Loading...
HomeMy WebLinkAbout19970708 Ver 2_More Info Received_20090209ILF? THE LPA GROUP of North Carolina, p.a. Transportation Consultants 5000 FALLS OF NEUSE ROAD ¦ SUITE 304 ¦ RALEIGH, NORTH CAROLINA 27609 ¦ 919-954-1244 ¦ FAX 919-954-1345 February 6, 2009 Annette Lucas NCDENR-DWQ Wetlands and Stormwater Branch 1650 Mail Service Center Raleigh, North Carolina 27699-1650 D IR IRL ,all Re: Coastal Carolina Regional Airport FEH 9 2009 Runway 22 Safety Area and RPZ Improvements WETLANDS AND 5T?FtMW?TF.:(c ???? tl Dear Ms. Lucas: Enclosed please find a set of the plans and supporting documentation for the above referenced project for the Stormwater Management Permit Application that will be submitted to the Washington regional office. Ed Small requested that I submit a copy to you. The Safety Area and RPZ Improvements project is being completed to comply with FAA regulations for grading and obstruction at the end of Runway 22 at the Coastal Carolina Regional Airport. As part of the project, we will be regrading part of the safety area and clearing vegetation. Ed Smail informed me that you had a question about the runoff flow from the road and the flow to trap "B". The runoff from the road will travel thorough fifty to sixty feet of grass at a maximum slope of three percent. During construction this runoff will be diverted by temporary swells to sediment traps. Trap "B", located at the north-west edge of the project, will have a peak discharge of 0.12cfs. See enclosed documentation for more information. If you have any questions or need additional information, please do not hesitate to call. Sincerely, THE LPA GROUP of North Carolina, p.a. Charles Harrison Senior Designer Enclosures Member of THE LPA GROUP INCORPORATED ATLANTA ¦ BALTIMORE ¦ BATON ROUGE ¦ CHARLOTTE ¦ COLUMBIA ¦ GREENSBORO ¦ IRVINE ¦ JACKSONVILLE ¦ KENNESAW ¦ KNOXVILLE ¦ LITTLE ROCK McLEAN ¦ MOBILE ¦ NASHVILLE ¦ OCEAN SPRINGS ¦ ORLANDO ¦ RALEIGH ¦ SARASOTA ¦ TALLAHASSEE ¦ TAMPA ¦ WEST PALM BEACH Maps and Documents for the Stormwater Management Permit of RUNWAY 22 SAFETY AREA AND RPZ IMPROVEMENTS COASTAL CAROLINA REGIONAL AIRPORT NEW BERN, NORTH CAROLINA THE LPA 0-"OA GROUP THE LPA GROUP of North Carolina, p.a. 5000 Falls of Neuse Road, Suite 304 Raleigh, North Carolina 27609 Member of THE LPA GROUP INCORPORATED OCTOBER 2008 ?n I VD§ rs- R FED `? Z??09 ?pS PNp";''?r (ltrnue4launtg RUNWAY 22 SAFETY AREA AND RPZ IMPROVEMENTS AT COASTAL CAROLINA REGIONAL AIRPORT PROJECT DESCRIPTION AND PURPOSE This project is being completed to meet FAA standards for safety areas at the Coastal Carolina Regional Airport. The existing area will be regraded to expand the safety area and insure that maximum slope allowances are met. As part of the project, approximately 630' of the existing perimeter road that travels around the safety area will be redirected. The area of the project limits is 3.1 acres. This project lies within the Neuse River Basin. Runoff from the site flows from the safety area into existing ditches that lead to Scott's Creek. Scott's Creek is considered a class SC waterway, with supplemental classifications as Sw (swamp waters) and NSW (nutrient sensitive waters). We are applying for a Section 404 Permit (Corps), Section 401 Water Quality Certification (DWQ), and a Coastal Zone Consistency (Division of Coastal Management) permits for the Scott's Creek area. SOILS INFORMATION The historical findings for this area indicate the project site consists of interbedded very loose to medium dense clayey, silty, or clean sands (SP, SM, SC) and very soft to firm silts or clays (MH, CL, CH). The topsoil thicknesses were between 3 to 6 inches. The groundwater elevation at the time borings were taken was approximately 1.5 to 8 feet below the existing ground surface. In addition, soils in the area were determined to be Bragg (BrB) soils, which are hydrologic group C. EROSION AND SEDIMENT CONTROL MEASURES A variety of measures will be employed to control sediment runoff and prevent erosion during and after construction of this project. Temporary sediment traps, diversion ditches and silt fence will be used to control sediment on the project site during construction. Looking at the enclosed Drainage Area Map, the runoff from Area 1 will sheet flow and be directed by diversion ditches to the north-east corner of the safety area. In the north-east corner of Area 1 a temporary sediment trap will be set up with a slope drain for the out flow. Area 2 will use a combination of sheet flow and temporary diversion ditch to direct flow into a temporary sediment trap. Areas 3 will use silt fence and erosion control matting to control any sediment. In addition, all disturbed areas will be seeded and mulched at the completion of construction. The construction plans specify that no area where activities have temporarily or permanently ceased shall remain without stabilization for more than 21 calendar days. Safety Area ImProvement I October, 2008 CONSTRUCTION SEQUENCING General construction sequencing parameters have been described in these plans and specifications. The Contractor will be required to incorporate these guidelines into a detailed erosion control plan and construction sequencing schedule, which must be approved prior to the ' start of construction. The Contractor will be required to take appropriate erosion and sediment control measures during construction and to conform to all local and state laws pertaining to the environment. Temporary runoff and sediment control facilities are included in the project design and are the responsibility of the Contractor to install and maintain throughout construction as has been noted in the plans. It is anticipated that the Contractor will proceed with construction as follows: • Install silt fence as shown on the grading plan. • Install sediment trap as shown on the grading plan. ' • Install diversion ditches. • Strip topsoil and stockpile onsite. • Start grading activities including demolition of existing perimeter road and ' reconstruction. • Cover all 4:1 slopes and ditches with Type 1 temporary erosion control matting, seed and mulch as grading operations allow. • Complete grading activities. 0 Once permanent vegetation has been established, Contractor shall remove the temporary erosion control devices and reseed as necessary. Maintenance of the all BMP's will remain the responsibility of the Contractor until completion of the project and permanent vegetation has been established. The Coastal Carolina Regional Airport will be responsible for maintaining permanent vegetation once the Contractor has removed all temporary erosion control measures and the project is completed. See enclosed drawings and specifications for additional information. 1 1 ' Safety Area Improvement 2 October, 2008 GEOTECHNICAL REPORT Note: The information in this report is offered for information purposes only. Neither THE LPA GROUP, nor the owner makes a claim to the completeness or accuracy of the findings. 1 Safety Area Improvement October, 2008 at W?LUAMM - /- 'o1r,\p l JS- 5? \ -?? `5 R N ?N +N _ i'S1 m m 00 N ?-? N ? 71 N ?- ?01 ?II Q0 I% I ? o I I ? I I 11 v en I m l l I I I I ?-' z Q W V s &U' ,-o WN ?W J? HWZ OW !5Z WW 40 O M N Z a O Lo J O Z) m y om z ? N U O ? II ? CD I I ° _ o 1 Q z II ?00 Im ?Q II ? co .0-1- -j 1 Qz< I °°C_ F= w ?- I ?-?WQ:? o II ?? oU>- z i w Q III L ?oW ?I o?0 II a ? m m 0 0 0 0 w W z 000 Q?[I > I? I 1 / U J I I II I PROJECT: Craven County Regional Airport Craven County, North Carolina TEST BORING RECORD B-22 1051-03-117 NOTES: Boring location is approximate. DATE DRILLED: 6118103 ELEVATION: Ground Surface DRILLING METHOD: 3-114" HSA BORING DEPTH: 10.0 ft LOGGED BY: A. NASH WATER LEVEL: 2' After 24 Hrs. DRILLER: M. MOSELEY DRILL RIG: CME-750 U J W W O STANDARD PENETRATION TEST DATA = a. o MATERIAL DESCRIPTION _j J 6: Q ; (blows/ft) N-value C) W W (7 N Z w 3 10 20 30 .6.0.8.0. - OSOIL P Firm Gray-Tan Fine Sandy CLAY (CL), Moist i Medium Dense Tan Silty Fine SAND (SM), Saturated 14 5 Medium Dense Tan Fine SAND (SP), Saturated 17 Soft Dark Gray-Green Clayey SILT (MH), Wet 4 10 Boring terminated at 10 feet below existing ground surface. Groundwater was observed in borehole at a depth of 2 feet after 24 hours. 15 20- 25- 30- NOTES : ?.THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING, SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D•1586. 3. PENETRATION (N•VALUE) IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN. REQUIRED TO DRIVE 1.4 IN. I.D. SAMPLER 1 FT. 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. Page 1 of 1 S&ME ENGINEERING • TESTING ENVIRONMENTAL SERVICES 3109 Spring Forest Road Raleigh, NC 27616 PROJECT: Craven County Regional Airport Craven County, North Carolina TEST BORING RECORD B-23 1051-03-117 NOTES: Boring location is approximate. DATE DRILLED: 8118/03 ELEVATION: Ground Surface DRILLING METHOD: 3-114" HSA BORING DEPTH: 10.0 ft LOGGED BY: A. NASH WATER LEVEL: 3.1' @ TOB DRILLER: M. MOSELEY DRILL RIG: CME-750 U J W W W p STANDARD PENETRATION TEST DATA = a? W a. U MATERIAL DESCRIPTION -' W 0-o m (blows/ft ) N-value w O v Q o w v Z W 3 10 20 30 60 80 TOPSOIL Very Loose to Medium Dense Tan-Gray Silty Fine SAND (SM), Saturated 4 FfC 5 16 12 Firm Dark Gray-Green Clayey SILT (MH), Wet 10 5 Boring terminated at 10 feet below existing ground surface. Borehole caved at 3.5 feet below existing ground surface. Groundwater was observed in borehole at a depth of 3.1 feet at termination of boring. 15 20- 30- NOTES : 1. THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. Z BORING, SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. 3. PENETRATION (N -VALUE) IS THE NUMBER OF BLOWS OF 140 L8. HAMMER FALLING 30 IN. REQUIRED TO DRIVE 1.4 IN. I.D. SAMPLER I FT 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. Page 9 of 1 ^?v S E ENGINEERING • TESTING ENVIRONMENTAL SERVICES 3109 Spring Forest Road Raleigh, NC 27616 PROJECT: Craven County Regional Airport Craven County, North Carolina TEST BORING RECORD B-24 1051-03-117 NOTES: Boring location is approximate. DATE DRILLED: 6/18/03 ELEVATION: Ground Surface DRILLING METHOD: 3-1/4" HSA BORING DEPTH: 10.0 ft LOGGED BY: A. NASH WATER LEVEL: 6.8'@ TOB DRILLER: M. MOSELEY DRILL RIG: CME-750 U J > W w p STANDARD PENETRATION TEST DATA ? (7 o MATERIAL DESCRIPTION a 4) (blows/ft) N-Value Q v Q W Q o w C? (0 Z W 10 20 30 .6.0.8.0. TOPSOIL Firm Tan-Brown Fine Sandy CLAY (CL), Moist 6 Medium Dense White Fine SAND (SP), Saturated 20 5 Medium Dense Tan Silty Fine to Medium SAND (SM), Saturated Q FfC 20 Loose Orange Clayey Fine SAND (SC), Saturated E 9 10 Boring terminated at 10 feet below existing ground surface. Borehole caved at 7.2 feet below existing ground surface. Groundwater was observed in borehole at a depth of 6.8 feet at termination of boring. 15 20 25 30 NOTES: 1. THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING, SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. 3. PENETRATION (N-VALUE) IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN. REQUIRED TO DRIVE 1.4 IN. I.D. SAMPLER 1 FT. 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT 5. WA TER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. Page 1 of 1 S&ME ENGINEERING • TESTING ENVIRONMENTAL SERVICES 3109 Spring Forest Road Raleigh, NC 27616 PROJECT: Craven County Regional Airport Craven County, North Carolina TEST BORING RECORD B-25 1051-03-117 NOTES: Boring location is approximate. DATE DRILLED: 6/18/03 ELEVATION: Ground Surface DRILLING METHOD: 3-1/4" HSA BORING DEPTH: 10.0 ft LOGGED BY: A. NASH WATER LEVEL: 4.4'@ TOB DRILLER: M. MOSELEY DRILL RIG: CME-750 U J > W w p STANDARD PENETRATION TEST DATA ~ w = U Q o MATERIAL DESCRIPTION -j a >- F' -, ° (blows/ft ) N-value W v W a o W -w - (? F- V) Z J ul 3: 10 20 30 60 80 TOPSOIL Very Loose Tan Silty Fine SAND (SM), Saturated 3 Very Loose to Loose Tan Fine to Medium SAND (SP), Saturated 5 4 Soft Orange and Gray Slightly Fine Sandy CLAY (CH), Wet 4 10 Boring terminated at 10 feet below existing ground surface. Borehole caved at 4.6 feet below existing ground surface. Groundwater was observed in borehole at a depth of 4.4 feet at termination of boring. 15 20 25- 30- : NOTES 1. THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. Z BORING, SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. 3. PENETRATION (N-VALUE) IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN. REQUIRED TO DRIVE 1.4 IN. I.D. SAMPLER 1 FT. 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. Page 9 of 1 ?H S&ME ENGINEERING • TESTING ENVIRONMENTAL SERVICES 3109 Spring Forest Road Raleigh, NC 27616 PROJECT: Craven County Regional Airport Craven County, North Carolina TEST BORING RECORD B-26 1051-03-117 NOTES: Boring location is approximate. DATE DRILLED: 6/18103 ELEVATION: Ground Surface DRILLING METHOD: 3-114" HSA BORING DEPTH: 10.0 ft LOGGED BY: A. NASH WATER LEVEL: 4' @ TOB DRILLER: M. MOSELEY DRILL RIG: CME-760 v J W w W O STANDARD PENETRATION TEST DATA _ D (D Q6 nz MATERIAL DESCRIPTION J a > F ?, JD (blows/ft ) N-value W o Q W Q o w (? Q (n Z J W 3 10 20 30 .6.0.8.0. TOPSOIL Loose Tan Silty Fine SAND (SM), Moist to Saturated 10 5 - 8 Loose Tan-Gray-Orange Clayey Fine to Medium SAND (SC), Saturated 7 10 8 Boring terminated at 10 feet below existing ground surface. Borehole caved at 4.3 feet below existing ground surface. Groundwater was observed in borehole at a depth of 4 feet at termination of boring. 15 20 25- 30- NOTES' 1. THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. Z BORING, SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM 0-1586. 3. PENETRATION (N-VALUE) IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN. REQUIRED TO DRIVE 1.4 IN. I.D. SAMPLER 1 FT. 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. Page 1 of 9 S&ME ENGINEERING - TESTING ENVIRONMENTAL SERVICES 3109 Spring Forest Road Raleigh, NC 27616 PROJECT: Craven County Regional Airport Craven County, North Carolina TEST BORING RECORD B-27 1051-03-117 NOTES: Boring location is approximate. DATE DRILLED: 6/18/03 ELEVATION: Ground Surface DRILLING METHOD: 3-114" HSA BORING DEPTH: 10.0 ft LOGGED BY: A. NASH WATER LEVEL: 3.8' @ TOB DRILLER: M. MOSELEY DRILL RIG: CME-750 0 J W O STANDARD PENETRATION TEST DATA _ a w a 0 o MATERIAL DESCRIPTION W -i Lu n. > ¢ 6 (blows/ft) N-Value W o ?- Q W a o w (? Q Z .j W 3 10 20 30 60 80 TOPSOIL Medium Dense Gray Clayey Fine SAND (SC), Moist 11 Loose Gray Slightly Silty Fine to Medium SAND (SM), Saturated - 5 5 HC Firm Tan-Orange Medium Sandy CLAY (CL-CH), Wet 5 Firm Gray CLAY (CH), Wet 13 10 Boring terminated at 10 feet below existing ground surface. Borehole caved at 6 feet below existing ground surface. Groundwater was observed in borehole at a depth of 3.8 feet at termination of boring. 15 20 25- 30- NOTE S: 1. THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING, SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. 3. PENETRATION (N-VALUE) IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN. REQUIRED TO DRIVE 1.4 IN. I.D. SAMPLER 1 FT. 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY Page 1 of 1 S&ME ENGINEERING • TESTING ENVIRONMENTAL SERVICES 3109 Spring Forest Road Raleigh, NC 27616 PROJECT: Craven County Regional Airport Craven County, North Carolina TEST BORING RECORD B-28 1051-03-117 NOTES: Boring location is approximate. DATE DRILLED: 6118103 ELEVATION: Ground Surface DRILLING METHOD: 3-114" HSA BORING DEPTH: 10.0 ft LOGGED BY: A. NASH WATER LEVEL: Dry @ TOB DRILLER: M. MOSELEY DRILL RIG: CME-750 U J w W O STANDARD PENETRATION TEST DATA = za c9 o MATERIAL DESCRIPTION LU a r ¢ d (blows/ft) N-Value Q v a- o: W ¢ p Z .. c9 ¢ w 10 20 30 .6.0.8101 . TOPSOIL Medium Dense Gray Silty Fine SAND (SM), Moist 16 Medium Dense Tan-Brown Clayey Fine SAND (SC), Moist 16 5 Medium Dense White Fine SAND (SP), Saturated HC 20 Very Loose Light Tan Slightly Clayey Fine to Medium SAND (SC), Saturated 4 10 Boring terminated at 10 feet below existing ground surface. Borehole caved at 6.5 feet below existing ground surface. Borehole was observed dry at termination of boring. 15- 20- 25 30 NOTES: 1. THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING, SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. 3. PENETRATION (N-VALUE) IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN. REQUIRED TO DRIVE 1.4 IN. I.D. SAMPLER 1 FT. 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY Page 1 of 1 *S&ME ENGINEERING - TESTING ENVIRONMENTAL SERVICES 3109 Spring Forest Road Raleigh, NC 27616 Topographic Map with Site Location Safety Area Improvement October, 2008 Safety Area Improvement Site Plan with Site Location And Drainage Area Map October, 2008 w Z J w ? z N F? d ? w U O W U a ? d W a o ia ?- r . p K c? ? o c> "? Z Z Z O p a o N> N N a s w a? w w z z w I l w I x {' 00 0 0 v LNL ? r O Uc O c `= O o °o° ?? °?? .fz 1 67 WILLIAMS R? ?° `" °° cad' ? ,? - _ ??? ? gad j? 2V I I,. ,. e?? .? 'j ;. ?` +^r - ?? ?= Q z S R. ,41? r x''> Z i ?I I `-.. ? xl o ° I? fly r r -, I::? 'f II JJ / / : ? . ? J'i' ?? f \ ?? # Q N '? K ' ?, z - - = _0 a T o? J j LU W t . 6- r r - --? 0? ----- _ r a Z Q ,OSt x ? - ?S? ?- 1 0 N o ?u lCle'l ,I bi1.I _ Q a f' \ r ? I Nn? o ?? :; v Z k ,ra ' k . c v^ u c7? i.l. Q 0' j j 31 ?LS? p °o 0 N m O O w J Q U O ? U 2 F d Z U' ? HN^ z ° '= u ?IIII o a ?? Lu <lg rJpa.. erc R? Z Q Q ?\ \ ' o M c? r Z o Z z z a w F x F F F ?\ \\ 1 \ 1 _ ?' 1' \ \ ` i V VV/ / i ? z a w E: w w w 1 -z LL 4 , `.• // 5 ` O r A /? ? I ,III A A l ` 7 / ; - , - ', •; Q. 6. \ k , III _ , \ ?? / a N Uj h 4;f, - ---- \ li , i' I I C I I I f l A ?' Ir ? f` ?? \ \\ V A\?v` AI I II ? Q 999 W Z LL L Z \ L q l I •? I i? ? Y ,? 'Av I ?4 v ?I ,f f 11 Ili/1 f ? ? .1 ij1 ? / \t .V Il,rf/ 1 l,lilll wAA ? /? O N \ 1 III J ,, , '\ ! r' \ (\ ;/ }I .il II I Il ltl` ?; ? V 3 ?' I I I ?Q? .I?, -1 I 1111 / v ''VAS ..IIib ,,j4f J I ; A` U ` ts i I r '1 I' 1 1 ?\ / i s , /Jf 4 II '?_ ___ ?\ II f I j y I II ? II I• I. > I" \ I I I f \ I ?I. 7 1 II Ili L I I I ` I ? 1 1 _ AV f,l 1 / II ? i ' ? l?l ? I II III /? I,j I 1 1 1 Ilf ? , 1 I ?'I!I ll? \ I w:110 110 h' / Q , 'III Uf . \\\ f I i t I I co, `; \ II I - 1 ?\ ? 1 I I II III 1 I 1\ I I I ? t `l 1 ? I ,I,;I I i I I'i11? \ N v ' ? ? i 1 , , I I ! I _IU a z I I: I ? 1 \ I?l ?l I / Il. ii I I I i?' / f"'o /? ? I I ! I 11 I I _ 1 1 I I I III ? ???n / \ \\ I' ?II I 1 ! il'I'` (?, , I? I =moo //? r/? h lil i I I ? ?\1 , J tl{(IIi ? I I 1 ?3a 1 7;' 1 1 I ' I 1IIII C1 . / / // / ;\? I I ? I I \., 1 I I i i 'i 1 IIII ; - IIII I ? Hi / \ / II I I I X 11 1 .IIII LU<12. ,' f i I' ! III , IP'I, 56.70 v` v ? 11I ?' I I IIII i I I?,I f` I-JOuai'? O. _ ?\t ?'., 1 I I I I I i III .' I C7 Q. LL_ Safety Area Improvement Temporary Sediment Trap Design Calculations October, 2008 ' THE LPA GROUP OF NORTH CAROLINA, P.A. 5000 Falls of Neuse Road, Suite 304 ' Raleigh, North Carolina 27609 (919) 954-1244 FAX (919) 954-1345 JOB Coc?-StD-E Cc.yobdaG RfW 2Z S? SHEET NO. n OF Ci CALCULATED BY DATE 12 ? • '? o CHECKED BY DATE SC:AI F PRODUCT 204-1(SNie Sheets) 205-1 (Padded) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Oct 9 2008, 2:39 PM Hyd. No. 2 Sediment Trap A Hydrograph type = Rational Peak discharge = 1.51 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 4.1 ac Runoff coeff. = 0.1 Intensity = 3.643 in/hr Tc by FAA = 39 min IDF Curve = CRAVEN.IDF Asc/Rec limb fact = 1/1 Hydrograph Volume = 3,529 cuft 1.00 0.00 0.0 0.2 Hyd No. 2 0.3 0.5 03 0.8 1.0 1.2 Q (cfs) 2.00 1.00 0.00 1.3 Time (hrs) 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Sediment Trap B Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 0.4 ac Intensity = 3.481 in/hr OF Curve = CRAVEN.IDF Thursday, Oct 9 2008, 2:48 PM Peak discharge = 0.12 cfs Time interval = 1 min Runoff coeff. = 0.1 Tc by FAA = 42 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 307 cuft Sediment Trap B Q (cfs) Q (cfs) Hyd. No. 1 -- 10 Yr 5 i - 0.50 0.45 - - - - - I 0.45 0.40 - - 0.40 0.35 - - 0.35 0.30 -- 0.30 0.25 - - I I 0.25 0.20 0.20 0.15 0.15 i 0.10 - -- - - - - - ? I 0.10 I 0.05 - - - --- - -- - - - - 0.05 i 0.00 --- 0.00 0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 Time (hrs) Hyd No. 1 1 1 Safety Area Improvement Impact on the Complete Drainage Area Design Calculations October, 2008 1 1 1 1 t ` t j a o i ; J6 f N e LQ`U) U O CL F T I Q - h j H N D 2 W (L ° a 2 r d ? a g N N J W O Q Q ul W W c Q /' ?n V °o Z a Z - C) N _j 0 ? N Q m J a j ? J (n o m O S a O O 0 U') O w z J w z J W ¢ F O O = m W W a a o o w a () v o a C7 H ?- O C7 O O Z ? ? Z = Z Z Z N Q O O N X Z (n X to X (n JC ? d d W 4 W W W , I I 1 I W 1 , I i ) I / J I - 1 N F Z J'o"m ?IIII V e' ° ?IIII F NZ wQaO s-.Jo ? FJpa.s H dro ra h Plot C-0 M 4,-tr. DT-O,'-10,5e, kr-Y J p P ,,. TO ?lIo'es Hydraflow Hydrographs by Intelisolve Hyd. No. 3 ' Total Area Pre- Hydrograph type = Rational ' Storm frequency = 10 yrs Drainage area = 756.4 ac Intensity = 1.092 in/hr IDF Curve = CRAVEN.IDF I Tuesday, Oct 14 2008, 10:40 AM Peak discharge = 247.72 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by FAA = 220 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 3,269,963 cult Total Area Pte- Hyd. No. 3 -- 10 Yr Q (cfs) 280.00 240.00 200.00 160.00 120.00 80.00 40.00 ' 0.00 0.0 0.7 1.3 ' Hyd No. 3 2.0 2.7 3.3 4.0 4.7 0.00 5.3 6.0 6.7 7.3 Time (hrs) HYdro9raph Plot Cow,PLe+e' prc,'-"GArect, --o Ps'Pfcs ' Hydraflow Hydrographs by Intelisolve Hyd. No. 4 ' Total Area Post- Hydrograph type = Rational Storm frequency = 10 yrs ' Drainage area = 756.4 ac Intensity = 1.092 in/hr ' IDF Curve = CRAVEN.IDF ' Q (cfs) 280.00 240.00 200.00 160.00 Tuesday, Oct 14 2008, 10:42 AM Peak discharge = 247.73 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by FAA = 220 min Asc/Rec limb fact = 1/1 120.00 80.00 40.00 Hydrograph Volume = 3,270,006 cuft Total Area Post- Hyd. No. 4 -- 10 Yr 0.00 0.0 0.7 1.3 2.0 2.7 3.3 4.0 4.7 Hyd No. 4 Q (cfs) 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0.00 5.3 6.0 6.7 7.3 Time (hrs) 1 Detailed Site Map of Temporary Sediment Controls ' See enclosed drawings PL-1, GD-1, and EC-1 & 2 Safety Area Im p rovement October, 2008 Project Specifications 01060 Control of Erosion, Siltation & Pollution ' D-753 Rip E-893 Temporary Silt Fence E-895 Erosion Control Matting ' P-151 Clearing and Grubbing P-152 Excavation And Embankment. T-901 Seeding ' T-905 Topsoiling T-908 Mulching Safety Area Improvement October, 2008 SECTION 01060 CONTROL OF EROSION, SILTATION AND POLLUTION PART1 GENERAL 1.01 REQUIREMENTS: The Contractor shall take all measures necessary to minimize soil erosion, siltation, water pollution, and air pollution caused by his operations. The Contractor shall comply with the applicable regulations of all legally constituted authorities relating to pollution prevention and control. The Contractor shall keep himself fully informed of all such regulations which in any way affect the conduct of the work, and shall at all times observe and comply with all such regulations. In the event of conflict between such regulations and the requirements of the specifications, the more restrictive requirements shall apply. The Engineer will limit the area over which clearing, grubbing, excavation, borrow, and embankment operations are performed whenever the Contractor's operations do not make effective use of construction practices and temporary measures which will minimize erosion, or whenever effective erosion control features are not being completed as soon as permitted by construction operations. 1.02 EROSION CONTROL SCHEDULE: Except as otherwise specified, the Contractor shall submit to the Engineer for his approval three (3) copies of his erosion control schedule at the time of the preconstruction conference. This schedule shall show the time relationship between phases of the work which must be coordinated to reduce erosion, and shall describe construction practices and temporary erosion control measures which will be used to minimize erosion. The schedule shall also show the Contractor's proposed method of erosion control on haul roads and borrow and material pits, and his plan for disposal of waste materials. No work shall be started until the erosion control schedule and methods of operations have been approved by the Engineer. PART 2 PRODUCTS (Not used) PART 3 EXECUTION 3.01 EROSION AND SILTATION CONTROL: The Contractor shall exercise every reasonable precaution throughout the life of the project to prevent the eroding of soil and silting of rivers, streams, lakes, reservoirs, other impoundments, ground surfaces, or other property. Prior to suspension of operations on the project or any portion thereof, the Contractor shall take all necessary measures to protect the construction area, including but not 01060-1 limited to borrow pits, soil type base courses, and waste areas, from erosion during the period of suspension. 3.02 COORDINATION OF EROSION CONTROL OPERATIONS: A. Temporary and permanent erosion control measures shall be provided as shown on the plans or as directed by the Engineer. All permanent erosion control work shall be incorporated into the project at the earliest practicable time. Temporary erosion control measures shall be coordinated with permanent erosion control measures and all other work on the project to assure economical, effective, and continuous erosion control throughout the construction and post construction period and to minimize siltation of rivers, streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property. B. Temporary erosion control measures shall include but not be limited to the use of temporary berms, dikes, dams, silt fences, drainage ditches, silt basins, diversion ditches, slope drains, structures, vegetation, mulches, mats, netting, gravel, rip rap, or any other methods or devices that are necessary. Temporary erosion control measures may include work outside the construction limits where such work is necessary as a result of construction such as borrow pit operations, haul roads, plant sites, equipment storage sites, and disposal of waste or debris. The Contractor shall be liable for all damages to public or private property caused by silting or slides originating in waste areas furnished by the Contractor. C. Materials for temporary erosion control measures shall be approved by the Engineer before being used or shall be as directed by the Engineer. D. Erosion control measures installed by the Contractor shall be acceptably maintained by the Contractor. 3.03 WATER AND AIR POLLUTION: A. The Contractor shall exercise every reasonable precaution throughout the life of the project to prevent pollution of rivers, streams, and water impoundments. Pollutants such as chemicals, fuels, lubricants, bitumens, raw sewage, and other harmful waste shall not be discharged into or alongside of rivers, streams, or impoundments, or into natural or manmade channels leading thereto. ' B. The Contractor shall comply with all Federal, State or local air pollution regulations throughout the life of the project. ' 3.04 OPEN BURNING OF COMBUSTIBLE WASTES: Where and if burning is permitted by the specifications, the following conditions shall apply: i 01060-2 A. No tires, oils, asphalt, paint, or coated metals are permitted in combustible waste piles. B. Burning shall not be permitted unless the prevailing wind is away from a nearby town, built-up area, or aircraft operations area. C. Burning shall not be permitted during a local air inversion or other climatic condition as would result in a pall of smoke over a nearby town, built-up area, or aircraft operations area. D. Burning shall not be permitted when the danger of brush or forest fires is made known by State, local, or Federal officials. E. The size and number of fires shall be restricted to avoid the danger of brush or forest fires. Burning shall be done under surveillance of a watchman, who shall have fire-fighting equipment and tools readily available. 3.05 DUST CONTROL: A. The Contractor shall control dust throughout the life of the project within the project area and at all other areas affected by the construction of the project, including, but not specifically limited to unpaved roads, haul roads, access roads, disposal sites, borrow and material pits, and production sites. Dust control shall not be considered effective where the amount of dust creates a potential or actual unsafe condition, public nuisance, or condition endangering the value, utility, or appearance of any property. B. The Contractor will not be directly compensated for any dust control measures necessary; this work will be considered incidental to the work covered by the various contract items. 3.06 APPLICATION OF SPECIFICATIONS: The provisions of this section shall apply to all construction operations. Further references and detailed requirements concerning erosion, siltation, and pollution prevention and control, may be given in other sections of the specifications and on the drawings. 3.07 CONTRACTOR'S INSPECTION AND REPORT: The Contractor shall make an inspection of the construction site on a weekly basis and after each potentially damaging rainfall. Note shall be taken of any damage to existing erosion control features and of siltation problems encountered during the inspection. In a report to the Engineer, the Contractor shall outline his corrective measures to be undertaken and the date of implementation. 01060-3 3.08 TEMPORARY SUSPENSION OF WORK: Failure of the Contractor to fulfill any of the requirements of this section may result in the Engineer ordering the stopping of construction operations in accordance with the following: A. The Engineer shall have the authority to suspend the work wholly or in part by written order, for such periods as he may deem necessary due to conditions considered unfavorable for the suitable prosecution of the work, or to failure on the part of the Contractor to correct conditions unsafe for workmen or the general public or to carry out orders given or to perform any provisions of the contract. Such suspension of operations will not justify an extension of contract time. B. Failure on the part of the Contractor to perform the necessary measures to control erosion, siltation, and pollution will result in the Engineer notifying the Contractor to take such measures. Any fine, penalty or other cost assessed by State, local or other governmental agencies for non-performance of erosion, siltation or pollution controls against the Owner shall become the responsibility of the Contractor; such assessments, if not paid by the Contractor, shall be deducted from monies due the Contractor at the completion of the job. In the event that the Contractor fails to perform such measures within 24 hours after receipt of such notice, the Engineer may suspend the work as provided above, or may proceed to have such measures performed by others. The cost of such work performed by others will be deducted from monies due the Contractor on his contract. 3.09 PAYMENT: Except where specified otherwise elsewhere in the specifications, there will be no direct payment for any work in connection with the requirements of this section; the work shall be considered incidental to demolition, clearing, grubbing, grading, excavation, embankment, or other operations. END OF SECTION 01060 01060-4 ITEM D-753 RIP RAP DESCRIPTION 753-1.1 This item shall consist of the construction of rip rap aprons and other erosion control devices in accordance with these specifications, and conforming with the lines, grades, dimensions and locations shown on the drawings, or required by the Engineer. MATERIALS 753-2.1 WASHED STONE. Washed stone shall consist of quarry stone which is sound, tough, dense, resistant to the action of air and water, and suitable in all other respects for the purpose intended. The stone shall meet the following AASHTO No. 57 gradation requirements: ' PERCENT OF TOTAL PASSING RY WFIGHT Sieve Size 1-1/2" 1/2" No. 4 No. 8 Percent Passing 100 95-100 25-60 0-10 0-5 753-2.2 RIP RAP. Stone for Rip Rap - Class B or Class I shall conform to the requirements contained in the North Carolina Department of Transportation (NCDOT) Standard Specifications for Roads and Structures, current edition. 753-2.3 FILTER FABRIC MATERIAL. The filter fabric shall be composed of strong rot-proof synthetic fibers formed into a woven or non-woven fabric, free of any treatment ' or coating which might significantly alter its physical properties after installation. The fabric shall contain stabilizers and/or inhibitors to make the filaments resistant to deterioration resulting from sunlight or heat. The fabric shall be a pervious sheet of ' fibers oriented into a stable network so that the fibers retain their relative position with respect to each other. The edges of the fabric shall be finished to prevent the outer fiber from pulling away from the fabric. The fabric shall be free of defects or flaws which significantly affect its physical or filtering properties. Sheets of fabric may be sewn or bonded together. Except as otherwise specified, no deviation from any physical ' requirements will be permitted due to the presence of the seam. During all periods of shipment and storage, the fabric shall be wrapped in a heavy duty ' protective covering to protect the fabric from sunlight, mud, dust, dirt, and debris. The fabric shall not be exposed to temperatures greater than 140°F. The fabric shall meet the physical requirements specified below. All strength D-753-1 requirements are minimum average roll values in the weakest principal direction. PHYSICAL REQUIREMENTS Physical Property Test Method Requirements Grab Strength ASTM D 4632 200 lb. min. Elongation ASTM D 4632 15% min. Seam Strength ASTM D 4632 180 lb. min. Puncture Strength ASTM D 4833 80 lb. min. Apparent Opening Size (U.S. Standard Sieve) ASTM D 4751 No. 100 Sieve min. No. 50 Sieve max. Ultraviolet Degradation at 150 hours ASTM D 4355 70% Strength Retained Trapezoid Tear ASTM D 4533 50 lb. min. Burst Strength ASTM D 3786 320 psi min. The Contractor shall furnish certified test reports with each shipment of material attesting that the fabric meets the requirements of this provision. CONSTRUCTION METHODS ' 753-3.1 PREPARING SUBGRADE. Excavation shall be made to the required width and depth in accordance with the dimensions, lines, and grades as shown on the drawings or required by the Engineer. Excavated material shall be disposed of as ' specified in Item P-152. When specified on the drawings or directed by the Engineer, a layer of filter fabric shall be placed over the completed subgrade. The properly shaped, ' graded and compacted subgrade shall be checked and accepted by the Engineer prior to placing any rip rap or fabric. ' 753-3.2 PLACING FILTER FABRIC MATERIAL. The surface to receive the filter fabric shall be free of obstructions, debris, and pockets of soft or low density material. ' At the time of installation, the fabric shall be rejected if it has defects, rips, holes, flaws, deterioration, or damage incurred during manufacture, transportation, or storage. ' The filter fabric shall be laid smooth and free from tension, stress, folds, wrinkles, or creases. Horizontal overlaps shall be a minimum of 12 inches with the upper fabric overlapping the lower fabric. Vertical overlaps shall be a minimum of 18 inches with the ' upstream fabric overlapping the downstream fabric. In the event that the fabric is displaced or damaged during rip rap placement, the rip rap shall be removed and the fabric repositioned or replaced prior to the replacement of the rip rap, all at no additional ' cost to the Owner. D-753-2 The fabric shall be covered with rip rap within 2 days after placement of the fabric, or ' the fabric shall be replaced with new fabric. Filter fabric shall be protected from damage due to the placement of rip rap or other materials by limiting the height of drop of the material or by placing a cushioning layer of sand on top of the fabric before dumping the ' material. 753-3.3 PLACING RIP RAP. The Contractor shall place the stone by mechanical ' methods, augmented by hand placing, provided that when the rip rap is completed it forms a properly graded, dense, neat layer of stone without damage to any underlying fabric. The stone shall be graded so that the smaller stones are uniformly distributed throughout the mass. The surface of the completed rip rap shall be reasonably uniform and free from excessive humps and depressions. ' The thickness of the completed rip rap shall be as shown on the drawings or as specified by the Engineer. 753-3.4 SEDIMENT. Sediment deposits trapped by erosion control devices shall be removed when the accumulations have reached the capacity of the erosion control device to function properly or when so directed by the Engineer. 753-3.5 REMOVAL OF TEMPORARY DEVICES. Temporary rip rap devices and underlying fabric shall remain in place until the Engineer directs that they be removed. ' Upon removal, the Contractor shall remove and dispose of any excess sediment accumulations, dress the area to give a pleasing appearance, and vegetate all bare areas in accordance with the contract requirements. The temporary rip rap and fabric materials will remain the property of the Contractor and may be used at other locations provided the materials meet the requirements of this specification, or shall be removed from airport property. METHOD OF MEASUREMENT ' 753-4.1 Rip rap for aprons, slope protection, and other erosion control devices shall be measured by the ton in place, complete, and accepted. No measurement for payment shall be made for furnishing or installing filter fabric or washed stone as these ' items are considered incidental to the placement of rip rap. BASIS OF PAYMENT 753-5.1 No separate payment will be made for removal and disposal of sediment ' accumulations. The cost of this work shall be considered incidental to the cost of erosion control devices. ' D-753-3 753-5.2 Payment for rip rap shall be made at the contract unit price per ton complete and accepted. These prices shall be full compensation for furnishing all materials including filter fabric and washed stone, and for all preparation, hauling, and placing of these materials, and for removal of temporary rip rap and fabrics, and for all labor, equipment, tools, and incidentals necessary to complete this item. Payment will be made under: Item D-753 Rip Rap ........................................................................per ton TESTING AND MATERIAL REQUIREMENTS ASTM D 3786 Hydraulic Bursting Strength of Knitted Goods and Nonwoven Fabrics ASTM D 4355 Deterioration of Geotextiles from Exposure to Ultraviolet Light and Water ASTM D 4533 Trapezoid Tearing Strength of Geotextiles ASTM D 4632 Breaking Load and Elongation of Geotextiles (Grab Method) ASTM D 4751 Determining Apparent Opening Size of a Geotextile ASTM D 4833 Index Puncture Resistance of Geotextiles, Geomembranes, and Related Products END OF ITEM D-753 D-753-4 ITEM E-893 TEMPORARY SILT FENCE DESCRIPTION 893-1.1 This item shall consist of furnishing, installing, maintaining, and removing a geotextile barrier-fence designed to remove suspended particles from water passing through it. 893-1.2 The quantities of temporary silt fence shown on the drawings may be increased or decreased at the direction of the Engineer based on weather, construction procedures, and actual site conditions that occur during construction. Such variations in quantity will not be considered as alterations in the details of construction or a change in the character of the work. 893-1.3 Except as otherwise directed by the Engineer, installation of temporary silt fences shall be completed prior to any excavation or grading operations. 893-1.4 At option of Contractor and approval by Engineer, either a wire supported geotextile silt fence or a self supporting geotextile silt fence may be provided. MATERIALS 893-2.1 GEOTEXTILE. Fabric shall consist of rot-proof synthetic fibers formed into a woven or non-woven fabric meeting the requirements shown in Table 1. The geotextile shall be free of any treatment or coating which might adversely alter its physical properties after installation. Geotextile rolls shall be furnished with suitable wrapping for protection against moisture and extended ultraviolet exposure prior to placement. Each roll shall be labeled or tagged to provide product identification sufficient for inventory and quality control purposes. Rolls shall be stored in a manner which protects them from the elements. TABLE 1 - PHYSICAL REQUIREMENTS FOR GEOTEXTILE PROPERTY TEST METHOD REQUIREMENT Tensile Strength ASTM D 4632 90 lbs. minimum Elongation @ 45 Ibs ASTM D 4632 50% maximum Apparent Opening Size (U.S. Standard Sieve) ASTM D 4751 No. 20 maximum No. 50 minimum Ultraviolet Degradation ASTM D 4355 at 500 Hours Minimum 70% Strength Retained E-893-1 ' 893-2.2 POSTS. Posts shall be steel, weighing not less than 1.33 pounds per linear foot. Posts shall have a minimum overall length of 5 feet and be of sufficient strength to resist damage during installation and to support applied loads after installation. In soft ' ground, wet soils, swamps, and other similar conditions, provide a wider post or other means as needed to develop adequate resistance to applied loads. ' 893-2.3 SUPPORT FENCE. Wire or other support fence shall be at least 32 inches high and strong enough to support applied loads. Wire support fence shall be at least 14 gauge, 6x6 steel. 893-2.4 PREFABRICATED FENCE. Prefabricated fence systems may be used provided they meet all of the above material requirements, perform satisfactorily in the field, and are approved by the Engineer. CONSTRUCTION METHODS M 893-3.1 FENCE INSTALLATION. The Contractor shall install temporary silt fences as shown on the drawings and at other locations as directed by the Engineer. Fence ' construction shall be adequate to handle the stress from sediment and wind loading. Geotextile shall be adequately fastened to the support fence with wire or plastic ties having a minimum 50 pound tensile strength. Geotextile at the bottom of the fence shall ' be buried a minimum of 8 inches down and 4 inches forward in a trench so that no flow can pass under the barrier. The trench shall be backfilled and the soil compacted over the geotextile. Filter fabric height shall be not less than 18 inches or more than 24 inches above ground surface. The geotextile shall be spliced together only at a support post, with 4 feet minimum overlap to the next post. 893-3.2 POSTS. Posts shall be spaced a maximum of 8 feet apart when standard strength fabric with wire support fence is used. Posts shall be driven a minimum of 24 inches into the ground. Where a 24 inch depth is impractical to achieve, the posts shall be adequately secured to prevent overturning of the fence due to sediment or wind loading. ' 893-3.3 WIRE SUPPORT. When wire support fence is used, the wire mesh shall be fastened securely to the up slope side of the post. The wire shall extend to the bottom ' of the trench and extend a maximum of 36 inches above the original ground surface. 893.3.4 SELF SUPPORT. When self supported fence is used, the geotextile shall be securely fastened to fence posts. 893-3.5 RESPONSIBILITY. It is the Contractor's responsibility to maintain the ' integrity of silt fences as long as they are necessary to contain sediment runoff. The E-893-2 Contractor shall inspect all temporary silt fences immediately after each rainfall and at least daily during prolonged rainfall. Any deficiencies shall be immediately corrected by the Contractor. In addition, the Contractor shall make a daily review of the location of silt fences in areas where construction activities have changed the natural contour and drainage runoff to ensure that the silt fences are properly located for effectiveness. Where deficiencies exist, additional silt fences shall be installed as directed by the Engineer. Should the silt fence become damaged, clogged, or otherwise ineffective while the barrier is still necessary, it shall be repaired or replaced promptly by the Contractor at his expense. 893-3.6 SEDIMENT. Sediment deposits shall be removed when the accumulations have reached the capacity of the silt fence to function properly or when so directed by the Engineer. ' 893-3.7 REMOVAL. The silt fence shall remain in place until the Engineer directs that it be removed. Upon removal, the Contractor shall remove and dispose of any excess sediment accumulations, dress the area to give a pleasing appearance, and vegetate all bare areas in accordance with the contract requirements. The fence materials will remain the property of the Contractor and may be used at other locations provided the materials meet the requirements in Table 1. METHOD OF MEASUREMENT 893-4.1 The quantity of temporary silt fence to be paid for will be the actual number of linear feet of silt fence, measured in place from end post to end post of each separate installation, which has been completed and accepted. ' BASIS OF PAYMENT 893-5.1 No separate payment will be made for removal and disposal of sediment accumulations. The cost of this work shall be considered incidental to the cost of temporary silt fence. 893-5.2 Payment for accepted temporary silt fence shall be made at the contract unit price per linear foot. The above price shall be full compensation for all work covered by this item, including but not limited to furnishing all fence posts, fence fabric, filter fabric, hardware, and ' other material; installing and maintaining the silt fence; removal and disposal of sediment accumulations from the silt fence; removal of the silt fence; and dressing the disturbed areas after the silt fence has been removed. ' E-893-3 Payment will be made under: Item E-893 Temporary Silt Fence ............................................. per linear foot TESTING AND MATERIAL REQUIREMENTS ASTM D 4355 Deterioration of Geotextiles from Exposure to Ultraviolet Light and Water ASTM D 4632 Breaking Load and Elongation of Geotextiles (Grab Method) ASTM D 4751 Determining Apparent Opening Size of a Geotextile END OF ITEM E-893 E-893-4 I ITEM E-895 ' EROSION CONTROL MATTING DESCRIPTION ' 895-1.1 The work covered by this section consists of furnishing, placing, and securing either temporary jute matting, excelsior matting, paper matting, or other approved ' matting on previously shaped and seeded slopes, drainage channels, or other areas at locations shown on the plans or as directed by the Engineer. The quantity of matting to be placed will be affected by the actual conditions which occur during the construction of the project. The quantity of matting may be increased, decreased, or eliminated entirely at the direction of the Engineer. Such variations in ' quantity will not be considered as alterations in the details of construction or a change in the character of the work. MATERIALS 895-2.1 TEMPORARY MATTING MATERIAL. A. General. Matting shall be jute matting, excelsior matting, or paper matting. Other acceptable material manufactured especially for erosion control may be used when approved by the Engineer in writing before being used. Erosion control matting shall not be dyed, bleached, or otherwise treated in a manner that will result in toxicity to vegetation. B. Jute Matting. Jute matting shall be of a uniform open plain weave of single jute yarn, 48 inches in width plus or minus 1 inch. The yarn shall be of a loosely twisted construction and shall not vary in thickness by more than one-half its normal diameter. There shall be 78 warp ends, plus or minus 2, per linear yard; and the weight shall average 1.122 pounds per linear yard of the matting with a tolerance of plus or minus 5 percent. C. Excelsior Matting. Excelsior matting shall consist of a machine produced mat of curled wood excelsior at least 47 inches in width. The mat shall weigh 0.975 pounds per square yard with a tolerance of plus or minus 10 percent. At least 80 percent of the individual excelsior fibers shall be evenly distributed over the entire area of the blanket. One side of the excelsior matting shall be covered with a woven fabric of twisted paper cord or cotton cord, or with an extruded plastic mesh. The mesh size for either the fabric or plastic mesh shall be a minimum of 1 inch x 1 inch and a maximum of 1 1/2 inches x 3 inches. E-895-1 D. Paper Matting. Paper matting shall consist of a knitted polypropylene yarn with uniform openings through which biodegradable paper strips have been ' continuously interwoven. The openings shall be no greater than 3/4 inch in their greatest dimension and 1/2 inch in their least dimension. The interwoven yarn and paper shall form a flexible mat which will stretch in any direction so as to conform to the shape of an irregular surface when applied to such surface. Paper matting shall be 3.6 feet or more in width and weigh a minimum of 0.09 pound per square yard. ' E. Wire Staples. Staples shall be machine made of No.11 gage steel wire formed into a "U" shape. The size when formed shall be not less than 6 inches in length with a throat of not less than 1 inch in width. ' CONSTRUCTION METHODS 895-3.1 MANUFACTURER'S INSTRUCTIONS. Except as otherwise specified herein or approved by the Engineer, each type of matting shall be installed in accordance with its manufacturer's printed instructions. ' 895-3.2 TEMPORARY MATTING INSTALLATIONS. Placing of matting shall be done immediately following seeding. The earth surface shall be smooth and free from stones, clods, or debris which will prevent the contact of the matting with the soil. Care shall be ' taken to preserve the required line, grade, and cross section of the area covered. Matting shall be unrolled in the direction of the flow of water, and shall be applied ' without stretching so that it will lie smoothly but loosely on the soil surface. The up- channel or top of slope end of each piece of matting shall be buried in a narrow trench at least 5 inches deep. After the end of the matting is buried, the trench shall be closed and tamped firmly. Where one roll of matting ends and a second roll begins, the end of the upper roll shall be brought over the buried end of the second roll so that there will be a 6 inch overlap. Check slots shall be constructed at each 50 feet longitudinally in the matting or as directed by the Engineer. These slots shall be narrow trenches at least 5 inches deep. The matting shall be folded over and buried to the full depth of the ' trench, after which the trench shall be closed and firmly tamped. Where 2 or more widths of matting are laid side by side, the overlap shall be at least 4 inches. ' Staples shall be placed across matting at ends, junctions, and check slots and shall be spaced approximately 10 inches apart. ' Staples shall be placed along the outer edges and down the center of each strip of matting and shall be spaced 3 feet apart. Staples shall also be placed along all lapped edges 2 to 3 feet apart. 1 E-895-2 When excelsior matting is used, the matting shall be installed with the fabric on the top side. After matting has been placed and stapling completed, the matting shall be rolled with an approved roller to assure that it is in proper contact with the soil. In the installation of matting on cut or fill slopes the Engineer may require adjustments in the trenching or stapling requirements to fit individual slope conditions. METHOD OF MEASUREMENT 895-4.1 The quantity of temporary erosion control matting to be paid for will be the number of square yards, measured along the surface of the ground, over which temporary erosion control matting has been acceptably placed and maintained. BASIS OF PAYMENT 895-5.1 The quantity of temporary erosion control matting, measured as provided above will be paid for at the contract unit price per square yard. The above price and payment will be full compensation for all work covered by this section, including but not limited to furnishing all matting, staples, and other materials; and placing and securing the matting. Seeding shall be paid for under Item T-901. Payment will be made under: Item E-895 Temporary Erosion Control Matting ............... per square yard TESTING AND MATERIAL REQUIREMENTS ASTM D-1682 Tensile Strength and Elongation ASTM D-1777 Material Thickness ASTM D-3776 Weight of Materials ASTM D-4355 Ultraviolet Stability END OF ITEM E-895 E-895-3 ITEM P-151 ' CLEARING AND GRUBBING DESCRIPTION 151-1.1 This item shall consist of clearing or clearing and grubbing, including the disposal of materials, for all areas within the limits designated on the plans or as ' required by the Engineer. Clearing shall consist of the cutting and removal of all trees, brush, logs, and hedges, and the removal of other loose or projecting material from the designated areas. The grubbing of stumps and roots will not be required. Clearing and grubbing shall consist of clearing the surface of the ground of the designated areas of all trees, stumps, down timber, logs, snags, brush, undergrowth, hedges, grass, weeds, debris, rubbish of any nature, natural obstructions, and such material which in the opinion of the Engineer is unsuitable; grubbing stumps, roots, matted roots, and foundations; and disposal of all spoil materials. CONSTRUCTION METHODS 151-2.1 GENERAL. The areas denoted on the plans to be cleared or cleared and ' grubbed shall be staked on the ground by the Contractor and approved by the Engineer. All spoil materials removed by clearing or clearing and grubbing shall be disposed of off ' airport property. The Contractor shall obtain and file with the Engineer permission in writing from the property owner for the use of the private property for this purpose. ' Blasting shall not be done unless specifically authorized by the Owner. ' The removal of existing structures and utilities required to permit orderly progress of work shall be accomplished by local agencies, unless otherwise indicated. Whenever a telephone or electrical pole, pipeline, conduit, sewer, roadway, or other utility is encountered and must be removed or relocated, the Contractor shall advise the Engineer who will notify the proper authority or owner and attempt to secure prompt action. ' 151-2.2 CLEARING. The Contractor shall clear the staked or indicated area of all trees. Trees in clearing areas shall be cut and removed by hand or by low impact ' equipment which will minimize ground disturbance. Any equipment used in the clearing areas must have the approval of the US Army Corps of Engineers and NCDENR for use in wetland areas. Trees shall be felled in a manner to minimize damage to trees that ' are to be left standing. The Contractor shall preserve and protect from injury all trees P-151-1 i? ' not to be removed. Trees unavoidably falling outside the specified limits must be cut up, removed, and disposed of in a satisfactory manner. Trees shall be cut to a height of not ' more than 12 inches above the ground. Grubbing of stumps and roots will not be required. ' 151-2.3 CLEARING AND GRUBBING. All trees, stumps, roots, buried logs, brush, grass, and other unsatisfactory materials shall be removed. Tap roots and other projections over 1-1/2 inches in diameter shall be grubbed out to a depth of at least 18 ' inches below the existing and finished grades. Except as otherwise indicated, existing buildings and structures within areas to be cleared shall be removed as specified in Item S-140. All holes remaining after the grubbing operation in areas not to be excavated shall have ' the sides broken down to flatten out the slopes, and shall be filled with acceptable material, moistened and properly compacted in layers to the density required in Item P- 152. METHOD OF MEASUREMENT 151-3.1 The quantities of clearing or clearing and grubbing as shown by the limits on the plans or as ordered by the Engineer shall be the number of acres or fractions thereof, of land specifically cleared or cleared and grubbed. BASIS OF PAYMENT 151-4.1 Payment shall be made at the contract unit price per acre for clearing. This price shall be full compensation for furnishing all materials and for all labor, equipment, tools, and incidentals necessary to complete the item. 151-4.2 Payment shall be made at the contract unit price per acre for clearing and grubbing. This price shall be full compensation for furnishing all materials and for all labor, equipment, tools, and incidentals necessary to complete the item. Payment will be made under: Item P-151 A Clearing and Grubbing .................................................... per acre Item P-151 B Clearing ...........................................................................per acre END OF ITEM P-151 P-151-2 ITEM P-152 EXCAVATION AND EMBANKMENT DESCRIPTION 152-1.1 This item covers excavation, disposal, placement, and compaction of all soil and rock materials within the limits of the work required to construct safety areas, as well as other areas for drainage, roads, or other purposes in accordance with these specifications and in conformity to the dimensions and typical sections shown on the plans. 152-1.2 CLASSIFICATION. All material excavated shall be classified as defined below: A. Unclassified Excavation. Unclassified excavation shall consist of the excavation and disposal of all material, regardless of its nature, which is not otherwise classified and paid for under the following items. B. Embankment In Place Embankment In Place consists of the excavation, transportation, and embankment on-site of off-site borrow materials. Borrow material for this item shall be obtained from a borrow pit on the airport property. No Embankment In Place shall be utilized until all grading with Unclassified Excavation is completed and the Contractor has performed field surveys. C. Topsoil. Topsoil shall consist of the surface layer of soil or other excavation ' meeting the composition requirements of Item T-905. ' 152-1.3 Unsuitable Excavation. Any material containing vegetable or organic matter, such as muck, peat, organic silt, or sod shall be considered unsuitable for use in embankment construction. Material, when approved by the Engineer as suitable to ' support vegetation, shall be used as topsoil. 152-1.4 Wet Soil Material. High or excessive moisture contents of a soil material will not constitute a reason for classifying the soil material unsuitable. Soils with moisture contents too high for proper compaction but otherwise suitable as determined by the Engineer shall be excavated, aerated, dried to suitable moisture content, replaced, and ' compacted as part of unclassified excavation. Soils that gain excessive moisture contents due to the Contractor's unsatisfactory ' operations shall be similarly excavated, aerated, and replaced but at the Contractor's expense. P-152-1 1 CONSTRUCTION METHODS ' 152-2.1 General. Before beginning excavation, grading, and embankment operations in any area, the area shall be completely cleared and grubbed, when required, and stripped of topsoil to the depths specified or directed by the Engineer. The suitability of material to be placed in embankments shall be subject to approval by the Engineer. All unsuitable material not approved for use as topsoil shall be disposed of outside airport property. When the Contractor's excavating operations encounter artifacts of historical or archaeological significance, the operations shall be temporarily discontinued. At the direction of the Engineer, the Contractor shall excavate the site in such a manner as to preserve the artifacts encountered and allow for their removal. Such excavation will be paid for as extra work. If it is necessary to interrupt existing surface drainage, sewers, underdrainage, conduits, utilities, or similar underground structures, the Contractor shall be responsible for and shall take all necessary precautions to preserve them or provide temporary services. When such facilities are encountered, the Contractor shall notify the Engineer, who shall arrange for their removal if necessary except as otherwise indicated on the plans. The Contractor shall, at his/her own expense, satisfactorily repair or pay the cost of all damage to such facilities or structures which may result from any of the Contractor's operations during the period of the contract. For the purpose of determining compaction control in excavation and embankment areas, noncohesive soils are defined as those with a plasticity index (PI) of less than 6 when tested in accordance with ASTM D 4318; cohesive soils are soils having a plasticity index of 6 or more. 152-2.2 EXCAVATION. No excavation shall be started until the work has been staked out by the Contractor and the Contractor has obtained elevations and measurements of the ground surface. This "pre-excavation survey" must be performed by a surveyor licensed in the State of North Carolina. All suitable excavated material shall be used in the formation of embankment or for other purposes shown on the plans. All unsuitable material shall be disposed of as specified in paragraph 152-2.1. When the volume of excavation is not sufficient for constructing the fill to the grades indicated, the deficiency shall be obtained from borrow areas. The grade shall be maintained so that the surface is well drained at all times. When necessary, temporary drains and drainage ditches shall be installed to intercept or divert surface water which may affect the work. Where such features are impractical, provide suitable pumping for disposal of accumulations of surface water. P-152-2 A. Undercutting. Rock, shale, hardpan, loose rock, boulders, or other material ' unsatisfactory for subgrades under pavements or any areas intended for turfing shall be excavated to a minimum depth of 12 inches, or to the depth specified by the Engineer, below the subgrade. Muck, peat, matted roots, or other yielding ' material, unsatisfactory for subgrade foundation, shall be removed to the depth specified. Unsuitable materials shall be disposed of as specified in paragraph 152-2.1. This excavated material shall be paid for at the contract unit price per cubic yard for "Unclassified Excavation". The excavated area shall be refilled with suitable material obtained from the grading operations or borrow areas and compacted to specified densities. The necessary refilling will constitute a part of the embankment. B. Overbreak. Overbreak, including slides, is that portion of any material displaced or loosened beyond the finished work as planned or authorized by the Engineer. The Engineer shall determine if the displacement of such material was unavoidable and his/her decision shall be final. All overbreak shall be graded or removed by the Contractor and disposed of as directed; however, payment will not be made for the removal and disposal of overbreak which the Engineer determines as avoidable. Unavoidable overbreak will be classified as "Unclassified Excavation." C. Removal of Structures and Utilities. The removal of existing structures and utilities required to permit the orderly progress of work will be accomplished by someone other than the Contractor, e.g., the utility, unless otherwise shown on the plans. All existing foundations shall be excavated for at least 2 feet below the top of subgrade or as indicated on the plans, and the material disposed of as directed. All foundations thus excavated shall be backfilled with suitable material and compacted as specified herein. D. Compaction Requirements in Areas of Excavation. The subgrade under areas to be paved shall be compacted to a depth of 6 inches and to a density of not less than 95 percent of the maximum density as determined by ASTM D 698. If in-place natural densities do not meet specified requirements, the subgrade shall be compacted from the surface to achieve the required densities by methods and equipment approved by the Engineer. If in the judgment of the Engineer it is not practical to achieve the required densities by compacting from the surface, the subgrade materials shall be removed and replaced at the required densities. Payment for suitable materials removed, manipulated, and replaced in order to obtain the required depth of density will be paid for as "Unclassified Excavation." No such removal and P-152-3 replacement work shall be done without prior agreement with the Engineer regarding the scope of such work. The in-place field density shall be determined in accordance with ASTM D 1556 or ASTM D 2167. Stones or rock fragments larger than 4 inches in their greatest dimension will not be permitted in top 6 inches of the subgrade. The finished grading operations, conforming to the typical cross section, shall be completed and maintained at least 1,000 feet ahead of the paving operations or as directed by the Engineer. E. Finished Slopes. In cuts, all loose or protruding rocks on the back slopes shall be removed to line of finished grade of slope. All cut-and-fill slopes shall be uniformly dressed to the slope, cross section, and alignment shown on the plans or as directed by the Engineer. F. Blasting. Blasting will not be permitted. 152-2.3 BORROW EXCAVATION. Borrow area(s) within the airport property are indicated on the plans. Borrow excavation shall be made only at these designated locations and within the horizontal and vertical limits as staked or as directed. 152-2.4 PREPARATION OF EMBANKMENT AREA. Where an embankment is to be constructed, all topsoil, sod and vegetable matter shall be stripped from the surface upon which the embankment is to be placed, and the cleared surface shall be completely broken up by plowing or scarifying to a minimum depth of 6 inches. This area shall then be compacted as indicated in paragraph 152-2.5. No direct payment shall be made for the work performed under this subsection. Any necessary clearing and grubbing, stripping of topsoil, or excavation will be paid for under the respective items of work. 152-2.5 FORMATION OF EMBANKMENTS. Embankments shall be formed in ' successive horizontal layers of not more than 8 inches in loose depth for the full width of the cross section, unless otherwise approved by the Engineer. ' The grading operations shall be conducted, and the various soil strata shall be placed, to produce a soil structure as shown on the typical cross section or as directed. Materials such as brush, hedge, roots, stumps, grass and other organic matter, shall not be incorporated or buried in the embankment. Operations on earthwork shall be suspended at any time when satisfactory results cannot be obtained because of rain, freezing, or other unsatisfactory field conditions. The Contractor shall drag, blade, or slope the embankment to provide proper surface drainage. P-152-4 The material in the layer shall be within +/-2 percent of optimum moisture content before rolling to obtain the prescribed compaction. In order to achieve a uniform moisture content throughout the layer, wetting or drying of the material and manipulation shall be required when necessary. Should the material be too wet to permit proper compaction or rolling, all work on all of the affected portions of the embankment shall be delayed until the material has dried to the required moisture content. Sprinkling of water on dry material to obtain the proper moisture content shall be done with approved equipment that will sufficiently distribute the water. Sufficient equipment to furnish the required water shall be available at all times. Samples of all embankment materials for testing, both before and after placement and compaction, will be taken for each 1,000 cubic yards placed per layer. Based on these tests, the Contractor shall make the necessary corrections and adjustments in methods, materials or moisture content in order to achieve the correct embankment density. Rolling operations shall be continued until the embankment, including the top 6 inches of the surface on which the embankment is placed, is compacted to not less than 95 percent of maximum density for noncohesive soils, and 90 percent of maximum density for cohesive soils as determined by ASTM D 698. Under all areas to be paved, the embankments shall be compacted to a depth of 6 inches and to a density of not less than 95 percent of the maximum density as determined by ASTM D 698. On all areas outside of the pavement areas, no compaction will be required on the top 4 inches. The in-place field density shall be determined in accordance with ASTM D 1556 or ASTM D 2167. Compaction areas shall be kept separate, and no layer shall be covered by another until the proper density is obtained. During construction of the embankment, the Contractor shall route his/her equipment at ' all times, both when loaded and when empty, over the layers as they are placed and shall distribute the travel evenly over the entire width of the embankment. The ' equipment shall be operated in such a manner that hardpan, cemented gravel, clay, or other chunky soil material will be broken up into small particles and become incorporated with the other material in the layer. In the construction of embankments, layer placement shall begin in the deepest portion of the fill; as placement progresses, layers shall be constructed approximately parallel to the finished pavement grade line. When rock and other embankment material are excavated at approximately the same time, the rock shall be incorporated into the outer portion of the embankment and the P-152-5 other material shall be incorporated under the future paved areas. Stones or fragmentary rock larger than 4 inches in their greatest dimensions will not be allowed in the top 6 inches of the subgrade. Rockfill shall be brought up in layers as specified or as directed and every effort shall be exerted to fill the voids with the finer material forming a dense, compact mass. Rock or boulders shall not be disposed of outside the excavation or embankment areas, except at places and in the manner designated by the Engineer. When the excavated material consists predominantly of rock fragments of such size that the material cannot be placed in layers of the prescribed thickness without crushing, pulverizing or further breaking down the pieces, such material may be placed in the embankment as directed in layers not exceeding 2 feet in thickness. Each layer shall be leveled and smoothed with suitable leveling equipment and by distribution of spalls and finer fragments of rock. These type lifts shall not be constructed above an elevation 4 feet below the finished subgrade. Density requirements will not apply to portions of embankments constructed of materials which cannot be tested in accordance with specified methods. Frozen material shall not be placed in the embankment nor shall embankment be placed upon frozen material. 152-2.6 FINISHING AND PROTECTION OF SUBGRADE. After the subgrade has been substantially completed, the full width shall be conditioned by removing any soft or other unstable material which will not compact properly. The resulting areas and all other low areas, holes or depressions shall be brought to grade with suitable select material. Scarifying, blading, rolling and other methods shall be performed to provide a thoroughly compacted subgrade shaped to the lines and grades shown on the plans. Grading of the subgrade shall be performed so that it will drain readily. The Contractor shall take all precautions necessary to protect the subgrade from damage. He/she shall limit hauling over the finished subgrade to that which is essential for construction purposes. All ruts or rough places that develop in a completed subgrade shall be smoothed and recompacted. No subbase, base, or surface course shall be placed on the subgrade until the subgrade has been approved by the Engineer. A. Subgrade Proof Rolling. After preparation to proper grade and cross section, proof roll the subgrade with 4 coverages of a loaded dump truck weighing at least 15 tons. A coverage is defined as the application of one tire print over the designated area. Operate the roller in a systematic manner to provide the number of coverages at speeds between 2 and 4 miles per hour. Proof rolling P-152-6 shall be done in the presence of the Engineer. Rutting or pumping will indicate areas of unsatisfactory material or densities. Such areas shall be manipulated as needed to adjust the water content and re-compacted, or removed and replaced with satisfactory material as directed by the Engineer. The repaired areas shall again be proof rolled. 152-2.7 HAUL. All hauling will be considered a necessary and incidental part of the work. Its cost shall be considered by the Contractor and included in the contract unit price for the pay of items of work involved. No payment will be made separately or directly for hauling on any part of the work. 152-2.8 TOLERANCES. In those areas upon which a subbase or base course is to be placed, the top of the subgrade shall be of such smoothness that, when tested with a 16-foot straightedge applied parallel and at right angles to the centerline, it shall not show any deviation in excess of 1/2-inch, or shall not be more than 0.05-foot from true grade as established by grade hubs or pins. Any deviation in excess of these amounts shall be corrected by loosening, adding, or removing materials; reshaping; adjusting moisture content as required, and recompacting. On areas to be turfed and other designated unpaved areas, the surface shall be of such smoothness that it will not vary more than 0.10 foot from true grade as established by grade hubs. Any deviation in excess of this amount shall be corrected by loosening, adding or removing materials, and reshaping. 152-2.9 TOPSOIL. When topsoil is specified or required as shown on the plans or under Item T-905, it shall be salvaged from stripping or other grading operations. The topsoil shall meet the requirements of Item T-905. If, at the time of excavation or stripping, the topsoil cannot be placed in its proper and final section of finished construction, the material shall be stockpiled at approved locations. Stockpiles shall not be placed within runway or taxiway safety areas or areas which subsequently will require any excavation or embankment. If, in the judgment of the Engineer, it is practical to place the salvaged topsoil at the time of excavation or stripping, the material shall be placed in its final position without stockpiling or further rehandling. Upon completion of grading operations, stockpiled topsoil shall be handled and placed as directed, or as required in Item T-905. No payment will be made for topsoil under Item P-152. The quantity removed and placed directly or stockpiled shall be paid for at the contract unit price per cubic yard for Topsoil as specified in Item T-905. Payment for topsoil will be made one time only. No compensation will be directly made for temporarily stockpiling and rehandling topsoil prior to its final placement. P-152-7 152-2.10 DEWATERING. A. Surface water and subsurface or ground water shall be prevented from flowing into excavations and other graded areas and from flooding the project site and surrounding area by methods approved by the Engineer. B. Do not allow water to accumulate in excavations. Remove water to prevent softening of foundation soils, undercutting of footings, and soil changes detrimental to the stability of subgrades and foundations. Maintain grades so that the surface is well drained. Provide and maintain pumps, well points, sumps, suction and discharge lines, and other dewatering system components necessary to convey water away from excavations. C. Convey water removed from excavations and other graded areas to collecting or runoff areas. Establish and maintain temporary drainage ditches, swales, and other diversions to protect slopes and structures. Do not use trench excavations as temporary drainage ditches. METHOD OF MEASUREMENT 152-3.1 The quantity of excavation to be paid for shall be the number of cubic yards measured in its original position. Measurement shall not include the quantity of materials excavated without authorization beyond normal slope lines, or the quantity of material used for purposes other than those directed. 152-3.2 The quantity of Embankment In Place to be paid for shall be the number of cubic yards measured in its final position. 152-3.3 For payment specified by the cubic yard, measurement for all excavation shall be computed by digital terrain modeling software (Terramodel software version 9.8 or higher). The original ground surface established by the Contractor's field cross section survey and the field survey supplied by the Contractor's licensed surveyor after all excavation is completed will be utilized to complete the quantity of "Unclassified Excavation". ' For payment specified by the cubic yard, measurement for all embankment shall be computed by digital terrain modeling software (Terramodel software version 9.8 or higher). The ground surface established by the Contractor's field cross section survey ' after all excavation is completed and the final field survey supplied by the Contractor's licensed surveyor after all embankment is completed will be utilized to complete the quantity of "Embankment In Place". P-152-8 ' The surveys shall be supplied to the Engineer in both written and electronic versions. The electronic file shall contain a points file with break lines and contours, along with an ' ASCII points file. 152-3.4 There shall be no separate measurement or payment for dewatering. All ' costs related to dewatering shall be considered incidental and shall be included in the contract unit price for other payment items. ' 152-3.5 There shall be no separate measurement or payment for proof rolling. All costs related to proof rolling shall be considered incidental and shall be included in the contract unit price for other payment items. BASIS OF PAYMENT ' 152-4.1 For "Unclassified Excavation" payment shall be made at the contract unit price per cubic yard. This price shall be full compensation for furnishing all materials, labor, equipment, tools, and incidentals necessary to complete the item. ' 152-4.2 For "Embankment In Place" payment shall be made at the contract unit price per cubic yard. This price shall be full compensation for furnishing all materials, ' transportation, labor, equipment, tools, and incidentals necessary to complete the item. Payment will be made under: ' Item P-152 A Unclassified Excavation ................................... per cubic yard ' Item P-152 B Embankment In Place ...................................... per cubic yard TESTING REQUIREMENTS ASTM D 698 Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-Ibf/ft3) (600 kN-m/m3) ASTM D 1556 Density and Unit Weight of Soil In Place by the Sand-Cone Method ' ASTM D 1557 Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-Ibf/ft3) (2700 kN-m/m3) ASTM D 2167 Density and Unit Weight of Soil In Place by the Rubber Balloon Method. ' ASTM D 4318 Liquid Limit, Plastic Limit, and Plasticity Index of Soils. END OF ITEM P-152 P-152-9 ITEM T-901 ' SEEDING DESCRIPTION ' 901-1.1 This item shall consist of temporary and permanent seeding at the areas shown on the plans or as directed by the Engineer in accordance with these ' specifications. This item shall also include periodic mowing, as directed by the Engineer, in order to maintain the site until it is turned over to the Owner. MATERIALS ' 901-2.1 The kinds of seed and fertilizer, and the rates of application of seed, fertilizer and lime shall be as stated below, or shall follow the requirements of Seeding Mixture ' Number 1 CP (Table 6.11p) from the North Carolina Department of Environment and Natural Resources Erosion and Sediment Control Planning and Design Manual, most current edition. All rates are in pounds per acre. ' January 1 - December 31 80# Kentucky Fescue 31 ' 50# Wilmington Bahiagrass 1000# 10-10-10 Fertilizer 4000# Lime Between May 1 and August 31, add 25# per acre of Kobe or Korean Lespedeza 901-2.2 SEED. The kinds of grass, legume, and cover-crop seed furnished shall be those stipulated above. Seed shall conform to the requirements of Fed. Spec. JJJ-S-181. Seed shall be furnished separately or in mixtures in standard containers with the seed name, lot number, net weight, percentages of purity and of germination and hard seed, ' and percentage of maximum weed seed content clearly marked for each kind of seed. The Contractor shall furnish the Engineer duplicate signed copies of a statement by the vendor certifying testing within 6 months of date of delivery. This statement shall ' include: name and address of laboratory, date of test, lot number for each kind of seed, and the results of test as to name, percentages of purity and of germination, and percentage of weed content for each kind of seed. ' 901-2.3 LIME. Lime shall be ground limestone containing not less than ° 85 /° of total carbonates, and shall be ground to such fineness that 90% will pass through a No. 20 T-901-1 ' mesh sieve and 50% will pass through a No. 100 mesh sieve. Coarser material will be acceptable, providing the rates of application are increased to provide not less than the ' minimum quantities and depth specified in the special provisions on the basis of the two sieve requirements above. Dolomitic lime or a high magnesium lime shall contain at least 10% of magnesium oxide. All liming materials shall conform to the requirements ' of ASTM C 602. 901-2.4 FERTILIZER. Fertilizer, if specified, shall be standard commercial fertilizers supplied separately or in mixtures containing the percentages of total nitrogen, available phosphoric acid, and water-soluble potash. They shall be applied at the rate and to the depth specified herein and shall meet the specified requirements of Federal Specification 0-F-241 and the applicable State and Federal laws. They shall be furnished in standard containers with name, weight, and guaranteed analysis of contents clearly marked thereon. No cyanamide compounds or hydrated lime shall be ' permitted in mixed fertilizers. The fertilizers may be supplied in one of the following forms: ' A. A dry, free-flowing fertilizer suitable for application by a common fertilizer spreader; ' B. A finely-ground fertilizer soluble in water, suitable for application by power sprayers; or, C. A granular or pellet form suitable for application by blower equipment ' 901-2.5 SOIL FOR REPAIRS. The soil for fill and topsoiling of areas to be repaired shall be at least of equal quality to that which exists in areas adjacent to the area to be repaired. The soil shall be relatively free from large stones, roots, stumps, or other ' materials that will interfere with subsequent sowing of seed, compacting, and establishing turf, and shall be approved by the Engineer before being placed. CONSTRUCTION METHODS 901-3.1 ADVANCE PREPARATION AND CLEANUP. After grading or clearing and ' grubbing of areas has been completed and before applying fertilizer and ground limestone, areas to be seeded shall be raked or otherwise cleared of stones larger than 2 inches in any diameter, sticks, stumps, and other debris which might interfere with ' sowing of seed, growth of grasses, or subsequent maintenance of grass-covered areas. If any damage by erosion or other causes has occurred after the completion of grading and before beginning the application of fertilizer and ground limestone, the Contractor ' shall repair such damage. This may include filling gullies, smoothing irregularities, and repairing other incidental damage. T-901-2 ' An area to be seeded shall be considered a satisfactory seedbed without additional treatment if it has recently been thoroughly loosened and worked to a depth of not less ' than 5 inches as a result of grading operations and, if immediately prior to seeding, the top 3 inches of soil is loose, friable, reasonably free from large clods, rocks, large roots, or other undesirable matter, and if shaped to the required grade. ' However, when the area to be seeded is sparsely sodded, weedy, barren and unworked, or packed and hard, any grass and weeds shall first be cut or otherwise ' loosened to a depth not less than 5 inches. Clods shall be broken and the top 3 inches of soil shall be worked into a satisfactory seedbed by discing, or by use of cultipackers, rollers, drags, harrows, or other appropriate means. The Contractor shall be required to perform seeding work on each area immediately upon completion of the grading operations as directed by the Engineer. 901-3.2 DRY APPLICATION METHOD ' A. Liminq. Four thousand pounds (4000#) of ground limestone shall be applied separately and prior to the application of any fertilizer or seed and only on seedbeds which have previously been prepared as described above. The lime ' shall then be worked into the top 3 inches of soil after which the seedbed shall again be properly graded and dressed to a smooth finish. B. Fertilizing. Following advance preparations and cleanup, one thousand pounds (1000#) of 10-10-10 commercial fertilizer shall be applied per acre. The fertilizer shall be spread uniformly over all areas to be seeded. Superphosphate, 20% analysis shall be furnished. C. Seeding. Grass seed shall be sown at the rate specified on the plans or in the ' special provisions immediately after fertilizing, and the fertilizer and seed shall be raked within the depth range stated in the special provisions. Seeds of legumes, either alone or in mixtures, shall be inoculated before mixing or sowing, in ' accordance with the instructions of the manufacturer of the inoculant. When seeding is required at other than the seasons shown on the plans or in the special provisions, a cover crop shall be sown by the same methods required for ' grass and legume seeding. D. Rolling. After the seed has been properly covered, the seedbed shall be ' immediately compacted by means of an approved lawn roller, weighing 40 to 65 pounds per foot of width for clay soil (or any soil having a tendency to pack), and weighing 150 to 200 pounds per foot of width for sandy or light soils. ' T-901-3 901-3.3 WET APPLICATION METHOD. ' A. General. The Contractor may elect to apply seed and fertilizer (and lime, if required) by spraying them on the previously prepared seedbed in the form of an aqueous mixture and by using the methods and equipment described herein. ' The rates of application shall be as specified in the special provisions. B. Spraying Equipment. The spraying equipment shall have a container or water tank equipped with a liquid level gauge calibrated to read in increments not larger ' than 50 gallons over the entire range of the tank capacity, mounted so as to be visible to the nozzle operator. The container or tank shall also be equipped with a mechanical power-driven agitator capable of keeping all the solids in the mixture in complete suspension at all times until used. The unit shall also be equipped with a pressure pump capable of delivering 100 gallons per minute at a pressure of 100 pounds per square inch. The pump shall be mounted in a line which will recirculate the mixture through the tank whenever ' it is not being sprayed from the nozzle. All pump passages and pipe lines shall be capable of providing clearance for 5/8 inch solids. The power unit for the pump and agitator shall have controls mounted so as to be accessible to the nozzle operator. There shall be an indicating pressure gauge connected and mounted immediately at the back of the nozzle. ' The nozzle pipe shall be mounted on an elevated supporting stand in such a manner that it can be rotated through 360 degrees horizontally and inclined vertically from at least 20 degrees below to at least 60 degrees above the horizontal. There shall be a quick-acting, three-way control valve connecting the recirculating line to the nozzle pipe and mounted so that the nozzle operator can control and regulate the amount of flow of moisture delivered to the nozzle. At ' least three different types of nozzles shall be supplied so that mixtures may be properly sprayed over distance varying form medium-range ribbon nozzle, and one a long-range jet nozzle. For case of removal and cleaning, all nozzles shall ' be connected to the pipe by means of quick-release couplings. In order to reach areas inaccessible to the regular equipment, an extension hose ' at least 50 feet in length shall be provided to which the nozzles may be connected. C. Mixtures. Lime, if required, shall be applied separately, in the quantity specified, prior to the fertilizing and seeding operations. No more than 220 pounds of lime shall be added to and mixed with each 100 gallons of water. Seed and fertilizer shall be mixed together in the relative proportions specified, but not more than a total of 220 pounds of these combined solids shall be added to and mixed with each 100 gallons of water. All water used shall be obtained from fresh water sources and shall be free from ' injurious chemicals and other toxic substances harmful to plant life. Brackish water shall not be used at any time. The Contractor shall identify to the Engineer all sources of water at least 2 weeks prior to use. The Engineer may take ' samples of the water at the source or from the tank at any time and have a laboratory test the samples for chemical and saline content. The Contractor shall not use any water from any source which is disapproved by the Engineer ' following such tests. All mixtures shall be constantly agitated from the time they are mixed until they A are finally applied to the seedbed. All such mixtures shall be used within 2 hours from the time they were mixed or they shall be wasted and disposed of at locations acceptable to the Engineer. ' D. Spraying. Lime, if required, shall be sprayed only upon previously prepared seedbeds. After the applied lime mixture has dried, the lime shall be worked into the top 3 inches, after which the seedbed shall again be properly graded and dressed to a smooth finish. ' Mixtures of seed and fertilizer shall only be sprayed upon previously prepared seedbeds on which the lime, if required, shall already have been worked in. The mixtures shall be applied by means of high-pressure spray which shall always be directed upward into the air so that the mixtures will fall to the ground like rain in a uniform spray. Nozzles or sprays shall never be directed toward the ground in such a manner as might produce erosion or runoff. Particular care shall be exercised to insure that the application is made uniformly and at the prescribed rate and to guard against misses and overlapped areas. Proper predetermined quantities of the mixture in accordance with specification shall be used to cover specified sections of known area. Checks on the rate and uniformity of application may be made by observing the degree of wetting of the ground or by distributing test sheets of paper or pans over the area at intervals and observing the quantity of material deposited thereon. On surfaces which are to be mulched as indicated by the plans or designated by the Engineer, seed and fertilizer applied by the spray method need not be raked into the soil or rolled. However, on surfaces. on which mulch is not to be used, the raking and rolling operations will be required after the soil has dried. 901-3.4 MAINTENANCE OF SEEDED AREAS. The Contractor shall protect seeded areas against traffic or other use by warning signs or barricades, as approved by the Engineer. Surfaces gullied or otherwise damaged following seeding shall be repaired by regrading and reseeding as directed. The Contractor shall mow, water as directed, T-901-5 ' and otherwise maintain seeded areas in a satisfactory condition until final inspection and acceptance of the work. ' When either the dry or wet application method outlined above is used for work done out of season, it will be required that the Contractor establish a good stand of grass of ' uniform color and density to the satisfaction of the Engineer. If at the time when the contract has been otherwise completed it is not possible to make an adequate determination of the color, density, and uniformity of such stand of grass, payment for ' the unaccepted portions of the areas seeded out of season will be withheld until such time as these requirements have been met. METHOD OF MEASUREMENT 901-4.1 The quantity of seeding to be paid for shall be the number of acres measured ' on the ground surface, completed and accepted. BASIS OF PAYMENT ' 901-5.1 The quantity of seeding, determined as provided above, will be paid for at the contract unit price per acre, or fraction thereof, for the pay item listed below, which price ' and payment shall be full compensation for furnishing and placing all material and for all labor, equipment, tools, and incidentals necessary to complete the work prescribed in this item. ' Payment will be made under: Item T-901 Seeding ..................................................................... per acre ' MATERIAL REQUIREMENTS ASTM C 602 Agricultural Liming Materials ASTM D 977 Emulsified Asphalt Fed. Spec. JJJ-S0181 B Agricultural Seeds Fed Spec. O-F-241 D END OF ITEM T-901 Commercial Mixed Fertilizer T-901-6 1 1 1 1 1 ITEM T-905 TOPSOILING DESCRIPTION 905-1.1 This item shall consist of preparing the ground surface for topsoil application, removing topsoil from onsite areas to be stripped and graded or from existing onsite stockpiles when designated or from approved sources off airport property, stockpiling when required, and placing and spreading the topsoil on prepared areas in accordance with this specification at the locations shown on the plans or as directed by the Engineer. MATERIALS 905-2.1 TOPSOIL. Topsoil shall be the surface layer of soil with no admixture of refuse or any material toxic to plant growth, and it shall be reasonably free from subsoil, stumps, roots, brush, stones (one inch or more in diameter), clay lumps, or similar objects. Brush and other vegetation which will not be incorporated with the soil during handling operations shall be cut and removed. Ordinary sods and herbaceous growth such as grass and weeds are not to be removed but shall be thoroughly broken up and intermixed with the soil during handling operations. The topsoil or soil mixture, unless otherwise specified or approved, shall have the following composition. 905-2.2 COMPOSITION. Onsite and offsite topsoil as needed shall contain at least 3% and not more than 20% organic matter as determined by the Organic Carbon, 6A, Chemical Analysis Method described in USDA Soil Survey Investigations Report No. 1. The mixture shall have a pH level between 5.5 and 7.6. All topsoil will be subject to inspection during the planting period and any material which does not meet the specifications will be rejected. Natural topsoil may be amended by the Contractor with approved materials and methods to meet the above specifications at no additional cost to the Owner. CONSTRUCTION METHODS 905-3.1 GENERAL. Suitable equipment necessary for proper preparation and treatment of the ground surface, stripping of topsoil, and handling and placing of all required materials shall be on hand, in good condition, and approved by the Engineer before the various operations are started. 905-3.2 PREPARING THE GROUND SURFACE Immediately prior to dumping and spreading the topsoil on any area, the surface shall be loosened by discs or spike tooth harrows, or by other means approved by the Engineer, to a minimum depth of 2 inches T-905-1 ' to facilitate bonding of the topsoil to the covered subgrade soil. The surface of the area to be topsoiled shall be cleared of all stones larger than 2 inches in any diameter and all litter and other material which may be detrimental to proper bonding, the rise of capillary moisture, or the proper growth of the desired planting. Grades on the areas to be topsoiled shall be as indicated on the plans and shall be maintained in a true and even condition. Where grades have not been established, the areas shall be smooth graded and the surface left at suitable grades in an even and ' properly compacted condition to prevent, insofar as practical, the formation of low places or pockets where water will stand. 905-3.3 OBTAINING TOPSOIL. Suitable topsoil shall be secured from onsite stripping or grading work. The Contractor shall notify the Engineer sufficiently in advance of operations in order that necessary measurements and tests can be made. Prior to the stripping of topsoil from approved areas, any vegetation, briers, stumps, large roots, rubbish, or stones found on such areas, which may interfere with ' subsequent operations, shall be removed using methods approved by the Engineer. Heavy sod or other cover which cannot be incorporated into the topsoil by discing or other means shall be removed. ' The Contractor shall remove the topsoil to the depths as directed by the Engineer. The topsoil shall be hauled to the site of the work and spread on areas already tilled and smooth graded, or stockpiled in areas approved by Engineer. Stockpile areas must be clear of runway and taxiway safety areas. Any topsoil temporarily stockpiled by the Contractor shall be rehandled and placed without additional compensation. The sites of ' all stockpiles and areas adjacent thereto which have been disturbed by the Contractor shall be graded if required and put into a condition acceptable for seeding. ' The Contractor shall install all erosion control measures (such as silt fence, inlet protection, diversion ditches, sedimentation ponds, etc.) prior to stripping any area on the project site. ' 905-3.4 PLACING TOPSOIL. The topsoil shall be evenly spread read on the prepared areas to a uniform depth of not less than 3 inches after compaction, unless otherwise shown on the plans or approved by the Engineer. The Engineer will perform at least two depth checks per acre of topsoil placed. The Contractor shall rework any areas where topsoil depths are found to be less than specified thickness at no additional cost ' to the Owner. Spreading shall not be done when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work. Spreading shall be carried on so that turfing operations can proceed with a minimum of soil preparation or tilling. After spreading, any large, stiff clods and hard lumps shall be broken with a pulverizer ' T-905-2 or by other effective means, and all stones or rocks (one inch or more in diameter), roots, litter, or any foreign matter shall be raked up and disposed of by the Contractor. After spreading is completed, the topsoil shall be satisfactorily compacted by rolling with a cultipacker or by other means approved by the Engineer. The compacted topsoil surface shall conform to the required lines, grades, and cross sections. Any topsoil or other dirt falling upon pavements as a result of hauling or handling operations shall be promptly removed. ' METHOD OF MEASUREMENT 905-4.1 Topsoil shall be measured by the number of cubic yards in its final position. The topsoil depth measurement to be used in computing topsoil volume on finished slopes shall not exceed the specified depth. BASIS OF PAYMENT 905-5.1 Payment will be made at the contract unit price per cubic yard for topsoil in- place , complete and accepted. This price shall be full compensation for furnishing all materials and for all preparation, hauling, stockpiling, rehandling, placing, and spreading of the materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. Payment will be made under: T-905 Topsoil ........................................................................ per cubic yard END OF ITEM T-905 T-905-3 ' ITEM T-908 ' MULCHING DESCRIPTION ' 908-1.1 This item shall consist of furnishing, hauling, placing, and securing mulch on surfaces indicated on the plans or designated by the Engineer. ' MATERIALS 908-2.1 MULCH MATERIAL. Acceptable mulch shall be the materials listed below or any approved locally available material that is similar to those specified. Low grade, musty, spoiled, partially rotted hay, straw, or other materials unfit for animal ' consumption will be acceptable. Mulch materials, which contain matured seed of species which would volunteer and be detrimental to the proposed overseeding, or to surround farm land, will not be acceptable. Straw or other mulch material which is fresh ' and/or excessively brittle, or which is in such an advanced stage of decomposition as to smother or retard the planted grass, will not be acceptable. IA. Straw. Straw shall be the threshed plant residue of oats, wheat, barley, rye, or rice from which grain has been removed. B. Asphalt Binder. Asphalt binder material shall conform to the requirements of ASTM D 977, Type SS-1 or RS-1, as appropriate. ' 908-2.2 INSPECTION. Within 5 days after acceptance of the bid, the Engineer shall be notified of sources and quantities of mulch materials available and the Contractor shall furnish him with representative samples of the materials to be used. These ' samples may be used as standards with the approval of the Engineer and any materials brought on the site which do not meet these standards shall be rejected. CONSTRUCTION METHODS 908-3.1 MULCHING. Before spreading mulch, all large clods, stumps, stones, brush, roots, and other foreign material shall be removed from the area to be mulched. Mulch shall be applied immediately after seeding. The spreading of the mulch may be by hand methods, blower, or other mechanical methods, provided a uniform covering is obtained. Mulch material shall be furnished, hauled, and evenly applied on the area shown on the plans or designated by the Engineer. Straw shall be spread over the surface to a uniform thickness at the rate of 2 to 3 tons per acre to provide a loose depth of not less than 1-1/2 inches nor more than 3 inches. Other organic material shall be spread at the T-908-1 ' rate directed by the Engineer. Mulch may be blown on the slopes and the use of cutters in the equipment for this purpose will be permitted to the extent that at least 95% of the ' mulch in place on the slope shall be 6 inches or more in length. When mulches applied by the blowing method are cut, the loose depth in place shall be not less than 1 inch nor more than 2 inches. ' 908-3.2 SECURING MULCH. The mulch shall be held in place by light discing, pins, stakes, wire mesh, asphalt binder, or other adhesive material approved by the Engineer. ' Where mulches have been secured by either of the asphalt binder methods, it will not be permissible to walk on the slopes after the binder has been applied. The Contractor is warned that in the application of asphalt binder material he must take every precaution to guard against damaging or disfiguring structures or property on or adjacent to the areas worked and that he will be held responsible for any such damage resulting from his operations. ' If the "Peg and String" method is used, the mulch shall be secured by the use of stakes or wire pins driven into the ground on 5-foot centers or less. Binder twine shall be ' strung between adjacent stakes in straight lines and crisscrossed diagonally over the mulch, after which the stakes shall be firmly driven nearly flush to the ground to draw the twine down tight onto the mulch. 908-3.3 CARE AND REPAIR. ' A. The Contractor shall care for the mulched areas until final acceptance of the project. Such care shall consist of providing protection against traffic or other use by placing warning signs, as approved by the Engineer, and erecting any ' barricades that may be shown on the plans before or immediately after mulching has been completed on the designated areas. ' B. The Contractor shall be required to repair or replace any mulching that is defective or becomes damaged until the project is finally accepted. When, in the judgment of the Engineer, such defects or damages are the result of poor workmanship or failure to meet the requirements of the specifications, the cost of the necessary repairs or replacement shall be borne by the Contractor. However, once the Contractor has completed the mulching of any area in accordance with the provisions of the specifications and to the satisfaction of the Engineer, no additional work at his expense will be required, but subsequent repairs and replacements deemed necessary by the Engineer shall be made by the Contractor and will be paid for as additional or extra work. C. If the Asphalt Spray method is used, all mulched surfaces shall be sprayed with asphalt binder material so that the surface has a uniform appearance. The binder shall be uniformly applied to the mulch at the rate of approximately 8.0 gallons per 1,000 square feet, or as directed by the Engineer, with a minimum of 6.0 T-908-2 gallons and a maximum of 10 gallons per 1,000 square feet depending on the type of mulch and the effectiveness of the binder securing it. Bituminous binder material may be sprayed on the mulched slope areas from either the top or the bottom of the slope. An approved spray nozzle shall be used. The nozzle shall be operated at a distance of not less than 4 feet from the surface of the mulch and uniform distribution of the bituminous material shall be required. A pump or an air compressor of adequate capacity shall be used to insure uniform distribution of the bituminous material. D. If the Asphalt Mix method is used, the mulch shall be applied by blowing, and the asphalt binder material shall be sprayed into the mulch as it leaves the blower. The binder shall be uniformly applied to the mulch at the rate of approximately 8.0 gallons per 1,000 square feet or as directed by the Engineer, with a minimum of 6.0 gallons and a maximum of 10 gallons per 1,000 square feet depending on the type of mulch and the effectiveness of the binder securing it. METHOD OF MEASUREMENT 908-4.1 Mulching shall be measured in acres on the basis of the actual surface area acceptably mulched. BASIS OF PAYMENT 908-5.1 Payment will be made at the contract unit price per acre for mulching. This price shall be full compensation for furnishing all materials and for placing and anchoring the materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. Payment will be made under: Item T-908 Mulching ....................................................................per acre MATERIAL REQUIREMENTS ASTM D 977 Emulsified Asphalt END OF ITEM T-908 T-908-3