Loading...
HomeMy WebLinkAboutDEQp00021558. f*W A*A NCDENR North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor December 27, 2001 William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D. Mr. Michael. Johnson, Environmental Manager Acting Director E. I. Dupont de Nemours & Company, Inc. Division of Water Quality 22828 NC Hwy. 87 West Fayetteville, NC 28306 SUBJECT: Compliance Evaluation Inspection E. I. Dupont de Nemours & Company, Inc. Wastewater Treatment Plant NPDES Permit No. NC0003573 Bladen County Dear Mr. Johnson: Enclosed is a copy of the Compliance Evaluation Inspection conducted December 13, 2001. As part of the inspection a tour of the Wastewater Treatment Plant was conducted. All observations and recommendations are in Part D. Summary of Findings/Comments of this inspection report. The cooperation of Mr. Robert Geddie, Grade IV ORC was greatly appreciated. During the inspection a copy of the NPDES Compliance Reminders were reviewed and left with facility staff. As a reminder preservation of the Waters of the State can only be acquired through consistent NPDES permit compliance. Please review the attached report. If you or your staff have any questions do not hesitate to contact me at 910-486-1541. Sincerely, Belinda S. Henson Environmental Chemist /bsh Enclosures cc: Mr. Robert Geddie, ORC, E. I. Dupont Fayetteville Regional Office 225 Green Street- Suite 714, Fayetteville, North Carolina 28301-5043 Phone: 910-486-15411 FAX: 910-486-07071 Internet: www.enr.state.nc.us/ENR An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper J IJ , • U33 I,111Hnm uz i Nee in ^,Q 0 t NPDES COMPLIANCE INSPECTION REPORT North Carolina Division of Water Quality 5 Iwo' Y Fa etteville Regional Office Section A. National Data System Coding Transaction Code: N NPDES NO. NC0003573 Date: 011213 Inspector: S Facility Type:2 Facility Evaluation Rating: 4 BI: N QA: N Section B: Facility Data Name and Location of Facility Inspected: E. I. Dupont de Nemours WWTP Entry Time/Date: 9:50am/011213 Exit Time/Date: 1:OOpm/011213 Name(s), Title(s) of On -Site Representative(s): Robert Geddie - (Certified Grade IV) - "ORC" Phone Number(s): (910)678-1219 Name, Title and Address of Responsible Official: Mr. Michael Johnson, Environmental Manager 22828 NC Hwy. 87 West Fayetteville, NC 28306 Inspection Type: C Reserved: Reserved:: Permit Effective Date: 001101 Permit Expiration Date: 011031 Contacted: no S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated, N/A = Not Applicable) 9 Allwli i Johnson Page 3 December 27, 2001 The wastewater facility furnishes treatment to the following industries: PMDF, Dymetrol, Nafion, and Butacite. Mineral by products from the water treatment system is also discharged into the W WTP. All the industries are owned by Dupont with the exception of Dymetrol. 2. Approximately 20,000 gallons per day of domestic wastewater is discharge into the treatment works. All wastewater enters the head of the plant by gravity. Four (4) influent pumps are onsite to bring the flow into the plant. 3. Ammonia and Phosphoric acid are added each day as a food source to enable the bacteria to live and reproduce. 4. The flow travels from the Headworks to the aerated pre -digester tank. The tank appeared to be operational. The flow normally travels to the EQ basin first but the facility is troubleshooting high pHs and are not using the EQ basin at this time. 5. The waste stream flows from the pre -digester tank to the aeration tank fort. further treatment. The diffused air system in the aeration tank appeared to be operating adequately. A Biomixer which mixes and adds air in an area where the flow enters the tank was not operational. It is presently under repair. The most recent Mixed Liquor Suspended Solids (MISS) result for December 13, 2001 was 3683 mg/L. The MLSS goes into a preaeration tank where excess oxygen is taken out. This part of the treatment assists in keeping solids from floating on the surface of the clarifiers. 6. Clarifier #1 and Clarifier #2 appeared to be operational. An antifoam agent is added to the clarifiers to eliminate foaming problems. Polymer is also added when needed to assist with solids settling. Clarifiers are taken out of service monthly for maintenance and repair. 7. The effluent appeared to be free of solids. The effluent outfall is easily accessible from the area near the William O. Huske Lock and Dam # 1. 8. The effluent composite sampler temperature appeared to be adequate at 4 degrees C. The acceptable temperature range samples during storage and for stored sample extracts, is 1.0 - 4.4 degrees C. The effluent sampler tubing for pipes 001 (process wastewater) and 002 (cooling water) combined appeared to have some solids or algae buildup in it. Increase in frequency of changing the tubing could enhance the quality of the composite sample. 9. The effluent flow meter was calibrated May 10, 2001 by "Water and Waste Technical Services". It is advisable that the flow meter calibration document contain the % error before and after calibration in the future by the technician. w... r; �QdII�9�� Johnson Page 4 December 27, 2001 10. Solids are wasted to the DAF unit and then to the sludge thickener and finally to the sludge filter press. The DAF unit was not operating at the time of the inspection but repairs were going to be implemented immediately as per staff. Polymer is added to the biosolids before they enter the press to assist with dewatering. Solids content leaving the press are between 11 and 12 %. From the press, solids are dried and lime is added and treatment of biosolids are complete. Biosolids leaving the oven are between 40 and 60% solids. I 11. Sludge disposal is by "Waste Industries" which transports the dried biosolids to their landfill in Roseboro (Sampson County). 12. All maintenance records are on computer and documentation is incorporated by the Powerhouse (Utilities) division of this facility which is located onsite. 13. As Built engineering drawings and O & M manuals are located at the Powerhouse as per Mr. Geddie. 14. The facility's present permit expired October 31, 2001. They have applied for renewal and will continue to operate under the present permit until a new one is submitted to the facility. 15. "Simalab" analyzes all NPDES permit required parameters with the exception of the pH and Temperature which are done by facility staff. 16. Laboratory records were reviewed for the months February and April 2001 and compared to Discharge Monitoring Reports. All records reviewed appeared to be accurate. 17. A compliance evaluation analysis report for the period September 2000 through August 2001 revealed a monthly BOD violation in February 2001. A Notice of Violation (NOV) was submitted to the facility for the BOD violation. Name and Signature of Inspector Belinda ,S,.�Henson Name and Signature of Reviewer Paul E. Rawls Agency/Office/Telephone Date DENR/Fayetteville/(910)486-1541 )1-2_7-01 Agency/Office/Telephone Date DENR/Fayetteville/(910)486-1541 1' Regulatory Office Use Only Action Taken Compliance Status Noncompliance _Compliance Date S31Li WHINM A-LINnIn u-novio k1t 410 Zoo r_ 1 r 1Fesc ��� i 1! 11' 4- I1 • aerationThe WWTP consists of equalization. neutralization- aerated =-digester tank, a nutrient feed systLM an dual clarifiers.• • _. filter for sludge thickening, a sludge filter press and steam heated sludge dEyers (001); boiler blowdown from Dupont oil -fired boilers, boiler blowdown and cooling tower blowdown from BCH Energy PEQject. once throughcooling watcL tmated wastewater effluent•I_0 1001.• • biodegradable process wastewater from111 backwash discharge 11 FACILITY SITE REVIEW esi No N/A 1. Treatment units properly operated and maintained. Yes No 2. Standby power or other equivalent provision provided. Yes No N/A. 3. Adequate alarm system for power or equipment failure available. 4. Sludge disposal procedures appropriate: 3 No N/A a. Disposal of sludge according to regulations No N/A b. State approval for sludge disposal received. X§s',No N/A 5. Sufficient sludge disposed of to maintain treatment process equilibrium. es No N/A 6. The ORC and Backup Operator are officially designated with NCDENR/DWQ Training and Certification Unit. es - No N/A 7. Adequate spare parts and supplies inventory maintained. Yes No N/A 8. Plant has general safety structures such as rails around or covers over tanks, pits, or wells. O. es `No N/A 9. Plant is generally clean, free from open trash areas. 11. Grit Removal: Yes No a. Excessive organic content in the grit chamber Yes No N/A b. Excessive odors Yes No N/A c. Grit properly disposed of. `' 4 i 10. Screening: Yes No (LTtA a. Manual Yes No N/A b. Mechanical Yes No , N/A c. Buildup of debris Yes No N/A d. Screenings properly disposed of. 11. Grit Removal: Yes No a. Excessive organic content in the grit chamber Yes No N/A b. Excessive odors Yes No N/A c. Grit properly disposed of. `' 4 i Page 2 15. StabilizatiorlPonds/Lagoons: Yes No 01 a. Excessive weeds including duckweed in stabilization ponds Yes No N/A b. Dead fish or aquatic organisms Yes No. NIA c. Buildup of solids around influent pipe Yes No N/A d. Excessive scum on surface. 14. Activated Sludge Basins/Oxidation Ditches: 12. Primary clarifier: Yes No (n) a. Excessive gas bubbles Yes No N/A b. Black and odorous wastewater Yes No N/A c. Poor suspended solids removed Yes No N/A d. Excessive buildup of solids in center well of circular clarifier Yes No NIA e. Weirs level Yes No NIA f. Weir blockage Yes No N/A g. Evidence of short circuiting Yes No N/A h. Lack of adequate scum removal Yes No N/A i. Excessive floating sludge Yes No N/A j. Broken sludge scraper. 13. Trickling Filter: Yes No a. Trickling filter ponding(indicating clogged media) Yes No NIA b. Leak at center column of trickling filter's distribution arms Yes No N/A c. Uneven distribution of flow on trickling filter surface Yes No N/A d. Uneven or discolored growth Yes No N/A e. Excessive sloughing of growth Yes No NIA f. Odor Yes No NIA g. Clogging of trickling filter's distribution arm orifices Yes No N/A h. Filter flies, worms, or snails. 15. StabilizatiorlPonds/Lagoons: Yes No 01 a. Excessive weeds including duckweed in stabilization ponds Yes No N/A b. Dead fish or aquatic organisms Yes No. NIA c. Buildup of solids around influent pipe Yes No N/A d. Excessive scum on surface. 14. Activated Sludge Basins/Oxidation Ditches: Yes Qb N/A a. Dead spots Yes No (g� b. Failure of surface aerators Yes <0 N/A c. Air rising in clumps Yes N/A d. Dark foam or bad color Yes T N/A e. Thick billows of white, sudsy foam Yes N/A f. Air rising unevenly YesRC �' N/A g. Excessive air leaks in compressed air piping. 15. StabilizatiorlPonds/Lagoons: Yes No 01 a. Excessive weeds including duckweed in stabilization ponds Yes No N/A b. Dead fish or aquatic organisms Yes No. NIA c. Buildup of solids around influent pipe Yes No N/A d. Excessive scum on surface. S37l� TIM j l�ynr+ u! U" -'n 41Q aq* 0 A►r. Yes N/A Yes Yes N/A Yes N/A Yes N/A Yes N/A (Y -a No N/A Yes (Q N/A Yes d�3 NIA Yes QP N/A Secondary Clarifier: a. Excessive gas bubbles on surface b. Level overflow weirs c. Weir blockage d. Evidence of short circuiting e. Excessive buildup of solids in center well of circular clarifier f. Pin floc in overflow g. Effective scum rake h. Floating sludge on surface i. Excessive high sludge blanket j. Clogged sludge withdrawal ports on secondary clarifier. Yes No (�?p 19. Ultraviolet radiation disinfection present and in use. 20. Dechlorination: Yes No (FN a. Proper storage of sulfur dioxide cylinders Yes No N/A b. Adequate ventilation of sulfur dioxide feeding room Yes No N/A c. Automatic sulfur dioxide feed or feedback control operating properly. 17. Filtration: Yes No � a. Filter surface clogging Yes No N/A b. Short filter run Yes No N/A c. Gravel displacement of filter media Yes No N/A d. Loss of filter media during backwashing Yes No N/A e. Recycled filter backwash water in excess of 5 percent Yes No N/A f. Formation of mudballs in filter media. Yes No (�?p 19. Ultraviolet radiation disinfection present and in use. 20. Dechlorination: Yes No (FN a. Proper storage of sulfur dioxide cylinders Yes No N/A b. Adequate ventilation of sulfur dioxide feeding room Yes No N/A c. Automatic sulfur dioxide feed or feedback control operating properly. 18. Chlorination Unit: Yes No �O a. Sludge buildup in contact chamber Yes No N/A b. Gas bubbles Yes No N/A c. Floating scum and/or solids Yes No N/A d. Adequate ventilation of chlorine feeding room and storage area Yes No N/A e. NIOSH -approved 30 minute air pack Yes No N/A f. All standing chlorine cylinders chained in place Yes No N/A g. All personnel trained in the use of chlorine Yes No N/A h. Proper chlorine feed, storage, and reserve supply. Yes No (�?p 19. Ultraviolet radiation disinfection present and in use. 20. Dechlorination: Yes No (FN a. Proper storage of sulfur dioxide cylinders Yes No N/A b. Adequate ventilation of sulfur dioxide feeding room Yes No N/A c. Automatic sulfur dioxide feed or feedback control operating properly. 21. Aerobic Digester: Yes No N/A a. Excessive foaming in tank Yes No N/A b. Noxious odor Yes No N/A c. Mechanical aeration failure Yes No N/A d. Clogging of diffusers. Page 4 22. Anaerobic Digester: • Yes No (fiZ a. Floating cover tilting Yes No N/A b. Gas burner operative 24. Filter Press: Yes OP N/A a. High level of solids in filtrate from filter presses or vacuum filters Yes �W N/A b. Thin filter cake caused by poor dewatering Yes 96 N/A c. Sludge buildup on belts and/or rollers of filter press Yes Qb N/A d. Excessive moisture in belt filter press sludge cake. 25. Polishing Ponds or Tanks: Yes No (25) a. Objectionable odor, excessive foam, floating solids, or oil sheens on water surface Yes No N/A b. Solids or scum accumulations in tank or at side of pond Yes No N/A c. Evidence of bypassed polishing ponds or tanks because of low capacity. 26. Plant Eluent: Yes (93 N/A a. Excessive suspended solids, turbidity, foam, grease, scum, color, and other macroscopic particulate matter present YesT& N/A b. Potential toxicity (dead fish, dead plant at discharge) (S No N/A c. Outfall discharge line easily accessible. 23. Sludge Drying and/or disposal: Yes No RN a. Poor sludge distribution on drying beds Yes No b. Vegetation in drying beds Yes No c. Dry sludge remaining in drying beds Yes No d. Dry sludge stored on site Yes No (�Ac e. Filtrate from sludge drying beds returned to front of plant es No N/A f. Sludge disposal through county landfill. Sc-mfson Coun-is( Yes No (1* g. Sludge land applied. 24. Filter Press: Yes OP N/A a. High level of solids in filtrate from filter presses or vacuum filters Yes �W N/A b. Thin filter cake caused by poor dewatering Yes 96 N/A c. Sludge buildup on belts and/or rollers of filter press Yes Qb N/A d. Excessive moisture in belt filter press sludge cake. 25. Polishing Ponds or Tanks: Yes No (25) a. Objectionable odor, excessive foam, floating solids, or oil sheens on water surface Yes No N/A b. Solids or scum accumulations in tank or at side of pond Yes No N/A c. Evidence of bypassed polishing ponds or tanks because of low capacity. 26. Plant Eluent: Yes (93 N/A a. Excessive suspended solids, turbidity, foam, grease, scum, color, and other macroscopic particulate matter present YesT& N/A b. Potential toxicity (dead fish, dead plant at discharge) (S No N/A c. Outfall discharge line easily accessible. 27. Flow Measurement: • C je No N/A a. Proper placement of flow measurement device Yes No N/A b. Flow meter calibrated Yes Q�Z N/A c. Buildup of solids in flume or weir Yes (&' N/A ' d. Broken or cracked flume or weir Yes No (0 e. Clogged or broken stilling wells Yes (95� N/A" f Weir plate edge corroded or damaged Yell ,No N/A g.. Flow measurement error less than 10%. S3114 WS1N33 Page) JLljWr%r, Un IWAA Jn Ala 700 081 Wgialiaosite e ing and analysis completed on parameters specified by permit sample temperatures maintained at 4 degrees Celsius or less (but above freezing) during sampling No N/A c. Contract laboratory used for sample analysis No N/A d. Effluent composite samples obtained are flow proportional. es No N/A es) No N/A Yes No N/A sJ No N/A I RECORDKEEPING AND REPORTING 1. Records and reports maintained as required by permit. 2. All required information available, complete, and current. 3. Records maintained for 3 years and all sludge records maintained for 5 years. 4. Analytical results consistent with data reported on DMRs. 6. Monitoring records adequate and include: Yes No N/A a. Monitoring charts kept for 3 years Yes No N/A b. Flowmeter calibration records kept for 3 years. (YZ�� No N/A 7. The pH meter is calibrated daily with two buffers and checked with a . third buffer and properly documented. Ye .) No N/A S. Expiration dates of pH buffers adequate. es, No N/A �9. All thermometers used in NPDES permit reporting is calibrated annually with an NIST certified thermometer or a traceable thermometer annually and documented. Ye7No N/A 10. The following NPDES permit required parameters are analyzed on site: pH, Temperature, Dissolved Oxygen and Chlorine Residual. 5. Sampling and analyses data adequate and include: Yes No N/A a. Dates, times, and location of sampling Yes No N/A b. Name of individual performing sampling Yes No N/A c. Results of analyses and calibration Yes No N/A d. Dates of analyses Yes No N/A e. Name of person performing analyses. 6. Monitoring records adequate and include: Yes No N/A a. Monitoring charts kept for 3 years Yes No N/A b. Flowmeter calibration records kept for 3 years. (YZ�� No N/A 7. The pH meter is calibrated daily with two buffers and checked with a . third buffer and properly documented. Ye .) No N/A S. Expiration dates of pH buffers adequate. es, No N/A �9. All thermometers used in NPDES permit reporting is calibrated annually with an NIST certified thermometer or a traceable thermometer annually and documented. Ye7No N/A 10. The following NPDES permit required parameters are analyzed on site: pH, Temperature, Dissolved Oxygen and Chlorine Residual. 6-roV Page 6 Yes No 11. The NPDES permit required parameter Total Chlorine Residual is analyzed by approved method. Yes No C 12. BOD incubator temperature maintained at 20 +/- 1 Degrees Celsius and the temperature maintained in a log for every day of operation. Yes No N%' 13. Fecal coiiform incubator maintained at 44.5 +/- 0.2 Degree Celsius and the temperature maintained in a log for every day of operation. Yes No N/ 15. 14. Plant records adequate and include: Yes No N/A a. O & M Manual Yes No N/A b. "As -built" engineering drawings Yes No N/A c. Schedules and dates of equipment maintenance repairs Yes No N/A d. Equipment data cards. Yes No N/ 15. Permittee is meeting compliance schedule. No N/A 16. DMRs complete and include all NPDES permit required parameters. Yes No 17. The facility has a permitted flow greater than 5 MGD and is required to operate seven days per week 24 hours a day. CYe V No N/A 18. ORC visitation logs available and current. rYeV No N/A 19. ORC certified at a level equal to or greater than the classification of. the wastewater facility. (rep No N/A 20. Backup Operator certified at one level less than the classification of the wastewater facility or greater. ° Yes No N/A 21. Current copy of the complete NPDES permit on site. Yes No . Nits''' 2r1' Facility description verified as contained in NPDES permit. Yes N/A 23. 14ility analyzes process control parameters for example: MLSS, t*MCRT, Settleable Solids and others that are applicable. Yes No 24. .Industrial Waste Surveys (IWS) sent to all possible Significant Industrial Users (SIUs) within the last five years (especially new industries). Revised 7/16/01 by Belinda Henson p U DIV ur ##J41 cn WUAUTY Mme- FILES