HomeMy WebLinkAboutDuke Energy Progress-Henderson Operations CenterNL;
Water Resources .
ENVIRONMENTAL QUALITY
October 26,2018. '
Ottis W. Allen'
Duke Energy- Progress LLC
P.O. Box 1007
Charlotte, NC 28201. .
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
Subject: Buffer Determination Letter
RRO #18-383
Vance Countv
Determination Type:
Buffer
Interrriittent/Perennial
R, Neuse (15A NCAC 2B .0233)'
Stop@
®'Tar -Pamlico (15A NCAC 2B.0259)
❑ Intermittent/Perennial Determination (where local buffer
•A
ordinances apply)
❑ Jordan (15A NCAC 2B.0267)
(governmental and/or interjurisdictional
X
projects)
Project Name: Duke Energy Progress -Henderson Operations Center
Address/Location: 546 Raleigh Rd Henderson, NC
Stream(s): Red Bud Creek
Determination Date: October 24, 2018 Staff: Gary Kreise'r
Stream
E/I/P* .
Not
Subject
Subject Start@
Stop@
Soil
Survey
USGS ,
To o
•A
X
X
*E111P = Ephemeral/Intermittent/Perennial
Explanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of Vance
County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each
stream that is checked "Not Subject' has been determined to not be at least intermittent or is not present. Streams
that are checked "Subject' have been located on the property and possess characteristics that qualify it to be at least
an' intermittent stream. There maybe other streams located on the property that do not show up on the maps
referenced above but may be considered jurisdictional according to the US Army Corps of Engineers.
This on-site determination shall expire five (5) years from.the.date of this letter. Landowners or affected
parties that dispute a determination made by the DWR may request a, determination by the Director. An
appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the
Director shall be referred to the Director in writing. 'If sending via US Postal Service: c/o Karen. Higgins;
DWR.— 401 & Buffer Permitting Unit, 1617 Mail Service Center; Raleigh; NC 27699-1617. If sending via
delivery service (UPS, FedEx, etc.): Karen Higgins;, DWR — 401 &' Buffer Permitting Unit; 512 N. Salisbury
Street; Raleigh, NC 27604.
Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://portal.ncdetir.orc./web/wq/aps
1628 Mail Service Center, Raleigh, NC 27699=1628 Phone: (919) 791-4200
Location: 31800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159
Duke Energy Progress -Henderson Operations Center
Vance County
October 26, 2018
Page 2 of 2
This determination is final and binding unless, as detailed above, unless an appeal is requested within sixty
(60) days.
This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884.
If you have questions regarding this determination, please feel free to contact Gary Kreiser at (919) 791-4241.
Sincerely;
Danny Smith
Supervisor, Water Quality Regional Operations Center
cc: RRO DWR File Copy
Kelly Roth, McAdams Company (electronic copy), roth(4,mcadamsco.com
18-383: Duke Energy Progress -Henderson
Operations Center
PR4J CT ARA
.d� C*6
r
r
.� '•�.`.�...—rte
FEATURE A —�
s� Not S u b j ec#'--_._
ApL3
I
Y
r
-I! LM
rr=
STAIZ
Map provided by NCDEQ
legend:
Division of Water Re-
sources
-Approximate Site boundary: 4
locations are approxi-
� Maq✓• �
mate and are provided
for reference only ::
18-383: Duke Energy Progress -Henderson
Operations Center
i v � c
�.STVZZ Map provided by NCDEQ
Legend:
" Division of Water Resources
-Approximate Site boundary:
Locations are approximate
+" and are provided for
N4 u yF reference only ::
S
Al
I HA%
o
r
z
South
WELCOME