Loading...
HomeMy WebLinkAbout19970708 Ver 2_Staff Comments_2009040197-0708v2 Coastal Carolina Regional Airport AML Comments April 1, 2009 Per the requirements of GC 3705, this project must comply with Stormwater Management Plan (SMP) Requirements for Applicants Other Than the North Carolina Department of Transportation, available at: http: /h2o.enr.state.nc.u.s/ncwetlands/documents/SMPReyuirementsforApplicants otherthanNCDOT.pdf You have two options for meeting the SMP requirement: a. Submit an SMP to the DWQ 401 Unit that removes a minimum of 85 percent TSS and 30 percent TN from the stormwater generated by the entire project (as defined by the Army Corps of Engineers). For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http://li2o.e.tir.state.nc.usisu/bnip forms.htm. b. Provide documentation of the DWQ Washington Regional Office's approval of the SMP for this project by providing BOTH a valid approval letter from the DWQ Washington Regional Office AND one copy of the approved SMP, including plan details, calculations and other supporting information. 2. Please be advised that a temporary Sediment and Erosion Control Plan does not suffice to meet the requirement for a permanent SMP. Please be further advised that failure to provide an appropriate SMP in the next submittal will result in a return of application.