Loading...
HomeMy WebLinkAbout105 Declair Court18-408: 105 Declair Court Fa p 4: 18-408: 105 Declair Court 1 Pond 1: Subject Stream A.: Subject C Map provided by NCDEQ Division of Legend: path water Resources Locations are approximate and are -Approximate Site boundary: > o ,y. provided for reference only 105 Declair Court Wake County November 21, 2018 Page 2 of 2 appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins; DWR — 401 & Buffer Permitting Unit, 1617 Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins; DWR — 401 & Buffer Permitting Unit; 512 N. Salisbury Street; Raleigh, NC 27604. This determination is final and binding unless, as detailed above, unless an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this determinati , please feel free to contact Stephanie Goss at (919)791-4256. Sin erel , Danny Smith Supervisor, W ter Quality Regional Operations Center cc: RRO DWR File Copy Glenn White via e-mail at alerm Ldcompleteconstructionco.com North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 01 a 7rr7 onnn November 21, 2018 Marie A. Zanchelli 105 Declair Court Cary, NC 27513 Subject: Buffer Determination Letter NBRRO #18-408 W� ? County Determination Type: Buffer ROY COOPER t� Governer ❑ Tar -Pamlico (15A NCAC 2B .0259) MICHAEL S. REGAN ordinances apply) GWM�t' LINDA CULPEPPER (governmental and/or interjurisdictional Interim Dire,, for NORTH CARO -IN A Environmental o,wality November 21, 2018 Marie A. Zanchelli 105 Declair Court Cary, NC 27513 Subject: Buffer Determination Letter NBRRO #18-408 W� ? County Determination Type: Buffer Intermittent/Perennial ® Neuse (15A NCAC 2B .0233) USGS To o ❑ Tar -Pamlico (15A NCAC 2B .0259) El Intermittent/Perennial Determination (where local buffer ordinances apply) ❑ Jordan (15A NCAC 213 .0267) Stream A (governmental and/or interjurisdictional Located off property X projects) Project Name: Address/Location: Stream(s): 105 Declair Court 105 Declair Court, Cary, NC UT to Crabtree Creek Determination Date: November 19, 2018 Staff: Stephanie Goss Stream E/UP* Not Subject Subject Start C Stop C Soil Survey USGS To o Pond 1 X X Stream A X Located off property X X *EIIIP = Ephemeral/Intermittent/Perennial Explanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of Wake County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each stream that is checked "Not Subject" has been determined to not be at least intermittent or is not present. Streams that are checked "Subject" have been located on the property and possess characteristics that qualify it to be at least an intermittent stream. There may be other streams located on the property that do not show up on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DVM may request a determination by the Director. An North Carolina Department of Environmental Quality I Division of Water Resources I Raleigh Regional Office 3800 Barrett Drive 11628 Mail Service Center I Raleigh. North Carolina 27699-1628