HomeMy WebLinkAbout20030832 Ver 1_Triage Checklist_20030710A
Triage Check List
Date: 1 to?
Project Name: '20
DWQ#: 0 3-(o83?_
County:
11-?RO
To: Mike Parker ? WaRO Tom Steffens
O Ken ven e ? WiRO Noelle Lutheran' ? MRO Alan Johnson ? WSRO Cyndi Karoly (Central Office)
? RRO Steve Mitchell
From: X?J_ Telephone : (919) -?1 F
The file attached is being forwarded to your. for your evaluation.
Please call if you need assistance.
XL$trearn length impacted
,/?eam determination
? Wetland determination and distance to blue-line surface waters on USFW topo maps
zation/avoidance issues
e:uffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
d fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available. and viable?
drawings for accuracy.
?the application consistent with pre-application meetings?
Cumulative impact concern
Comments: