: 0.017 Operational Acres: 0.000 q L� .S.-•_••• - •_ _ _ k CD I1'k k'N ■ .�'' 'ii' _ _ _' PP a S _ --- - - a -r _3 •• •- 'Y' 4 - _ P1 k 'Y' S' _ _ _ _ _ _ _ _ 5r - ' __ __ _ - - k;lk_ _ I 'k k- ;:= - - - _ ar- s - _ - -- ~ s ' - ,'• •ik, k kk k- k 91 _i _ ��. - _ - _ ri c' t -- - :i' 4r - .:skk Pt - i d'. aPIL - - 6 - - - ti J-3 _ ,,,� __ ,•q _ .____ s - - - =-� : A - - - o - - - - - ' r _ - -- -= .; " S' 5" ►• 't _ _ 4' s - 5' - 6 1 _ :I Q - _ ^ ' +' Y MVP LIDAR Contours "NC Orl Contours I _' _ rnrno 0 0 o 0 _ rn-4a0 M o 1 oco m -� Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline Operational Workspace Limits of OConstruction Right - of -Way Survey Area L _ j Adjacent Sheet __;County Boundary Streams: Approximated Ephemeral Delineated Ephemeral Delineated E Intermittent _ Delineated Perennial —Delineated Pond Pond Wetlands: _ Delineated Wetland Boundary Approximated PEM Oj _ Delineated PEM 0 ISM CAiiiia GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ------------------------------------------------------------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 42 FT `o c k i n9 h am "a"F Ra County N r9 Mountain Valley 'r PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 42 of 108 600 Willowbrook Ln TRCWest Chester, PA 19352 Date: November 2018 kPP sf - - - _ __ - ;1 . X20 aye R _ - - - - kP °Oks Rd - - - - -- -- _: - ---- - - - - -• 1 - ;� - NC OneMa Conf0ur5 _ - - - - P WD .___ _ _ - - _ Z'__ ' __- Z PP PP �_-' t 'P-- �• - - - -- --- - -- _ JJ -... - -_ PPPPtt ----- - - - -=-- - _ 1 a 124 _ - - -- - - _P N 1 - 1- - - - - - _ 2s_ •� __ it - _ =- - - - " 3 - -- - - - - _ _ - - - - - ° - z -_ - _ - _ _ t . t - - 1-- �- --- __-_ -_ - - - -- --- - - - -_ - .1 d.� ;t' 1` ♦♦ N _ -:% "mss 1. 11 ♦ ' - - - .=t��• ♦�- - ___ 1•s�•�i s•� _ - �` �" �-jL Pt LX i; '� .-sem-- _ �a ! •r� - • PA-RO 124A 1 _ �..-�t-_---=M-01.45- - - _ . - - • __ __ _ __ _-v -- --- /t50 '11 -- _ _ r E' j5 h�. 't---- --- -- — -- — — _ _ _ --- _ PPP ''1 ''I .3 i- .d ••r. • - _ .- P pp 1P pp l " TA RO 125 - _ - - - L • - _ .. - •4i •'• 6VO P P- �' - k' k K • 'f _' _ - -•' ,1 - - TA-RO126 - - pp 1P ' - - ''p Fs---_ i - K • 1.P Pk - ... _ - 5 D �;Pk n� - w e.s 9 - :'4 9 _ - µ _ _ _ P 1P pp O __r:::'� 3 O••S� I' J • '•i •l'� _ ''1'' _ Q_ °+I al' - - Legend O Mileposts (MP, 0.5 mi) _ Permanent Access Road Temporary Access Road - - H-650 Pipeline Permanent Access Road 1-, Operational -1 Workspace QTemporary Access Road Limits of QConstruction Right - of -Way Survey Area L _ jAdjacent Sheet County Boundary Streams: Wetlands: _ Delineated Wetland Boundary 0 010 EM CA GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _......................................-......................................-........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Ra 5� 49 a.o 0 t , 3nk I,d Rockingham County n Mountain Valley PIPELINE'uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 43 of 108 ^ 600 Willowbrook Ln TRC West Chester, PA 19382 Date: November 2018 1p I- - - - - - - N (`j ff-I O Irl` LT''' - _ a'' =o=-- - - - Ma Contours 0 -• _ _ _ _ _ _ C One "" - _ MVP LIDAR Contours _ , 1 tcs , - - j = - '�r Pp'' •"''• r " 1 ' `'r �'• -f ,'{' i''i,' - P'P pp ;1 ' 1 k_ :p - -- --- -- _ -- 4: - - - - -- - _ ' - - - - - - - `� 6' `- - - - - - --- - - - - -- jr' w =_ - - ") 1 - -v� - - - - _ - - L- ___--- • - - _ - - - _ - - - y Con./Op. -•----- _ . Pi - - p p eline Crossin ft.: 0.000 - - _ _ - _ - - -f' � • = � - - - - Construction Crossing ft.: 99.309 _ _ _ _ _ _ _------ - Operational Crossing ft.: 0.000 _ - 4• ` __ - - - - _ ._ •fid• _ _ _ pot,-7 _ _ - _ _ _ •t +•• _ _ _ _ - - _ i - _F j j r�I I I: r - - 1 1 •: rrr. .Sr _-3.• _ _ - - ,,'r. __ ��;' ■f ------- 1 [ - Y. - L- .•i=a;: _ - ---- - � �r. '•--- y'r .,%��, - - _i.71 ht ice, •:{�'� -';�,' - .r_- _-----i _- - -- 4'5:5,..-.;•,:� __ ae- r`T r rt rir r rr* -^. t'' r;:'', � _ �_ - - - - "" .@: A ♦�`' '1 �'', j. •.. - - ,tit •'3" r.:.2-�•._ __ •-'r �r ^'J' - AS -618-71 / S-618-71: Per. _ - --�_�° —� _ Con./Op. Pipeline Crossing ft.: 13.314 •. �s=;';%;;; ~" ► - `r - - _ Construction Crossing ft.: 89.300 ___ •____ ,,4 6 iib - _ _ s ;1 Construction sq. ft.: 719.745 1'. - Operational sq. ft.: 0.000 '•'' - 70 TA RO 126 f 6 80 J 4 _ r Y`r ■ P :t -'-rte-'' :'�,•.�=___:___• -::;: •, ;� =i= -'_ .Y - `rti.••' v � i` - S� {{ ,5 f 1 _ b - •:s" - -lk 5 f .r ' 2 It; . z - r:=- _ S _ - - - - _ - to _ - O 1 3 - •F - Rti - �•1 - _ r ra- - �r r5 - i 6' 1 111.1 •' �:. T � - - t - - h o _ s 6 9 0 R C r - >� t - P •r .7 - r \ o _ `s 1 - - 0 \. C v _ 0 _ _ P - 0 _ 7 'i � M _ r •t,` 6.• - okk .r= 0 sr r, ' 7 - �:� o - '�;;,' t, ',rti; ; 11. 730 Legend Mileposts (MP, 0.5 Delineated O mi) Intermittent Temporary Access Delineated _ Road _ Perennial H-650 Pipeline -Approximated Operational Perennial Workspace Perennial Surface Temporary Access 0 Water Road Wetlands: Limits of Wetland Construction Right- _Delineated Boundary of -Way j.4 Delineated PEM Survey Area L _ j Adjacent Sheet __.County Boundary Streams: Approximated Ephemeral Approximated Perennial Delineated Ephemeral 0 Qn EM CA iiiia GIM Note:1 inch = 200 Feet - Construction (Con.) Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _""""""""""""""""""""""""""""""""""""""_""""""""""""""""""""""""""""""""_______________________________ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham Count v Y � t Frank Rn r9 Mountain Valley 'r PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts p p p Rockingham Count NC 9 Y� Sheet 44 of 108 ,y` . • TRC 600 Willowbrook Ln a �m ry West Chester, PA 19382 `"' Date: November 2018 k. 6 a a a` 1I ♦ i O' ' 6 :moi_ '�a a s` r s 6 4 - - -f- e _ - S _- 650 - - - �I sl 0 - �1 ;41 's 67 - - - I I _ 0 _ I i - - _ _ - r _ MP 46 �f 'r11P P.,! yr -!!i r ?' -..--.A--. `,I'� 'I 'r'' - S-1318-68:Per. ., �„ �__ It k Con./Op. Pipeline Crossing ft.: 3.000 ' %4 ' a r, , , '-� - 1�•�,' . I Construction Crossing ft.:96.179 :' �.' ';; -' =-+'+- r — ;' - - Operational Crossing ft.: 61.159 y + - - r" _ - _ _ P. ♦. s = = - s= I s • t:Y - { u' - 3 ' til'•1' ° a - I - r a . ti�' ' g s - ' - -_ - - O .. l .' - _ �a := 1 :' '; 1•: � - _ - - 9 t,; 1' 4. �•`:: 1 - , r ,S & 5' . 11 - S' S - - - _ I III. e r pp .� J n J ,` t t - - t: _ Iz .s 0 - I rl 1 L ' _ 0 .y 9 1: -s:P. 6 r,' _ mss. , -_:'S _ ;•r _, d- - �o _ =a s s' •S. k It It I _ l _ i •"s' s S1. - - - 'wti �,ia h s,l. i d _ U Y 1 R -t `I Pp •J _ _ - R ■1 J r - i Qpp P- i + x_ Is x •t Pp k pp n' VP LI D - A __ Co ntour = - - _ s estipp ;�. _ - r s - ,'• r 'ate•.--•• � ` `• _ 0 7 ' - �J - 690 ti r- =-- - 7 00 L Y �• �.'_ - - 4 - - _ i -PPP 11 :{ - s:-• ii '''4'1 ______ _ r _ p Ptr r�•1, , �r - rpp 6 _ _ 6 , W _1_ N - - - - 6 - 9 - O - `1 _ p' s�' - - - - P _ _ L : •' r - -- TA-RO-127 Lk I''•''�'� 10 ^O r' '-- - 710 co o i ;r' ` -- tY W 00 O v O O O �. O z Re C,:) O ' It P •'r••' �• ', f: o o ^ - - F • '� , o - - -' Q' pp - w - - 'a a O It P O ' - - - It Lp. - . - L... YP21,1 Legend O Mileposts (MP, 0.5 _ Delineated mi) Perennial TemporaryAccess Wetlands: Road Delineated Wetland - - H-650 Pipeline _ Boundary Operational Workspace Temporary Access Road Limits of E::] construction Right - of -Way Survey Area L7 Adjacent Sheet _]County Boundary Streams: Approximated Ephemeral —Approximated Intermittent Approximated Perennial GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------.-................... Data Sources: EQT, ESRI p. NC OneMa TRC USGS Basema : Lidar 2' Contour NC OneMa 2' Contour VA USGS 10' Contour p p Y` Rock;i°ngham Count y W' n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 45 of 108 ^ 600 Willowbrook Ln TRC West Chester, PA 19382 Date: November 2018 s 5 Z1kk I - -kk11k-k (-k S-A18-231: E h.tikkkk k41k,kk kk kk kk P S -A18-234: Int. _ 11 I 1 3k Con.lO . Pi eline Crossin ft.: 0.000 -p P 9 - Con.lOp. Pipeline Crossin ft.: 2.000 - 3, - kk kk m Construction Crossin ft.: 32.242 r' - t `:i�• 0 9 Construction Crossin ft.: 120.564 _ 4' Operational Crossing ft.: 14.839 POperational Crossing ft.: 89.487 -Sp = a'• kk r';' ' UJ - u S kkk O '• S ` i ' a ' yrV. - -_ Fc• 5' -�_ 1 Y _ A ��_• rte_ ��� •�,; _, h, - _ '• ,>�.'• Y y �� • r " 1 ' - Ai'f'• - -jam".. :.. _ Y '.�' _A ' 4'' ►' - ~ C L IM y ♦� MP 4 -� `R - - ''s'. r-== - • - t . 1' 5' ♦ •I :✓ - - - :s' :j n S A18 235: Per. i' - _ :� • •; fr ♦"" , . , ►. Con.lO Pi eline Crossin ft.: 3.000 I ''•' 1 : �', ', ± Construction Crossin ft.: 105.639 • • ` y� 1 5 Operational Crossin ft.: 76.134 + ' ? ' :.:',. :v' ' - - -. r "• 5. _ s S„' ”, a '" _ - - ' - - - - - tea° i'. - - - „' `:. , ;------------ ------ '�s� - - - co l 1 - - ; - --- ------ i Q ° : -;:" r ��' ---------- :,: . - - r:- _ _ _ -- - - - z -_ A�., _ Z '' _ `is yo' ------------- _ - - .. . . .. r .. yC '•% tp a p �- Up• O - _ _ ' ' •y, ----- C-' J :s r0 - 6 -k ?o 620 S A18 239: Int. Tem ora Access Road r.' - P rY ( ) .'; - - - - - - = Con./0 . Pi eline Crossin ft.: .0.k0k k 0 kk kkP .000 _ _ _ P P kk kk 9 - - - - Construction Crossin ft.: 5.811 _ 'r;' - 9 t = - - - - -- 0 Operational Crossin ft.: 0.000 __ p 9 _ - - ,'. - _ -_ - - ------_____ TA-RO-129 't - - - kPk 6;• - - - 1 - o - - - - - - ;;j - �� - - - ` - ' ' - _ 2587 - - w� l�' ' - _ '?; - - - - -- - -- - .I g ----- - - - - 60 - - - - - - - - ; �, - _ - - Legend Mileposts (MP, 0.5 Delineated O mi) _ Perennial Temporary Access Wetlands: Road Delineated Wetland H-650 Pipeline _ Boundary Operational 9k Delineated PSS Workspace Temporary Access Road Limits of E::] construction Right - of -Way Survey Area L _ Adjacent Sheet __.County Boundary Streams: Approximated Intermittent Delineated Ephemeral Delineated Intermittent 0 0) CA F'0— GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -""""""""""""""""""""""""""""""""""""""-""""""""""""""""""""""""""""""""_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __________ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour RID 4T:) 43 Rockingham Count Y r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 46 of 108 600 Willowbrook Ln iC TRC West Chester, PA 19382 Date: November 2018 --' - �+,� �-` :r`r�'y'k ¢s *sas:'k' k - �5: ! ',r yY• - -- _ - ..{� P. gin: sd� 4 ..5 `.� •1 ,r l n - - IIS ' - - _ ii _ � z� . r, , p {r f a .r a - -; 650 �- 1, =-=_ ' 6 rkg n 6 - 4 � D 4 0 - 6 _630 ± r;, _ 1 _ - 5 _ _ � + - kk 0 6 - 1 - r.` ' - - - - r r 6 r` - - - cT _ - _ - -- - _ 6 ;t k 30 'as' - _ O :� '� +tea: _ - rrYr v' - :9 C 610 _ :�-'�p . i- '�1 _ _ _ _ _ d k s•- r 4 - _ 'k kkr — ~- - ---- --- -.its '`*''- - ` =-'ter "P. %k_ - -PPP1 C _ _ _ 5 s - +r # _ Con.lO . Pipeline Crossing ft.: 18.811 p p 9 '1., Construction Crossing ft.: 81.012 �^y •.,= 610% ti _ - - `� - - Constructions . ft.: 1 180.125 - }; 0 Operational sq. ft.: 0.000 p cr '• - ;r - _%- 1+ 1J, ' yrs ��� - -- •!. - ; - 1 ; iii _ +L� 1 - 4c- -Z-`_•' !•�' 11-- - - ':. - ' r,.' , e. _ - fL � � ;.MI k k k. - A P pp•:s` S. � 117' '• �•'. i. .. W -C18-77: PFO _ Con.lO . Pipeline Crossingft.: 46.565 Construction Acres: 0.081 ; ' ,{:; �•' -z:, - . ♦ ' :t _ t Operational Acres: 0.032* a'� r1 'rn '' 1 - 1 'r+ 1 - r Yv IO a 'ate • 1 _ y 's 1� • O 9- - p P - T d •-r1 ` 1 - s cl e' n ' 'r :-rr w• _ 5 A P- . "' ti's - co -} ' r' N rs • ` O -J1 L() 11„1 •' _ _ _ + s� 1 _ _ _ -�1, ,4 'r Y - s i-` ti - I - _ _ __ _ i �'. -r Y _ �- � i - ••, `'�, '�`,•-, ti`s - i,~ .i•'li•'! - "�, i.,'i' ,i' •';;' 1', �� $', - .:'• pp P • - '•- - ,4 , •4� , �. pp pp PM V - - P - D A - - - Contours- ;'r, ;" ' - ne- - r - s U r `r = =f, - I - - s pp ' ti ' ' 1' �' - 10 _ - •, PP i'i', • i+ 1'i' L ' i _ __ _ _ •. - _ _ - 620 ---- - - _ _ 6: 610 00 - - ; _ =_- __: - - - _ - pp k ------ -- - - - - - - - - - PPP - - - - - - .'r1 1'r r1 r - ---- - - - - -- - -" - - ;, y;r k s';:','1 :•'�,�::s .',- r; Legend O Mileposts (MP, 0.5 �y Delineated PFO mi) - - H-650 Pipeline Operational Workspace Temporary Access Road Limits of =Construction Right - of -Way Survey Area L _ *Adjacent Sheet __;County Boundary Streams: Delineated Intermittent _ Delineated Perennial Perennial Surface Water Wetlands: —Delineated Wetland Boundary o go m m �\ GIM Note: 1 inch - 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT ESRI NC OneMap, TRC USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour IJ Gl'J \ r � Rockingham County r9 Mountain VallPIPEey Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 47 of 108 i` TRC Willowbrook Ln We a �m ry West Chester, PA 19382 "' Date: November 2018 _ 640 - L 5 a.' i4r __ v n 5w 0 � 5 . J. '. e J pp .0 • �-k sAs =o- �. s - .s - j -f II1 - 6 0 kP5 _ •.P 0 P1 P `o :., _ •ar _ 1 _ _ Sj _ Q 6 _ - , • 50 � e rr - ::' - - - e y660 r S. ro I -.yam. - _ •.S - } s ,.k: 51 5. - y�y}i�y .•Yt. s _ -- - - - 1 N• `n'7' _ - ••L• - iia-__ _ ''I'' 1'1 :" �5 � - '1• - •. `',`.� .` r pp -r -• " - i r _ r _ i r" r - s -rZ � r S -A18-90: Per. +t • i� ' A - �' r :�w=-. � Con.lO . Pipeline Crossing ft.:2.000 :' p p _ t ' g � rl,. r- 1, r ' _ Construction Crossin ft.: 102.964 a` = �' p, Y , - Operational Crossing ft.: 74.688 _ o r. p 9 4 -tea•♦ a r�. • 'f _z. - z 1 •A • •i is kk pea ••_ wf ti 'Jt % d - z::s=::: v . .�r S Z . z.. a� S -C18-79: Per. - r`` n� _ Con.lO . Pipeline Crossing ft.: 4.000 p p 9 '�r a Construction Crossing ft.: 216.494 r ••1__ 'Y4' .•� `pi ,.; r �r` ., r ° r ' a r` ` Operational Crossing ft.: 133.711 r IIF.':• r.. _ p 9 - - r•N .ihP _ - i - '� . ry:�o J _1 ` • QST -�f' T L� i • N i ti .i ♦' ' r + , Rrt''�', . P , i •'r:`'�J�P e' Mr ' yr ` i ,ice -r: -_-ate' Or ' ,u xR MP 47:5 kqJ ♦ __ r - ♦- N7; , 4I � ��_ -_Sr •S' �r - • r.' L _ S 5 .'r .r' . i ;r •ar•: 6 3 i - t r Y �i '� i'• ' �''� PP P i +t9' i i' s '1 - 'w i e,r r• -. 0 r - 5 ' ♦`h t - . •N r S; rr t` r `t ;r - as: PP n' .sy 'S c "r pkp pp, P P -IJ P k%P, _ i' R S • h' ii \; _ • tl ' :A - ' v •u ti t','ri • 1 1 - - 's• . + Q - 0 J _ ;r 'S pp ppkpp. _ -r ` r 1 - :.� TA-RO-130 - • i= - - 5 111 4 rl „' _ - :;;• .;r ,' v� ' ,,11 o _ _ t tp- - ::r � . ♦ .jai ' -s• 'rs c _ L , r• •2 _ _ _ 5'' • J i 0' c9 C• ii_. 80 O- s O _'r': . 0 -_ .i s - 4 - rt P PP _ O R A - - o rn O r 7 ...j rQ-a O P o N .v .a' O - a'P , �- a _- r 0 _ O �'; 2 O ' a` -r- _ u_ _ co• - O O O J t ;• �. II O O II t Q1 O L.- --- .t.• 680 O - i - _ Qr a O O 0 O O O �- - - o o O _ - u> 1 0 6 67 - n - 3 0 - 0 - _ m m r- 3 Ik 0 - m �. E . 5 60 =:x. - kk - ] 'ri Legend Mileposts MP 0.5 p ( Perennial Surface O mi Water Tem ora Access p rY Wetlands: Road Wetland - - H-650 Pipeline _Delineated Boundary ,---,Operational M -'Workspace Temporary Access p rY Road Limits of Construction Right - 0 ht - 9 of -Way of -Way Survey Area L_ *Adjacent Sheet l 1 -_]County Boundary Streams: Approximated Intermittent Delineated Ephemeral Delineated _ Perennial 0 an 0) M GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational 0 . = Conversion Impacts for Wetlands p ( p) p (Due to Vegetation Maintenance) t_ -Permanent Conversion of Type Vegetation Cover T e From 9 PFO to PEMIPSS -......................................-......................................-........................ Data Sources: EQT ESRI NC OneMap, TRC USGS Basema : Lidar 2' Contour NC OneMa 2' Contour VA USGS 10' Contour p p 48 Rockingham County r9 Mountain Valle - Y � PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 48 of 108 600 Willowbrook Ln iC TRC West Chester, PA 19382 Date: November 2018 .R PPPt S• co 32 O S<'' - - - 3_ - _ g _ .i O _ O Irl _ -� _ aa� a O ••r'1 - - % - ''i.t- - r3. it a' Contours i r 'r [ •'; . r - ;�'• ti, '' :'yS t i `I , ,MVP LIDAR Contours Pik- I 4i: - a tis_+ wY,•. II , . d , _ �. •c AS -A18-2421 S -A18-242: Per. - r'PP 5' 1 \.' _ __ �i _ _ z 1, Con./0 . Pipeline Crossing ft.: 19.102 _ PP p p 9 _ =; C.' s r Z _ Construction Crossing ft.: 101.786 _ - u 9 ri - - - s' - rP' Constructions . ft.: 1 595.868 - - - q � Q• Operational sq. ft.: 0.000 ��. ' - 'ti S.5''''' ' co ♦ ♦ ♦ PP - + ; - .. ♦ . _III - - - - - , - __ - - - -.s:f .r- - s. _I - t r` . h i - - > - - Pt - ' _ - - Pp 1 5 kk r ♦ ' _ _ n - s a• • .in •.� 1P. 11 -`511 _ 511` •� 5`. •� L" t' =� -- r' -2'• 1 q� S• tp !- - \ K a - � r kk [' TAR013 1 4 1A \ \` - ;•��. ��' "r' tri: ;i '.•r; •,.." - AS -APS -01: Int. + - O l qn . Ll Con./0 . Pipeline Cross ft.: 0.000 - P P 9 �s', '� rl - Construction Crossingft.: 2.677 , - - - 1\ is - _- 0erational Crossing ft.: 0.000 \' - co 9 I Al t 5 - °4 I r, 11 \ \ JI - co co t'r� •ra ' - - --• / _ i" _ ti r` - ::�___ — AI ' _ e' - _ i' j _ 'r. �`- _ 'll'' _ 1• ♦'-�♦ ;gam S• :rl ` Z ------------- ' - e pp f : �'��: l •�� �"----' 'i:•'. mss.^•' _ .'wwl ��------- ---- ---- _•-kt- ---- ..T'p '1'r' 's. '�' _ •tee--- .`1`' - •��•• _____' h'f • .�• - _x_- 15' - _ t _ Q e% r-: r jt,. - - - q.l 1 - _ ••� c - _ - O _ •�h' � 1 _ 1' 4 1 - - - - r: s - rn - - - - - -'1 '' - - - - - - + _ - _o T,• • t, 9 _ sig 41 j _ • C . .4 ra NII•' ! _ _ - r r' _ - _ ' µ P pp.M n5 - - - V G - R - - C e n - -_ t ;- a O - u r p - s� u o f: n z t =x O - u+ r _ _ °r- 6 r L - 0 \1 _ 6 _ 90 6g - 0 r' �, '' _"rr ia,.• s_ _ W4, -ti Pr EE ; Legend Mileposts (MP, 0.5 Delineated O mi) _ Perennial Temporary Access Approximated Road Perennial - - H-650 Pipeline Perennial Surface Operational Water Workspace Wetlands: Temporary Access _ Delineated Wetland Road Boundary Limits of E::] construction Right - of -Way Survey Area L7 Adjacent Sheet _]County Boundary Streams: Approximated Intermittent Approximated Perennial Delineated Ephemeral f� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands Due to Vegetation Maintenance ( 9 ) *_ - Permanent Conversion of Type Vegetation Cover T e From 9 PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT ESRI NC OneMap, TRC USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour i Bea � t k RockiIng ham Count Y �3 r9 Mountain Valley 'r PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 49 of 108 ,y` . • TRC We Willowbrook Ln a w� ry West Chester, PA 19382 `"' Date: November 2018 --------- - - ------ - - - - -- Beaver Lod e C - pp pp pp - - ' - r Wonderland Dr P P pp k pp 60 ,\o o 7 ^moo pp i- - - - -- PP --- =- --- - -- _ o I, - - 12 - - 730pp ; - - NC OneMap Contours MVP LIDAR Contours ��o - n /tco P.PP'• • L — - o _ o o • — — rz PP pp .. - - e -tr51 - �, TA-RO-131 _ il-pdjalirK - ; pp pp y• in - t - P pp 11 P pp �.iP pp - g0 1 -� - - i • 1' 1 - -- 1 - PP _,�,1 - _ -- _ - - y . - 1 + • • W -A18-62-2: PSS - _ - - 9 d� j - Con./Op. Pipeline Crossing ft.: 39.545 Construction Acres: 0.106 P tOperational Acres: 0.000 Pp kk a - 730_ _ ` 740 -- `P PP - - - '- P pp - i / t f-'' - - 1% W -B18-139: PFO - / Con./Op. Pipeline Crossing ft.: 24.401 -- -- - + I P Construction Acres: 0.032 - + ' - _ _ - _ 1 Operational Acres: 0.015* +, 1- - _ _ 30 - - 7 = 1 ;'� . fr 1p _ _ 720 _-yr_��__��:�t�r_i:_ 1 __ �yt,• - ,iii'�--_—y�::.--,`� _S•�e_�a-_______ �'pp -,�_� - T- - Legend O Mileposts (MP, 0.5 ,,Oi' Delineated PEM mi) Delineated PFO Temporary Access Delineated PSS Road H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way Survey Area L_ Adjacent Sheet __.County Boundary Jordan Lake Watershed Streams: —Delineated Pond = Pond Wetlands: _ Delineated Wetland Boundary 0 010 � CA GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ---------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour y+cayan+Ln h�RbcRipngham County n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 50 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 - ' - a _ P • - -C 0 ": apContour 100 - - -f•: -_ ,oP rszz_::_ - 5 -- ti ; : =_ _ 5 - - - - ,r' TA-RO-133k 1P t -�•:a,ii' .' - - - t k k -o + ti1;.1 ; �'_ W -A18-62: PSS kP kII t _ _ _ f - `� Con.lOp. Pipeline Crossing ft.: 0.000 PP • ; , P. a - + Construction Acres: 0.001 I^ ,' - Operational Acres: 0.000 - 1 o' p mow; '� J' '1 r� W -A18-61: PEM It n . ;; • Con./Op. Pipeline Crossing ft.: 0.252 ♦ �,s�' ,PkP kk �'. �L`; 'r 1 t i<< Construction Acres: 0.007 •' ` ' ri''♦ ♦ �,.' k • a�� • , coil ` ;, , Operational Acres: 0.000 j �; ! :ate R, - %•'' ' S _ `'r' "�MP'4.8-.5 ; Q� �'�W �s Buffer Zone Impacts !,� ♦>�'',,, , ' - ' ` P I f _ Zone 1 Construction Acres: 0.113 ♦ ' • ♦ _ cs Aer • �� ;',J�� A �ti Zone 1 Operational Acres: 0.075 ,�' ♦ �.��TA-RO-134 - s�� ='• ' 4 Zone 2 Construction Acres: 0.077 ♦ ` n f:' ♦ .. �:° _ - - <p •,► _ ' Zone 2 Operational Acres: 0.051'k co k I k ♦_ ,�" — 30' ki 10 W-318-139: PFO —`7 — ' •. �' s -'T rte ♦ •�P� • ,h ♦ P 10, 1 Con./Op. Pipeline Crossing ft.: 24.401 --- - - — ' + ♦ ♦<�' ,l. •' Construction Acres: 0.032a �F,� •� �.'�♦♦ Operational Acres: 0.015* - - - •% i-= mss` - - 1 W -A18-62-2: PSS �.'•P '. .�:'' . .3'. - - rp Con./Op. Pipeline Crossing ft.: 39.545kk -� . �r}�. �'� .� = I kk Construction Acres: 0.106` : + � ��� ��� ♦'�:�'� - -- 3 Operational Acres: 0.000 �< ��� t'R' <' zs - _ _ - PPI COP)_ _ S -A18-60: Per. Con./Op. Pipeline Crossing ft.: 4.000 ' !; .' • - 1 P 1P PP Construction Crossing ft.: 87.797 _ _ _ i_ : _ _ _ ' Operational Crossing ft.: 55.217 ;= - •; :• --' _ - _ • r' _ 1 P Pt mooP ,h; -_ - q v s - - s - P P,`sf , s' J - PP NC OneMa R ContouP.r ': - - C'q��O ontoUrg -S ^Mo Pt k ^Or;; ,P I P P i ; i I •♦ I• - Legend Mileposts (MP, 0.5 ••.Jordan Watershed O mi) '"' . Buffer Zone 2 Temporary Access Wetlands: _ Road Delineated Wetland - - H-650 Pipeline _ Boundary ---,Operational Delineated PEM L -'Workspace Delineated PFO Temporary Access = a#� Delineated PSS Road Limits of =Construction Right - of -Way = Survey Area L _ Adjacent Sheet =County Boundary =Jordan Lake Watershed Streams: Delineated _ Perennial Jordan Watershed Buffer Zone 1 Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS ------------------------------------------------ ----------------------------------------------------- Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour °reaaanrea ws r s� Rockingham County �g �a n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 51 of 108 TRC Willowbrook Ln We West Chester, PA 19352 Date: November 2018 -,°nt yes _ 760 G pn Q#�G°rtip. - • - - NC OneMa ^ COO ��� Qontou I PP P, MVP �IDgR C - I nPp tou S • z:760 P PP --- 11 - -- _ =. - - P P k - - -- __ _ = - •1 - -kP r -- TA RO 135 - - - - - ____ --- -- - - - - ; a� - — - - _----- --- - - -- -Q' :'• - - 'pPk _ - I I -4 -- ♦; - - 1 '; •0It It tP I•' Pk lk .�"' r' .-- �.'� _ 'r=��. -�` ' - . `=: - •:_`'; •;' ` S A18 55: Per. Con.lO Pi eline Crossin ft.: 3.000 Ikkk P �+o _ _ _ =�_ _ ": ''. _ - c _ �: _ ' - : ' _ 1 1 �{ :T 1 Construction Crossing ft.: 79.705 Operational Crossin ft.: 52.609 Pp 1'• '2 moi•,i�'-..- '� - - - �L; _ ;7 Ik _ _P 11 r�• •,,,-,-' Arm I �, - - f-*'�'_-•_ - �`4,- ,7-''-+�__-- - - -- -�--= -P IP �' - 1 •.'- _ - _ _ _ Buffer Zone Impacts - r - - Zone 1 Construction Acres: 0.109 Zone 1 Operational Acres: 0.073 lam ^ y 5 !' - - - - - _ Zone 2 Construction Acres: 0.073IPk -I Q_ +'; �' - Zone 2 Operational Acres: 0.049 _a - 1. - • - - -I._ t PP -- - - �•, S+ - -- _ ;__• - t S' bPP _ s•_ - __ ­tP tt M - §stz • - _ - - - - - 59ttrs=- - I PIt P."`: - d Legend o Mileposts (MP, 0.5 mi) Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way Survey Area L7_ Adjacent Sheet _]County Boundary Jordan Lake Watershed Streams: Approximated Perennial Delineated Intermittent _ Delineated Perennial Jordan Watershed Buffer Zone 1 -.Jordan Watershed Buffer Zone 2 Wetlands: _ Delineated Wetland Boundary ,1"j Delineated PEM 0 = 0) CA *Ik, GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS —______________________________________—______________________________________—_______________......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour c Ra �Oy^& r -ins v 6� qr 1 t. Rockingham' County,, _ �r 6+� r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 52 of 108 600 Willowbrook Ln r TRC West Chester, PA 19382 °•"" Date: November 2018 P PP It `no Contours' ----- - _ -- - - co - _ ,:" COneMa - - N up LIDAR Conto _ _-- - M X60 Contours - — j ~-- _ - _, - - - - NC oneMap ontours J _ - ` - - L 1 - ; - Ik - PP PP P. a. Perennial Buffer Zone Impacts j P kPk a. _ - Perennial Zone 1 Construction Acres: 0.240 - -'- + '""Buffer Soil Zone 1 Zone 1 Operational Acres: 0.175 "-tPp + - -- -_ �•_.- ---Buffer Soil Zone 2 Zone2ConstructionAcres:0.204 �., _ - - -_ - Zone 2 Operational Acres: 0.108 • i-. _; kkkk AS -A18-1821 S -A18-182: Int. -_ i•, -PP ~ - -- _ w - Con./Op. Pipeline Crossing ft.: 1.000 _ _ _ ; , s kt _ :s : r - • +"" +' _ _ _ _ -- - - _ _ _ _ _ . _ _ Construction Crossing ft.: 87.990 P ti ' „ ;,:; : .__. - Operational Crossingft.:66.455 'i,; PPP _ - 1D ' ' - _ - '' - -- ._ W -A18-184-2: PEM Con./Op.PipelineCrossing ft.: 0.000- ., ' k' - - - _ - P Construction Acres: 0.008 1 _ _ _ - jj_•�Jji/ Operational Acres: 0.000 �^ Ln P • 1�k 11 - - - --- -• 'y = _ _ " _ _. _ - S -A18-185: Int. kk - , •- - ;;•, �_ _ _ _.' _ = c " ' """ `" _ Con.lOp. Pipeline Crossing ft.: 0.000 -PP 1 "" - ':: - _ _ _ _ _ _ _ _ Construction Crossing ft.: 7.627 - ' _ _ _ _ _ _ _ _ :`: �' - - a - - ------------------ - Operational Crossing ft.: 0.916 kk _ 1 • }� - - W -A18-184: PEM • 1,' _ _ • 1 _ _ :y; -- -- - Con./Cp. Pipeline Crossing ft.: 56.981 , 1 TA-RO-136 •• " �: --- ----' -" Construction Acres: 0.116 Operational Acres: 0.000 -:•. " _ Pk _ 1 '• - - --- ,sem i �'•If - -- - - -- -- ,•I .. M Or P Pe • _T�'•e� ____ - - -�'r--- - - gyp. ,r` n. __ • - _ --------' - - - - 1 1 S -A18-183: Per. - W -A18-184: PFO - + -' Con./Op. Pipeline Crossing ft.: 4.000 - Con./Op. Pipeline Crossing ft.: 0.000 CP _ :'•�p--, _ • oo - _ Construction Crossing ft.: 115.106 Construction Acres: 0.015 '+s ; - TA-RO-138 Operational Crossing ft.: 78.657 Operational Acres: 0.000* %o ' �7 i t P Pt PP % kt • PP P _ - _ - 11• k k - - k. '.-k i %P t -1- t%p . - -�: . Pk --- -- ; , 1' ; - �' ` q.-- P• ---------- ` - - • - - - - - - 1' - -- ----- - - --- - - L- t_ rt PP% _ __ _ _ _ , _ - %°p - _. __-_ - - - - ' - L _ 0 r to t '' - ours o n t - - = - - r ue1F - - LIDAR Contou s Sam _ _ - �' MVpLIDAR ntours ------ _ -- - - _ _ t4 OneMap CO _---- - - _ - p MV Contours ,Map �:; ti - -- - _ - 760 Legend Mileposts (MP, 0.5 Delineated o mi) _ Intermittent _ Temporary Access _ Delineated Road Perennial - - H-650 Pipeline _Soil Survey Stream ,---,Operational Perennial L -'Workspace --.Jordan Watershed =Temporary Access '""Buffer Soil Zone 1 Road --.Jordan Watershed Limits of ---Buffer Soil Zone 2 =Construction Right- ••••.Jordan Watershed of -Way • • • Buffer Zone 1 =Survey Area. ---.Jordan Watershed L _ Adjacent Sheet ""Buffer Zone 2 =County Boundary Wetlands: Jordan Lake =Watershed _ Delineated Wetland Boundary Streams: Approximated PEM _Approximated =Approximated PFO Intermittent Oi: Delineated PEM _Approximated Delineated PFO Perennial o go EM a) t� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS _......................................—........_............................—........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour Rocki't'tg"Fbm County L L� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 53 of 108 600 Willowbrook Ln TRC West Chester, PA 19352 Date: November 2018 +- _P. I ; PP PP _ ---- - --- " - - Pt ' AS -A18-182/ S -A18-182: Int _ - Con./Op. Pipeline Crossing ft.: 1.000Pk - - - - --- •__ t Construction Crossing ft.: 87.990 - i- ; kP Operational Crossing ft.: 66.455 _ _ -P - _ .s I )1P P - - PPk "Mi _ _ ' Ikk wk -- - `ml-. Buffer Zone Impacts Buffer Zone Impacts _ -`_ y+ Zone 1 Construction Acres: 0.240 W -B18-140: PEM - - ' ' - Zone 1 Construction Acres: 0.099 Zone 1 Operational Acres: 0.175 _ - Con./Op. Pipeline Crossing ft.: 0.000 `. �j-; =• p Zone 1 Operational Acres: 0.071 ml Zone 2 Construction Acres: 0.204 Construction Acres: <0.001 - Zone 2 Construction Acres: 0.074 ' tt Zone 2 Operational Acres- 0.108 ----- Operational Acres: 0.000 - Zone 2 Operational Acres: 0.047 ttt pkp Legend PP Lk ��Lt Delineated - - - - PP It Temporary Access _ Delineated -00 _ - - -- - Perennial _ _ - P- to: -_--------T---r--'- - --- - -- - -- - =�s— -• .--- — — --- — — — r — -- ----- -- ---- -- -- - —• — -- — —�—mss-- — — — -- — __ _ _ -tJ--- —1� — — I- _ k P% Temporary Access __ Road --.Jordan Watershed Limits of ---'Buffer Soil Zone 2 E::] construction Right- Jordan Watershed of -Way Buffer Zone 1 >_} Jordan Watershed L_ Adjacent Sheet Buffer Zone 2 L__. County Boundary Jordan Lake =Jordan ' - --- - - - - -- Streams: moi: Delineated PEM Approximated - ------ Approximated PP •t• - kkk �� ---- •• - - -- -- •E tPIP --- -_ -_-- -- •_• _ --- - --- t�: f ' - _ - - -- - - - _ �_ t _ - I. ._ TA-RO 139 S -A18-244 Per. ----- - _ t PP_ Con.lOp. Pipeline Crossing ft.: 3.000 �' - - _ - - I - - _: -- Construction Crossing ft.: 49.432 - _ _ _ _ _ -_ Operational Crossing ft.: 43.432 _ _ _:•_ -tp tv- k 1k -fes - --- - - _ = -_ -.'` y�- • - .far" _ Ie' - - -- - - _------"'""-- ,_ �.:== _ - + - ' - - ----- -. P t - - -- _- - --:---------- - -- ._/ -- - �1' - -- _. _-- - _• v __- _may k, kr - -- Buffer Zone Impacts Zone 1 Construction Acres: 0.027 1 _ _ _ _ - _ r - / _ _ r 1 / Zone 1 Operational Acres: 0.000 _ _ _ I - _ _,.. �• _ _ _ _ - ' _ Zone 2 Construction Acres: 0.028 - -- - - Zone 2 Operational Acres: 0.000 __';•-%;== I - - -" -"" - -- :. • " _ -- --- - / ' •' ' ' L. _ - __ ' - - k S -C18-71: Eph. (Temporary Access Road) _- P Con./Op. Pipeline Crossing ft.: 0.000 -� kk . r ` - r Construction Crossing ft.: 6.443 Operational Crossing ft.: 0.000 r ; -�;• ' s _ - i MVP LIDAR Contours - r NC OneMap Contours ..- - • - / - i - - Pk Legend Mileposts (MP, 0.5 Delineated O mi) Ephemeral Temporary Access _ Delineated Road Perennial - - H-650 Pipeline Perennial Surface Operational Water Workspace Jordan Watershed Temporary Access - _ -' Buffer Soil Zone 1 Road --.Jordan Watershed Limits of ---'Buffer Soil Zone 2 E::] construction Right- Jordan Watershed of -Way Buffer Zone 1 Survey Area Jordan Watershed L_ Adjacent Sheet Buffer Zone 2 L__. County Boundary Wetlands: Jordan Lake =Jordan —Delineated Wetland Boundary Streams: moi: Delineated PEM Approximated Intermittent Approximated Perennial 0 mm Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ------------------------------------------------------------------------______—_______________......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour ,FiQcR,.kingham County A� s� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 54 of 108 TRC 600 Willowbrook Ln West Chester, PA 19352 Date: November 2018 ---- - ., Pt IP pP tt Pp - - - - • Buffer Zone Impacts ti Zone 1 Construction Acres: 0.099 -~, - - Zone 1 Operational Acres: 0.071 " Zone 2 Construction Acres: 0.074 "ti - - _ Zone 2 Operational Acres: 0.047 ______ ________ t i, - - - ----- ;; - ----- s + 4; ----- - __ - CCi�e� y S -C18-71: Eph. (Temporary Access Road) �a �C Con./Op. Pipeline Crossing ft.: 0.000 __ 'oC°°�fO Construction Crossing ft.: 6.443 'P_:' • _ - �f° Ors Operational Crossing ft.: 0.000 - - --------- - - -- • P , , ,. - - ♦ - - ' --- -- 4' Buffer Zone Impacts I" Zone 1 Construction Acres: 0.027 �, Zone 1 Operational Acres: 0.000 ------ �'- Zone 2 Construction Acres: 0.028 - -- _ ;- Zone2OperationalAcres:0.000 - PP G rn -�` 690, _ - �76am Ry a TA RO 139 a'` 'P� _ ~ o-_� ---- A760 - - �rr •, - - - , - - ---------- - - •� - ------ _ S'\ _____ tPt.tP P 1P --"P - • ` - 1 PI PPP ` ,'� - - . I 1 ♦ • - ------ - ----- - tpt ceeK�t` ------ _ - G1 55G - - ----------- - 730 pt ---- tp Pp - �° - Legend Mileposts (MP, 0.5 •-.Jordan Watershed o mi) Buffer Zone 2 Temporary Access Wetlands: Road Delineated Wetland Temporary Access _ Boundary Road Limits of =Construction Right - of -Way Survey Area L _;Adjacent Sheet County Boundary Jordan Lake =Watershed Streams: Delineated Ephemeral Delineated _ Perennial Perennial Surface Water Jordan Watershed Buffer Zone 1 0 ISM CA mm Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS .--------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 1 ti eek Rockingham County n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 55 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 ---------------> >00 6�0 NC OneMap Contours 690PP0 _ MVP LIDAR Contours PPP z_ k' It - _ - --' f i- - k ko - _ I -; :..: p . ar ,_ - - i r PP - - - IP t al Buffer Zone Impacts - •'� AS-NHD-305: Per. Zone 1 Construction Acres: 0.154 - SS-SOIL18-02 _ Con.lOp. Pipeline Crossing ft.: 16.117 Zone 1 Operational Acres: 0.043 r -_ I _ f'" �' • Zone 2 Construction Acres: 0.190 Con./Op. Pipeline Crossing ft.: Unknown - ,'�- Construction Crossing ft.: 91.956 j• Construction Crossing ft.: 178.611 - Construction sq. ft.: 1,315.628 Zone 2 Operational Acres: 0.153 Operational Crossing ft.: 78.025 Operational sq. ft.: 0.000 P I _'• '�rv. _ M ., ' _P pt P.»� .fir -f •�, •__- p y. _ f - •, • - pp-tP:50:5------------------ ------ - ----- - - �.� 'r',J` �'tl-ham �� s.e ti. `'�`�'! - �-rr-� .� ri,••^. _ �.n _fir-� t,''ya�s.� •r���::ti moi„ " A& - r'aLt _L_1C sT� i : - =� ___ ___ ___ __Z__ it + _ - •, -w..a« - %•�� --• -�• -tpt - I- �` _ - '""- ♦'-� '""' � '�. `. _ •air.-:_�.\... .. .Y••♦aai.• y' t PP""- "�'•' ' I Buffer Zone Impacts Zone 1 Construction Acres: 0.241 - „ Zone 1 Operational Acres: 0.114 - - _; _ Zone 2 Construction Acres: 0.155 A w _ �'` `• " tt PPt Zone 2 Operational Acres: 0.083 z - + 1 % ` --- A- � P -- - - - --- r-• - -' F I -"_""""_ it -- - - - -- ---- - ' -- - - -- - - -- ' I'. 'Y'• __ -�`•_ •oma_ _ -- coh ----- - - - - -- - , y- - ------ - - - - - I ' Qj - - -_i: - - •t�fl- �_ MVP LIDAR Contours- - 6,;10 NC OneMap Contours Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline Operational Workspace Limits of OConstruction Right - of -Way Survey Area L _ j Adjacent Sheet '__;County Boundary Jordan Lake Watershed Streams: Approximated Ephemeral Approximated Perennial Delineated Ephemeral Approximated Perennial _Soil Survey Stream Perennial Jordan Watershed • • • :Buffer Soil Zone 1 ••.Jordan Watershed •••. Buffer Soil Zone 2 Jordan Watershed Buffer Zone 1 -.Jordan Watershed Buffer Zone 2 Wetlands: _ Delineated Wetland Boundary Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * -_ Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -""""""""""""""""""""""""""""""""""""""-""""""""""""""""""""""""""""""""""""""_"""""""""""""""......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham County b I G 1q Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 56 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 kk l - _ NC OneMap Contours on ours 6`90 - r t S I 700 ` �' d - ---------- - I ; I - - - ------ I0 - -- �� I- f tea: r'' = -------- --- _. - Ik kk - _ - -, �M ----- _ -a kk - _ Q.. -_ - - S -C18-21: Per. { Con./Op. Pipeline Crossing ft.: 7.000 _ r' - - - _ _ - _. Construction Crossing ft.: 75.276 - rn ,rl - Operational Crossing ft.: 54.526 , ; o kk ' Buffer Zone Impacts "Zone 1 Construction Acres: 0.108 i' S -C18-22: Eph. l'-, coli Con./Op. Pipeline Crossing ft.: 3.000 Zone 1 Operational Acres: 0.079 M, Zone 2 Construction Acres: 0.057 M, - - Construction Crossing ft.: 67.714 , __ Operational Crossing ft.: 50.107 Zone 2 Operational Acres: 0.036 } -kk: 11 ____ - I r1� + 111yv I- - - 11 11 > 7 u---- -�-f^- �irC--`--T-}-y- -_� S�-�--� -------- ----- --- ---*-Y-�--a�-}�-I-- -------L-r-}-,- -------------- - --~- i-}--�--�p_r�� ��-a�--------y�--7��--+_7.Sp-J-�- - - r r.ir} '!.'r'r rr-•�r rrr rr -}`� ri`W ar, ti•f.,rr ;ri¢ rr•�+r rrrt•rr r rrrtr rp'r•rr,r ar,r �•! ��ts:��1•ry�______ rr .♦rr�•r 33� - . kk -- ------ ;qs " )kk" I' - -• - o P 5 !_ r, ` -.c. -- - -- W -C18-20: PFO i '00 - Con./Op. Pipeline Crossing ft.: 15.538 - _ - Construction Acres: 0.052 v •1•N -- Operational Acres: 0.016' _ - l kk W -C18-20: PEM ""- - Con./Op. Pipeline Crossingft.: 54.695 =_ • r' - - _ • r: _ _ Construction Acres: 0.080 - — .,r _ Operational Acres: 0.000 P„•� - '` r t._ - _ - a t- • . - - - - - - ._ - - - - - _ - _ _ - r t _ to :a 4 I -- h2o - - - _ - -ItI 1 _ s r MVP LIDAR ContoursZ. OneMap Contours Legend Mileposts (MP, 0.5 Pond O mi) Jordan Watershed - - H-650 Pipeline Buffer Zone 1 Operational Jordan Watershed Workspace Buffer Zone 2 Limits of Wetlands: E::] construction Right- Delineated Wetland of -Way —Boundary Survey Area Approximated PEM L _ j Adjacent Sheet O j. Delineated PEM County Boundary Delineated PFO Jordan Lake Watershed Streams: Approximated Ephemeral Approximated Perennial Delineated Ephemeral Delineated _ Perennial —Delineated Pond 0 Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) =Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour �a Cpswebll C'0 u n-4 y Rockingham , County Y�`;a a � ye, r9 Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 57 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 I ----- ^moo NCOneMa Co ours 5� '�-- ---- — - - - �• - MVP LIDAR Contours - 100 I . X30 PP i.�.s.,k 11- -- - - - - -- I - • -P P PP P PP P P. PI I;` 1- _ - . _ - Buffer Zone Impacts .---_ _-P1P I - - L' Zone 1 Construction Acres: 0.108 TA-RO 142 �•_. + 7;:; Zone1 Operational Acres: 0.079 :: Zone 2 Construction Acres: 0.057 - - - - - ('kk Zone 2 Operational Acres: 0.036 - -- - - I cD t ' - WC1820:PEM _ :`- _-- _ __ _ - - I .`f.• r' Con./Op. Pipeline Crossing ft.: 54.695 •---- ---- _ _ r t , �t Construction Acres: 0.080 ---- __ -_- _ - - I« r Operational Acres: 0.000 _ _ a°ii PPP tl_: X.Ppp"p, PP - i _ - �j a E _ = P PP -- " • < - - _ - - - -- - ---- -- -- - -------- - - - - --------------- - - - - -- - - - - -- -- -'-'- - - r . --- -- - - , J — J I - TA-RO-141 k kl' �- . -- - W -C18-20: PFO - W C18-17: PSS (Temporary Access Road) �� • --- - -------- t Con.lOp. Pipeline Crossing ft.: 0.000 Con./Op. Pipeline Crossing ft.: 15.538 • - �� Construction Acres: 0.010 w -_ I Construction Acres: 0.052 5 0 Operational Acres: 0.016' _ Operational Acres: 0.00 _ _ _ _ - - 680 rl - _ - - - _ - `• - - -- a i kkk PP S -C18-18: Eph. (Temporary Access Road) --- - _ - - -- ' Con./Op. Pipeline Crossing ft.: 0.000 Q' Construction Crossing ft.: 8.550 4 _ _ - -PP Operational Crossing ft.: 0.000 k -- -� _-------- -- TA-RO-140 t .. - _ ,• _ • ----------------- -- - - I - i-- - - -_- - -- -_ i -- PP - -- - --_ - j • - --- -- P. - - _ - -P P MVP LIDAR Contours I --neContours -F--- --------- ' NCO Map '• •. I �o Legend Mileposts (MP, 0.5 —Delineated on O mi) =Approximated Pond Temporary Access Pond Road Jordan Watershed - - H-650 Pipeline Buffer Zone 1 Operational -,Jordan Watershed Workspace --- :BufferZone 2 �Temporary Access Wetlands: Road Delineated Wetland Limits of —Boundary E::] construction Right - of -Way Approximated PEM Survey Area O�e, Delineated PEM L7_ Adjacent Sheet >0 Delineated PFO L__�County Boundary r,`Delineated PSS Jordan Lake Watershed Streams: Approximated Perennial —Approximated Pond Delineated Ephemeral o m m GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _......................................_......................................_........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour CasW211 Courtty l'.�1 Q� li I �3 I ►I Tr I Rockingham County i /Guilford County n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 58 of 108 VITRO 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 - NC OneMa Contours �2� _ `-- ---- - >>� _'00- L .-. _ MVP LIDAR Contours -• ' - I'• , -:_ I rkk - - - - -- -- - - -- -- - - -- - - 0k kk - kk ., _ - ,• y11 ` - ''ry , kIk IIk kk kkk ;' - +' "' S -C18-15: Int. - N Con./Op. Pipeline Crossing ft.: 3.000 • n + Construction Crossing ft.: 359.880 - i kk Operational Crossingft.:185.661 - S -A18-217: Int. Buffer Zonelmpacts _ - o - - Con./Op. Pipeline Crossing ft.: 0.000 •• '• L��."- Zone 1 Construction Acres: 0.108 kk Construction Crossing ft.: 15.109 Zone 1 Operational Acres: 0.024 1 a - - - _ - - Operational Crossing ft.: 0.000 Zone 2 Construction Acres: 0.072 t , �. ''. 22p Zone 2 Operational Acres: 0.048 c �' - - �I - - - - - - :� �-._ -- -- - - --- - - ---- --�--- --------- - -- I _- �r------ -- +• •� ~ `p i•r.� �- '4 '' 'r .� lt-in+r,r-�.+.� ` -`.r'� r - �+- '�-- ------ -- -L-- -- -- - '�• ,�! _ - --:: :�•---------- ------ K_ i _ _ TA-RO-145 E'r •ars• .l.S. ': �_•:.• - -' ___ __• i Buffer Zone Impacts - _ _ - "" _ - -,� _ -•; Zone 1 Construction Acres: 0.421 = _"_ - - -- - - - S -C18-15-2: Int. (Temporary Access Road) - _ Zone 1 Operational Acres: 0.246 / - iz": 1 o • ' - _, _ _ _ r i : Zone 2 Construction Acres: 0.220 -- Con./Op. Pipeline Crossing ft.: 0.000 - F.a Construction Crossing ft.: 10.253 Zone 2 Operational Acres: 0.131 . - - - - Operational Crossing ft.: 0.000 _ -y - 5' S - y� �• , - - - - - �_ _ I `' ' K, ---- -.. . L ; Lk 'k-•- - __.. MVP LIDAR Contours ` ' NC OneMap Contours , t s90 Legend Mileposts (MP, 0.5 Perennial Surface 0 mi) Water Temporary Access Jordan Watershed Road Buffer Zone 1 - - H-650 Pipeline -.Jordan Watershed Operational " ' Buffer Zone 2 Workspace Wetlands: Temporary Access _ Delineated Wetland Road Boundary Limits of ,1'j Delineated PEM E::] construction Right - of -Way Survey Area L _ j Adjacent Sheet L'County Boundary Jordan Lake Watershed Streams: Delineated Intermittent Delineated _ Perennial Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -""""""""""""""""""""""""""""""""""""""-""""""""""""""""""""""""""""""""...... _........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour CasWeII C o u rpt y ca, mr G ne Rd , A l a m a n c e County II Q3 ice' �' 041 RocRingha.. County �� Guilford ,i County i/ 1q Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 59 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 "'"'°""'°"""' Date: November 2018 750 -- - - _ Or�OU� 5 t i•t it a .' •' • 1 �0 eMa G°n�OUC - Nc pg Q LkID �. MJ -it it i - P, P- - - ---- _c° Urs �\ o - OreMaR GontO i .�``\'9/ tic R e N JQ LOOP OC \O� ZJ` S -B18-94: Per. pp,h'oa • _ _ t ItCon./Op. Pipeline Crossing ft.: 4.000 /j� '1 CC, ' Construction Crossing ft.: 123.505 _ - _PP I+ ,Sj C' .,o,� fo` Operational Crossing ft.: 89.480 - '.; o (l Buffer Zone Impacts fO4rS�s '0P Zone 1 Construction Acres: 0.159 t.\�j> - Zone 1 Operational Acres: 0.104 - •,� • - OI/•`� Zone 2 Construction Acres: 0.097 - - _ - �- - Zone 2 Operational Acres: 0.065 - - ��L -k k k_ - - - - ! VSA %�% ♦ f - -' �; •� ♦ to '' ♦ r•._ � ''r r=, •_•��, 'P" ''�I�,-•'•• __-__ __• jam- ''Y�' !'� t, _ � •� •,i __,,�,♦♦``` •' _ ? Buffer Zone impacts ----- • s�•-� �� -'t- Zone 1 ConstructionAcres: 0.108 - ,.�''� - -tY�� `. J' Zone 1 Operational Acres: 0.024 - - ,= ��` ' 'kk • -- °'' Zone 2 Construction Acres: 0.072 _ �'''• + :_ -♦� . I �. h i d, Zone 2 Operational Acres: 0.048 - �� % r - ; ; r= + :% . ♦ . _ - - a� �'.`. Q� 'i 1'k 1., _ 'A♦"r Yom'' - - I __ \ _ "r ',: ,•, _ '• Y'� 1 1` - -- --- _ - ,- - 1 -::-. - it L 's' __ __ + =fir �sK •-', air. :'1 i '7-, _ -' 1 ' • _ aa - _ i y - - eP. r •'I 'r 1 0 7E ' 1 - - - - - • TARO -146A ' ' �•; i• S -A18-219: Per. J :s' ._ 1 • - •. 1 Y 1 Con./Op. Pipeline Crossing ft.: 4.846 - - - - L _ Construction Crossing ft.: 72.687 G �J - i • - -'; Construction sq. ft.: 366.997 680 r0 ; ; ; ;A •, ' - - 680 = C� - ,, ly , . 1 s _ Operational s . ft.: 0.000 ._ 99�� 1. 1k 'k e Y '•i• ti'j, "I PP f ' ` ' - ; fir• _RG°"t�o�Cs �--._ ^93 — - MVP reMaP - 7 • _ -- ^h L - - c g a• LP -o P P�a Legend Mileposts (MP, 0.5 Jordan Watershed O mi) Buffer Zone 1 Temporary Access --.Jordan Watershed Road _ _ - :Buffer Zone 2 H-650 Pipeline Wetlands: Operational Delineated Wetland Workspace _ Boundary Temporary Access Road Limits of E::] Construction Right - of -Way Survey Area L_ Adjacent Sheet __.County Boundary Jordan Lake Watershed Streams: Delineated _ Perennial Perennial Surface Water ISM 0) X111 iiiia "*� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour (saswell County ♦ � S \, Alamance ®. \, County ng m'.o a r � Guilford ' County n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham and Alamance County, NC Sheet 60 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 - - -- EveW0 ----- ll --• - _ - - - - - - -- - - - - -- --------- - - - - -- k PP -'k - "Qo - 1P1 P P- i ■ya �Goo�o. - - T. ;3i •`' �,, '1 :;'. •- ---- State ._ ,; I a 11 Pl ♦ ; __ 5 , -- - ♦♦'�� 1P TA -AL -149 - I It ♦♦,�., TA -AL -147 - '-�_-----`- _ r . r r r r ~ • ��. �� ♦ .;. _y_�_- it r r r.L r z«- ,,� ,;•� k wk - -1k, •�. :� . - - - - - - W -A18-83: PEM / -- -- ` - Con./Op. Pipeline Crossing ft.: 26.093 --------Construction Acres: 0.055 r .} ` > �''• -- _ Operational Acres: 0.000 TA -AL -152 PP P --------• - 1- :Buffer Zone Impacts - - - r �• e -s eta Zone 1 Construction Acres: 0.000----------_ - aaoer_ Zone 1 Operational Acres: 0.000 - - ' ----- - - P Zone 2 Construction Acres: 0.042 - - 'tii� P - Zone 2 Operational Acres: 0.002 __ _ 5r• - f P k 11 PP --- -- - _ P P 1' 1 PP 11 — -a: { - — P. P 1P 1P P v - - - -- CO S - -- ' h% - yup LIDAR Contours. - 0 Y- - / fO a �C' - = t4C one ap - r �pUUht ti , LQO 52 X00 �7 n 11 kP 0 Legend Mileposts (MP, 0.5 ••.Jordan Watershed O mi) Buffer Soil Zone 2 Temporary Access Wetlands: Road Delineated Wetland - - H-650 Pipeline _ Boundary Operational QApproximated PEM Workspace ;�j Delineated PEM Temporary Access Road Limits of E::] Construction Right - of -Way Survey Area L_ Adjacent Sheet L__. County Boundary Jordan Lake Watershed Streams: _Soil Survey Stream Perennial Jordan Watershed ... :Buffer Soil Zone 1 0 0) CA GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ---------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour V:. Iliyi•�a.:, �lk Alamance i County 11 � Guilford i County i n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 61 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 - - - _ --- ? OneMa Contours - - - - - r i �Q_ MVP LIAR Contours )2 - - - - . j- - - - - - •--- - - - - -- - - - -- - It - - It %k P It - °ai;'• ' i; j - V It It =. r9 kk k d1%/_ _ _ _ _ _ _ Buffer Zone Impacts r•�I. _ - _ - Zone 1 Construction Acres: 0.078 I. -_ - _ _ _ _ _ _ _ Zone 1 Operational Acres: 0.068 � Zone 2 Construction Acres: 0.084 / Zone 2 Operational Acres: 0.051 _ _ _ _ _ _ _ } _ • F Buffer Zone Impacts ' _ -Zone 1 Construction Acres: 0.349 S -A18-89: Int. -- . Zone 1 Operational Acres: 0.220 Con /Op. Pipeline Crossing ft.: 0.000 : _ _ _ _ _ W -A18-85-2: PEM - _ Zone 2 Construction Acres: 0.202 Construction Crossing ft.: 33.156 - W -A18-85: PEM Con./Op. Pipeline Crossing ft.: 0.000 Zone 2 Operational Acres: 0.139 Operational Crossing ft.: 27.147 Con./Op. Pipeline Crossing ft.: 8.976 Construction Acres: 0.002 _ Construction Acres: 0.021 Operational Acres: 0.000 �L10 } Operational Acres: 0.000 _ }. _ - _ - - 1 a •►�► _ _x-----.� _----'------ - ♦ MP 53.5 .. ;.: 1__�_ �t--- - -'t - 1. t♦tip,,- �r�'r'j-�,--�-? _T—T_y I _ __ ;ItIt 4 k 1k kk t WB -A18-88: Pond (Temporary Access Road) Con./Op. Pipeline Crossing ft.: 0.000 i W-Al8-85: PSS , Con./Op. Pipeline Crossing ft.: 0.000 ; - Construction Crossing ft.: 151.175 I Construction Acres: 0.016 S -A18-87: Per. Construction sq. ft.: 350.017 1k ItOperational Acres: 0.000 a Con./Op. Pipeline Crossing ft.: 5.000 - s Operational sq. ft.: 0.000 i, 'Construction Crossing ft.:172.225 - Operational Crossing ft.: 111.274 S -A18-84: Per. Con./Op. Pipeline Crossing ft.: 4.000 • '-` \ j� Construction Crossing ft.: 83.667 1 e; ,'.' 7 1 Operational Crossing ft.: 56.748 '• •-' _ - - -rte !W. - `-' - - i ` \It It kk TA -AL -153 ; - - --- -- - - s, k I- AP MVP LIDAR Cont ur NC OneMap tdurk k k k- o i Legend Mileposts (MP, 0.5 Delineated O mi) Intermittent Temporary Access Delineated Road _ Perennial - - H-650 Pipeline —Delineated Pond Operational Pond Workspace Jordan Watershed Temporary Access ORoad Buffer Zone 1 --.Jordan Watershed Limits of Buffer Zone 2 E::] construction Right- Wetlands: of -Way Delineated Wetland Survey Area —Boundary L_ Adjacent Sheet DApproximated PEM L__jCounty Boundary "fie Delineated PEM Jordan Lake r_0_"4 Delineated PSS Watershed Streams: _ Approximated Intermittent Approximated Perennial Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour / v Alamance County / / Guilford / Count M Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 62 of 108 TRC 600 Willowbrook Ln West Chester, PA 19352 "'"'° Date: November 2018 W C18 67: PFO - --- 'P'k S -C18-63: Per. i •:I Con./Op. Pipeline Crossing ft.: 4.000 tp t ,kPPPtPPPp'tt1P t1P1� tpt%L ttP.PP% %It .:PP,P,P %kP tk 1P. 1P tPP PPk PPPP Pi pp tpPPt Pt P PQP 4 Con./Op. Pipeline Crossing ft.: 102.881 _ .; . _ - ,' ---_----_ Construction Crossingft.:144.729 •, "Co7- —� I -Pt .kPP PPP PP PP nstruction Acres: 0.129 . Operational Acres: 0.067' Operational Crossing ft.: 108.565 ' , ;P71--- ` _ ol-----;- f------aL ---� ------ -.�'- -- - --F^ '*1-- - -- �'� - - -".�� �.'1- -�•t •MR 54- _ ---- ------1— --------- ' �--- ' ------------+-•—'�—�—--------------L--i--�---- — --- -- ------------- ------ -- r _ - - -:_:- - 774 - - - 6yy� Buffer Zone Impacts - _ _ �.—r.'—........ Zone 1 Construction Acres: 0.078 _ --- - Zone 1 Operational Acres: 0.068 _ Zone 2 Constructi pAcres: 0.084 - = RR .. / - Zone 2 Operatior�21 Acres: 0.051 / �; s ; Buffer Zone Impacts P P P I PtPP' PP - - - _ _ - F r _ _ _ • _ Zone 1 Construction Acres: 0.195 r - _ _ - Zone 1 Operational Acres: 0.139 i - - - _ - ;u; -• _ :: - Zone 2 Construction Acres: 0.119 PPtP- i - _ TA -AL -154 / �3� - _ Zone 2 Operational Acres: 0.080 t - - 1 72p. , / ------ -- , ----------- •;1 / ----- ----- a, I ; _ i gl • a - - y - • - 1 ' \ - •l i I'• =fid \ Ee ` - - I a o - - - --- - a - - MVP LIDAR Contours - - iP NC OneMap Contours - - _ -- — -I \----------- - - h- \ - - \ -_ TA -AL -155 - 160 -- j• _ 1g0 : ^ho X50 i +'k i i -----pt '� r' I— — —'r Legend Mileposts (MP, 0.5 Pond O mi) Jordan Watershed Temporary Access Buffer Zone 1 Road .-.Jordan Watershed - - H-650 Pipeline Buffer Zone 2 Operational Wetlands: Workspace Delineated Wetland �Temporary Access _ Boundary Road Delineated PFO Limits of i Delineated PSS Qconstruction Right - of -Way Survey Area L_ Adjacent Sheet L__jCounty Boundary aJordan Lake Watershed Streams: Delineated Intermittent Delineated _ Perennial —Delineated Pond o m m GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ---------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour `s 4, Alamance County � Guilfordy County n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 63 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 S -C18-63: Per. _ _ S -B18-143: E h. S -B18-142: Ink - S -C18-62: Per. P Con./0 Pi eline Crossin ft.: 1.000 t PPPP . %'krPP t kk'kkP PPtk PP P PPP P kk I , %" tP P " P kPP"P"P. P k PPPPP' PP PPPt, IPP Pk -1P PP kk Con./Op. Pipeline Crossing ft.: 4.000 _ _ _ _ Con./Op. Pipeline Crossing ft.: 4.000 ti . Con./Op. Pipeline Crossing ft.: 0.000 P• P 9 PPP r'^ Construction Crossing ft.: 53.383 i f, Construction Crossing ft.: 144.729 - Construction Crossing ft.: 118.069 Construction Crossing ft.: 46.224 0 erational Crossin ft.: 108.565 Operational Crossin ft.: 23.994 Operational Crossing ft.: 48.741 P 9 Operational Crossing ft.: 89.969 P 9 , - - - • - • - --- - ,- - - • y'-�-- ' ' L ' LL- - �-- -- -------- -?---^-----------L-----------L-----------`�-----�------ - - -�L' -�� � r - r VPP PP tkP Pt - .MP=54:5. - - .. � .._- -- - '• _�' -�-.- �: , . �-• •_T�Q 1.a:s=t - �' fr �.`.i' r,4'r -7y`tom -- i rat .�. '.� �,�' ` C:�•t-* �� �.r' '�'' 'r`� , • _ Pk P Pk 4.�5 -- �-�-- ��ti:t: •.-----�- - --r.- iJ-'---•: - 1---- _ ---� -- -- -- -- ----- --- ---------------------�^------- pk .` tMP 55 ,,k r, mac, + ' f ' - - - - - } \\� 690 ._ - - - ,+' ' - - - _ _ - _ - Buffer Zone Impacts Buffer Zone Impacts d `' Zone 1 Construction Acres: 0.249 t :;_, - Zone 1 Construction Acres: 0.148 5::.=' ; _\ S -A18-216: Int. Tem ora Access Road - Zone 1 Operational Acres: 0.176 1- , ( P ry ) _ Zone 1 Operational Acres: 0.105 - 4 r, Con./Op. Pipeline Crossing ft.: 0.000'-I ', - Zone 2 Construction Acres: 0.172 P _ Zone 2 Construction Acres: 0.081 °_ �t. - Construction Crossing ft.: 25.579 - Zone 2 Operational Acres: 0.102 t ' Zone 2 Operational Acres: 0.054 ' _ `• ; ', l' Operational Crossing ft.: 0.000 ; - - - S -C18-60: Int. S -C18-61: Int. ', j. _ - Con./0 . Pi eline Crossin tft.: 2.0001 Buffer Zone Impacts -'' _ Con./Op. Pipeline Crossing ft.: 4.000 _ P P g ' > ', Construction Crossing ft.: 47.495 Zone 1 Construction Acres: 0.195 S -A18-215: Per. (Temporary Access Road) Construction Crossing ft.: 82.186 Zone 1 Operational Acres: 0.139 ' k;'= - - - - Con./Op. Pipeline Crossing ft.: 0.000 -- - P 9 Operational Crossing ft.: 37.769 0 erational Crossin ft.: 55.094 I; Zone 2 Construction Acres: 0.119 :' Construction Crossing ft.: 25.253 ' - ; Zone 2 Operational Acres: 0.080 Constructions ft.: 152.067 ' " ` P Buffer Zone Impacts q ; 0 erational s ft.: 0.000 :,•,•, t'• + Zone 1 Construction Acres: 0.053 P Q . _ _ _ . . _ , Zone 1 Operational Acres: 0.000 f Zone 2 Construction Acres: 0.025 - _ 1' Zone 2 Operational Acres: 0.000 - _ it `• _ ` ', 1 S, - -•� - • - - 'tr i - kkP kP PI PP tkk PP% s'r ' �'� is <'� �,a -::' { _ �'n sem'• - _• �•' MV' P LIDAR Contou�f;. "�' ' - ti C Orl Contours ;i I- - - 'P PPP Pk - - I-•---• L o -- - �o t - _ - / - i - x::_ -- _ ____________ TA -AL -155 -- - ---- - o 'P LPP _ - - �a i Jar" PP It P k j' - ',P. - Calc -- _ kk_ Legend Mileposts (MP, 0.5 Delineated O mi) Intermittent Temporary Access Delineated Road _ Perennial H-650 Pipeline Perennial Surface Operational Water Workspace Jordan Watershed Temporary Access Buffer Zone 1 Road -.Jordan Watershed Limits of Buffer Zone 2 E::] construction Right- Wetlands: of -Way Delineated Wetland Survey Area _ Boundary L_ Adjacent Sheet 'X Delineated PFO __.County Boundary Jordan Lake Watershed Streams: -Approximated Intermittent Delineated Ephemeral r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS .--------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Alamance County D � . L � G u i I f o r d\'�.\- County n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 64 of 108 TRC 600 Willowbrook Ln West Chester, PA 19352 "'"'°""'°"""' Date: November 2018 -P P P- '- i ` - - - -- - ----'1 - -- - - - 1 - It k Pp P - _ _ TA -AL -157 ^_ - - - - ' j - It •;9 �/ Zja _ Buffer Zone Impacts Ps 9Ae 5 _ Zone 1 Construction Acres: 0.000 i kPkk . _ o fo - - - kk pp } , .-- q Zone 1 Operational Acres: 0.000 ; i 1 . _ _ Zone 2 Construction Acres: 0.025 ' -_ Zone2OperationalAcres.0.600 �kk;1' -__-- - - - - -- - ;rr,�,i `�-• _ i : - - k ------ . 5 i' _ - ' _ 1 _ �titt' ,. - W-318-61: PEM _ _ - - ' ' Con.lOp. Pipeline Crossing ft.: 39.072 - _-_: _ _ - - -: - '''' -" - - Construction Acres: 0.057 - _ _ _ _ ==Rw`- '= • �� `' '♦ �" ;''I ; 0 erationalAcres:0.000 V_ - 4�=• �'•♦ '.k-"' P _ ♦ ,t k 1k Con.lOp. Pipeline Crossing ft.: Unknown _ ♦ i } ^rO Construction Crossing ft.: 185.698 = }=1 t ,'' �'� PIMP 55 ;,4 - _ _ - -:� ;" w - Operational Crossing ft.: 57.718 y " ,a - --S. •r. �•. . �• �, `' Buffer Zonelmpacts - s::y;� i i �P ;' • Zone 1 Construction Acres: 0.296 ..,'• .� u L ..-- - i I " •� + _ _ Zone 1 Operational Acres: 0.079 Y�� �.. -------- _ :" �• `/°h S17 - _. -f -' -s•r• Zone 2 Construction Acres: 0.195 MP'S♦5:5.' _ J i �' Cre = Zone 2 Operational Acres: 0.053 ♦ - _a\ PA -AL -155A % i ,Y ,' ♦ ,' i ♦ mlPp \A �. _ SS-SOIL18-04-2: Per. (Temporary Access Road) r, `. �, . \\ �. Con./Op. Pipeline Crossing ft.: 0.000 a * �, , ♦ �„ Construction Crossing ft.: 29.369 coil \\\+\"\\ - S -B18-59-2: Per. ';� ♦ tOperational Crossing ft.: 0.000 f a^ ' PP X % \ Con./Op. Pipeline Crossing ft.: 0.000 - 0 i ql ♦' -PP PI P kI kk P V .\; - Construction Crossing ft.: 47.718 1� r, x' _ ; i 1 ". Operational Crossing ft.: 0.000 ; ; ~ ,%� - - m\,� , h -- - - -P k P Pi ,, •_-1• - \w ♦ \ O _ fir. .� .].ys• - _ i+_--•', - - r :�.:; `s' _ - \\ ��\.\�• air. b kk S -C18-68: Per. =• ., yyJ.j _ _ Con./Op. Pipeline Crossing ft.: 5.000 _ _ ;t-• "'--'' _ W-618-60: PSS _ - - Construction Crossing ft.: 77.682is:-!°•' ` Con./up. Pipeline Crossing ft. 0.000 P 9 Operational Crossing ft.: 51.955 . -, \=i ♦ r ,' Construction Acres: 0.003 - i .<-^ Operational Acres: 0.000 - AS -618-59 / S -B18-59: Per. ' s r k - Con./Op. Pipeline Crossing ft.: 3.000 - _ _ _ _ _ - S -B18-59: Per. Construction Crossing ft.: 118.041 Jty Operational Crossing ft.: 89.441 - - -_, ' Con./Op. Pipeline Crossing ft.: 3.000 00 �o Construction Crossing ft.: 158.004 _ - _ _ - _ _ _ _ Operational Crossing ft.: 85.369 - s -Pp , - Buffer Zone Impacts -- - _ o _ Zone 1 Construction Acres: 0.503 kk co - kk Zone 1 Operational Acres: 0.326 ry-__ :{_k, W-C18-69:PFO - - Con./Op. Pipeline Crossing ft.: 37.006 Zone 2 Construction Acres: 0.299 . _ _ _ _ - o Zone 2 Operational Acres: 0.228 oro ; , : Construction Acres: 0.069 ; - o Operational Acres: 0.026* Legend Mileposts (MP, 0.5 Delineated O mi) Ephemeral Permanent Access Delineated Road Intermittent Temporary Access _Delineated Road Perennial - - H-650 Pipeline _Soil Survey Stream Permanent Access Perennial Road -.Jordan Watershed Operational ---"Buffer Soil Zone 1 Workspace - - -,Jordan Watershed Temporary Access `-`'Buffer Soil Zone 2 Road Jordan Watershed Limits of Buffer Zone 1 E::] construction Right- --•-.Jordan Watershed of -Way --- Buffer Zone 2 Survey Area Wetlands: Adjacent Sheet _Delineated Wetland L_�County Boundary Boundary Jordan Lake ".#• Delineated PEM Watershed Delineated PFO Streams: ;fix Delineated PSS Approximated Perennial Q'go hmmmmmmdn r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar T Contour, NC Oneft 2' Contour, VA USGS 10' Contour 4+ a'F Alamance '. Count 0 e �n. e / M Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 65 of 108 TRC We Willowbrook Ln West Chester, PA 19352 Date: November 2018 - NC OneMap Contours 1k kk P`,, - MVP LIDAR Contour$--• - - - - - •. -- - -- - - IP. - ?_. 'k` - W _ I t 5t OP -% I: t' 7 ' i _ A; : 1 ` Q a3p 1 �;-- - r' 1k Pk k % i;• -'kk - TA -AL -157 :i` " . - ❑ - - - ,� I - - It P -1 SS-SOIL18-05 ",c,' ` _ - L'1 P k Con./Op. Pipeline Crossing ft.: Unknown +, . _ =a?�,'• _ --- - - pp k Construction Crossing ft.: 101.816 ' - : _ _ - kk " ' Operational Crossing ft.: 50.974 _ - �� - s =:" a kk 1k 1k �' . -'T2; ss -•a'_ j- - ` • • _ •� Y' I'' _4 'i•,� r ;sem•- - .G- '• ♦� `'•- --_; Y..i�y� , I. •:i_-: _ "'ter=: - v - ♦ r f - '� p P pp P 1 - • •• •--- PPP r >r•� r `.� r r r r r r,� 1 r•� r r'^_r-r��_r r P* ��r.� .� •f r -k r.r r•1 r .� r r r r r r r r:,r 7 r �o- — —— r r r- r r r r r r ;II -pp r , P. 7• . —� --- -� ,�-T ----- ----- ----- -MP-56-------.---------------r---- P -77 y ➢; •- ''is - I - Z- i .`ONS - - o Buffer Zone Impacts k r - - ct --- _ __ _ _ --=- Zone 1 Construction Acres: 0.140 - y' _ - - - Zone 1 Operational Acres: 0.070 { d-• __ dI : _ _ Zone2ConstructionAcres:0.093 _ % - `Iy - ml ®k k 'Y==r- Zone2OperationalAcres:0.047 -. -. -- - ----- --1 - Qi :"•~ . - ' r - - _moi• ! I♦ ` k pp .) r r I k :k•- • _ - - 1 e� ---- ♦♦� ♦ 4 -- •-- _ - - - - -- % -- -- - - - - - ,moi - --- - - - =---- - - - - -- - - ' - MVP LIDAR Contourspp - - _NC OneMap Contours - -- kr --- aspkk - - N % P Appl�!c - I — — - Legend Mileposts (MP, 0.5 M Pond O mi) _Soil Survey Stream Temporary Access Perennial Road -Jordan Watershed H-650 Pipeline �Buffer Soil Zone 1 Operational -.Jordan Watershed Workspace ----BufferSoil Zone 2 �TemporaryAccess Jordan Watershed Road Buffer Zone 1 Limits of -.Jordan Watershed O Construction Right- '... :Buffer Zone 2 of -Way Wetlands: Survey Area Delineated Wetland L_ Adjacent Sheet _ Boundary L__. County Boundary ,x Delineated PFO Jordan Lake Watershed Streams: —Approximated Pond Delineated Intermittent —Delineated Pond Approximated Pond 0 1m 0) CA W111 Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _......................................—......................................—........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour c� 4a h i Cis Alamance County! b r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 66 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 n. - , _ _ _ _ _ _ 'a Con./Op. Pipeline Crossing ft.: 2.000 ° c�,A Construction Crossing ft.: 79.713 W -A18-119-2: PFO - - ° Operational Crossing ft.: 32.139 Con./Op. Pipeline Crossing ft.: 297.228 ' -_-------- Construction Ac res: 0.470 I ------------ - - Operational Acres: 0.207* Ie..P Pt_ --- ---- r - • r TA -AL -159 %+ P pp I pp t •'•.f•. L..... .�- ' •' _ - e Foster Tr/ ------ --r-T- j- ----Y----•rL--7� i------�--L--�--r-- -- �-- --�-• ----rr-�---a- �-_- ----L- - ^s - ---- --•• - - - ------f�-�---_--- 11 , - - ------ - - - J- -,art- --i`---r•-t-r--i-k--:k-a.-jr_-•-�.- -���- --fir• 5: n P 56. =r' I;- -P P P 1 1 I 1 1 1 1'j 1 1 1 III 71 o - f' ---------- --- I 1 1 1 11'1 ,' 'I 11,x7 � I I I� FI 1 1 I �r �'r ��� 1 fi+'^• � cc, , W -A18-119: PFO - - - -- I•, _ dl �' Con./Op. Pipeline Crossing ft.: 95.348 _ d" r -------- Construction Acres: 0.109 J tee• nl_ _ Operational Acres: 0.064* AQ WA18-119-2: PEM - Con./Op. Pipeline Crossing ft.: 0.000 _-_• -- - ail ^ , ; Construction Acres: 0.059 E _ •••- W -A18-119: PEM Operational Acres: 0.000 ' Con./Op. Pipeline Crossing ft.: 0.000 "-=; ' - W A18-127: PEM Lj Construction Acres: 0.059 - S -A18-125: Per. Q Con./Op. Pipeline Crossing ft.: 0.000 " ' Con./0 Pipeline Crossing ft.: 0.000 : p Construction Acres: 0.018 - - ; ; , Operational Acres: 0.000 - .� P' P 9 Operational Acres: 0.000 i----- - _ - _ _ _ Construction Crossing ft.: 16.016 1_ ------ - - _ __ _ Operational Crossing ft.: 0.000 %,p pp PP pp P I- - - _ S -A18-126: Eph. - - - - - - _ ------ -- - - - - } Con./Op. Pipeline Crossing ft.: 1.000 ___ % _ - Construction Crossing ft.: 44.921 1_ _ _ - _ _ -- - Operational Crossing ft.: 36.953 -P P - -- -!.m ,;' _ - - --- - - _ I'`p' TA -AL -159A i- - _ % ' MVP LIDAR Contours - -NC Orl Contours PPP 1 / P P V�. fi' - 311 Legend pp L\ . - , ; ` : k : 11 - - - - I 1 __q4 ­j 1P P P- .1 "P 'P pp INC OneMa ' Cotours ---------------- -Delineated Intermittent Temporary Access %MVP LIDAR Contqurs _ Perennial - H-650 Pipeline -Delineated Pond - - WB -A18-121! Pond ~ z-' --'Workspace S -A18-125-3: Per. Temporary Access Pond Road C on /0 Pipeline Crossing ft • 31.396n Limits of ipe ne ross ng t i i 0 /0 Pipeline C f 0 00 CoConstruction 'P P ;' P, ------- Construction Crossing ft : 79.073 Q Survey Area _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ onst uction Crossing ft.: 60.706 Delineated Wetland QCounty Boundary _ Boundary QJordan Lake ,10�e Delineated PEM Construction sq. ft.: 1,864.055 K} Delineated PFO Streams: Construction sq. ft.: 725.473 _Approximated Perennial Delineated Operational sq. ft.: 0.000_ -""" _ _ -" """ " Operational sq. ft.: 0.000 - 'a Buffer Zone Impacts ;z� Zone 1 Construction Acres: 0.067 - _ _ ", Buffer Zone Impacts - IZone 1 Operational Acres: 0.024 Zone 1 Construction Acres: 0.246 '- I °: Zone 2 Construction Acres: 0.111 i Zone 1 Operational Acres: 0.171 - - • . 'L. Zone 2 Operational Acres: 0.058 Zone 2 Construction Acres: 0.156 Zone 2 Operational Acres: 0.134 _ �a� S -A18-120: Per. Con./Op. Pipeline Crossing ft.: 2.000 S Per. _ _ - Construction Crossing ft.: 95.167 pPP Operational Crossing ft.: 41.408 - - P SB1865'I t -A18-125-2: Con./Op. Pipeline Crossing ft.: 5.000 Construction Crossing ft.: 87.180 0 erational Crossin ft.: 54.713 P g _ p,9 ' " d :2 Q n. - , _ _ _ _ _ _ 'a Con./Op. Pipeline Crossing ft.: 2.000 ° c�,A Construction Crossing ft.: 79.713 W -A18-119-2: PFO - - ° Operational Crossing ft.: 32.139 Con./Op. Pipeline Crossing ft.: 297.228 ' -_-------- Construction Ac res: 0.470 I ------------ - - Operational Acres: 0.207* Ie..P Pt_ --- ---- r - • r TA -AL -159 %+ P pp I pp t •'•.f•. L..... .�- ' •' _ - e Foster Tr/ ------ --r-T- j- ----Y----•rL--7� i------�--L--�--r-- -- �-- --�-• ----rr-�---a- �-_- ----L- - ^s - ---- --•• - - - ------f�-�---_--- 11 , - - ------ - - - J- -,art- --i`---r•-t-r--i-k--:k-a.-jr_-•-�.- -���- --fir• 5: n P 56. =r' I;- -P P P 1 1 I 1 1 1 1'j 1 1 1 III 71 o - f' ---------- --- I 1 1 1 11'1 ,' 'I 11,x7 � I I I� FI 1 1 I �r �'r ��� 1 fi+'^• � cc, , W -A18-119: PFO - - - -- I•, _ dl �' Con./Op. Pipeline Crossing ft.: 95.348 _ d" r -------- Construction Acres: 0.109 J tee• nl_ _ Operational Acres: 0.064* AQ WA18-119-2: PEM - Con./Op. Pipeline Crossing ft.: 0.000 _-_• -- - ail ^ , ; Construction Acres: 0.059 E _ •••- W -A18-119: PEM Operational Acres: 0.000 ' Con./Op. Pipeline Crossing ft.: 0.000 "-=; ' - W A18-127: PEM Lj Construction Acres: 0.059 - S -A18-125: Per. Q Con./Op. Pipeline Crossing ft.: 0.000 " ' Con./0 Pipeline Crossing ft.: 0.000 : p Construction Acres: 0.018 - - ; ; , Operational Acres: 0.000 - .� P' P 9 Operational Acres: 0.000 i----- - _ - _ _ _ Construction Crossing ft.: 16.016 1_ ------ - - _ __ _ Operational Crossing ft.: 0.000 %,p pp PP pp P I- - - _ S -A18-126: Eph. - - - - - - _ ------ -- - - - - } Con./Op. Pipeline Crossing ft.: 1.000 ___ % _ - Construction Crossing ft.: 44.921 1_ _ _ - _ _ -- - Operational Crossing ft.: 36.953 -P P - -- -!.m ,;' _ - - --- - - _ I'`p' TA -AL -159A i- - _ % ' MVP LIDAR Contours - -NC Orl Contours PPP 1 / P P V�. fi' - 311 Legend Mileposts (MP, 0.5 o mi) -Delineated Intermittent Temporary Access Delineated _ Road _ Perennial - H-650 Pipeline -Delineated Pond -,Operational -Perennial Surface --'Workspace Water Temporary Access Pond Road Jordan Watershed Limits of Buffer Zone 1 Construction Right- Jordan Watershed of -Way .... Buffer Zone 2 Q Survey Area Wetlands: L _ Adjacent Sheet Delineated Wetland QCounty Boundary _ Boundary QJordan Lake ,10�e Delineated PEM Watershed K} Delineated PFO Streams: _Approximated Perennial Delineated Ephemeral 0 Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS ...... -................................................................................................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour Alamance County 44 p !C59, Fpm a � n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 67 of 108 600 Willowbrook Ln West Chester, PA 19352 Date: November 2018 S -A18-125-3: Per. Con./Op. Pipeline Crossing ft.: 0.000 _ Construction Crossing ft.: 60.706 _ _ _ _ _ - - GkI& Construction s3b.: 725.473 Operational sq. ft.: 0.000 MVP LIpgR Contours -- - - - - - -- �_ P. pp Buffer Zone Impacts ------- - I - - - Zone 1 Construction Acres: 0.246 �oQ Zone 1 Operational Acres: 0.171 - - Zone 2 Construction Acres: 0.156. - _ - Zone 2 Operational Acres: 0.134 - - - - - - . ----- _ - .� .4 I - - _ - S -A18-125-4: Per. Con./Op. Pipeline Crossing ft.: 0.000 ,'•' o _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ Buffer Zone Impacts Construction Crossing ft.: 3.430 ------- _ - s Zone 1 Construction Acres: 0.181 rn ----- Construction sq. ft.: 1.840 "' - _ _ ----------- - '--"�"'� Zone 1 Operational Acres: 0.114 I `° Operational s ft.: 0.000 _ " ' �.'' - =� Zone 2 Construction Acres: 0.178 m s - - �; • _ -'%' ' - = F�;_ Zone 2 Operational Acres: 0.095 ; UD) U - - ',.� - W -A18-127 PFO _ W -A18-133: PEM I ° Con./Op. Pipeline Crossing ft.: 61.319 _ = Con./Op. Pipeline Crossing ft.: 0.000 - - f0a^ W -A18-130: PFO Construction Acres: 0.073 �• '=a Construction Acres: 0.020 ! a Con./Op. Pipeline Crossing ft.: 17.037 --= % _ _ _ �,s•s:= N _ ,; -i Operational Acres: 0.042* - _ _ Operational Acres: 0.000 Construction Acres: 0.095 ►� ❑' ri PP P PP P. P. pp Operational Acres: 0.031* ' _ - - - - - - - - W A18 133: PFO i . - - - Con./Op. Pipeline Crossing ft.: 56.047 _ Construction Acres: 0.096 - ,.: _ _ _ - - _ - _ _ _ Operational Acres: 0.039* '' _ k' W -A18-127-2: PEM J y- . s -; _ ! ► 1 v -: _�,'. • -= 1 ; : Con./Op. Pipeline Crossing ft.: 0.000 N Construction Acres: 0.020 ► =+::t. _ ' ` - __ -Operational Acres: 0.000 e - `` d Ip s -- .: ,•-.MP- 5.71'. S -A18-126: Eph. - _ Con./Op. Pipeline Crossing ft.: 1.000 v y._-'�,-_�_ - ',�� .'•`� Construction Crossing ft.: 44.921 w Operational Crossing ft.: 36.953 TA -AL -159A e=.'• - _ -`. ' ' •I : r .. - -5' __ _____'__�-,• •�j��. - - \/ - -•. a W -A18-130: PEM W -A18-127: PEM - Con./Op. Pipeline Crossing ft.: 0.000 ■ 740 Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.006 „ ► 1 ��'► 1 ► • - Operational Acres: 0.000 ► ► ; 1 PPXP Construction Acres: 0.018 1 1 ► .` ► Operational Acres: 0.000 1'. r W'A18-133-2`PEM M t+ _ Con./Op. Pipeline Crossing ft.: 0.000 +t o - Construction Acres: 0.009 yco - Operational Acres: 0.000 0 107 `'r S -A18-132: Per. •� - . _ Con./Op. Pipeline Crossing ft.: 5.000 1 r _; ?, c Construction Crossingft.:120.018 110�� s I; Operational Crossing ft.: 83.910 .a, 0.. - = +'. _'� - - i, sf _ --- i Q - baa NC One R Contours _ - Map ContourPP Legend O Mileposts (MP, 0.5 Perennial Surface mi) Water Temporary Access Pond Road Jordan Watershed H-650 Pipeline Buffer Zone 1 Operational Jordan Watershed Workspace _ _ • . Buffer Zone 2 �TemporaryAccess Wetlands: Road _ Delineated Wetland Limits of Boundary E::] construction Right- �Delineated PEM of -Way Survey Area .X. Delineated PFO L7_ Adjacent Sheet _]County Boundary Jordan Lake Watershed Streams: Delineated Ephemeral _ Delineated Perennial -Delineated Pond o EM CA iiiia GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS --------------------------------------------------------------------------------._................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour Alamance Counr 9 -0 J Q r' M Mountain Valley PIPELINE " Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 68 of 108 600 Willowbrook Ln TRC West Chester, PA 19352 Date: November 2018 i------------------•-- ---- rno NC One4l I - - I MVP ID ap urs tr - I on °urs S A18 132: Per. Con./Op. Pipeline Crossing ft.: 5.000 PP, P.- P,' Construction Crossing ft.: 120.018 Operational Crossing ft.: 83.910 I Buffer Zone Impacts - ----- • • ; � . Zone 1 Construction Acres: 0.181 ;. _ _ - - Zone 1 Operational Acres: 0.114 - • Zone 2 Construction Acres: 0.178 Buffer Zone Impacts `P 11 Zone 2 Operational Acres: 0.095 Zone 1 Construction Acres: 0.006 y , 00 Zone 1 Operational Acres: 0.003 _ °�i `OI ' Zone 2 Construction Acres: 0.051 Zone 2 Operational Acres: 0.033 - - - 1Pkyl cl 1 u; W -A18-135: PFO S' Con./Op. Pipeline Crossing ft.: 145.789 Construction Acres: 0.205 SS-SOIL18-06 Operational Acres: 0.098* 1P Con./Op. Pipeline Crossing ft.: Unknown Construction Crossing ft.: 129.861 ,;- Operational Crossing ft.: 68.391 - -- -- ' - - ' P 1P --'+..qt ..^ _ {' r_ ti..'•s�� _ ►1' 7� r TLI,'T^Tr 0 0 CO d�PRa's9oc ` ------ _ -- - ` I W -A18-254: PFO Con./Op. Pipeline Crossing ft.: 151.623 t' Construction Acres: 0.225 Operational Acres: 0.097* IS ` a' MP'57.5� V � v 0 _ _ , ' i.. lam' 1+i ! ��. , - �( ,� ♦ ♦,� , '' 1 ► ► , • _ 7•r r r ``,�- '� �' '� r.i,, • ---y-, -,•Iii ' ,. , ♦ , • �� �' - I ■°`- r + -"`� .est'' • • -- ':T'. �$:.'r '+,�� �� ♦ _. ;_ 'moi. •<.� ' P. ppP pp •tea`, ' I __: = 1•.+r , , ,��C i _ W -A18-135: PEM ` ■ - - h� a� C, Con./Op. Pipeline Crossing ft.: 0.000p t_ ^tO �Q Construction Acres: 0.016a pI �-= .'� Operational Acres: 0.000 ' - wm Buffer Zone Impacts •J , W -A18-133-2: PEM y Zone 1 Construction Acres: 0.177 Y 1r/ - _ . Zone 1 Operational Acres: 0.088 I , ', Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.009 Zone 2 Construction Acres: 0.125 pp Operational Acres: 0.000 -- " -- - Zone 2 Operational Acres: 0.053 I -- Pt I k 1k ;4 » - - - - - - ._ I _ - 'l ; r .r f` 6 v Q - -�� ' - 610 ' �•• rP P."� is L,`- _ - •r.� ,' kP kk5 a '-------- ' - - kk, Y ` P ppW P 1P •- - -fk pp Pk P' r' �P.' - --- - / k k P P k P k. I r . -' Legend Mileposts (MP, 0.5 •-.Jordan Watershed o mi) Buffer Soil Zone 1 - - H-650 Pipeline -.Jordan Watershed Operational "-' Buffer Soil Zone 2 Workspace Jordan Watershed Limits of Buffer Zone 1 E::] Construction Right- ... :Jordan Watershed of -Way :_ _ - - Buffer Zone 2 Survey Area Wetlands: L _ j Adjacent Sheet _ Delineated Wetland County Boundary Boundary Jordan Lake i.4 Delineated PEM Watershed ;X Delineated PFO Streams: 20i Delineated PSS Delineated Intermittent Delineated _ Perennial —Delineated Pond Pond _Soil Survey Stream Perennial 0 go ISM M GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _......................................-......................................-........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Alamance ­C.ounty f n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 69 of 108 TRC 600 Willowbrook Ln West Chester, PA 19352 Date: November 2018 1 670 ---------------- k. "_ _ _ - - Claude Simpson Rd State Rd 1590 ° ' -- ---- --------t. ._ f I Gtee�� -•-----4 . --------------- --- __ ------ l�qR Con o4 s'a -- c = �. - r-- -• JC •\� �`P. - - k P -F •, Buffer Zone Impacts �ek Zone 1 Construction Acres: 0.004 Zone 1 Operational Acres: 0.000 . • Zone 2 Construction Acres: 0.035 �Zone 2 Operational Acres: 0.000 ..P 1P P. - a. TA -AL -161 _ sho -1 `�>> ; TA -AL -162 , P.,� - -- i - - - - W -C18-3: PEM • • LGJ►l� Con./Op. Pipeline Crossing ft.: 13.052 - - - Construction Acres: 0.041 - -- - -_ '� ----- �^�%►��+ Operational Acres: 0.000 ___ - ---____- -- S C18 2: Int. - - - ;.. �r ♦' - Con./Op. Pipeline Crossing ft.: 1.000 _ - ' �' -- _ _ Construction Crossing ft.: 96.621 �~ 1 . ,r ♦, ' -- .. •ft"� Operational Crossing ft.: 67.605 �• Y- �_ . _--- ''z �t-� ____ t-•', ' ` JJ '• +� ♦ Ari a -1•� ' -�- _ ma=t �_-_- t -s .. - - _ - 00 '` u^♦�^i }�� z--: P Pk :--= - i' ♦- �•y 1 , W -A18-254: PFO ; ` e - _ �- - L Con./Op. Pipeline Crossing ft.: 151.623 - ' , \ _ ` Construction Acres: 0.225 ; «�' _-- - - _ Operational Acres: 0.097* � �r� ' . -,r ,- �s�- - -t� . - - - W -C18-5: PEM - ■:; Con./Op. Pipeline Crossing ft.: 0.000 , _- - R`� "'•' - _ - Construction Acres: 0.025 a - - '+, Operational Acres: 0.000 kk - - kf - Y • _ . W -C18-5 PSS -:� • 1 _ - Con./Op. Pipeline Crossing ft.: 52.163 - '_: _ -- - W-C18-3:PF0 Construction Acres: 0.069 -' 1 Con./Op. Pipeline Crossing ft.: 0.000 k"' o -- - =- - -P Operational Acres: 0.000 - 1 Construction Acres: <0.001 r; Operational Acres: 0.000* ' s Buffer Zone Impacts PP ------ Zone 1 Construction Acres: 0.121 PP - .` -= Zone 1 Operational Acres: 0.078 _ a_ - - W -C18-3-2: PEM W -C18-3-2: PFO Zone 2 Construction Acres: 0.061 - Con./Op. Pipeline Crossing ft.: 12.604 Con./Op. Pipeline Crossing ft.: 7.569 Zone 2 Operational Acres: 0.037 F; Construction Acres: 0.017k Construction Acres: 0.010 ----- - Operational Acres: 0.000 Operational Acres: 0.005* kk - - _ _ _ r ;- - - ; 5 _ -- Vo L , t_ Pk 1P P k PP 1P _ r. - 'tl- - e J 6 5 or -aha - Staff aP Legend Mileposts (MP, 0.5 o mi) —Delineated Perennial _ Temporary Access Approximated Pond Road - Perennial Surface - - H-650 Pipeline Water ,---,Operational Jordan Watershed L --'Workspace Buffer Zone 1 =Temporary Access .---.Jordan Watershed Road - ' -- :Buffer Zone 2 Limits of Wetlands: =Construction Right- Delineated Wetland of -Way —Boundary =Survey Area Oj: Delineated PEM L _ Adjacent Sheet v'� Delineated PFO =County Boundary W, Delineated PSS =Jordan Lake Watershed Streams: —Approximated Pond Delineated _ Ephemeral Delineated _ Intermittent o tm EM im F0 t� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEM/PSS Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour pa oo.a ne I 1 ATV"M5' a rk e .County IS ]ua�j aod,sap a �eB 7k PIO M Mountain Valley PIPELINE " Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 70 of 108 600 Willowbrook Ln TRC West Chester, PA 19352 Date: November 2018 l - i 64p 670 - - - ------------ i 660 ,'t - - i t - - P k;. ;kRor ------ state Rd 1594 ss\ IPP, PPP PP - = o ,_ NC OneM� Contours S i' - t VP L on ours • i - •i• `t• ,ti'r PPP i - TA -AL -163 i —t i - - ` r - - �. TA -AL -162 .S - �� - - F '' a --� rPP PP.i -- - -- P air •" - - - -P, tt i Buffer Zone Impacts _ _ - - t _ Zone 1 Construction Acres: 0.004 ' _i Zone 1 Operational Acres: 0.000 _ _ _ - - • - _ ` _ - - - Zone 2 Construction Acres: 0.035 > r Buffer Zone Impacts i - Zone 2 Operational Acres: 0.000 - =F - -- Zone 1 Construction Acres: 0.138 ; - -- i r • - Zone 1 Operational Acres: 0.069 Zone 2 Construction Acres: 0.092 E Nr� 1; , Zone 2 Operational Acres: 0.046 - n,.,�,,�, _ `- r - • • l`�J wl� - - 6' i •` _ ------ _ s moi• •rA.`�`� - ,, '♦ �� �; y.r - -- ,s . tet. . ` -tom ••• - -MP-5 -- '°• S • ----- : ''• '- MP -58:5. -s�-' _I • �d ` 1 --- - -- -��Y,� --�,• -'� •f !{�`� 'r '_ - - - -- ' rp • ' - -- --- '� `K"-`- - •-- -;PP-yr-�ti - - r______ -- x �p d r - - - - - - - - -- -- ai •__ _. __ - _ , ,,'4 •__ SS-SOIL18-07 - _` _ Con./Op. Pipeline Crossing ft.: Unknown Q• .' , , =i'r• - _:;�- - - Construction Crossing ft.: 100.031 - -- -- f"' .`+ !ti _ Operational Crossing ft.: 50.016 s` --- - P1 PIP, ------- - - _ _____. - ,x4'4 •1 p _ __ ___- __ PP - - - - - - -- •--- _ - _ _ _ _-_ -rte: _ _ - --- - - - - -- - - - - -- - - Legend Mileposts (MP, 0.5 --.Jordan Watershed o mi) ... :Buffer Soil Zone 1 Temporary Access •-.Jordan Watershed Road Buffer Soil Zone 2 - - H-650 Pipeline Jordan Watershed Operational Buffer Zone 1 Workspace Jordan Watershed �TemporaryAccess ---•Buffer Zone 2 Road Wetlands: Limits of Wetland E::] Construction Right- _Delineated Boundary of -Way MApproximated PEM Survey Area ;X Delineated PFO L_ Adjacent Sheet L__. County Boundary Jordan Lake Watershed Streams: Delineated Intermittent _Soil Survey Stream Perennial o w m m iiiia GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 6 a-° a a v �sr A1-amance County a n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 71 of 108 TRC 600 Willowbrook Ln West Chester, PA 19352 Date: November 2018 ------ - - - - -- - I- ----------- , - t6311 - OneMa Cont®urs MVP L ours - Sfate Rd 1594 III _- _ $asin-Cretik-Rcf--` i ry%; ' ---- _ - -° •----- --- e _ _• _ -------- - 3 _ - ------ - + ' PA -AL -164 t 6, m - - I - r' --- AS-NHD-1554: Int. (Permanent Access Road) �� +t Con./Op. Pipeline Crossing ft.: 0.000 ' _ - - Construction Crossing ft.: 25.507 f - Permanent Fill Crossing ft.: 25.507 "' -- -_ • = ' -- - - c _' - - - - -- --- Nim _ kP PP Buffer Zone Impacts - -- t; - - -- ` Zone 1 Construction Acres: 0.271 r - • WE - ' P` c'r Zone 1 Operational Acres: 0.063 •r - - _ _ _ _ _ Zone 2 Construction Acres: 0.087 • ---------------- ti " �iZone2OperationalAcres:0.057 -�* w'r - - •- - - - - -- , - Buffer Zonelmpacts _- S -C18-13: Int. - Zone 1 Construction Acres: 0.037 - 1 ' Con.lO . Pipeline Crossing ft.: 2.000 _ P P 9 - ,' Zone 1 Operational Acres: 0.037 - +; Construction Crossing ft.: 89.978 - --- Zone 2 Construction Acres: 0.027 Operational Crossing ft.: 17.413 S -C18-11: Per. Zone 2 Operational Acres: 0.027 _ Con.lOp. Pipeline Crossing ft.: 78.912 - - - Construction Crossing ft.:254.025 - _ _ ------ • .�': f K - Construction sq. ft.: 4,762.390 _ _ Operational sq. ft.: 0.000 - - _"" `• 1` _ - .. :f�; - f•: _ i;•�--• •I' • ♦ J - - ,' I I, _ri'_.. --+ r ter'- - r _ _ _ ,_ MP -59.;- 4_ _ - '�', ••r, -_,r r-!'� r t1 ;7 . ,•-� ' !fir * i �•). r �,r r r r r * 'r r r r ._ . _ _ . - C �'L11 =,'�,T�—t. t — 7---—_-----�: r_s_ --LL �sli _--L-----"----------------�— --�—� — J'S.__ •�' .r r r,i r r 110?•4 -__� *+_ •� � a r - - t - - - _ S -C18-12: Int. - - Con./Op. Pipeline Crossing ft.: 0.000 - Construction Crossing ft.: 5.928 •� ; a, Operational Crossing ft.: 0.000 - 7� . _ _ _ _ _ - . ,, I I'll I P �1 5 - i t �. _ + - r - f� --- @ h �. °�- Legend Mileposts (MP, 0.5 Delineated O mi) Intermittent Permanent Access Delineated _ Road _ Perennial - - H-650 Pipeline Perennial Surface Permanent Access Water Road Jordan Watershed Operational Buffer Zone 1 Workspace -.Jordan Watershed Limits of Buffer Zone 2 E::] construction Right- Wetlands: of -Way Delineated Wetland Survey Area _ Boundary L_ Adjacent Sheet _]County Boundary Jordan Lake Watershed Streams: —Approximated Intermittent Delineated Ephemeral r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour N� Foy ¢a Alamance County r' 0 $m Pp t =" n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 72 of 108 901 TRC We Willowbrook Ln West Chester, PA 19352 Date: November 2018 'Prip o�� Rd State Rd 1594 - - - - - ,, - aV�Q�\OP 'Basin Creek - ------ • - o 03 o HO ' 6g� - , �lj 00 1 I PPV,o4�o Map .1 PPca�' ,,�'.PP PP S qR co ' k I- PP tt ►'P. -1; - - -- - -- -a - - -k -- - - - ' -- - -k :::-t -- - - -- - - - - It. ' - - 19 - -_PP P I I P t�. P. --------- - - -- -- - - - -- ♦' �`.w'�� ' ': r ♦ ` --- -- �: ♦ '. ; 1 s o _ -- _ _ 'kk Buffer Zone Impacts 1 `. _____--- ________ :; ��; ` ,`�'`a Zone Construction Acres:0.131 r �.; �`. `� r�Zone 1 Operational Acres: 0.080 PPI r `�� Zone 2 Construction Acres: 0.086 Zone 2 Operational Acres: 0.054 - `• ' { A; ♦ f .' E, G - -+; . - PP PI -A MP 59'5. :_. k PP ••ire, I I1 PP Pr PIP!4 oL `rfd ♦ �, ♦r�� -• a ,- �'� r-_-+'-•��_ - __' _ �.�;� �,�; _.+TSL- .�� - S - •- - 1 ' 4 - AS-NHD-1549: Int. a Con./Op. Pipeline Crossing ft.: < 6 ft (Unknown) I� poi - p - kI - Construction Crossing ft.: 95.066 _ rn1 Operational Crossing ft.: 57.997 1 1I k k 1k �,� 9 �o , --" - - -- - Ik 1P PP kIk - - " - r- eco:. '__ - - - '. -- :,P.s } , - _ k 11 - -� . -- - '� '�.• 11 e'• , • i_ <-__________ J`y _ ` ` i p�c-�' ot` - - P .1- - e O Q l . • - �? rya - - - -; -Pj - - Legend O Mileposts (MP, 0.5 —Delineated Wetland mi) Boundary - - H-650 Pipeline Operational Workspace Limits of OConstruction Right - of -Way Survey Area L _ j Adjacent Sheet __;County Boundary Jordan Lake Watershed Streams: —Approximated Intermittent —Approximated Pond Approximated Pond Jordan Watershed Buffer Zone 1 Jordan Watershed ... :Buffer Zone 2 Wetlands: 0 EM M Ilk r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ---------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Aa Boanc Kd UlJ �a a � cl^ool v I� m Alamance s�Pp County a� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 73 of 108 TRC 600 Willowbrook Ln West Chester, PA 19352 Date: November 2018 '' ` - Ego cI — .1� k �� - - 1 - _ 1' 0 0 = �o PPI' -' NC OneMa Contours 1' - - r •' MVP LIDAR Contours �e 6d, _j _ - °i �' - e� P - P - �a k - ' - . -:s ,r � kk ', - ' akk - - I _ -- -- - i - --_ ^ -- ._. -' S - - - - CY'10- - - - - - -- e• yp- . V 1V - TA -AL -165 ' r �- a- - `_P k - - 1 c `} t ,_.- - ' k 1PPP -- - - PP 1 --_-- -- -- ---- --- - j---- :-- 4 'ff a - ._.J--- _ _ _ - D ' ' - - - _ a K_ .____ _ _ . �• •_ L _ K _ _[_ ? a _ - k 1k L -_•- - - -•_ I C _ - -= =- -- -- - -- - - - - on , -- ----- a Legend o Mileposts (MP, 0.5 _ Delineated Wetland mi) Boundary Temporary Access Road H-650 Pipeline Operational Workspace Operational Ground 0 Bed Temporary Access Road Limits of E::] Construction Right - of -Way Survey Area L7 ;Adjacent Sheet County Boundary Jordan Lake Watershed Streams: -.Jordan Watershed ... :Buffer Zone 2 Wetlands: 0 go EM 0) r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ________________________________________________________________________......_........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour R� Hemet Merit ahsf Ch;.•• 84cn Rd gap, a e 1 b cryov � A I a riTya,,q G, e Countly � A� d 2 n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 74 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 - _ ' ' f ' f . f •• ,_ r f -- -------------- - -P - - -- - -- _ - • - Ephemeral - - - - - - - - - P Road - - -fti - - H-650 Pipeline Permanent Access - Road Operational Workspace - - - NC'OrieMap Contours - - - I R Bed - - - - MVP LIDAR ontours-•"" - -"" - - k Pk Limits of E::] Construction Right - of -Way Survey Area L _ j Adjacent Sheet County Boundary ' �' - Watershed - - -- - - - -- i 'P"�r�- - - - - - "" 4 -_ - _ - -- I - - - .. PP - - . :{u ,� ---- ----- - - - - -- _- - - i - - _ _ - -• - - .j- �-- "_ - _ -- y._ •e' 3 CY-10 - • - - - -- o ko o _ •�W ,;` - - - ---- - - - - -- TA -AL -165A - %- • -- -" - ---:------ - - - _-- u:: MP -60:5-'_":_'-:- _ _,_ _ . --�~ ----�_=----- i _ - _ - - * ----- -- •�Yi - - , — "` - - �' i--------_—'____ ` - T -- __ — ----'yam _. - •__ _• kk r -- - -t-- - -- -- ------ 1-• PA -AL -166 - - - - _ ^' tk -- -- - 1 .. _ •, Pt -- -- `- P .' t rt - _ ._ % -- -- 1 I P ,r -- __ _ pt k -- - -- - - • - -- - - s2o ' , - - - - P. s - ,- f MVP LIDAR Contours -_ _ _ _ _"""-"` k-. - C ne ap ontours 6bO __ - Legend Mileposts (MP, 0.5 Streams: O mi) Delineated Permanent Access Ephemeral Road Wetlands: Temporary Access_ Delineated Wetland Road Boundary - - H-650 Pipeline Permanent Access Road Operational Workspace Operational Ground 0 Bed Temporary Access Road Limits of E::] Construction Right - of -Way Survey Area L _ j Adjacent Sheet County Boundary Jordan Lake Watershed Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _""""""""""""""""""""""""""""""""""""""_""""""""""""""""""""""""""""""""""""""_"""""""""""""""......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour H"fn b� d � a uu Afamanc'e �p zCounty 9 � Anv�,vcgn L 4 yaw � �'9c+iva Rp 3 n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 75 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 "'"'°""'°"""' Date: November 2018 f� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _""""""""""""""""""""""""""""""""""""""_""""""""""""""""""""""""""""""""""""""_"""""""""""""""......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour H"fn b� d � a uu Afamanc'e �p zCounty 9 � Anv�,vcgn L 4 yaw � �'9c+iva Rp 3 n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 75 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 "'"'°""'°"""' Date: November 2018 --- - - - - -- -- __- - - - s�dr �o TA -AL -167 '��o yk P P P P P pp pp P P pp kk kk k - 66� pp P - -..__. --- -' - - - -- •, _ _ N I,MVP LIDAR Contours - - _ pp - P pp i- - - _ - --- - - _ ' pp P - - -- r - - - - - Y - Ik. - - P t - - -:- _ z I .• - - I I -- 620 j - "'' - - :' - - - - �! ykk l -- - 7 Buffer Zone Impacts - �; - - _ 1 j•• ' Zone 1 Construction Acres: 0.081 Zone 1 Operational Acres: 0.026 :�' = _ '+'.. k Po ft Zone 2 Construction Acres: 0.094 - I cro r Zone 2 Operational Acres: 0.059 - _ I' kt a„ - - - --- S-C18-28:Int. - QI ` Con./Op. Pipeline Crossing ft.: 3.000tI ' Construction Crossing ft.: 157.316 -,.1 - _ _ Operational Crossing ft.: 44.802kk �' Pk Pt t. ts - - -- - - - - -- zu r pp - 1 1 1 ;. 1 -F - =_,�_�r+i� •_ ________ _ _ Her, _ _r �sc�• ��__r_�__ _�_�-_ __1________ ________ _____r___rwr.__:�__ _ - ____:�_:_ _ ___ ------ a------------ _�_�____L___r__J_�_ c ,1' 11, ,' _ _ _ _ •, S r • �_�s.it -�__ z'____rt�__�r_ ____ _____ ___ _____�__ _____ _ __�__t�_ ________r�__�__�__�._�__�___ _ y.l '1 ____ _ ._ -- I kk l 1<< W -C18-29: PFO ', - --^ -- _ Ikk Con./Op. Pipeline Crossing ft.: 317.377 • _ _ -k 1 d Construction Acres: 0.550 _ �•c • -- - -t - , SC1830:Int. Operational Acres: 0.211' -__ _ __ ______ _ -�,•_____- -I k Con./Op. Pipeline Crossing ft.: 12.948 ; - _ _- --- _- I Construction Crossing ft.: 79.231 kk Ik _ Construction sq. ft.: 1,181.687 - _ rQ r Operational sq. ft.: 0.000 -- - �� - 1 r r. • - - -�; ; r t _ _ ` - - -I i. r;;It -- - i Legend Mileposts (MP, 0.5 Pond O mi) Jordan Watershed Temporary Access Buffer Zone 1 Road Jordan Watershed H-650 Pipeline ...:Buffer Zone 2 Operational Wetlands: Workspace Delineated Wetland �Temporary Access _ Boundary Road Delineated PFO Limits of E::] construction Right - of -Way Survey Area L _ j Adjacent Sheet _]County Boundary Jordan Lake Watershed Streams: Delineated Intermittent —Delineated Pond Intermittent Surface Water Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Alaman`c'e Co -u my O �S r r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 76 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 6g0 �� U�5 J "q -r Or 5 - - f - eMa G °rt°v ,b' - - - - All 6 N vQ SIO P G - - - Rid ohe�d So Mk1_ • _ 9 C0 — - `-y oOfOlr - _ - rs - - - _. - ---------- --- __= • - r ._ - :.: - - ❑ - - 660 t. kk i - - - - - — - - - -- - - - - -- - r - - State RQ �6p? - - - f Ir•f --- --- __ ----- --- - -- lr - pp PPP'1P I - - - 1 - - SS-SOIL18-08 1 - Con./Op. Pipeline Crossing ft.: Unknown kk ;1 Construction Crossing ft.: 100.270 •; •, :.' .E • , ♦ '�� \ Operational Crossing ft.: 50.133 t sM`: s �- � -i,. ., ♦ e; TA -AL -168 •r• • .- . k' Ji- ••i,' 'err ♦♦�,; • 1 d Ln - .�' ♦ ♦ ♦ an ~41 P `.♦-- PVw \ r E��. .' ♦i fir.- •.it ♦♦`�,,_ f • 'r ' 1 „ u MP 61%,.5., ♦ ♦-�� - - 1 •' r• •kk - ` �- - - v �i w - "� ' 1. +' pp P 4. !-s-' 1 ' - ' _ ,mow, ♦ ♦ `,,, _ �z: -♦ _ �• aP k' • ♦ .� Buffer Zone Impacts 4_ 1 r Zone 1 Construction Acres: 0.138 _ _pP PP �,s�'♦ ♦ k' •' 7a . Zone 1 Operational Acres: 0.069 - ~*♦�♦ ♦ `♦ ; 1 --Zone 2 Construction Acres: 0.092 - '�� k �4.� ✓��� '. Zone 2 Operational Acres: 0.046 ' ♦ %, `♦ ; mss'' - • i, . 1 ------ p p'r N ' e 1 a'. - ! ti %��'%r -''_��1 - .rte '�' `'r'k tp ' - 680 _ _ - I Qm i ppAQP _ Gon Buffer Zone Impacts J _I , -Zone 1 Construction Acres: 0.137 �' Zone 1 Operational Acres: 0.078 ------ pp I - Zone 2 Construction Acres: 0.190 tf Zone 2 Operational Acres: 0.097 0 ./ Legend Mileposts (MP, 0.5 •-•Jordan Watershed O mi) Buffer Soil Zone 1 Temporary Access •-.Jordan Watershed Road Buffer Soil Zone 2 H-650 Pipeline Jordan Watershed Operational Buffer Zone 1 Workspace.....Jordan Watershed �TemporaryAccess •••':Buffer Zone 2 Road Wetlands: Limits of Wetland E::] Construction Right- _Delineated Boundary of -Way Survey Area L _ j Adjacent Sheet _]County Boundary Jordan Lake Watershed Streams: Delineated _ Perennial _Soil Survey Stream Perennial 0 go ISM M GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _________________________________________________________________________________._................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Bclhel Melhptl,g�L, iriir:'• '�.: Alamance Qom County B- Rd I , i pW Diet Rd P �O` n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 77 of 108 TRC Willowbrook Ln We West Chester, PA 19352 Date: November 2018 ____ V t - _ Construction Crossing ft.: 35.181 _________ - • • • . Buffer Zone 2 ____--- - , _ - Operational Crossing ft.: 20.087 r - _ -------- I Delineated PFO ------- r -- - Pk P kP -------- --- _ 1. N O - - OneMa Contours Zone 1 Operational Acres: 0.000 - - --- - - - VP IDAR Contours , - - - k� _ - 6>0 _ "- oa ---- - - - IP - ---- Ephemeral _ Zone 2 Operational Acres: 0.012 - PP :, ' Jordan Watershed '- -.. P _ - ' - kPk X - - 4 - ------ - y.�r r. 11 _ Y' ' - - ---- ' - Buffer Zonelmpacts -_ PP - - ------ - _ Zone 1 Construction Acres: 0.137 . _ _ �S yqs ' - _ - - Zone1OperationalAcres:0.078 __- - - - ` Zone 2 Construction Acres: 0.190 _ -1y° Zone 2 Operational Acres: 0.097 - - - - ti. i cT �: ` PP - W -A18-79: PFO �; 5 ;$ - Con./Op. Pipeline Crossing ft.: 0.000 y p Construction Acres: 0.004 - _ s=' - _ Operational Acres: 0.000* - - - _ - S-A18-78:Int. pP - - - - _ - •- Con./Op. Pipeline Crossing ft.: 2.000 _ ' -- Construction Crossing ft.: 87.419 ''' • • `1 Operational Crossing ft.: 52.604 O {' ti. • I - - 11 -------- ----- fP IN -' ' - _ ,r _ _ er---� r--,---1 --+a— —� — —�— — ---- ---- — — ------ �Z-------�-- --- -- -- — ----T—,—•— — — ---------------- — — --- --•ir ------+•'------ — ----------------------tel- •J�. •r •� , a S. �. -ter -�---- �r"! ^,`��-----}'�- �•� r>t__K -� r mak.' �•ti I 'I �'YV •�;�L� �y ' ------r+=� -^.-*ti y:.-: --r. - �.- ------------------ - -------Y�7..� -- •• -- -- - -`- ------------ _- --------------- ---- -- ' �-=- -- ---' % , 61P Y , S A18-77: Eph. - - ----------- � kk - - �' •'. Legend V t - _ Construction Crossing ft.: 35.181 _I: - _.�:- : - • •, 1, •, _ _ -- " • • • . Buffer Zone 2 - - H-650 Pipeline ;, - Operational Crossing ft.: 20.087 - .r.= • Buffer Zone Impacts Limits of Delineated PFO E::] Construction Right - Zone 1 Construction Acres: 0.004 kP -------- Survey Area - - Zone 1 Operational Acres: 0.000 - Jordan Lake Z. • - - - _ _ _ ;= • Zone 2 Construction Acres: 0.035 _ Ephemeral _ _ _ _ : _ _ _ _ Zone 2 Operational Acres: 0.012 - _ Perennial :, ' Jordan Watershed Buffer Zone 1 - - -4' - y.�r r. 11 =r- P. - P 1. - _.•- -- .. ._ i�• - ' - - - ` - - Legend Mileposts (MP, 0.5 •-.Jordan Watershed O mi) • • • . Buffer Zone 2 - - H-650 Pipeline Wetlands: Operational Delineated Wetland Workspace _ Boundary Limits of Delineated PFO E::] Construction Right - of -Way Survey Area L _ j Adjacent Sheet __;County Boundary Jordan Lake Watershed Streams: Delineated Ephemeral Delineated Intermittent Delineated _ Perennial Jordan Watershed Buffer Zone 1 0 CA iiiia rtm Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------. _................... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour LU Ab _ Mamance t &0 4"t I d ., 1 4ce1 Cl gin n �^W P n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 78 of 108 600 Willowbrook Ln TRC West Chester, PA 19352 Date: November 2018 r , .pP _----- . 't k k P k ft PP P P. pp I P -off a Dr' - - P1 P kPk Pk tP +R - __.- 650 P"k `` "-------- - - - - -- kk - IyC OneMap!Contk toUr -4 ° - ^ - 1: ------ �Ps -_ ^ ------------ - - •- s _ - =�: �s ; --------------- - - - - -- ` - _ - -- - _ I - ^ 6� oo W -A18-75: PEM (Temporary Access Road) - - - r v o Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.018 l .Z.�F S -A18-70-2: Per. (Temporary Access Road) Operational Acres: 0.000 } Con./Op. Pipeline Crossing ft.: 0.000 I ---- Construction Crossing ft.:10.068 j' a�a� _ _ _ Construction sq. ft.: 117.330 S -A18-72-2: Int. (Temporary Access Road) _ %Qy - _ - - Operational sq. ft.: 0.000 _ _ _ Con./Op. Pipeline Crossing ft.: 0.000 _ _ TA -AL -169 I f - 1 Construction Crossing ft.: 12.034 _ - ao Operational Crossing ft.: 0.000 - o pp pp �; - W -A18-75-2: PEM (Temporary Access Road) I ',�+_ Con./Op. Pipeline Crossing ft.: 0.000I 1k '� •• • • • ' Construction Acres: 0.001 - - P P. PP• • • • j _ Operational Acres: 0.000 I '' - - ,. +' 17 -Tti-~ -♦•♦ w.''' -n !'�•'p: ------_ •. ,it'V 2 s - �R •. i: .,� ------- - ----- -y• »�`e •. • ''�♦. :ar _ +, E {:---- S -A18 70: Per. kkk IP '= ,:. -- - - Con./Op. Pipeline Crossing ft.: 19.704 1 - - - `- -� Construction Crossing ft.: 133.780 _ ••��`•:., `■ �. •'•:__' -�• '- Construction sq. ft.: 1,437.681 =`=r,: • +'-" ::::; =• W -A18-80: PEM ar• ppp Operational sq. ft.: 0.000r Con./Op. Pipeline Crossing ft.: 63.679 h • Construction Acres: 0.086 _ °s - `� ' , - _ Operational Acres: 0.000 ; d W -A18-73: PFO �• I,M co Con./Op. Pipeline Crossing ft.: 0.000 - ;!�;'.; W A18 74: PFO _ _ _ - I pPQ Construction Acres: 0.005 Con./Op.PipelineCrossingft.:8.411 --- ;r , Operational Acres: 0.001 Construction Acres: 0.008 I =z' Operational Acres: 0.007* L '1, P I -, .. Buffer Zone Impacts >_+' L S A18 72: Int. k---- _ -- VP K Zone 1 Construction Acres: 0.402 Con./Op. Pipeline Crossing ft.: 2.000 ' - Zone 1 Operational Acres: 0.127 Construction Crossing ft.: 82.442 _ r _ _ _ _ _ Zone 2 Construction Acres: 0.177 Operational Crossing ft.: 52.123 { I Zone 2 Operational Acres: 0.075 i + c. S _ -- --- I •+ ` "-- ', I - I -- - - _ •r• k 1k ' ` t' -- L 0 k -- - - Legend Mileposts (MP, 0.5 o mi) —Delineated Perennial Temporary Access —Delineated Pond Road Approximated - - H-650 Pipeline Perennial Operational Perennial Surface Workspace Water Temporary Access = Pond Road Jordan Watershed Limits of Buffer Zone 1 OConstruction Right- ,...,Jordan Watershed of -Way :---. Buffer Zone 2 Survey Area Wetlands: L7_ Adjacent Sheet Delineated Wetland _]County Boundary _ Boundary Jordan Lake /tee Delineated PEM Watershed ><> Delineated PFO Streams: Approximated Perennial Delineated Intermittent Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS —--------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour Alamance COunty 6 :1 Ahy a[e� Rd ' aY srn..I Rd I �s v "It o 1q Mountain Valley PIPELINIIi Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 79 of 108 600 Willowbrook Ln TRC West Chester, PA 19382 Date: November 2018 f� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS —--------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour Alamance COunty 6 :1 Ahy a[e� Rd ' aY srn..I Rd I �s v "It o 1q Mountain Valley PIPELINIIi Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 79 of 108 600 Willowbrook Ln TRC West Chester, PA 19382 Date: November 2018 6�0----- - -• - -- �- N1VpllpA '2 - 0 Rd 969 sso NC 6ne -" Contour's• - - ' R Cpntnurs 7; 64 Ln MVP L• DAF>t orrto1 - So ------------ 1 Buffer Zone Impacts Zone 1 Construction Acres: 0.491 ` P P.- _ _ Zone 1 Operational Acres: 0.224 } _ - - - - - - Zone 2 Construction Acres: 0.276 - - - Zone 2 Operational Acres: 0.158 C, - ?�� - - - - kk k S-1318-12-5: Per. P` r - - �• _ ; _ _ Con./Op. Pipeline Crossing ft.: 0.000 Ikt_ + Construction Crossing ft.: 48.973 i 1, _ • n,.�,,, -- S-1318-12-2: Per. Operational Crossing ft.: 15.099 _ _ _ ---Pk " • • .IBJ Con./Op. Pipeline Crossing ft.: 6.000 _ - ------ ------ _ ------- Construction Crossing ft.: 89.408 - - - �' P k- _ - _ _ _ _ _ _, Operational Crossing ft.: 51.376 S -B18-14-1: Eph. _ _ _ Con./Op. Pipeline Crossing ft.: 0.000 TA -AL -169 /\ S-1318-26: Int. - Construction Crossing ft.: 25.099 Con./Op. Pipeline Crossing ft.: 0.000 ' Operational Crossing ft.: 0.000 } - Construction Crossing ft.: 32.359 - Operational Crossing ft.: 9.748 1 RA _ S-1318-29: Eph. 1 _ Con./Op. Pipeline Crossing ft.: 0.000 1 �O S -B18-12: Per. Construction Crossing ft.: 49.780 } Con./Op. Pipeline Crossing ft.: 0.000 _ . _ _ _ Operational Crossing ft.: 14.217 ik k Construction Crossing ft.: 43.435 ------P k _ -•' Operational Crossing ft.: 43.435 �r� . S-1318-14: Eph. - - - - • - �� Con./Op. Pipeline Crossing ft.: 0.000. ` - - S-1318-23: Eph. -'�.- - '� Pi p _ _ _ _ _ _ _ . Construction Crossing ft.: 0.543 ---------------- -k Con./Op. Pipeline Crossing ft.: 4.000 - , -- Operational Crossing ft.: 0.000 i G W-1318-32: Construction Crossing ft.: 64.124 _ __ _ _------- PEM } ' c Con./Op. Pipeline Crossing ft.: 0.000 Operational Crossing ft.: 34.132 �t - -_ z Construction Acres: 0.005 `� i - aOperational Acres: 0.000 ��r} •. _k Ilk ti ', t --- -J- r -=r---- �,♦ - •'. .+•may', - . _ - o- "" -- , ♦♦ i,tt "__-_ "-- r, r - i-. _______ � ♦, �, `♦ +rte`.;♦ -______ �'. - __ __ ._ J ___ `♦ ,���' •__ - E - P� `k .P o' 7LI�'t W -B18 28: PFO - kkk 111 1 L , 3 - - Con./Op. Pipeline Crossing ft.: 313.499 ` - 1 "iP P Construction Acres: 0.500 k - - 3' Operational Acres: 0.212* L: S -B18-12-4: Per. PPPP S -B18-12-3: Per. 1 1k kk - Con./Op. Pipeline Crossing ft.: 6.000 s" ` Con.lOp. Pipeline Crossing ft.: 6.000 ,. -- _'• Construction Crossing ft.: 97.268 �1 :a , ; ' S-1318-24: Per. _ -t ' ', Construction Crossing ft.: 141.933 Operational Crossing ft.: 85.241 Con./Op. Pipeline Crossing ft.: 0.000 Operational Crossing ft.: 86.331 1'` ' �' Construction Crossing ft.: 38.750 - - Operational Crossing ft.: 10.027 S-318-12-6: Per. i _ _ _ _ ❑ - S-1318-22-2: Int. Con./Op. Pipeline Crossing ft.: 21.039 -- 1��62 S-1318-22: Int. Con./Op. Pipeline Crossing ft.: 0.000 Construction Crossing ft.: 128.348 _ _ _ Con./Op. Pipeline Crossing ft.: 0.000 _ _ - Construction Crossing ft.: 53.046 Construction sq. ft.: 1,279.582 t _ - - _ Construction Crossing ft.: 30.121 Operational Crossing ft.: 26.278 Operational sq. ft.: 0.000 L T _ ' Operational Crossing ft.: 0.000 _ PP P - -P, - - ______ __.. _. 4 - __ _ �- n_ - - - -- - -'�;; __ _ PP K t il ', • - VP L16�CR.¢bnt u - ne ap_ on ur :f' - - N C r = - - -• -kk 650 �- -- on our Legend Mileposts (MP, 0.5 O mi) -Delineated Perennial Temporary Access -Delineated Pond Road Perennial Surface - - H-650 Pipeline Water Operational Pond Workspace Jordan Watershed Temporary Access E] Buffer Zone 1 Road--.Jordan Watershed Limits of Buffer Zone 2 E::] Construction Right- Wetlands: of -Way Delineated Wetland Survey Area -Boundary L7_ Adjacent Sheet Approximated PFO _]County Boundary 0',*',, Delineated PEM Jordan Lake Y\} Delineated PFO Watershed Streams: Delineated Ephemeral Delineated Intermittent o r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour ev Rd 'W Rd Alamance C 0 ukny School Rd d n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 80 of 108 TRC 600 Willowbrook Ln West Chester, PA 19352 Date: November 2018 .-- - - - - -- - 590 NC OneN - V LID. _ "• .0 - P P; `6 - -- T� 5i 1 - :: +!% . _ ° - - - �•,-- -- '• ---4 ' gtate -- - I', - q� - _ - w /'• f: r ------ -- 00 _ S90 n 7ti AS -618-16 I S-618-16: Per. H-650 Pipeline HDD , l 7 Con./Op. Pipeline Crossing ft.: 304.726 ) : ' ; S-1318-12-6: Per. Construction Crossing ft.: 60.623 _ k - _ TA -AL -171 Construction sq. ft.: 15,216.998 ','.' , Con./Op. Pipeline Crossing ft.: 21.039 a- Construction Crossing ft.: 128.348 _ 4 Operational sq. ft.: 0.000 - _ - Construction sq. ft.: 1,279.582 Operational sq. ft.: 0.000 ---- _ _ _ j "kk:,/ ::k :kk" k k k /. •� ' vo; ; ., -- - --7=== - ----- - _ -- - 1 ; : ; M P'65 rLi, --- - -- a ',i, `" r wf�••- r__________ •_s_m�'1 O, -�-_. �- • - _ _ __ _ - - - ` kk _ - _ S-318-15: Int. (H-650 Pipeline HDD) - ' `! PP = Con.lO . Pi eline Crossin ft.: 0.000 Buffer Zone Impacts - - '-S, Construction Crossing ft.: 2.662 ' 'kk, - - _ i; Zone 1 Construction Acres: 0.491 _ o Operational Crossing ft.: 0.000 - ;I' - - Zone 1 OperationalAcres: 0.224 -= - - _ - - `• - Zone 2 Construction Acres: 0.276 _ _ - --- - kl,k P, P BufferZonelm acts ----- - - Zone 2 Operational Acres: 0.158 '- P _ -- ___ °:: Zone 1 Construction Acres: 0.037 Buffer Zone Impacts ------- % = - _ Zone 1 Operational --- ".er _ p Zone 1 Construction Acres: 0.086 _ - Zone 2 Construction Acres: 0.068 Zone 1 Operational Acres: 0.000 - - _ _ _ '- ' _ Zone 2 Operational Acres: 0.000 Zone 2 Construction Acres: 0.057 -- PP - - . _ _ _ - Zone 2 Operational Acres: 0.000 _ - -� - p P Pk -- -- - - --- T - - - _ - - ::__ - - - - - - -- - - ------ -_- :t�- - P PP P P - - -- = __ - MVP LIDAR Contours - NC OneMap Contours Legend , Mileposts (MP, 0.5 Delineated O mi) _ Perennial Temporary Access o - ;r Road t Contours - - H-650 Pipeline Perennial Surface : Contours- Water Workspace Jordan Watershed j - TemporaryAccess ,_PPc- Road - - -' Buffer Zone 2 • Ff Wetlands: E::] Construction Right- Wetland of -Way _Delineated Boundary Survey Area Approximated PFO L _ j Adjacent Sheet ,x Delineated PFO JCounty Boundary �__ Jordan Lake Watershed Streams: Approximated Perennial Delineated Intermittent 5' tai' --- --P PP - --- - _ - - - -- ------ -- 00 _ S90 n 7ti AS -618-16 I S-618-16: Per. H-650 Pipeline HDD , l 7 Con./Op. Pipeline Crossing ft.: 304.726 ) : ' ; S-1318-12-6: Per. Construction Crossing ft.: 60.623 _ k - _ TA -AL -171 Construction sq. ft.: 15,216.998 ','.' , Con./Op. Pipeline Crossing ft.: 21.039 a- Construction Crossing ft.: 128.348 _ 4 Operational sq. ft.: 0.000 - _ - Construction sq. ft.: 1,279.582 Operational sq. ft.: 0.000 ---- _ _ _ j "kk:,/ ::k :kk" k k k /. •� ' vo; ; ., -- - --7=== - ----- - _ -- - 1 ; : ; M P'65 rLi, --- - -- a ',i, `" r wf�••- r__________ •_s_m�'1 O, -�-_. �- • - _ _ __ _ - - - ` kk _ - _ S-318-15: Int. (H-650 Pipeline HDD) - ' `! PP = Con.lO . Pi eline Crossin ft.: 0.000 Buffer Zone Impacts - - '-S, Construction Crossing ft.: 2.662 ' 'kk, - - _ i; Zone 1 Construction Acres: 0.491 _ o Operational Crossing ft.: 0.000 - ;I' - - Zone 1 OperationalAcres: 0.224 -= - - _ - - `• - Zone 2 Construction Acres: 0.276 _ _ - --- - kl,k P, P BufferZonelm acts ----- - - Zone 2 Operational Acres: 0.158 '- P _ -- ___ °:: Zone 1 Construction Acres: 0.037 Buffer Zone Impacts ------- % = - _ Zone 1 Operational --- ".er _ p Zone 1 Construction Acres: 0.086 _ - Zone 2 Construction Acres: 0.068 Zone 1 Operational Acres: 0.000 - - _ _ _ '- ' _ Zone 2 Operational Acres: 0.000 Zone 2 Construction Acres: 0.057 -- PP - - . _ _ _ - Zone 2 Operational Acres: 0.000 _ - -� - p P Pk -- -- - - --- T - - - _ - - ::__ - - - - - - -- - - ------ -_- :t�- - P PP P P - - -- = __ - MVP LIDAR Contours - NC OneMap Contours Legend Mileposts (MP, 0.5 Delineated O mi) _ Perennial Temporary Access Approximated Road Perennial - - H-650 Pipeline Perennial Surface Operational Water Workspace Jordan Watershed Operational HDD Buffer Zone 1 TemporaryAccess --,Jordan Watershed Road - - -' Buffer Zone 2 Limits of Wetlands: E::] Construction Right- Wetland of -Way _Delineated Boundary Survey Area Approximated PFO L _ j Adjacent Sheet ,x Delineated PFO JCounty Boundary �__ Jordan Lake Watershed Streams: Approximated Perennial Delineated Intermittent o m m iiiia Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ------------------------------------------------------------------------______-_______________......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 9�eN d Alamance County 2 q� �a Y v c Gh� ell, r9 Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 81 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 x - M�� _ 1 '• _ _ - - AS-NHD-1547: Per. 4, ,. ';� .* P P - �' - Con./0 . Pipeline Crossin ft.: 8.404 •i PP. PPI 1 P P 9 P " _ - Construction Crossing ft.: 116.151 }' Q ' 'C Construction sq. ft.: 1,398.480 MP 64 ♦ ,��Pk, .,,. _ _ 1 -= Operational sq. ft.: 0.000PZ 1 - - -- - _ - _ - ? - - - ♦ ` PILIN` ` _ - - _ - - e. ---- - -- --- - r ` r .P. - - _ - C8�-- - - _ - ` - - - .1 : She - - - - • r ✓ 'Ch's•- _ - -- c . `. - - +'P' - - - - Buffer Zone Impacts w-♦ , N .�, .�" - _ s ' 1'; - - - - --- Zone 1 Construction Acres: 0.160 + ♦ �. �• ^ a' . _ - �o - Zone 1 Operational Acres: 0.036 ; ?; - :1 - - Zone 2 Construction Acres: 0.105 Y �. �' ; r Zone 2 Operational Acres: 0.065 ♦♦ �,P PP PPP P =.� 04, PP ♦,,�' AW -1318-19: PFO Con./Op. Pipeline Crossing ft.: 49.891 PP k ♦`;. Construction Acres: 0.081 PP P - ; Operational Acres: 0.033* - �. ♦ ; o � ,' ♦ , i --" ; >� P P:,PP.PP,- -N P P P PP P P P P . P P P P I P-- _ -P, P P PP - - - - - - - - - - - - - - - __ ASB1820:Int. s - '...��: Con./Op. Pipeline Crossing ft.: 2.000 . .. P P Construction Crossing ft.: 96.353 �' ; -; - - _ - _ Operational Crossing ft.: 41.923 pp pp <� .:.: pp ' H >t P pp• - (y p - ---__________ °��� Buffer Zone lm acts - Zone 1 Construction Acres: 0.052 `'•tr , ----- --------- G ^ - _ _ _ _ _ _ - m `� ' " Zone 1 Operational Acres: 0.038 - _ - - - - _ Y• +• _ _ _ _ ; , Zone 2 Construction Acres: 0.086- _ _ Zone 2 Operational Acres: 0.057 " _ ;' ♦,P pp Buffer Zone Impacts ! ,v` • ----------- i Zone 1 Construction Acres: 0.036 ' ^ ' ° - Zone 1 Operational Acres: 0.000% "" -------- Zone 2 Construction Acres: 0.023 `; p, _ _ _ Zone 2 Operational Acres: 0.000 k pp P pp _ - L�''�'pp, P' __ • �1_ 1 AS -1318-138: Per. (Temporary Access Road) �_�` K s ♦_ _ _ _ _ . _ _ Con./Op. Pipeline Crossing ft.: 0.000 - ••�D-: - - a _ _ - - Construction Crossing ft.: 26.778 _ - - _ _ _ _ _ _ _ _ Buffer Zone Impacts _ _ _ _ - --- S-618-137: Int. (Temporary Access Road) 0 erational Crossing ft.: 0.000 � ? - lgheeta Zone 1 Construction Acres: 0.086 _ Con./Op. Pipeline Crossing ft.: 0.000 P 9 �'', ;'','` raceaI _ = Zone 1 Operational Acres: 0.000 - - _ - _ _ _ - Construction Crossing ft.: 28.047 _ rn - _ `-" Pdl 570 - _ Zone 2 Construction Acres: 0.057 - = ♦♦ Zone 2 Operational Acres: 0.000 Operational Crossing ft.: 0.000 - =~� -P I =� - - -z - = -' ' �• P PP - AS -618-16 / S-618-16: Per. H-650 Pi eline HDD S�0 / _ _ Con./Op. Pipeline Crossing ft.: 304.726) u ; /•• r / - Construction Crossing ft.: 60.623 L _ TA -AL -172 , - _ Buffer Zone Impacts Construction sq. ft.: 15,216.998 %` Zone 1 Construction Acres: 0.039 p Operational sq. ft.: 0.000 L _ Zone 1 Operational Acres: 0.000 - - ---- " _ • - ` ` Zone 2 Construction Acres: 0.024 - - - ` Zone 2 Operational Acres: 0.000 - 1 - - ` - Legend Mileposts (MP, 0.5 Delineated O mi) Intermittent Temporary Access _ Delineated Road Perennial H-650 Pipeline -Approximated Operational Perennial Workspace Perennial Surface Operational HDD Water Temporary Access =Road Jordan Watershed Buffer Zone 1 Limits of ;---.Jordan Watershed =Construction Right- '---'Buffer Zone 2 of -Way Wetlands: Survey Area Delineated Wetland L _ Adjacent Sheet _ Boundary _]County Boundary =Approximated PFO Jordan Lake =Jordan � Delineated PFO Streams: -Approximated Intermittent Approximated Perennial o EM 4m Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ------------------------------------------------------------------------------._................... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour k''Le4 L� Alamance County lsao�aa�� n Mountain' Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 82 of 108 TRC We Willowbrook Ln West Chester, PA 19352 Date: November 2018 ;`- - - - - ---- - - - -. I o kk �' u� - - - - -- pp ---- - -- - P P, 7y` :f% 1'-• - - __ r '�, 1 •'' r 1 k 1 r f• ' l PIpPp PP rk ,. ._ - - -____ 1 1 rr ,1k• rl Ifs _ -___ _______________ _ ___ r ;r ' _ --P Pp - • - - - - r, - - - - - - PP ppP ;. 7 MVp netij - •- - - - - -- - </p e Co - ------ - - - - -- - qR Co htoUr' -- ---' - _- - - - s % hfoUrS ---------- - - - - pp kk 1 _. -- - - -- - ;; 7' kk - v �� 11 rn m _ _ _ Q' - :s • Buffer Zone Impacts - j 5� Zone 1 Construction Acres: 0.109 " • _: Zone 1 Operational Acres: 0.073 AS-NHD-1547!Per. - _ _ Zone 2 Construction Acres: 0.072 7 Con.lO Pi eline Crossin ft.: 8.404 -- '' = = - -PP P ppZone 2 Operational Acres: 0.049P Pk Construction Crossing ft.: 116.151 - _ P, PVPPPPttP tP PPtttPXPP_ Construction sq. ft.: 1,398.480 - Operational sq. ft.: 0.000 _ - - _ _ _ _ - _ _ PttP pp PP P PI rd - - - - ,t, r - - v 1 P k' •r 5-r ' Jai --—J— _ i J— _ kk _ 'O w :z� - �s-���•-i'----6-�- - r'- - - - - - s� - r - - - - -'r {�s�,- { - L,L` - - rr - - �,L • - — — r' --,� -;---- _� -. 'f =� �r:Y �°�; `' 'MP 64:5 -- - - - -- - _ I k/ ------ - - -- - kk L - - +\ k k k.: ? - - - _ - ;I • t Buffer Zone Impacts - - - - -- - _ _ -- - - Zone 1 Construction Acres: 0.160 - - 560 Zone 1 Operational Acres: 0.036 Zone 2 Construction Acres: 0.105 - _ - t :+ Zone 2 Operational Acres: 0.065 - - --- _ _ Z -- - _ �. - S�� _ - - - pp - - -pp - -- - _ - - _ pp -- - - -- - .i __ ____• _ �... •l kP .`Q ______. - 1 AS-NHD-3040: Int. pp Con./Op. Pipeline Crossing ft.: < 6 ft (Unknown) ; r ',,•„ Construction Crossing ft.: 79.577 P �p ' 0 f I C ft 52 631 1°R'• - - - - u: - - -o -f i ! - • ___-______ - _ -- _ - �����•�•,• ''i _ P, r''P e • - �'. - - - - - ay ;gam:' : ; _ _ - - -- r;; _- __ - -' 1 - - t - _P pp P pp , r - �` -.. '., - - - Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline Operational Workspace Limits of OConstruction Right - of -Way Survey Area L _ j Adjacent Sheet L__, County Boundary Jordan Lake Watershed Streams: —Approximated Intermittent Approximated Perennial —Approximated Pond Approximated Perennial Approximated Pond Jordan Watershed Buffer Zone 1 Jordan Watershed ••. :Buffer Zone 2 Wetlands: _ Delineated Wetland Boundary 0 0'.0 pera lona rossing .. . M - - - - -_k. - ', Imo, ' k rt `. - • ;, �` - - - - - u: - - -o -f i ! - • ___-______ - _ -- _ - �����•�•,• ''i _ P, r''P e • - �'. - - - - - ay ;gam:' : ; _ _ - - -- r;; _- __ - -' 1 - - t - _P pp P pp , r - �` -.. '., - - - Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline Operational Workspace Limits of OConstruction Right - of -Way Survey Area L _ j Adjacent Sheet L__, County Boundary Jordan Lake Watershed Streams: —Approximated Intermittent Approximated Perennial —Approximated Pond Approximated Perennial Approximated Pond Jordan Watershed Buffer Zone 1 Jordan Watershed ••. :Buffer Zone 2 Wetlands: _ Delineated Wetland Boundary 0 0'.0 EM M GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ________________________________________________________________________......_........................ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Alamance County � o Cie y Gni � r9 Mountain Valley 'r PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 83 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 - - _ - -----• - -- - -- - -- - - -- - - - • - 45 k PP --- teed ----P. t \R; St - vp t - -- -- PA -AL -175A _ ' PP t `P - _ - • _ -r - s�---Y- a-+� i"i'�---_-- ti', -. i - - - -s____ ' -r_ ;: _ _ ___ -_-SMP 65 PP PP, P PP P i s�-_-_��'' ice:-:!' ••r•-� -.' '' / r,•V &50M P.11 e - Y J---- - - - - -- --- - r - -- _ ��so - - - - -- ; - �• _ '/P };Pp - - ' ;ti• - - _ - �o t -- -- - - ------ 't --- - - - PP P ------------- -fPP ps -- ��'• - - ------ - - - - -- - - ?.} - _� %%(D - - k f ao --- - - - - - - - - - -- �;T • 1 1 - --- -P P1tiA - - atieQ` I 1p - -- ----- ---• a�< 6 PP 6' = -- - - - - -- - -- r - - - - - eeQG \ fo - - Legend O Mileposts (MP, 0.5 mi) _ Permanent Access Road H-650 Pipeline CPermanent Access Road Operational Workspace Operational Ground 0 Bed Limits of E::] Construction Right - of -Way Survey Area L7 ;Adjacent Sheet L__, County Boundary Jordan Lake Watershed Streams: Wetlands: —Delineated Wetland Boundary Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour - Alamance Countgy ITS n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 84 of 108 600 Willowbrook Ln TRC West Chester, PA 19382 Date: November 2018 - _ - - ------- - r - - __ _ - _r. -- - -,� - r -- - - -- r - - - - -- PP P �. ` r' l.• t it ' s - `' r r' - ' �• f' - r¢ �• - 'j - -- - - - -- PP P ---_P PP - --- - - - - - - -- -' - -- - r _— - ---- - -- - -- - •� r Buffer Zone Impacts _ _ Zone 1 Construction Acres: 0.155 - '�� _ ♦ _; _ i� - Zone 1 Operational Acres: 0.095 ::: _ _ _ - ,' "� ,�• _ _ _ _ _ _ . r = Zone 2 Construction Acres: 0.090 _ ______________ �._x>, .� _ • 9 Zone 2Operational Acres: 0.050 - __�!_ ♦ �� `ems •!� ��� �9 - _ _" ,mss _ - �j♦ '".. �``� 40 f__�_ ---- •- '-. _ .• r^;♦♦'� ,' __________• i♦ :«�•:';�` • . rJ ,,,,';.yam,,, " , ,P P '� - MP 65:5:;•• ';: ,.- i ' f , 2 _ `; ♦ . ♦ ♦ , f' t �. ,, '�1p o - �� ♦ i _____ `1 G 1 ♦AMP 65 • 3 ' L ' ' -- - - -- ` Rd 1777 a tf - R d State ` rnw - ' er = o R°ne lineb -�-, a • I, ♦ - 11 r V,•• n N P 3r11 i bapPP N e • ' Pt°v<y G° r�°�t� • G° ~ G Or�`pQ _ aap u, - ` n J Duke R e Irl - _ L - ,4 670 P Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline Operational Workspace Limits of OConstruction Right - of -Way Survey Area L _ j Adjacent Sheet __;County Boundary Jordan Lake Watershed Streams: —Approximated Intermittent Jordan Watershed Buffer Zone 1 Jordan Watershed '---:BufferZone 2 Wetlands: _ Delineated Wetland Boundary o m m iiiia GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ------------------------------------------------------------------------------------------------------. Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour b Alamance 9p E3E3 County far+ce!(� Ln l'!CJ wn A p O� U n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 85 of 108 TRC We Willowbrook Ln West Chester, PA 19382 Date: November 2018 ----------- %eA _ ----- �------------- - -P f - •------------ -% - w Ln Buffer Zone Impacts r-- — — — -- — — ---— - — - — -— Zone 1 Construction Acres: 0.155=------------ 1 Zone 1 Operational Acres: 0.095 t ----------------- Zone 2 Construction Acres: 0.090 1; Zone 2 Operational Acres: 0.050 --------- PP PP P, I'. - 5r �� - Q MP 65.5 �� - - - Qi S -A18-250: Per. - _ _ _ _ _ _ . _ 100 .t • . ,• �.• Con./Op. Pipeline Crossing ft.: 4.000 d -- �' - .�� Construction Crossing ft.: 98.611 N c + �_ �' - �'+ • • _ •; - �' Operational Crossing ft.: 56.121 I - .. , - PP ' 1' : . n . ♦ ' P+' P It Cp k It PP, .. S A18 251: Int. - - ----P.--pp P, -J--- - - --- --- Con./Op. Pipeline Crossing ft.: 2.000 _ _ _ _ - - pp P pp Construction Crossing ft.: 33.270 _ - _ _ _ Operational Crossingft.:33.270 62 ---_ _ _ -' t _ r NC pneMa Contours - " - - - NIVP CORGram OECD r' pp -- - --- a I ir •-• - - _ ___ n,•r• • __ _ - ___ y _ _ - S ' .pp PP It It _ It -I - It _ I ; - --. Qd - - -- - ! - " I It Rd_- _ - -- -- - . - _ Dross -- -- P1 Sada 660 o - - - L -- - - 1 Statie -- ---- -- ----- - -` - --- - --- - :. - I 66 - _ - I o Legend Mileposts (MP, 0.5 Jordan Watershed O mi) Buffer Zone 1 - - H-650 Pipeline Jordan Watershed Operational " ' Buffer Zone 2 Workspace Wetlands: Limits of Wetland =Construction Right- _Delineated Boundary of -Way Survey Area L _ j Adjacent Sheet County Boundary =Jordan Lake Watershed Streams: —Approximated Intermittent _ Approximated Perennial Delineated Intermittent Delineated _ Perennial o W m m IMEMMMMW GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ---------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour s G� c' Sty,. Rd Alamance County r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 86 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 r r ------- r . r. - -- - - - - -- - - - r r' - r- I - - ------ - - - - -- r -- - ----------------- - - - - -- _.j- -� • I i SPP- - `-� - -----—- --- - - -- _ - - r e - - I - - - - ------ - - - - -- r _--- - - - - -- ' ' ' • P - MP 66--=----- ------ • • r ' - ' L ' kP 4�I - - ----- - - - -- -- - - -- - -- - -P PP I ,, , , V ``: P. A ♦ - cn `9 ; - - - - I':. - yah �`.�� . 'P 1p k' N\ _ _ .� i i �` ♦ '. ` yl _ ♦ ` --- c `A ♦,`�1 °�° °G, 1752 � :. � - - 4r 's Rd ---------- `p P _ s State V ♦ , t Sand_-__ I•- Y. - i , ?�•- - -- -— - - -- ♦ • . - - - - - - - t 11 MP 66:5: o - I ----- t, Y _ — — —=— — — - — — — I S . - - • �' - _ _ _ _ — — Adjacent Sheet 89 - - o- -- -1• �; PP - Cp 5k' - P PP PP PP r. Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline Operational Workspace Limits of OConstruction Right - of -Way Survey Area L _ j Adjacent Sheet __;County Boundary Jordan Lake Watershed Streams: —Approximated Pond =Approximated Pond Wetlands: _ Delineated Wetland Boundary 0 W EM M IMEMMMMMEM GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour `7 Rd Alamance ` 4 C ow m y �Ssan�u p yf � n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 87 of 108 TRC 600 Willowbrook Ln West Chester, PA 19352 Date: November 2018 —- It p - It - - . - - --- - - - - - - - -- - _ - -- - - - It -- - _------------/ It --------- -- -- It - - - - - - %- - -- -- '. c s' `•" r I ks' - - -t r fkI -' - -_ tit a S k It It t 1P It It it It It artin- - - - Buffer Zone Impacts ',' Zone 1 Construction Acres: 0.035 Zone 1 Operational Acres: 0.000 ¢ Zone 2 Construction Acres: 0.023 ti , I.11 _ _ _ _ _ _ Zone 2 Operational Acres: 0.000 _- d ' ---- -- ; --- - -- - _ - ----- PIP __ - - ' ,�h k ItAS-NHD-7000: Int. (Temporary Access Road) ^' ti Con./Op. Pipeline Crossing ft.: 0.000 = t ,r :, 0 t--- Construction Crossing ft.: 25.976 - - - - - - - - - - - - - _ _ •/ •, ',� r - Operational Crossing ft.: 0.000 ------ " _ _ �V : ♦ __PP m Pk r •• . J i--------------_ __ _ a t• �"_: -_�\ - - - yy ar.•.?;�: - ----- --- to __ •i'�:- :�aA• s. _ ------ - - - - -- a 'k P tp 6P---------- - _ - E __ ` • .�.tea s :;' , tp t Pt pt W \'. % s: S0 . 1 , ______ _ _ _ _ ' 1 • ' ♦ __________ 1 1 f ' II ItP pt a _. - - 1 _____-_ __ C - •, ' - It PP tp It% ' _ _ 1I k, " y ♦ ��''r' _----__-_�_ '�It tp -_ k It --- C♦ 'i''�'' '� . �•+= ori' +► � - --�� --- •� e'1 •♦ / , n . --- - • . f;. ��'�It y; u41 4b '�Q P. PP -- - -- ' �, It- Legend Mileposts (MP, 0.5 Jordan Watershed o mi) Buffer Zone 1 Temporary Access --.Jordan Watershed Road ... :Buffer Zone 2 - - H-650 Pipeline Wetlands: ,---,Operational Wetland M -'Workspace _Delineated Boundary Temporary Access Road Limits of [—]Construction Right - of -Way Survey Area L7_ Adjacent Sheet _]County Boundary Jordan Lake Watershed Streams: _ Approximated Intermittent —Approximated Pond M Approximated Pond 0 go ISM 4W 01=1 Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour Alamance County � A� Isley i r P� tifeg • � / 1q Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 88 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 ;N i `y ;. -' s , kk PP P'PPPPJv ;W • 520 510 r r - - PPI PP' °m S530 - _ . Pk PP PpPp PPk Pk PP Pkk Pkkk ,' P P ' pkkp "kI -kkPp:k °r 5g 40 - ' 0 550 - _ _ kk S80 570 - �s- - - ` P 590:" kkkkL kP (1 kPP PI TA -AL -179A - -- -- - _- ----- �� - _= , - -- -- rs_ .� - j �i z� - \'' _ - -- k- $ . - re - _ kP PP PP PP - ti - - 5901 ------ - _ i •--- - - -i pIkP-Pp Ik '`•' Buffer Zone Impacts 's ---- I t ' - - = _ - - Zone 1 Construction Acres: 0.124 D _ _ - _ _- - _ Zone 1 Operational Acres: 0.083 Zone 2 Construction Acres: 0.084 _� - - Zone 2 Operational Acres: 0.056 y� _ _ ?:. - ,'. a; - 3' �.• v = 94 , _ /' e_'_�-� • rte_ . r .i r_+rr __ -: �� _ --- r4�ii_- - r rr-rte 1'♦ '-1r_ ' • • _ __ - -'ii - -�i - --",- •� ♦ -fir , i1 -` .i?'--- - i. r - _ - -':4 ;+r _ s • ' ___rs____ s: -- ,;I Mileposts (MP, 0.5 --.Jordan Watershed O mi) ••-. Buffer Zone 2 rn �' - ;' - _ Delineated Wetland - - - _ - - - _ I P AS-NHD-3025: Int. Con./Op. Pipeline Crossing ft.: < 6 ft (Unknown) Temporary Access - vis r, _ _ PP Limits of ;� ; 1P = Construction Crossing ft.: 90.115 of -Way o�tio Ce kP r� _ _ _ _ L_ Adjacent Sheet __.County Boundary Operational Crossing ft.: 60.334 Jordan Lake c�oJt �Q o%_k OP pp —Approximated Intermittent ppp Buffer Zone 1 4 pp C.----- Qv r P Q k PP __ - __ - _ - - -7 - r - - �''' I k k t - _ i i' - - - - - -- -- ______ __ _ ____ 11 L, -- - - - -- - -- - - 1 - - - - '1 I' ', - -kkt _ - (. kk - - --- _ I' Legend Mileposts (MP, 0.5 --.Jordan Watershed O mi) ••-. Buffer Zone 2 Temporary Access Wetlands: Road Delineated Wetland - - H-650 Pipeline _ Boundary Operational Workspace Temporary Access Road Limits of E::] Construction Right - of -Way Survey Area L_ Adjacent Sheet __.County Boundary Jordan Lake Watershed Streams: —Approximated Intermittent Jordan Watershed Buffer Zone 1 o EM m -k� GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -______________________________________-______________________________________-_______________......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour a 3 m° Alamance County a� . U I . pn i HSu�rAa\tri A� � y�oV� ,SC . - .' Ay1d, 4 n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 89 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 1111 _ -�— - - - - - •1 �• 1 P7-- - --------- - _ --- -r; kk PP - rn -- - - _ _ _ _ _ _. — _ r a oC, _ - — — --- ----------------- - - k. - - -- 1 l.;t-' - - - ,; - ! . - ry r J•• S'1 '--- • - C-' ' - • 4, i k' - - kkk ------ - �:- • - - - - - 1 i. ', AS -A18-177: Per. - _ -- - - -- ; Con./Op. Pipeline Crossing ft.: 14.161 �{ Construction Crossing ft.: 76.249 `. °= - - - ' i t Construction sq. ft.: 1,066.574 _ , r'i 1 Operational sq. ft.: 0.000 `r= - ' r .1 - f - `..-- - "-"-- "--- 1 1 -..-- , k' k�; r. 1 - - kk Buffer Zone Impacts - ' 1 y - Zone 1 Construction Acres: 0.108 - 1 i' 0� - Zone 1 Operational Acres: 0.024 =x _ = -- - - Zone 2 Construction Acres: 0.070 `_•� _ _- - Zone 2 Operational Acres: 0.047 • • r� • I _ 4 A1 k ---- t _ --- �� � ---- _ _ - -�:J--t' r.�,�a -•yet - - ~ N '1 _.._ - • � M- 1'• v'ii'i 1 l AS -APP -5006: Pond (Temporary Access Road)_ _ _ _ _ r ; :, Con./Op. Pipeline Crossing ft.: 0.000 .. - -------- r �1;' Construction Crossing ft.: 9.629 - _ _ _ _ _ _ _ _ 1 i; t; '' 3+ dao Construction sq. ft.: 6.268k kkr ' r. �;y kk Operational sq. ft.: 0.000 - - - TA -AL -180 - _ - ,•7 --:- ' �._11 m - -ter' •i A.:� `r. v ir --_ ` ------ _ 4-r-1• to_-- --------- -- _ ''.y. `•. 3 y-. 1 •r. 1 !� - _ . ion --. • - _ --- r• ',� N' _ __ ; •1 r -. 1' Q�- 1-, r - �- �;� _ kk i !- i r -r 1 0 --------- -••• ---- "' 1 1 LO � 1 , y., . 6,00 .Y,r - ;- 4 `•. 01 --•. -- -_ -- - - - - -- - - -- - ;, r - - - -- _P i-__ • i Legend O Mileposts (MP, 0.5 M Approximated Pond mi) Jordan Watershed Temporary Access Buffer Zone 1 Road .-.Jordan Watershed H-650 Pipeline '••-�Buffer Zone 2 Operational Wetlands: Workspace _ Delineated Wetland �TemporaryAccess Boundary Road Limits of E::] construction Right - of -Way Survey Area L7_ Adjacent Sheet _]County Boundary Jordan Lake Watershed Streams: Approximated Perennial —Approximated Pond ' Approximated Perennial 0 EM M GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour .. sw REA r P Z? • . RU a r° .� �Go% C 3� � Al�14,DanCe - 00knty as a n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 90 of 108 TRC We Willowbrook Ln West Chester, PA 19352 Date: November 2018 �• t - •. ' -' `_ . , , : " ", � - - 16 ,:�.: a - :; r ; _ I ''.. :P. - .r t1 ? - - - - - I % % ' 4 ], I -' --- ��.r - It k - I _ - J^J^O -.jkl _ _% ' 540 ''' ' " - - . - j r, ' ; ', • I' , i ,r _ - - -- __ -- ► - - , %- %.- .- . % - -- ,- - - -. -.I -- :�- .- �. -:.� :-- ,-- -P,� . .-- 11-P _-- �%-%_% ,-,__Z%,I�%J.:,% % _-%-_ :-- : .- -. - I" , ,, :-.k k,k ,kkl",, I" -". k "",I." _ �'� - fit' •••' - _ - .,%_ ,;.'r •4,• - - - •,-` S4 - sc ' --- -- r, P,- .�-,"I4,,,P.P,,�,, ',-, . _" , t", , � I.-, ,. .- ., PI , ..t-,..-�- P - - PPI k.I -,k,Pk1" .:I., I, �, , t- P,-, ,k k.'k .-� k k.p P�P,t- , , P .,- ..P -,k - P. '" , kkP Pf, PPk � .P -. P , It, P-, IPp,- P P I P P p,, "-.t P PI - I Pp.PI . PP, " - tt - "I ,, tP.I-.tI. . 'I --. P" I, , - k-- Pk, I "1., PI , , - P:. PkP" - P" .k- t k.: I- P I- I P : , .: -- ".,,: , P" I I , P, ,,-, - I, -- P , - P , ,�- I. . Pk ",. -"�� P,- t kI!k.. - k ,,Z- k- t ,-*, - -, .11 : -P -k::. --, -: k..I ,- : -- - -- t. -I - "-k,I :� PI Aft-�,;- I t.-.-.- -� - : kk :*-,t -.-- ": _ P "- -k ; .k-kt,P , �- ::k �-. Pk" k - .kP.I.-I P -,"kk .k.I-kk1-, "_- .t t , . -,I. �PP. , "k * -. t P"-,,, k - .I P - _tP k - , P, - kkk', � P P --", -,, I---..- I ._� -I--,:kI % P7:, k Pk - "" ---- Pk - P,,`-'�, " P - .-,,P �I k! k , IP I P : -t �tk Pk�,P Pk.1PP ; ,- - P I'k PP � ,,.k P t, .-�tP: . - et , P"k *, tk ,- tP PP k I" ;�., P,k,-- P P1 ., k t I . -- P-� , -� I. kPP I-, %k , 1 P :.,P t,I PPP ', .. -. -, I -, � P1, -..t ',k,%�. k -k " . t P.tk" P. P:k :-t t _-,, k I�t::P -4 ; .,.,.-, tPk . I: ­ P -,Pt , k 2 4 , � P,t-" -,I , .k -w- - '- P 1 .I -�p�,- P� PI P --- ..;,., P P . P,k-. '-P.ft- .-: k .. ..-.:k , --- ---: ,kt - - p;,k P , -II -P-,:k-, , ...- --k... Ik-� -I k :t Pk,. --: ,.-t t- ,:; Z,-.-1 , , -- t I.t ,-, : kPI k k�� . , w..,. -k"i- I, �"-- _ I Pk , , . I I--k:P. _ I'P:1, ..,-- P , ,,� ; -: Pkk-I :,: 11- "- k '. :Pt .-- I,I.I - , : k ,I . k , .- P,,k - �. , .kk P I P� �- IP, r", .P,-..k'S- -P �-,,; '�. - - --, k"t-,- �t:-k-- , - P. I ,1. . ,,-,& .,-k - ­:. -, , -,k kk--k I t� , I - 1 -_ 'k.. .-, I k ---k' - �P_� - kkP_ " "" , ,.,-- kk _-'k - k: -I " .- � % ,, t - -- . P - ,,,,- P'- .1, - I , : - �- - -�. . I -P P, k , _. 1-% ,, - _ -:--k �-- -k :- -- -s ., , : , �- I , �- :I:---- . ,-.-­- -P -: �. _-.--,--_- ­ % -, I: - ---%,-- - -.. -�,. , --- %�..I.-_ -,- P % ---- -1, __:% I-, ..- P- - I �-- �.-- .- 5-A- . ., ; -- - _ _ _ _ AS -A18-233 / S -A18 -23W .--_, ---)-'--- 3: Per. _ _ _ _ _ _ ' I' _ _ _ PI, I* 3.,. `e.. •t Con./Op. Pipeline Crossing ft.: 24.843 ._, ,' ;', fkk , -- P.- . _, t . -,_,., ' . -1,, -. .--- '.- .,.,k),, tI �.,- P : ,t ., Pt -,-.-" -,. I. ,t -" I. P. PI I. .:,� . P , , Yom.'. _`k - _ _ - Construction Crossing ft.: 87.295 - _ -- , , , *�: , -' � - =_ Construction sq. ft.: 1,920.575 -_ - 7.-- - '- - - _ - - Operational sq. ft.: 0.000 '"_. /-/I_ �.ft „_. :I: - - _.. _ - - r 'r - - ,.w' -.J . _ - - - 1: - { - - - - - r, • .. ---- _ _ - - * ---M--w y5 -_—P "r== ------+:=;_ -,' �__ , ;' -: --- _ - ----- , _ _ I. -J- �L' . . . •,' . . , - z-+ P -rte. ` -- __- 't -+i--, _--- r . r r •,� . e { as - - I - ••,' - - r. _ *z - �°' - -.Eij1 - .' r'I `�'_'� _ _ _ Ss'�, e yc1 .1 q :.'� - - ,a . R/ - s, _ . - - - -- - a1 • �` _ C` __ - Q 4 y-•, /. 'ii m __ _ - j- __ - IQ. - _ - - -, _ _ ----, Buffer Zone Impacts - ?�;. - /- - - - • Zone 1 Construction Acres: 0.127 �•' - - - `', �_ - _ _ - Zone 1 Operational Acres: 0.025 '_ ' '` - - ---- '-`e; Zone2ConstructionAcres:0.111 ,' __ . ­ `--- . , . - _ Zone 2 Operational Acres: 0.053 _ _ _ _ _ : _ _ _ _ - ;, •. _ - - ' _ �� / -- - - Y + -- - S e- , _ - _ - __ • - __ _ --- _ _ __,: I "��`: - - v ___ - ', � =� ,,L- ,-, '� ' -t•_i -x _ `__ a� _ ��yq7�. •- -r r - =�V _ _ +ply -i _ _ -1' .• __ - - Y _� �` -- a+�� I S• til - _ - �•- _ i fr 4 `-saw;-• a ' -- - I :,k = r- 2$ - - `�_�' _ _ I'�; -- - - r;r, - -- --- - . - - ;" -- - _- I' ;,ti; - - :'�;' -- • is ca: - ' r;`'s' - -- -- - , MVP LIDAR Contours' };.�t;:,-' - - _-5-- 9 -------- _:::_____ NC neMapContours + 2 - " ----" - _- 520 - - G _ _ = - _ _ - i - - - Legend 2 IIF6 , .. r... _ 1�11 Mileposts (MP, 0.5 Jordan Watershed O mi) Buffer Zone 1 - - H-650 Pipeline - -•Jordan Watershed Operational ---'Buffer Zone 2 Workspace Wetlands: Limits of Wetland E::] construction Right- _Delineated Boundary of -Way P +ren Survey Area 3°la s L _ I Adjacent Sheet a __;County Boundary mG c u 0 �i - Jordan Lake 0 $ �Y g NoP.6,0 N Watershed H� Streams: Approximated Perennial Delineated _ Perennial Approximated Perennial Perennial Surface Water 0 = ISM CA F� M Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ---------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 1q Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 91 of 108 TR�600 Willowbrook Ln _.-_. West Chester, PA 19382 Date: November 2018 2 IIF6 , .. r... _ 1�11 c - . Aiefmance County �- I--- WI i&� i 1 P +ren o wy n� 3°la s a mG c u 0 �i - $ �Y g NoP.6,0 N H� s� 1q Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 91 of 108 TR�600 Willowbrook Ln _.-_. West Chester, PA 19382 Date: November 2018 t- ----------- - :� -• - -�� \ -,- - - - - -- -- :.• . 1 TA -AL -181 - • r.It It \ • -- - �; o P P _ - - - - -- v•♦ . - - - - �iIt It It It P It It- �z - t�.:y • ----- - - - - -- t It It - ♦ - - �> '♦" - - - --. ♦ .. - •0 - - - Y " C� �\ o0 1p - • tr-' ;'fir, {' - �Q - - - - • �.- Buffer Zone Impacts t: "• - ` - _ - _ - \ ♦ ,- Zone 1 Construction Acres: 0.122 _ _------ k - - - - - - - -- - PPPpp 1 Operational Acres: 0.081 Q% - _ • \ _ Zone 2 Construction Acres: 0.082 - _ _ _ - _ _ \.- Zone 2 Operational Acres: 0.054 -- \ ♦ -� - - i \ • -!• It ZQ 1P f- \, _ O ItIt Io O _ " - - ` -••- q= AS NHD 1551: Int - a�a - ', v� t :f - _ • y�Oti':r • ;zz ? Con./Op. Pipeline Crossing ft.: < 6 ft (Unknown) Construction Crossing ft.: 88.177_ _ _ _ _ o _ \ Operational Crossing ft.: 58.763 N %• ' ;Y �- - -- — — .t, 1e='. - a--•. 'r,+ ---' '–'--- -' --'-----• ---- r- -- -- mss---- \ �; Adjacent Sheet 93 -F - --- -- - •: - - .. - - -- - i i \ .` �•' : ; ;''S _' i •�. 580It Legend Mileposts (MP, 0.5 Jordan Watershed O mi) Buffer Zone 1 TemporaryAccess --.Jordan Watershed Road ...: Buffer Zone 2 -- H-650 Pipeline Wetlands: Operational Delineated Wetland Workspace _ Boundary Operational Ground 0 Bed Temporary Access Road ounty; a Limits of E::] Construction Right - of -Way ! s� Survey Area L7 ;Adjacent Sheet County Boundary Jordan Lake Watershed Streams: Approximated Intermittent Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Lk/ Rd �5hnp r f� EW 4a Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 92 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 Lk/ Rd �5hnp r a�0 , fan•�9u n C"aBn4 4a z z Alamance ounty; a K 11 2� ! s� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 92 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 ' , fit• - - - - -- 40 Buffer Zone Impacts , tt , 52 Zone 1 Construction Acres: 0.122 ; ; : 04A Zone 1 Operational Acres: 0.081 ' - i y Zone 2 Construction Acres: 0.082 - O o ` ' ` Ad'acent Sheet 92 Zone 2 Operational Acres: 0.054 - 8— 0% p G^ , � ra e 50 4„ s PP WB -1318-1: Pond (H-650 Pipeline Ground Bed) - - Con./Op. Pipeline Crossing ft.: 0.000 PP PP tConstruction Crossing ft.: 22.221 + - •PP 'P P - - _ _ ..... - _- - ; ; ; , _ Construction sq. ft.: 10.626 ; ----- _ _ - - ; :� Permanent Fill sq. ft.: 10.626 - ► ` - - - - -♦ - - - - - �: _ - - .� ♦ . - AW -1318-5: PFO - _ - - ��� *'>i.•. Con./Op.Pipeline Crossingft.:6.154 - ` * Construction Acres: 0.011 Operational Acres: 0.004* PP 'P • - _ -` ♦♦ P PP ♦ ,� Buffer Zone Impacts - - - - - _ _ _ " - -' ��� ♦ %` = _ - Zone 1 Construction Acres: 0.109 -"" - : , - Zone 1 Operational Acres: 0.023 - - *' • ` - Zone 2 Construction Acres: 0.075 ' -- -- ♦ �,.1 _ _ _ f-� `•' - Zone 2 Operational Acres: 0.048 �� ♦ - �.- Buffer Zone Impacts ` '�s; ♦�� ' , ' '+'1 ' �" t Zone 1 Construction Acres: 0.014 -�� ♦ _ Zone 1 Operational Acres: <0.001 ' `. ♦ `.' — - _ _ Zone 2 Construction Acres: 0.048. ., _ _ - ♦ . Vii; `; Zone 2 Operational Acres: 0.027 ♦ ` " P ♦ v' - S ` - ---- � 3 �., W-1318-5: PFO _ . ♦ �-' _ - ♦ -_ •R' _ _ Con./Op. Pipeline Crossing ft.: 0.000 -- -- _ _ _ Construction Acres: 0.001 `. ♦ , ,- t -. - • • - - Operational Acres: 0.000*}• • .� •�, ' Vii= _ ..•♦ 41 1• _ --- _ "_ ~Pp oolo ~ ` ♦ I(, 'ice'k 1P 46 P PA -AL -181 A / - S-618-7 Per. , , , •_� 3'� �>LA _ _ - - - ~" _ :; r� Con./Op. Pipeline Crossing ft.: 2.807 i` "r; LPPP 'P Construction Crossing ft.: 77.094�•- U, ;rr •--- e Q - Construction sq. ft.: 318.200 PPP ;rr;' sir, -' 0perational sq. ft.: 0.000 �, - , -4 •- O,.• _ ' N• O O _ OO • _ _ f_'♦ -•1 PP % ON - - _ Z-�•.- - ♦ Y - - - _ 1'1 Buffer Zone Im acts P U' O - _ P 500 50 : p : _ _ : t Zone 1 Construction Acres: 0.129 _ - — Z5 :{, Y Zone 1 Operational Acres: 0.082 `• `, ♦ M -68.5 - `�_ A•. PPP - - - - - - - - • i . Zone 2 Construction Acres: 0.106 -, •. y , P" ': - ° Zone 2 Operational Acres: 0.068 o C R „� ♦ `� _ 6o Iw .' :. ages - .}, `t ♦ ` RiVej - - C Delineated AS-NHD-1552: Int. Ho 'oeda�e • p s ; Con./Op. Pipeline Crossing ft.: < 6 ft (Unknown) ' R - d ;S. �ry0 0 m = h Construction Crossing ft.: 85.647 Road •7•'' -• _k O. % � PP Operational Crossingft.:51.577 i, Operational Ground O II h� - j Jordan Watershed - Buffer Zone 2 Wetlands: of -Way iIt �� i -'ti —— - r Survey Area —Boundary L7 ;Adjacent Sheet r Legend Mileposts (MP, 0.5 Delineated o mi) Intermittent Permanent Access Delineated _ Road _ Perennial - - H-650 Pipeline —Delineated Pond r- Permanent Access Perennial Surface Road Water Operational Pond Workspace Jordan Watershed Operational Ground O Buffer Zone 1 Bed Jordan Watershed Limits of Buffer Zone 2 E::] Construction Right- Wetlands: of -Way Delineated Wetland Survey Area —Boundary L7 ;Adjacent Sheet QApproximated PFO L__, County Boundary >(> Delineated PFO Jordan Lake Watershed Streams: Approximated Intermittent Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS --------------------------------------------------------------------------------..................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour g fir/ v, Alamance County r N� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 93 of 108 TRC Willowbrook Ln We West Chester, PA 19352 Date: November 2018 t� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS --------------------------------------------------------------------------------..................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour g fir/ v, Alamance County r N� n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 93 of 108 TRC Willowbrook Ln We West Chester, PA 19352 Date: November 2018 --- - - - _, f 1p - -- I; -- ' P P,- -� -pp, P PP - - - -- / - - - - - - - -- - / kk - -- --- - s l - - - P P,- -. - i i - - PP - P, a yy0 y� - S> NC neMap Co nto o : "✓.': - _ 5 V LDA urs - r ;' 530 Contours , k' st _ " TA AL -185 /� r }'' r P. a �\ tir t r' cn ' ,' e • s, ' r o _ r Q' 'P, r s -P. r -pp . \ h pp - r i. .y pp a, . _ Q a {. �, . s. / / l ti op P AS-NHD-1552: Int. a - ti,•P rp Con./0 . Pi Pipeline Crossin ft.. 6 ft Unknown r_ _ kftoP p p 9 ( ) - - o - 'i..° �- Construction Crossing ft.: 85.647 _ '4 -- i - ' 0 erational Crossin ft.: 51.577 - P v, - k'. - _ / ; k - y� - r a r'r , P -_' a - - - \ ''' -• - _ " • -' S,318-8: Int. o t :',` .i' Con./Op. Pipeline Crossing ft.: 12.554 s: pp pp 'PpPp Ik o . •'� ' Construction Crossin ft.: 92.916 g k • -•may - -�♦• kA - �.� K� _ _ Construction sq. ft.: 1,377.587 - - - P PP �r= =ter �+r- , �.♦ `K J - Operational sq. ft.: 0.000 - Y� S ♦,;� i MP _68:5. ;7• r'y -- _ - -s ♦. - " ••I:' ♦!r nt• •.7 � - ray' ,'•v_ - - ��• ' _ � ,`� r,r.• .+. -._s-ar �•�==-1�-;' -- ;i-'-tis--�._�, ._`••_ 't .r'�'� '�r��{• _ "T- 1'r;1 pow P; - 4--i--�--t 11' .�! r; +'� ��� .1• -s. Air s;•. Buffer Zone Impacts s: •_ - - Zone 1 Construction Acres: 0.129 - - _ ' �: - - �, -`�� _ _ _ ---- Zone 1 Operational Acres: 0.082 -; �;: r'i ., ''� �•. _ ='^' e - • Zone 2 Construction Acres: 0.106 r . kk Zone 2 Operational Acres: 0.068 - _ _ - - - kk kI a :kk - - -- -- - - m : : +.. _ ._ - - - S-318-11: Int. _ - - ; ;G:kk - - '; • ._ Con./Op. Pipeline Crossing ft.: 3.000 - -� _ ' - _ I Construction Crossing ft.: 90.693 = r P P P POperational Crossing ft.: 54.080 - - ur - " • - f - _ • �, kkkka7 - - --- �' '' Q_ _ Buffer Zone Impacts k1 ;, , Buffer Zone Impacts f Zone 1 Construction Acres: 0.128 o Zone 1 Construction Acres: 0.134 kk - - k Zone 1 Operational Acres: 0.028 Zone 1 Operational Acres: 0.080 7 :.�'- Zone 2 Construction Acres: 0.079 r- - - - Zone 2 Construction Acres: 0.093 Zone 2 Operational Acres: 0.054 - Zone 2 Operational Acres: 0.068 r: /1 r __ _ __ _P P P'r•• kkpp a :_;' - - ai-� • _ - - - _ k8k k %%p Legend Mileposts (MP, 0.5 Delineated O mi) Intermittent Temporary Access Intermittent Surface Road Water - - H-650 Pipeline Jordan Watershed Operational Buffer Zone 1 Workspace Jordan Watershed Temporary Access El Buffer Zone 2 Road Wetlands: Limits of Wetland Construction Right- _Delineated Boundary of -Way Survey Area L7_ Adjacent Sheet _]County Boundary Jordan Lake Watershed Streams: _ Approximated Intermittent Delineated Ephemeral GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour 9f - .��k Yq M�aH I} irn Alamance County n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 94 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 Date: November 2018 -------------- , ' Ma G rti°°Cs pp 1P " - Or ;p p9_ - - TA -AL -185 = - '1' NG JP _ ;ef; $� 3' - = i P k P. I k lk- o k kv' q� P �., - - ;� - - - .e - -�'` - - r ' - - - ". .P pp P- - -- - - _ - r Gni, .' - -- - - > -- .t N PP- • S-: _? __ ' • iii• _ . c - a �. - e� :t a t •� i , - - - b M P 69 • : - ; ,6°` _ ti Buffer Zone Impacts �. S -A18-10: Eph. �` 5 _. Zone 1 Construction Acres: 0.110 Zone 1 Operational Acres: 0.025 Con./Op. Pipeline Crossing ft.: 2.000 _ ,� ,' ; a p - -- --_ - a * ;'�'' Construction Crossing ft.: 81.488 ° Zone 2 Construction Acres: 0.095 t- - Zone 2 0 erational Acres: 0.048 Operational Crossing ft.: 54.028 h ! p == . ♦ 1 %♦ ♦ - J 1 ' ta 5 - I f AS -B18-132: Per. Conkk /Op Pipeline Crossing ft.: 8.048 M=`a - Construction Crossing ft.: 78.604 - ` - r?> :' Constructionsq. ft.: 536.118 __. -; =t• •4:� Operational sq. ft.: 0.000 5 'S' z� ��••-�• •-- --i - •�' .f J I - f ♦ 7- ♦MP 69.5- r' Lu'ti.♦;� . ' , , i' i 5 rt'� +— �5.�-t---- e �``. ,, 0♦ a e `�L=. =i-�•� : ,', t..... - -'--a• �• 'Iii i P PP :� s-• N 0 w - - 1 ;♦• �►-•. - ,! ' Vin: a;•• - --/ , . ' .♦♦,'Li �' ' TA AL 186 1 ♦; �;. f;!_ „ ,, -r'Pt Pt s ';� �. SA1815:Int.t. A >' t .,, �y, Con./Op. Pipeline Crossing ft.: 4.000 �:;: . `! ys' A r •': _ s _ Construction Crossing ft.: 84.422 ��: _:�' ' %• s', '' - 9 ; 4 - - -' Operational Crossing ft.: 56.449 -::_r' #'•�_ ;, ;� i' : ;d ' : v';pP. _ -{1' .r,�. ^-• ':6 _r• ; ,5r r' TA -AL -187 _ K _ ' iy �.'r�y_eI _ ,;ice 'V J •_• - - - �Pt ��� Buffer Zone Impacts `; r Zone 1 Construction Acres: 0.116 .g L PPPz Zone 1 Operational Acres: 0.078 tr - ; Zone 2 Construction Acres: 0.097 :'N 96 ;;� Zone 2 Operational Acres: 0.052 490 'e$ - ± _..::>, ` 6a� `P N P Yis ' R ! rr ,'� ♦ ''• • t •,' ' •,14 '�' , r ,i `'��j'Pt" J. - A Legend Mileposts (MP, 0.5 Delineated O mi) Ephemeral Temporary Access Delineated Road Intermittent H-650 Pipeline _Delineated Operational Perennial Workspace —Delineated Pond Temporary Access - Approximated Road Perennial Limits of - Perennial Surface E::] construction Right- Water of -Way Pond Survey Area Jordan Watershed L7 Adjacent Sheet Buffer Zone 1 _]County Boundary --- :Jordan Watershed Jordan Lake 0 • - - 'Buffer Zone 2 Watershed Wetlands: Streams: Delineated Wetland Approximated _ Boundary Ephemeral Ore Delineated PEM Approximated Perennial 0 YX! i) M WOMMMMW GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ------------------------------------------------------------------------------------------------------. Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour u 9a w� Alamance, County Gh�Td' Sti n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 95 of 108 TRC We Willowbrook Ln West Chester, PA 19352 Date: November 2018 - _ - -k k t - - -- - - - - •1-- rkAtd + Y' _ - - - - - - -- — - -- ; �' - kk SO • , ' i - - . - 0- _ _- i i ,i;kk , i' I , ty_ •P.� ,• _ �' Pk ---- - - - - -- a V _;; - _- - -- - oo �O - - - Gkk - it ` %_ _ _ P� :'c'. - ` - to ' - - - -- --''A�Y�: pwk tier= t ate qkk - - - - - �It '-- 30 5 Ik 1 _ - - • - 5 "- Buffer Zone Impacts ' kk kk - —�' __ } - _ _ % - Zone 1 Construction Acres: 0.131 - : - _;•, S{at --,_ _ Zone 1 Operational Acres: 0.029 PP1 PP ___-- - ' - -- 1 - - --- '' - Zone 2 Construction Acres: 0.088 ; _ - - + Zone 2 Operational Acres: 0.055 r, ' Pelm haS `'r: ; . - _ i +��L - - P. a 1 ,r . - kk \'.+r3 Pr. � jam♦ v .•may �- ` -r„`� ti' i 'w<:r r ti ' - �- �- i • 1 '�' 1•� 1• •{I a ' r' • 1 P ?' - r•.' ^- •���{ •a �:�••` - __- _ ��•M F:7U. s �;L 4,r i; iT', `vim •f '�1' a- '�'Pk PPP. a+`a:i-- a� •��� .eT� +r •+'=-�'t ;.P t P P P P - 1 -'. 'r '193$ i Rif : s C Stag _ _ b + ; AS -A18-115: Per. 1 ti , _ - [� '; Con./Op. Pipeline Crossing ft.: 18.272 - ••- _ _ - - :; Construction Crossing ft.: 91.242 ' `=' = - 5 ; '1P P - -"+ .% ` - Construction sq. ft.: 985.543P. _ - ' b.,, `' '•: ,'- _ a,:== Operational sq. ft.: 0.000 _ ' ; -- - _" �- ._ . _ _ - - - - - •'r• - __ _ - - '+r_ - J� _ ,J r. - P PP o. -•� e� - - o+ rifer - - Q' - - - ?' e ti - .:. r; r C, N k, kr _ k k:r ! r a - -y i: �¢ P Pkk- -- �jY a� _ fY _ 'rt - k - - R' , -t• ' ' r+,,' - •• .1� 'orf • - ____ •C� _ 'r i• f• , . [�,'• ' + 'ail I �'i%i: i r -^w A•� �r ' `T:::�_;_T • ` - r� .! - - q 1 - Fr i' ' tPp _ _ _ ; C _ =o ,- - tir TA -AL -187- % P PP - �` Y PPr, �5= t V11 I ti't 7 �.'. '-- PI k PPP P 1P t S _ 1 r 530 /' z �, :, ` ::_> - - - - -= r:: 5 Legend O Mileposts (MP, 0.5 mi) Temporary Access Road H-650 Pipeline Operational Workspace =Operational Bore Temporary Access = Road Limits of =Construction Right - of -Way Survey Area L _ j Adjacent Sheet _]County Boundary =Jordan Lake Watershed Streams: Approximated Perennial Delineated Ephemeral Approximated Perennial Jordan Watershed Buffer Zone 1 -.Jordan Watershed • - Buffer Zone 2 Wetlands: _ Delineated Wetland Boundary Q' 1m'�' 'm `Tl GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ---------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rr,x cryo >•`tl •. AIamance_ flp County N 0 Zr L a 4y ,E n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 96 of 108 TRC Willowbrook Ln We West Chester, PA 19382 "'"'°""•° . Date: November 2018 - - - - _ 11 P ---- _________ 'I _ _ $ -� �sr - _ _ - _ - - �; ` ss - - - --- - o �• - t 'I N% -- ;r. - - - - - - - - " - - - - - - - ` - - - - i - - r� - k - Y _ - t• .s _ tiss` .. _ •_ �. _ �' _ r! - P pp =� _ - - j• _ - - " _ - t - pp P 't tp -, . - -P t - t k - - _. _ �'♦ _ - - _ pp _. .r :r� _ f- '- - S-618-133: Per. I. -- - - - Con./0 . Pi eline Crossin ft.: 11.530 i- Construction Crossing ft.:82.612 - - .__ }•', - r s - y'. Constructions . ft.: 1 226.390 `� v q o o - - `t _ 0 erational sq. ft.: 0.000 kP d.. p q - --- yy .'PtPp •6 , __ - pt pPP PPP ' ' I S-618-134: Int. �' _ .,r.' : i i P P 4'. - i = s'. Con./Op. Pipeline Crossing ft.: 3.000 S -C18-82: Int. _ pp r: Construction Crossing ft.: 92.444 Con./Op. Pipeline Crossing ft.: 3.000 - Operational Crossing ft.: 29.619 Construction Crossing ft.: 92.314 - Operational Crossing ft.: 60.668 ' ?;: • _ -r'' - �' I tk �f - -_ = r �z s:_ - _ a e a.' ep., P P1 • r _L •� �- - -.sem ��._ ' �~-,�"1r __ - �_• ,s .-'_ . .� - ____ - ..' �_`-_____' * _ �7 _i„_' ,A -J C `. ..• ,i'aL . �T^• ♦ -.j'rr '-,sro- •xz _�' 94 ,-!� i- t •ipl,Y,1 P-/ 0 •I• .�ti �ti -.��-� 'r�, Wi=t; -i'-�r �•� _ r :r',�''-� 'r �� r. 'r.. -•r �+r:f,�': r �� * : �.;� y w k - k. - - ri-•- - - _� -1: r�7T -+-____�_�_ _t1_' :Y,.: -J:_�� ti: 1�,:as• --__ _���:� -1Ji it' - r.'_:�� h. ,�• "h•.' P - - _�r'•. �,. ' _ ♦' i41 k ' �! t t w S. - r._ - _ - a '. r - kkp .� ■ i' Buffer Zone Impacts _ - - - ,r _ ..¢,' _ S-618-135: Eph. . n�.�,.� Zone 1 Construction Acres: 0.165 - �Jwl� - - -- -- kPk Zone 1 Operational Acres: 0.106 ` Con./Op. Pipeline Crossing ft.: 2.000 - ;kp - _ -- -,� _ • - Ic { ; - Zone 2 Construction Acres: 0.117 Construction Crossing ft.: 129.611 - _ - d Operational Crossing ft.: 75.177 r= n _ _ Zone 2 Operational Acres: 0.092 m tp t' P---- _ _ _ �Q - _ Buffer Zone Impacts }' P Zone 1 Construction Acres: 0.195 _ - - o Zone 1 Operational Acres: 0.070 :�• ;;� '' _ - - - . • _ _ _ _ _ _ - Zone 2 Construction Acres: 0.170 : _ _ _ - 's - - _ _. Zone 2 Operational Acres: 0.124 _ ,. ♦ �'P 1 .n '� _ - _ - O .. - - - - a. - - - - __ _ - i _ . _ 7.- �^ it:-�- tit _=f~ __ ~ ■ - - A - - �- - y s '_ 480 s� .y..•� :�5�-eyA-�=timet?-r:= -------- • - - - _ - 490MVP LIDAR Contours �9 �—` _ kkkkbIt NC OneMap Contours - --- - -- - - - Legend O Mileposts (MP, 0.5 mi) - - H-650 Pipeline Operational Workspace Limits of OConstruction Right - of -Way Survey Area L_ Adjacent Sheet __;County Boundary Jordan Lake Watershed Streams: Delineated Ephemeral Delineated Intermittent _ Delineated Perennial Perennial Surface Water Jordan Watershed Buffer Zone 1 Jordan Watershed Buffer Zone 2 Wetlands: _ Delineated Wetland Boundary 0 ISM CA r�\ Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS -______________________________________-______________________________________-_______________......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour Alamance County db r9 Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 97 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 - t -- - 1 PP - P. PP ko- - - f h� �P pp pp pp PO f - _ i t - - 1 �s = - ~ Sd -- ou - - I 1 - _ ova - met 9g P. Pt j PRr,0 ; ; ` ' .i SS-SOIL18-09 (TempomyAccess Road) —55C Pp --- N vQ �.-PPP Con./Op. Pipeline Crossing ft.: 0.000 SSO I M _ - Construction Crossing ft.: 22.920 _ - - K ►' -- - - Operational Crossing ft.: 0.000 - <- 'tJ pp -Pt 5n - - -- -- _ ^ 540 P. , fi' - - - - - - ; TA -AL -189 k ----------Buffer Zone Impacts - - - __ Zone 1 Construction Acres: 0.043 - - - - - - -- \ Zone 1 Operational Acres: 0.000 - • Zone 2 Construction Acres: 0.027 - i �Y - -. ' - - •�:; - _ - Zone 2 Operational Acres: 0.000 - -_a n s - TA -AL -188 - e� Buffer Zone Impacts - I _ Zone 1 Construction Acres: 0.284 - ---- - �'• 1 %t- Zone 1 Operational Acres: 0.181 ' - - -- . - Zone 2 Construction Acres: 0.210 ; m pp 7p P. r; t v rr' Zone 2 Operational Acres: 0.119 •= _. - ". - P - Iv1 Buffer Zone Impacts 1 ; :y - a Zone 1 Construction Acres: 0.114 !•'• S -A18-107: Int. _ Zone 1 Operational Acres: 0.025 a o :, . Con./Op. Pipeline Crossing ft.: 1.000 +ti:�. . Zone 2 Construction Acres: 0.076 - - Construction Crossin ft.: 118.364 t-- - -''i - g - 1 r•� _ •rsf �•. __-- Zone 2 Operational Acres: 0.05 f .: 72. P - 0 erational Crossin t 880 � t_ _ P 9 pt k ��• �♦ ice' ^''?"r ~•'" •sir' i.;•. - - - - - - - -_ -_-_ _ - •_�' kkkk P P. Pk ♦ •a'+ -�, «,� ' •'' area• ;i .t:., `�s��r► - _ �n+f s�•1 •t`� .tom'~ A '.R� - :ia, �!'' Y _' �.� .MP'.7_;1t •ec �' - L - -- -- S.t'- •;+• �„ ♦�♦; «;r _ - ''� .1 �� ' •4:•••-9�:":- r!-_:-• •6:as _ � - _+'t-• ' _ ' :mss^ _ ' � •_ ' _ .E. 'a%'• _ Z r '1-- te N;r S C18 81: Per. - S -A18-109: Per. - __ - �- _ }_-<= ' �_.- - Con./Op. Pipeline Crossing ft.: 24.179 4 �.�t ♦ .;! - - ��: Construction Crossing ft.: 83.018 Con./Op. Pipeline Crossing ft.: 5.000 *:' 9 Construction Crossing ft.: 104.251 S -A18-108: Int. •� '•• _ • " "• .�k Construction sq. ft.: 1,761.826 Con./Op. Pipeline Crossing ft.: 2.000 Buffer Zone Impacts _ - "�' _ •_ _ ti%:`',� _. • _ _ - Operational Crossing ft.: 54.252 Operational sq. ft.: 0.000 _ _ _ Construction Crossing ft.: 115.563 Zone 1 Construction Acres: 0.139 t •:�" - :�Y= �=w-_ Zone10 Operational Acres: 0.093 Operational Crossing ft.: 84.035 P I _ 480 Zone2ConstructionAcres:0.093 ='� Zone 2 Operational Acres: 0.062 --- - - - - ----- - - - - -- - - - - --y;s` _ '} _ :_ •� t•' F _ - _ - p. pp pp . - - ------ -- -r• .- Legend Mileposts (MP, 0.5 Perennial Surface O mi) Water Temporary Access _Soil Survey Stream Road Perennial - - H-650 Pipeline Jordan Watershed Operational Buffer Soil Zone 1 Workspace ••.Jordan Watershed Temporary Access ":Buffer Soil Zone 2 Road Jordan Watershed Limits of Buffer Zone 1 E::] construction Right- ;---.Jordan Watershed of -Way -•-:BufferZone 2 Survey Area Wetlands: L_ Adjacent Sheet _ Delineated Wetland L__. County Boundary Boundary Jordan Lake Watershed Streams: Delineated Intermittent Delineated _ Perennial �— r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ------------------------------------------------------------------------------------------------------- Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour C'iCJ H CCA'! I I q, Alamance oo n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 98 of 108 TRC Willowbrook Ln We West Chester, PA 19352 Date: November 2018 PP pp, PP --- - - - - - -- - - - _ sure -Teo •,I PP o 0 0 A 1 � TA -AL -188 °J , — Legend O Mileposts (MP, 0.5 mi) Temporary Access Road Temporary Access Road Limits of =Construction Right - of -Way Survey Area L7 ;Adjacent Sheet __;County Boundary Jordan Lake =Watershed Streams: Wetlands: _ Delineated Wetland Boundary ll' V ♦ ' '! IM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour y8 Alamance County �s res 0 o R 1 o. r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 99 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 o cp`r 530 k' kNC OneMap Conto s 570 pp ` „+ ,pp I ont rs - ++ � , , .. r+pp P+` - - - - r+ - P. ;rrPPP r - - . kk pp ''n �', ie _ _ ♦S,r -------- ___ 'k k _ h' •. '',f ' • -' - + - - - -_ -_ - J- ------ - r/k - _ - - - r' _ - _ _ { - - - - pp pp PPP 'rt' - - - - - _ - _ .r - _ P PP - - _ - - - f , _ - - +. TA -AL -190 - la k k- -- .a - t � -- - P 'P_ _ _ - _ - S -A18-65: Int. " np ; Con./Op. Pipeline Crossing ft.: 1.000 n�I1 :'+';' • • . IJ ►i� _ __ _ _ _ _ _ - Construction Crossing ft.: 109.906 •r, • Operational Crossing ft.: 91.148 • . o�. t,,PPPP I _ - - •J_-_ _L______ - - ,P,, .pp %; - - - ka ------------ P• •.....;�- I r +- v ------y------------ ----- --- ,. MP -71.5- -- I-- S'--- z�-' •� ' - •- --_ - - - 'r"'S Buffer Zone Impacts "' •' �•s.�• ■; + _ al Zone 1 Construction Acres: 0.295 480 z� S -A18-64: Per. f` = • Con./0 Pipeline Crossing ft.: 25.878 en. Zone 1 OperationalAcres:0.084 p• P 9 t- C' Zone 2 Construction Acres: 0.200 Construction Crossing ft.: 74.953 - ! - _ aAl Zone 2 Operational Acres: 0.056 Construction sq. ft.: 1,221.660 _ _ - - rr',r Operational sq. ft.: 0.000 rr{ I - - - 480 ;rsa = 480 - - _ SS SOIL18 10 __ -- `-= Con./Op. Pipeline Crossing ft.: Unknown "•rr•• Buffer Zone Impacts - h - - . ;,-_•--_- __________________ Construction Crossing ft.: 187.382 -•, � " 1 r_;: - - Zone 1 Construction Acres: 0.224 kk - '-------- ,-• Operational Crossingft.:61.478 - __. •• _._ - � '_ _ _, -t- i I _ _ _ _ _ - _ _ ��` - - - , Zone 1 Operational Acres: 0.132 �, - - Zone 2 Construction Acres: 0.129 I _. 1pv 1 _ - - Zone 2 Operational Acres: 0.108 _ - - s - ;'y; ;''rI;; - - - - - - r -- - PP - +' - 1vP - - - - - - - - - It pp Pp - ----•--- -- - •T- - +� - Q V - Cae� a =r r _ �' - - -- • - -- Ile Dr State Rd 2237 - - -- --- - Va i k P kk --- - - - - -- NCVP LIDgR Contours : ` 6 00 ° P, MVP LIDAR Contours tx neM a Contours Legend Mileposts (MP, 0.5 r O mi) k \ , P PPPP- Temporary Access Pond Road _Soil Survey Stream - - H-650 Pipeline Perennial - - Workspace _ n' PP k t= - -- {P ; P 5P' Limits of pp _ - 1 , 4 QConstruction Right- Buffer Zone 1 s' ' r r.t pt, . j•;: , SS-SOIL18-10-2 (Temporary Access Road) E " _Delineated Wetland Con./Op. Pipeline Crossing ft.: 0.000 Boundary Watershed Construction Crossing ft.: 30.174'.,i•', - ;t Operational Crossing ft.: 0.000 ,':+ , TPz S2 pp Delineated Ste, , ;; ; k,. _ Perennial —Delineated Pond '• II =: f� TA -AL -189 + Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts �. (Due to Vegetation Maintenance) pt PFO to PEMIPSS t _••••••••••••••••••••••••••••••••••••••-••••••••••••••••••••••••••••••••_______________________________ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour r p�irt�t •• :tib �.- •'�'' _ s-r:'�. `�-- ----_ ter♦ 'r�'i'{• ',�.����='ti:_yr�•- _ 33_11 _ - _ �r P IP ------ -- ---- o cp`r 530 k' kNC OneMap Conto s 570 pp ` „+ ,pp I ont rs - ++ � , , .. r+pp P+` - - - - r+ - P. ;rrPPP r - - . kk pp ''n �', ie _ _ ♦S,r -------- ___ 'k k _ h' •. '',f ' • -' - + - - - -_ -_ - J- ------ - r/k - _ - - - r' _ - _ _ { - - - - pp pp PPP 'rt' - - - - - _ - _ .r - _ P PP - - _ - - - f , _ - - +. TA -AL -190 - la k k- -- .a - t � -- - P 'P_ _ _ - _ - S -A18-65: Int. " np ; Con./Op. Pipeline Crossing ft.: 1.000 n�I1 :'+';' • • . IJ ►i� _ __ _ _ _ _ _ - Construction Crossing ft.: 109.906 •r, • Operational Crossing ft.: 91.148 • . o�. t,,PPPP I _ - - •J_-_ _L______ - - ,P,, .pp %; - - - ka ------------ P• •.....;�- I r +- v ------y------------ ----- --- ,. MP -71.5- -- I-- S'--- z�-' •� ' - •- --_ - - - 'r"'S Buffer Zone Impacts "' •' �•s.�• ■; + _ al Zone 1 Construction Acres: 0.295 480 z� S -A18-64: Per. f` = • Con./0 Pipeline Crossing ft.: 25.878 en. Zone 1 OperationalAcres:0.084 p• P 9 t- C' Zone 2 Construction Acres: 0.200 Construction Crossing ft.: 74.953 - ! - _ aAl Zone 2 Operational Acres: 0.056 Construction sq. ft.: 1,221.660 _ _ - - rr',r Operational sq. ft.: 0.000 rr{ I - - - 480 ;rsa = 480 - - _ SS SOIL18 10 __ -- `-= Con./Op. Pipeline Crossing ft.: Unknown "•rr•• Buffer Zone Impacts - h - - . ;,-_•--_- __________________ Construction Crossing ft.: 187.382 -•, � " 1 r_;: - - Zone 1 Construction Acres: 0.224 kk - '-------- ,-• Operational Crossingft.:61.478 - __. •• _._ - � '_ _ _, -t- i I _ _ _ _ _ - _ _ ��` - - - , Zone 1 Operational Acres: 0.132 �, - - Zone 2 Construction Acres: 0.129 I _. 1pv 1 _ - - Zone 2 Operational Acres: 0.108 _ - - s - ;'y; ;''rI;; - - - - - - r -- - PP - +' - 1vP - - - - - - - - - It pp Pp - ----•--- -- - •T- - +� - Q V - Cae� a =r r _ �' - - -- • - -- Ile Dr State Rd 2237 - - -- --- - Va i k P kk --- - - - - -- NCVP LIDgR Contours : ` 6 00 ° P, MVP LIDAR Contours tx neM a Contours Legend Mileposts (MP, 0.5 Perennial Surface O mi) Water Temporary Access Pond Road _Soil Survey Stream - - H-650 Pipeline Perennial Operational Jordan Watershed Workspace Buffer Soil Zone 1 Temporary � •--.Jordan Watershed Road . •• :Buffer Soil Zone 2 Limits of Jordan Watershed QConstruction Right- Buffer Zone 1 of -Way Jordan Watershed Survey Area • • • :Buffer Zone 2 L7 Adjacent Sheet Wetlands: L__'County Boundary _Delineated Wetland Jordan Lake Boundary Watershed Streams: Delineated Intermittent Delineated _ Perennial —Delineated Pond 0 EM f� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS _••••••••••••••••••••••••••••••••••••••-••••••••••••••••••••••••••••••••_______________________________ Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour •• Alamance `C.ounty .. 1 11 1 1 O 4 s� p� E 0 d w _ r9 Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 100 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 SSa - - Sg0 5` tel 550 Sta Jimmie Kerr Rd ,77 NC One R Contours --"-" "" - MVp LIDA - - - - y:P\ y '� i - t �� + kk :1'„'. - a • �� - _ �-�i r, _ _ '`” ti' } - - i TA -AL -192 ' - - .. y'. - - ;,`;' 'S ', ,) -- "1 :} J _ J ' ' P.+' \ r x. r ' =� - \., - - - k k'P. - r, �, • - i•:;::: -- rr' Pp k PP P - r, } r - r + - .� Y - PP PIP P 4�, f,� _ - _ PP ' - :s - _ s - - i .• - - %,i- S-A18-68!Per. 3=_ lP W -A18-67: PFO Con./Op. Pipeline Crossing ft.: 3.000 •'a = ------ r - Con./Op. Pipeline Crossing ft.: 43.867 - +'' P Construction Crossing ft.: 80.354 • • nn ,�. q; �,'I�J�l�': ' Operational Crossing ft.: 53.647 v C ; - Construction Acres: 0.039 _ ' fP k t' �. p 9kk Operational Acres: 0.025' - • - 1 18-65: Int. Con./Op. Pipeline Crossing ft.: 1.000 - - = "�, h� AS-NHD-1560: Int., ;.' `; ti ' �' Con./Op. Pipeline Crossing ft.: < 6 ft (Unknown) P Construction Crossing ft.: 109.906 - - ► } _ h y - Construction Crossing ft.: 76.033 Operational Crossing ft.: 91.148 - ;i; �s' C' - Operational Crossing ft.: 50.648 ti' 1 p 9 PW irte. .ice' ,,+' S _•. } , - ' r+11 A `► - -- - ,T "' •• tis ' 1 -�-�-• - • - rr ,[ _ `_____ -'L- �s - .�•i Y . "'. y.� of �'`�:�'-• �"~ -_ _ �CO�'' �'� � l� ,• _ ' Lk — �_ ` - - moi' r' ` �• - . _— y ---J _ =1111P:72� _ � --- � � __>;,, a -- -- - -ate_ - - -�� -- - ref* : - ++- - x_ 7 .ice � ri:= �fJr =r =.�:�•• _•• .••••_•.-••••_• �x •:i• •'�' �i =r = - �• Buffer Zone Impacts _ - Zone 1 Construction Acres: 0.126 P-------- - - - I W -A18-67-2: PFO Zone 1 Operational Acres: 0.073 = - Buffer Zone Impacts ._ Con./Op. Pipeline Crossing ft.: 0.000 Zone 2 Construction Acres: 0.112 - _ _ Zone 1 Construction Acres: 0.105 } Construction Acres: 0.003 Zone 2 Operational Acres: 0.073 - - Zone 1 Operational Acres: 0.070 } -�- - Operational Acres: 0.000' '` - - Zone 2 Construction Acres: 0.070 • c' Zone 2 Operational Acres: 0.047 1 j = - -�• '} _ Buffer Zone Impacts - _ _ _ _ _ :ti-`' Zone 1 Construction Acres: 0.224 _ - - -- .r;' y Zone 1 Operational Acres: 0.132 - _ _ _ _ _ - - - _ _ •_ • - _ _ - - - ,1 : - Zone 2 Construction Acres: 0.129 - - _ _ _ - - " = _ " - '• ` r ' ' t- Zone2OperationalAcres:0.108 --- _ -'d,, zz ;i''•- - --___ `` - - k. -- - - - -=z: _ = - - -- `'` _ - _. -- - - -+`. - - -- - _ p _ k. ---- - - 237 Valle Dr _ o atc - - P. State Rd 2 ?pyo ': - -- y�Q - - 'r a s 4 - , s - - IP k I MVP �� ont M pC ontours O iron, a C 50 -PP Legend O Mileposts mi) Temporary Access Road H-650 Pipeline Operational Workspace Temporary Access Road Limits of OConstruction Right - of -Way Survey Area L7 Adjacent Sheet L_ .County Boundary 0Jordan Lake Watershed Streams: —Approximated Intermittent Delineated Intermittent _Delineated Perennial Perennial Surface Water Jordan Watershed Buffer Zone 1 Jordan Watershed Buffer Zone 2 Wetlands: _ Delineated Wetland Boundary Delineated PFO Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ---------------------------------------------------------------------------------------------.......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour qo tt r A.]amance 1�ounty o�u ti i•o . r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 101 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 - - rr;. ; 56 - Jimmie Kerr State Rd 1928 - - - - - - S;, 570 - • ' 5AO ;._`. ___- =_-- 520r; 40 530 re`Okb t tt� ; � 4 i!= == =-- - - - _. o ;4 „o 05 -t - ntours - - - - PP k.+• NC OneMap Co - MVP LIDAR Contours -_ 11 k Z. . �' •' '- 1. -% �� - r f z - 1 P - -- - - 1P k1 'I- =- : , p TA -AL -193 _------• [ I _ LJ - - �t - • -•- - _ _ - _ - - - _ _ 5$0 - S .k - - ;Pj `• •- 'si •• `• ''' fit.-, `I• ID - - - k - '�1 ''. .a - - • Buffer Zone Im acts _ ,yr : mf Buffer Zone Impacts p o kP yi Zone 1 Construction Acres: 0.000 Zone 1 Construction Acres: 0.162 `� kt - '',•ICD a� TA -AL 192 - Zone 1 Operational Acres: 0.103 �' Q ` Zone 1 Operational Acres: 0.000 - _ 'b Zone 2 Construction Acres: 0.009 - - • • cN Zone 2 Construction Acres: 0.117 S-618-128! E h. I °1 r < '' Zone 2 Operational Acres: 0.082 P z _ _ - Zone 2 Operational Acres. 0.001 • Con./Op. Pipeline Crossing ft.: 2.000 ly )r, -- - _ - Construction Crossin ft.: 124.694 ^. - _ M - Operational Crossing ft.: 50.542 I m ` . _ _ W A18 208: PEM -;s; `0 9 _ . ). _ _ - _ _ _ S-618-125: Int. _ - I •, J Con./0 . Pi eline Crossin ft.: 0.000 +':` a ' f P P 9 Con./0 . Pi Pipeline Crossin ft.: 3.000 , f ' _ Construction Acres: 0.003 P P 9 I Q Construction Crossin ft.: 100.140 9 i; ' - r'1 - Operational Acres: 0.000 J + _ _ - P Operational Crossing ft.: 68.383 ;r, `;'., -{- Via• I•. .:�. - _ i h _ kkk -- - - _ r `' P + � `, ♦ i. -•-- .Y ..�'� :' - -•eye---ty--- •� _ _ -�-*1- ♦ 1• 0:. pp it MP 7.2:5'.• -- _ - --- - i�• - rF - - - IJ-- - - -- P, PPP sBuffer Zonelmpacts-=i-=r�..'� ;__-- - _ 1:', - t Zone 1 Construction Acres: 0.039 -'4 Buffer Zone Impacts , i S-618-127: Int. Zone 1 Construction Acres: 0.105 Zone 1 Operational Acres: 0.017 Zone 2 Construction Acres: 0.067 Buffer Zone Im acts Con./Op. Pipeline Crossing ft.: 5.000 Zone 1 Operational Acres: 0.070 P Construction Crossing ft.: 121.146 Zone 2 Construction Acres: 0.070 Zone 2 Operational Acres: 0.050 Zone 1 Construction Acres: 0.139 p Zone 2 Operational Acres: 0.047 Zone 1 Operational Acres: 0.094 Operational Crossing ft.: 70.121 Zone 2 Construction Acres: 0.095 AS NHD 1560: Int. S -A18-207: Int. ----- -- 490 Zone 2 Operational Acres: 0.061 -- S-618-129: Eph. Con./Op. Pipeline Crossing ft.: < 6 ft (Unknown) Con./Op. Pipeline Crossing ft.: 0.000- Con./Op. Pipeline Crossing ft.: 3.000 Construction Crossing ft.: 76.033 Construction Crossing ft.: 6.710 _ _ _ __ Construction Crossing ft.: 80.828 Operational Crossing ft.: 50.648 Operational Crossing ft.: 0.000 - -- _ • - w b• Operational Crossing ft.: 53.876 - 480 II • Buffer Zone Impacts ,I Zone 1 Construction Acres: 0.000 0 00 Zone 1 Operational Acres: 0.000 Zone 2 Construction Acres: <0.001 Zone 2 Operational Acres: 0.000 a I Ngo 4go _k PP Legend Mileposts (MP, 0.5 Delineated O mi) Intermittent Temporary Access _ Delineated Road Perennial - - H-650 Pipeline Perennial Surface ,!Ppf Water Workspace Jordan Watershed Temporary Access Buffer Zone 1 Road -.Jordan Watershed Limits of -' Buffer Zone 2 E::] construction Right- Wetlands: of -Way AS NHD 1560: Int. S -A18-207: Int. ----- -- 490 Zone 2 Operational Acres: 0.061 -- S-618-129: Eph. Con./Op. Pipeline Crossing ft.: < 6 ft (Unknown) Con./Op. Pipeline Crossing ft.: 0.000- Con./Op. Pipeline Crossing ft.: 3.000 Construction Crossing ft.: 76.033 Construction Crossing ft.: 6.710 _ _ _ __ Construction Crossing ft.: 80.828 Operational Crossing ft.: 50.648 Operational Crossing ft.: 0.000 - -- _ • - w b• Operational Crossing ft.: 53.876 - 480 II • Buffer Zone Impacts ,I Zone 1 Construction Acres: 0.000 0 00 Zone 1 Operational Acres: 0.000 Zone 2 Construction Acres: <0.001 Zone 2 Operational Acres: 0.000 a I Ngo 4go _k PP Legend Mileposts (MP, 0.5 Delineated O mi) Intermittent Temporary Access _ Delineated Road Perennial - - H-650 Pipeline Perennial Surface Operational Water Workspace Jordan Watershed Temporary Access Buffer Zone 1 Road -.Jordan Watershed Limits of -' Buffer Zone 2 E::] construction Right- Wetlands: of -Way Delineated Wetland Survey Area _ Boundary L7_ Adjacent Sheet Fe Delineated PEM L_ r -- 1 .County Boundary Jordan Lake Watershed Streams: _ Approximated Intermittent Delineated Ephemeral 0 t) CA Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Alamance C o u n t y 11 Ly,1C1 Ir LV.1G1 �� WU UI:CS I -l1lJC1 0 r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 102 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 s - __ j wo cp 5'' - - . o ur '_`' O - t R, - '} o n pp pp Ps - PPP pp k' toOr_ 1 Wk k.L - VP L% z" - - - 1.' , - k : : -----_ - s; `r • s'" - f P'P P I _ - _ - n,% - - ' I-- j - -- - -Che Ln_ �l - 1_ ~ - Q o pp 1' kkkk - Cher kk 1- -- 3 I P d�'=-- h kk C :i - m i- rz,- k k k:: )k - 5 PA -A C ti� 1 — ••. •' — . — Dl �5i - ' fs' TA -AL -19 - _ :D' _ L _-_ ,•L '-S Mir. ���� ALL �N 'L, L• '.6' 1 Y 1 � 1 ! kk 41 0 -'_�,• ,; •'• _ Buffer Zone Impacts MP E • .e 'k k-1'' Zone 1 Construction Acres: 0.000 - • thg _ _ _ - - L Zone Operational Acres: 0.000 A8 - Zone 2 Construction Acres: <0.001 W -A18-111-2: PEM (Meter Station) - r�'� • ,-' �� Zone 2 Operational Acres: 0.000 rt Con./Op. Pipeline Crossing ft.: 0.000 Lj : S _ Construction Acres: 0.027 _ _ _ _ _ _ _ ate.= t Operational Acres: 0.000 _-__________ ds� d - 41p W -A18-111: PEM - 1 Con./Op. Pipeline Crossing ft.: 56.520 = _ _ M." ti_ C 520 _- s 'hLA Qs Spp 19 0 , p - - -P °bt o4r s� , . K k. -- i r ' y y 5i f r- :} S }' �p 4k '' '.,;';;I �y ' ` u tP P"o PA -AL -194 + :�k k/ o` T-21 Haw Rive k k Interconnect P,kk 1 MP 73.11 o ¢ __j • , _tit _-194A k1k, k k • $13 i� �� - ♦=- k pp '♦d• •� - �,� i♦- i ♦ ♦ t- ,% ♦ : - -- ♦ ti ♦ ♦ - wP P-- 4P 4P I 4p 4P s --- .R -P s; Ap_ - _ J ' Legend - d Construction Acres: 0.222 -, . Perennial 11 Delineated j _ - -_ _ ; Operational Acres: 0.000 Road Perennial - - H-650 Pipeline Approximated Permanent Access Perennial Road Perennial Surface Operational Water Workspace Jordan Watershed Temporary Access Buffer Zone 1 Road Jordan Watershed Limits of Buffer Zone 2 =Construction Right- Wetlands: of -Way Delineated Wetland Survey Area _ Boundary L _ jAdjacent Sheet O� Delineated PEM -__.County Boundary =Jordan Lake 1. Watershed - _ ' . _•- - - - •''1 d :f �-�', 11 '• ' •.V,,yA ," �V __- •_ ._. - -_ 1 _ - - - `' f • ? ••Y� ___- • ..kms • - - JI, r 49 S. . _ _ 'k '' - - _. Ro - - - ;� - - - - - Contours pp - --- - r -- - Vp LIDAR - M _ - - _: one ap Contour - - - _ --14C 490 - S70 t - Legend Mileposts (MP, 0.5 Approximated O mi) Perennial Permanent Access Delineated _ Road Ephemeral Temporary Access _ Delineated Road Perennial - - H-650 Pipeline Approximated Permanent Access Perennial Road Perennial Surface Operational Water Workspace Jordan Watershed Temporary Access Buffer Zone 1 Road Jordan Watershed Limits of Buffer Zone 2 =Construction Right- Wetlands: of -Way Delineated Wetland Survey Area _ Boundary L _ jAdjacent Sheet O� Delineated PEM -__.County Boundary =Jordan Lake Watershed Streams: 0 1m t) CA GIM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Alamance d County 11 1 li 1 � I Ul'�CJ 5 :! y� � s a n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Alamance County, NC Sheet 103 of 108 TRC 600 Willowbrook Ln West Chester, PA 19382 "'"'°""'°"""' Date: November 2018 _k ---------------- -- AW-NWI-541: PEM (Contract Yard) Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.122 - - - Operational Acres: 0.000 P. kkkk ; e AS-NHD-1513: Int. (Contract Yard) - - Con./Op. Pipeline Crossing ft.: 0.000 Construction Crossing ft.: 766.279 - Operational Crossing ft.: 0.000 AS -A18-248 / S -A18-248: Eph. (Contract Yard) . Con./Op. Pipeline Crossing ft.: 0.000 Construction Crossing ft.: 153.976 - -- Operational Crossing ft.: 0.000 - CY-'05 k PP n I , W -A18-249: PEM (Contract Yard) _Con./Op. Pipeline Crossing ft.: 0.000 Construction Acres: 0.075 �tR e Operational Acres: 0.000 SJtJ� teRa� - - Pp - TA-RO-082 D 4' PP TA-RO-082E e ' 01 m - w 91 AW-NWI-540: PEM (Contract Yard) Con./Op. Pipeline Crossing ft.: 0.000 �I Construction Acres: 0.208 Operational Acres: 0.000 PP AS -APP -1569: Pond (Contract Yard) Con./Op. Pipeline Crossing ft.: 0.000 Construction Crossing ft.: 49.329 Construction sq. ft.: 1,289.698 Operational sq. ft.: 0.000 - - TA-RO-082C - rn g30 0 Legend O Mileposts (MP, 0.5 —Delineated Wetland mi) Boundary Temporary Access Approximated PEM Road Oj: Delineated PEM Temporary Access Road Limits of =Construction Right - of -Way Survey Area L7 ;Adjacent Sheet County Boundary Streams: Approximated Ephemeral —Approximated Intermittent —Approximated Pond Delineated Ephemeral Approximated Pond Wetlands: 0 w 0) CA r� Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS .-----------------------------------------------------------------------------..................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Udar 2' Contour, NC OneMap 2' Contour, VA USGS 10' Contour 1. 5 y 3 Rockingham C o u 0y n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 104 of 108 600 Willowbrook TRC West Chester, PA 19382 Date: November 2018 Legend O Mileposts (MP, 0.5 mi) Temporary Access Road Temporary Access Road Limits of =Construction Right - of -Way Survey Area L _ jAdjacent Sheet County Boundary Streams: Wetlands: _ Delineated Wetland Boundary o w ISM cn XM Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS .-----------------------------------------------------------------------------._................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Rockingham County p° r`S eP 0 6T Ei�°paN � N 2 '+5[ n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 105 of 108 600 Willowbrook Ln TRC West Chester, PA 19352 Date: November 2018 11 kk PP 620 YIK PP 0 - -- -- tate S - -- - - - -- - -- -- 60� ce _ _ Co��ef, (P -P, rn 0 - -- -- -- 1P6�0 - W -A18-245: PEM (Contract Yardkk ) _ Con./Op. Pipeline Crossing ft.: 0.000 PP k 1. CY-06 Construction Acres: 0.234 -------- AS -A18-246 / S -A18-246: Int. (Contract Yard) ■ Operational Acres: 0.000 Con./Op. Pipeline Crossing ft.: 0.000 ■ Construction Crossing ft.: 534.180 ■ ` Operational Crossing ft.: 0.000 ■ ` - } - ) kk _- - - - - -- m S -A18-247: Int. (Contract Yard) A Con./Op. Pipeline Crossing ft.: 0.000 ------- Construction Crossing ft.: 182.365 Operational Crossing ft.: 0.000 W -A18-245-2: PEM (Contract Yard) CY-07 Con./Op. Pipeline Crossing ft.: 0.000- __ -- -- Construction Acres: 0.001 _ - Operational Acres: 0.000 _ 't I. i __' TA-RO 082B aN - - Stia�e� 630 kk - aa`��Ot - - A.•- • Legend O Mileposts (MP, 0.5 mi) Temporary Access Road Temporary Access Road Limits of =Construction Right - of -Way Survey Area L _ jAdjacent Sheet __;County Boundary Streams: —Approximated Intermittent Delineated Intermittent Wetlands: _ Delineated Wetland Boundary lfi. Delineated PEM o tN 0) m bommmmmmen mm MMMMMEW Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS --------------------------------------------------------------------------------._................... Data Sources: EQT, ESRI, NC Oneft, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour y Ftp Puc �P�L � e, El U0`av �� w Rockingham County n Mountain Valley PIPELINE uc Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 106 of 108 600 Willowbrook Ln TRC West Chester, PA 19352 Date: November 2018 _ W rib M ' •.--•- rM iiiia ----- -- ---- Q) ;'�' ;. k' 'k -- ;1k �' - ' kk - TA-RO-000A l - - - - -- P PP- 1 - Drum Rd State Rd 2647 �t - .' . - --- - - - - -- - - P PP _- - -- - ------- - - - - -- - :CY 08 1 -- - - - - -- - - -. ----- --- - • - y i i � - - - - - -- - - - - -- - - r P , i - -- - + - - . - -- - --- - - - L �' ' ---- -- - - ----------- ----- -- - - r •.- - i r i -------- P P y - 780 __________. l C L•_I 7 - -- ____ ._. ______ �. i - r1 1 f 1•�i' i' - - - - • - - - -- __ _____ -- kk ____ , u - u ,t', ''tit "ti , k P PP ________ , n ;' „ k' ;,5' _ - ' _. iP __, '''11 jk, ,�4 - .._ t __ _- ' I l L ` • kk -i fir- c a - k. Legend O Mileposts (MP, 0.5 mi) _ Temporary Access Road Temporary Access Road Limits of =Construction Right - of -Way Survey Area L7 ;Adjacent Sheet County Boundary Jordan Lake = Watershed Streams: Wetlands: _ Delineated Wetland Boundary 0 W rib M rM iiiia Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS ----------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Miker Si rS b 3�� Y Rock iMoham C o u rf t y '�La>,t� YIJY rhrl 11 & do d � N i, nr � - �• r9 Mountain Valley PIPELINIE Section 404/401 Permit Application Proposed Pipeline Route and Impacts Rockingham County, NC Sheet 107 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018 760 CY 09 DCD 160 � N e Legend O Mileposts (MP, 0.5 mi) Temporary Access Road Temporary Access Road Limits of =Construction Right - of -Way Survey Area L7 ;Adjacent Sheet L__, County Boundary Jordan Lake =Watershed Streams: Wetlands: _ Delineated Wetland Boundary 0 1m ISM cu rM iiiia Note: 1 inch = 200 Feet Construction (Con.) = Temporary Impacts Operational (Op.) = Conversion Impacts for Wetlands (Due to Vegetation Maintenance) * = Permanent Conversion of Vegetation Cover Type From PFO to PEMIPSS .--------------------------------------------------------------------------------------------......... Data Sources: EQT, ESRI, NC OneMap, TRC, USGS Basemap: Lidar 2' Contour, NC Oneft 2' Contour, VA USGS 10' Contour Qa � Tnirtt ��1 Guilford C o u my z 10 U�:JLJ hlcl.ean svrll YS r9 Mountain Valley Section 404/401 Permit Application Proposed Pipeline Route and Impacts Guilford County, NC Sheet 108 of 108 600 Willowbrook Ln iCWest Chester, PA 19382 TRC Date: November 2018