Loading...
HomeMy WebLinkAbout20181638 Ver 1_Appx L-1 Wetland Impacts_20181130M Mountain Valley Joint Permit Application PIPELINEJu USACE — Wilmington District and NCDEQ SAW -2018-008887 MVP Southgate Project Standard Joint Permit Application U.S. Army Corps of Engineers — Wilmington District (SAW -2018-00887) North Carolina Department of Environmental Quality, Division of Water Resources Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Within Conversion Permanent Crossing Impact ID Watershed HUC Wetland Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ Pipeline (Rockingham County) W -C18-96- Cascade Creek - 2: PFO 26.1 Dan River 36.541688 -79.63256 PFO 0 0.001 0.001 0.000 Workspace Only 0301010309 Cascade Creek - W-1318-98: 26.5 Dan River 36.536541 -79.63749 PFO 15 0.029 0.011 0.000 Conventional PFO 0301010309 W -A18-22: Cascade Creek - 26.7 Dan River 36.534583 -79.63901 PEM 77 0.168 0.000 0.000 Conventional PEM 0301010309 Cascade Creek - AW -A18- 27.3 Dan River 36.528542 -79.64566 PEM 31 0.057 0.000 0.000 Conventional 44: PEM 0301010309 W -A18-26: Cascade Creek - 28.1 Dan River 36.519201 -79.65474 PEM 22 0.022 0.000 0.000 Conventional PEM 0301010309 Cascade Creek - AW -A18- 28.1 Dan River 36.519117 -79.6548 PEM 21 0.042 0.000 0.000 Conventional 26: PEM 0301010309 Cascade Creek - W -A18-30: 28.3 Dan River 36.517047 -79.65642 PEM 26 0.036 0.000 0.000 Conventional PEM 0301010309 W -A18-30: Cascade Creek - 28.3 Dan River 36.516646 -79.65647 PFO 5 0.011 0.004 0.000 Conventional PFO 0301010309 Cascade Creek - W -A18-33: 28.3 Dan River 36.516535 -79.65682 PEM 0 0.007 0.000 0.000 Workspace Only PEM 0301010309 W -A18-38: Cascade Creek - 28.6 Dan River 36.513291 -79.66016 PEM 29 0.044 0.000 0.000 Conventional PEM 0301010309 Cascade Creek - W -A18-38: 28.6 Dan River 36.51324 -79.66004 PFO 0 0.013 0.000 0.000 Workspace Only PFO 0301010309 L-1-1 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Within Conversion Permanent Crossing Impact ID Watershed HUC Wetland Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ Cascade Creek - W-1318-48: 29.1 Dan River 36.508367 -79.66519 PFO 23 0.051 0.018 0.000 Conventional PFO 0301010309 W-1318-48: Cascade Creek - 29.1 Dan River 36.508421 -79.6653 PEM 0 0.011 0.000 0.000 Workspace Only PEM 0301010309 Cascade Creek - W -A18-18: 29.7 Dan River 36.500578 -79.67273 PFO 935 1.866 0.644 0.000 Conventional PFO 0301010309 W -A18-18: Cascade Creek - 29.9 Dan River 36.499656 -79.67372 PEM 50 0.073 0.000 0.000 Conventional PEM 0301010309 Cascade Creek - W-1318-39: PEM 30.2 Dan River 36.496101 -79.67764 PEM 25 0.000 0.000 0.000 HDD 0301010309 Cascade Creek - W-1318-39- 30.2 Dan River 36.495973 -79.67773 PEM 40 0.000 0.000 0.000 HDD 2: PEM 0301010309 W-1318-39- Cascade Creek - 30.2 Dan River 36.495819 -79.67789 PEM 30 0.000 0.000 0.000 HDD 3: PEM 0301010309 Cascade Creek - W-1318-39- 30.2 Dan River 36.49571 -79.67801 PEM 32 0.000 0.000 0.000 HDD 4: PEM 0301010309 W-1318-36: Cascade Creek - 30.2 Dan River 36.495507 -79.67823 PEM 36 0.000 0.000 0.000 HDD PEM 0301010309 Cascade Creek - W-1318-36- 30.3 Dan River 36.495364 -79.6784 PEM 16 0.000 0.000 0.000 HDD 2: PEM 0301010309 W-1318-36: Cascade Creek - PFO 30.3 Dan River 36.495171 -79.67856 PFO 32 0.000 0.000 0.000 HDD 0301010309) L-1-2 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Within Conversion Permanent Crossing Impact ID Watershed HUC Wetland Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ Cascade Creek - W-1318-36- 30.3 Dan River 36.494746 -79.67912 PEM 18 0.000 0.000 0.000 HDD 3: PEM 0301010309 W-1318-36- Cascade Creek - 30.4 Dan River 36.49434 -79.67962 PEM 0 0.000 0.000 0.000 HDD 4: PEM 0301010309 Cascade Creek - W-1318-36- 30.4 Dan River 36.494219 -79.67966 PEM 27 0.033 0.000 0.000 Conventional 5: PEM 0301010309 W-1318-36- Cascade Creek - 30.4 Dan River 36.494116 -79.67993 PEM 0 0.002 0.000 0.000 Conventional 6: PEM 0301010309 Cascade Creek - W-1318-34: 30.5 Dan River 36.49309 -79.68011 PFO 179 0.454 0.123 0.000 Conventional PFO 0301010309 Cascade Creek - W -A18-54: 30.7 Dan River 36.490849 -79.68334 PEM 11 0.014 0.000 0.000 Conventional PEM 0301010309 W-1318- Cascade Creek - 31.1 Dan River 36.485665 -79.68523 PEM 0 0.002 0.000 0.000 Workspace Only 103: PEM 0301010309 Cascade Creek - W -A18- 32 Dan River 36.476993 -79.69605 PFO 183 0.338 0.131 0.000 Conventional 141: PFO 0301010309 W -A18- Cascade Creek - 141: PEM 32 Dan River 36.477148 -79.69616 PEM 0 0.023 0.000 0.000 Workspace Only 0301010309 Cascade Creek - W -A18- 32.2 Dan River 36.474621 -79.69833 PEM 53 0.159 0.000 0.000 Conventional 149: PEM 0301010309 W -A18- Cascade Creek - 149: PSS 32.2 Dan River 36.474593 -79.69826 PSS 51 0.070 0.000 0.000 Conventional 0301010309) L-1-3 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing Within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ W -A18- Cascade Creek - 152: PEM 32.6 Dan River 36.4698 -79.70249 PEM 21 0.057 0.000 0.000 Conventional 0301010309 W -A18- Cascade Creek - 152: PFO 32.6 Dan River 36.46964 -79.70251 PFO 29 0.030 0.017 0.000 Conventional 0301010309 W -A18- Cascade Creek - 155: PEM 33.1 Dan River 36.464024 -79.70291 PEM 0 0.064 0.000 0.000 Workspace Only 0301010309 W -A18- Cascade Creek - 155 -2: PSS 33.1 Dan River 36.463768 -79.70285 PSS 0 0.001 0.000 0.000 Workspace Only 0301010309 W -A18- Cascade Creek - 155: PSS 33.1 Dan River 36.463484 -79.70266 PSS 68 0.155 0.000 0.000 Conventional 0301010309 W -A18- Cascade Creek - 222: PFO 33.4 Dan River 36.459381 -79.70024 PFO 43 0.079 0.029 0.000 Conventional 0301010309 W -A18- Cascade Creek - 222: PEM 33.4 Dan River 36.459274 -79.70029 PEM 0 0.001 0.000 0.000 Workspace Only 0301010309 W -A18- Cascade Creek - 224: PFO 33.7 Dan River 36.455977 -79.69777 PFO 11 0.022 0.007 0.000 Conventional 0301010309 W -A18- Cascade Creek - 224: PEM 33.7 Dan River 36.455931 -79.69782 PEM 0 <.001 0.000 0.000 Workspace Only 0301010309 W -C18-40: Cascade Creek - PEM 34.6 Dan River 36.445616 -79.68953 PEM 0 0.004 0.000 0.000 Workspace Only 0301010309 AW -AWB- Cascade Creek - 01: PFO 36.0 Dan River 36.433337 -79.67106 PFO 0 0.016 0.000 0.000 Workspace Only 0301010309) L-1-4 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing Within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ W -A18-95: Cascade Creek - PEM 37.0 Dan River 36.425012 -79.65763 PEM 8 0.020 0.000 0.000 Conventional 0301010309 W -A18-98: Cascade Creek - PFO 37.2 Dan River 36.423306 -79.65623 PFO 0 0.007 0.000 0.000 Workspace Only 0301010309 W -A18-6: Cascade Creek - PFO 38.5 Dan River 36.407396 -79.64947 PFO 130 0.152 0.084 0.000 Conventional 0301010309 W -A18-6-2: Cascade Creek - PFO 38.5 Dan River 36.407067 -79.64917 PFO 0 0.004 0.000 0.000 Workspace Only 0301010309 W -A18-6-3: Cascade Creek - PFO 38.5 Dan River 36.406781 -79.64867 PFO 92 0.088 0.058 0.000 Conventional 0301010309 W -A18-6: Cascade Creek - PEM 38.5 Dan River 36.406695 -79.64842 PEM 46 0.092 0.000 0.000 Conventional 0301010309 W -A18-7: Cascade Creek - PFO 38.6 Dan River 36.405557 -79.64812 PFO 0 0.001 0.000 0.000 Workspace Only 0301010309 W -A18-7: Cascade Creek - 38.6 Dan River 36.40538 -79.64821 PEM 76 0.183 0.000 0.000 Conventional PEM 0301010309 W -A18-7: Cascade Creek - PSS 38.6 Dan River 36.40525 -79.6481 PSS 34 0.076 0.000 0.000 Conventional 0301010309 W -A18-7-2: Cascade Creek - PEM 38.6 Dan River 36.405113 -79.64815 PEM 0 0.001 0.000 0.000 Workspace Only 0301010309 W -A18-7-3: Cascade Creek - PEM 38.7 Dan River 36.404994 -79.64787 PEM 16 0.046 0.000 0.000 Conventional 0301010309) L-1-5 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing Within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ W -A18-7-4: Cascade Creek - PEM 38.7 Dan River 36.404784 -79.6476 PEM 29 0.069 0.000 0.000 Conventional 0301010309 W -A18-7-5: Cascade Creek - PEM 38.7 Dan River 36.404414 -79.64724 PEM 16 0.038 0.000 0.000 Conventional 0301010309 W-1318-78: Cascade Creek - PFO 39.7 Dan River 36.39375 -79.63832 PFO 56 0.060 0.032 0.000 Conventional 0301010309 W-1318- Hogans Creek -Dan 112: PEM 40.1 River 36.387125 -79.6366 PEM 0 0.011 0.000 0.000 Workspace Only 0301010401 W-1318- Hogans Creek -Dan 110: PFO 40.2 River 36.386777 -79.63634 PFO 0 0.016 0.007 0.000 Workspace Only 0301010401 W-1318-55: Hogans Creek -Dan PEM 41.1 River 36.378086 -79.62523 PEM 0 0.001 0.000 0.000 Workspace Only 0301010401 W-1318-55: Hogans Creek -Dan PFO 41.1 River 36.377936 -79.62531 PFO 84 0.129 0.059 0.000 Conventional 0301010401 W-1318-46: Hogans Creek -Dan PFO 41.7 River 36.371464 -79.62067 PFO 6 0.019 0.008 0.000 Conventional 0301010401 AW -1318- Hogans Creek -Dan 67: PEM 44.7 River 36.333943 -79.60195 PEM 0 0.017 0.000 0.000 Workspace Only 0301010401 W -C18-77: Hogans Creek -Dan PFO 47 River 36.305304 -79.58774 PFO 47 0.081 0.032 0.000 Conventional 0301010401 W-1318- Headwaters Haw 139: PFO 48.5 River 36.290957 -79.57249 PFO 24 0.032 0.015 0.000 Conventional 0303000202 L-1-6 November 2018 M Mountain Valley Joint Permit Application USACE — Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing Within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ W -A18-62- Headwaters Haw 2: PSS 48.6 River 36.288909 -79.57167 PSS 40 0.106 0.000 0.000 Conventional 0303000202 W -A18-62: Headwaters Haw PSS 48.6 River 36.288605 -79.57162 PSS 0 0.001 0.000 0.000 Workspace Only 0303000202 W -A18-61: Headwaters Haw PEM 48.7 River 36.288426 -79.57145 PEM 0 0.007 0.000 0.000 Workspace Only 0303000202 W -A18- Headwaters Haw 184: PEM 49.9 River 36.275271 -79.55896 PEM 57 0.116 0.000 0.000 Conventional 0303000202 W -A18- Headwaters Haw 184-2: 49.9 River 36.274967 -79.55886 PEM 0 0.008 0.000 0.000 Workspace Only PEM 0303000202 W -A18- Headwaters Haw 184: PFO 49.9 River 36.274931 -79.55888 PFO 0 0.015 0.000 0.000 Workspace Only 0303000202 W-1318- Headwaters Haw 140: PEM 50.2 River 36.271313 -79.55597 PEM 0 <.001 0.000 0.000 Workspace Only 0303000202 W -C18-20: Headwaters Haw PFO 51.4 River 36.256448 -79.54537 PFO 16 0.052 0.016 0.000 Conventional 0303000202 W -C18-20: Headwaters Haw PEM 51.4 River 36.256395 -79.54518 PEM 55 0.080 0.000 0.000 Conventional 0303000202 Total 2968 5.486 1.297 0.000 L-1-7 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Within Conversion Permanent Crossing Impact ID Watershed HUC Wetland Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ Pipeline (Alamance County) W -A18-83: Headwaters Haw 53.3 River 36.23401 -79.52916 PEM 26 0.055 0.000 0.000 Conventional PEM 0303000202 W -A18-85: Headwaters Haw 53.6 River 36.230089 -79.5274 PEM 9 0.021 0.000 0.000 Conventional PEM 0303000202 W -A18-85: Headwaters Haw PSS 53.7 River 36.230006 -79.52737 PSS 0 0.016 0.000 0.000 Workspace Only 0303000202 W -A18-85- Headwaters Haw 53.7 River 36.229981 -79.52711 PEM 0 0.002 0.000 0.000 Workspace Only 2: PEM 0303000202 W -C18-67: Headwaters Haw PFO 54.3 River 36.221472 -79.52161 PFO 103 0.129 0.067 0.000 Conventional 0303000202 W -C18-69: Headwaters Haw 55.3 River 36.209331 -79.51679 PFO 37 0.069 0.026 0.000 Conventional PFO 0303000202 W-1318-60: Headwaters Haw PSS 55.3 River 36.208809 -79.51596 PSS 0 0.003 0.000 0.000 Workspace Only 0303000202 W-1318-61: Headwaters Haw 55.5 River 36.20826 -79.51218 PEM 39 0.057 0.000 0.000 Conventional PEM 0303000202 Back Creek -Haw W -A18- 56.4 River 36.19942 -79.50073 PFO 95 0.109 0.064 0.000 Conventional 119: PFO 0303000204 W -A18- Back Creek -Haw 119: PEM 56.4 River 36.199328 -79.5008 PEM 0 0.059 0.000 0.000 Workspace Only 0303000204 W -A18- Back Creek -Haw 119-2: 56.5 River 36.198118 -79.49922 PFO 297 0.470 0.207 0.000 Conventional PFO 0303000204 L-1-8 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing Within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ W -A18- Back Creek -Haw 119-2: 56.5 River 36.198372 -79.49967 PEM 0 0.059 0.000 0.000 Workspace Only PEM 0303000204 W -A18- Back Creek -Haw 127: PEM 56.6 River 36.197454 -79.49868 PEM 0 0.018 0.000 0.000 Workspace Only 0303000204 W -A18- Back Creek -Haw 127: PFO 56.6 River 36.196999 -79.49842 PFO 61 0.073 0.042 0.000 Conventional 0303000204 W -A18- Back Creek -Haw 127-2: 56.6 River 36.19697 -79.49853 PEM 0 0.020 0.000 0.000 Workspace Only PEM 0303000204 W -A18- Back Creek -Haw 130: PEM 56.8 River 36.19409 -79.49768 PEM 0 0.006 0.000 0.000 Workspace Only 0303000204 W -A18- Back Creek -Haw 130: PFO 56.9 River 36.193874 -79.49742 PFO 17 0.095 0.031 0.000 Conventional 0303000204 W -A18- Back Creek -Haw 133: PFO 57.1 River 36.191046 -79.49661 PFO 56 0.096 0.039 0.000 Conventional 0303000204 W -A18- Back Creek -Haw 133: PEM 57.1 River 36.190868 -79.49666 PEM 0 0.020 0.000 0.000 Workspace Only 0303000204 W -A18- Back Creek -Haw 133-2: 57.1 River 36.190481 -79.49655 PEM 0 0.009 0.000 0.000 Workspace Only PEM 0303000204 W -A18- Back Creek -Haw 135: PFO 57.2 River 36.189488 -79.4961 PFO 146 0.205 0.098 0.000 Conventional 0303000204 W -A18- Back Creek -Haw 135: PEM 57.2 River 36.189625 -79.49626 PEM 0 0.016 0.000 0.000 Workspace Only 0303000204 L-1-9 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing Within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ W -A18- Back Creek -Haw 254: PFO 57.6 River 36.184753 -79.49316 PFO 152 0.225 0.097 0.000 Conventional 0303000204 W -C18-3: Back Creek -Haw PEM 57.8 River 36.181161 -79.49433 PEM 13 0.041 0.000 0.000 Conventional 0303000204 W -C18-3: Back Creek -Haw PFO 57.9 River 36.181039 -79.49448 PFO 0 <.001 0.000 0.000 Workspace Only 0303000204 W -C18-3- Back Creek -Haw 2: PEM 57.9 River 36.180872 -79.49435 PEM 13 0.017 0.000 0.000 Conventional 0303000204 W -C18-3- Back Creek -Haw 2: PFO 57.9 River 36.180842 -79.49435 PFO 8 0.010 0.005 0.000 Conventional 0303000204 W -C18-5: Back Creek -Haw PSS 58 River 36.178724 -79.49395 PSS 52 0.069 0.000 0.000 Conventional 0303000204 W -C18-5: Back Creek -Haw PEM 58 River 36.178665 -79.49406 PEM 0 0.025 0.000 0.000 Workspace Only 0303000204 W -C18-29: Back Creek -Haw PFO 60.8 River 36.160629 -79.45422 PFO 317 0.550 0.211 0.000 Conventional 0303000204 W -A18-79: Back Creek -Haw PFO 61.8 River 36.156382 -79.43924 PFO 0 0.004 0.000 0.000 Workspace Only 0303000204 W -A18-73: Back Creek -Haw PFO 62.5 River 36.150406 -79.43022 PFO 0 0.005 0.001 0.000 Workspace Only 0303000204 W -A18-74: Back Creek -Haw PFO 62.5 River 36.149929 -79.42932 PFO 8 0.008 0.007 0.000 Conventional 0303000204 L-1-10 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing Within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ W -A18-80: Back Creek -Haw PEM 62.7 River 36.149688 -79.42679 PEM 64 0.086 0.000 0.000 Conventional 0303000204 W-1318-32: Back Creek -Haw PEM 62.9 River 36.148216 -79.42397 PEM 0 0.005 0.000 0.000 Workspace Only 0303000204 W-1318-28: Back Creek -Haw PFO 63.1 River 36.147383 -79.4207 PFO 313 0.500 0.212 0.000 Conventional 0303000204 AW -1318- Back Creek -Haw 19: PFO 63.8 River 36.146437 -79.40714 PFO 50 0.081 0.033 0.000 Conventional 0303000204 AW -1318-5: Back Creek -Haw PFO 68.4 River 36.106102 -79.37114 PFO 6 0.011 0.004 0.000 Conventional 0303000204 W-1318-5: Back Creek -Haw PFO 68.4 River 36.106001 -79.37125 PFO 0 0.001 0.000 0.000 Workspace Only 0303000204 W -A18-67: Back Creek -Haw PFO 71.8 River 36.062821 -79.36136 PFO 44 0.039 0.025 0.000 Conventional 0303000204 W -A18-67- Back Creek -Haw 2: PFO 71.8 River 36.062807 -79.3615 PFO 0 0.003 0.000 0.000 Workspace Only 0303000204 W -A18- Back Creek -Haw 208: PEM 72.2 River 36.056285 -79.36448 PEM 0 0.003 0.000 0.000 Workspace Only 0303000204 W -A18- Back Creek -Haw 111: PEM 73 River 36.046202 -79.36594 PEM 57 0.222 0.000 0.000 Conventional 0303000204 Total 1983 3.510 1.170 0.000 L-1-11 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ T-15 Dan River Interconnect (Rockingham County) AW -1318- Cascade Creek - 36: PEM 30.3 Dan River 36.495523 -79.67955 PEM 0 0.055 0.000 0.000 Workspace Only 0301010309 W-1318-36- Cascade Creek - 7: PEM 30.3 Dan River 36.495633 -79.68009 PEM 0 0.060 0.000 0.000 Workspace Only 0301010309 W-1318-36- Cascade Creek - 8: PEM 30.4 Dan River 36.494389 -79.6797 PEM 0 0.048 0.000 0.000 Workspace Only 0301010309 W-1318-36- Cascade Creek - 9: PEM 30.4 Dan River 36.494208 -79.67995 PEM 0 0.015 0.000 0.000 Workspace Only 0301010309 W-1318-36- Cascade Creek - 10: PEM 30.4 Dan River 36.494116 -79.67963 PEM 0 0.004 0.000 0.000 Workspace Only 0301010309 Total 0 0.181 0.000 0.000 T-21 Haw River Interconnect (Alamance County) W -A18- Back Creek -Haw 111-2: 73 River 36.04641 -79.36617PEM 0 0.027 0.000 0.000 Workspace Only PEM 0303000204 Contractor Yard 5 (Rockingham County) W -A18- Cascade Creek - 249: PEM 30.6 Dan River 36.517407 -79.72331 PEM 0 0.075 0.000 0.000 Workspace Only 0301010309) AW-NWI- Cascade Creek - 540: PEM 30.7 Dan River 36.515258 -79.72055 PEM 0 0.208 0.000 0.000 Workspace Only 0301010309 AW-NWI- Cascade Creek - 541: PEM 30.7 Dan River 36.515513 -79.72065 PEM 0 0.122 0.000 0.000 Workspace Only 0301010309 Total 0 0.406 0.000 0.000 L-1-12 November 2018 M Mountain Valley Joint Permit Application USACE — Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing Within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ Contractor Yard 6 (Rockingham County) W -A18- Cascade Creek - 245: PEM 30.7 Dan River 36.509651 -79.71699 PEM 0 0.234 0.000 0.000 Workspace Only 0301010309 W -A18- Cascade Creek - 245 -2: 30.7 Dan River 36.509324 -79.71743 PEM 0 0.001 0.000 0.000 Workspace Only PEM 0301010309 Total 0 0.236 0.000 0.000 Temporary Access Road TA -PI -068 (Rockingham County) W-1318-97: Cascade Creek - PEM 26.1 Dan River 36.540307 -79.63187 PEM 0 0.006 0.000 0.000 Workspace Only 0301010309 Temporary Access Road TA-RO-073 (Rockingham County) W -A18-44: Cascade Creek - PEM 27.1 Dan River 36.530013 -79.64242 PEM 0 <.001 0.000 0.000 Workspace Only 0301010309 W -A18-44- Cascade Creek - 2: PEM 27.1 Dan River 36.529958 -79.64238 PEM 0 <.001 0.000 0.000 Workspace Only 0301010309 W -A18-44- Cascade Creek - 3: PEM 27.1 Dan River 36.530058 -79.64362 PEM 0 0.007 0.000 0.000 Workspace Only 0301010309 Total 0 0.007 0.000 0.000 Temporary Access Road: TA-RO-076 (Rockingham County) W -A18-28: Cascade Creek - 28.4 Dan River 36.517229 -79.65866 PEM 0 0.011 0.000 0.000 Workspace Only PEM 0301010309 Temporary Access Road: TA-RO-080 (Rockingham County) W -A18-20: Cascade Creek - PEM 29.7 Dan River 36.504276 -79.67691 PEM 0 0.002 0.000 0.000 Workspace Only 0301010309 L-1-13 November 2018 M Mountain Valley Joint Permit Application USACE - Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing Within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ W -A18-20- Cascade Creek - 2: PEM 29.7 Dan River 36.50464 -79.67726 PEM 0 <.001 0.000 0.000 Workspace Only 0301010309 W -A18-20- Cascade Creek - 3: PEM 29.7 Dan River 36.504854 -79.67751 PEM 0 0.006 0.000 0.000 Workspace Only 0301010309 W -A18 -18 -Cascade Creek - 2: PEM =30Dan River 36.499882 -79.6771 PEM 0 0.012 0.000 0.000 Workspace Only 0301010309 Total 0 0.007 0.000 0.000 Temporary Access Road: TA-RO-104 (Rockingham County) W -A18-7-6: Cascade Creek - PEM 38.6 Dan River 36.406224 -79.64699 PEM 0 <.001 0.000 0.000 Workspace Only 0301010309 Temporary Access Road: TA-RO-140 (Rockingham County) W -C18-17: Headwaters Haw PSS 51.5 River 36.254136 -79.54535 PSS 0 0.010 0.000 0.000 Workspace Only 0303000202 Temporary Access Road: TA -AL -169 (Alamance County) W -A18-75: Back Creek -Haw PEM 62.5 River 36.150773 -79.42976 PEM 0 0.018 0.000 0.000 Workspace Only 0303000204 W -A18-75- Back Creek -Haw 2: PEM 62.5 River 36.150735 -79.42962 PEM 0 0.001 0.000 0.000 Workspace Only (0303000204 Total 0 0.020 0.000 0.000 Permanent Access Road PA-RO-113A (Rockingham County) W-1318-43: Hogans Creek -Dan PEM 41.8 River 36.369669 -79.61979 PEM 0 0.025 0.000 0.025 Fill 0301010401 Project Total 4951 9.944 2.467 0.025 L-1-14 November 2018 TI Mountain Valley Joint Permit Application PIPELINEJu USACE — Wilmington District and NCDEQ SAW -2018-008887 Appendix L-1 Proposed Wetland Impacts by ID and Type of Impact Pipeline Wetland Permanent Pipeline Impact ID Watershed HUC Wetland Crossing Within Conversion Permanent Crossing a/ Milepost 10 Latitude Longitude Type b/ Length Construction PFO to Fill Method or (feet) c/ Workspace PSS/PEM (acres) f/ Other Impact (acres) d/ (acres) e/ Type g/ a/ Data is based on wetland field delineations completed through September 20, 2018 where access has been obtained, National Wetland Inventory (NWI) data, and desktop analysis of approximated resources. Wetland IDs starting with "W" have been field delineated and wetland ID starting with "AW" are approximated based on NWI data, desktop analysis, and field scientists knowledge of the surrounding area/adjacent properties (where accessible). b/ Wetland type based on Cowardin Classifications PEM = palustrine emergent wetland, PSS = palustrine scrub shrub wetland, PFO = palustrine forested wetland; all wetlands are jurisdictional under Section 404 and Class WL (15A NCAC 0213.0101 (c)(8))". c/ Crossing length is measured at the intersection of the wetland and centerline of the pipeline. Crossing length of "0" indicates the wetland is not crossed by the centerline of the pipeline, but is located within the construction workspace. d/ Wetlands crossed by HDD or conventional bore have a "0" for construction workspace. e/ Conversion of PFO (forested wetland) to PSS/PEM (nonforested wetland) is based on a 30 -foot -wide woody vegetation maintenance corridor centered over the pipeline. f/ permanent fill limited to permanent access roads only. g/ Construction crossing method will ultimately be determined by field supervisor based on field conditions observed during construction. "Workspace Only" indicates that the wetland is not crossed by the pipeline but is located within construction workspace. L-1-15 November 2018