Loading...
HomeMy WebLinkAboutDEQp00022083s Z-544 REV. 12-79 auPONT ESTABLISHED 1802 • E. I. DU PONT DE NEMOURS & COMPANY INCORPORATED P. O. DRAWER Z FAYETTEVILLE, N. C. 28302 POLYMER PRODUCTS DEPARTMENT Mr. Arthur Mouberry, Supervisor Permits and Engineering Unit N.C. Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street Raleigh, N.C. 27611 Dear Mr. Mouberry, RECEIVED MAR 2 7 1989 PERMITS & ENGINEERING March 23, 1989 c) C) 3513 R� -el.) upend - n In answer to your letter of 3/22 (attached), the • Certification letter for that expansion project was submitted to the Permits and Engineering Unit on November 29, 1988. In case it has been misplaced in your Division files, I have enclosed a copy of the cover letter and certification from our files. Please advise if I can be of any further assistance. Sincerely, 'Thomas W. Olcott Environmental Coordinator (919) 483-4681 Ext 155 TWO: mm CC: Fayetteville Regional Office (cover letter only) BETTER THINGS FOR BETTER LIVING I is J RECEIVED ,LL�... MAR 2'7 1989 PERMITS & ENGINEERING State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor William W. Cobey, Jr., Secretary THOMAS W. OLCOTT E.I. DUPONT-FAYETTEVILLE P.O. DRAWER Z FAYETTEVILLE, NC 28302 Dear Permittee: R. Paul Wilms Director March 22, 1989 SUBJECT: CERTIFICATE OF COMPLETION PERMIT NO. 0003573AD E.I. DUPONT-FAYETTEVILLE BLADEN COUNTY On March 28, 1988 the Division of Environmental Management issued you the subject permit. One of the conditions of the subject permit read as follows: Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the requirements of this permit and the approved plans and specifications. Mail certification to the Permits and Engineering Unit, P.O. Box 27687, Raleigh, N.C., 27611-7687. To date, our records show that no certification has been received for the subject permit. If the permitted facility has been constructed and placed into operation please submit the required certification immediately. Operation of the treatment system prior to submission of the required certification is in violation of your permit and is subject to enforcement action. If the facility has not been constructed, please contact the Fayetteville Regional Office at (919)486-1541, so that they can update their records. Thank you for your prompt attention to this matter. Sincerely, Arthur Mouberry, S Permits and Engine cc: File Fayetteville Regional Office P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer • E. I. DU PONT DE NEMOURS & COMPANY INCORPORATE? P. O. DRAWER Z FAYETTEVILLE, N. C. 28302 • i POLYVER PRODUCT= RECEIVED BCC: J.E. HAGLE F.D. VAN HAELST MAR 2 7 1989 J.C. HOLLAN FILE: F-1-3-38. PERMITS & ENGINEERING COVER LETTER 01LY J.M. STALLIIV9GS, D-12026=3 R.C. BUTTERWORTH, L53526 P.F. SNYDER F.S. CHRISTIANSEN November 29, 1988 Permits & Engineering Unit N.C. Dept. of Natural Resources and Community Development Division of Environmental Management P.O. Box 27687 Raleigh, N.C. 27611-7687 Dear Sirs: In accordance with the instruction in the Authorization to Construct issued by R. Paul Wilms on 3/28/88 (attached), I have enclosed the engineering certification attesting that the construction of the wastewater treatment modification at Fayetteville Works of E.I. du Pont de Nemours & Co., Inc. in Bladen County, Permit No. NC003573, was completed in accordance with approved plans and specifications by the Division. At the present time, the new aeration tank is operating under test procedures with the former aeration basin as an operational standby (i.e. available for aeration service in case of problems with the new tank system.) Barring problems, this test status will continue until the end of January, when the basin will be converted to a sludge digester. Sincerely, o Thomas W. Olcott Environmental Coordinator TWO: mm (8.13) CC: (Cover Letter) Bladen County Health Department Fayetteville Regional Supervisor, M.J. No Ms. Babette McKemie, Permit Branch BETTER THINGS FOR BETTER LIVING L �i FLUOR DANIEL •IN T E R OF F I C E C OR RES P ON D E N C E • i TO: Riley Hammond FROM: C. R. Green SUBJECT: DuPont Fayetteville Works Waste Treatment Facilities DATE: MAR. 2 7 1989 PERMITS &ENGINEERING November 1, 1988 a This memo Is in response to DuPont's request for an Engineer's Certification of the Waste Treatment Addition on Project 5262. The applicable documents which have been submitted to the State of North Carolina and hence are the basis of the construction certification are as follows: DuPont Drawing W388407 DuPont Drawing W945772 DuPont Drawing W992699 DuPont Drawing W993519 Paragraph "Expanded System" of Attachment A — Description and Design Basis of Expanded Wastewater Treatment Facilities, DuPont Fayetteville Works, Bladen County, North Carolina. I inspected the permitted facilities on October 26, 1988. The facilities were constructed in accordance with the approved plans and specifications as defined above. This construction certification does not cover: a) Design or suitability thereof. b) Operation of system. c) Control logic of Network 90 system. d) Equipment, piping, instrument or electrical component selection. e) Compliance with codes or standards. CRG:bmc QUALITY IS THE KEY ��9D cC�t r FORM 01041 REV. 3M8 6.PRINTED IN U -SA.