HomeMy WebLinkAbout20181638 Ver 1_Appx G Wetland Crossing Analysis_20181130M Mountain Valley Joint Permit Application
PIPELINEJu USACE — Wilmington District and NCDEQ
SAW -2018-008887
MVP Southgate Project
Standard Joint Permit Application
U.S. Army Corps of Engineers —
Wilmington District (SAW -2018-00887)
North Carolina Department of
Environmental Quality,
Division of Water Resources
Appendix G
Wetland and Waterbody Crossing Analysis
November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-1 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
Yes
No
No
---
---
---
---
Oen Cut
18 1
$9,747.00
Yes
Yes
Yes
Yes
1.0
Yes
AS-A18-115
18
Bore
58
$81,055.00
Yes
Yes
Yes
No
8.3
No
Open Cut
HDD
2,400
$3,928,800.00
No
Yes
Yes
No
403.1
No
---
---
---
Yes
No
No
---
---
---
---
AS-A18-143 /
Oen Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-143
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
2,400
$3,928,800.00
No
Yes
Yes
No
3627.7
No
---
---
---
Yes
No
No
---
---
---
---
AS-A18-150 /
Oen Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-150
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
2,400
$3,928,800.00
No
Yes
Yes
No
3627.7
No
---
---
---
Yes
No
No
---
---
---
---
AS-A18-177
14
Open Cut
14
$7,581.00
Yes
Yes
Yes
Yes
1.0
Yes
Bore
54
$75,465.00
Yes
Yes
Yes
No
10.0
No
Open Cut
HDD
2,400
$3,928,800.00
No
Yes
Yes
No
518.2
No
---
---
---
No
No
No
---
---
---
---
AS-A18-182 /
Oen Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-182
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
2,400
$3,928,800.00
Yes
Yes
Yes
No
7255.4
No
---
---
---
Yes
No
No
---
---
AS-A18-233 /
Oen Cut
25
$13,537.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-233
25
Bore
65
$90,837.50
Yes
Yes
Yes
No
6.7
No
Open Cut
HDD
2,400
$3,928,800.00
No
Yes
Yes
No
290.2
No
---
---
---
Yes
No
No
---
---
---
---
AS-A18-242 /
Oen Cut
19
$10,288.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-242
19
Bore
59
$82,452.50
Yes
Yes
Yes
No
8.0
No
Open Cut
HDD
2,400
$3,928,800.00
No
Yes
Yes
No
381.9
No
---
---
---
Yes
Yes
No
---
---
---
---
Open Cut
25
$13,537.50
Yes
TOY
Yes
Yes
1.0
TOY
AS -A18-40
25
Bore
65
$90,837.50
Yes
Yes
Yes
No
6.7
No
TOY Open
Cut
HDD
2,400
$3,928,800.00
No
No
Yes
No
290.2
No
G-1 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-2 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
No
No
No
---
---
---
---
Oen Cut
15
$8,122.50
Yes
Yes
Yes
Yes
1.0
Yes
AS-A18-42
15
Bore
55
$76,862.50
Yes
Yes
Yes
No
9.5
No
Open Cut
HDD
2,400
$3,928,800.00
Yes
Yes
Yes
No
483.7
No
---
---
---
Yes
Yes
No
---
---
---
---
Open Cut
42
$22,743.00
Yes
TOY
Yes
Yes
1.0
TOY
AS -A18-8
42
Bore
82
$114,595.00
Yes
Yes
Yes
No
5.0
No
TOY Open
Cut
HDD
2,400
$3,928,800.00
No
No
Yes
No
172.7
No
---
---
---
Yes
No
No
---
---
---
---
AS-B18-102 /
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S-1318-102
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Oen Cut
p
HDD
2,400
$3,928,800.00
No
Yes
Yes
No
3627.7
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
AS -1318-104
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
2,400
$3,928,800.00
No
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
AS -1318-105
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
4836.9
No
---
---
---
Yes
No
No
---
---
---
---
Oen Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
AS-1318-117
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
Oen Cut
10
$5,415.00
Yes
Yes
Yes
Yes
1.0
Yes
AS-1318-117-2
10
Bore
50
$69,875.00
Yes
Yes
Yes
No
12.9
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
483.7
No
---
---
---
Yes
No
No
---
---
---
---
Oen Cut
8
$4,332.00
Yes
Yes
Yes
Yes
1.0
Yes
AS-1318-132
8
Bore
48
$67,080.00
Yes
Yes
Yes
No
15.5
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
604.6
No
G-2 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-3 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
No
No
No
---
---
---
---
AS-1318-16 / S-
Oen Cut
305
$165,157.50
Yes
Yes
Yes
Yes
1.0
Yes
B18-16
305
Bore
345
$482,137.50
Yes
Yes
Yes
Yes
2.9
Yes
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
15.9
No
---
---
---
No
No
No
---
---
---
---
Oen Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
AS-1318-20
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
AS-B18-59 / S-
Oen Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
B18-59
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
AS-B18-71 /S-
13
Open Cut
13
$7,039.50
Yes
Yes
Yes
Yes
1.0
Yes
B18-71
Bore
53
$74,067.50
Yes
Yes
Yes
No
10.5
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
372.1
No
---
---
---
Yes
Yes
No
---
---
Open Cut
8
$4,332.00
Yes
TOY
Yes
Yes
1.0
TOY
AS-NHD-1547
8
Bore
48
$67,080.00
Yes
Yes
Yes
No
15.5
No
TOY Open
Cut
HDD
1,600
$2,619,200.00
No
No
Yes
No
604.6
No
---
---
---
No
No
No
---
---
AS-NHD-
Oen Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
1549*
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
967.4
No
---
---
---
Yes
No
No
---
---
---
---
AS-NHD-
Oen Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
1551*
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
967.4
No
---
---
---
No
No
No
---
---
---
---
AS-NHD-
Oen Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
1552*
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
967.4
No
G-3 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-4 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
No
No
No
---
---
---
---
AS-NHD-
Oen Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
1560*
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
967.4
No
---
---
---
No
No
No
---
---
---
---
AS-NHD-
Oen Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
3025*
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
967.4
No
---
---
---
Yes
No
No
---
---
AS-NHD-
Open Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
3040*
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
967.4
No
---
---
---
Yes
No
No
---
---
---
---
Oen Cut
16
$8,664.00
Yes
Yes
Yes
Yes
1.0
Yes
AS-NHD-305
16
Bore
56
$78,260.00
Yes
Yes
Yes
No
9.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
302.3
No
---
---
---
Yes
No
No
---
---
---
---
Oen Cut
36
$19,494.00
Yes
Yes
Yes
Yes
1.0
Yes
AS-NHD-4000
36
Bore
76
$106,210.00
Yes
Yes
Yes
No
5.4
No
Open Cut
HDD
2,400
$3,928,800.00
No
Yes
Yes
No
201.5
No
---
---
---
No
No
Yes
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-10
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
No
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-101
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-102
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
G-4 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-5 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
Yes
No
No
---
---
---
---
Open Cut
53
$28,699.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-105
53
Bore
93
$129,967.50
Yes
Yes
Yes
No
4.5
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
91.3
No
---
---
---
No
No
No
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-107
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
4836.9
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-108
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-109
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
967.4
No
---
---
---
No
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-120
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
No
No
Yes
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-126
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
No
No
4836.9
No
---
---
---
No
No
No
---
---
---
---
Open Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-132
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
967.4
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-140
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
G-5 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-6 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
No
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-140-2
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1209.2
No
---
---
---
No
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-144
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
Open Cut
103
$55,774.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-147
103
Bore
143
$199,842.50
Yes
Yes
Yes
No
3.6
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
47.0
No
---
---
---
No
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-15
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
55
$29,782.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-151
55
Bore
95
$132,762.50
Yes
Yes
Yes
No
4.5
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
87.9
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
48
$25,992.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-151-2
48
Bore
88
$122,980.00
Yes
Yes
Yes
No
4.7
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
100.8
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-153
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
Yes
Yes
No
---
---
---
---
Oen Cut
247
$133,750.50
Yes
TOY
Yes
Yes
1.0
TOY
TOY Open
S-A18-17
247
Bore
287
$401,082.50
Yes
Yes
Yes
Yes
3.0
Yes
Cut
HDD
1,600
$2,619,200.00
No
No
Yes
No
19.6
No
or Bore
G-6 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-7 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
Yes
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-171
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
26
$14,079.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-176
26
Bore
66
$92,235.00
Yes
Yes
Yes
No
6.6
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
186.0
No
---
---
---
No
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-181
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
No
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-183
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
20
$10,830.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-2
20
Bore
60
$83,850.00
Yes
Yes
Yes
No
7.7
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
241.8
No
---
---
---
No
No
No
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-213
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
4836.9
No
---
---
---
No
No
No
---
---
---
---
Open Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-219
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
967.4
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-220
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
G-7 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-8 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-221
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-223
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No---
Open Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-225
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
967.4
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-226
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-228
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
967.4
No
---
---
---
No
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-234
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
No
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-235
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1612.3
No
---
---
---
No
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-244
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1612.3
No
G-8 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-9 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
No
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-250
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1209.2
No
---
---
---
No
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-251
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-256
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
Open Cut
7
$3,790.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-32
7
Bore
47
$65,682.50
Yes
Yes
Yes
No
17.3
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
691.0
No
---
---
---
No
Yes
No
---
---
---
---
Oen Cut
3
$1,624.50
Yes
TOY
Yes
Yes
1.0
TOY
TOY Open
S-A18-47
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Cut
HDD
1,600
$2,619,200.00
Yes
No
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-55
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-60
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
26
$14,079.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-64
26
Bore
66
$92,235.00
Yes
Yes
Yes
No
6.6
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
186.0
No
---
---
---
Yes
No
No
---
---
---
S -A18-65
1
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
Open Cut
G-9 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-10 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
4836.9
No
---
---
---
Yes
No
No
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-68
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
20
$10,830.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-70
20
Bore
60
$83,850.00
Yes
Yes
Yes
No
7.7
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
241.8
No
---
---
---
No
No
No
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-70-2
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
4836.9
No
---
---
---
No
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-72
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
No
No
No
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-72-2
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
4836.9
No
---
---
---
No
No
No
---
---
---
---
S
2
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
-A18-78
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
No
No
No
------
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-84
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1209.2
No
---
---
---
No
No
No
---
---
---
---
Open Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-87
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
967.4
No
G-10 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-11 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
No
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-9
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-90
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-94
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -A18-97
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
27
$14,620.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-108
27
Bore
67
$93,632.50
Yes
Yes
Yes
No
6.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
179.1
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-109
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-11
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-125
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
G-11 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-12 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
Yes
No
No
---
---
---
---
Open Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
S-1318-127
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
967.4
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S-1318-128
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
No
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S-1318-129
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
12
Open Cut
12
$6,498.00
Yes
Yes
Yes
Yes
1.0
Yes
Open Cut
S-1318-133
Bore
52
$72,670.00
Yes
Yes
Yes
No
11.2
No
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
403.1
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S-1318-134
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
No
No
No
---
---
O en Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S-1318-135
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
No
No
No
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S-1318-142
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
4836.9
No
---
---
---
No
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S-1318-23
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1209.2
No
G-12 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-13 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
Test
° Ratio
�3 g/�O) h/
---
---
---
No
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-38
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1612.3
No
---
---
---
No
No
No
---
---
---
---
Open Cut
19
$10,288.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-41
19
Bore
59
$82,452.50
Yes
Yes
Yes
No
8.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
254.6
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-44
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
No
No
No
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-47
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
4836.9
No
---
---
---
Yes
No
No
---
---
---
---
S
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
Open Cut
-B18-49
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-51
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-52
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
39
$21,118.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-56
39
Bore
79
$110,402.50
Yes
Yes
Yes
No
5.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
124.0
No
G-13 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-14 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
No
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-57
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
No
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-59
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-59-2
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
4836.9
No
---
---
---
No
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-65
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-68
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-7
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-72
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S-1318-74
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
G-14 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-15 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-74-2
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
13
$7,039.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-8
13
Bore
53
$74,067.50
Yes
Yes
Yes
No
10.5
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
372.1
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-89
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
4836.9
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
12
$6,498.00
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-92
12
Bore
52
$72,670.00
Yes
Yes
Yes
No
11.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
403.1
No
---
---
---
No
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-94
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
28
$15,162.00
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-95
28
Bore
68
$95,030.00
Yes
Yes
Yes
No
6.3
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
172.7
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -B18-99
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
4836.9
No
---
---
---
No
No
No
---
---
---
---
Open Cut
79
$42,778.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-11
79
Bore
119
$166,302.50
Yes
Yes
Yes
No
3.9
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
61.2
No
G-15 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-16 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
No
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-13
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
No
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-15
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-15-2
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
4836.9
No
---
---
---
No
No
No
---
---
---
---
Open Cut
1
$541.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-2
1
Bore
41
$57,297.50
Yes
Yes
Yes
No
105.8
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
4836.9
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
7
$3,790.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-21
7
Bore
47
$65,682.50
Yes
Yes
Yes
No
17.3
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
691.0
No
---
---
---
No
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-22
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1612.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-25
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
---
---
---
No
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-28
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1612.3
No
G-16 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-17 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
No
No
No
---
---
---
---
Open Cut
13
$7,039.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-30
13
Bore
53
$74,067.50
Yes
Yes
Yes
No
10.5
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
372.1
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
10
$5,415.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-35
10
Bore
50
$69,875.00
Yes
Yes
Yes
No
12.9
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
483.7
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
25
$13,537.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-38
25
Bore
65
$90,837.50
Yes
Yes
Yes
No
6.7
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
193.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
17
$9,205.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-38-2
17
Bore
57
$79,657.50
Yes
Yes
Yes
No
8.7
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
284.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
23
$12,454.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-38-3
23
Bore
63
$88,042.50
Yes
Yes
Yes
No
7.1
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
210.3
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
8
$4,332.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-38-4
8
Bore
48
$67,080.00
Yes
Yes
Yes
No
15.5
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
604.6
No
---
---
---
No
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-39
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-49
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
G-17 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-18 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Test
° Ratio
�3 g/�O) h/
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-51
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
---
---
---
No
No
No
---
---
---
---
Open Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-52
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
967.4
No
---
---
---
Yes
No
No
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-53
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-57
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
No
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-60
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
2
$1,083.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-61
2
Bore
42
$58,695.00
Yes
Yes
Yes
No
54.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
2418.5
No
---
---
---
No
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-62
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1209.2
No
---
---
---
No
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-63
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1209.2
No
G-18 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
G-19 November 2018
Appendix G
Wetland and Wate body Crossing Analysis - Streams
Stream ID
Stream
Width
(feet) a/
Crossing
Option
Crossing
Footage
b/
Cost by
Crossing
Option c/
15% or
Greater
Slopes
at
WOTUS
d/
Aquatic
T&E
Species
e/
Proximity
to
Private
Wells f/
Cost
Effectiveness
Crossing
Method
Practicable
i/
Most
Practicable
Option i/
Test
° Ratio
�3 g/�O) h/
---
---
---
Yes
No
No
---
---
---
---
Open Cut
5
$2,707.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-68
5
Bore
45
$62,887.50
Yes
Yes
Yes
No
23.2
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
967.4
No
---
---
---
No
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-74
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
1612.3
No
---
---
---
No
No
No
---
---
---
---
Open Cut
19
$10,288.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-76
19
Bore
59
$82,452.50
Yes
Yes
Yes
No
8.0
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
254.6
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-79
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
---
Open Cut
4
$2,166.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-80
4
Bore
44
$61,490.00
Yes
Yes
Yes
No
28.4
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1209.2
No
---
---
---
Yes
No
No
---
---
Open Cut
24
$12,996.00
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-81
24
Bore
64
$89,440.00
Yes
Yes
Yes
No
6.9
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
201.5
No
---
---
---
Yes
No
No
---
---
---
---
Open Cut
3
$1,624.50
Yes
Yes
Yes
Yes
1.0
Yes
S -C18-82
3
Bore
43
$60,092.50
Yes
Yes
Yes
No
37.0
No
Open Cut
HDD
1,600
$2,619,200.00
No
Yes
Yes
No
1612.3
No
---
---
---
No
No
No
---
---
---
---
Open Cut
25
$13,537.50
Yes
Yes
Yes
Yes
1.0
Yes
WB -A18-121
25
Bore
65
$90,837.50
Yes
Yes
Yes
No
6.7
No
Open Cut
HDD
1,600
$2,619,200.00
Yes
Yes
Yes
No
193.5
No
G-19 November 2018
TI Mountain Valley Joint Permit Application
PIPELINEr USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Wate body Crossing Analysis - Streams
15% or Cost
Greater Aquatic Proximity Effectiveness Crossing
Stream Crossing Cost by Most
Crossing
Stream ID Width Footage Crossing Slopes T&E to Test Method Practicable
Option at Species Private ° Ratio Practicable
(feet) a/ b/ Option c/ WOTUS e/ Wells f/ �3 g/�°) h/ i/ Option i/
d/
a/ Stream width at intersection with pipeline; for purposes of this analysis, all stream crossing widths are assumed to be at least 1 foot wide.
b/ Crossing footage varies by method; an additional 40 feet is required for conventional bore (5 feet for the bore pit and 15 -foot wide stream buffer on each side of
stream); HDD crossings lengths are 100 feet per each inch of pipeline diameter due to pipe bending constraints.
c/ See table of Cost Comparison by Method at end of this appendix.
d/ Slope was calculated based on average slope change within 30 feet of stream crossing. WOTUS = Waters of the United States
e/ Identified crossing by agencies for a previously known occurrence federally listed threatened or endangered ('T&E") species based on agency correspondence
to date.
f/ Private wells (known to date) within 150 feet of a resource crossing
g/ Cost effectiveness test: cost greater than 300 percent of open cut crossing method is considered not practicable.
h/ Cost ratio relative to open -cut crossing method.
i/ See practicable logic test for various conditions by crossing method at the end of this appendix for details A method is considered practicable if all variables are
practicable; methods practicable for all variables except for presence of aquatic T&E species are classified as practicable with time of year ('TOY") crossing
restrictions.
j/ If the Project moves forward with alternative crossing method that is not practicable, it is due to the request of a regulatory agency that does not consider
practicability.
G-20 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Cost by
Greater
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Crossing
Slopes
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
Option c/
at
Present
Private
(300%)
Ratio
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
---
---
---
Yes
No
No
---
---
W-1318-98:
15
Oen Cut
15
$5,436.44
Yes
Yes
Yes
Yes
1.0
Yes
PFO
Oen Cut
p
Bore
55
$76,916.39
No
Yes
Yes
No
14.1
No
HDD
2400
$3,928,800.00
No
Yes
Yes
No
722.7
No
---
---
---
No
No
No
---
---
W-A18-22:
77
Oen Cut
77
$27,956.22
Yes
Yes
Yes
Yes
1.0
Yes
PEM
Oen Cut
p
Bore
117
$163,974.20
Yes
Yes
Yes
No
5.9
No
HDD
2400
$3,928,800.00
Yes
Yes
Yes
No
140.5
No
---
---
---
Yes
No
No
---
---
AW-A18-
Oen Cut
31
$11,034.84
Yes
Yes
Yes
Yes
1.0
Yes
44: PEM
31
Oen Cut
p
Bore
71
$98,558.90
No
Yes
Yes
No
8.9
No
HDD
2400
$3,928,800.00
No
Yes
Yes
No
356.0
No
---
---
---
Yes
No
No
---
---
W-A18-26:
Oen Cut
22
$7,801.05
Yes
Yes
Yes
Yes
1.0
Yes
22
Oen Cut
p
PEM
Bore
62
$86,057.60
No
Yes
Yes
No
11.0
No
HDD
2400
$3,928,800.00
No
Yes
Yes
No
503.6
No
---
---
---
Yes
No
No
---
---
AW-A18-
Oen Cut
21
$7,578.36
Yes
Yes
Yes
Yes
1.0
Yes
26: PEM
21
Oen Cut
p
Bore
61
$85,196.68
No
Yes
Yes
No
11.2
No
HDD
2400
$3,928,800.00
No
Yes
Yes
No
518.4
No
---
---
---
Yes
No
No
---
---
W-A18-30:
Oen Cut
26
$9,458.60
Yes
Yes
Yes
Yes
1.0
Yes
PEM
26
Oen Cut
p
Bore
66
$92,465.41
No
Yes
Yes
No
9.8
No
HDD
2400
$3,928,800.00
No
Yes
Yes
No
415.4
No
G-21 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Greater
Cost by
Proximity
T&E
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Slopes
Crossing
to
Species
Method
Practicable
Test
(feet) a/
Option
b/
at
Option c/
Private
Present
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
Wells f/
e/
h/
i/
d/
g/
--- ---
--- No
No No
--- ---
W-A18-30:
Oen Cut 5
$1,854.26 Yes
Yes Yes
Yes 1.0
Yes
PFO
5
Oen Cut
p
Bore 45
$63,068.26 Yes
Yes Yes
No 34.0
No
HDD 2400
$3,928,800.00 Yes
Yes Yes
No 2118.8
No
--- ---
--- No
No No
--- ---
W-A18-38:
Open Cut 29
$10,423.39 Yes
Yes Yes
Yes 1.0
Yes
PEM
29
Oen Cut
p
Bore 69
$96,195.14 Yes
Yes Yes
No 9.2
No
HDD 2400
$3,928,800.00 Yes
Yes Yes
No 376.9
No
--- ---
--- No
No No
--- ---
W-1318-48:
Oen Cut 23
$8,470.51 Yes
Yes Yes
Yes 1.0
Yes
PFO
23
Oen Cut
p
Bore 63
$88,645.60 Yes
Yes Yes
No 10.5
No
HDD 2400
$3,928,800.00 Yes
Yes Yes
No 463.8
No
--- ---
--- Yes
No No
--- ---
W-A18-18:
Oen Cut 935
$337,943.77 Yes
Yes Yes
Yes 1.0
Yes
PFO
935
Oen Cut
p
Bore 975
$1,362,335.47 No
Yes Yes
No 4.0
No
HDD 2400
$3,928,800.00 No
Yes Yes
No 11.6
No
--- ---
--- Yes
No No
--- ---
W-A18-18:
Oen Cut 50
$17,902.29 Yes
Yes Yes
Yes 1.0
Yes
PEM
50
Oen Cut
p
Bore 90
$125,107.34 No
Yes Yes
No 7.0
No
HDD 2400
$3,928,800.00 No
Yes Yes
No 219.5
No
--- ---
--- Yes
No No
--- ---
W-B18-39:
Oen Cut 25
$8,902.85 Yes
Yes Yes
Yes 1.0
Yes
PEM
25
Oen Cut
p
Bore 65
$90,316.97 No
Yes Yes
No 10.1
No
HDD 2400
$3,928,800.00 No
Yes Yes
No 441.3
No
G-22 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Greater
Cost by
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Slopes
Crossing
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
at
Option c/
Present
Private
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
--- ---
--- Yes
No
No
--- ---
W-1318-39-
Oen Cut 40
$14,631.59 Yes
Yes
Yes
Yes 1.0
Yes
2: PEM
40
Oen Cut
p
Bore 80
$112,463.34 No
Yes
Yes
No 7.7
No
HDD 2400
$3,928,800.00 No
Yes
Yes
No 268.5
No
--- ---
--- Yes
No
No
--- ---
W-1318-39-
Open Cut 30
$10,794.72 Yes
Yes
Yes
Yes 1.0
Yes
3: PEM
30
Oen Cut
p
Bore 70
$97,630.63 No
Yes
Yes
No 9.0
No
HDD 2400
$3,928,800.00 No
Yes
Yes
No 364.0
No
--- ---
--- Yes
No
No
--- ---
W-1318-39-
Oen Cut 32
$11,408.60 Yes
Yes
Yes
Yes 1.0
Yes
4: PEM
32
Oen Cut
p
Bore 72
$100,003.80 No
Yes
Yes
No 8.8
No
HDD 2400
$3,928,800.00 No
Yes
Yes
No 344.4
No
--- ---
--- Yes
No
No
--- ---
W-1318-36:
Oen Cut 36
$13,173.73 Yes
Yes
Yes
Yes 1.0
Yes
PEM
36
Oen Cut
p
Bore 76
$106,827.51 No
Yes
Yes
No 8.1
No
HDD 2400
$3,928,800.00 No
Yes
Yes
No 298.2
No
--- ---
--- Yes
No
No
--- ---
W-1318-36-
Oen Cut 16
$5,905.92 Yes
Yes
Yes
Yes 1.0
Yes
2: PEM
16
Oen Cut
p
Bore 56
$78,731.31 No
Yes
Yes
No 13.3
No
HDD 2400
$3,928,800.00 No
Yes
Yes
No 665.2
No
--- ---
--- Yes
No
No
--- ---
W-1318-36:
Oen Cut 32
$11,506.40 Yes
Yes
Yes
Yes 1.0
Yes
PFO
32
Oen Cut
p
Bore 72
$100,381.86 No
Yes
Yes
No 8.7
No
HDD 2400
$3,928,800.00 No
Yes
Yes
No 341.4
No
G-23 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Greater
Cost by
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Slopes
Crossing
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
at
Option c/
Present
Private
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
--- ---
--- Yes
No
No
--- ---
W-1318-36-
Oen Cut 18
$6,477.93 Yes
Yes
Yes
Yes 1.0
Yes
3: PEM
18
Oen Cut
p
Bore 58
$80,942.61 No
Yes
Yes
No 12.5
No
HDD 2400
$3,928,800.00 No
Yes
Yes
No 606.5
No
--- ---
--- Yes
No
No
--- ---
W-1318-36-
Open Cut 27
$9,641.12 Yes
Yes
Yes
Yes 1.0
Yes
5: PEM
27
Oen Cut
p
Bore 67
$93,170.99 No
Yes
Yes
No 9.7
No
HDD 2400
$3,928,800.00 No
Yes
Yes
No 407.5
No
--- ---
--- Yes
No
No
--- ---
W-1318-34:
Oen Cut 179
$64,812.47 Yes
Yes
Yes
Yes 1.0
Yes
PFO
179
Oen Cut
p
Bore 219
$306,454.43 No
Yes
Yes
No 4.7
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 40.4
No
--- ---
--- Yes
No
No
--- ---
W-A18-54:
Oen Cut 11
$4,064.70 Yes
Yes
Yes
Yes 1.0
Yes
PEM
11
Oen Cut
p
Bore 51
$71,613.48 No
Yes
Yes
No 17.6
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 644.4
No
--- ---
--- No
No
No
--- ---
W-A18-
Oen Cut 183
$66,011.72 Yes
Yes
Yes
Yes 1.0
Yes
141: PFO
183
Oen Cut
p
Bore 223
$311,090.53 Yes
Yes
Yes
No 4.7
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 39.7
No
--- ---
--- Yes
No
No
--- ---
W-A18-
Oen Cut 53
$19,144.05 Yes
Yes
Yes
Yes 1.0
Yes
149: PEM
53
Oen Cut
p
Bore 93
$129,907.76 No
Yes
Yes
No 6.8
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 136.8
No
G-24 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Greater
Cost by
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Slopes
Crossing
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
at
Option c/
Present
Private
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
--- ---
--- Yes
No
No
--- ---
W-A18-
Oen Cut 51
$18,614.57 Yes
Yes
Yes
Yes 1.0
Yes
149: PSS
51
Oen Cut
p
Bore 91
$127,860.90 No
Yes
Yes
No 6.9
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 140.7
No
--- ---
--- No
No
No
--- ---
W-A18-
Open Cut 21
$7,640.99 Yes
Yes
Yes
Yes 1.0
Yes
152: PEM
21
Oen Cut
p
Bore 61
$85,438.84 Yes
Yes
Yes
No 11.2
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 342.8
No
--- ---
--- No
No
No
--- ---
W-A18-
Oen Cut 29
$10,627.51 Yes
Yes
Yes
Yes 1.0
Yes
152: PFO
29
Oen Cut
p
Bore 69
$96,984.24 Yes
Yes
Yes
No 9.1
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 246.5
No
--- ---
--- No
No
No
--- ---
W-A18-
Oen Cut 68
$24,755.27 Yes
Yes
Yes
Yes 1.0
Yes
155: PSS
68
Oen Cut
p
Bore 108
$151,599.82 Yes
Yes
Yes
No 6.1
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 105.8
No
--- ---
--- No
No
No
--- ---
W-A18-
Oen Cut 43
$15,403.84 Yes
Yes
Yes
Yes 1.0
Yes
222: PFO
43
Oen Cut
p
Bore 83
$115,448.72 Yes
Yes
Yes
No 7.5
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 170.0
No
--- ---
--- No
No
No
--- ---
W-A18-
Oen Cut 11
$3,825.40 Yes
Yes
Yes
Yes 1.0
Yes
224: PFO
11
Oen Cut
p
Bore 51
$70,688.39 Yes
Yes
Yes
No 18.5
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 684.7
No
G-25 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Greater
Cost by
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Slopes
Crossing
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
at
Option c/
Present
Private
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
--- ---
--- No
No
No
--- ---
W-A18-95:
Oen Cut 8
$2,729.84 Yes
Yes
Yes
Yes 1.0
Yes
PEM
8
Oen Cut
p
Bore 48
$66,453.12 Yes
Yes
Yes
No 24.3
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 959.5
No
--- ---
--- No
No
No
--- ---
W-A18-6:
Open Cut 130
$46,870.16 Yes
Yes
Yes
Yes 1.0
Yes
PFO
130
Oen Cut
p
Bore 170
$237,092.39 Yes
Yes
Yes
No 5.1
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 55.9
No
--- ---
--- Yes
No
No
--- ---
W-A18-6-3:
Oen Cut 92
$33,160.18 Yes
Yes
Yes
Yes 1.0
Yes
PFO
92
Oen Cut
p
Bore 132
$184,091.83 No
Yes
Yes
No 5.6
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 79.0
No
--- ---
--- No
No
No
--- ---
W-A18-6:
Oen Cut 46
$16,583.30 Yes
Yes
Yes
Yes 1.0
Yes
PEM
46
Oen Cut
p
Bore 86
$120,008.34 Yes
Yes
Yes
No 7.2
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 157.9
No
--- ---
--- No
No
No
--- ---
W-A18-7:
Oen Cut 76
$27,399.57 Yes
Yes
Yes
Yes 1.0
Yes
PEM
76
Oen Cut
p
Bore 116
$161,822.26 Yes
Yes
Yes
No 5.9
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 95.6
No
--- ---
--- Yes
No
No
--- ---
W-A18-7:
Oen Cut 34
$12,198.60 Yes
Yes
Yes
Yes 1.0
Yes
PSS
34
Oen Cut
p
Bore 74
$103,057.78 No
Yes
Yes
No 8.4
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 214.7
No
G-26 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Greater
Cost by
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Slopes
Crossing
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
at
Option c/
Present
Private
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
--- ---
--- Yes
No
No
--- ---
W-A18-7-3:
Oen Cut 16
$5,886.84 Yes
Yes
Yes
Yes 1.0
Yes
PEM
16
Oen Cut
p
Bore 56
$78,657.58 No
Yes
Yes
No 13.4
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 444.9
No
--- ---
--- Yes
No
No
--- ---
W-A18-7-4:
Open Cut 29
$10,376.68 Yes
Yes
Yes
Yes 1.0
Yes
PEM
29
Oen Cut
p
Bore 69
$96,014.55 No
Yes
Yes
No 9.3
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 252.4
No
--- ---
--- Yes
No
No
--- ---
W-A18-7-5:
Oen Cut 16
$5,817.10 Yes
Yes
Yes
Yes 1.0
Yes
PEM
16
Oen Cut
p
Bore 56
$78,387.95 No
Yes
Yes
No 13.5
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 450.3
No
--- ---
--- No
No
No
--- ---
W-1318-78:
Oen Cut 56
$20,240.47 Yes
Yes
Yes
Yes 1.0
Yes
PFO
56
Oen Cut
p
Bore 96
$134,146.37 Yes
Yes
Yes
No 6.6
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 129.4
No
--- ---
--- No
No
No
--- ---
W-B18-55:
Oen Cut 84
$30,240.93 Yes
Yes
Yes
Yes 1.0
Yes
PFO
84
Oen Cut
p
Bore 124
$172,806.50 Yes
Yes
Yes
No 5.7
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 86.6
No
--- ---
--- No
No
No
--- ---
W-1318-46:
Oen Cut 6
$2,114.73 Yes
Yes
Yes
Yes 1.0
Yes
PFO
6
Oen Cut
p
Bore 46
$64,075.21 Yes
Yes
Yes
No 30.3
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 1238.5
No
G-27 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Cost by
Greater
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Crossing
Slopes
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
Option c/
at
Present
Private
(300%)
Ratio
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
---
---
---
No
No
No
---
---
W-C18-77:
Oen Cut
47
$16,833.23
Yes
Yes
Yes
Yes
1.0
Yes
PFO
47
Oen Cut
p
Bore
87
$120,974.52
Yes
Yes
Yes
No
7.2
No
HDD
1600
$2,619,200.00
Yes
Yes
Yes
No
155.6
No
---
---
---
No
No
No
---
---
W-1318-
Open Cut
24
$8,820.94
Yes
Yes
Yes
Yes
1.0
Yes
139: PFO
24
Oen Cut
p
Bore
64
$90,000.33
Yes
Yes
Yes
No
10.2
No
HDD
1600
$2,619,200.00
Yes
Yes
Yes
No
296.9
No
---
---
---
Yes
No
No
---
---
W-A18-62-
Oen Cut
40
$14,295.57
Yes
Yes
Yes
Yes
1.0
Yes
2: PSS
40
Oen Cut
p
Bore
80
$111,164.36
No
Yes
Yes
No
7.8
No
HDD
1600
$2,619,200.00
No
Yes
Yes
No
183.2
No
---
---
---
No
No
No
---
---
W -A18-61:
Oen Cut
0
$91.01
Yes
Yes
Yes
Yes
1.0
Yes
0
Open Cut
PEM
Bore
40
$56,251.85
Yes
Yes
Yes
No
618.1
No
28777.
HDD
1600
$2,619,200.00
Yes
Yes
Yes
No
8
No
---
---
---
No
No
No
---
---
W-A18-
Oen Cut
57
$20,598.50
Yes
Yes
Yes
Yes
1.0
Yes
184: PEM
57
Oen Cut
p
Bore
97
$135,530.42
Yes
Yes
Yes
No
6.6
No
HDD
1600
$2,619,200.00
Yes
Yes
Yes
No
127.2
No
---
---
---
No
No
No
---
---
W-C18-20:
O en Cut
16
$5,617.00
Yes
Yes
Yes
Yes
1.0
Yes
PFO
16
Oen Cut
p
Bore
56
$77,614.39
Yes
Yes
Yes
No
13.8
No
HDD
1600
$2,619,200.00
Yes
Yes
Yes
No
466.3
No
G-28 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Greater
Cost by
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Slopes
Crossing
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
at
Option c/
Present
Private
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
--- ---
--- No
No
No
--- ---
W-C18-20:
Oen Cut 55
$19,772.20 Yes
Yes
Yes
Yes 1.0
Yes
PEM
55
Oen Cut
p
Bore 95
$132,336.08 Yes
Yes
Yes
No 6.7
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 132.5
No
--- ---
--- No
No
No
--- ---
W-A18-83:
Open Cut 26
$9,432.55 Yes
Yes
Yes
Yes 1.0
Yes
PEM
26
Oen Cut
p
Bore 66
$92,364.71 Yes
Yes
Yes
No 9.8
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 277.7
No
--- ---
--- No
No
No
--- ---
W-A18-85:
Oen Cut 9
$3,244.75 Yes
Yes
Yes
Yes 1.0
Yes
PEM
9
Oen Cut
p
Bore 49
$68,443.69 Yes
Yes
Yes
No 21.1
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 807.2
No
--- ---
--- Yes
No
No
--- ---
W-C18-67:
Oen Cut 103
$37,191.51 Yes
Yes
Yes
Yes 1.0
Yes
PFO
103
Oen Cut
p
Bore 143
$199,676.32 No
Yes
Yes
No 5.4
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 70.4
No
--- ---
--- No
No
No
--- ---
W-C18-69:
Oen Cut 37
$13,377.78 Yes
Yes
Yes
Yes 1.0
Yes
PFO
37
Oen Cut
p
Bore 77
$107,616.30 Yes
Yes
Yes
No 8.0
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 195.8
No
--- ---
--- No
No
No
--- ---
W-B18-61:
Oen Cut 39
$14,124.54 Yes
Yes
Yes
Yes 1.0
Yes
PEM
39
Oen Cut
p
Bore 79
$110,503.16 Yes
Yes
Yes
No 7.8
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 185.4
No
G-29 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Greater
Cost by
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Slopes
Crossing
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
at
Option c/
Present
Private
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
--- ---
--- Yes
No
No
--- ---
W-A18-
Oen Cut 95
$34,468.35 Yes
Yes
Yes
Yes 1.0
Yes
119: PFO
95
Oen Cut
p
Bore 135
$189,149.02 No
Yes
Yes
No 5.5
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 76.0
No
--- ---
--- Yes
No
No
--- ---
W-A18-
Open Cut 297
$107,447.88 Yes
Yes
Yes
Yes 1.0
Yes
119-2: PFO
297
Oen Cut
p
Bore 337
$471,275.99 No
Yes
Yes
No 4.4
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 24.4
No
--- ---
--- No
No
Yes
--- ---
W-A18-
Oen Cut 61
$22,166.79 Yes
Yes
Yes
Yes 1.0
Yes
127: PFO
61
Oen Cut
p
Bore 101
$141,593.18 Yes
Yes
Yes
No 6.4
No
HDD 1600
$2,619,200.00 Yes
Yes
No
No 118.2
No
--- ---
--- Yes
No
No
--- ---
W-A18-
Oen Cut 17
$6,158.87 Yes
Yes
Yes
Yes 1.0
Yes
130: PFO
17
Oen Cut
p
Bore 57
$79,709.17 No
Yes
Yes
No 12.9
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 425.3
No
--- ---
--- Yes
No
No
--- ---
W-A18-
Oen Cut 56
$20,261.16 Yes
Yes
Yes
Yes 1.0
Yes
133: PFO
56
Oen Cut
p
Bore 98
$137,021.34 No
Yes
Yes
No 6.8
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 129.3
No
--- ---
--- Yes
No
No
--- ---
W-A18-
Oen Cut 146
$52,702.66 Yes
Yes
Yes
Yes 1.0
Yes
135: PFO
146
Oen Cut
p
Bore 190
$265,229.90 No
Yes
Yes
No 5.0
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 49.7
No
G-30 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Greater
Cost by
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Slopes
Crossing
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
at
Option c/
Present
Private
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
--- ---
--- Yes
No
No
--- ---
W-A18-
Oen Cut 152
$54,811.64 Yes
Yes
Yes
Yes 1.0
Yes
254: PFO
152
Oen Cut
p
Bore 198
$276,177.84 No
Yes
Yes
No 5.0
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 47.8
No
--- ---
--- No
No
No
--- ---
W-C18-3:
Open Cut 13
$4,718.27 Yes
Yes
Yes
Yes 1.0
Yes
PEM
13
Oen Cut
p
Bore 61
$85,320.07 Yes
Yes
Yes
No 18.1
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 555.1
No
--- ---
--- No
No
No
--- ---
W-C18-3-2:
Oen Cut 13
$4,556.18 Yes
Yes
Yes
Yes 1.0
Yes
PEM
13
Oen Cut
p
Bore 63
$87,488.44 Yes
Yes
Yes
No 19.2
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 574.9
No
--- ---
--- No
No
No
--- ---
W-C18-3-2:
Oen Cut 8
$2,736.21 Yes
Yes
Yes
Yes 1.0
Yes
PFO
8
Oen Cut
p
Bore 60
$83,247.73 Yes
Yes
Yes
No 30.4
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 957.2
No
--- ---
--- Yes
No
No
--- ---
W-C18-5:
Oen Cut 52
$18,856.92 Yes
Yes
Yes
Yes 1.0
Yes
PSS
52
Oen Cut
p
Bore 106
$148,362.78 No
Yes
Yes
No 7.9
No
HDD 1600
$2,619,200.00 No
Yes
Yes
No 138.9
No
--- ---
--- No
No
No
--- ---
W-C18-29:
Oen Cut 317
$114,731.85 Yes
Yes
Yes
Yes 1.0
Yes
PFO
317
Oen Cut
p
Bore 373
$521,794.61 Yes
Yes
Yes
No 4.5
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 22.8
No
G-31 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Greater
Crossing Cost by
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing Slopes
Footage Crossing
Species
to
Method
Practicable
Test
(feet) a/
Option at
b/ Option c/
Present
Private
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
--- --- --- No
No
No
--- ---
W-A18-74:
Oen Cut 8 $3,040.45 Yes
Yes
Yes
Yes 1.0
Yes
PFO
8
Oen Cut
p
Bore 66 $92,808.88 Yes
Yes
Yes
No 30.5
No
HDD 1600 $2,619,200.00 Yes
Yes
Yes
No 861.5
No
--- --- --- Yes
No
No
--- ---
W-A18-80:
Oen Cut 64 $23,019.95 Yes
Yes
Yes
Yes 1.0
Yes
PEM
64
Oen Cut
p
Bore 124 $172,841.39 No
Yes
Yes
No 7.5
No
HDD 1600 $2,619,200.00 No
Yes
Yes
No 113.8
No
--- --- --- No
No
No
--- ---
W-618-28'
Oen Cut 313 $113,329.82 Yes
Yes
Yes
Yes 1.0
Yes
PFO
313
Oen Cut
p
Bore 375 $524,759.58 Yes
Yes
Yes
No 4.6
No
HDD 1600 $2,619,200.00 Yes
Yes
Yes
No 23.1
No
--- --- --- No
No
No
--- ---
AW-1318-
Oen Cut 50 $18,035.64 Yes
Yes
Yes
Yes 1.0
Yes
19: PFO
50
Oen Cut
p
Bore 114 $159,162.85 Yes
Yes
Yes
No 8.8
No
HDD 1600 $2,619,200.00 Yes
Yes
Yes
No 145.2
No
--- --- --- No
No
No
--- ---
AW-1318-5:
Oen Cut 6 $2,224.82 Yes
Yes
Yes
Yes 1.0
Yes
PFO
6
Oen Cut
p
Bore 72 $100,835.79 Yes
Yes
Yes
No 45.3
No
HDD 1600 $2,619,200.00 Yes
Yes
Yes
No 1177.3
No
--- --- --- Yes
No
No
--- ---
W-A18-67:
Oen Cut 44 $15,857.99 Yes
Yes
Yes
Yes 1.0
Yes
PFO
44
Oen Cut
p
Bore 112 $156,334.41 No
Yes
Yes
No 9.9
No
HDD 1600 $2,619,200.00 No
Yes
Yes
No 165.2
No
G-32 November 2018
M Mountain Valley
Joint Permit Application
USACE — Wilmington District and NCDEQ
SAW -2018-008887
Appendix G
Wetland and Waterbody Crossing Analysis - Wetlands
15% or
Aquatic
Cost
Wetland
Crossing
Greater
Cost by
T&E
Proximity
Effectiveness
Crossing
Most
Wetland ID
Width
Crossing
Footage
Slopes
Crossing
Species
to
Method
Practicable
Test
(feet) a/
Option
b/
at
Option c/
Present
Private
Ratio
(300%)
Practicable
Option /
p 1
WOTUS
e/
Wells f/
h/
i/
d/
g/
--- ---
--- No
No
No
--- ---
W-A18-
O en Cut 57
$20,432.01 Yes
Yes
Yes
Yes 1.0
Yes
57
Oen Cut
p
111: PEM
Bore 127
$176,811.80 Yes
Yes
Yes
No 8.7
No
HDD 1600
$2,619,200.00 Yes
Yes
Yes
No 128.2
No
a/ Wetland width at intersection with pipeline; for purposes of this analysis
b/ Crossing footage varies by method; an additional 40 feet is required for conventional bore (5 feet for the bore pit and 15 -foot wide stream buffer on each
side of stream); HDD crossings lengths are 100 feet per each inch of pipeline diameter due to pipe bending constraints.
c/ See table of Cost Comparison by Method at end of this appendix.
d/ Slope was calculated based on average slope change within 30 feet of wetland crossing. WOTUS = Waters of the United States
e/ Identified crossing by agencies for a previously known occurrence federally listed threatened or endangered ("T&E") species based on agency
correspondence to date.
f/ Private wells (known to date) within 150 feet of a resource crossing
g/ Cost effectiveness test: cost greater than 300 percent of open cut crossing method is considered not practicable.
h/ Cost ratio relative to open -cut crossing method.
i/ See practicable logic test for various conditions by crossing method at the end of this appendix for details A method is considered practicable if all
variables are practicable; methods practicable for all variables except for presence of aquatic T&E species are classified as practicable with time of year
("TOY') crossing restrictions.
j/ If the Project moves forward with alternative crossing method that is not practicable, it is due to the request of a regulatory agency that does not consider
practicability.
G-33 November 2018
M Mountain Valley
Joint Permit Application
USACE —Wilmington District and NCDEQ
SAW -2018-008887
Practicable Logic Test for Various Conditions by Crossing Method
Crossing Method
Practicable ?
Crossing Method
No Aquatic T&E Species Present a/
Aquatic T& E Species Present a/
Open Cut
Yes
Yes with TOY b/
Bore
Yes
Yes
HDD
Yes
No
Slopes at WOTUS < 15%
Slopes at WOTUS > 15%
Open Cut
Yes
Yes
Bore
Yes
No
HDD
Yes
No
Within 150 feet of Private Well c/
Not within 150 feet of Private Well c/
Open Cut
Yes
Yes
Bore
Yes
Yes
HDD
Yes
No
Cost Effective d/
Not Cost Effective d/
Open Cut
Yes
No
Bore
Yes
No
HDD
Yes
No
a/ Presence of state or federal -listed threatened or endangered ("T&E") species based on agency
correspondence to date.
b/ TOY = Time of Year construction restrictions.
b/ Private wells known to date within 150 feet of a resource crossing.
c/ Cost ratio within 300 percent of Open -Cut crossing method.
Cost Comparison by Crossing Method
Crossing Method
Crossing Unit Costs b/
Stream Open Cut
$ 541.50
Wetland Open Cut
$ 361.50
Conventional Bore
$ 1,397.50
HDD Method
$ 1,637.00
a/ Costs in excess of the base cost of open cut 24" or 16" pipeline installation in upland areas.
Costs determined from the average of two contractors under consideration per linear foot of crossing.
G-34 November 2018