Loading...
HomeMy WebLinkAbout20101017 All Versions_RE 2016 Division's 9-14 Annual Monitoring Report Meeting_20170427 Carpenter,Kristi From:Baker, Virginia Sent:Thursday, April 27, 2017 4:07 PM To:Elliott, Jason C; James Lastinger (James.C.Lastinger@usace.army.mil); Lori Beckwith (Loretta.A.Beckwith@usace.army.mil); chambers, marla (marla.chambers@ctc.net); Steve Kichefski (steven.l.kichefski@usace.army.mil); Barnett, Kevin; Todd Bowers (bowers.todd@epa.gov); Monte Matthews (Monte.K.Matthews@saw02.usace.army.mil); Chapman, Amy; 'Crystal Amschler (crystal.c.amschler@usace.army.mil)'; Hood, Donna; Wanucha, Dave; Marella Buncick (marella_buncick@fws.gov); Euliss, Amy; McHenry, David G; Bryan, Roger D; Thompson, Larry B; Beam, Patricia; Allen, Pete; Griffin, Randy W; Harris, Philip S; Moore, Byron G; Green, Matthew L; Cox, Marissa R Cc:Carpenter,Kristi Subject:RE: 2016 Division's 9-14 Annual Monitoring Report Meeting Follow Up Flag:Follow up Flag Status:Flagged Hi Jason, Thanks for sending the 9-14 meeting minutes. These are added notes to your meeting minutes. I will get any added/edits to your draft min for 1-8 meeting back to you hopefully quicker then these. Let me know if you have any edits to these additions. Ginny Division 12 I-3819A UT to Fourth Creek - The four-wheel drive vehicle encroachments on the back side are being (or have been already addressed?) with fencing and signage. DWR (Ginny Baker) asked for clarification on the planting plan and location of plantings. There was a discussion on cross-section monitoring along the E2 section of the stream and the necessity of it brought up by Ginny. ACOE (Steve Kichefski) said it was requested by the agencies due to hoof shear damage from cattle accessing the stream. DOT plans to continue E2 monitoring to meet this agency requirement. Division 13 B-4183 Jacktown Creek (DWR# 20090385)- DWR inquired about the bank pins, DOT said they had been stable since they were installed in March 2016. R-2518A&B and R2519A (DWR# 20071134) 1 R-2518A Bailey Branch Site D - DWR said there was one structure in the north section of the stream proposed for credit that is obstructing aquatic passage, otherwise the site appeared stable and vegetated and can be reviewed for crediting. Ivy Gap Branch Site N- DOT said there has been little change with the four bank pins that were installed in 2015. Middle Fork Site I- DWR asked about the encroachments (vehicle wide mowed path) on the back side along the inside of the fence boundary. DOT said the encroachment was likely caused by the adjacent landowner and would speak to them about this issue. Turkey Branch J - DOT said the encroachment area from DOT mowers would be signed better and replanted in March 2017. DOT maintenance would be contacted about the mowing. UT to Middle Fork Site F - DOT said this UT had been constructed all the way up to the fence and planted, although the buffer was narrow. DWR had concerns about the lack of trees in this upper section. It was agreed to review this stream section in the field. R-2518B Bald Creek Site 4- DOT summarized the issue with the church that had applied for a permit to cut vegetation around their sign which DOT denied. DOT is working with the land owner across the street to see if the sign can be moved there for better visibility from US19. Bald Creek Site 8- DWR had concerns about the change in XS area for XS5. DOT said the right-of-way crossing caused bank failure downstream of XS5 which had caused some sediment buildup. UT to Bald Creek Hydro Site 7- DOT said beaver dams had been removed downstream of this site in 2014 and 2017. R-2519A Georges Fork Site 26 - DOT plans to fence this site so there will not be future mowing encroachments by the adjacent church. Plum Branch Tributary Site 32- The DEO for DOT Div 14, Roger Bryan, and USFWS, Marella Buncick, discussed a site visit in which a pipe upstream of the site that drains to a wetland across the road was found, diverting water from the stream. 2 U-2550B (DWR# 20101017) East Prong Hunting Creek - DWR asked about the supplemental planting that was done at East Prong Hunting Creek, DOT said approximately 15% of the site was replanted including two rows of trees along the south buffer. There has been some difficulty with getting trees to establish, likely due to deer browse. I-5402 UT's to Hominy Creek (DWR# 20120309) - DOT noted the benthic monitoring report was recently posted, this monitoring was done in part to justify the increased ratio. The EPA, Todd Bowers, asked to explain the credit adjustment. The ACOE, Lori Beckwith, said this was calculated using the ACOE draft buffer guidance. DWR noted that the new 2016 Mitigation Monitoring guidance has updated methodology that could also be used to generate extra stream credit on future DOT on-site projects. From: Elliott, Jason C Sent: Thursday, March 23, 2017 8:19 AM To: James Lastinger (James.C.Lastinger@usace.army.mil) <James.C.Lastinger@usace.army.mil>; Lori Beckwith (Loretta.A.Beckwith@usace.army.mil) <Loretta.A.Beckwith@usace.army.mil>; chambers, marla (marla.chambers@ctc.net) <marla.chambers@ctc.net>; Steve Kichefski (steven.l.kichefski@usace.army.mil) <steven.l.kichefski@usace.army.mil>; Barnett, Kevin <kevin.barnett@ncdenr.gov>; Baker, Virginia <virginia.baker@ncdenr.gov>; Todd Bowers (bowers.todd@epa.gov) <bowers.todd@epa.gov>; Monte Matthews (Monte.K.Matthews@saw02.usace.army.mil) <Monte.K.Matthews@saw02.usace.army.mil>; Chapman, Amy <amy.chapman@ncdenr.gov>; 'Crystal Amschler (crystal.c.amschler@usace.army.mil)' <crystal.c.amschler@usace.army.mil>; Hood, Donna <donna.hood@ncdenr.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Marella Buncick (marella_buncick@fws.gov) <marella_buncick@fws.gov>; Euliss, Amy <aeuliss@ncdot.gov>; McHenry, David G <dgmchenry@ncdot.gov>; Bryan, Roger D <rdbryan@ncdot.gov>; Thompson, Larry B <lthompson@ncdot.gov>; Beam, Patricia <pdbeam@ncdot.gov>; Allen, Pete <pallen@ncdot.gov>; Griffin, Randy W <rgriffin@ncdot.gov>; Harris, Philip S <pharris@ncdot.gov>; Moore, Byron G <bgmoore@ncdot.gov>; Green, Matthew L <mlgreen@ncdot.gov>; Cox, Marissa R <mrcox@ncdot.gov> Subject: 2016 Division's 9-14 Annual Monitoring Report Meeting Good morning all, Please see the attached DRAFT meeting minutes for the 2016 Division’s 9-14 Annual Monitoring Report meeting. Please let me know if any changes or additions are required and I will make the corrections as needed. I will be setting up site visits R- 2518A&B projects, B-4183 Crooked Creek and B-4191 Jacktown Creek as requested in the meeting. Thanks again to all for your help this past year and let me know If you have any questions. Jason C. Elliott Natural Environment Section 3 Natural Environment Engineering Group NC Department of Transportation 1598 Mail Service Center Raleigh, NC 27699-1598 Phone: 919-707-6114 Fax: 919-212-5785 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ Facebook Twitter YouTube Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 4