Loading...
HomeMy WebLinkAboutDEQp00020434DuPont Company A To C No. 003573A01 July 15, 2008 I �p Engineer's Certification t=: a k tv ty ... 9 R. c TRa 1,9�{ga�r�a' S i; A� as a duly registered Professional Engineer in the State of North darolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the DuPont Company Fayetteville Works WWTP, located on NC Highway 87 in Bladen County for DuPont Company, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Addition of 85 -foot diameter, 17 -foot sidewall depth clarifier (clarifier #3) and a 1500 gpd sludge pump with associated yard piping, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. Y certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. J Si nature �> Registration No. + g Date Send to: Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633 38 ha j i, i fy cs Y p