HomeMy WebLinkAboutDEQp00021699A*—�
`Av
NCDENR
North Carolina Department of Environment and Natural Resources
Michael F. Easley, Governor
March 26, 2003
Mr. Michael Johnson, Environmental Manager
E. I. Dupont de Nemours & Company, Inc.
22828 NC Hwy. 87 West
Fayetteville, NC 28306
SUBJECT: Compliance Evaluation Inspection
E. I. Dupont de Nemours & Company, Inc.
Wastewater Treatment Plant
NPDES Permit No. NC0003573
Bladen County
Dear Mr. Johnson:
William G. Ross, Jr., Secretary
Alan Klimek, P.E., Director
Division of Water Quality
Enclosed is a copy of the Compliance Evaluation Inspection conducted March 21, 2003. As
part of the inspection a tour of the Wastewater Treatment Plant was conducted. All observations and
recommendations are in Part D. Summary of Findings/Comments of this inspection report. The
cooperation of Mr. Robert Geddie, Grade IV ORC and Mr. Ray Beard, Grade II Operator in Training
was greatly appreciated. As a reminder preservation of the Waters of the State can only be acquired
through consistent NPDES permit compliance.
Please review the attached report. If you or your staff have any questions do not hesitate
to contact me at 910-486-1541.
Sincerely, p
Belinda S. Henson
Environmental Chemist
/bsh
Enclosures
cc: Mr. Barry Hudson, Site Manager, E. I. Dupont
Mr. Robert Geddie, ORC, E. 1. Dupont
Fayetteville Regional Office
225 Green Street — Suite 714, Fayetteville, North Carolina 28301-5043
Phone: 910-486-1541/FAX: 910-486-0707\ Internet: www.enr.state.nc.us/ENR
An Equal Opportunity \ Affirmative Action Employer— 50% Recycled \ 10% Post Consumer Paper