Loading...
HomeMy WebLinkAbout19970708 Ver 2_More Info Letter_20090401 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H.Sullins Dee Freeman Governor Director Secretary April 1, 2009 DWQ Project#97-0708,Ver. 2 Craven County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Thomas Braaten Coastal Carolina Regional Airport 200 Terminal Drive New Bern,NC 28562 Subject Property: Coastal Carolina Regional Airport Scotts Creek [030410, 27-102, SC,NSW] REQUEST FOR MORE INFORMATION Dear Mr. Braaten: On December 15, 2008,the Division of Water Quality(DWQ)received your application dated November 7, 2008,with Public Notice issued by the USACE on November 20, 2008, and received by the DWQ on November 21, 2008, to fill or otherwise impact 0.81 acres of 404/wetland, 15,682 square feet of Zone 1 Neuse River basin protected riparian buffers and 5,700 square feet of Zone 2 Neuse River basin protected riparian buffers to construct the proposed extension of Runway 22 Safety Area at the site. On January 21, 2009, and February 9, 2009,the DWQ received additional information from you, however,the DWQ has determined that your application remains incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will place this project on hold as incomplete until we receive this additional information. If we do not receive the requested information, your project will be formally returned as incomplete. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Per the requirements of GC 3705,this project must comply with Stormwater Management Plan (SMP)Requirements for Applicants Other Than the North Carolina Department of Transportation,available at: http://h2o.enr.state.ne.us/ncwetlands/documents/SMPRequirementsforApplicantsotherthanNCDO T.pdf. You have two options for meeting the SMP requirement: a. Submit an SMP to the DWQ 401 Unit that removes a minimum of 85 percent TSS and 30 percent TN from the Stormwater generated by the entire project(as defined by the Army Corps of Engineers). For each proposed BMP, please provide a completed BMP 401 Oversight/Express Review Permitting Unit One 1650 Mail Service Center,Raleigh,North Carolina 27699-1650 NorthCarolina Location:2321 Crabtree Blvd.,Raleigh,North Carolina 27604 Phone:919-733-17861 FAX:919-733-6893 aturaffi Internet:http://h2o,enr,state.nc.us/ncwetlands/ An Equal Opportunity 1 Affirmative Action Employer Coastal Carolina Regional Airport Page 2 of 2 April 1,2009 Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http://h2o.enr,state.nc.us/su/bmp forms.htm. b. Provide documentation of the DWQ Washington Regional Office's approval of the SMP for this project by providing BOTH a valid approval letter from the DWQ Washington Regional Office AND one copy of the approved SMP, including plan details,calculations and other supporting information. 2. Please be advised that a temporary Sediment and Erosion Control Plan does not suffice to meet the requirement for a permanent SMP. Please be further advised that failure to provide an appropriate SMP in the next submittal will result in a return of application. Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter,your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands,waters or protected buffers. Please be aware that any impacts requested within your application are not authorized(at this time)by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sin ely, AK Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/i m cc: Kyle Barnes, DWQ Washington Regional Office USACE Washington Regulatory Field Office File Copy Edward Smail, The LPA Group, Inc., 700 Huger Street,Columbia, SC 29520 Filename: 970708 V er2CoastalCa roll naRegiona lAi rport(Craven)On_Hold3 COMPLETE THIS SECTION ON DELIVERY ■ Complete items 1,2,and 3.Also complete A. Sig t item 4 if Restricted Delivery is desired. ❑Agent ■ Print your name and address on the reverse / ❑Addressee so that we can return the card to you. e_ Received by(, n me) Date of Delivery ■ Attach this card to the back of the mailpiece, �`�"' '¢ or on the front if space permits. D. Is delivery address different from item 1? ❑Yes 1. Article Addressed to: If YES,enter delivery address below: ❑No Coastal Carolina Regional Airport Mr Thomas Braaten 200 Terminal Dr New Bern NC 28562 3. Service Type Certified Mail ❑Express Mail DWQ 97-0708 Ver 2 Craven County Registered Return Receipt for Merchandise ❑Insured Mail kU C.O.D. 4. Restricted Delivery?(Extra Fee) ❑Yes 2. Article Number (Transfer from service late 7008 1830 0004 1353 5404 PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 UNITED STATES,POSTAL SERVICE �:,..: ., r.,... ti•ni. y...r ei t:�..3k..i tiF•.c�v ..� } u� ,k�� ,.mid 0-4 • Sender: Please print your name, address, and ZIP+Mrri"phis box • NC DENR Division of Water Quality 401 Oversight/Express Unit 2321 Crabtree Boulevard, Suite 250 Raleigh,NC 27604