Loading...
HomeMy WebLinkAbout19970093 Ver 1_Env Assessment_20090223® North Carolina Wildlife Resources Commission MEMORANDUM TO: Melba McGee Office of Legislative and Intergovernmental Affairs, DENR FROM: Travis Wilson, Highway Project Coordinator Habitat Conservation Program -?--? // ?- DATE: February 23, 2009 SUBJECT: North Carolina Department of Transportation (NCDOT) Environmental Assessment (EA) for the proposed construction of a new location rail spur, Lenoir County, North Carolina. TIP No. U-2928, SCH Project No. 09-0197 Staff biologists with the N. C. Wildlife Resources Commission have reviewed the subject EA and are familiar with habitat values in the project area. The purpose of this review was to assess project impacts to fish and wildlife resources. Our comments are provided in accordance with certain provisions of the National Environmental Policy Act (42 U.S.'C. 4332(2)(c)) and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d). NCDOT in coordination with the North Carolina Global TransPark (GTP) proposes to construct a new location rail spur from the existing North Carolina Railroad to a point within the GTP. Seven build alternatives were evaluated. The recommended alternative G was developed as a "best fit" alignment to avoid and minimize impacts to a practicable extent resulting in 10,8 acres of wetland and 239 linear feet of stream impacts. At this time we do not have any specific comments, the document contains information requested from prior agency coordination and therefore we concur Iwith the EA for this project. Thank you for the opportunity to comment if we can be of any further assistance please call me at (919) 528-9886. cc: John Ellis, U.S. Fish and Wildlife Service, Raleigh David Wainwright, DWQ, Raleigh Tracey Wheeler, U.S. Army Corps of Engineers, Washington Mailing Address: Division of Inland Fisheries • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028