Loading...
HomeMy WebLinkAboutDEQp00021695Regional Field Inspectors Check List for Field Parameters lame of site to be Inspected: Q,., aDn 4- Date:_ 3 - a 1 - 03 field certification # (if applicable): 51 C 5 Inspector:1 JPDES #: A/C no 6 3 S 7 3 Region: e+j g /; J1 e. Circle the parameter or parameters performed at this site. tesidual Chlorine, Settleable SolidsDO, Conductivity emperatur 1. Instrumentation: k. Does the facility have the equipment necessary to analyze field parameters as circled above? I. A pH meter es No t. A Residual Chlorine meter Yes No 3. DO meter Yes No f. A Cone for settleable solids Yes No 5. A thermometer or meter that measures temperature. es No 3. Conductivity meter Yes No 111. Calibration/Analysis: 1. Is the pH meter calibrated with a 2 buffers and checked with a third buffer each day of use?. es No 2. For Total Residual Chlorine, is a check standard analyzed each day of use? Yes No 3. Is the air calibration of the DO meter performed each day of use? Yes No 4. For Settleable Solids, is 1 liter of sample settled for 1 hour? Yes No 5. Is the temperature measuring device calibrated annually against a certified thermometer?es : No 6. For Conductivity, is a calibration standard analyzed each day of use? Yes No IV. Documentation: 1. is the date and time that the sample was collected documented? Yes No 2. Is the sample site, documented? Yes No 3. Is the sample collector documented? Yes No 4. Is the analysis date and time documented? Yes No 5. Did the analyst sign the documentation? Yes No 6. Is record of calibration documented? Yes No 7. For Settleable Solids, is sample volume and 1 hour time settling time documented? Yes No 8. For Temperature, is the annual calibration of the measuring device documented? Yes No Comments: 1011sj2ec^_-kori o+- fks Vat -J Fy_. n Febr�tct✓�/ ►S Sit �=, S l it��5 Please submit a copy of this completed form to the Laboratory Certification Program. DWQ Lab Certification Chemistry Lab Courier # 52-01-01 FIELD INSPECTOR CHECKLIST REV. 04/23/2002 a