HomeMy WebLinkAboutRDU Park Economy 3 Expansion SiteDetermination -Type:
Buffer
Intermittent/Perennial
® Neuse (15A NCAC 2B .0233)
❑ Tar -Pamlico (15A NCAC,2B :0259)
ElIntermittent/Perennial Determination (Where local buffer:
ordinances apply)
n Jordan (15A NCAC 26 .0267)
`(governmental and/or interjurisdictional
projects) .
Project Name: RDU Park Economy 3 Expansion Site
Address/Location: ' Southeast of RDU Airport adjacent to I40
I
Stream(s): Haley's Branch
Determination'Date (s): -10/1672017, & : Staff 'Rick Trone "
10/20/2017
;1
Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http`.//Portal.ncdenr.org/web/wq/aps
1628 Mail Service Center; Raleigh, NC 27699,-1628 Phone: (919) 791=4200
Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159
Feature
*E/I/P = Ephemeral/Intermittent/Perennial
Explanation: ;The features(s) listed above has been located on the most recent published NRCS Soil Survey of Wake
County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,OOO.scale. Each
feature that is checked "Not Subject' has been: determined to not be at least intermittent or is not present' Streams
are "Subject' been,located possess characteristics that it to beat least
that checked have on the property and qualify
an intermittent stream. There may be other features.lo'cated on the property that do not show up on the maps
referenced above but may be considered jurisdictional', according to the US Army Corps of Engineers.
E/I/P*
Not Subject
Subject
Start a
Stop@
Soil
Survey
USGS
To o '
'A
X,
'
Throughout Project
X '
'
B
E•
X
Throu`ho ut Project
C
I/P
X
B -SI •Feature A
X
X
D
E
X
Throughout Pro'ect ,
X
Feature
*E/I/P = Ephemeral/Intermittent/Perennial
Explanation: ;The features(s) listed above has been located on the most recent published NRCS Soil Survey of Wake
County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,OOO.scale. Each
feature that is checked "Not Subject' has been: determined to not be at least intermittent or is not present' Streams
are "Subject' been,located possess characteristics that it to beat least
that checked have on the property and qualify
an intermittent stream. There may be other features.lo'cated on the property that do not show up on the maps
referenced above but may be considered jurisdictional', according to the US Army Corps of Engineers.
E/I/P*
Not Subject
Subject
Start a
Stop@
Soil
Survey
USGS
To o '
'A
'P.
X
Throughout Project
X '
X
B
E•
X
Throu`ho ut Project
C
I/P
X
B -SI •Feature A
X
D
E
X
Throughout Pro'ect ,
X
E
I/P
X
B -S2 Feature A
X
F
I/P
X
Culvert Feature G
X
G #1
I/P
X
B -S3 B -S3 stop
X
G #2
I/P
X
B -S3 #2 B -S3 #2 stop
G #3)
I/P
X
B -S3 #3 B-53#3 stop
X
G #4
I/P
X
B -S3 #4 Feature A
X
H. #1
I
X
H-1 start H-1 stopX
H #2
1
X
H-2 start H-2 stopX
I #1
I/P
X
A -S07 A -S08
X.
I #2
I/P
X
A -S09 Feature L
J
I/P.
X
A -S03 A-SO4
X
K ,
E
X
Throughout Project
X
L
VP
X
A -S05
Feature I
X-
M
I/P
X
AL -S06
Feature I
X
N
I/P
X
Through ut Project
X
X
O
UP
X
Stormwater
Device
Outside project
boundary
X
X
P
E
X
Throughout Project
X
NA
X
Not depicted on maps
R
E
X
Throughout
X
S
I%P
X
A -S02 Feature O
X
T
E
X
Throughout Project
-X!
U
E-
X
Throughout Project
X
V
E
X
Throughout Project
X
X
W
E
X
Throughout Project
X
Pond' 1
NA
X
Throughout Project
X
Pond 2
NA
XI..
Throughout Project
X
Pond 3
NA
X
Throughout Project
X
Pond 5'
NA
X
Throu hout Project
X
Lake!
Crabtree
NA
X
Throughout Project
This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected
parties that dispute a determination made by the DWR may request a determination by the Director. An
appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the
Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins;
DWR — 401 & Buffer Permitting Unit; 1617 Mail Service Center, Raleigh, NC 27699-1617. If sending via
delivery service (UPS, FedEx, etc.): Karen Higgins; DWR — 401 & Buffer Permitting Unit; 512 N. Salisbury
Street, Raleigh, NC 27604.
This determination is final and binding unless, as detailed above, an appeal is requested within sixty (60)
days.
This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884.
If you have questions regarding this determination, please feel free to contact Rick Trone at (919) 791-4257, or by
email at iick.trone@ncdenr.gov
Si erel
Danny Smith
Supervisor, Water Quality Regional Operations Center
cc: RRO DWR File Copy
RDU Park Economy 3 Expansion Site
Wake County, NC-DWR Project # 17-346
JLLu
wit Raleigh-Durham \ -
Int^rnational
.. Airport���,r°j t.
yJ �`!�
A 461
1
/x
PS
W
FP171
o
-sir �„ • x. -
#.
-yx
USGS Topographical Map
Cary Quadrangle 2016 s :: Locations are approximate
Legend: > and are provided for refer-
ence only
-Project boundary.�� I�JA`1 JI
RDU Park Economy 3 Expansion Site
Wake County, NC-DWR Project # 17-346
NRCS Soil Survey Sheets 36 & 37 acs 4nTE
Wake Co, NC 1970 Locations are approximate
Legend: )� and are provided for refer-
v
ence only
-project boundary
Pond 5
A -S03 Start
TT
A -S11
46 TT PL
Wit at" ,,I",`-" St
1art "H-1" Stop "H-1" Start "H-2"
35 TT PL 0* +'
I` oQ 3 24" RCP B -S3 #4 Start
I U ♦ -- ', .>1'_ r .. �,� B -S3 #3 Start
t
W12 B -S3 Start
o�E lFq Culvert .,' B -S3 Stop
-r; B -S3 #2 Start
"
' 863-B67
(DP3)
0. A -S02 Start
N Culvert
P
A34 TT A01
NPDES Non JD B-S1A
Sto—ter Pond
A -S01 Start ,
..w...,
ect Area
III r
igh Durham International Property
nnial Stream
L
mittent Stream
dictional Linear Wetland
-jurisdictional Pond in High Ground
tree Lake, 27-33-(3.5), "B;NSWdictional
Crabtree Lake (Formerly Pond 4)
Wetland
euse River Buffer
fmu
onfirmed the jurisdictional features or
0-17-17.
Rick Trone with the NCDWR corfirme;'
1e 50' Neuse River Buffers or
0-16-17.
CL TT CH
A -S06 Start
B57 TT
B -S1
A73 -A76 TT C
8135 TT B 147
22 TT 8113 8123 TT 8134
Floodplain Pool
B68 TT PL
8112 TT PL
NPDES Non JD Stormwater Pond
Wake County, NC
Figure 3- Sketch Map .rets+xo. aw.: Wake County GIS 9o11lEnvironmentalConsatants,PA
+axw +.fee• NC On.M
holed Mer.: h.Pree by:
vrrr axir ur. r.,iM�n'+rair. n.. Minwfwn. r,., �in.w.a+
+arm
(Haley's Branch
Survey edge of water
and stream flowing
into pond _