Loading...
HomeMy WebLinkAbout20140957 Ver 2_NCDEQ_Response_Part2_20170929_sent_20171002Dominion Energy Services, no. 5000 Dominion Boulevard Glen Allen, VA 23060 DominlonEnergy.cwm September 29, 2017 ELECTRONIC MAII. Jeff Poupart Water Quality Section North Carolina Department of Environmental Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Jeff.Poupart(i�ncdenn gov Re: Atlantic Coast Pipeline — DWR Project #14-0957 v2 Response to Request for Additional Information (Part 2 of 2) 401 Water Quality Certification Review Dear Mr. Poupart: Dominion mow Energy° Atlantic Coast Pipeline, LLC (Atlantic) is providing the enclosed responses to the North Carolina Department of Environmental Quality's (NCDEQ) September 14, 2017, request for additional information on Atlantic's Water Quality Certification application. The enclosed responses are in addition to responses submitted on September 22, 2017 and complete the remaining responses to item numbers l.b.i, and 6.c. Atlantic respectfully requests that NCDEQ continue to process its application. Please contact Spencer Tricll at (804) 273-3472 or Spencer.TrichellLw, dominionenergy.com, if you have questions regarding this submittal. Please direct written responses to: Richard B. Gangle Dominion Energy Services, Inc. 5000 Dominion Boulevard Glen Allen, Virginia 23060 Richard B. Gdfigle Environmental Manager, Atlantic Coast Pipeline cc: Spencer Trichell (Dominion Energy) Jennifer Burdette (NCDEQ) Enclosure —Response Materials and Appendices Atlantic Coast Pipeline North Carolina Department of Environmental Quality Response to Information Request for 401 Water Quality Certification Dated September 14, 2017 Atlantic Coast Pipeline September 29, 2017 Response to NCDEQ Request for Additional Information dated September 14, 2017: The North Carolina Department of Environmental Quality (NCDEQ), Division of Water Resources (Division), sent a "Request for Additional Information" to Atlantic Coast Pipeline, LLC (Atlantic), dated September 14, 2017, to address public comments from a public comment period held by the Division between June 16 and August 19, 2017, and to address public comments from public hearings held on July 18 and 20, 2017. Consistent with a previous request for information submitted to Atlantic dated June 28, 2017, the Division stated that Atlantic's response to the September 14 request was necessary to process Atlantic's application requesting an Individual Water Quality Certification/Buffer Authorization for the Atlantic Coast Pipeline Project (ACP or Project). Atlantic has reviewed the NCDEQ request for additional information and is providing the following responses and attached information according to the NCDEQ request. This is part 2 of Atlantic's submittal. Previously submitted items are noted in the responses below. Each of the requests for information, as numbered in the NCDEQ request, is provided below, followed by Atlantic's response in italics: 1. The project involves numerous stream crossings that have the potential to affect downstream water quality both temporarily during construction and permanently. Your application and responses to the Division provide thorough general descriptions of the plans for the project, however more site-specific detail is necessary to ensure that downstream water quality is protected. Provide the additional justification requested below: a. Add a column to the Wetland and Waterbody Crossing table (appendix C-1) for each waterbody more than 30 feet in width that provides site specific reasons why each crossing could not be completed using the HDD method or a conventional bore to avoid impacts to the stream channel. Atlantic Coast Pipeline North Carolina Department of Environmental Quality Response to Information Request for 401 Water Quality Certification Dated September 14, 2017 September 29, 2017 Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. b. Many crossings are proposed to be installed using the open cut method that do not make accommodations for the work to be completed in the dry or without exposure to flowing water. i. Provide a site-specific justification for not working in the dry and a crossing plan for each open cut crossings proposed. These plans should include turbidity curtain locations, and upstream/downstream water quality sampling locations for turbidity and total dissolved solids (sampling for total dissolved solids is only required within Water Supply Watershed areas). Atlantic's Response: Atlantic received comments on construction erosion and sediment control plans from NCDEQ Division of Energy, Mineral and Land Resources and Atlantic is working to update plans based on these comments. Atlantic has modified the construction erosion and sediment control drawings to include turbidity curtains and water quality sampling locations where the open cut method is proposed at perennial waterbody crossings; provided along with this submittal (Appendix A). Atlantic will sample water 50 feet above and 50 feet below perennial waterbody crossings that are open cut and where water is present at the time of construction. Monitoring will occur at a minimum rate of 2 times per day during the period when active construction is occurring, in both the background location (50 feet above activity) and downstream location (50 feet below activity). The first monitoring event will occur approximately 30 minutes prior to the commencement of construction, and the second will occur a minimum 2-4 hours after start of instream construction. Measurements of turbidity grab samples will continue during instream pipeline installation activities. Once the crossing is complete and restoration occurs, monitoring will be conducted for four days at a minimum rate of I time per day to evaluate residual impacts due to construction. Should the post -construction turbidity readings (4 -day average) exceed standards, remediation of the source will occur and monitoring will continue once per day until the source is addressed and readings are within water quality standards. Turbidity will be measured in the field at each of the perennial open cut crossings listed in Table I below, and total dissolved solids will be 2 Atlantic Coast Pipeline North Carolina Department of Environmental Quality Response to Information Request for 401 Water Quality Certification Dated September 14, 2017 September 29, 2017 measured at those within water supply watersheds (these streams are identified with a TDS in Table 1). Atlantic Coast Pipeline - Review of Perennial Waterbodies with Proposed Open Cut Crossing Methods in North Carolina Milepost Feature ID Waterbod Name(feet) Ordinary High Water Mark Width Water Monitoring Parameters AP -2 1.9 snrh006 Jacks Swamp 15 Turbidity 23.1 sh1h017 Beaverdam Swamp 45 Turbidity 26.6 sh1h009 UNT to Burnt Coat Swamp 8 Turbidity 27.4 sh1h011 Jacket Swamp 25 Turbidity 29.8 sh1a001 Breeches Swamp 15 Turbidity 42.1 snah025 UNT to Flat Rock Branch 10 Turbidity 42.2 snah026 UNT to Flat Rock Branch 4 Turbidity 44.4 snac001 Flat Rock Branch 8 Turbidity 44.8 sna 012 Flat Rock Branch 6 Turbidity 47.6 snah009 Pig Basket Creek 25 Turbidity 48.7 DKSQ NC_002 (renamed snah015) Stony Creek 28 Turbidity 53.3 snah021 UNT to Sapony Creek 10 Turbidity & TDS 56.3 snah024 Sapony Creek 20 Turbidity & TDS 56.6 snah022 UNT to Sapony Creek 10 Turbidity & TDS 69.7 swio007 Marsh Swamp 8 Turbidity 79.5 sjob104 Little Buffalo Creek 20 Turbidity 86.5 s'oo004 Little Creek 4 Turbidity 97.5 s'oo008 Polecat Branch 8 Turbidity 102.8 s'ob004 UNT to Hannah Creek 4 Turbidity 117.2 ssa 003 Juniper Run 12 Turbidity 118.9 ssao007 Beaverdam Swamp 9 Turbidity 119.7 ssaa001 Beaverdam Swamp 25 Turbidity 122.2 ssao006 Starlins Swamp 15 Turbidity 122.3 ssao005 Starlins Swamp 20 Turbidity 126.8 scm 009 UNT to Cape Fear River 8 Turbidity 127.3 scm 010 UNT to Cape Fear River 6 Turbidity 174.0 sroh010 Raft Swamp 40 Turbidity & TDS AP -3 5.9 snrpO17 UNT to Cypress Creek 7 Turbidity 5.9 snrpO16 UNT to Cypress Creek 9 Turbidity 10.0 snro003 Cypress Creek 30 Turbidity Reason for the open cut crossings listed in the table above: For longer crossings in saturated wetland areas, significant disturbance to the adjacent wetland would be created by configuring the site for a dry crossing. Each site specific scenario would result in a different set of impacts, but generally setting up for an open cut crossing takes more time and more traffic within the adjacent wetlands, which can lead to more compaction of wet soils, and the duration of time the waterbody and wetland are exposed to the disturbance. Additionally, saturated soils are generally low in strength and will increase the complexity associated with and time required to configure this site and install a Atlantic Coast Pipeline North Carolina Department of Environmental Quality Response to Information Request for 401 Water Quality Certification Dated September 14, 2017 September 29, 2017 dry crossing. Moving wet soils takes more time, and in order to hold the trench may require additional stabilization measures such as sheet pile, adding additional time and equipment passes through the wetlands. Open cutting these crossings will expedite the installation and minimize impacts to the waterbody, adjacent wetland, and associated habitat. ii. Your July 12, 2017 response to the Division indicated that the open cut method was proposed for several crossings due to the presence of inundated wetlands. Many of these wetlands do not appear to be inundated based on aerial photography and identification of a discrete channel by the field survey. Provide documentation that the adjacent wetlands are inundated beyond the discrete channel for each of these crossings. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. iii. Your July 12, 2017 response to the Division also stated that utilizing a dry method for several stream crossings would result in more impact for a longer duration. Provide an explanation of the additional impact and duration of the impact compared to using a dry method, including specific plans showing the additional impact. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. iv. Both dam and pump and flume method are listed for many stream crossings. Provide the criteria for selecting one method over the other, including who will make the decision and when the decision will be made. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. v. The typical diagrams for each stream crossing method indicate that a temporary bridge will be installed "if needed". Provide the criteria to 4 Atlantic Coast Pipeline North Carolina Department of Environmental Quality Response to Information Request for 401 Water Quality Certification Dated September 14, 2017 September 29, 2017 determine if a temporary bridge will be needed. If a temporary bridge isn't needed, explain how equipment will operate without crossing back and forth within the stream channel. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. vi. Provide construction drawings, including construction sequencing for the Neuse River crossing. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. c. Provide a restoration plan for all stream crossings. This can be accomplished by providing a site-specific plan for each crossing, or by providing a typical restoration plan for each different type of restoration (e.g., restoration of preconstruction contours, laying back banks on incised streams, or placement of riprap to ensure streambank stability where the conditions at the crossing warrant this protection) and assigning which restoration plan will be used at each stream crossing. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. d. Provide a plan to monitor all stream and wetland restoration through two growing seasons once vegetation is established. Explain your method for determining whether the success criteria provided in your application are met. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. 2. There are numerous places throughout the application where qualifiers are used when citing methods to protect water quality (e.g., may, as appropriate, as near as practical, where feasible, when needed, etc.). Propose a standard method and provide justification Atlantic Coast Pipeline North Carolina Department of Environmental Quality Response to Information Request for 401 Water Quality Certification Dated September 14, 2017 September 29, 2017 for each variation from the standard for each waterbody crossing not using the standard method. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. 3. Provide a list of the drinking water well testing parameters. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. 4. Provide the locations and rate of discharge of hydrostatic test water. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. 5. The Division received numerous comments expressing concerns over potential sedimentation and turbidity from the construction of the pipeline. The Division understands from the Division of Energy, Mineral and Land Resources (DEMLR) that the proposed pipeline has submitted two Sediment & Erosion Control Plans for review (one for Northampton, Halifax, Nash, Wilson, and Johnston Counties, on for Sampson, Cumberland, and Robeson Counties), but there may be an exemption from NPDES Stormwater permitting. a. Provide all Sediment & Erosion Control plans for the project using the following link: https:Hedocs.deq.nc.gov/Forms/SppDlemental-Information-Form. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. b. Provide an overview of the sediment and erosion control measures you plan to implement as part of you Sediment & Erosion Control Plan, including if there are any measures or steps you plan to voluntarily take above the minimum requirements (e.g., implementing the requirements in Section II.B of the NCGO10000 Construction Stormwater General Permit, etc.). 0 Atlantic Coast Pipeline North Carolina Department of Environmental Quality Response to Information Request for 401 Water Quality Certification Dated September 14, 2017 September 29, 2017 Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. 6. The Division requires additional information regarding cumulative impacts. It is important to note that an analysis of cumulative impact is required regardless of whether these projects are separate from the ACP, not within ACP's purview or undertaken by entities other than ACP. a. Provide a map of the proposed pipeline showing all existing transmission pipelines and their associated distribution points in North Carolina. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. b. Provide the shapefiles for the proposed pipeline route. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. c. The application indicates Metering and Regulation stations will be constructed in Johnston, Cumberland, and Robeson Counties. Provide a qualitative cumulative impacts analysis for these counties. Refer to the Division's Cumulative Impact Policy for 401 and Isolated Wetland Permitting Program (Ver 2. 1, dated April 10, 2004) for guidance, available online: htlps:Hfiles.nc. gov/ncdeq/Water%20Qaualiiy/Surface%2OWater%20Protection/40 I/Policies Guides Manuals/CumulativeImpactPolicypdf Atlantic's Response: Atlantic completed a qualitative cumulative impacts analysis for the counties with Metering and Regulation stations, included as Appendix B. d. Based on the Division's review, the proposed pipeline will cross Moccasin Creek [27-53-(0.5)] in Johnston County, which is a 303d stream impaired for benthos. 7 Atlantic Coast Pipeline North Carolina Department of Environmental Quality Response to Information Request for 401 Water Quality Certification Dated September 14, 2017 September 29, 2017 The proposed pipeline will also cross just upstream of the following 303d streams: i. Stony Creek [28-68b] in Nash County, which is impaired for benthos and dissolved oxygen; ii. Tar River [28-(36)b] in Nash County, which is impaired for dissolved oxygen; and iii. Mill Creek [27-52-(1)b] in Johnston County, which is impaired for dissolved oxygen. Based on past concurrent construction projects, provide a quantitative cumulative impact analysis from construction activities for the 4 watersheds listed above. Alternatively, provide a commitment to implement the requirements in Section H.B. of the NCGO10000 permit, or other similar additional best management practices, in these 4 watersheds. Atlantic's Response: Response to this information request was provided to NCDEQ on September 22, 2017 via email, and hard copy on September 26, 2017 via FedEx. Atlantic has provided these responses within 30 days from September 14, 2017, per NCDEQ's request for additional information. Appendix A Revised Drawings Including Turbidity Curtain Locations and Water Monitoring Sample Locations HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: 500 500 STATIONING SHOWN ON THE DRAWING IS BASED 60+65 S 007R CL STREAM NH F ON SLOPE MEASUREMENTS. 400 om to om to op oN to to oil loo w �l 1% loo 400 AgF+ F+ rn rno f+ 300 300 200 m TII IT m m TI T TI TI m m + + + + m m m TI m �Iw mmTl + o oll I� - - o 0 200 - roo 0 m --o ---- o L 0 0 — o -----o o o ---- o --- o----� ---- o ---- ---J --- D, 0 0 0 o ---- o -----o ---- o -- — 0 0 o —I-- ----- 0 0 o --- ---- --- -- 0 0 0 0 ---- — L-- X11__ ---- 0 0 0 o _I — ---- ----- ---- — ,00 Go <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% O o 0 N PROFILE VIEW _ HORZ: 1" = 200' Ed Of VERT: 1" = 200' -(DO -100 �+ TOPSOIL SEGREGATION AREA PROPOSED PERMANENT R.O.W.PROPOSED 36" AP -2 PIPELINE PROPOSED PERMANENT R.O.W. °' ^' N < r 77/77777 PROPOSED TEMPORARY R.O.W. / 171 U /T N �, & //// V+. 4t= 1 STATIONING & CONSTRUCTION LIMITS m v N u - u o ut LL -16-003 N/F LL -16-006 N/F HAZEL L. BERNARD PARCEL I.D. # 6031-43-3618 5105 LF VIRGINIA C. CLEMENITS PARCEL I.D. # 6030-49-2708 2599 LF PROPERTY OWNERSHIP CD 0 08 O � Ldm Z + U 2 i - ` ac a� ago ^_r .7- _ 4`_1 _^.LSC '- _ I \ Tj s� I N W o Q = m .F _ - I i � 6Q sa US Zoo ~ Q O1 ��EI:II:Tj SCALE: AS SHOWN DATE: 09/29/17 ('� E DRAWN: GPT E • e E CHECKED: DLH APPROVED : NET PIPE SPECIFICATION 60+65 CL STREAM SNRH007 9ai Consultants - NC, in 4198 CO% ROAD 0 o14 ll l o 0 0 0l o to of to 0 0 0 0 0 0 of 0 0 + 0 0 0 0 l - 0 0 0 0 SUITE1 GLEN ALLELE N, 23060 804-270-935]7 N.C. COL dF-0269 = II Fn£+ F lom z l I=m = 1 = 1 0 Fu Fm F Fm Fm AE FN F+ � io F STRING VIEW BAND =e=e zo NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UFMWITHNADESDATUM,ZONEIT.US 3URVEYFOOT.CENTRALMERIDIANSl-W. — — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURSAND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND N EEA TH. SURVEY PERFORMED BY M CONSULTANTS. INC FROM II -0B2014 TIED 1 72014. E%TRA WORK SPADE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG FENCE(BSRF) NRES NOWNLAREBASE 4. TH�EPROFERn LI DON G158TPX ASSESSMENT RECORDS(PROVIDED BYOTHERS). GAI LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPRESSED ORIMFLIEDAS TO THE —X—X— FENCE — — STREAM E W UNDERGROUND ELECTRIC WATERLINE ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY 0i STREAM CROSS INC R.O.W.ALLITAT' O USFWSSTREAMCROSSING �n COIR LOG COMPOST FILTER SOCK ORANGE SAFETY FENCE ACCURACY OF TIE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAMANDWETLAND DATASHOVJN ON THEDRAWINGS WAS PROVIDED BY ERM. 6. EROSION ANING SPOENTATION CONTROL ELEMEMS MAYSESHOWN OUBIOE OF THE WORK AREAS FOR CLARITY ONLY.ACNPL INSTALLATION SHALL BEWITHIN THEWORI(AREAS. NING SXOWN IS SLOPESTATONINE KSHALLBEINSTALLEDPARALLELiOLONTOURTOE%TENTPRALTLPBLEINALWROTHISMDSMINRIMPROTAIL PROJECT NO. DASH NO. C140488 —G G— EXISTING GAS PIPELINE OH OVERHEAD UTILITY LINES SAN SANITARY SEWER EDGE OF GRAVEL ® WE ­I --sox _ PR......—-- rcavioE CLunr axLT N UTILITY POLE �( WITH ENHANCED CONTROLS CONSTRUCTION ENTRANCE WITX DITCX LU LVERT A6 NEEDED C, ROADSIDE DITCH SOIL TYPE S. ACCESS ROADS HAVE NLGROUPEOINTO FWRCATEGORIES1 J E%ISTING ROADS NO IMPROVEMENTS, AND4INEWROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PRONDED FOR ROADS IN DRAINAGE: DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. E FOR THE NATUREAND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SECTION OFTHE INCEA NAN 2) EXISTING ROADS MINOR IMPROVEMENTS. 3) EXISTING ROADS MAJOR IMPROVIIAENT3 CATEGORIES23AND4. ROADSINCATEWRIESIAND2HAWADEOUATEE%ISTING SIGNED AND SEALED BASED ON THESOURCE DATA PROVIDED AND AS DESCRIBED IN THE TASK NO. 005 SUB TASK NO. 00 GROUP D DRAWING NO. CULVERT!ACCESS ROAD WATERBARS A GENERALIZED SURFACE WATER FLOW WATERBARES DHEET EDINP ON WBASEDONINFORMATIONCURRENTLYAVAILABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED A3 NEEDED BASED ON CONDITIONS ACCESS ROAD PROPOSED PERMANENT EASEMENT 1 OBSERVED CONFI TME IO cory DEPICTED IN NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE TC TURBIDITY CURTAIN IPLAN VIEW) SURFACE WATER FLOW WITHIN NOW TXECONFIGURAnOry DEPICTED Iry PLAry vIEWAPPLIES TO DOTH TEMPORARYANDPERMANENT WATERBARS, Al APPROPRIATE. PROPOSED GAS PIPELINE SS R� SS PROPOSED GAS PIPELINE NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) D E007 7 OF 189 O' (♦ STYRBIOITY SAMPLING LOCATION (PLAN VIEW) SO' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. 'HIS DRAWING WAS PRODUCED WITH COMPUTER LADED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAJ Consultants, Inc. NOTE: 600 STATIONING SHOWN ON E z- £ z- E p I E 5_ 5_ m m m £ `r' z- 21 1186, 5 EDGECK EDGE E £ o RICHNECK RD RICHNECK RD r- 600 THE DRAWING IS BASED �- - y _ n _ z z _ - z- - I ' 1186+OB 1186+69 o� 500 ON SLOPE MEASUREMENTS. 500 op op �, ��, - - - o- o- o� o- �m £� RIGHi of wA� RIGHT OF war- Io N� to E;�; AI NI=N NI IN" AI to+I=� 186+54 OVERHEAD ELEC. w `" 400 T T T T T �~ o T T T N I I 400 300- J III 300 - w I + + 200 + o 0 0 0 + 0 o 0 o + + + o a o 0 0 0 0-----o 0 o o 0 0 0 + + + o o o— + o 0 0 o o 0 0 200 (n �1 L__1 ---5' ----- L<5% — ---- ---- --- —<5% O — too -- ----o --- ----o — ---- ----- -- ---- — ----- —5Z-1 4 _ —<5%— — ----<s%---- _ —L --- <s%--- s% too _ PROFILE VIEW <s% <sz <5%--- <5%— r5% <5 <5% _ > HORZ: 1" = 200' LLI VERT: 1" = 200' o o 1185+95 ,186+57 1106+63 - _ -- -186+01 I I - + - - PROPOSED TEMPORARY R.O.W. $ o /SiT n v-rrrrr� n _ PROPOSED PERMANENT R.O.W. PROPOSED 36" AP-2 PIPELINE _ PROPOSED PERMANENT R.O.W. TEMPORAR PROPOSED R.O.W. 116s+FE _ - - - _� L1/1/86+ 86 93 r - - - m + _ - _ -- - STATIONING & CONSTRUCTION LIMITS - - w - u - _ N m m e TOPSOIL SEGREGFir ATION AREA Vines+3 1186+98u - - } LL-17-050 N/F of LL-17-051 N/F m1 LL-17-052 N/F LL-17-054 LL-17-054 �I N/F m1 I� N/F LL-17-057 vI- r' J.D. WHITEHEAD JR. PARCEL I.D. #0501077 I OTTO WLUAMS PARCEL I.D. #0402993 I OTTO WIWAMS PARCEL I.D. /0402929 REGINALD H. COLLINS REGINALD H. COLLINS N/F PARCEL I.D. #0401751 I PARCEL I.D. #0401751 CORINE READ 3226 LF 356 LF 881 LF 391 LF 873 LF C/0 EDWARD EADY PARCEL I.D. #0403871 a92 LF PROPERTY OWNERSHIP C,r I/ O ` + 1 PANEL I.D. III 040"GO ^ rn 1 N/FPANEL / e U X # W2929 // / / J n m EF PI 117 � I O z W� _ _ Z EIRS v W vV 11 a d y a - all ' PANEL7-7 (8 I n~moo - V _ = e I = 04 I z N .. - _ - - - _ MA Q„ = I T = a w o p o m - 411 O z U 3 o i � i ♦ Q 1 ® ` P 17;5 , EE) U is PARCEL WE III 1 1 IX.SCALE: PANEL o�" AS SHOWN DATE: 09/29/17 a P 1 0 I - - 1 / S S 1 _ NEI •• S 0 DRAWN: GPT CHECKED: DLH APPRoveo: NET PIPE SPECIFICATION 1186+24 EDGE OF RICHNECK RD 1186+45 EDGE OF RICHNECK RD 9ai COnBUltan[5 - NC, in 00 l o l l l o 0114 0 0 0 0 0 t o o l o l o f o o l l o l �1I I o o �� I' o 0 0 l o 4198 COX ROAD EN ALLEN, VA 23060 804-270-9357 N.C. COL dF-0269 E E E P E 21 EF ` m f I to = 1 tmo l69 RIGHOWAY IJ-----R TF 7 E IG1+WAY to �TF �+ 1I I1��I�I E+ f+ E+� E+ E+ E+ £ '.} E+ E+ I 1 1186+94 z, `^ OVERHEAD ELEC.EE S� STRING VIEW BAND T r NOTES: LEGEND PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCEAND MARRING BI°W. OT.PERFORME 1, COORDINATESYSTEMYTOPOGRAP ULIDARD — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION IC WERED RIVED FROM TAANDATUM.ZONEIT. GROUND SUBY 3. CONTOURSANDTOPOGDOCLE FEATURES WERE DERIVED FROM LIDPR DATAANOGPS SUBMETER GROUNDSURVEYPERFORMED BY GN CONSULTANTS. INC FROM tt-0&N14 N EA TH. THRU 11-072014. E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG FENCE(BSRF) 4. THEE PROFEOFH DONGI38TPX ASBESSMENi RECOR03 (PROVIDED BYOTHERS). -CONSULTANTS MAKE NO GUNWNTEE EITHER EXPREBSEOORIMFLIEOAS NNE' HOWNLAREBASE TO THE —X—X— FENCE — — STREAM E W UNDERGROUND ELECTRIC WATERLINE ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W.LISP a STREAM CROSSING O �n COIR LOG COMPOST FILTER SOCK ORANGE SAFETY FENCE ACCURACY OF TIE RECOROB AS BHOWNON THESE DRAWINGS. 6. STREAM AND WEVINENTATA SHOWNON THEDRAWINW WAS PROVDED BY ERM. 6. EROSION AND SEDIMEMATION CONTROL ELEMEMS MAYSESHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACNAL INSTALWTION SHALL BEWITHIN THEWORMAREAS. NINGSO NISSLOPESTATONING. KSHALLBEINSTALLEDPARALLELTOCONTOURTOE%TENTPRACTCAELEINALCOROANCEWITHSTANDARDOETAIL PROJECT LA0. DASH LA0. C140488 —G G— EXISTING GAS PIPELINE OH OVERHEAD UTILITY LINES SAN SANITARY SEWER EDGE OF GRAVEL ® WETLAND •o VPaVIDE cuvnr axLT N UTILITY POLE �( WITH ENHANCED CONTROLS WITH ENHANCED CONSTRUCTION ENTRANCE WITX DITCX LU LVERT AS NEEDED CG,� ROADSIDE DITCH SOIL TYPE TES.J EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENT3.3) EXISTING ROADS MAJOR IMPROVEMENTS 9. ACCESSROADSHA APPROP LATE EROSIO AND CASEDIMENT IMENT CON DRANAG DRAINAGE FEATURSWEROSIONAVIDDFOR NTCONTCAT WILL BE PROVIDED FOR ROADS IN CATEGORIES2,3NND4. ROADS IN GITEGORIESIANDR HAVEADEOUATE EXISTING DRAIrvAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10. RESPONSIBLEFORTHE R—REANDLOCATIONOFTHEDEPICTED BMPSASOFTHEDATE SIGNEDANDSE4LED BABEOON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE TASK NO. OG5 SUE TASK NO. 00 GROUP ID DRAWING NO. CULNERT!ACCESS ROAD WATER.ARS A GENERALIZED SURFACE WATER FLOW Wq EA,C.NFBSUTI0NEl6 DEPICTED IN PLANNED BASSOON INFORMATIONCURRENTLYAVAILABLE. WATERBAR CONFIGURATION MAV BE FIELD AOJu3TE0 A3 NEEDED BASSOON CONDITIONS ACCESS ROAD PROPOSED PERMANENT EASEMENT 1 OBSERVED ATTHE TIME OF corvsTRCTEDIN. TXECANFIGURAnory oEPlcTEOIry PLAN vIEWAPPLIES To eoTH TEMPORARYANDATION MAYBEFIELD ARSASADAS NEEDED NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE TC TURBIDITY CURTAIN(PLAN VIEW) SURFACE WATER FLOW WITHIN NOW PROPOSED GAS PIPELINE R� R� R� PROPOSED GAS PIPELINE NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). � SO'TURBIDITY SAMPLING LOCATION (PLAN VIEW) Q WATERBAR OUTLET (PLAN VIEW) D E029 SO' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) 29 OF 189 'HIS DRAWING WAS PRODUCED WITH COMPUTER LADED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. HIS DRAWING WAS PRODUCED WITH COMPUTER LADED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: STATIONING SHOWN ON 600 LI ^� ^� 1 OF `+55 I� 1325+86 EDGE OF BRYANT RD rl EDGE OF BRYANT RD F 600 THE DRAWING IS BASED ON SLOPE MEASUREMENTS. = �= 500 my CONo ou iow �N o 500 om oN �� 9 t � loo 400 400 1325+24 RIGHT OF WAYI z 300 of w 300 - 200 0 0 0 0 g o 0 0 C, 0 0 0 0 o C 0 0 0 + o o I + 0 0 0 0 C + o 0 0 0 0 0 0 0 0 0 a a 0 0 + 200 co z O -- ---- -----o --- ----0-1 — --- — — — — -- z — (n PROFILE VIEW 100 <5z <sz <5% <5% <5% <5% <5% <59< <51 <5% <5% <59> <5% <5% 100 HORZ: 1" = 200' Ed VERT: 1" = 200' 0 0 1325+91 / 1326+72 1325+6a nNp�.yl.y1N p�y'y1 - PROPOSED TEMPORARY R.O.W. %1T'y"l"'�l� To T/T/T rT7'7Tl/ PROPOSED 36" AP -2 PIPELINE PROPOSED PERMANENT R.O.W. TA. 1316+76 / 0� PROPOSED PERMANENT R.O.W. 32°+4, /7�7T/�777TT T/iiTTiT TTl/T �I2+ aS �� /7 11T1 1T1 T1 v 1 T/Z 1325+3 PROPOSED TEMPORARY R.O.W. 0 1325+O, ++N + a � STATIONING & CONSTRUCTION LIMITS _ _ - TOPSOIL SEGREGATION AREA/ / El LL -17-077 LL -1]-0]9 LL -1]-0]6 N/F ml N/F N/F ARTHUR R YVONNE LEWIS YOLANDA D BURNLEY ALMYRA PITTMAN HEIRS PARCEL I.D. #0401614 PARCEL I.D. 0404143 C/O VIOLA BOONE 985 LF 547 LF LL -17-080 + LL -17-080 N/F > N/F uIALMYRA PITTMAN HEIRS lu ALMYRA PITTMAN HEIRS _I C/O VIOLA BOONE C 0 VIOLA BOONE / PARCEL I.D. #402059 I I PARCEL I.D. #402059 I LL -1]-081 N/F LL -17-083 RONALD DAVIS LOCKE JR TRUST nl Im N/F &RONALD DAVIS LOCKE SR TRUSTEE / LL -17-082 WANDA S. HARDEE C/O RONALD DAVIS LOCKE SR TRUSTEE I I PARCEL I.D. #401188 N/F ±I LL -17-085 tO A. JAMES A. HARDEE: PARCEL I.D. #0401213 ' r. i si 331 LF 798 LF PARCEL I.D. #401654 1155 LF PARCEL I.D. #0402060 973 LF ALFRED L. WESTER JR. 1908 LF 239 LF PARCEL 32 PROPERTY OWNERSHIP L#605289 59 / ♦ / ♦ / / allHIrn o ALAN. PDRIMAN HEIRS / PARCEL I.D. 401IMI -17-055 JAN ES n U # ♦ ®/ � " 1 MAS LOCKE BE TRUSTEE p C - J z_UST U D GM _ WJ sz _- _. - w Lu .I N U,_ QIILfFII) ��iFi��scj - F z CL04 N — m a w Qo m HE _A.io2o M Ogo FARCE O ¢ U 3 zLA 7 'R- PI 1 21+94 U Q m NI HVRS he josm mw -Sal ME ® O _ ..%1 LI I RNMED HARDEE PARCEL 55 OF EII POTWAR IS AM �— i _ /� I SCALE:AS SHOWN DATE: 09/29/17 C/O YOLA, NO MINE 239 UF SCALE: 1EPITTIMAN DRAWN: GPT 2" 1I \ I''. I Et O St00 CHECKED: DLH - � APPROVED : NET PIPE SPECIFICATION gai consultants - NC, in �I + 4198 COX ROAD SUITE 114 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o GLEN ALLEN, VA 23060 804-2]0-935] N.C. COL dF-0269 s—I Is— mpv HT u E+ u E -01 4,1 - u 1325+24+a RIGHT OF WAY 1325+55 1325+86 e^ J E a u STRING VIEW BAND EDGE OF BRYANT RD EDGE OF BRYANT RD NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING PND TOPOGRAPHY. OTMWITHNADMDATUM,20NE11.U8 3UWEYFO0T.CENTRALMERIDMNSl'W. — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOOMAND TOPOGRAPHIC FEATURES WERE DERNED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED N TH. BY M CONSULTANTS. INC FROM II -0B2014 THRU-72014. EXTRA WORK SPADE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG FENCE(BSRF) NREB NOWNLEEA 4. TH�EPR AREBASE LI DON G138TPX ASBESSMENi RECORDS (PROVIDED BYOTHERS). GAI LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPREBSEOORIMFLIE.AS TO THE —X—X— FENCE — — STREAM E UNDERGROUND ELECTRIC W WATERLINE a STREAM CROSSING PROPOSED TEMPORARY R.O.W.LISP ® AREA OF NO DISTURBANCE O �n 07 COIR LOG ACCURACY OF TIE REGORGE AS BHOWN ON THESE DRAWINGS. 5. STREAM AND WEVINENTATA SHOWNON THEDRAWINW WAS PROVIDED BY ERM. 6 EROSION AND SEDIMEMATION CONTROL ELEMEMS MAYSESHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACNPL INSTALLATION SHALL BEWITHIN THEMWAREAS. COMPOST FILTER SOCK NINGSXOWNISSLOPESTATONING. ORANGE SAFETY FENCE KSHALL BE INSTALLEDPARALLEL TO CONTOUR TO E%TENTPRACTCAELE IN ALCORDANLEWITHBTANDARDDETAIL PROJECT LA0. DASH LA0. C1404E8 —G G— EXISTING GAS PIPELINE SAN SANITARY SEWER OH OVERHEAD UTILITY LINES EDGE OF GRAVEL ® WETILAIU •o rcavioE CLunr axLT WITH ENHANCED CONTROLS WITH ENHANCED CONTROLS CONSTRUCTION ENTRANCE WITX OITCX �( N UTILITY POLE LU LVERT A6 NEEDED TER.J EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENT3.3) EXISTING ROADS MAJOR IMPROVEMENTS ROADSIDE DITLX 9. ACCESSROADSHA EBEOPRIARE EROSIOAND SEDIMETCON DRAWN EW RONAGIFPROPRMTE EROSION ON PNDDFOR ROADS IRCATEGORBE PROVIDED FOR ROADS IN CATEGORIES2,3NND4. ROADS IN GITECARIESIANOR HAVEADEOUATE E%ISTING DRAINAGE; DRAIrvAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIE53 AND 4. CG,� SOIL TYPE 10. RESPONSIBLEFORTHE F—REANDLOCATIONOFTHEDEPICTEDBMPSASOFTHEDATE SIGNEDANGSEALED BA BE. ON THE SOURCE OATH PROVIDED AND AS DESCRIBED IN THE TASK NO. OG5 SUE TASK NO. 00 GROUP D DRAWING NO. CULVERT!ACCEES ROA. WATERBARS A GENERALIZED SURFACE WATER FLOW WA EARCONFIGUTIO STEPICTED IN PLANNEW BASEOONINFORMATIONCURREHI'l AIIABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS ACCESS ROAD PROPOSED PERMANENT EASEMENT 11 NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE TC TURBIDITY CURTAIN (PLAN VIEW) � SURFACE WATER FLOW WITHIN NOW OBSERVEDATTHETIMEOFcoNSTRUCTION. THECONRCURAnory DEPICTED Iry PLAN VIEWAPPUES TO MOTH TEMPORARYAND PEHMANENT WATERBARS, Al AFPROPRIAT. PROPOSE. GAS PIPELINE PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). � STYRBI.ITY SAMPLING LOCATION (PLAN VIEW) O' Q WATERBAR OUTLET (PLAN VIEW) D E032 SO' TURBIDITY AND T.S SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) 32 OF 189 HIS DRAWING WAS PRODUCED WITH COMPUTER LADED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. 0 2017 GAI Consultants, Inc. NOTE: 600 1382+96 EDGE OF 1383+36 EDGE OF 600 STATIONING SHOWN ON THE DRAWING IS BASED A_ x _ x HEATHSALLE RD o21 _HEATHSVILLE RD zu z- za 500m u 138 +B No �, 500 ON SLOPE MEASUREMENTS. ENCE m �� Fm X X ST N —�� oyJ IDN A+ 400 OJ _ � 1383+46 oRIGHT 400 II I OF WAY 300 >o1 w w w w w w w x w x w w w LII '> n01 300 o ZDD+ 0 0 0 o 8 + 0 0 0cn o 0 0 0 + o 0 o o o o + o x o IIII + + + + + + o 0 0 0 0 0 0 0 0 o S o o o 200 S — — ---------<5%---- ----<5% ---------�--- ----—--------� �d —I o — ------------- — ---- ------ -- —---------- ---- -------- 1 —4--,5%0 A z 00 ------ `5% <s% <5% <5%_ <5% <5% <5% <5% % 100 � PROFILE VIEW <5% HORZ: 1" = 200' 0 0 VERT: 1" = 200' 1383+95 O e��,zz�7I,, cKc91 PROPOSED TEMPORARY R.O.W. P P _ LT1T1 77777=T1T�T�TIT1ZI r/%1T�L T/ mZ= T1=72_ T/ =7=_/'7' PROPOSED PERMANENT R.O.W. 1383+,] 1362+w PROPOSED 36" AP -2 PIPELINE PROPOSED PERMANENT R.O.WW _ PROPOSED TEMPORARY R.O.W,362+2D. ,3ez a / / / 1J81+94 1362+J5 �' /P� ' STATIONING & CONSTRUCTION LIMITS m e TOPSOIL SEGREGATION AREA /m/ 7 N LL -17-086 LL -17-086 LL -17-085 N/F N/F LL -17-089 RONALD D. LOCKE TRUST & RONALD D. LOCKE TRUST & N/F �I �I T fI N/F r' ,- AUDREY LOCKE SHEARIN to AUDREY LOCKE SHEARIN JAMES I.A. HARDEE TRUSTEE C/0 AUDREY TRUSTEE C/0 AUDREY SAMK & PARCEL D. @0401213 I I I I BOBBY R. TAYLOR y-'�� „ LOCKE SHEARIN TRUSTEE LOCKE SHEARIN TRUSTEE 1908 LF PARCEL I.D. #0402598 PARCEL I.D. X40401655 PARCEL $0401655 4080 LF 6I.D. ]90 LF 85 LF I I PROPERTY OWNERSHIP 0 + 1 UmPI J � 1377+ flD. OO J O W=as LF Nvo Z o Z z J O E J � v W V� w ayo 711.67 IN LF _SHLHOIo, �� m 00 0 4 azz N F ms� D<wp � VUig . . . -10 - 77 �ohiffiam z = H. O co co zo � In U N/F1 A\ SCALE: AS SHOWN DATE: 09/29/17 E DRAWN: GPT • • � E E 400' CHECKED: DLH APPROVED : NET PIPE SPECIFICATION 7 gai consultants - NC, in 0 0 0 0 0 0 0 + T + + 0 0 0 0 FF 0 0 0 0 0 l o o f o 0 111 Igo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FF 0 FF 0 FF o o o FF 0 FF 0 FF D 4198 CO% ROAD E114 X X Yd GLEN ALLEN, VA 23060 804-2]0-935] N.C. COL XF-0269 r x X 1383+60 E m 1382+69 Ipp i °'w' z J RIGHT OF WAY rl ELEC OVERHEAD z w N o_ p z p 1383+46 " 1382+86 m o w 0 0- RIGHT OF WAY f X Xo °i FENCE 13a2+96 W 13s3+3s =- STRING VIEW BAND EDGE OF HEATHSVILLE RDrl It EDGE OF HEATHSVILLE RD NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNABMDATUM.EONEIT.US 3UWUFO0TCENTRALMERIDNNSl-W. — PROPERTY LINE --------- STORM SEWER \7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURSAND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY M CONSULTANTS. INC FROM II -0B2014 THRU-7.2014. N EEA TH. FENCE(BSRF) NRESSHOWNLAREBASE E%TRA WORK SPADE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG 4. THEE PROFEOFH DONGI38TPX ASBESSMENi RECORDS (PROVIDED BYOTHERS). G4I LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPREBSEOORIMFLIEOAS TO THE —X—X— FENCE E UNDERGROUND ELECTRIC COIR LOG ACCURACY OF TIE RECORDS AS SHOWNON THESE DRAWINGS. a STREAM CROSSING 5. STREAM AND WETIANDOATA SHOWNON THEDRAWINGS WAS PROVOED BY ERM. 6. EROSION AND SEDIMEMATION CONTROL ELEMEMS MAYSESHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACTUAL INSTALLATION SHAH BEWITHIN THEWORKAREAS. PROJECT N0. DASH N0. — — STREAM W WATERLINE COMPOST FILTER SOCK NINGSROWNISSLOPESTARONING. PROPOSED TEMPORARY R.O.W.LISP �n ORANGE SAFETY FENCEKSHALLBEINSTALLEDPARALLELTOC%NITIRTOE%TENTPRACTCAaLEINALCOROANCEWITHSTANDARDOETAIL ® AREA OF NO DISTURBANCE O WITH ENHANCED WITH ENHANCED CONTROLS C140488 TED.J EXISTING ROADS ND IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENT3.3) EXISTING ROADS MAJOR IMPROVEMENTS —G G— EXISTING GAS PIPELINE SAN SANITARY SEWER ROADSIDE DITLK 9. ACCESSROADSHAV APPROPRIATE EROSIOAND CASEDIMENT IMENT CON CONSTRUCTION ENTRANCE WITH OITCX DRAMA EW ROADS. FEATURSWEROSIONANDDFOR NTCONTCAT WILL BE PROVIDED FOR ROADS IN C4TEGORIES2,3NND4. ROADS IN CATECARIESIANOR HAVEADEOUATE E%ISTING GH OVERHEAD UTILITY LINES EDGE OF GRAVEL ® WETLAND �( DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES AND 4. N UTILITY POLE LU LVERT A6 NEEDED CG,� SOIL TYPE 10. E FORTHE NATUREANDLOCATIONOFTHEDEPICTED BMPGASOFTHEDATE SIGNEDANDSENLED BA BE. ON THE SOURCE OATH PROVIDED AND AS DESCRIBED IN THE TASK NO. OG5 SUE TASK NO. 00 •o rcaviDE CLunr axLT CULVERT!ACCESS ROAD WATERBARS A GENERALIZED SURFACE WATER FLOW WATERBAR C.HFIGURATI0NEl6 DEPICTED IN PLANNEW SASEOON INFORMATIONCURRENTLY AVAILABLE WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASSOON CONDITIONS ACCESS ROAD PROPOSED PERMANENT EASEMENT 1 , . OBSERVEDATTHETIMEOFcoNSTRUCTION. NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE TC TURBIDITY CURTAIN (PLAN VIEW) � SURFACE WATER FLOW WITHIN NOW THEOONRGURAnOry D111 EO Iry ILAI VIEWAPPUES To eons TEMPORARYAND PERMANENT WATERBARSAS APPROPRIATE GROUP D DRAWING NO. BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) PROPOSED GAS PIPELINE PROPOSED GAS PIPELINE NO GROUND SURVEY) EAS CONTROL DESIGN COMPLETEDO' D E033 33 OF 189 � STYRBIOITY SAMPLING LOCATION (PLAN VIEW) SO' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) WATERBAR (PLAN VIEW) HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 CAI Consultants, Inc. NOTE: 600 STATIONING SHOWN ON 1537+90 EDGE OF SNEED RD. 1538+25 F F F F EDGE OF 71 El 771 ZI SNEED RD. 600 THE DRAWING IS BASED '^ > N `" ON SLOPE MEASUREMENTS. 500 o S� - '-' sem, i+ sN 500 400 ou + -, -: -: 400 o 300-2 Ila L - - 300 200 + o + + +' 0 0 0 0 0 0 0 0 0 o + 0 0 0 0 0 0 + 0 0 0 0 0 0 0 �1---�I 200 (n 1�---- o -1 -1 - ---- ----- - - - - - - - - ----- - - - - --- ---�-- --------�------------------4-- --- ----- -------- ---- ----- ---- -- 100 <5% <59. <5% <5% <59. <59. <5% 100 (n PROFILE VIEW <5z _ > HORZ: 1" = 200' D LLI VERT: 1" = 200' D 1537+57 1538+19 1537+6 I I 1538+26 N N� ww v N w����T�-��-�I-��'�-��-�� PROPOSED TEMPORARY R.O.W. P I I S A W 17� 7-/r17si ri �-rm�r,S T n �-rrrrr /��Z/1 ri 1--' Y2 l� T 71 r! N PROPOSED PERMANENT R.O.W. ti _ _ PROPOSED PERMANENT R.O.W. PROPOSED 36" AP-2 PIPELINE /:7 T PROPOSED TEMPORARY R.O.W. 153+92 m 1s3e+s� 1 t5 7+99 p 1538+61 1 TOPSOIL SEGREGAT`ONAREA - w e Iol R _ S n STATIONING & CONSTRUCTION LIMITS �< w w w a 1538+05 ' } - - LL-17-096 LL-1]-097 LL-17-098 LL-17-099 LL-17-100 LL-1]-101 ul IN .LIVER EARL OVERTON II mI OUVER EARL OVERTON II NI EARL G ADKINS AI wI PATRICIA HARRIS ROBERT B JERNFELL TRUSTEE N/F N/F N/F N/F N/F _ '- Ipr'' & PAULA JERNELL TRUSTEE PARCEL I.D. $0401973 PARCEL I.D. X0401974 PARCEL I.D. $0400179 EARL G ADKINS PARCEL I.D. k060122].; REVOCABLE TRUST I I 863 LF I 907 LF I 879 LF I PARCEL I.D. X0400182 I 7306 LF PARCEL I.D. #0401979 409 LF 3814 LF PROPERTY OWNERSHIP - r �rPAT,o o n J STRUCTURE NETLAND! \\ \ \ O z WSs2 W + \ MILE 30 Z Ed Lo J O a 04 OF ,\ o EL o z 6 os T U-17-0117 ( FF N/F N OUNER PI tILJ�114081 / O r v v i WHILH020F It O=MERUNEU TRUSTEEi i v UST / v v PARCEL I.D. 19" 'I A •� �� / 00 SCALE: AS SHOWN DATE: 09/29/17 DRAWN: GPT • 0 E• \ \ (\ l I CHECKED: DLH APPROVED : NET PIPE SPECIFICATION 1537+90 1538+25 EDGE OF SNEED �n DGE OF SNEED gai Consultants - NC, in N o 0 0 0 0 0 o I I o o 0 0 0 0 0 0 0 o o 0 0 0 0 0 0 o 4198 COX ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 o .C. COL dF-0269 ( EllFFN xF' FF xF El NSU Nov STRING VIEW BAND - NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHMADASDATUMZONEI7.US 3URVEYFO0T.CENTRALMERIDNNS1-W. — PROPERTY LINE --------- STORM SEWER \7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONFOURSAND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY M CONSULTANTS. INC FROM 11-0&2014 THIRD —7.2014 N FENCE(BSRF) ­TRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG 4. THEE PROFEOFH GONGI38TPX ASSESSMENT RECORDS (PROVIDED BYOTHERS). G4I CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSEOORIMFLIEOAS TO THE NNESSHOW IEBASE —X—X— FENCE E UNDERGROUND ELECTRIC COIR LOG ACCURACY OF THE RECORDS AS SHOWNON THESE DRAWINGS. STREAM CROSS INC 5. STREAMANDWETIAND DATASHOWN ON THEDRAWINGS WAS PROVIDED BY ERM. 6. EROSION ANING SH ENTATION DOMROL ELEMEMS MAYSESHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACTUAL INSTALLATION SHALL BEWITHIN THEWORPAREAS. - - - STREAM W WATERLINE p COMPOST FILTER SOCK NING SHOWN IS SLOPESTATONINE PROPOSED TEMPORARY R.O.W.LISPALLITAT' ® AREA OF NO DISTURBANCE O �n ORANGE SAFETY FENCE KSHALLBE INSTALLEDPARALLEL TO CONTOUR TO E%TENTPRALTCAELEIN eLCOROANLEWITH3TANDAROOETAIL PROJECT N0. DASH NO. C14G466 WITH ENHANCED CONTROLS WITH ENHANCED CONTROLS TER.J EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING RGAOS MINOR IMPROVEMENT3.3) EXISTING ROADS MAJOR IMPROVEMENTS —G G— EXISTING GAS PIPELINE SAN SANITARY SEWER ROADSIDE DITCH 9. ACCE I NEWRSHA EBENLGIATE EROSIOAND CADIMENT CON CONSTRUCTION ENTRANCE WITH DITCH AMC4INEWRAINAGE PPROPRKTE EROSION SEDIMENT CAT WILL BE PROVIDED FOR MADS IN CATEGORIES2,3NND4. ROADS IN CATECARIESIANOR HAVEADEOUATE E%ISTING �( DRAINAGE;LELY RESPFEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. GH OVERHEAD UTILITY LINES EDGE OF GRAVEL ® WE xsxoxwD •o rcavio. cLunr axLT N UTILITY POLE � CULVERT A6 NEEDED CG,� SOIL TYPE 10. EFOR THE NANREAND LOCATION OF THEDEPICTED BMPG AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOTES OFTHATI0NIN— NAN TASK NO. OGS SUE TASK NO. OO ('ROUP D DRAWING NO. CULVERT!ACCESS ROA. WATERBARS A GENERALIZED SURFACE WATER FLOW ESEDDON I6 DHEETEDINP WBASEDONINFORMATIONCURRENTLYAVAIIABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED ASNEEDED BASED ON CONDITIONS ONFI TME IO cory DEPICTED IN ACCESS ROAD PROPOSED PERMANENT EASEMENT 1 OBSERVED CONFIGURATION NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE TC TURBIDITY CURTAIN IPLAN VIEW) SURFACE WATER FLOW WITHIN NOW -CONFIGURATION D1111111 11 PLAry vIEWAPPLIES To BOTH TEMPOReRYANDPERMANErvT WATERBARS, Al APPROPRIATE. (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) PROPOSE. GAS PIPELINE SS R� R� R� SS PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM O' (♦ STYRBI.ITY SAMPLING LOCATION (PLAN VIEW) D E036 SO' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) 36 OF 189 HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: 700 2171,73 EDGE OF 700 STATIONING SHOWN ON THE DRAWING IS BASED STREAM suaeo25 ON SLOPE MEASUREMENTS. 600 21]5+09 2EOB+70 600 CL OF STREAM SNM026 CL OF STREAM SNAB103 500 EE EE 21 �l l�N�l IoN X�ll l=N 500 400 £+ £+ £+ E} £+ <+. m X 400 - 300 NN AJ > IAN " N N N N N N > o m N o _ 300 co Z m 0 o o 0 0 0 + + o 2oa + o o 0 0 0 0 0 0 0 a S J o---------- 2 °° z — PROFILE VIEW o l — -------I----- ---- ----- --- ---- ---- ---------- --------------o LL_----- - > __ '----11 --- — <5% <59. <5% 5-10% <5% <5% <59. <5% <5% <5%5-10% <5% <5% <5% 5% <5% 5-10% <5% <5% 5-109. HORZ: 1" = 200 a w Of VERT: 1" = 200' (oa (oa 2210+95 PROPOSED TEMPORARY R.O.W. " E Mt PROPOSED PERMANENT R.O.W. —T7A PROPOSED 36" AP-2 PIPELINE N PROPOSED PERMANENT R.O.W. //T/� �T��1 PROPOSED TEMPORARY R.O.W. i__T1� - lz STATIONING & TOPSOIL SEGREGATION AREA _ w 7 m w m .A CONSTRUCTION LIMITS 1M1� LL-18-049 LL-18-052 m N/F N/F LL-18-054 LL-18-055 LL-18-056 LL-18-058 �I oI 7 - JACKIE 5. & TONY RAY & N/F N/F N/F N/F RANDALL K. & MARTHA S. BENNETT ET AL Im DONNA SUE RUFFNER LOTTIE S. ENNIS WI AI MARTHA 5. BENNETT �I LAURA ANN DEHART PARCEL I.D. LL-18-051 JENNIFR B. BRITT PARCEL# 023147 - PARCEL I.D. /025088 .I. •025119 I I N/F PARCEL I.D. 1022010 I PARCEL I.D. •000483 I PARCEL I.D. •0004841 964 LF WILLIAM H. JR. & 1525 LF 522 LF 305 LF 829 LF I 201] LF BRENDA S. TAYLOR PARCEL PROPERTY OWNERSHIP 9;D.L1021818 NNA SUE RU ER 2017 LFa2' 1 1 1 / l S�4 �1 (� N 04 V A ( ( I 2 H"' J 1 03 U WOE° I O z W=s2 IF Jo / / J w p a BRENDA TAYLOR �� ELJ ( / r LIEt a _ aye / NI/. CVS QSME PARCEL D. 111 8 I Z o Q 2 aw z o LAURA ANN DENI PARCEL 25088 QSo �z� N LL-18-0/LID LL-18-053 r �ci ci8c 525 LF RANDALL KMARTHA 1 ,2m ---- : '11111114',L, oNI g /,' Rik P JENNIFER B. 1 2200+9 1 1 2162 09 30 LF / / U \\\ Z �1 SIR FIE rt SCALE: AS SHOWN DATE: 09/29/17 2171+63 mW D..., • • DRAWN GPT ' IE S. ENNISJ5 PARCEL I.D. 025112 FDE # 9:2 LF • • • • • , • 4 LF CHECKED: DLH APPROVED: NET [PIPE SPECIFICATION 2171+73 2171+09 2208+70 EDGE OF X CL OF STREAM SNAB103 STREAM SNAH025 CL OF STREAM SNAH026 SNI gai COnSUltan[5 - NC, in 4198 C ROAD ofmo l E 114 GLEN ALLEN, VA 23060 804-2]0-935] N.C. COL dF-0269 £ £ f £ £ ;l l lNNI zN poll loo N �NFEX STRING VIEW BAND NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UFMWITHNADMWUM,Z0NEI7.U8 3URVEYFO0TCENTRALMERIDANSl-W. — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOLMAND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY G4 CONSULTANTS. INC FROM II-0B2014 THRU-7.2014. N EEA TH. FENCE(BSRF) E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG 4. THEE PROFERn LI DON GI38TPX ASBESSMENi RECORDS(PROVIDED BYOTHERS). GAI LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPREBSEOORIMFLIEOAS TO THE NREB NOWNLAREBASE —X—X— FENCE E UNDERGROUND ELECTRIC COIR LOG ACCURACYOF THERECOROB AB BHOWNON THESE DRAWINGS. STREAM CROSSING 5. STREAM AND WEVINENTATA SHOWNON THEDRAWINW WAS PROVOED BY ERM. 6. EROSION AND SEDIMEMATION CONTROL ELEMEMS MAYSESHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACNPL INSTALLATION SHALL BEWITHIN THEWORMAREAS. — — STREAM W WATERLINE a COMPOST FILTER BOCK NINGSROWNISSLOPESTARONING. PROPOSED TEMPORARY R.O.W.LISP ® AREA OF NO DISTURBANCE O �n ORANGE SAFETY FENCE KSHALL BE INSTALLEDPARALLEL TO CONTOUR TO E%TENTPRACRCAELE IN ALLORDANLEWITHBTANDARDDETAIL PROJECT LA0. DASH LA0. C1404E8 WITH ENHANCED CONTROLS WITH ENHANCED CONTROLS TES.J EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENT3.3) EXISTING ROADS MAJOR IMPROVEMENTS —G G— EXISTING GAS PIPELINE SAN SANITARY SEWER ROADSIDE DITLK S. ACCESSROADSHA EBENLGINTE EROSIOAND CADIMENT CON CONSTRUCTION ENTRANCE WITH OITCX DRANA WROADS. FEATURES PRENDDFOR ROADS I CAT WILL BE PROVIDED FOR ROADS IN CATEGORIES2,3NND4. ROADS IN GITEDARIESIANOR HAVEADEOUATE E%ISTING �( DRAINAGE; DRAINAGE FEANRES WILL BE PROVIDED FOR ROADS IN CATEGORIES AND 4. N UTILITY POLE LU EVERT AS NEEDED CG,� SOIL TYPE 10. RESPONSIBLE REANDLOCATIONOFTHEDEPICTED BMPGASOFTHEDATE SIGNEOANOSEALED BAEEOON THE SOURCE OATH PROVIDED AND AS DESCRIBED IN THE GH OVERHEAD UTILITY LINES EDGE OF GRAVEL ® WEFLANIrD,o TASK NO. OGS SUE TASK NO. 00 rcavioE clunr axLVl �CULVERTACCESS ROAD WATERBARS A GENERALIZED SURFACE WATER FLOW WAiERBARCONFIGUIN OF RATI0NEI6 DEPICTED IEET N PLANNEW SASEOON INFORMATIONCURRENTLY AVAILABLE WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASSOON CONDITIONS ACCESS ROAD PROPOSED PERMANENT EASEMENT 1 OBSERVEDATTHETIMFOFcoNSTRUCTION. THECONRCURAHory DEPICTED Iry PLAN VIEWAPPUFS To eons TEMPORARYAND PERMANENT WATERBARS, Al APPROPRIATE. NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE TC TURBIDITY CURTAIN (PLAN VIEW) � SURFACE WATER FLOW WITHIN ROW GROUP D DRAWING NO. PROPOSE. GAS PIPELINE PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) D E048 48 OF 189 � STYRBIOITY SAMPLING LOCATION (PLAN VIEW) O' SO' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) WATERBAR (PLAN VIESN MIS DRAWING WAS PRODUCED WITH COMPUTER LADED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: 600 I, —2276+33 Cr RED OAK BATTLEBORO RD 2296+61 ICL OF STREAM SNAC001 600 STATIONING SHOWN ON 0 THE DRAWING IS BASED ON SLOPE MEASUREMENTS. 500 E 1 1 22]6+07 FRED OAK BATTLEBORo RD m m E E m E I� I� I� SN o_I=I Io_ 500 5N �N 2275+90 5N SN SN SN SN SN+` 400 oN fV _ RIGHT OF WAY £+ f fN z z E zo KU o 400 0 0 11�'T�I ISN ITw - 300 N N N N N TPoI J 1<�' � N 300 m m a + + 0 0 2000 0 0 N o 0 0 -- — — a ml + + m w 0 0 0 0 0 0 0 0 0 0 0 — — A. — — ----- ---- ----- ---- o Po 0 o N + o 0 0 0 — — — — — — ----- ---- —�� — — — l_ l J - 0 0 0 L o1 0 0 0 0 ---- ---- ----- ---- --- --- 0 0 o ---- ---- -- 200 [n 100 <5% 5-109 <59. 5-10% <5%<5% <5% <59. <53 10-203 <5% <5% 5-109, <5% <53 <59. <5% <5% 00 n _ (n PROFILE VIEW - > HORZ: 1" = 200' W VERT: 1" = 200' 0 0 \ \ 2276+33 2276+42 N a �� PROPOSED TEMPORARY R.O.W. o + Z > LT LT T LT1T17 -T1T1T r r r PROPOSED PERMANENT R.O.W. PROPOSED 36" AP -2 PIPELINE �71PROP. 222 66+612 1/7/ N T PROPOSED PERMANENT R.O.W. ES D TEMP/�O �T _ STATIONING & CONSTRUCTION CONSTRUCTION LIMITS w w O N ISI 2276+0' 22]6+09 a 0 e 0 0 0 m TOPSOIL SEGREGATION AREA J W k - } ' _ 7 k i LL -18-058-A006 N/F LL -18-058-A006 �I IN N/F mI LL-18-058-AO07 N/F mILL-18-058-AO091� LL -18-058-A010 N/F eI LL- 18-058-AO10 I I N/F - WILLIAM R &BARBARA RAY DEANS PARCEL I.D. A 022453 WILLIAM R & BARBARA RAY WILLIAM I I DEANS I R & BARBARA RAY N/F DEANS ISIDNEY HOWARD I W A In& JAMES C JONES PARCEL I.D. i1 023645 I LL -18-058-A014 W A III & I I JAMES C JONES 1867 LF PARCEL I.D. 9 022453 PARCEL I.D. i1 038328 SHEARIN III 1780 LF N/F PARCEL I.D. 023645 T ILF 1054 LF 681 LF PARCEL I.D. # WILUS EARL FISHER 612 PARCEL I.D. 022898 ? si PROPERTY OWNERSHIP 232 �F L �J ✓ FISHER FARMS ULC PARCEL I.E. # 022828 % j 0 0 + WOE PARCEL 111 024927 232 LIF IRA FISHER ve, N I t PAJOHN RCEL 1.0. 022820 04 .I �i,,.�� -- -- IN F rr 12 d N .; - DID o O �s W =104 N/F WILLS FISHER z W + Jg57 zD. # 022999 oo C14� " 111Lj z 17S'FIi:ZS1i1 �3F1#f6L) - LFFARE d_ 1 1 a y o WILLIAM R & BARBARA 15 CL F, 1 _N/F It BARBARA RA DEANS viPARCEL ID. # 022453 n T�—___ N 661 LIF WNACC dW z 0Om Z a i M¢ U g UB WWACDOSF r`30, ��TZII[i i z H — — v z Z \ s ir) 1g2.i LL -18- 58-AO10 Ig4� p\ Q U 3 i \ \\ ?SAUNDERS m Q FAMILY FARMS LLC r \ \ \ \ ANF Z _ —� \\ OU HE UJAMES p _—_—— — \ J 'S -160 N/F4. VA MARC& BARBARA RAY DEANS -. 1 \ LF \ rr12 EL # 022453 LF ;567 IIT i SCALE: AS SHOWN w I^ DATE: 09/29/17 _ — — — _— S4: �� DRAWN: GPT CHECKED: DLH Fi APPROVED: NET PIPE SPECIFICATION 2276+07 RED OAK BATREBORD RD 2276+33 2296+61 ICL OF STREAM SNAC001 9ai Consultants - NC, in _REG OAK BATTLEBORO RD m I SUIBE 104 ROAD o GLEN ALLEN, VA 23060 804-270-9357 0 N.C. COL dF-0269 7 SN 2275+90 ra 1 RIGHT OF WAY oN I IIP E E E E E SNI SNSN ISN SN ISN oN o oN o� o� o� £+ II 110 fN £+ f+ f+ £+fo STRING VIEW BAND >v NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNAEMDATUM,EONEIT.US 3URVEYFOOT.CENTRALMERIOMN61-W. — PROPERTY LINE --------- STORM SEWER \7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONFOURSAND TOPOGRAPHIC FEATURES WERE DERNED FROM LOAD DATA AND GPS SUBMETER GROUND N EEA TH. SURVEY PERFORMED BY M CONSULTANTS. INC FROM II -0&2014 THRU-72014. FENCE(BSRF) E%TRA WORK SPADE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG NREB NOWNLAREBASE 4. TH�EPROFERn LI DON G158TPX ASBESSMENi RECORDS(PROVIDED BYOTHERS). GAI LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPRESSEOORIMFLIE.AS TO THE —X—X— FENCE E UNDERGROUND ELECTRIC COIR LOG a STREAM CROSSING ACCURACY OF TIE RECORES AS BHOWN ON THESE DRAWINGS. 5. STREAM AND WEVINENTATA SHOWNON THEDRAWINW WAS PRWIDED BY ERM. 6. EROSION AND SEDIMEMATION CONTROL ELEMEMS MAYSESHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACNPL INSTALLATION SHALL BEWITHIN THEWORKAREAS. PROJECT N0. DASH N0. — — STREAM W WATERLINE ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W.LISP COMPOST FILTER SOCK �n ORANGE SAFETY FENCE WITH ENHANCED CONTROLS O WITH ENHANCED CONTROLS NINGSXOWNISSLOPESTATONING. KSHALL BE INSTALLEDPARALLEL TO CONTOUR TO E%TENTPRACTCAELE IN ALCORDANLEWITHBTANDARDDETAIL C1404E8 —G G— EXISTING GAS PIPELINE OH OVERHEAD UTILITY LINES SAN SANITARY SEWER EDGE OF GRAVEL ® IN -LAN. �( N UTILITY POLE ROADSIDE DITLX CONSTRUCTION ENTRANCE WITH OITCX LU LVERT AS NEEDED CG,� SOIL TYPE TED.J EXISTING ROADS NO IMPROVEMEMS, 9. ACCESSROADSHA EBENLGROUPEROSIOAND SEDIMETCON DRAINAEWRAINAGEAPPROPRIATE SWEROSIONVIDDFOR ROADS I CAT WILL BE PROVIDED FOR ROADS IN DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES AND 4. 10. EFORTHE N—REANDLOCATIONOFTHEDEPICTED BMPSASOFTHEOATE 2) EXISTING RCAOS MINOR IMPROVEMENT3.3) EXISTING ROA03 MAJOR IMPROVEMENTS CATEGORIES2,3NND4. ROADS IN GITECARIESIANOR HAVEADEOUATE EXISTING SIGNEOANOSEALED BA BE. ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE TASK NO. OG5 SUE TASK NO. 00 ACCESS ROAD PROPOSED PERMANENT •o rcavioE clunr axLT EASEMENT NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE CULVERT!ACCESS ROA. WATERBARS A GENERALIZED SURFACE TC TURBIDITY CURTAIN (PLAN VIEW) � SURFACE WATER FLOW WITHIN WATER FLOW WATERBAR C.NFIGURATI0NEl6 DEPICTED IN PLANNEW BASSOON INFORMATIONCURRENTLY AVAILABLE 1 OBSERVEDATTHETIMEOFcoNSTRUCTION. THECONFICURAno1 DEPICT. Iry PLAN VIEWAPPUES To eons ROW WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASSOON CONDITIONS TEMPORARYAND PERMANENT WATERBARS, Al AFPROPRIAT. GROUP D DRAWING NO. PROPOSE. GAS PIPELINE PROPOSED GAS PIPELINE (NO GROUND SURVEY) EAS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) D E050 50 OF 189 � STYRBI.ITY SAMPLING LOCATION (PLAN VIEW) O' SO' TURBIDITY AND T.S SAMPLING LOCATION (PLAN VIEW) WATERBAR (PLAN VIEW) THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. THIS DRAWING WAS PRODUCED WITH COMPUTER LADED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: 600 STATIONING SHOWN ON o o ISN X2426+83 OVERHEAD 2438+85 EDGE of RECEs R. T� 600 THE DRAWING IS BASED ON SLOPE MEASUREMENTS.RF 500 „ „FLED "" n�'w �o 2427+31 OVERHEAD f iA 500 SAS o_ o SNELEc E+ 400sem; gel 400 A' s T oT 2427+56 2439+7 8 - 300 m ,wa WETLAND WNAH022E RIGHT OF WAYAm 300 m + + m N HE + w A n n > n > n > n n > n > O OIr _ = n > n n A 200 0 0 0 0 0 +o + o 0 ED 0 m o 0 0 o a m o N 0 0 + o +' + + + + +' o o + o � N + + o o N N v v w w + +' + + + + o o----- 200 3 z OL — L a rc 100 PROFILE VIEW 5-tOR — — — — — — — — — — ----- ---- ---- ---- 5-109> <5% <W% <s1e — — ---- ---- — — — — _L—O ____ <5% — — — — — — — — — — — — — — 15. ---- ---- — <s� 100 (n > HORZ: 1" = 200' - LLI VERT: 1" = 200' 0 0 PROPOSED TEMPORARY R.O.W. I m PROPOSED PERMANENT R.O.W. g PROPOSED 36" AP -2 PIPELINE PROPOSED PERMANENT R.O.W. OR PROPOSE PM YR.O.W. STATIONING & r CONSTRUCTION LIMITS k LL -18-085 LL -18-083 N/F RAYMOND G. & u w LL -18-086 U N//F O' HOMER C. JR. & LL -18-090 LL -18-091 LL -18-094 / F / f } N/F JENNIFER JALETTE CARMEN T. PIKE N F AI / NI N F / JI LL -18-092 �I N/F mI + f TC SARA FRANCES PARCEL I.D. p023688 22 LFA PARCEL I.D. 8022462 LL -18-089 IN 393 L'F ROBERT A. GLOVER N/F BRENDA REGES SHAW ET AL N/F RACHAEL POWELL ERVIN PARCEL I.D. '- JONES RODRIGUEZ PARCEL I.D. /002666 MARGARET W. MAY ET AL II I I PARCEL I.D. /005125 I I R. D. G. REAL ESTATE LLC I p002829 669 LF PARCEL I.D. $024426 LL -18-087 3646 LF LL -18-087 ROW ONLY PARCEL I.D. #003892 495 LF PARCEL I.D. #066857 LF N/F N/F 2650 IF 1587 LF 1082 BRYAN DAVID FRITSCH BRYAN DAVID FRITSCH 60 Lf PARCEL I.D. 034194 PARCEL I.D. gg 034194 •1 PROPERTY OWNERSHIP ROW ONLY 362 IF 68 Ll WWII o 0 rn M N ;2 U J U O W + Zu7o J H.� W VV11 JO W WN a¢ F N Ez N ~ a o CL Qom OU Q g E z HOE �O Z O U M z U 3 ~ � a 1 z 1 SCALE: AS SHOWN DATE: 09/01/17 �_ �• P L P DRAWN : GPT CHECKED: DLIV CUSS II APPROVED: NET G B +F+ B- F F :D° PIPE SPECIFICATION NOT To scA(E 8 S TEST N6 8 DUKE POWER LINE $ PIPE LEGEND IIj'2426+83 ELEc ovERNEAD 2427+31 2438+85 EDGE OF REGES RD 9ai consultants - NC, in A 36"X 0.515" WT -X70 DSAW, FBE ELEC OVERHEAD B 36"X 0.618" WT -X70 DSAW, FEE N C 36"X 0.741" WT -X70 OSAW, FEE O_ O 4198 COX ROAD SUITE 114 D 36"X 0.741" WT -X70 DSAW, RD X/HDD D I GLEN ALLEN, VA 23060 E 36"X 0.515" WT -X70 DSAW, 5 Yi" CC o 0 D, 0 D, 0 0 o 0 0 0 0 0 0 0 0 0 0 o o 0 0 0 0 o o 804-270-9357 F 36'X 0.618" WT -X70 DSAW, 5" CC N.C. COL dF-0269 G 36"X 0.741" WT -X70 DSAW, 4" CC2399+4r' 3 E EDGE OF 2438+78 f RIGHT OF WAY PIG BASKET CREEK n+ z N ^+ A SNAH009 o o Z Z All o 2399+73 m EDGE OF o o i 2427+56 + o m STRING VIEW BAND PIc BASKET CREEK SNPH009 WETLAND WNAH022EIII NOTES: LEGEND V PERMANENTWATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNADMDATUM.ZONE17.US 3UWEYFO0T.CENTRALMERIDIANS1-W. — PROPERTY LINE --------- STORM SEWER TEMPORARY WATERBARISLOPE BREAKER E—A WORK SPADE ® TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG - -- BELTED SILT RETENTION FENCE(BSRF) 2. CONTOURSAND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND 3 IMIGERYTANUNFROMGCOGLEEARTH. 4. THEPROFERTY UNE SSHOWN IEBASE ONGISA TAX ASSESSMENT RECORDS (PRONGED BYO THERE). SURVEY PERFORMED BY GAI CONSULTANTS. INC FROM II -0B2014 FRED 1 72014. GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE X X FENCE E UNDERGROUND ELECTRIC COIR LOG ACCURACY OF THE RECORDEAS SHO WN ON THESE DRAWINGS. PROJECT N0. DASH NO. STREAM CROSSING 5. STREAMANDWETIAND DATASHOWN ON THEDRAWINGS WAS PROVIDED BY ERM. B EROSION ANO SEDIMENTATION CONTROL ELEM NDS MAYSESHOWN OUTSDE OF THE WORN AREAS FOR CLARITY ONLY.ACRIPL INSTALLATION SHNL BE WITHIN THE WORKAPEAS. STREAM W WATERLINE ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. O USFWS STREAM CROSSING COMPOST FILTER SOCK ORANGE SAFETY FENCE NINGSHOWNISELOPESTARONING. ONMIJBTO E%TENT PRALRCPB-IN SILT FENCE AND FILTERSOCK SH4LL BE INSTALLED PARALLEL iOL ALCORGANLEWITH STANDAROOETAIL C14O488 —G G— EXISTING GAS PIPELINE OH OVERHEAD UTILITY LINES SAN SANITARY SEWER EDGE OF GRAVEL WITH ENHANCED CONTROLS _ CONSTRUCTION ENTRANCE WITH OITCX WETLAND UTILITY POLE — CULVERT AS NEEDED �. � /��,�,� ROADSIDE DITCH SOIL TYPE 9. ACCESS ROADS HAVE BEEN GRODPEOINTO FWRCATEGORIE31)E%ISTING ROADS NO IMPROVEMENTS,2IEXISTING ROADS MINORIMPROVEMENTS. 3)EXISTING ROADS MAJOR IMPROVEMENTS AND4INEWROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES2, 3AND4. ROADSINCATEWRIESIAND2HAVEADEOUATEE%ISTING DRAINAGE: DRAINAGE FFATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 10.' ERM IS SOLELY RESPONSIBLE TEE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE TASK NO. 005 SUB TASK NO. 00 ACCESS ROAD PROPOSED PERMANENT EASEMENT coLax sxoxw •o rcavioc ccunv axLVl CULVERT ACCESS ROAD WATERBARS NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE A IN OF EET OF GENERALIZED SURFACE WATER FLOW WA .IE,CONFIGURATI0NEI6 DEPICTED IN PLANNEW BASEDON INFORMATIONWRRENTLYAVAILABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED A3 NEEDED BASSOON CONDITIONS 1 OBSERVED AT NFIGUA OF corvsT TSCA. TXECONFIBASIEFFILEATIll DEPICTED Iry DIDLAN VIEWAAVALADO I'll TEMPORARYANDATION AYBENT FIELD ARSSTED AS Al NEEDEE. SURFACE WATER FLOW WITHIN NOW GROUP ID DRAWING NO. PROPOSED GAS PIPELINE PROPOSED GAS PIPELINE NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) D E054 54 OF 189 —:— INATERBAR(PLAN VIEW) THIS DRAWING WAS PRODUCED WITH COMPUTER LADED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: 600 2439+18 Iz 2489+79 2490+15 600 STATIONING SHOWN ON THE DRAWING IS BASEDvN EDGE OF FECES RD F Ill F F F z z EDGE OF 164 \_ III WESTBOUND EDGE OF 164 F m EASTBOUND 2FENCE88 2 2FeNce° ON SLOPE MEASUREMENTS. 500 to tom& z+IIANg zp 500 400 w F`" ; 2490+95 OF WAV > 400 Ilam o� oa o`�I lo"' ow oA D^'� n. ^RIGHT 1 A300HT 2439+38 OF WAY < n K200 300 r1l m _ —---- — — --- — zoa vv v—� _ — -- --- — ---- --- 0% -10% <5% <5% 5-10% N----- N----�N Q 100 ----<5% — — ---- -- — ---- — — -----1-- ---- — -- — — —� - 15% F-109 -209 100 z (n PROFILE VIEW <59. sranoN EQuanoN > HORZ: 1 �� = 200 STATION EQUATION STATION = 24]8+66.93 BK. STATION = 2473+06.25 BK. STATION 2478+31.53 AHD. w � VERT: 1" = 200' 0 = STATION = 2471+45.54 AHD. 0 2488+8707 LA PROPOSED TEMPORARY R.O.W. PROPOSED 36'" AP -2 PIPELINE PROPOSED PERMANENT R.O.W. g N S. PROPOSED PERMANENT R.O.W. T/T/777.. PROPOS�E���� jRY R.O.W.�_L���GLL ��4ae+7s / 2aea Jae y N m o > N W t T STATIONING & 7 02 IWI Yk- CONSTRUCTION LIMITS Ow If LL-18-097N + LL -18-096 F LL -18-099 LL -18-100 LL -18-094 N/F LL -18-096 mI u F u N/F ± a STEVEN A. NEWCOMBE CHRISTOPHER R. N/F NI &HEATHER B. VANN NI - _ I� RACHAEL POWELL ERVIN PARCE2o 6 $002829 N/F Pi I STEVEN A. NEWCOMBE a PARCEL I.D. /103285 I PARCEL I.D. #103285 I 585 LF I WESTHAMPTON ESTATES LLC IU PARCEL I.D. #303644 STEVEN A. NEWCOMBE LL -18-101 PARCEL I.D. $ 046305 PARCEL I.D. $032061 LL -18-096 274 SF I ROW ONLY 1777 LF THREE N MR. LTD 60 LF 319 OF I STEVEN A. /NEWCOMBE 237 SF PARTNERSHIP PARCEL I.D. #103285 PARCEL I.D. #021051 I 2327 LF I PROPERTY OWNERSHIP 118 LF ' d]iX4I+IIS ,—_-- o 04 O J m H-' LEE W LUJ _ w N O_ CL m NN z Q a w z z O o m �ZCD U� s 0 FE RPM Q N Z O ® ® 1�3) I7yZ'•SII•:) SCALE: AS SHOWN DATE: 09/29/17 WE E DRAWN: GPT .9 - •E � LE .9� CHECKED: DLH APPROVED : NET PIPE SPECIFICATION 2439+18 EDGE OF REGES RD STATION EQUATION 2489+]9 + 15 STATION = 2473+06.25 BK. EDGE OF ND EDGE OF 164 WESTBOUND EASTBOUND 9ai COnSUltan[5 - NC, in g I I I STATION = 2471+45.54 AHD. x i w g g ml I SUITE 104 ROAD GLEN ALLEN, VA 23060 _ f f N 41 N N N rl 804-270-935] .C. COL dF-0269 2439+38 F RIGHTOF WAY z z EE z iv EE EE ra a iN pg ITA 2490+95 RIGHT OF WAY STATION EQUATION IIa> ro o> ro oA p -IIIA+ p p STATION = 24]8+66.93 BK. m mpl doll X2 TEN STATION 2478+31.53 AHD. FENCE IIF+ FN E+ F+ NI Io F F+ = I! SNI ~ox FFm o> 2`66+72K to STRING VIEW BAND n oFF FENCE NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNADMDATUM,Z0NE17.U8 3URVEYFOOTCENTRALMERIDIAN81-W. — PROPERTY LINE --------- STORM SEWER \7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURSAND TOPOGRAPHIC FEATURES WERE DERNED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY GN CONSULTANTS. INC FROM II -0B2014 THRU1 72014. N EEA TH. E—A WORK SPADE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG FENCE(BSRF) NNESSHOWNLAREBASE 4. THEE PROFED LI DON GI38TPX ASBESSMENi RECOR03(PROVIOEO BYOTHERS). G4I CONSULTANTS MAKE NO GUNWNTEE EITHER EXPREBSEOORIMFLIEOAS TO THE X ,\' FENCE — — STREAM E W UNDERGROUND ELECTRIC WATERLINE ® AREA OF NO DISTURBANCE 0i PROPOSED TEMPORARY R.O.W. O STREAM CROSSING USFWSSTREAMCROSSING COIR LOG ACCURACYOFRIERECOROSASSHOWNON THESE DRAWINGS. 5. EROSIOAN WETLANDDATASHOWNON THEDRAWINGS WAS PROVIDED BY ERM. B EROSION AND SEDIMENTATIONCONTROL ELEMEMS MAY BE SHOWN OUTSIDE OF THE WORN AREAS FOR CLARITY ONLY.ACRIPI INSTALLATION SHNL BE WITHIN THE WORKAPEAS. COMPOST FILTER SOCK NINGSHOWNISSLOPESTATIONINE �n ORANGE SAFETY FENCE KSH4LLBEINSTALLEDPARALLELiOCONTOURTOE%TENTPRACRCPBLEINALLORDANLEWITHSTANOARDDETAIL PROJECT N0. DASH N0. C140488 —G G— EXISTING GAS PIPELINE SAN OH OVERHEAD UTILITY ONES SANITARY SEWER EDGE OF GRAVEL ® W -LA.. N UTILITY POLE '� �( WITH ENHANCED CONTROLS CONSTRUCTION ENTRANCE WITH..TO. CU LVERT AS NEEOEO BB'SIIE%ISTINGROADS NOIMPROVEM" 2)EXISTING ROADSMINORIMPROVEMENT3.3)EXISTINGROADSMAJORIMPROVEMENTS ROADSIDE DITCH 9� ACCESSROADSHA EBENLGROUPEROSIOAND CASEDIMENT IMENT CON AN041NY DFANS.APPROPRSWERBE PRENDDFOR NTCONTCAT WILL BE PROVIDED FOR ROADS IN CATEGORIES2,3AL4D4. ROADS IN GITECARIESIANOR HAVEADEOUATE E%ISTING DRAINAGS ORAIrvAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. CG,� SOIL TYPE 10. RESPONSIBLEFORTHE N—REANDLOCATIONOFTHEDEPICIED SMPSASOFTHEDATE SIGNEDANDEEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE SECTOR F TASK NO. OG5 SUB TASK NO. 00 ACCESS ROAD PROPOSED PERMANENT EASEMENT •o rcavioE cuvnr axLVl NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE TC CULVERTACCESS ROAD WATERBARS TURBIDITY CURTAIN (PLAN VIEW) A GENERALIZED SURFACE WATER FLOW WATERBARCONFIGUTIONEIEFGDCTEDIN PLANNEW BASEOONINFORMATIONCURRENTLYAVNIABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS 11 � SURFACE WATER FLOW WITHIN ROW OBSERNEDATTHETIMFOFcoNSTRUCTION. THECONRGURAnory OEPICTEO Iry PLAN VIEWAPPUFS TO BOTHTEMPORARYAND PERMANERT WATERBARS Al APPROPRIATE. GROUP D DRAWING NO. PROPOSE. GAS PIPELINE SS R� R� R� SS PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). � STYRBIOITY SAMPLING LOCATION (PLAN O' VIEW) Q WATERBAR OUTLET (PLAN VIEW) D E055 SO' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) 55 OF 189 HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. cD ED ED O K DO v ro 0 0 0 0 0 0 0 0 0 0 0 0 0 <5% <5% 15% <5% y PROPOSED TEMPORARY R.O.W. J1 Ti"T� ==_==7=7= (rim i ri riT .rrrrri f/T �r rrrrrriZ�—r r� rrrrrr/� PROPOSED PERMANENT R.O.W. DanvnOm z " Ap- DIDFI InIF o �L STATIONING & CONSTRUCTION LIMITS x �wx b v A + + o 0 0 0 <5% <5% <59. STATION EQUATION STATION 2697+40.25 BK. STATION 2696+75.13 AHL NOTE: 600 x x x = e f o o x x x+ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 STATIONING SHOWN ON 600 wi THE DRAWING IS BASED EE EE I X X x ~ NX ON SLOPE MEASUREMENTS. 500 m X N + + 0 N x N N m m m A T' m + + + + 400 0 0 0 0 — --+-----4 <5% 5% 300 + ^x `-"x LOD 200 — <5% PROFILE VIEW 100 5% HORZ: 1" = 200' VERT: 1" = 200' 0 TEMPORARY WATERBARISLOPE BREAKER 0 0 0 0 0 0 0 0 0 0 0 0 0 <5% <5% 15% <5% y PROPOSED TEMPORARY R.O.W. J1 Ti"T� ==_==7=7= (rim i ri riT .rrrrri f/T �r rrrrrriZ�—r r� rrrrrr/� PROPOSED PERMANENT R.O.W. DanvnOm z " Ap- DIDFI InIF o �L STATIONING & CONSTRUCTION LIMITS x �wx b v A + + o 0 0 0 <5% <5% <59. STATION EQUATION STATION 2697+40.25 BK. STATION 2696+75.13 AHL ax FZ NAI x x x = e f o o x x x+ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 zo 600 wi A>o +x EE EE I X X x ~ NX �� v N N m m o + + m X N + + 0 N x N N m m m A T' m + + + + 0 0 ------------- <5% 0 0 0 0 — --+-----4 <5% 5% 0 0 0 0 0 0 0 0 0 0 0 0 0 <5% <5% 15% <5% y PROPOSED TEMPORARY R.O.W. J1 Ti"T� ==_==7=7= (rim i ri riT .rrrrri f/T �r rrrrrriZ�—r r� rrrrrr/� PROPOSED PERMANENT R.O.W. DanvnOm z " Ap- DIDFI InIF o �L STATIONING & CONSTRUCTION LIMITS x �wx b v A + + o 0 0 0 <5% <5% <59. STATION EQUATION STATION 2697+40.25 BK. STATION 2696+75.13 AHL m ax FZ NAI x x x = e f o o x x x+ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 zo m JiJ♦ . +I.�� � � JiJfJ ------------------ LL -18-135 LL -18-136 LL -18-141 LL -18-143 N/F +o N/F LL -18-137 LL -18-139 LL -18-140 01 N/F N/F CHRISTOPHER A. N/P N/F FISHER FARMS LLC WILLIAM 0. CORBETT ET AL oIJEFFERY VAN & SHARN W. TYSON & KIMBERLY C. GRAY ul VI N/F N1 REGINALD LEE BONE PARCEL I.D. 303199 JI PARCEL I.D. X003300 JACKSON FISHER FARMS LLC TEDDY A. PROCTOR I R C/O ATTN: FAYE C. LENOX 452 LF I PARCEL I.D. y003249 I LL- 8-133 PARCEL I.D. #300298 I PARCEL I.D. ID04941 I PARCEL4'8.Lp002631 U.- /F142 372 LF 1 PARCEL I.D. M003414 321 LF 94 LF495 LF CHRISTOPHER L. & WENDY M. SANDY 1159 LF JEFFERY VAN & SHARN W. TYSON PARCEL I.D. @ 038856 PARCEL I.D. #003222 PROPERTY OWNERSHIP 8,9 LF ROW ONLY 2727 LF PIPE SPECIFICATION x x 0 0 0 0 0 0 x x x = e f o o x x x+ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 0 600 m I EE EE I X X x ~ 500 LEGEND 0 m 400 l 300 + ^x `-"x LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNADESDATUM,Z E17.US SURVEYFOOTCENTRALMERIDIAN81-W. 2011 5% --------- 5% 100 0 JiJ♦ . +I.�� � � JiJfJ ------------------ LL -18-135 LL -18-136 LL -18-141 LL -18-143 N/F +o N/F LL -18-137 LL -18-139 LL -18-140 01 N/F N/F CHRISTOPHER A. N/P N/F FISHER FARMS LLC WILLIAM 0. CORBETT ET AL oIJEFFERY VAN & SHARN W. TYSON & KIMBERLY C. GRAY ul VI N/F N1 REGINALD LEE BONE PARCEL I.D. 303199 JI PARCEL I.D. X003300 JACKSON FISHER FARMS LLC TEDDY A. PROCTOR I R C/O ATTN: FAYE C. LENOX 452 LF I PARCEL I.D. y003249 I LL- 8-133 PARCEL I.D. #300298 I PARCEL I.D. ID04941 I PARCEL4'8.Lp002631 U.- /F142 372 LF 1 PARCEL I.D. M003414 321 LF 94 LF495 LF CHRISTOPHER L. & WENDY M. SANDY 1159 LF JEFFERY VAN & SHARN W. TYSON PARCEL I.D. @ 038856 PARCEL I.D. #003222 PROPERTY OWNERSHIP 8,9 LF ROW ONLY 2727 LF PIPE SPECIFICATION x x 0 0 0 0 0 0 x x x = e f o o x x x+ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 0 N x EE EE I X X x ~ NOTES: LEGEND m o STATION EQ 2697+40.25 BK m o z m STATION = 2696+75.13 AHD. m f o o g l Ng> x o� + ^x `-"x LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNADESDATUM,Z E17.US SURVEYFOOTCENTRALMERIDIAN81-W. STRING VIEW BAND PROPERTY LINE --------- STORM SEWER HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. 0 W (r 7}t O O O n N U O J r. J Oa W= W + Z i ZL o J O E, W J Lp LLJ v� W a Q � CL 04 N �z H d W z Q O m Z U j G ego Z U 3 O U ~ m M a H N Z O U SCALE: AS SHOWN DATE: 09/29/17 DRAWN: GPT CHECKED: DLH APPROVED: NET gai consultants - NC, in 4198 COX ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 C. COL dF-0269 PROJECT N0. DASH NO. C140468 TASK NO. SUB TASK NO. 005 00 3ROUP ID DRAWING NO. D E059 59 OF 189 NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNADESDATUM,Z E17.US SURVEYFOOTCENTRALMERIDIAN81-W. — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ GROUND SURVEY PERFORMED BY GAI CONSULTANTS. INC FROM II4 THRU-72014. BELTED SILT RETENTION 2. CONTOURSANG TOPOGRAPHIC FEATURES WERE DERNED FROM LIDAR DATA AND GPS SUBMETERRV-0B201 N EEA TH. EXTRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG ENCS BSRF F ( ) 4. THEE PROFEOFLI GONGI38TPX ASBESSMENi RECORDS (PROVIDED BYOTHERS). G4I LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPREBSEOORIMFLIEOAS TO THE NNEBSHOWNLAREBASE X ,�' FENCE E UNDERGROUND ELECTRIC a STREAM CROSS INC COIR LOG ACCURACY OF TIE RECOROB AS BHOWNON THESE DRAWINGS. 5. STREAMANDWETIAND DATASHOWN ON THEDRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL ELEM NDEL WASHOWNOUBIYEOF THE WORK AFEAS FOR CLARITY ONLY.ACNPL INSTALLATION SHNL BE WITHIN THE WORKAPEAS. — — STREAM W WATERLINE ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W.ALLITAT' O` O USF WS STREAM CROSSING �n COMPOST FILTER SOCK NING SHOWN IS SLOPE STARONING. ORANGE SAFETY FENCE ONTOURTO E%TENT PRALTLPBLE IN ALWROANLE WITH STANDARD DETAIL �ENLGROUPEOENTOFWRCATEGORIES —G G— EXISTING GAS PIPELINE SAN SANITARY SEWER WITH ENHANCED CONTROLS 9. ACCESS ROADS HA 1) E%ISTING ROADS NO IMPROVEMEMS, 2I ISTING ROADSMINORIMPROVEMENTS.3)EISTINGROADSMAJORIMPRON ENT3 ROADSIDE DITCH GH OVERHEAD UTILITY LINES EDGE OF GRAVEL ® INETL­�( N UTILITY POLE CONSTRUCTION ENTRANCE WIT. OITCX CULVERT AS NEEDED CGi� AND4INEWROADS APPROPRKTE EROSION AND SEDIMENT CONTROLS WILL BE PRONDED FOR RGADS IN CATEGORIES2,3AND4. ROADSINCATEWRIESIAND2HAVEADEOUATEE%ISTING DRAINAGE: DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. E FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE SOIL TYPE 10.ES •o rcavioE cuvnr axLT �CULVERTACCESS ROAD WATERBARS A SELTON GENERALIZED SURFACE WATER FLOW WATERBARCONFIGUOF RATIONIS ACCESS ROAD PROPOSED PERMANENT EASEMENT NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE TC TURBIDITY CURTAIN (PLAN VIEW) � DEPICTED IN PIANNEW BASEOONINFORNIIIONWRRENTLYAVNIABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS 1 OBSERVEG ATTHE TIME OF CDNSTRUCTION. THECONFICURATIDN DEPICTED Iry PLAN VIEW APPLIES TO BDTH TEMPORARYAND PERMANENT WATERBARS, Al APPROPRIATE. SURFACE WATER FLOW WITHIN NOW PROPOSED GAS PIPELINE PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) � SO'TYRBIOITY SAMPLING LOCATION (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) WATERBAR (PLAN VIEW) HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. 0 W (r 7}t O O O n N U O J r. J Oa W= W + Z i ZL o J O E, W J Lp LLJ v� W a Q � CL 04 N �z H d W z Q O m Z U j G ego Z U 3 O U ~ m M a H N Z O U SCALE: AS SHOWN DATE: 09/29/17 DRAWN: GPT CHECKED: DLH APPROVED: NET gai consultants - NC, in 4198 COX ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 C. COL dF-0269 PROJECT N0. DASH NO. C140468 TASK NO. SUB TASK NO. 005 00 3ROUP ID DRAWING NO. D E059 59 OF 189 MIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAJ Consultants, Inc. NOTE: 500 STATIONING SHOWN ON s SN s S��N s E ¢ f11 Sv 500 THE DRAWING IS BASED ON SLOPE MEASUREMENTS. 400 oN o om o� 400 f; loco �+ F f gN F$ EN 300 v „ „ +'� + ., + > 300 zoo C, 0 0 -- 0 0 0 --4---------- --- D, --- o 0 0 ----- ---- ---- 0 0 0 0 0 0 0 o 0 0 + 0 c, c, 0 0 0 0 200 100 <59. <5% <5% <5% 15% <5% <59 <5% <5% <5% <s% <s% 15% <s% 100 cn Z O_ 0 0 n PROFILE VIEW - > HORZ: 1" = 200' Ed VERT: 1" = 200' -100 -100 „TOPSOIL SEGREGATIONa PROPOSED TEMPORARY R.O.W. AREA N m [�=,Sd— m m ___ / ___ ___ ___ ___ PROPOSED PERMANENT R.O.W. PROPOSED 36 AP -2 PIPELINE PROPOSED PERMANENT R.O.W. PROPOSED TEMPORARY R.O.W. /1 L1L N s - kz STATIONING & m o o u w m m U 7 N ", CONSTRUCTION LIMITS1}t LL -18-160 _7 ' LL -18-158 N/F N/F of UPON T. BOONE LL -18-161 oI LL -18-162 LL -18-163 LL -18-164 IA N/F UI N/F JI N/F SAG PROPERTIES LLC THREE MR LTD PARTNERSHIP PARCEL I.D. #002868 PARCEL I.D. /006381 I 1160 LF N/F HOWARD ANDREW TYSON THREE MR LTD PARTNERSHIP THREE MR LTD PARTNERSHIP � I PARCEL I.D. /032407 � PARCEL I.D. #023475 I PARCEL I.D. #023660 886 LF 2776 LF PARCEL I.D. #003299 501 LF 572 LF 94 LFPARCEL 4 4T PROPERTY OWNERSHIP RRDNDA R. AMR I.D. f-INSUM 0 D, ME AMR 0 rz 00 N O XbA N/rJ THREE MR LTD PARTNERSHIP O r J PARCEL I.D. # U34M SI OF O a U W = �s 'Nb ,- F U-18-164 � w+N/F Zz m Co LLJ MILE 5 PARCEL I.D. f I LF a<o aDO a - t^C w Qom �U 1 1FE Q S o ? w / -- of - v. M z H p fir' 2875+ O z U 3 2856+04 Q m ®= ® ® e /�s'7:yYlici O Z ® HOWARD ANDREW TCHON THEM MR LTD PA ERSHIP PARCEL 1.0 LF SCALE: AS SHOWN 1� DATE: 09/29/17 - E 1 ' L200' 400' DRAWN: GPT CHECKED: DLH APPROVED : NET PIPE SPECIFICATION gai consultants - NC, in o o ISI o o o o D, 0 0 o o o o 0 0 4198 COX ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 .C. COL dF-0269 gN a� STRING VIEW BAND NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOG LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UFMWITHNADESDATUM,20NE17.US 3URVEYFOOT.CENTRA1_MERIDIANS1-W. — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONFOURSAND MfADGRARHC FEATURES WERE DERIVED FROM LOAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY M CONSULTANTS. INC FROM II -0&2014 N EEA TH. THIRD 11-072014. -TRA WORK SPACE ®TOPSOIL SEGREGATION AREA FENCE(BSRF) TRENCH BREAKERIPLUG 4. TH�EPROFERn LI DON G158TPX ASBESSMENi RECORDS(PROVIDED BYOTHERS). GAI LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPRESSEOORIMFLIEOAS NREB NOWNLAREBASE TO THE —X—X— FENCE - - - STREAM E UNDERGROUND ELECTRIC W WATERLINE ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W.LISPALLIT" p O COIR LOG STREAM CROSS INC COMPOST FILTER SOCK �n ORANGE SAFETY FENCE ACCURACY OF RIERECORES AS SHOWN ON THESE DRAWINGS. 5. STREAMANCWETIAND OATASHOWN ON THEDRAWINGS WAS PROVDED BY ERM. 6. EROSION ANING SH ENTATION CONTROL ELEMEMS MAYSESHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACNPL INSTALLATION SHALL BEWITHIN THEWORI(AREAS. NTNG SHOWN IS SLOPESTAIIONINE KSHALLBEINSTALLEOPA-LLELTOC)_T1 RTO E%TENTPRACRCAELEINA-R,CANCEWITHST-DAROOETA" PROJECT N0. DASH NO. C140468 —G G— EXISTING GAS PIPELINE OH OVERHEAD UTILITY ONES SAN SANITARY SEWER EDGE OF GRAVEL ® -E­I--soxw_ PR......--- VPaVIOE CLunr axLVl �( N UTILITY POLE WITH ENHANCED CONTROLS WITH ENHANCED ROADSIDE.ITCH CONSTRUCTION ENTRANCE WIT. ..TO. CU LVERT AS NEEDED C, SOIL TYPE FC.JE%ISTINGROADS NO IMPROVEM" 2)EXISTING ROADSMINORIMPROVEMENTS.3)EXISTINGROADSMAJORIMPROVEMENTS 9� ACCESS CADIMENT CON DRAINAEWROADS.APPROPRKTE EROSION ROADS IRCATEGORBE PROVIDED FOR ROADS IN CATEGORIES2,3NND4. ROADS IN CATECARIESIANOR HAVEADEOUATE E%ISTING DRAINAGE; ORAIrvAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 Arv04. 10. E FOR THE NATUREAND LOCATION OF THE DEPICTED SMPS AS OF THE DATE SIGNED AND SEALED BASED ON THESOURCE DATA PROVIDED AND AS DESCRIBED IN THE NOiEES SECION OFTHE INCEX NAN TASK NO. 005 SUE TASK NO. 00 GROUP D DRAWING NO. CULVERTACCESS ROA. WATERBARS A GENERALIZED SURFACE WATER FLOW DHEETEDINP WBASEDONINFORMATIONCURRENTLYAVAILABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS ACCESS ROAD PROPOSED PERMANENT EASEMENT 1 OBSERVED CONFIURA IOcory DEPICTED IN NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE TC TURBIDITY -AIN IPLAN VIEW) SURFACE WATER FLOW WITHIN ROW TXECONFIGURAnOrvoEVICTEOIrvvLAry vIEWAPPLIES To BOTH TEMPORARYANDPERMANENT WATERBARS, Al AvvROVRIATE. PROPOSE. GAS PIPELINE SS R� R� R� SS PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). (♦ STYRBI.ITY SAMPLING LOCATION (PLAN VIEW) Q WATERBAR OUTLET (PLAN VIEW) O' D E062 SO' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) 62 OF 189 MIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. O 2017 CAI Consultants, Inc. NOTE: 500 2882+e3 2883+08 500 STATIONING SHOWN ON EDGE OF LINDSAY RD r EDGE OF LINDSAY RD THE DRAWING IS BASED �N zea3+a8� 2883+29 RIGHT of zm ON SLOPE MEASUREMENTS. 400 T m m WETLAND wNAH013F III wAY� 12883+48 o 400 300 m m z m v o u u 2882+68 m s m RIGHT of WAY v a I III W,ERAND WNAH025F m m a o m 0 0 m m m 0 m om o m E o o ° = = + ++ + N + N 2 +' + 300 200 + N 0 0 _ _ + + + 0 0 0 0 0 0 +o + 0 ---- o I + __--Lo o ____ ___- .1 01 o —_-- _ ---_ o_____o o____ oo o___ 200 IDD <5%---- <5% <5% <59. 15% <5% <5% <59. <5% <5% 15% <5% 15% 15% IDD i Goz O D 0 (n PROFILE VIEW - > HORZ: 1" = 200' ELI Of VERT: 1" = 200' -100 -100 U -,PROPOSED TEMPORARY R.O.W.o TOPSOIL SEGREGATION AREA _TLT1 r1-r,r�r� rrrrrri TlT 70 AII PROPOSED 36" AP -2 PIPELINE PROPOSED PERMANENT R.O.W. _ T PROPOSED PERMANENT R.O.W. P POSED TEMPORARY R.O.W. '/�L//1 STATIONING &I CONSTRUCTION LIMITS1}tWM LL -18-164 N/F LL -18-164 N/F SAG PROPERTIES LLC uI SAG PROPERTIES LLC LL -18-168 uI PARCEL I.D. #023660 m N/F 535 LF I Ie JOYCE BONE JOYNER �I JOHNNY LL -18-170 N/F GLENN LAND mI LL -18-172 N/F STANLEY C. @ �I LL -18-174 LL -18-175 LL -18-176 N/F �I N/F AI N/F i PARCEL I.D. #023660 886 LF LL -18-166 PARCEL I.D. #021070 PARCEL I.D. #025998 I I N/F I I 340 LF I 319 LF I GEORGIA L. ROBBINS I MITZI DAUGHTRY DAN PRICE ET AL MARVIN W. WINSTEAD JR. PARCEL I.D. #032415 I PARCEL I.D. #032460 # WILBUR A. & PARCEL I.D. #103]45 591 LF 1030 332 LF PARCEL I.D. #026132 1617 LF CONNIE I. B#0244 PARCEL170 PROPERTY OWNERSHIP L#024464 0 0 + _ — EXISWR.AD04 Ln - MAJOR UPGRADE U 1 — T- O �r p a W=as W+z Zig �; 0� W w ag o Q CD MZ� z g `♦ z y= ` O SCALE: AS SHOWN DATE: 09/29/17 DRAWN: GPT • • • . E I. CHECKED: DLH APPROVED : NET PIPE SPECIFICATION 2883+48 WETLAND WNAH013F gai ConsUltan[5 - NC, in S o o o S o I I S o 0 D, 0 D, S o ppbb o 0 0 0 o S o S o 0 o I 4198 SU TE j04 ROAD GLEN ALLEN, VA 23060 804-270-9357 N.C. COL dF-0269 0 �m 2882+83 2883+08 �m EDGE OF LINDSAY RD EDGE OF LINDSAY RD r ~mw ZI J III X2883+29 2882+68 RIGHT OF WAY RIGHT OF WARY I m i+ 2883+48 0 STRING VIEW BAND WERAND wNAFDz11` _ NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY. UTMWITHNADMWUM,Z0NE17.US 3URVEYFOOT.CENTRALMERIDIANS1-W. — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURSAND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUBMETER N TH. GROUND SURVEY PERFORMED BY M CONSULTANTS. INC FROM II -0&2014 THIRD TIED.—. E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCX BREAKERIPLUG FENCE(BSRF) NREBSHOWNLEEA ARE BASE a. THEE PROFERn LI DON GI38TPX ASBESSMENi RECORDS(PROVIDED BYOTHERS). G4I CONSULTANTS MAKE NO GUNWNTEE EITHER EXPREBSEOORIMFLIEOAS TO THE X X FENCE - - - STREAM E W UNDERGROUND ELECTRIC WATERLINE ® AREA OF NO DISTURBANCE p PROPOSED TEMPORARY R.O.W. O STREAM CROSSING USFWSSTREAMCROSSING COIR LOG ACCURACYOFTIIERECOROBASBHOWNON THESE DRAWINGS. 5. EROSIOAN WETLANDDATASHOWNON THEDRAWINGS WAS PROVIDE BY ERM. B EROSION AND SEDIMENTATIONCONTROL ELEMEMS MAY BE SHOWN OUTSIDE OF THE WORK AREAS COMPOST FILTER SOCK NINGSHOWNISSLOPESTATIONING. �n ORANGE SAFETY FENCE KSHALLBEINSTALCEDPARALLELiOCONTOURToE%TENTPRALRLPBLEINALLOROANLEWITHSTAN.ARDDETAIL FOR IxARIIT ONLY.ACNPL INSTALLATION SHNL BE WITHIN THE WORT(AREAS. PROJECT N0. DASH N0. C140468 —G G— EXISTING OH OVERHEAD GAS PIPELINE SAN UTILITY LINES SANITARY SEW ER EDGE OF GRAVEL ® W-LAIU �( N UTILITY POLE WITH ENHANCED CONTROLS CONSTRUCTION ENTRANCE WITH..TO. CU LVERT A6 NEEDED BB'S) E%ISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENT3.3) EXISTING ROADS MAJOR IMPROVEMENTS — ROADSIDE DITCH 9� ACCESSROADSHA APPROP TATE EROSIO AND CADIMENT CON ARO4INEWROAOS.APPROPRSWEROSIONVIDDFOR ROADS IRCATEGORBE PROVIDED FOR ROADS IN CATEGORIES2,3NNDa. ROADS IN GITEDARIE5I ANOR HAVEADEOUATE E%ISTING DRAINAGE; DRAINAGE FEANRES WILL BE PROVIDED FOR ROADS IN CATEGORIE53 AND 4. CG,� SOIL TYPE 10. EFORTHE N—REANDLOCATIONOFTHEDEPICTED BMPSASOFTHEDATE SIGNEDANDSEALED BA BE. ON THE SOURCE OATAPROVIDED AND AS DESCRIBED IN THE TASK NO. OG5 SUE TASK NO. 00 ACCESS ROAD •o VPaVloE cuvnr axLVl PROPOSED PERMANENT EASEMENT NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE TC CULVERT!ACCESS RDA. WATERBARS TURBIDITY CURTAIN (PLAN VIEW) A GENERALIZED SURFACE WATER FLOW Wq EA,CONFIGORATI0NEl6 DEPICTED IN PIANNEW BASSOON INFORMATIONCURRENTLY AVAILABLE WATERBAR CONFIGURATION MAV BE FIELD ADJUSTED A3 NEEDED BASSOON CONDITIONS 1 OBSERVEDATTHETIMFOFcoNSTRUCTION. THECONRGURAnory DEPICTED Iry PLAN VIEWAPPUFS TO BUTHTEMPORARYAND PERMANENT WATERBARS, Al APPROPRIAT. � SURFACE WATER FLOW WITHIN NOW GROUP D DRAWING NO. PROPOSED GAS PIPELINE SS R� R� R� SS PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) D E063 63 OF 189 � STYRBI.ITY SAMPLING LOCATION (PLAN VIEW) O' SO' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) WATERBAR (PLAN VIEW) THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: STATIONING SHOWN ON THE DRAWING IS BASED ON Epp I 3540+07 WINBORNE RD £ m .£ ,� r� zw pw Sw 3553+20 I I 3553+40 MARSH SWAMP RD MARSH SWAMP RD 3553+a6 N ra o 3570+55 f III OLD RALEIGH RDN I 3570+75 11 u J �� 600 SLOPE MEASUREMENTS. 500 o, ELEC OVERHEAD IIA m E w _ ;Po om O D RALEIGH RD f o A= 3570+95 m m - - 500 I�+m. III ~o+I III 'o RIGHT OF WAY o „ T 400 NN.n lyv�im 3570+32 ELEC OVERHEAD t 400 _ n v� I - 300 w m N U U I> m m m 300 N o o m m + -5----<s% - - % <5% < <5% <s9 <�5% 200o Z200 <1 < <5% < • PROFILE VIEW 00 00 - in HORZ: 1" = 200' LLI Of VERT: 1" = 200' 0 0 3540+57 la� 35`40+47 3552+8475 3553+50 3553'58 3570+15 3570+81 35]0+2(6 3570+87 N u u + III T PROPOSED TEMPORARY R.O.W. o_ LTLT1 T1T1Z.T—� 1 PROPOSED PERMANENT R.O.W. PROPOSED 36" AP -2 PIPELINE PROPOSED PERMANENT R.O.W. < 5553+s8/ 333553++32 --77/��T 7 r //N _ 353/ 553+2 555+ 5 PROPO�D TEMPORARY R.O.W/553 / 371++0D3 57t35404 3571+06 /o o *coo' II N of m STATIONING & f II TOPSOIL SEGREGATION AREA > W7 SNI J CONSTRUCTION LIMITS 3544+25 U N 3554+85 n TIA LL-19-023LL-19-025 T T LL -19-026 N LL-19-027N/F F u JAMES T 8, JESSE E SKINNER c I IJ WILLIAM DOUGLAS FULGHUM f I N I lu ZILPHIA HIGH NICHOLS I LAWFON EARL NICHOLS HEIRS V� O41 PARCEL I.D. A 2772-46-3918.000 PPARCEL I.D. / 27]2-35-7808.000 LL -19-026 PARCEL I.D. 2772-25-9316.000 _��� PARCEL I.D. s 2772-23-5133.000 1260 LF I I 504 LF N/F ZILPHIA HIGH NICHOLS I I 530 IF I 3378 LF PARCEL I.D. g 2772-25-9316.000 PROPERTY OWNERSHIP 161 LF _ _ A I / - I � PI LL -19-027 O + / ! q LAWTON EARL NICHOLS PARCEL HEIRS -q - 3378 UP L0 O J m JAMES JESSE E SKINNER7fNI / / _ J F- CE) to i,i?� PARCEL I.E. 0 2772-46w+PIN CD L Go w a JrT ` _ CL o �o CLFIT ` \ \ \, C� !Z m z Q v / BB a ED O O m PARCEL I.D. # 2772-46-3918.00D _ti VRLUAM x1 DOUGLASL / a / P Z 09 vs PPARCEL I.D. # 2772 1504 UP v v �]y % ZU 3 IT J / O R- +71 PARCEZUPHIA HIGH NICHOLS L I.E. 2772-25-9316.000 PARCE L R- a f Um- 9-0261 0 F ZILP HIA H H NICHOLS U 16 SERGI SCALE: AS SHOWN G i 1 00 DATE: 09/29/17 DRAWN: GPT - CHECKED: DLH F APPROVED: NET PIPE SPECIFICATION 3553+46 570+55 OLD RALEIGHRD lOLDOR+75 A EIGH RD 9ai COnSUltan[5 - NC, in LlI ELEC OVERHEAD I ELEC 3570+32 OVERHEAD > I I nm 1 SU198 ITE 104 ROAD pI Y + GLEN ALLEN, VA 23060 804-270-935] N.C. COL dF-0269 3540+07io WINBORNE RD N y tio MARSH SWAMP RD MARSH SWAMP RD35530 N z U o sS 71 m omau�lll�u f f o om N o f fm IIoo EN_> :III Iow w III" '' '' '°' sa STRING VIEW BAND „ N r NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTNINTHNADASDATUM.ZONEIT.US 3URNEYFOOT.CENTRALMERIC—l-W. — PROPERTY LINE --------- STORM SEWER \7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURSAND TOPOGRAPHIC FEATURES WERE N EEA TH. DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY GN CONSULTANTS. INC FROM II -082014 THRD-72014. E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG FENCE(BSRF) NRES NOWNLAREBASE a. TH�EP=G`FLI DONG158TPX ASSESSMENT RECORDS (PROVIDED BYOTHERS). GAI LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPRESSEOORIMFLIEDAS TO THE —X—X— FENCE — — STREAM E W UNDERGROUND ELECTRIC WATERLINE ® AREA OF NO DISTURBANCE a STREAM CROSSING PROPOSED TEMPORARY R.O.W.USF1. O COIR LOG COMPOST FILTER SOCK �n ORANGE SAFETY FENCE ACCURACY OF TIE RECORDS AS SHOWN ON THESE DRAWINGS. 5. STREAM AND WETIANDOATA SHOWNON THEDRAWINGS WAS PROVIDED BY ERM. B EROSIONAND SEDIMEMATIONCOMROL ELEMEMS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACNPL INSTALLATION SHNL BE WITHIN THE WORT(AREAS. NINGSHOWNISSLOPESTATONINE KSHALL BEINSTALLEDPARALFS.LEL TO CONTOUR TO E%T11ID"LTCABLE INALCORGANCEWITH ST-DAR PROJECT N0. DASH NO. 140468 —G G— EXISTING GAS PIPELINE SAN OH OVERHEAD UTILITY LINES SANITARY SEWER EDGE OF GRAVEL �( N ® WE WITH ENHANCED CONTROLS WITH ENHANCED CONTROLS ROADSIDE DITCH CONSTRUCTION ENTRANCE WITH DITCH /���,�,� UTILITY POLE P"- CULVERT AS NEEDED SOIL TYPE 9. ACCESSROADSHAVEBENGROUPEROSIOAND CADIMENT CONTROLSBENO'PROODED FOR ANDdI NEW ROADS. APPROPRMIE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROPDS IN IN1E%ISTIRIEE2G DRAINAGE: DRAINAGEFFATORES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. NERM IS SOLELY OTES SECTION OFTENISIBLE FOR THE NANTHISREANPUND LOCA TION OF THE DEPICTED BMPS AS OF THE DATE SET SANINORGADSINEMENT3.3)E%ISAND HADSMAJOR IMPROVEMENTS CATEGORIES2,3NNDa. ROADS IN CATECARIE3I ANOR HAVEADEQUATE EXISTING SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE TASK NO. 005 SUE TASK NO. 00 ACCESS ROAD PROPOSED PERMANENT EASEMENT asxoxnD.o rcavio. cLunr axLVl NOTE: THE PE SEAL AND SIGNATURE APPLIES CULVERTACCESS ROAD WATERBARS ONLY TO THE TC TURBIDITY CURTAIN (PLAN VIEW) A GENERALIZED SURFACE WATER FLOW WATERBAR CONFIGURATION`SDEPICTED IN 11 � SURFACE WATER FLOW WITHIN ROW OBSERVEDATTHETIMEOFcoNSTRUCTION. PLAN NEW BASED ON INFORMATION CURRENTLYAVAIIABLE. THECONFIGURAno1 DEPICTED Iry PLAN VIEWAPPLI"TD RUTH WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS TEMPORARYAND PERMANENT WATERBARS. Al APPROPRIAT. GROUP D D DR'A'WING NO. E076 PROPOSED GAS PIPELINE R� R� R� PROPOSED GAS PIPELINE (NO GROUND SURVEY) EAS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) 76 OF 189 � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. ., 4109+23 4123+48 4123+77 NOTE: STATIONING SHOWN ON THE 600 E E 4080+18 Q Q 11 m 11+— —EDGE OF 4103+79 4109+03 I' GLENDALE RD EDGE OF I_� —EDGE OF F ASEDNEGO RD ' ABEDNEGO RD. 4123+29 600 DRAWING IS BASED ON SLOPE MEASUREMENTS. 500 CL STREAM SJOB104 1. zo �� �°'eo �T :. Ep. WERAND WJOB1051EDGE OF I I 4109+38 GLENDALE RD RIGHT OF WAV at 26+36 zt �WETLANO WJOP022F �w II �N RIGHT OF WAY I L121+11 500 o N o 4108+]5 RIGHT OF WAYS I 4110+29 4121+26 N 4080+95 \ I WETLAND WJD00041 WETLAND WJ00004F 400 WETLAND WJ08111S r T ITS— 4103+92 WETLAND WJ08105F II'' .i RIGHT OF Wpy 400 - 300 > m w e m w o m $ I III 1300 o w o 0 0 0 + + 0 N o 0 a + w 0 + + + + + o 0 0 0 0 0 0 0 o N m w + + + + + + + + + + + + + + 0 o o o 0 0 0 0 0 o 0 0 0 0 lI�II o 0 0 0 0 o o o LJJ L---J-----L----1----J-----L--1 L co 2000 0 __1 ----1----J---—L----1----J-- --L-------J-----L 1-- LJ ____ ---1----J----- --- 200 Z ----1----J— — — — — — — — — <5% 151 <5% <5% <5% <5% <57 <5% <5% <5% <s% <s% <s% O 0 10-20% 5% <5% PROFILE VIEW t00 HORZ: 1" = 200' w Of VERT: 1" = 200' 0 0 4088+20 4090+05 4093+82 4094+82 4101+44 4103+35 4108+91 4122+69 4124+55 4124+71 4087+21 $ 4091+05It 4108+87 \ \ 4110+07ij _ PROPOSED PERMANENT R.O.W. PROPOSED 36" AP -2 PIPELINE _ 4122+92 4123+54 PROPOSED PERMANENT R.O.W. + 4123+98 4123+784124+87 n7RT,, Illi PROPOSED TEMPORARY R.O.W. o - TOPSOIL SEGREGATION AREA 1 4110+47 m w 4110+06 ��" ykCIO STATIONING & w + atoa+ss I N w4125+09 E CONSTRUCTION LIMITS o t. _ - 4108+50 4109+06 4104+67 410]+50 4109+04 4124+22 4 g LL -20-020 LL -20-016 w o LL -20-022 �-' ANNA MARIE B HODGE LIFE ESTATE-� 'B o GLENDALE FARMS INC + + + iO LL -20-021 Y IN HELL OFORTH w s 11 _ ti +I LL -20-015 AND WLM R & ALBERTHODGE N/F PARCEL I.D. / 03P04021 \ PARCEL ID 03P04023 �� 435 LF 1_1��D ml ANNA MARIE B HODG4 WIGGINS TRUSTEE LL -20-024 LL -20-026 PARCEL I.D. j 03PO5001 N/F GLENDALE CHAPEL wl Im IN F I LL -20-029 p LL -20-030 N/F I I N/F GLENDALE FARMS INC 112 LF LL -20-01 LIFE ESTATE AND WL R &PARCELi H/ GEI 316 LF COMMUNITY CENTER INC EDWARD DEWAYNE SUTTLES PARCEL I.D80 MARIE J TART LL-20-03B�� JERRY C WOODARD p,T' PARCEL I.D. / 03P04024 N/F LL -20-017 I I I.D. LL -20-018 I LF3POSOOeJ I I PARCEL I.D. $ 03P05008M I PARCEL I.D. � 03PO5003N JERRY C/WOODAR01 I I PARCEL I.D. g 03P05003C 1338 LF ANNA MARIE B HODGE IIFE ESTAT N/F 03P04020 N/F 510 LF 846 LF 1355 LF PARCEL I.D. AND WLM R & ALBERT B HODGE VAN B S ANGELA P KILEETT PARCEL I.D. 03P040218 PARCEL I.D. 03P04023D 271 LF GLENDALE (ARMS INC 03P05003C PROPERTY OWNERSHIP $ / nt r ss LF PARCEL D.Lf 03PO402 ROW ONLY 158 SIF 35 LF s _ I 0 CD d]<T!T�bIIfl ;2 J Q O LEI s Z Z Z - J Do wv W a o aw CL Q a o m 11 az C, ¢zm w ¢ 00 z MFE o E O IIS o� g�3 Qf z Z SCALE: AS SHOWN \ DATE: 09/29/17 DRAWN: GPT . � . L_ CHECKED: DLH APPROVED: NET PIPE SPECIFICATION 4080+184108+75 CL STREAM SJOB104 4110+29 RIGHT OF WAY WENAND WJ00004F 4103+92 III 4121+26 4124+11 WETLAND WJ00004F�` RIGHT OF WAY' gai Consultants - NC, in WETLAND WJ08105F 111 1 111 4198CO% ROAD TE 114 + �H + + o N ALLEN, VA 23060 o£ o 0 0 o 0 804-270-9357 N.C. COL dF-0269 Z o o f o f 4103+79 4109+23 WETLAND WJ06105F EDCE OF GLENDALE RD f� 4123+48 4123+77 EDGE OF EDGE OF i .� ABEDNEGO RD ABEDNEGO RD 4080+95 w w WETLAND WJOB111S fes, Z+, .o En. C, E+. \1 4109+03 EDGE OF I I 4109+38 �'1 I I pv GLENDALE RD RIGHT OF WAV 4123+29 4126+36 RIGHT OF WAV WETLAND W101022F STRING VIEW BAND NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY OTMWITHMADASDATUM.MNEIT,US SURVEYFOOTCENTRALMERIDIANH-W. — PROPERTY LINE --------- STORM SEWER \7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOUREAND TOPOGRAFFC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY M CONSULTANTS. INC FROM II -0&2014 N EEA TH. THIRD HER.01,. E UNDERGROUND ELECTRIC -TRA WORK SPACE ®TOPSOIL FENCE(BSRF) SEGREGATION AREA TRENCH BREAKERIPLUG 4. THEE PROFERn LI GON GI58TPX ASBESSMENi RECORDS(PROVIDED BYOTHERS). G4I LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPREBBEOORIMFLIEOAB TUNER NOWNLAREBASE ACCURACYOF THERECOROR AR RHOWNON THESE DRAWINGS. TO THE PROJECT N0. DASH N0. 140468 X X FENCE COIR LOG STREAM CROSS ING 5. STREAMANDWETIAND DATASHOWN ON THEDRAWINGS WAS PROVIDED BY ERM. SEDIMENTATION CONTROL ELEM NCE WAS 6. EROSION AN OUTSIDE OF THE WORN AREAS FOR CLARITY ONLY.ACNPL INSTALLATION SHNL BE WITHIN THE WORKAPEAS. — — NTNG SHOWN ISSLOPESTARONING. PROPOSED TEMPORARY R.O.W.USE STREAM W WATERLINE a ORANGEC.MPOSSAFETY FENCE ® AREA OF NO DISTURBANCE O �n FENCE KSH4LLBE INSTALLEOPARALLELTO LONTOURTOE%TENT PRALRLPBLE IN ACCORDANCE WITH RTANOAR —G G— EXISTING GAS PIPELINE SAN SANITARY SEWER OH OVERHEAD UTILITY LINES EDGE OF GRAVEL �( N ® WE UTILITY POLE WITH ENHANCED CONTROLS WITH ENHANCED CONTROLS — ROADSIDE DITLX ROADSIDE DITCH CONSTRUCTION ENTRANCE WITH DITCH /���,�,� P - CULVERT AS NEEDED SOIL TYPE PR.1L SWILL ROADRNO IMPROVEMENTSNCWTEGGRIES2 S ANDNORIMPROVEMENWRIE%IIAND2HSTING A ADEORIMPROVEMENTS R. ACCESSROADSHAVEBEOPRIATE EROSIOAND CADIMENT CONTROLS ANDdI NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES2,3NND4. ROADS IN GITEDARIE5I ANOR HAVEADEOUATE E%ISTING DRAINAGE: DRAINAGEFEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. 0. THE NATURE AND LOCATION OF THE DEPICTED SMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE TASK NO. 005 SUE TASK NO. 00 ACCESS ROAD PROPOSED PERMANENT EASEMENT asxoxwD io rcaviDE CLunr axLVl NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE N`RMOTES RSOLELY ECTION OETENISIBLE BOR SS CULVERT ACCEROAD WATERBARS A GENERALIZED SURFACE WATER FLOW WATERBAR CONFIGURATION IS DEPICTEHEET OFD IN PIANNEW BABEODNINFORMATIONCURRENTLYAVAIIABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS 1 TC TURBIDITY CURTAIN (PLAN VIEW) � SURFACE WATER FLOW WITHIN NOW OBSERVEDATTHETIMEDFcoNSTRUCTION. THECONFIGURAnoN DEPICTED Iry PLAN VIEWAPPUES TO BDTHTEMPORARYAND PERMANENT WATERBARS Al APPROPRIATE. GROUP D DRAWING NO. PROPOSED GAS PIPELINE SS R� R� R� SS PROPOSED GAS PIPELINE NO GROUND SURVEY) EAS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) D E086 86 OF 189 � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) WATERBAR (PLAN VIEW) THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. MIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: STATIONING SHOWN ON THE 600600 r r DRAWING IS BASED ON SLOPE MEASUREMENTS.^ARI 500 71 FN Iq F+ A i - Ft FN s+ s�A^>^> ov F+ IAA ;: 71 FN 500 000 gm o 400 To� N�� To ow T aoo _ 300 o m o 14 14 11 A o a o = t t 300 zoo + 0 0 ---- + 0 0 ------- - + ---- + + + 0 0 0 ----------- + + 0 0 -- 1--- ----- 0 ---- ---- 0 ----- 0 0 ---- --------o----o 0 to ---- - - - - - - - ____200 w Z <s% <5% <s% - - - - - - - - - - - - <59 c51 - - - <6r O <5% N PROFILE VIEW 100 100 HORZ: 1" = 200' LLI 0' VERT: 1" = 200' 0 0 4443+56 4444+56 r a�a oE' o� RKd � OPS91LrSEGR N AR %1 $ _ _ _ PROPOSED 36" AP-2 PIPELINE > PROPOSED PERMANENT R.O.W. 31 PROPOSSE-7D-7P-ERM/ANENT R.O.W. �J PROPOSED TEMPORARY R.O.W. A 1JL/1 _ A *fjNip STATIONING & 4411+44 o N TOPSOIL SEGREGATION AREA `� 4442+85 %s* CONSTRUCTION LIMITS A 0 0 4421+20 4426+71 A ' LL-20-072 F N/F LL-20-074 LL-20-076 �'I' _ Iu JAMES DWAIN & BING TIET ROBERTSON LL-20-073 Iy N/F IJ N/F _ Im LL-20-078 N/F 4' h � -T\// ��PARCEL I.D.# 1OJ99030T N/F TALTON CONSTRUCTION CO. INC AND JOHN ARTHUR TALTON KENNETH A TALTON TRUST AND KENNETH A TALTON WILLIAM C &JULIA PHILLIPS ', Tlt' 642 LF KENNETH A TALTON TRUST AND KENNETH A TALTON I PARCEL I.D. �10N08019 I PARCEL I.D. /14N08020E I PARCEL I.D. #14NO8032D 800 LF 1816 LF 1414 LF PARCEL I.D. /1 ON08019 PROPERTY OWNERSHIP 300 Lf / J UI /F LL-20-078 7 i 2 UE 54J YAUJAM C & JULIA III�/ o _ PARCEL I.D. 800 #14 - - LF+ 000 fit) z p - = W �s w+� Zz� `ILIE BE v -j 0 1 K,ado N N � a CL H F - —� CLwo pom NIEMAND 00 C 040 _030 r ,O I �. _ .7 I'll PARCEL 1.0. I, O '.4. VIII w\ � o U 00 H/F i TALTON NI U. u- 6 1% �]a!4fiARTHUR %% NETLAND FI 014N SCALE: AS SHOWN LL-20-070 WJDOO15F 1414 Ur LANGLEY E L DATE: 09/29/17 DRAWN: GPT 1.0. #IONO&013C PARCELCHECKED: • • E DLH APPROVED: HET PIPE SPECIFICATION gai consultants - NC, in I+o SUIRE 104 ROAD GLEN ALLEN, VA 23060 804-270-9357 N.C. COL dF-0269 SAI SA r SA SA SA. �SA p zA ISA SA z .gym STRING VIEW BAND NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNADMWUM.ZONED.US 3URVEYFOOT.CENTRALMERID-1-W. — PROPERTY LINE --------- STORM SEWER \7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURSAND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND N EEA TH. GPS SUBMETER GROUND SURVEY PERFORMED BY M CONSULTANTS. INC FROM II-0B2014 THRU-7�201a. E—A WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG FENCE(BSRF) NNESSHOWNLAREBASE 4. THEE PROFEE'H DONGIGBTPX ASGESSMENi RECORDS (PROVIDED BYOTHERS). G4I CONSULTANTS MAKE NO GUNWNTEE EITHER EXPRESSEOORIMFLIEOAG TO THE —X—X— FENCE — — STREAM E UNDERGROUND ELECTRIC W WATERLINE ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY a R.O.W.USE O STREAM CROSSING �n COIR LOG ACCURACY OF TIE RECORDS AS SHOWNON THESE DRAWINGS. 5. STREAM AND WEVINENTATA SHOWNON THEDRAWINW WAS PROVIDE BY ERM. 6. EROSION AND SEDIMEMATION CONTROL ELEMEMS MAYSESHOWN OMIDE OF THE WCRK AREAS FOR CLARITY ONLY.ACNPL INSTALWTION SHNL BEWITHIN THEWORKAREAS. COMPOST FILTER SOCK NINGSX NISSLOPESTARONING. ORANGE SAFETY FENCE KSHALLBEINSTALLEDPARALFREDLELTOCONI PROJECT N0. DASH N0. 140488 —G G— EXISTING GAS PIPELINE OH OVERHEAD UTILITY YNES SAN SANITARY SEWER EDGE OF GRAVEL ® WE �( N UTILITY POLE I6.,,.....��� P" WITH ENHANCED WITH ENHANCED CONTROLS CULVERUCTIONENTRANCE WITH DITCH CULVERT AS NEEDED — /���,�,� EYTOURToE%TENTPRALTCAELEINALCOROANCEWITHSTANDARDOETAL ROADSIDE DITCH 9. ACCESSROADSHA APPROPRWPEROSIOAND SEDIMENT TCOTOLSWILL BE PRMIO IMPROVEMENTSNCAJEGORIES23 ARNAGP ROADS.APPROPR$WEROSIONVIDDFOR NTCONTCAT WILL BE PROVIDED FOR ROADS IN SOIL TYPE DRAIMAS:LELY REGEFEANRESWILLBEPROREADUECATIDSINCATEGORIE53 AND a. 0. NERM IS OTES LECTION OF TENINIOE%BORTHE NANREANO LOCATION OF THEDEPICIED BMPG AS OF THE GATE MDNORIMPROVEMENTS. II WRIE%IIAND2HSTING A MAJOR IMPROVEMENTS C4TEGORIES2,3NND4. ROADS IN CATECARIESIANOR HAVEADEOUATE E%ISTING SIGNED AND SE4LED BASSOON THESOURCE DATA PROVIDEDANO AS DESCRIBED IN THE TASK NO. OOS SUE TASK NO. OO ACCESS ROAD PROPOSED PERMANENT EASEMENT asxoxwD io rcaviDE CLunr axLVl NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE TC CULVERTACCESS ROAD WATERBARS TURBIOITYCURTAINIPLAINVIEW) A GENERALIZED SURFACE WATER FLOW WATERBARCONFIGURATION ISDEPICTED IN PUJINEW BASSOON INFORMATIONCURRENTLY AVAILABLE WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED A5 NEEDED BASED ON CONDITIONS SURFACE WATER FLOW WITHIN NOW OBSERVED AT NFIGUA OF corvsTT'TEGIN. TXECONFIGURAnory OEVICTED Iry vLAry vIEWAPPUFS To eoTHTEMPORARYANDATION AYBENI FIELD ADJUAl STED AS NEEDED GROUP ID DRAWING NO. PROPOSED OAS PIPELINE R� R� R� PROPOSED GAS PIPELINE (NO GROUND SURVEY) E.L. CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) Q WATERBAR OUTLET (PLAN VIEW) D E092 50• TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) 92 OF 189 MIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: 600 600 STATIONING SHOWN ON THE ., DRAWING IS BASED ON x SLOPE MEASUREMENTS. 500 m S S SNI Fs S IIS S SNI 400 0 0 0 �o..0 00 400 Jllo� IT 300 �I I� T�I �I T�Im x I� Tml 300 200 o N m m o a $ 200 N + 0 L o 0 o 0 0 o o o v o + 0 + 0 0 + 0 0 0 o 0 o N > o o----- N o o m 0 o Z 100 — `5% -- ---- ___ -----o ____o ---- ----<s%--- — -----o ---- ---- ----- ---- — —y ---J ---- -----o -- -------o ---- ---- ----- ---- ,OD _ PROFILE VIEW HORZ: 1" = 200' <5% <5% <5% <5% <s% <5% <5% 15% <5% 15% <5% <5% <sz - j W VERT: 1" = 200' D 0 TOPSOIL SEGREGATION AREA PROPOSED TEMPORARY R.O.W. L;ZTZ —p PROPOSED PERMANENT R.O.W. ^PROPOSED 36 AP -2 PIPELINE PROPOSED PERMANENT R.O.W. T1T1T/iiTT/1T1 PROPOSED TEMPORARY R.O.W. ��i�rrPORARY �T �L7171�1T17 U U1 /1 /1 L1 STATIONING & o ' N m o MEELFF— CONSTRUCTION LIMITS c LL -20-156 N/F �� LL -20-156-A001 LL-20-157-AO02 fl N/F mI LL-20-157-AO03 N/F �I I� LL -20-157-A001 ROBERTS S, WELLONS INC PARCEL I.D. / 15111018 I N/F LUCILLE M. STEVENS ESTATE I LUCILLE M. STEVENS ESTATE JAMES W. NARRON REVOCABLE TRUST LL-20-157-AO02 I N/F I N/F LUCILLE M. STEVENS ESTATE 1135 LF PARCEL 1.0. 8 15LI2016B PARCEL I.D.:,E 15111050A PARCEL I.D. / 15L12040A UCILLE M. STEVENS ESTAT PARCEL I.D. / 15L12016D 1095 LF 741 LF 1120 LF PARCEL I.D. / 1511 1050A 4224 LF PROPERTY OWNERSHIP 320 LF h. o0 Lo o � J OO 4 O a J n .o V N � - O � W = LLJ + Z z W Z O) U J O ��E Ifz 2sKf w a a FCL Z� , — — 3 I z Q z Ll = m MAJOR UPGRADE S2 o 7 Y Lo S2 oQ --. ® Z o H � g 3 U Q Of H Z z O U SCALE: AS SHOWN DATE: 09/29/17 EXISTING ROAD MINOR UPGRADE DRAWN: GPT iTg 3 E CHECKED: DLH APPROVED: NET PIPE SPECIFICATION x II gai consultants - INC, inc. I 4198 COX ROAD l o I+ SUITE 114 CLEN ALIEN, VA 23060 804-270-9357 NC. COL 11F-0269 FE sal FE I� FEF sol I= solm cr ., c, F FE I=o sNl wl ��II�� X o�om STRING VIEW BAND NOTES: LEGEND V PERMANENT WATERSAWSLOPE BREAKER LOD LIMIT OF DISTURBANCE 1. COORIONATE SYSTEM USED FOR NPPPINGANDTOPOGPAPHY WMWIIHN<DWDATUM.— IT.US SUWUFOOT.CENTRALMERIDKNBI°W. PROPERTY LINE STORM SEWER EXTRA WORK SPACE ® TOPSOIL SEGREGATION AREA '7 TEMPORARY WATERBARISLOPE BREAKER �D T TRENCH BREAKERIPLUG BSRF— BELT ED SILT RETENTION 2. FENCE BSRF ( 1 4. CONTOURSAIO TOPOGRAPHIC FEATURES WERE DERIVED FROM UDAR DATAANDGPSSUBMETERGROUND SURVEYPERFORMED BYGPICONSIA —. INC FRO411Lg2114 IMAGERY —CN FROM GDOGLE EARTH. THEPRaP `N'sHDWNutEBASEDONGIs fl Tar ASSESSMENTRELORDS IPROVIDEDBYDTHERS).wILDNSULTUOSMA%ENOGVARAxTEEERHERE%PRESSEDORIMIIIEDASTDTHE THRU 1117-2014. —X—X— FENCE — — STREAM E W UNDERGROUND ELECTRIC WATERLINE AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. STREAM CROSSING CROSSING USEWITH O X COIR LOG 6 COMPO ST FILTER SOCK S. ORA NGESAFETY FENCE a ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. g•REAMANDwr=TurvD DATASHOWN ON THE DRAWINGSWAS PROAADED BY ERM. EROSION ANO SEOIMEMATION CONTROL EIEMENIS MAYSESHOANOUT9ICEOFTHEWORKAREASFORCW ONLY.A INSTA IONSHAILBEWITHINTHEMWAREAS. gLLGTATIONING SHOWN ISSLOPESTARONING. SILT FENCE ANOFILTEBEENOR LLBEINSTALIEOPARALLELi0LO1TOORTOE%LENTPRALRrnvcINALWRDANLEWIIHSTPNDARDDETAIL PROJECT N0./DASH N0. 140468 —G G— EXISTING GAS PIPELINE OH OVERHEAD UTILITY LINES SAN SANITARY SEWER EDGE OF GRAVEL WETLAND K J-� co.ac sxoxw.o.cavi0. cuci.v ax.v, UTILITY POLE WITH RUC NCED CONTROLS ENHANCED � I., CONSTRUCTION ENTRANCE WITX DITCH F"`- CULVERT AS NEEDED � � /���,^ �- ROADSIDE DITLX 9. SOIL TYPE f0. ncCEss ROnD3 HAVESEEN OR INTOFWRfATEGORIE3-t MENTS DE UAE EMS ) OL SWILD ROADS ND D FOR ROADS I, C TESORG ROADA MINOR IMPROVEMENTS, B) E%ISTING HAVE C SWI NES PROVIDED FOR ROADS IN G4TECARIE323AND 4. ROADS INCATECARIES1AND 2 HAVEADEOUATE E%ISTING DAND 4) RAINAGE; DRAWS FEATURSWEROSIONPVIDDFORSEDIMENT ROADS AND 4. ILL NATUREAD I-OCAT N IN WE DRAINAGE DRAINAGE NSIBLE MR THE 'ERM IS SOUIVRESPoNSIBLE FORTHE N4TUREAHD LOCATIONOFTHE DEPICTED BMPS ASOFTHE DATE SIGNED AND SEALED BASEDONTHESOURCEWTAPRONDED AND AS DESCRIBED IN THE OFT.HTNNIISDEPICOFTH TASK N0. GGS SUB TASK N0. GG GROUP ID DRAWING NO. CULVERTIACCESS ROAD WATERBARS ' GENERALIZED SURFACE WATER FLOW yyp7EgBARCON tt IPNNEWR43EDONINFORMATNINCUNiENRY AVAILABLE. WATERBAR CONFIGURATON MAYBEFlELDADJUSTEDAg NEEDED BASE00NCONDITXNI3 ACCESS ROAD — PROPOSED PERMANENT EASEMENT Tr TURBIUITYCURTAIN(PLANVIEW) SURFACE WATER FLOW WITHIN ROW OSSERVEDATTHE TIME OF CONSTRUCTION.—CONFIGURATION DEPICTED IN PIAN VIEWAPPUESTO BOTH TEMPOPARYAND PERMANENT WATERBARS. ASAPPROPRIATE. NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE D E104 � PROPOSED GAS PIPELINE PROPOSED GAS PIPELINE (NO GROUND SURVEY) EAS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) . WpTERBAR OUTLET (PLAN VIEW) 50' TURBIDITY AND TOG SAMPLING LOCATION (PLAN VIEW) WATERBAR(PLAN VIEW) 104 OF 189 HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. © 2017 GAI Consultants, Inc. NOTE: STATIONING SHOWN ON THE 600 5269+03 I I US 701 5269+265300+94 5291+95 I I 5292+16 x 5302+19 WETLAND WJOAo08F x 600 DRAWING IS BASED ON SLOPE MEASUREMENTS. 500 I I US 701 a LEES UNION CHURCH RD I LEES UNION CHURCH RD y CL REAM SJOB004 E RE RE x El 500 InoIT ywl� 5291+78o x ou aux " 40O D III RIGHT OF WAY IIS; f+ +�o�*�*a �+ x 4OO I IK 5291+76 FENCE m dol wm x 300 80 I'm T mm mUx 3001. N L I N N m o N + + N N N U v v N N m + m m a m +I � 0 N d + 200 o 0 Llu� — --<59, o N + + + + 0 0 0 0 * + �I o o o g o o 0 L J1 o' 0 0 J ti w o + + + 0 + o 0 0 0 � + 200 (n Z 5-10% ---�— __� ____ _-- <5% <5% — — --- — — — — ---- --- — — — _ — --- ----- --- — -- ---- ----- --- ----- ---- ---- A 100 s-,°% s-109. <5% <5% <sz -59. <5% --- <sz <ax -- <sz <sz 5% <s9. <5% 100 o (n PROFILE VIEW sranoN EouanoN HORZ: 1" = 200' 0 STAnON = 5295+98.76 BK. STATION = 5296+61.82 AHD.LLJ 0 a VERT: 1" = 200' 52569+74 2 3 5280+45 +0 9269+7 39 m I I 5270+73 wI p�$'� Sr rJ S 5290+80 iO iF77 J1j ^ > J J 5293+39� PROPOSED�rTEMPORARYT1 R.O.W. 1ZrLT L�irrri�� _ T1—Ti —1T T—�71T PROPOSED 36" AP -2 PIPELINE 81 qi PROPOSED PERMANENT R.O.W. 564/////////�/� 69+€2 ��� 69+59' _ PROPOSED PERTMANNEENTTR.00..W. PR OPOSED TEMPORARY R.O.W. a +I I m m L�L� TOPSOIL SEGRE�GATI_ON AREA _ STATIONING & CONSTRUCTION LIMITS NII w 52x1+83 E. '1 LL -20-178' m I Io WILLIAM FRANK LEE LIFE LL -20-179 LL -20-181 LL -20-186 ESTATE & REBECCA M LEE N/F N/F REMAINDERMAN m I Io N/F N I LOUISE ALLEN LIFE ESTATE & NORMA w I Io LOUSE B ALL LIFE ESTATE & o I LL -20-185 LL -20-187 N/F N/f I WILLIAM WOOD SANDERS w _ LL -20-176 N/F BRYAN K & DANA ALLEN DAVIT PARCEL I.D. W08J14013 LL -20-180 I I PARCEL I.D.08J14012 I ALLEN BLACK MON REMAINDERMAIN I I TOMESIA A WILLIAMS REMAINDERMAN I WILLIAM WOOD JR SANDERS PARCEL I.D. /08J14029 I PARCEL I.D. 802J14020D I LL -20-191 N/F MEAND B LEE LLC 936 LF N/F ��� PARCEL I.D. #08J14012C PARCEL 536 LF I.D. #08J14012E 504 LF 1479 LF WILLIPARCELWoo DD& ZBB16020CSANDERS PARCEL I.D. #02J14016B MICHELLE LEE ALLEN 686 LF gl9 LF 202 F PARCEL I.D. #08.14 12A 616 LF I PROPERTY OWNERSHIP LF - UL_2GI 87 CP 06, 02JI 4020D WILLIAM\OL� N/F 16 \\{i O PARCEL II 02JI401 AVE _ 111I/ U. I/ Ile WILLIAM FRANK LEE LIFE ESTATE & �\ \\ --� hI, �- N 11 01 + REBECCA M LEE REMAINDMM�\ ` I __ PARCEL I.E. III 08JI4013 ED SIR JR SANDERSPARCEL I.D. f 081140" STOCK POND L,U LM 11 N J 50 LF PA O a LiN> 3 \ 4-20-194 Uv O Z Z Z LJj \ 1 I\F ��Sill I.1 �\ '� _ DO z W I y/ — * TION THEN - 5295+9 ' 81 �'� LL -20-190 alN z aN FIT Y N z = mrn 44 UNKNOWN -20-179 N/rA QMARKER 0Q 2 �/' \ ! - p e PARCEL v ll —I / I I W - MCD z w Tm \� �\ ��- v ` v Z o H- Q J 6�� i PNY �' v ,�,_ �� i� �` M Ckf PARCEL N O z 288+ aMIT 81 « WAW. ]� i�J. SCALE: AS SHOWN DATE: 09/29/17 ALLEN LIFE ESTATE & li II 0 1 I / + / �/ vtiPARCEL -I A `�1 1. �/ _ DRAWN: GPT UP PARCEL L. {•. - i 479 LF> / - • CHECKED: DLII {.t ( kl'F APPROVED: NET PIPE SPECIFICATION 5269+03 US 701 5269+28 5291+95 5292+16 LEES UNION CHURCH RD LEES UNION CHURCH RD 5300+94 C STREAM SJOeOoa� 5302+19 x x gai mnsu tans- NC, in US 701 If.,l( I WETLAND WJOAOOBF o 4198 SUITE 04 ROAD 1LEN o X } x GALLEN, 7 23060 804-270-9357 o o o 0 0 o N.C. COL dF-0269 IJ IiNN mI �+ I IC+ 5291+78 RIGHT OF WAY zno of F+ Fo zo y m y STATION EQUATION 52 1+76 x^ *wo a G U, e STRING VIEW BAND STATION = 5296+61+82 AHD. NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHRADMDATUM.2014E1T,U83URVEYFOOTCENTRALMERIDMNH-W. — — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURBAND TOPOGRAPHIC FEATURES WERE DERNED FROM LIDAR DATA AND GP8 SUBMETER GROUND SURVEY PERFORMED BY M CONSULTANTS. N TH. INC FROM II -0B2014 THRU-7.2014. E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCX BREAKERIPLUG FENCE(BSRF) NNEBSHOWNLEEk ARE BASE d. THEE PROFEO'R GONGI58TPX ASBESSMENi RECOR05 (PROVIDED BYOTHERS). G4I CONSULTANTS MAKE NO GUNWNTEE EITHER EXPRESSED ORIMFLIEOAB TO THE X ,\' PENCE E UNDERGROUND ELECTRIC a STREAM CROSS ING COIR LOG ACCURACY OF TIE RECORDS AS BHOWNON THESE DRAWINGS. 5. STREAMANDWETIAND DATABHOWN ON THEDRAWINGS WAS PROVIDED BY ERM. S EROSION AND SEDIMEMATION CONTROL ELEMENT MAYSESHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACNAL INSTALLATION SHNL BEWITHIN THEWORPAREAS. PROJECT N0. DASH NO. — — STREAM W WATERLINE PROPOSED TEMPORARY R.O.W.USF ® AREA OF NO DISTURBANCE O �n ORANGEC.MPOUSSAFETY FENCE EIDITC. NIND SXOWN ISBLOPESTATONINE KSHALLBEINSTALLEDPARALATED.LELTOLONTOURTOE%TENTPRALTCPBLEINALI_ NLEWITHSTANOAROO.TAIL 140488 —G G— EXISTING GAS PIPELINE SAN OH OVERHEAD UTILITY LINES WITH ENHANCED SANITARY SEWER WITH ENHANCED CONTROLS CONSTRUCTION ENTRANCE WITH DITCH /���,�,� �( P" CULVERT AS NEEDED EDGE OF GRAVEL ® WE asxoxwD io rcavio. cLunr axLVl N UTILITY POLE ROADSIDE ROADSIDE DITLX SOIL TYPE R. ACCESSROADSHA HAVE EROSIOAND SEDIMENTSWILL BENO'PROADED FORIN CATISTINGS2 S ANINORIMPROVEMENWRIE%IIAND2HA ADEORIMPROVEMENTS ANOdI NEW ROADS. APPROPRIATE EROSION AND SEDIMEM CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES2,3NND4. ROADS IN CATECARIESIANOR HAVEADEOUATE E%ISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. ;0. N'EIRMOTES SOLELYSECTION SIBLEBOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE N SET TASK NO. 005 SUE TASK NO. 00 GROUP ID DR'A'WING NO. CULVERT ACCEST ROAD WATERBARS A GENERALIZED SURFACE WATER FLOW WATERBARCONFIGURATION IS DEPICTED IN PIANNEW BASEDONINFORMATIONCURRENTLYAVNIABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS ACCESS ROAD PROPOSED PERMANENT EASEMENT . E APPLIES ONLY TO THE TC TURBTY CURTAIN (PLAN VIEWOBSERVEDATTHETIMEOFcoNSTRUCTION. THECONFIGURAno1 DEPICTED Iry PLAN VIEWAPPUESTOBDTH TEMPORARYAND PERMANENT WATERBARS, NOTE: THE PE SEAL AND SIGNATURIDI ) � SURFACE WATER FLOW WITHIN NOW Al APPROPRIATE PROPOSED GAS PIPELINE SS R� R� R� SS LINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). PROPOSED GAS PIPEES � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) Q WATERBAR OUTLET (PLAN VIEW) D E109 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) WATERBAR (PLAN VIEW) 109 OF 189 HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: 600 6053+46 EDGE STREAM SSAP003 6076+43 6076+62 6086+00 6086+23 600 THE SHOWN ONBASED TIMOTHY RD TIMOTHY R�rn GREEN PATH RD GREEN PATH RD DRAW NCN S ON SLOPE MEASUREMENTS. 500 zo' �mzo zo o moll P' a = I o o I Imo 500 400 \ SNI I\605U f+l �' 3161 $ oI Ind A' A owl �^� " lo; " 400 S+ EDGE STREAM SSAP003 Zo m300 - ,f i-IT 300 ++0 + +2 +o 0 o o 0 0 00 0 0 00 0 0 0 0 0 0 _1L� _ ___ __________________o______________ _ ___ o_____ ______ ____________ _ _____ o _____ _G5% ___o _ 0 o o 0 ______ ______ _____ ___ ____ ____ cn 200 2001L z <5% <59 <59. <59 100 100 (n PROFILE VIEW sranaN EouanoN - > HORZ: 1„ = 200BTA710N = 6068+8].74 BK. srarloN 6o]1+aria W � VERT: 1" = 200 • 0 = Ano. p 6043+43 6075+30 6084+74 6085+69 6085+74m 6043+58 u u o0 0 o u , T o m 16085+77w TOPSOIL SEGREGATION AREA N Te N PROPOSED PERMANENT R.O.W. PROPOSED 36" AP -2 PIPELINE 6086+33 STA. 6087+28 PROPOSED PERMANENT R.O.W. _ r/% /% 6086+38 / S.� PROPOSED TEMPORARY R.O.W. j /�-- � �_ D � a o N + o+ p y1O STATIONING & _ >. o o N N N N •P ti m CONSTRUCTION LIMITS LL -21-023 T T LL -21-020 N/F LL -21-025 LL -21-025 LL -21-025 F �'I' LL -21-021 •" THOMAS EDWARD SUMPTER aI Im N/F IPARCEL I.D. 14018379801 N/F JI IJ N/F UL 1 MYRTLE W. DRAUGHON AND BETTY D. MYRTLE W. DRAUGHON ry/p MYRTLE W. DRAUGHON ELVA J. XILL MARVINFNILL ml 21- �1 NI LL-�AR �l�Iy4 i' , FAR 20 PARCEL I.D. / I PARCEL I.D. N 140652975071 I L-21-023 LL -21-022 REBARKER I I AND BETTY D. REBARKER DONELL H. LEE 1 I AND BETTY D. REBARKER �T 16065600001 360 LF N/F STEPHEN N/f PARCEL I.D. § 14028676001 PARCEL I.D. 16028674001 PARCEL I.O. 16003600902 PARCEL I.D. # 14028674001 313 LF THOMAS ED SUMPTER PARCEL I.D. JASON NICHOLAS BASS 2235 LF 899 LF ROW ONLY 2335 SF 2868 LF BARD PARCEL I.D. 14018379801 7PARCEL I.D. s 14012126001 PROPERTY OWNERSHIP 46 LF 93 LF \\ • 1 i 1 I I 1 1 ;2 U J ® ED O ED U i W� ED Z z ED EE N H 04 Ill a w r Q o m / _ c (O — � a c� 5 I o� I II'l I - a O z Z\� U 3 g PEE U O � i IF NFL z SCALE: AS SHOWN DATE: 09 29 17 DRAWN: GPT I 11 • / � 11 � // CHECKED: DLH / APPROVED: NET PIPE SPECIFICATION 6053+46 6053+61 6076+43 6076+62 6086+00 GREEN PATH RD 6086+23 GREEN PATH RD 9E11 COnSUTdn[5 - NC, in EDGE STREAM SSAP003� �EDCE STREAM SSAP003 TIMOTHY RD� I.ITIMOTHY RD I I+ I 4198 COX ROAD E 114 °'Ill GLEN ALLEN, VA 23060 804-270-9357 o o N.C. COL dF-0269 N � 71 .. 11 - - s =ol�I I�> QUI II o :mll I �w ms��ll I�q �v �Tm ..a STA TION EQUATION A+ v n STATION = 6068+87.74 BK. DTIID+ STATION = 6071+44.58 AILD. �� o�l�w T + STRING VIEW BAND oN NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UFMWITHNAGMWUM,ZONED.US 3URVEYFO0T.CENTRALMERIDMNSYW. — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONFOURSAND TOPOGRAPHIC FEATURES WERE DERNED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY M CONSULTANTS. INC FROM II -082014 TIED -72014. N TH. FENCE(BSRF) NREB NOWNLEEA E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG d. THEE PROFERn LI GON GI58TPX ASBESSMENi RECOR05(PROVIDED BYOTHERS). GAI LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPREBBEOORIMFLIEOAB TO THE AREBASE X X FENCE E UNDERGROUND ELECTRIC COIR LOG ACCURACYOF THERECOROB AS BHOWNON THESE DRAWINGS. 6 STREAM CROSS ING 5. STREAMANDWETIAND OATASHOWN ON THEDRAWINGS WAS PROVIDED BY ERM. 6. EROSIONANING SH ENTATION CONTROL ELEMEMS MAYSESHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACUAL INSTALLATION SHALL BEWITHIN THEWORNAREAS. — — NTNG SHOWN ISSLOPESTATIONINE PROPOSED TEMPORARY R.O.W.LISP STREAM W WATERLINE ORANGE SAFETY FENCE ® AREA OF NO DISTURBANCE O �n KSLIPED INSTALLEDPARALLELTOLONTOURTOE%TENTPRALRLPBLEINALCOROANLEWITHSTANDARPR.1L PROJECT N0. DASH N0. 140488 WITH ENHANCED WITH ENHANCED CONTROLS ROANGESAFETVFENCE SWILL BE PROODED FOR GAGS IN CATISTINGS2 S ANINORIMPROVEMENWRIE%IIAND2HSTING A ADEORIMPROVEMENTS —G G— EXISTING GAS PIPELINE SAN SANITARY SEWER ROADSIDE DITLX R. ACCESSROADSHA EBENLGROUPEROSIOAND CPTES.DIMENT CONTROLS CONSTRUCTION ENTRANCE WITH DITCH /���,�,� ANOdI NEW ROADS. APPROPRMIE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROPDS IN CATEGORIES2,3NND4. ROADS IN CATEDARIESIANOR HAVEADEOUATE E%ISTING �( T'"CULVERT AS NEEDED SOIL TYPE DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. N UTILITY POLE N`RMOTES SOLELYRECTION SIBLEBOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE OH OVERHEAD UTILITY LINES EDGE OF GRAVEL ® -E­asxoxwN SET TASK NO. 005 SUE TASK NO. OO io rcavioE CLunr axLVl CULVERT ACCESS ROAD WATERBARS A GENERALIZED SURFACE WATER FLOW WATERBARCONFIGURATION IS DEPICTED IN PUJINEWBABEDONINFORMATIONCURRENTLYAVAIIABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS 11 ACCESS ROAD PROPOSED PERMANENT EASEMENT . TURBIDITY CURTAIN (PLAN VIEW) � SURFACE WATER FLOW WITHIN NOW THECONFIGURAnoN D111-1 Iry ILAN VIEWAPPUES TO BDTHTEMPORARYAND PERMANENT WATERBARS Al Al ­ NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE T(,' TURBIDOBSERVEDATTHETIMEDFcoNSTRUCTION. ('ROUP ID DR'A'WING NO. PROPOSE. PROPOSED GAS PIPELINE SS R� R� R� SS PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) E124 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) WATERBAR (PLAN VIEW) 124 OF 189 'HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. MIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: 600 x 600 STATIONING SHOWN ON THE FE DRAWING IS BASED ON 500 m m p 21 m xo, x 71 E ZI zmm 500 SLOPE MEASUREMENTS. zmzm y� ommm�m £+f+oJ ; f^ fN 400 X x 400 300 m J T m w m m „ cl 300 > + 0 U + o ti + 0 0 0 `Sc x `" m 0 ti c + + 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �� 1 0 0 0 0 0 w � zoo 1 _ _ --- — --- 0 ---- ------ 0 o ------ -- — ----- 20Dco i <5R <59. <5Y, O 100 100 z, (n PROFILE VIEW - > HORZ: 1" = 200' LLI VERT: 1" = 200' 0 0 -- — — — — --- — —— — —— --�EROPOSED PERMANENT R.O.W. PROPOSED 36" AP -2 PIPELINE apu PROPOSED PERMANENT R.O.W. �j�r/r/r ///�////�/j///////"j/T//� T�T�TJMJ77T T RARY R.O.W. /�.� PRO /1 /1 /'? DA LLQ _ o STATIONING & .L1 TOPSOIL SEGREGATION AREA - CONSTRUCTION LIMITS of ± ml F ;, fl LL LL -21-038 N/F LL -21-040 LL -21-041 LL -21-042 LL -21-063 LL -21-044 LL -21-065 N/F VI N/F I N/F N/F oI N/F fl N/F �� LL -21-046 N/F wI LL -21-047 N/F of LL -21-068 N/F -21-037 ANNIE LEE SMITH DOROTHY JF ADKINS I PARCEL I.D. / 1609 1]68001 I EARL D. POPE AWE RAY SMITH AWE RAY SMITH ARTHUR T. LEE RUSSELL EDWARD CAVENAUGH WILLIAM DAVID LEE PARCEL I.D. A 14081502603 I PARCEL I.D. / I PARCEL I.D. / 14011252301 I PARCEL I.D. d 14060586001 PARCEL I.D. / 1/021064001 I PARCEL I.D. $ 16015152002 I MARY LOU JOHNSON PARCEL I.D. / 14015152201 DONELL LEE JR. PARCEL I.D. A 14015152102 MYRTLE W. DRAUGHON AND BETTY D. REBARKER I PARCEL I.D. / 14028676001 '� TIT PARCEL I.D..y 1404643150 376 LF 690 LF 1609315]502 637 LF 343 LF 941 LF 483 LF 489 LF 467 LF 910 LF 578 LF 233 LF PROPERTY OWNERSHIP � I I / o 0 �' .•. �� - -�� y_ T U : Ih e I� _ O J J W Z Z Z f�`i[fyY_•'! ® - / i W /VDI y o : Q_.< NEE a ❑ Qz C C z o Q LLI D o m ED o 4 ZO UT z U 3 1115 T Z O ti4 /IF�i�II�37 \ ' SCALE: AS SHOWN \ \ \ � DATE: 09/29/17 y \ � E L L� L� DRAWN: GPT CHECKED: DLH APPROVED: NET PIPE SPECIFICATION x. x gai Consultants - NC, in N < x o 4198 CO% ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 0 0 0 0 0 0 0 0 N.C. COL lF-0269 Ell y X s m X z2 F}'E}' gs g`�,�� F, u o NX�Oi w e e STRING VIEW BAND NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNADASDATUM,EONEIT.US 3URVEYFO0T.CENTRALMERIDNNSl-W. — — PROPERTY LINE --------- STORM SEWER \7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURSAND TOPOGRAPHIC FEATURES WERE N TH. DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY M CONSULTANTS. INC FROM II -0&2014 THIRD -72014. FENCE(BSRF) E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG 4. NREB NOWNLEEA AREBASE TH�EPROFERn LI DON G158TPX ASBESSMEM RECORDS(PROVIDED BYOTHERS). GAI LONSULTPNB MAKE NO GUNWNTEE EITHER EXPRESSED ORIMFLIEDAS TO THE X ,�' FENCE — — STREAM E W UNDERGROUND ELECTRIC WATERLINE COIR LOG 6 STREAM CROSS ING 5. TERSOCK 6. PROPOSED TEMPORARY R.O.W.USF ® AREA OF NO DISTURBANCE O �n ORANGECIOMPOSISAFETY ACCURACY OF TIE RECORDS AS SHOWN ON THESE DRAWINGS. STREAMANDWETIAND DATASHOWN ON THEDRAWINGS WAS PRWIOED BY ERM. NW WAS EROSION ANO SEDIMENTATION CONTROL EL=OUBIOE OF THE WORK AREAS FOR CLARITY ONLY.ACNPL INSTALLATION SHNL BE WITHIN THE WORT(AREAS. NTNG SHOWN ISSLOPESTARONINE KSHALLBEINSTALLEDPARALLEES PROJECT NO. DASH N0. 14LO4166 —G G— EXISTING GAS PIPELINE SAN OH OVERHEAD UTILITY LINES SANITARY SEWER EDGE OF GRAVEL WITH ENHANCED WITH ENHANCED CONTROLS ROANGEEDITCHFENCE — ROADSIDE DITCH 9� CONSTRUCTION ENTRANCE WITH DITCH /���,�,� �( P""` CULVERT AS NEEDED SOIL TYPE N UTILITY POLE ® WE ACCESSROADSHA EBENLGIAM EROSIOAND CATES.DIMENT CONTOUSTING BE PRMIOID FOR ADSL CATEGRIES2ASAND4 RIMPROVEMENWRIE%IIAND2HSTING A ADEORIMPROVEMENTS I ETOURTOE%TENTPRALTCPBLEINALLOROANLEWITHSTANDARPR.1L ANDdI NEW ROADS. APPROPRKTE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR MADS IN CATEGORIES2,3NND4. ROADS IN GITECARIE5I ANOR HAVEADEOUATE E%/STING DRAINAGE: DRAINAGEFEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. N`RMOTES SOLELYRECTION SIBLEBOR THE NATURE AND LOCATION OF THE DEPICTED SMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE OF TASK NO. 005 SUE TASK NO. GG ACCESS ROAD asxoxwD io rcaviDE CLunr axLVl CULVERTACCESS ROAD WATERBARS A GENERALIZED SURFACE WATER FLOW 11 PROPOSED PERMANENT EASEMENT NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE T(,• TURBIDITY CURTAIN (PLAN VIEW) � SURFACE WATER FLOW WITHIN NOW WATERBAR CONFIGURATION IS DEPICTED IHEET N PLANNEW OBSERVEDATTHETIMEDFcoNSTRUCTION. TNECONFIGURAnON BASEDONINFORMATIONCURRENTLYAVAIIABLE WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS DEPICTED Iry PLAN VIEWAPPUES TOBDTHTEMPORARYAND PERMANENT WATERBARS Al APPROPRIATE. (''ROUP D DRAWING NO. PROPOSED GAS PIPELINE RE RRA RRA RRA RE PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) D E126 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) 126 OF 189 MIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. PHIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. O 2017 GAI Consultants, Inc. NOTE: 6308+96OSA0026309+32 600 STATIONING SHOWN ON THE STOCK POND 0� STOCK POND OS40002 6328+75 PROPOSED ACCESS ROAD 21 -070 -AR 1 600 DRAWING IS BASED ON SLOPE MEASUREMENTS. 500 £ WuuNwNNww £ I £ aww ymmm 500 400 moi >N' �o. .om a+,m. IA,w>m.mm 400 _ cob 300 300 m m m m m o w N v m m mcn 200 + + + + > m + + m N + m N + + ° m N + 200 Z o--� o---- 0 0 0 0 m o m m m 0 0 0 0 0 S o o_____o o_____0 0in w � -- ----- -- — ---- ----- ---- --_-- — _--- ----- ---- —_—_ _____ ____ _____ __ _ ---o PROFILE VIEW 100 <s% <sr. <s'o <5� 15% <5% <5� <sx <59 <sx 59. <SC <sx <5% 100 N HORZ: 1" = 200' LLI lof VERT: 1" = 200' 0 0 PROPOSED 36" AP -2 PIPELINE PROPOSED PERMANENT R.O.W. o PROPOSED PERMANENT R.O.W. lel/i�T�TT/T/IlJ�/71l/i�T�TT/1/1L'%��71I/!/T/Il1Lr�71/�l/L%��LZ/ll1/j�71/T/T!PROPOSEiTE�PODARY R.O.W. o STATIONING &,. CONSTRUCTION LIMITS TOPSOIL SEGREGATION AREA w > m NH FWARREN LL -21-070 aLL-21-068LL-21-063 LL-21-072N/F LL -21-067 f N/F l m1 HUBERT PARCEL I.D. 810010435801 AI L�� N/F "'1 N/FHUBERT WEEKS FARMS LLC H. WARREN JR. HUBERT H. WARREN JR I.D. 814029880012 I PARCEL I.D. 8 1 I 99 LF .. L-21-069 LL -21-071 I N/F WEEKS FARMS LLC PARCEL I.D.810107627003 PARCEL I.D. 810107627002PARCEL 1 2648 LF 10010435802 360 LF N/F 2629 LF 669 LF WEEKS FARMS LLC 271 LF HUBERT H. WARREN JR. PARCEL I.D.001 13720001 PARCEL I.D. 814060501001 s1 PROPERTY OWNERSHIP LF 665 LF MATCH SHEET ij -22 ItI ( O O 1. + T 11 J 1 1 1/V LL -21_ p o n 1 11 1 VA -WEEKSFAIGES LLCJ d PARCEL I.D. 0'0107627OD2 ILL! K w+ Z ZtOz JM J00 Lu 360 LF 2629 LFW a c2 CN o (n . O _ /llkYklS�k) ¢ u w Z U Z a O 0 _ M v LC� w Z p o Z U 3 Q �J a Q m =3 N Z O ' 1 1 ! C SCALE: AS SHOWN \ _ _ \ ♦ �L DATE: 09/29/17 + DRAWN: GPT CHECKED: DLIV — \ APPROVED: NET PIPE SPECIFICATION 6308+9fi 5309+32 STOCK POND OSA0002� STOCK POND OSA0002 6328+75 PROPOSED ACCESS ROAD 21 -070 -AR 1 9ai consultants - INC, in 4198 C ROAD TE 114 GLEN ALLEN, VA 23060 804-270-9357 N.C. COL dF-0269 U` a�zrn �m awl �w =N zm I cul �w� . .fie ern. F+. +E+ E+ '^'. w Vie. f+- STRING VIEW BAND NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNAD63DATUM.20NE17.US 3URVEYFOOT.CENTRALMERICIAN61°W. — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURSAND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND N EEA TH. SURVEY PERFORMED BY M CONSULTANTS. INC FROM II -0&2014 THIRD TIED.—. E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIPLUG FENCE(BSRF) 4. TH�EP=TFLI DONGIGBTPX ASBESSMENi RECORDS(PROVIGEG BYOTHERS). GAI NREB NOWNLAREBASE LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPRESSED ORIMFLIEGAS TO THE X ,\' FENCE E UNDERGROUND ELECTRIC — — STREAM W WATERLINE ® AREA OF NO DISTURBANCE 6 STREAM CROSSING PROPOSED TEMPORARY R.O.W.USES STREAM �n O COIR LOG COMPOST FILTER SOCK ORANGE SAFETY FENCE ACCURACY OF TIE REGORGE AS BHOWN ON THESE DRAWINGS. 5. STREAM AND WETLAND DATA SHOWNON THEDRAWINGS WAS PROVIDED BY ERM. B EROSIONAND SEDIMEMATIONCOMROL ELEMEMS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARIIT ONLY.ACNPL INSTALLATION SHNL BE WITHIN THE WORKAPEAS. 1. NINGSXOWNISELOPESTARONING. KSHALLBEINSTALLEDPARALLELTOCONTOURTOE%TENTPRALTCAELEINALLORCANCEWITHGTANDARDDETAIL PROJECT N0. DASH NO. 140488 —G G— EXISTING GAS PIPELINE SAN SANITARY SEW ER OH OVERHEAD UTILITY LINES EDGE OF GRAVEL �( N ® WE WITH ENHANCED WITH ENHANCED CONTROLS CONSTRUCTION ENTRANCE WITH DITCH UTILITY POLE P" CULVERT AS NEEDED ROADSIDE DITCH /���,�,� SOIL TYPE R. ACCESSROADSHA HAVE APPROPRIATE T EXISTING BE PROODED FOR MADS IN CkTISTING SANINOROADSINECAME 3)E%ISAND HA08MAJOR IMPROVEMENTS ANOdI NEW ROADS. APPROPRKTE EROSION AND SEDIMEM CONTROLS WILL BE PROVIDED FOR ROPDS IN CATEGORIES2,3NND4. ROADS IN CATECARIESIANOR HAVEADEOUATE EXISTING EROSIO AND SEDIMENT DRAINAGE: ORAINAGEFEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 ANN 4. IS SOLELY OFTENISIBLE BOR THE NATUTHISREANPLAIND LOCA TION OF THE DEPICTED SMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE TASK NO. 005 SUE TASK NO. GO ACCESS ROAD PROPOSED PERMANENT EASEMENT asxoxwD io rcaviDE CLunr axLVl NOTE: THE BE SEAL AND SIGNATURE APPLIES CULVERT!ACCESS ROA. WATERBARS ONLY TO THE T(,' TURBIDITY CURTAIN (PLAN VIEW) A GENERALIZED SURFACE WATER FLOW � SURFACE WATER FLOW WITHIN NOW =ERM 11EAR Wq EAR CONFIGURATIONISDEPICTED IN PLAN NEW BASED ON INFORMATION CURRENT-YAVNITABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVEDATTHETIMEOFcoNSTRUCTION. THECONRCURAn11 DEPICTED Iry PLAN VIEWAPPUES TOBOTHTEMPORARYAND PERMANENT WATERBARS AS APPROPRIATE. GROUP D DR'A'WING NO. ED BY M (SEE NOTE 10). PROPOSED GAS PIPELINE SS R� R� R� SS PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETER � 50' TURBI.ITY SAMPLING LOCATION (PLAN VIEW) Q WATERBAR OUTLET (PLAN VIEW) D E129 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) WATERBAR (PLAN VIEW) 129 OF 189 PHIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. ts, Inc. 6566+55 6566+94 g TI EGATION AREA ..y�::/IJJ •- I-% ..A�%-��.•., . PROP, , POP.. R.O.W. .�% .,;. •: -... : - •;rye rr rr i NOTE: 600 D 2017 GAI STATIONING SHOWN ON THE Ill WIMP FRI Wowj--- DRAWING IS BASED ON 500 .. : • _1j1111f11i.191111f -6562+96 SLOPE MEASUREMENTS. • �1�: �1�.. t1 GODWIN-FALCON RD 'r""" '�GODWIN-FALCON RD 400+ ISN EF 300 PERMANENT WATERBARISLOPE BREAKER LOD 200 — PROPERTY LINE 100 <5% o, m PROFILE VIEW m m m I`N HORZ: 1" = 200 0 w E, L--I��-----�----+t VERT: 1" = 200' N N o o N m 0 0 0 0 1 �-----�— 15% ts, Inc. 6566+55 6566+94 g TI EGATION AREA ..y�::/IJJ •- I-% ..A�%-��.•., . PROP, , POP.. R.O.W. .�% .,;. •: -... : - •;rye rr rr i F1LIR•ly1 a., LL-22-035 LL-22-036LL-22-A002 N/F D 2017 GAI PROPOSED PERMANENT R.O.W. PROPOSED 36" AP 2 PIP LINE SM Ill WIMP FRI Wowj--- p,T' 6542+89 I I 6543+10 .. : • _1j1111f11i.191111f -6562+96 LEGEND • �1�: �1�.. t1 GODWIN-FALCON RD 'r""" '�GODWIN-FALCON RD � IIS ISN EF ISN PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNADRIDATUM,Z EIT.US SURVEYFOOTCENTRALMERIDIAN81-W. SNI PROPERTY LINE - — — — — — — —- o, o, m m m m m I`N :., 0 JL -----+-----4-----E----- N N + wo N 0 0 0 w E, L--I��-----�----+t w N 0 N N o o N m 0 0 0 0 1 �-----�— 15% <5% Po <5% <5% ts, Inc. 6566+55 6566+94 g TI EGATION AREA ..y�::/IJJ •- I-% ..A�%-��.•., . PROP, , POP.. R.O.W. .�% .,;. •: -... : - •;rye rr rr i F1LIR•ly1 a., LL-22-035 LL-22-036LL-22-A002 N/F PROPOSED PERMANENT R.O.W. PROPOSED 36" AP 2 PIP LINE SM Ill WIMP FRI Wowj--- p,T' 600 .. : • _1j1111f11i.191111f -6562+96 LEGEND • �1�: �1�.. t1 500 CONSTRUCTION - V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNADRIDATUM,Z EIT.US SURVEYFOOTCENTRALMERIDIAN81-W. a PROPERTY LINE - — — — — — — —- E+ AE+ STATION EQUATION PI STATION = 6567+06.72 BK. 404 w 0 - --_ PI STATION = 6570+90.30 AHD. D. r Po 300 + o N N N N o + o + + o o S o 0 0 0 0 o 0 0 0 0 0 + 0 1_ m + 0 0 0 0 _ — — — zoa <5% <s% <s% FENCE <s% 100 0 it LL -22-025 GWENDOLNNFMCMILLAN fI PARCEL I.D.660593-70-7046 4 PROPERTY OWNERSHIP o 6566+55 6566+94 g TI EGATION AREA ..y�::/IJJ •- I-% ..A�%-��.•., . PROP, , POP.. R.O.W. .�% .,;. •: -... : - •;rye rr rr i F1LIR•ly1 a., LL-22-035 LL-22-036LL-22-A002 N/F PROPOSED PERMANENT R.O.W. PROPOSED 36" AP 2 PIP LINE SM Ill WIMP FRI Wowj--- p,T' PARCEL I.D. 1 0592-89-0807 PARCEL LD.I 505 -59-7359 PARCEL I.D.2 22 -57-4574 .. : • _1j1111f11i.191111f -6562+96 LEGEND • �1�: �1�.. t1 CONSTRUCTION - it LL -22-025 GWENDOLNNFMCMILLAN fI PARCEL I.D.660593-70-7046 4 PROPERTY OWNERSHIP o F1LIR•ly1 a., LL-22-035 LL-22-036LL-22-A002 N/F N/F N/F N/F GWENDOLYN MCMILLAN CLARENCE LEE TART DONALD M. MCINTYRE JR. p,T' PARCEL I.D. 1 0592-89-0807 PARCEL LD.I 505 -59-7359 PARCEL I.D.2 22 -57-4574 NOTES: LEGEND 756 LF i i - v THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: AS SHOWN DATE: 09/29/17 DRAWN: GPT CHECKED: DLH APPROVED: NET consultants - NC, 4198 CO% ROAD I SUITE 114 GLEN ALLEN, VA 23060 PO4-270-9357 .C. COL dF-0269 PROJECT N0. DASH NO. 140468 TASK NO. SUB TASK NO. 005 00 3ROUP ID DRAWING NO. D E133 133 OF 189 NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNADRIDATUM,Z EIT.US SURVEYFOOTCENTRALMERIDIAN81-W. — _ PROPERTY LINE - — — — — — — —- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURSAND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY GAI CONSULTANTS. INC FROM II -0&2014 THRU 11-07.2014. N EEA TH. E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA TRENCH BREAKERIP LUG ENCS BSRF F ( ) 4. THEE PROFERn LI GON GI38TPX ASBESSMENi RECOR03(PROVIDED BY OTHERS). G4I LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPREBSEO ORIMFLIEO AS TO THE NNESSHOWNLAREBASE —X—X— FENCE E UNDERGROUND ELECTRIC 6 STREAM CROSSING COIR LOG ACCURACY OF TIE RECORDS AS SHOWN ON THESE DRAWINGS. NGS WAS 5. STRFAMANDWETIAND DATASHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. — — STREAM W WATERLINE ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W.ALLITAT' O` O USFWS STREAM CROSSING �n 6. EROSION ANO SEDIMENTATION CONTROL ELEM OUTSIDE OF THE WORN AREPS FOR CLARITY ONLY.ACNPL INSTALLATION SHNLBE WITHIN THE WORT(AREAS. COMPOST FILTER SOCK NING SHOWN IS SLOPE STARONING. ORANGE SAFETY FENCE ONTOUR TO E%TENT PRACTLPBLE IN ALWROANLE WITH STANDARD DETAIL -G G- EXISTING GAS PIPELINE SAN SANITARY SEWER WITH ENHANCED CONTROLS 9. ACCESS ROADS HAVE NLGROUPEDENTO FWRCATEGLL.ELT TIE%ISTITOEOXTSNO IMPROVE`_Ni3,2IE%,STINGROADSM"DARPROVEMENT3.3)_%,STING ROADS MAJOR IMPROVEMENTS ROADSIDE DITCH GH OVERHEAD UTILITY LINES EDGE OF GRAVEL ® INETL­�( N UTILITY POLE F""" CULVERUCTIONENTRANCE WITH DITCH CULVERT AS NEEDED CG,� AND4,NEWROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PRONDED FOR ROADS IN CATEGORIES2, 3AND4. ROADSINCATEWRIESIAND2HAVEADEOUATEE%,STING DRAINAGE: DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. E FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE SOIL TYPE iDES •o rcavi•Ecuvnr axLT CULVERT!ACCESS ROA. WATERBARS A SECTION N SET GENERALIZED SURFACE WATER FLOW WATERBARCONFIGUOF RATIONIS ACCESS ROAD PROPOSED PERMANENT EASEMENT NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE T(,• TU RBIOITY CURTAIN (PLAN VIEW) � DEPICTED IN PIAN NEWBASEOONINFORMATONCURRENTLYAVAIIABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS 1 DEPI SURFACE WATER FLOW WITHIN NOW OBSERVED ATTHE TIME DF CDNSTRUCTION. TNECONRGURAnON CTED Iry PLAN VIEW APPLIES TO B'TH TEMPORARYAND PERMANENT WATERBARS, Al APPROPRIATE. PROPOSED GAS PIPELINE PROPOSED GAS PIPELINE NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) Q WATERBAR OUTLET (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. SCALE: AS SHOWN DATE: 09/29/17 DRAWN: GPT CHECKED: DLH APPROVED: NET consultants - NC, 4198 CO% ROAD I SUITE 114 GLEN ALLEN, VA 23060 PO4-270-9357 .C. COL dF-0269 PROJECT N0. DASH NO. 140468 TASK NO. SUB TASK NO. 005 00 3ROUP ID DRAWING NO. D E133 133 OF 189 THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. C 2017 GAI Consultants, Inc. NOTE: 600 600 STATIONING SHOWN ON THE DRAWING IS BASED ON 71 SLOPE MEASUREMENTS. 500 sN Ism zqN 500 o zm FE f- 400 £� £+ ml IT 400 300 Tm oN o> „ 300 zoo m + 0 o g m m m m + + o g o 0 0 o e b ' m m ti m m + + 0 0 o i o 0 0 0 0 0 0 0 0 0 0 I zoo cn 0 0 ----+----- 0 0 0 0 ------I--- — — — 0 0 ----- ----� 0 0 I ----�- I- }---- - <s2 <52 15z ---+ ---- ---=----�------------------- --- ------ -------------- ---- � a Z O 100 5% <52 <57 5-10% <5% 5-10% <52 <5% 100 in PROFILE VIEW - > HORZ: 1" = 200' 0 0 Ed VERT: 1" = 200' m 6622+87 TOPSOIL SEGREGATION AREA o 77777A-7PROPOSED TEMPORARY R.O.W. o_ I+, = mmi— y 4 m o', + J � rJLT Ll" � PROPOSED PERMANENT R.O.W. o PROPOSED 36" AP -2 PIPELINE PROPOSEDPPERRM�A-NNENNTT�RTO.W. �1D TEMPORA.0 // J L1 STATIONING & u 7 CONSTRUCTION LIMITS 09? LL -22-036 �� LL -22-038 LL -22-039 LL -22-044 ;, N/F DONALD M. MCINTYRE JR. N/F TART k TART INC. '�"� N/F °�'� (AURA HERRING 154 PARCEL I.D. # 0592-57-4574 1 2022 LF PARCEL I.D.:,t 0592-28-1132 826 LF 1 JOSEPH C. SCOii III ET UX PARCEL I.O. 0592-06-0355 PARCEL I.D. / 0592-45-0119 1 2202 LF TIT 913 LF PROPERTY OWNERSHIP i Is 111 6603+69 HE n ic,- i - KETLAND - _ PI 6620+ A O + M 6 toLL-22-0 J HIT JI DONALD M. MCINIYRIE JR. PARCEL I.D. 0 572 {�II��D O< Z U20592 LFi IJ Z 72 WETLAND WCUP011F _3 10 aw T1Fg � `' s' WIDE JOSEF SCOTT III ET U/ ♦ a o aN� a y o ~o 1 PARCEL D- 0592 45-0119TPARCEL I.D. f 0592 -GO -0355 795 LF UP N552 N Uma Z 1co M d U 0 Q U 3 ilTART lED. 0592-28-1132 4 v] ♦ A U QPARCEL o, C, am LF UL -22-042._ N/F ( N NOW ONLY 2065 SIF / y/ \ 99 MILE 12 MINOR UPGRADE � � SCALE: AS SHOWN ` ♦ n DATE: 09/29/17 �. o $\♦ /� 1 200' DRAWN: GPT ,.�SCA \' \ k L , E' SHED \\ \ (l CHECKED DLN APPROVED: NET PIPE SPECIFICATION gai consultants - NC, in 0 SU IE 114 ROAD GLEN ALLEN, VA 23060 804-270-9357 0 N.C. COL dF-0269 =NISI ISN SNI Ism STRING VIEW BAND 16, NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UTMWITHNXEMCATUM,EONEIT.US 3URVEYFOOT.CENTRALMERIGMNSl'W. — PROPERTY LINE --------- STORM SEWER \7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONTOURSANG TOPOGRAPHIC FEATURES WERE DERNED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY GN CONSULTANTS. INC FROM II -082014 THIRD 72014. N EEA TH. E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA FENCE(BSRF) NRES NOWNLAREBASE TRENCH BREAKERIPLUG d. TH�EP=TFLI DONG158TPX ASSESSMENT RECORDS (PROVIDED BYOTHERS). GAI LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPRESSED ORIMFLIEDAS TO THE —X—X— FENCE E W UNDERGROUND ELECTRIC WATERLINE 6 COIR LOG ACCURACY OF TIE RECORDS AS SHOWN ON THESE DRAWINGS. STREAM CROSS ING 5. STREAMANDWETIAND DATASHOWN ON THEDRAWINGS WAS PROVIDED BY ERM. COMPOST FILTER SOCK 6. EROSION AND SEDIMEMATION CONTROL ELEMEMS MAYSESHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACTUAL INSTALLATION SHALL BEWITHIN THEWORI(AREAS. PROJECT N0. DASH NO. — — STREAM ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W.1. O NINGSHOWNISSLOPESTARONINE RTOE%TENTPRALTLPBLEINALWROANLEWITHST-DAROOETAIL USFWSSTREAMCROSSING �n ORANGE SAFETY FENCE KSHALLBEINSTALLEDPARS. 140488 —G G— EXISTING GAS PIPELINE SAN OH OVERHEAD UTILITY LINES SANITARY SEWER �( EDGE OF GRAVEL ® WE asxoxwD io rcavioE CLunr axLVl N UTILITY POLE P" WITH ENHANCED CONTROLS ESOT EXV ROADSIDE DITCH 9� ACCESS ROADS HAVE NLGROUPEOINTO FWRCATEGORIES 1)E%ISTING ROADS NO IMPROVEMENTB 2)E%ISTING ROADS MINORIMPROVEMENTS.3)E%ISTINGRMDSMAJORIMPROV ENTB CONSTRUCTION ENTRANCE WITH DITCH /���,�,� AND4INEWROADS. APPROPRMIE EROSION AND SEDIMENT CONTROLS WILL BE PRONDED FOR ROADS IN CATEGORIEE2, 3AND4. ROADS IN CATEGORIES I AND 2 HAVE ADEQUATE EXISTING CULVERT AS NEEDED SOIL TYPE DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 ANN 4. NERM IS SOLELY OTES SECTION OFTENISIBLE FOR THE NATUTHISREANPUND LOCA TION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE SET TASK NO. 005 SUB TASK NO. 00 GROUP D D DRAWING NO. E134 CULVERT!ACCESS ROAD WATERBARS A GENERALIZED SURFACE WATER FLOW WATERBAR CONFIGURATIONISDEPICTEG IN PLAN NEW BASED ON INFORMATION CURRENTLYAVARABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS 11 ACCESS ROAD PROPOSED PERMANENT EASEMENT OBSERNEGATTHETIMEOFCONSTRUCTION. THECONFICURAnoN DEPICTED Iry PLAN VIEWAPPLI"TD eoTH TEMPORARYAND PERMANENT WATERBARS, AS A111111IATE. NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE TUR T(,' BIDITY CURTAIN (PLAN VIEW) � SURFACE WATER FLOW WITHIN ROW PROPOSED GAS PIPELINE PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET (PLAN VIEW) 134 OF 189 � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. 'HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING ME'HODS. C 2017 GAI Consultants, Inc. NOTE: 600 I I : : 9035+18 600 STATIONING SHOWN ON THEEDGE DRAWING IS BASED ON SLOPE MEASUREMENTS. 500 El 9017+42 Eon+67 OF EDGE OF sHaNNON RD I I SHANNON RD i e �:035,4D5ETUNwltoeot3s I£ z e EDGE OF z ,El STREAM+86 SROH010 S o S 500 400 o op,op +,o+ 400 ` EDGE OF STREAM SROH010 s " '" - 300 I Io „ -1 „ 300 o + + + 0 0l 'o + + + S v o N + + + o + 0 I�11 + 200 o 1 — o 0 _ ---- ---- o S o o o 1 o o 0 0 0 I o 0 0 0 0 0 0 0 0 20D z <5% <5% <5% <5% <59, —� — <5% — <5% <59. — — —_ ___ —o __L_o---- ----- --—o____ ------ _____ ____ ____ _____ ____ _L-- -----o n Too <s% <s% <5Y <s% < % <s% <s% <s% <s% <s% <s% <s% <s% <s% <s% <5% <s% 100 (n PROFILE VIEW - > HORZ: 1" = 200'w VERT: 1" = 200' G O PROPOSED TEMPORARY R.O.W. 9017+209017+80 9017+22 I 9017+83 ��Q',j.j',j.j',IIo T1 7=-/ T i7-7T7-ri _ PROPOSED PERMANENT R.O.W. 131 PROPOSED 36° AP -2 PIPELINE PROPOSED PERMANENT R.O.W. o�J T/Tii�TT/T/T 9017+26 9017+86 _ PROPOSED TEMPORARY R.O.W. 9017+28 9017+89 L901i]+31 9017+91 TT *Gr STATIONING & Uf TOPSOIL SEGREGATION AREA I CONSTRUCTION LIMITS 5' F -24-049 LL -24-049 ul LL -24-051 wl LL -24-052 LL -24-054 ml 41 �LL N/F Iw NIwl N/F N/F HI JOHN H. MCNEILL AND WELBORN FAMILY TRUST PARCEL I.D. 11 937677696000 JOHN H. MCNEILL AND WELBORN I I FAMILY TRUST PARCEL I.D. 937677696000 DANIEL JR. &CATHY TIMMS I PARCEL I.D. B 937635099300 I 576 LF WILLIAM EDWIN MCNEILL JR. ET AL LL -24-051 EVA H. KRYNOVICH AND JOANNE, PARCEL I.D. B 937659960304 NI�I\• I BANKS HEIRS 1403 LF DANIEL JR. & CATHY TIMMS PARCEL I.D. #937607169600 p,T' 1809 LF 1699 LF PARCEL I.D. A 937635099300 2586 LF 162 LF • PROPERTY OWNERSHIP _`1 - / o I 1 10 + ILL -24-041 1 N/F to IN MCNEILL AND WELBORN LL -24-051 PARCEL I.D. 111 937606941200 CEI} LD # 937677696000 I 1 i BOB UP LL -24-051 DANIEL JR. & CATHY TIMMS PARCEL I.D. 111 937 350993DO O J N 1699 LF DANIEL JR. CATHY 5 176 LF62 LF& a p 2 PARCEL I.D. # 937 099300 O LLJ576 Z Z LF Z a J p J �162 LF J � v LLJ o a�� O_3o _ 61- a� �o N N O CLzQ ELIr Quo m o$c M�wIS Hp Z U 3 WATER UNE MARKER -1 's WE O U-24-049EILL AND WELBORN JOHN H. MCN WE F ® ® [REP O a 4F FAMILY TRUSTWE PARCEL I.D. 937677696000 0 UP \\ III: LFPARCEL \\ \WILLIAM EDWIN CINEILL. JIL ET AL JT UL -24- 4 I.D. , 937 59960304 1403 LF EVA HUMPHREY N/FD5Z KRYNOVICH, ET AL PARCEL I.D. # 1376*7169600 UP I SCALE: AS SHOWN / \ \ \� DATE: 09/29/17 \ WILLIAM EDWIN MCNEILL -PARCEL I.D. f 9376509�_ J Er I _ 200' S L 1 , S P DRAWN: GPT CHECKED: DLH APPROVED: NET PIPE SPECIFICATION 9017+42 9017+67 EDGEOF EDGE OF SHANNON RD SHANNON RD 9035+18 WETLAND WRO10131 9ai COnSUltan[5 - NC, in o 2 2SUI III Ito I+ 98 CO% ROAD E 114 GLEN ALLEN, VA 23060 804-270-9357 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N.C. COL IF -0269 I~ oI EDGE O5 '��' '�£' OF Y� Ibz oI STREAM SROH010 `a "1 "1 "1 igloo �oloo 'fes +I Io E KEDGE e c E 9035+86 A+ £n+ _�EDGE OF STREAM seoeolo Am,a� s+.A+ STRING VIEW BAND NOTES: LEGEND V PERMANENT WATERBARISLOPE BREAKER LOD LIMIT OF DISTURBANCE 1, COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY UFMWITHNADMDATUM.20NE17.U8 3URVEYFO0TCENTRALMERICWSl-W. — PROPERTY LINE --------- STORM SEWER �7 TEMPORARY WATERBARISLOPE BREAKER - --_ BELTED SILT RETENTION 2. CONFOURSANG TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUBMETER GROUND SURVEY PERFORMED BY M CONSULTANTS. INC FROM II -0B2014 N EEA TH. THRU-72014. E%TRA WORK SPACE ®TOPSOIL SEGREGATION AREA FENCE(BSRF) TRENCH BREAKERIPLUG 4. TH�EPROFERn LI DON GIGBTPX ASBESSMENi RECORDS(PROVIDED BYOTHERS). GAI LONSULTPNTS MAKE NO GUNWNTEE EITHER EXPRESSED ORIMFLIEDAS NREB NOWNLAREBASE TO THE X ,�' FENCE — — STREAM E UNDERGROUND ELECTRIC W WATERLINE ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W.LISPS 6 O COIR LOG STREAM CROSSING COMPOST FILTER SOCK STREAM �n ORANGE SAFETY FENCE ACCURACY OF TIE RECORDS AS BHOWN ON THESE DRAWINGS. NW WAS 5. STREAMANDWETIAND DATASHOWNONTHEDRAWINGS WAS PROVIDED BY ERM. 6. EROSION AND SEDIMENTATION CONTROL EL=OUBYEOF THE WORK AREAS FOR CLARITY ONLY.ACNPL INSTALLATION SHNL BE WITHIN THE WORT(AREAS. NINGSHOWNISELOPESTATONING. KSHALLBEINSTALLEDPARALFS.LELTOLONTOURTOE%TENTPRAL`.0-- INALOOROANLEWITHSTANDARDOETAIL PROJECT N0. DASH NO. 140488 —G G— EXISTING GAS PIPELINE OH OVERHEAD UTILITY LINES SAN SANITARY SEWER EDGE OF GRAVEL �( N UTILITY POLE ® WE P" WITH ENHANCED CONTROLS WITH ENHANCED ROADSIDE DITCH CONSTRUCTION ENTRANCE WITH DITCH /���,�,� CULVERT AS NEEDED SOIL TYPE 9. ACCESSROADSHA ESENLGROUPEROSIOAND CADIMENT COTEXISTING BE PRMIO IMPROVEMENTSNCATEWRIES2S ANINORIMPROVEMENWRIE%IIAND2HAADEORIMPROVEMENTS ANOdI NEW ROADS. APPROPRMIE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES2,3NND4. ROADS IN GITECARIE5I ANOR HAVEADEOUATE E%ISTING DRAINAGE; ORAINAGEFEANRES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 ANN 4. IS SOLELY OFTENISIBLE FOR THE NATUTHEREANPLAIND LOCATION OF THE DEPICTED SMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE SET TASK NO. 005 SUE TASK NO. 00 ACCESS ROAD PROPOSED PERMANENT EASEMENT asxoxwD io rcavioE CLunr axLVl NOTE: THE BE SEAL AND SIGNATURE APPLIES ONLY TO THE 7(,' CULVERT!ACCESS ROAD WATERBARS A GENERALIZED SURFACE WATER FLOW TURBIDITY CURTAIN (PLAN VIEW) � SURFACE WATER FLOW WITHIN ROW =ERM 11EAR Wq EAR CONFIGURATION'SDEPICTED IN PLAN NEW BASED ON INFORMATION CURRENTLYAVNIABLE. WATERBAR CONFIGURATION MAYBE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS OBSERVEGATTHETIMEOFcoNSTRUCTION. THECONFICURAno1 DEPICTED Iry PLAN VIEWAPPUES""'ITEMPORARYAND PERMANENT WATERBARS AS APPROPRIATE. GROUP D DR'A'WING NO. PROPOSED OAS PIPELINE PROPOSED GAS PIPELINE (NO GROUND SURVEY) E83 CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). � 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) Q WATERBAR OUTLET (PLAN VIEW) D E180 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) 'Ai WATERBAR (PLAN VIEW) 180 OF 189 'HIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING ME'HODS. NOTE: 600 l LL -I6 -D69 l U-18-0]0 uo I LL - -0)I LL- 16-073 L N/F A 20"X 0.286" WT -%70 DSAW, FBE 600 STATIONING SHOWN ON THE m N/F m N/F N/F STONEWALL FARM WATERLINE ® TOPSOIL SEGREGATION AREA • 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) FIATP SSF TIMBER LLC DRAWING IS BASED ON SLOPE 500 FLY THE LAND HOLDINGS LLC o I 0 o o '� iAX MM d 4061-I5-5356 ,245 LF 500 MEASUREMENTS. iAx MAP 1061-]2-1581 1.285 LF TAX WP 1.074011OR-8902 o PROPERTY OWNERSHIP 5 0 I I I 400 CULVERT ACCESS ROAD WATERBARS �. E 20"X 0286 WT X70 DSAW, EDGE WETLAND EDGE O WNRP022F sw �,++ 400 0 o 0 0 0 0 FEE + 3" CC £_ F 2DE 0.343" WT -X70 DSAW, FEE + 3" CC `w o p n z G 20i( 0.412" WT X70 DSAW, FBE + 2.5 CC F ^' oT F �^ o e 300 314+55 H 24"% 0.500" WT -X70 BARE o o "S 300 EDGE OF WETLAND NR 022F - 200 STRING VIEW BAND EDGE OF WETLAND WNRP022F 200 100 ti + N > m o 0 0 + m 0 o N v m 0 0 0 o N o 0 o0 o0 o0 0+o —0oo -----— — — — 0�o --- oo+ 0 0 --<-5% 100 PROFILE VIEW 5% s% s% <—% <s% <5% <5%<5% % Sx 5% <5% HORZ: 1" = 200' D 0 VERT: 1" = 200' _ _ _ PROPOSED PERMANENT R.O.W. PROPOSED 20" AP -3 PIPELINE 7 -TI T1 '�LT1T1�1f�LT1N1��LT1l IN 17 PRQPQSF L=MT RYlILl L�1 U1T1T- NU1T1��1T1T17 STATIONING & m m v N 22 CONSTRUCTION LIMITS PIPE LEGEND LL -16-065 l LL -I6 -D69 l U-18-0]0 uo I LL - -0)I LL- 16-073 L N/F A 20"X 0.286" WT -%70 DSAW, FBE �. N/F m N/F m N/F N/F STONEWALL FARM WATERLINE ® TOPSOIL SEGREGATION AREA • 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) FIATP SSF TIMBER LLC o I FLYFHE LAND HOLDINGS LLC I FLYTHE LAND HOLDINGS LLC u I FLY THE LAND HOLDINGS LLC o I PROPERTIES LLC EXISTING GAS PIPELINE OVERHEAD UTILITY LINES ACCESS ROAD AN iAX MM d 4061-I5-5356 ,245 LF V iAX MAP IY 4061-52-8888 691 LF TAX MAP fl 4061-62-6352 507 LF iAx MAP 1061-]2-1581 1.285 LF TAX WP 1.074011OR-8902 ROA.SI.E DITCH HLT F SOIL TYPE g, ­ PARALLEL Tt oCE .NT.UR TO EXTENT �31 EX�STINGC OAo3 mNORE WITH DNRPROVEMENTSA, 3o EXISTING ROADS 910 EW ROADS FTA 53.3 N 4. ROADS IN GENERALIZED SURFACE WATER FLOW S DEQUATE EXISTING MLA NAGE DAUMAGE AND SNWILL BE PROVIDED FOR ROADSINCA [ ORIES 3 ANDGOO NE 10 M JEGSS SOLELY ESOVAME33 HASE LE FOR THE xaTURE Axo LOCATIox of THE DEPItTeD BMPS AS OF THE DATE SIGNED AN. SEALED BASED ox THE SOURCE DniA PROVIDE. AN. SURFACE WATER FLOW WITHIN ROW DESCRIBeD Ix THE NOTES SECTION N THE IxoN. SHEET of THIS PLA PROPERTY OWNERSHIP I I I I CULVERT ACCESS ROAD WATERBARS PIPE LEGEND PROPERTY LINE FENCE - — — — — — — — - E STORM SEWER UNDERGROUND ELECTRIC 313+54 A 20"X 0.286" WT -%70 DSAW, FBE �. PERMANENT WATERBARISLOPE BREAKER (PROFILE VIEW) TEMPORARY WATERBARI8LOPE BREAKER LIMIT OF DISTURBANCE NOTES: +. COoxolxniE SYSTEM useD FOR MAPPINGANDTo.OGRAPxr-urM wITx NADe3 DATUm�z.nE 1R, USS NS1'W. URVEY FOOT, CENTRAL MERIDIA BELTED SILT RETENTION 2, CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIAR DATA AO GPS S B -METE GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-3014 FENCE (BSRF) 3. IMAGERY TAKEN SYYY rr!YYYYY� r -,111���� �}�}� ,%,� • COIR LOG 4. TY LNRES sxowx ARE BAOM GOOOLE seD ON GIs S TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSES OR CL OR STREAM SNRP016 STREAM B 20"X 0.343' WT -X70 DSAW, FEE WATERLINE ® TOPSOIL SEGREGATION AREA • 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) fTl TT (PROFILE VIEW) TRENCH BREAKERIPLUG --------- - - C 20"X 0.412" WT -X70 DSAW, FIRE G G — — GH EXISTING GAS PIPELINE OVERHEAD UTILITY LINES ACCESS ROAD AN SANITARY SEWER EDGE OF GRAVEL PROPOSED PERMANENT EASEMENT ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND acox axawx.o xxov�oacuxm onLai UTILITY POLE D 20"X 0.412" WT -X70 DSAW, STREAM CROSSING USFWS STREAM CROSSING ENHANCED CONTROLS CONSTRUCTION ENTRANCE WITH DITCH CULVERT AS NEEDED - CIIB ♦ ROA.SI.E DITCH HLT F SOIL TYPE g, ­ PARALLEL Tt oCE .NT.UR TO EXTENT �31 EX�STINGC OAo3 mNORE WITH DNRPROVEMENTSA, 3o EXISTING ROADS 910 EW ROADS FTA 53.3 N 4. ROADS IN GENERALIZED SURFACE WATER FLOW S DEQUATE EXISTING MLA NAGE DAUMAGE AND SNWILL BE PROVIDED FOR ROADSINCA [ ORIES 3 ANDGOO NE 10 M JEGSS SOLELY ESOVAME33 HASE LE FOR THE xaTURE Axo LOCATIox of THE DEPItTeD BMPS AS OF THE DATE SIGNED AN. SEALED BASED ox THE SOURCE DniA PROVIDE. AN. SURFACE WATER FLOW WITHIN ROW DESCRIBeD Ix THE NOTES SECTION N THE IxoN. SHEET of THIS PLA — — — FEE + 40 MILS PC NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE PROPOSE. GAS PIPELINE (PIO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12)• CULVERT ACCESS ROAD WATERBARS �. E 20"X 0286 WT X70 DSAW, o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 o 0 0 0 0 FEE + 3" CC F 2DE 0.343" WT -X70 DSAW, FEE + 3" CC `w o p n z G 20i( 0.412" WT X70 DSAW, FBE + 2.5 CC F ^' oT F �^ o e 312+98 CL OR STREAM SNRPO17 314+55 H 24"% 0.500" WT -X70 BARE o o "S 311+s5 EDGE OF WETLAND NR 022F - STRING VIEW BAND EDGE OF WETLAND WNRP022F LEGENDLOU — — X X PROPERTY LINE FENCE - — — — — — — — - E STORM SEWER UNDERGROUND ELECTRIC TURBIDITY CURTAIN (PLAN VIEW) EXTRA WORK SPACE 50' TURBIDITY SAMPLING LOCATION PLAN VIEW ( 1 �. PERMANENT WATERBARISLOPE BREAKER (PROFILE VIEW) TEMPORARY WATERBARI8LOPE BREAKER LIMIT OF DISTURBANCE NOTES: +. COoxolxniE SYSTEM useD FOR MAPPINGANDTo.OGRAPxr-urM wITx NADe3 DATUm�z.nE 1R, USS NS1'W. URVEY FOOT, CENTRAL MERIDIA BELTED SILT RETENTION 2, CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIAR DATA AO GPS S B -METE GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-3014 FENCE (BSRF) 3. IMAGERY TAKEN SYYY rr!YYYYY� r -,111���� �}�}� ,%,� • COIR LOG 4. TY LNRES sxowx ARE BAOM GOOOLE seD ON GIs S TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSES OR STREAM —W— WATERLINE ® TOPSOIL SEGREGATION AREA • 50' TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEW) fTl TT (PROFILE VIEW) TRENCH BREAKERIPLUG --------- - - PLIED AER IMPLIEDTO TxE ACCURACYOFTHE RECORDS AS SHOWN ON THESE BRAW110S. COMPOST FILTER SOCK 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. ORANGE SAFETY FENCE 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK G G — — GH EXISTING GAS PIPELINE OVERHEAD UTILITY LINES ACCESS ROAD AN SANITARY SEWER EDGE OF GRAVEL PROPOSED PERMANENT EASEMENT ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND acox axawx.o xxov�oacuxm onLai UTILITY POLE O STREAM CROSSING USFWS STREAM CROSSING ENHANCED CONTROLS CONSTRUCTION ENTRANCE WITH DITCH CULVERT AS NEEDED - CIIB ♦ ROA.SI.E DITCH HLT F SOIL TYPE g, ­ PARALLEL Tt oCE .NT.UR TO EXTENT �31 EX�STINGC OAo3 mNORE WITH DNRPROVEMENTSA, 3o EXISTING ROADS 910 EW ROADS FTA 53.3 N 4. ROADS IN GENERALIZED SURFACE WATER FLOW S DEQUATE EXISTING MLA NAGE DAUMAGE AND SNWILL BE PROVIDED FOR ROADSINCA [ ORIES 3 ANDGOO NE 10 M JEGSS SOLELY ESOVAME33 HASE LE FOR THE xaTURE Axo LOCATIox of THE DEPItTeD BMPS AS OF THE DATE SIGNED AN. SEALED BASED ox THE SOURCE DniA PROVIDE. AN. SURFACE WATER FLOW WITHIN ROW DESCRIBeD Ix THE NOTES SECTION N THE IxoN. SHEET of THIS PLA — — — PROPOSED GAS PIPELINE NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE PROPOSE. GAS PIPELINE (PIO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12)• CULVERT ACCESS ROAD WATERBARS �. 11NEEDED WATlRBAR OUTLET (PLAN VIEW)BASED IN NIH- ED AT TIME of coxsiBUc N . IF'E CRMFIGURATION DEPICTIV N PLAN VIEW APPLIES TO 0TH TEMPORARY AND PERMANENT WATERBAR(PLAN VIEW) WATERBARS, AS APPROPRIATE. THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. 1n Z O (n > CLI IY 0 0 + h U O J 3 � a J O o W za W + a Z — Z O o JC4I W �� W N G, W N d ~ o EL N F— LLj �w Q0 oTO o Q oa ,,j a i H e ID Z � U H !n Z O U SCALE: AS SHOWN DATE: 9/28/17 DRAWN: JMS CHECKED: DLH APPROVED: NET gai consultants - NC, inc.1 4198 CO% ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 N.C. COL #F-0269 W -e monaloh basin engineers 300 BUSINESS CENTER DRIVE PITTSBURGH, PA 15205 412-788-2433 PROJECT N0./DASH NO. 140468 TASK NO. SLID TASK NO. 005 00 3ROUP ID DRAWING NO. D E009 009 OF 84 NOTE:o 600 m m o O o mo �^ o n mo mo �, �, 527+03 o o RIGHT-OF-WAY o PERMANENT WATERBARISLOPE BREAKER (PROFILE VIEW) TEMPORARY WATERBARI8LOPE BREAKER 600 STATIONING SHOWN ON THE DRAWING IS BASED ON SLOPE+ f'^ o+ �1p- �Eo mfe $F+ o N $f+� l I 527+t3 m wNRBt OF 02F ETUND 53t+3o zoN owl I/% EDGE OF STREAM 8F+ zo mem EDGE OF WETTAND 524+93 WNR0002FI I,I WNR0002F 127+13 MEASUREMENTS. 500 - om+ m`a>. m� n. £rn rn�p. �z �z oo -ui`". f ^�N' `av' I' SNR0003 I 527+45 N`a�' �� "' - CUB ♦ I I m A I 500 EDGE OF WETTAND WNRB102F WNRB102F� mSA Z 503+19 NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12). D 20"X 0.412" WT -X70 DSAW, I .I i+' CL OF RAILROAD { 11 NEEDED WATERBAR OUTLET (PLAN VIEW) AT TIME of coxsiBucTloxs. TxE coxHGURATION pEPICT.p IN PLAN vlEw APPUEs To Boix TEMPORARY Axo PERMwxENT WATERBAR (PLAN VIEW) BASED ON NO.— EDERBARS, AS APPROPRIATE. EDGE 0 WN 0 02F 400 01 PROPOSED ACCESS ROAD l l ,6 -086 -AR., l l 524+z8 RIGHT-OF-WAY 524+62 A l o� A o l EDGE O Y SEDGE 0 WETLAND �II� WNRB102F l o 400 300 CL OF NC -186 .I o T //y II{{/ 527+89 537+10 RIGHT-OF-WAY EDGE OF WETLAND) 0 0 0 0 0 0 300 200 OI 0 0 0 o EDGE OF WE4+86 WNR0002F I I 530+98 l PPP WNRB102F EDGE 0 FBE + 3" CC 200 524+93 RIGHT-OF-WAYN I SNRO 03� F 20'X 0.343" Wi-XJO DSAW, m PROFILE VIEW 100 mm n + e + + o v > m m o > > m + m m + $ o 0 0 8 8 8 8 o S o + o -<5 -<5 - -- J --- -- o - o ik . o -----o v + 0 0 527+89 o 0 0 I -_ --1 0 100 - - HORZ: 1° 200' o <5% <5% <5% <5% <SR <5% <5% <5% <5% <5% <5% <5% <59. <59. <5% <59. <5% 531+30 o <5% <5% VERT: 1" = 200' 0 E m N Z O' z m �, E^ N f m N WNR0003F 524+26 527+84 EDGE OF STREAM fSNR0003 0 H 24"X 0.540" WT -X70 BARE a o 4 + o m m m £ o E + RIGHT -OF -WAV EDGE OF WETLAND WNRB102F TOPSOIL SEGREGATION AREA m rs mho, „ 503+19 PROPOSED ACCESS ROAD CoA ms' Tse 524+62 !�I5LJOF SRAILROAD 530+98 EDGE STREAM NS- oSJ o o �rT PROPOSEDPERMANENT R.O.W. � = STRING VIEW BAND CL OF NC -186 52]+03 RIGHT-OF-WAY 01 SNR0003 _ _ _ _ PROPOSED 20" AP -3 PIPELINE PROPOSED PERMANENT R.O.W. R Y 171�7�7 T m U1T1 T� 1T1T1T1��T1T17 �R P�Lo/z G5U T N N1T1T 1 1��1T17�171 IV V� STATIONING & CONSTRUCTION LIMITS PIPE LEGENDo PROPERTY LINE FENCE - — — — — — — — - E STORM SEWER UNDERGROUND ELECTRIC 5z5+73 I .I 526+50 EDGE OF WETLAND PERMANENT WATERBARISLOPE BREAKER (PROFILE VIEW) TEMPORARY WATERBARI8LOPE BREAKER ix�I LL-- 088 A 20"X 0.286" WT -X70 DSAW, FBE W LL -16- N/f NEAL VAUGHAN N/f BOOKER VICKTACHARLES FFTT11 T IF RDJOHN CAPCWOOD„ EDGE OF WETTAND 524+93 WNR0002FI I,I WNR0002F 127+13 TAX MAP / 4081-58-2207 ,246 LF TAX MAP / 2,660 1F o R I b1A7452 BRENDA DRAPER BYRUM 6- I as m s I TAX MAPA 4081-86-0602 I 3,009 LF p DR H ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND acox axawx.o xxov�oacuxm oxLai UTILITY POLE PROPERTY OWNERSHIP I - CUB ♦ I I m A I m I I EDGE OF WETTAND WNRB102F PIPE LEGENDo PROPERTY LINE FENCE - — — — — — — — - E STORM SEWER UNDERGROUND ELECTRIC 5z5+73 I .I 526+50 EDGE OF WETLAND PERMANENT WATERBARISLOPE BREAKER (PROFILE VIEW) TEMPORARY WATERBARI8LOPE BREAKER LOU LI MIT OF DISTURBANCE NOTES: I. NE ER CROS MERIDIAN UTM x TAAND GPIS SUB SURVEY FOOT, PERFORMED MBYIDIA CONTTHRUOURS U TOPODSED FOR MAPPING WERE DERIVED BELTED SILT RETENTION CONTOURS I1ND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -MET GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11A3-2014 �yy rr�FENCE (BSRF) -UJJ JJ'X.'<.':.'<,"..'. 3. IMAGERY TA Lyyy����rrryyyyy;� COIR LOUN FROM GOGGLE EARTH. p3(PROVIDEp BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR � rxE 4' _ A 20"X 0.286" WT -X70 DSAW, FBE W n "' TOPSOIL SEGREGATION AREA • 50'TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEYM) FFTT11 T (PROFILE VIEW) TRENLX BREAKERIPLUG EDGE OF WETTAND 524+93 WNR0002FI I,I WNR0002F 127+13 537+10 EDGE OF WETLAND EXISTING GAS PIPELINE OVERREAD UTILITY LINES ACCESS ROAD SAN B 20"X 0.343' WT -X70 DSAW, FB E C 20"X 0.412" WT -X70 DSAW, FEE ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND acox axawx.o xxov�oacuxm oxLai UTILITY POLE t 2' - CUB ♦ ROADSIDE DITCH SOIL TYPE g, L.. PARALLEL Tt oCE �3I EX�STINGC OAo3 MINORE WITH D MRPROVEMENTSA, 3o EXISTING ROADS 910 EW ROADS FTA 53.3 N 4. ROADS IN GENERALIZED SURFACE WATER FLOW a pEOUATE EXISTING DRA NAGE DRAINAG¢FEATUIFRi1ESNWILLBE �ROVI4DLD FOR ROAIDSDIN CA [GORSiE33 ANDG40RIE 1U ' BEG$ RSOLELY ESOVANE. HAS. LE FOR TxE xai E AND LOCAnox of TxE DEPICT.D BMPS AS OF THE DATE SIGx.D AN. SEALED BASED ox THE SOURCE DATA PROVIDE. AN SURFACE WATER FLOW WITHIN ROW DESCRIEED IN TxE xoTE.11 ECTION OF TxE ONSNEET of TxI3 PLA RIGHT-OF-WAY 524+ EDGE OF WETTAND WNRB102F WNRB102F� NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12). D 20"X 0.412" WT -X70 DSAW, CULVERT ACCESS ROAD WATERBARB E °o'O 11 NEEDED WATERBAR OUTLET (PLAN VIEW) AT TIME of coxsiBucTloxs. TxE coxHGURATION pEPICT.p IN PLAN vlEw APPUEs To Boix TEMPORARY Axo PERMwxENT WATERBAR (PLAN VIEW) BASED ON NO.— EDERBARS, AS APPROPRIATE. EDGE 0 WN 0 02F I, \L\\\I FEE + 40 MILS PC E 20"X 0.286" WT X70 DSAW, 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 o 0 0 o o o o o FBE + 3" CC F 20'X 0.343" Wi-XJO DSAW, m m 524+33 527+89 m FBE + 3" CC o o o o EDGE OF WETLAND I I I RIGHT-OF-WAY 531+30 o G 20'X 0.412" WT -X70 DSAW, Z ^'� E m N Z O' z m �, E^ N f m N WNR0003F 524+26 527+84 EDGE OF STREAM fSNR0003 H 24"X 0.540" WT -X70 BARE n o 4 + o m m m £ o E + RIGHT -OF -WAV EDGE OF WETLAND WNRB102F m rs mho, „ 503+19 PROPOSED ACCESS ROAD CoA ms' Tse 524+62 !�I5LJOF SRAILROAD 530+98 EDGE STREAM NS- oSJ o o STRING VIEW BAND 16 -086 -API CL OF NC -186 52]+03 RIGHT-OF-WAY 01 SNR0003 LEGEND — — X X PROPERTY LINE FENCE - — — — — — — — - E STORM SEWER UNDERGROUND ELECTRIC TURBIDITY CURTAIN(PLAN VIEWI EXTRA WORK SPACE 0 50' TURBIDITY SAMPLING LOCATION (PLAN VIEW) C] PERMANENT WATERBARISLOPE BREAKER (PROFILE VIEW) TEMPORARY WATERBARI8LOPE BREAKER LOU LI MIT OF DISTURBANCE NOTES: I. NE ER CROS MERIDIAN UTM x TAAND GPIS SUB SURVEY FOOT, PERFORMED MBYIDIA CONTTHRUOURS U TOPODSED FOR MAPPING WERE DERIVED BELTED SILT RETENTION CONTOURS I1ND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB -MET GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11A3-2014 �yy rr�FENCE (BSRF) -UJJ JJ'X.'<.':.'<,"..'. 3. IMAGERY TA Lyyy����rrryyyyy;� COIR LOUN FROM GOGGLE EARTH. p3(PROVIDEp BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR � rxE 4' _ STREAM W WATERLINE TOPSOIL SEGREGATION AREA • 50'TURBIDITY AND TDS SAMPLING LOCATION (PLAN VIEYM) FFTT11 T (PROFILE VIEW) TRENLX BREAKERIPLUG --- --- -- -. - - IMPLIED ASTOTxEACCURTA SHOWN ON THE DSMMINGSA. ASPOVIED BY ERM. COMPOST FILTER SOCK 5. STREAM AND WETLAND DATION CONT O ELEDRAWINAYBESHOWN PROVIDEDBYERM. ORANGE SAFETY FENCE e. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAYBE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK G G - — GH EXISTING GAS PIPELINE OVERREAD UTILITY LINES ACCESS ROAD SAN SANITARY SEWER EDGE OF GRAVEL PROPOSED PERMANENT EASEMENT ® AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. WETLAND acox axawx.o xxov�oacuxm oxLai UTILITY POLE O STREAM CROSSING USFWS STREAM CROSSING ENHANCED CONTROLS CONSTRUCTION ENTRANCE WITH DITCH CULVERT AS NEEDED - CUB ♦ ROADSIDE DITCH SOIL TYPE g, L.. PARALLEL Tt oCE �3I EX�STINGC OAo3 MINORE WITH D MRPROVEMENTSA, 3o EXISTING ROADS 910 EW ROADS FTA 53.3 N 4. ROADS IN GENERALIZED SURFACE WATER FLOW a pEOUATE EXISTING DRA NAGE DRAINAG¢FEATUIFRi1ESNWILLBE �ROVI4DLD FOR ROAIDSDIN CA [GORSiE33 ANDG40RIE 1U ' BEG$ RSOLELY ESOVANE. HAS. LE FOR TxE xai E AND LOCAnox of TxE DEPICT.D BMPS AS OF THE DATE SIGx.D AN. SEALED BASED ox THE SOURCE DATA PROVIDE. AN SURFACE WATER FLOW WITHIN ROW DESCRIEED IN TxE xoTE.11 ECTION OF TxE ONSNEET of TxI3 PLA — — — PROPOSED GAS PIPELINE NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE PROPOSED GAS PIPELINE (NO GROUND SURVEY) ESS CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12). CULVERT ACCESS ROAD WATERBARB �. 11 NEEDED WATERBAR OUTLET (PLAN VIEW) AT TIME of coxsiBucTloxs. TxE coxHGURATION pEPICT.p IN PLAN vlEw APPUEs To Boix TEMPORARY Axo PERMwxENT WATERBAR (PLAN VIEW) BASED ON NO.— EDERBARS, AS APPROPRIATE. THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. 0 + `n U 0 J 3 a J O o LLJ z a W + a Z - ZCO W zoo W (n H w QUj 0 o m = o U m 1 N Q i H e Z � - 0o g U H !n Z 0 U SCALE: AS SHOWN DATE: 9/28/17 DRAWN: JMS CHECKED: DLH APPROVED: NET gai consultants - INC, inc.1 4198 GO ROAD SUITE 114 GLEN ALLEN, VA 23060 804-270-9357 N.C. COL #F-0259 rrf - e monaloh basin engineers 300 BUSINESS CENTER DRIVE PITTSBURGH, PA 15205 412-788-2433 PROJECT N0. DASH NO. 140468 TASK NO. SUB TASK NO. 005 00 GROUP ID DRAWING N0. D E013 013 OF 84 Appendix B Cumulative Impacts Assessment — Metering and Regulation Stations in North Carolina North Carolina Department of Environmental Quality — Response to Information Request Dated September 14, 2017 Item 6.c. CUMULATIVE IMPACTS ASSESSMENT FOR METERING AND REGULATION STATIONS IN NORTH CAROLINA BACKGROUND AND APPROACH Cumulative impacts represent the incremental effects of a proposed action when added to other past, present, and reasonably foreseeable future actions. Although the individual impact of each separate action may be minor, the additive or synergistic effects of multiple actions could be significant. The purpose of this analysis is to identify and describe cumulative impacts that could potentially result from construction and operation of the Smithfield Meter and Regulating (M&R) Station, Fayetteville M&R Station, and Pembroke M&R Station. These facilities are proposed to be constructed in Johnston, Cumberland, and Robeson Counties, NC, respectively, as part of the Atlantic Coast Pipeline (ACP or Project). In accordance with the National Environmental Policy Act (NEPA), the cumulative impacts of the M&R stations and other projects or actions in the same areas are considered. A list of past, present and reasonably foreseeable future projects in Johnston, Cumberland, and Robeson Counties is provided as Attachment 1. The analysis for this study uses an approach consistent with the methodology set forth in relevant guidelines from the State of North Carolina Department of Environment and Natural Resources (2001), Council on Environmental Quality (CEQ) (1997, 2005), and the U.S. Environmental Protection Agency (EPA) (1999). Under these guidelines, the inclusion of actions within the analysis is based on identifying commonalities of impacts from other actions to potential impacts that will result from the ACP. In order to avoid unnecessary discussion of insignificant impacts and projects and to focus the analysis on relevant projects and potentially significant impacts, the cumulative impacts assessment was conducted using the following guidelines: • Another project must impact a resource category that also is potentially impacted by the three M&R stations in the same general area as the Project. More geographically distant projects were not considered because their impacts will generally be localized and, therefore, will not contribute significantly to cumulative effects in the same areas as the Project. • The distance into the past and future that other projects could cumulatively impact the same areas as the ACP is based on whether the impacts are short term, long term, or permanent. Many of the impacts related to the M&R stations will occur during the construction phase. • Where a potential for cumulative impacts was indicated, those impacts have been quantified to the extent practicable. In most cases, however, the potential impacts could only be described qualitatively (e.g., impacts from projects that are in planning stages or are contingent on economic conditions, availability of financing, or the issuance of permits). The criteria listed below define the region of influence, which is used in this cumulative impacts assessment to describe the general area for which construction of the M&R stations could contribute to cumulative impacts. The region of influence varies depending on the resource being discussed. The anticipated cumulative impacts of the Project and other actions are discussed below. STUDY AREA BOUNDARIES Atlantic analyzed cumulative impacts on resources found within the construction footprints of the three M&R stations proposed in North Carolina. Other projects within three counties were analyzed to determine if potential cumulative impacts on these resources would occur. The proposed Smithfield M&R station is an approximately 5.5 acre site located in Johnston County. The proposed Fayetteville M&R station is located in Cumberland County and encompasses approximately 6.75 acres. The proposed Pembroke M&R station contains approximately 2.5 acres and is located in Robeson County. COUNTY DIRECTION AND GOALS Smithfield M&R station is located in central Johnston County, in a rural setting approximately 2.5 miles west from the town of Smithfield. According to the U.S. Census Bureau, Johnston County had an estimated population increase of 13.3% from 2010 until early 2016. Johnston County has experienced a steady, long-term increase in economic activity. This is attributed to the Research Triangle associated with Raleigh and Wake County. Recently, the county has seen a transformation of a primarily agrarian land use to a mix of urban, agricultural, and forested landscapes. According to the County Comprehensive Plan, Johnston County has had significantly high growth rates since 1990, a trend expected to continue (Johnston County, 2009). The closest population center to the Smithfield M&R station is the town of Smithfield. According to the town's website, Smithfield is considered a small, historic town with growing business opportunities. The Fayetteville M&R site is located in northern Cumberland County. The proposed site is approximately 10 miles north of the city of Fayetteville and 1.5 miles west from the town of Wade. The area immediately surrounding the site is rural and contains agricultural fields. In 2009, Cumberland County adopted a 2030 Growth Vision Plan and a Land Use Policies Plan that describes growth in the economy and development while maintaining a desire to preserve open space and rural character (Cumberland County, 2009). The Pembroke M&R Station is located in Robeson County, North Carolina. According to Robeson County's Comprehensive Plan with a Health and Wellness Component, population is expected to increase approximately 20% by the year 2030 in surrounding counties. The town of Pembroke, North Carolina is approximately 3 miles north of the Pembroke M&R Station. The town experienced a 10.9% increase in growth from the year 2000-2010. Robeson County has also seen an increase of housing of 10.3% between 2000 and 2010 (Robeson County, 2014). INVENTORY OF FEATURES Wetland and Waterbody Resources Atlantic conducted wetland and waterbody delineations within the proposed construction footprint of the three M&R stations located. One waterbody was documented within the Fayetteville M&R Station boundary, an unnamed perennial tributary to the Cape Fear River. No waterbodies were documented within the proposed construction footprints of the Smithfield and Pembroke M&R Stations. No wetlands were delineated at any of the three sites. Cultural Resources Atlantic conducted cultural resource surveys within the proposed construction footprints of the three M&R stations. No sites were identified. Threatened and Endangered Species Atlantic determined through consultation with federal and state agencies and the completion of field surveys that no threatened and endangered species or their habitats are present in the construction footprints at the Fayetteville, Smithfield, and Pembroke M&R Stations. Land -Use The Smithfield, Fayetteville, and Pembroke M&R Stations are proposed to be built in rural areas. The land within the proposed construction footprints of the three stations consists of agricultural fields, tree plantations, or forest. An adjacent property to the Smithfield M&R, owned by Robert & Wellons Inc., recently built an approximately 20 acre solar field. Public Lands and Conservation Lands There are no federal, state, or local public lands or conservation lands or easements within the construction footprints of the Smithfield, Pembroke, and Fayetteville M&R Stations. Recreation or Special Interest Areas There are no recreation or special interest areas within the construction footprint of the Smithfield, Pembroke, and Fayetteville M&R Stations. Visually Sensitive Areas No visually sensitive areas (e.g., scenic byways) occur in the vicinity of three M&R Stations. IMPACTS AND IMPACT CAUSING ACTIVITIES Geology and Soils Construction of the three M&R Stations will have direct temporary impacts on near - surface geology and soils. Construction activities such as clearing could expose the soil to erosive elements such as precipitation and wind. In addition, modest recontouring of the elevations around the M&R Stations will be required to allow proper drainage of each site. However, the grading will require minimal changes to existing contours. Impacts to geological and soil resources will be minimized by implementing the 2013 versions of the Federal Energy Regulatory Commission's Upland Erosion Control, Revegetation, and Maintenance Plan (Plan) and Wetland and Waterbody Construction and Mitigation Procedures (Procedures), and complying with the appropriate State permit requirements or guidelines. The FERC's Plan and Procedures define industry standard best management practices for construction of natural gas facilities, such as the implementation of erosion and sediment controls, and the restoration of disturbed areas. Construction of some of the other projects listed in Attachment 1 could coincide with the schedule proposed for the M&R Stations. Projects that require significant excavation or grading could also have temporary, direct impacts on near -surface geology and soils. However, the duration and effect of these projects are expected to be minimized through the implementation of erosion and sediment controls and restoration measures, similar to the ACP. Waterbodies and Wetlands Cumulative effects on surface water resources affected by the construction and operation of the three M&R Stations will be limited to waterbodies that are affected by other projects located within the same watershed. Of the three M&R stations, only the Fayetteville M&R Station contains an unnamed perennial tributary to Cape Fear River within the parcel boundary. This waterbody is outside the limits of disturbance planned for the M&R station, and therefore will not be impacted. No other wetlands or waterbodies are contained within the footprint of the three M&R stations in North Carolina. Therefore, no cumulative impacts to wetlands and waterbodies are anticipated. Cultural Resources As noted above, no cultural resource sites were found in the construction footprints of the three M&R stations. Therefore, no cumulative impacts on cultural resources are anticipated. Threatened and Endangered Species No threatened and endangered species or habitats were identified within the construction footprints of the three M&R stations. Therefore no cumulative impacts on threatened and endangered species are anticipated. Land Use Construction and operation of the three proposed M&R stations in North Carolina will result in permanent conversion of agricultural fields, plantation forests, and forest land (Table 1). Construction of other projects which affect agricultural lands, tree plantations, or forest lands would result in cumulative impacts on these land -use types, though the impact would be minor to negligible. Public State or Conservation Lands; Recreation and Special Interest Areas, There are no federal, state, or local public lands, conservation lands or easements, recreation areas, or special interest areas within the construction footprints of the three M&R stations. Therefore, no cumulative impacts are anticipated on these resource types. Visual Resources No visually sensitive areas are found in the vicinity of the three M&R stations, so no cumulative impacts on these resources are anticipated. Upon completion of construction, each of the M&R stations, which include aboveground components, will be stabilized with gravel within a fenced enclosure for security. Lighting and signage installed on the site will be designed to minimize impacts on adjacent areas. Atlantic will consult with local jurisdictions regarding appropriate landscaping and/or other means of mitigating the visual impacts of these facilities. As a result, there may be localized visual impacts due to the construction of the Smithfield, Pembroke, or Fayetteville M&R Stations, but these impacts would be minor and limited to the areas immediately surrounding the stations. Socioeconomics and Environmental Justice As part of the environmental analysis, Atlantic analyzed socioeconomic impacts on Social Justice Communities. In Johnston County, both the percentage of the population below the poverty threshold and percent minority were below the overall poverty and minority statistics for the State (Table 2). The Smithfield M&R Station is located in a rural location with few residential structures located within approximately 0.25 mile. Cumberland County is above the state average for percentage of poverty and minority populations. However, based on the review of the EPA EJScreen mapper, the census tract indicates that these population statistics represent the entire region and are not limited to Cumberland County. The Percent Minority for Robeson County is above the state statistics for minority populations (Table 2). However, based on the review of the EPA EJScreen mapper, the census tract indicates that these population statistics represent the entire region and are not limited to Robeson County. The FERC provided an analysis of impacts on socioeconomic conditions and an assessment of environmental justice factors in the Environmental Impact Statement prepared for the ACP. The FERC concluded that the ACP would not result in disproportionately high and adverse impacts on environmental justice populations with the implementation of mitigation measures identified Atlantic or required by federal and state review agencies. Therefore, no cumulative impacts on environmental justice populations are anticipated. TABLE 1 Summary of Land Use Types Affected by Construction and Operation of the Smithfield, Pembroke, and Fayetteville M&R Stations (in acres) Agriculture - Tree Agriculture - Plantation/ Crops and Harvest Pasture Forest Forest Developed Open Wetland Open Water Total M&R Station Con.' Op b Con. Op. Con. Op. Con. Op. Con. Op. Con. Op. Con. Op. Con. Op. Smithfield 1.3 1.3 4.2 4.2 <0.1 <0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.5 5.5 M&R Station Fayetteville 6.4 6.4 <0.1 <0.1 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 6.8 6.8 M&R Station Pembroke 2.5 2.5 0.0 0.0 0.0 0.0 <0.1 <0.1 0.0 0.0 0.0 0.0 0.0 0.0 2.5 2.5 M&R Station ' Construction Impacts b Operational Impacts Visual Resources No visually sensitive areas are found in the vicinity of the three M&R stations, so no cumulative impacts on these resources are anticipated. Upon completion of construction, each of the M&R stations, which include aboveground components, will be stabilized with gravel within a fenced enclosure for security. Lighting and signage installed on the site will be designed to minimize impacts on adjacent areas. Atlantic will consult with local jurisdictions regarding appropriate landscaping and/or other means of mitigating the visual impacts of these facilities. As a result, there may be localized visual impacts due to the construction of the Smithfield, Pembroke, or Fayetteville M&R Stations, but these impacts would be minor and limited to the areas immediately surrounding the stations. Socioeconomics and Environmental Justice As part of the environmental analysis, Atlantic analyzed socioeconomic impacts on Social Justice Communities. In Johnston County, both the percentage of the population below the poverty threshold and percent minority were below the overall poverty and minority statistics for the State (Table 2). The Smithfield M&R Station is located in a rural location with few residential structures located within approximately 0.25 mile. Cumberland County is above the state average for percentage of poverty and minority populations. However, based on the review of the EPA EJScreen mapper, the census tract indicates that these population statistics represent the entire region and are not limited to Cumberland County. The Percent Minority for Robeson County is above the state statistics for minority populations (Table 2). However, based on the review of the EPA EJScreen mapper, the census tract indicates that these population statistics represent the entire region and are not limited to Robeson County. The FERC provided an analysis of impacts on socioeconomic conditions and an assessment of environmental justice factors in the Environmental Impact Statement prepared for the ACP. The FERC concluded that the ACP would not result in disproportionately high and adverse impacts on environmental justice populations with the implementation of mitigation measures identified Atlantic or required by federal and state review agencies. Therefore, no cumulative impacts on environmental justice populations are anticipated. Air Quality and Noise Johnston, Cumberland, and Pembroke Counties are currently designated as being in attainment with the National Ambient Air Quality Standards (NAAQS) for all criteria pollutants. As shown in Table 3, the emissions from the M&R stations would be minor and would not be expected to result in a significant cumulative impact on local or regional air quality. TABLE 3 Potential Emissions by M&R Station for the Atlantic Coast Pipeline M&R Station NOx CO voc SO2 PM/PMI°/ PM2.5 CO2e (tons per year) Fayetteville M&R Station 0.039 0.304 0.147 1.4E-05 0.001 157 (Johnston County, North Carolina) Pembroke M&R Station 0.039 0.304 0.227 1.4E-05 0.001 248 (Robeson County, North Carolina) Smithfield M&R Station 0.039 0.304 0.238 1.4E-05 0.001 259 (Johnston County, North Carolina) Notes: Emission factors used in all calculations were supplied by the manufacturer or retrieved from EPA's AP -42 Sections 1.4 and 3.2. Assume all particulate matter (PM) is less than 1.0 microns. Equivalent carbon dioxide (CO2e) emissions were calculated based upon Table A-1 of 40 Code of Federal Regulations Part 98 Subpart A. Construction of the Fayetteville, Smithfield, and Pembroke M&R stations will result in short term noise impacts. Construction activities for the M&R Sites will be performed with standard heavy equipment such as a track -excavator, backhoe, bulldozers, dump truck(s), and concrete trucks. Many construction machines operate intermittently and the type of machines in use at construction site changes with the construction phase. Construction of the Projects may result in short-term, temporary acoustical impacts due to earthwork (e.g., site grading) and installation of the proposed facilities. Aboveground facility construction activities will most likely occur between the hours of 6 a.m. and 10 p.m. During operation, M&R stations produce a limited amount of noise as the sites consist primarily of piping connections, and in some cases, fired heaters. Therefore, no cumulative air and noise impacts are anticipated. Reliability and Safety Potential impacts of the Fayetteville, Smithfield, and Pembroke M&R stations on public safety will be mitigated through implementation of PHMSA's Minimum Federal Safety Standards in 49 CFR 192, which are designed to protect the public and prevent natural gas TABLE2 Population Statistics Percent (%)BelowPove Proposed M&R Station County Threshold Percent (%) Minority Smithfield M&R Johnston 15.4 21.6 Fayetteville M&R Cumberland 31.6 69.9 Robeson Pembroke 17.5 48.1 Overall State of North Carolina 17.4 30.5 Air Quality and Noise Johnston, Cumberland, and Pembroke Counties are currently designated as being in attainment with the National Ambient Air Quality Standards (NAAQS) for all criteria pollutants. As shown in Table 3, the emissions from the M&R stations would be minor and would not be expected to result in a significant cumulative impact on local or regional air quality. TABLE 3 Potential Emissions by M&R Station for the Atlantic Coast Pipeline M&R Station NOx CO voc SO2 PM/PMI°/ PM2.5 CO2e (tons per year) Fayetteville M&R Station 0.039 0.304 0.147 1.4E-05 0.001 157 (Johnston County, North Carolina) Pembroke M&R Station 0.039 0.304 0.227 1.4E-05 0.001 248 (Robeson County, North Carolina) Smithfield M&R Station 0.039 0.304 0.238 1.4E-05 0.001 259 (Johnston County, North Carolina) Notes: Emission factors used in all calculations were supplied by the manufacturer or retrieved from EPA's AP -42 Sections 1.4 and 3.2. Assume all particulate matter (PM) is less than 1.0 microns. Equivalent carbon dioxide (CO2e) emissions were calculated based upon Table A-1 of 40 Code of Federal Regulations Part 98 Subpart A. Construction of the Fayetteville, Smithfield, and Pembroke M&R stations will result in short term noise impacts. Construction activities for the M&R Sites will be performed with standard heavy equipment such as a track -excavator, backhoe, bulldozers, dump truck(s), and concrete trucks. Many construction machines operate intermittently and the type of machines in use at construction site changes with the construction phase. Construction of the Projects may result in short-term, temporary acoustical impacts due to earthwork (e.g., site grading) and installation of the proposed facilities. Aboveground facility construction activities will most likely occur between the hours of 6 a.m. and 10 p.m. During operation, M&R stations produce a limited amount of noise as the sites consist primarily of piping connections, and in some cases, fired heaters. Therefore, no cumulative air and noise impacts are anticipated. Reliability and Safety Potential impacts of the Fayetteville, Smithfield, and Pembroke M&R stations on public safety will be mitigated through implementation of PHMSA's Minimum Federal Safety Standards in 49 CFR 192, which are designed to protect the public and prevent natural gas facility accidents and failures. Atlantic will design, construct, operate, and maintain the M&R facilities in accordance with the regulations in 49 CFR 192 and other applicable laws and regulations. In addition, Atlantic will implement the mitigation measures specified in all safety plans and procedures. Other projects potentially constructed in the vicinity of the ACP will be required to adhere to the safety requirements, procedures, and laws and regulations applicable to those projects. Therefore, no cumulative reliability or safety impacts are anticipated. Cumulative Impact Analysis Summary Past, present, and reasonably foreseeable future projects in close proximity to the proposed M&R project areas were identified for inclusion in this cumulative impacts assessment. Smithfield M&R Station in Johnston County and Pembroke County M&R Station in Robeson County do not have wetlands or waterbodies in the proposed construction footprints. The Fayetteville M&R Station in Cumberland, County contains one waterbody. It is not anticipated that the construction and operation of the this M&R Station will result in cumulative impacts to water quality due to the implementation of erosion and sediment controls and other best management practices at this. Other potential impacts, such as air and noise and land use impacts, associated with the M&R stations will be temporary and minor when considered in combination with other past, present, and reasonably foreseeable activities. Some minor long-term cumulative impacts could occur on forested lands; however, most of the forested areas that will be cleared due to construction of the M&R stations consist of tree plantation. No cumulative impacts are anticipated for cultural resources, threatened and endangered species, public lands, conservation lands, visually sensitive areas, recreation areas, special interest areas, and environmental justice populations. In summary, due to the implementation of specialized construction techniques, the relatively short construction timeframe in any one location, and carefully developed resource protection and mitigation plans, minimal cumulative effects are anticipated when the impacts of the M&R Stations are added to the projects identified in Attachment 1. References Cumberland County. 2008. 2030 Growth Vision Plan Policies and Actions. Available online at https://www. co. cumberland.nc.us/planning/downloads/growth/203 0_Growth_Vision_Pla n Sept08_032709_P1Bdcopy.pdf Johnston County. 2009.2030 Comprehensive Plan. Available online at http://www.johnstonnc.com/mainpage.cfm?category_level_id=766. Accessed September 2017. Robeson County. 2014. Comprehensive Plan with a Health & Wellness Component. Available online at http://publichealth.southemregionalahec.org/robeson/docs/3-10- 2014%20DRAFT%20Robeson%20County%20Comp%20Plan.pdf. Accessed September 2017. U.S Environmental Protection Agency. 2017. EJSCREEN: Environmental Justice Screening and Mapping Tool. Available online at https://www.epa.gov/ejscreen. Accessed September 2017. Attachment 1 Past, Present, and Reasonably Foreseeable Future Projects for the Atlantic Coast Pipeline Closest Distance Facility/State/ Common and Direction From Project Name Proponent Counties/Cities Description Project Status North Carolina Complete 540 North Carolina Department Johnston Completion of Unknown Anticipated of Transportation Highway 540 toll road Spring 2018 to Spring 2022 I-40 Widening — North Carolina Department Johnston Road widening 20.4 miles Anticipated start Southeast Raleigh to of Transportation northwest date Fall 2018 Clayton Project through 2022 Lee -Selma 115 kV Dominion Johnston Line relocation Unknown Anticipated Spring Line 2016 through Summer 2017 Erwin -Selma 230 kV Dominion Johnston Line replacement 0.8 mile northwest Anticipated Summer Line 2015 through Winter 2016 Atlantic Coast Atlantic Coast Pipeline, Johnston A new office building Entirely within the Proposed, to Pipeline Office LLC for pipeline operations Smithfield M&R coincide with Building ` to be built on the same Station construction of the site as the Smithfield M&R station M&R Station Atlantic Coast Atlantic Coast Pipeline, Johnston Utility services for the Intersects Proposed, to Pipeline Utility LLC Smithfield M&R Smithfield M&R coincide with Services ` Station and office Station construction of the M&R Station Atlantic Coast Atlantic Coast Pipeline, Johnston Microwave tower at Within the Proposed, to Pipeline LLC the Smithfield M&R Smithfield M&R coincide with Communications Station Station construction of ACP Network ` aboveground facilities Selma -Wake 230 kV Dominion Johnston Construction of line Unknown Anticipated Summer Line tap 2015 through Winter 2017 Piedmont Facility Piedmont Natural Gas Johnston, Upgrades to existing Intersects at the Anticipated Winter Modifications ` Cumberland, facilities Smithfield, of 2016 Robeson Fayetteville, and Pembroke M&R Stations Erwin -Fayetteville Dominion Cumberland Relocate structures for Intersects near MPs In progress — 115 kV — Change and North Carolina 131.0 and 135.4 Summer 2013 Relocate Department of through Spring 2015 Transportation project Fayetteville Dupont Dominion Cumberland Install new tap line Unknown In progress — Winter 115 kV Line — 2014 through Spring Cumberland Solar 2016 City Fayetteville Dupont Dominion Cumberland Install new tap line Unknown In progress — Spring 115 kV Line — Grays 2014 through Creek Tap Summer 2015 Fayetteville Dupont Dominion Cumberland Install line switches Unknown Anticipated — 115 kV Line — Line Winter 2014 through Switches Spring 2016 Fayetteville Fort Dominion Cumberland Line relocation Unknown In progress — Winter Bragg 230 kV Line — 2014 through Winter Clifdalc Road 2015 Fayetteville Fort Dominion Cumberland Line relocation Intersects near MP Anticipated — Bragg 230 kV Line — 135.1 Winter 2014 through I-295 Bypass Spring 2016 Attachment 1 Past, Present, and Reasonably Foreseeable Future Projects for the Atlantic Coast Pipeline Closest Distance Facility/State/ Common and Direction From Project Name Proponent Counties/Cities Description Project Status Fayetteville Vander Dominion Cumberland Install new tap line Intersects near MP In progress — 115 kV Line — Tap to 144.1; runs parallel Summer 2014 Vander from MPs 144.6 to through Spring 2016 145.8 Fort Bragg Woodruff Dominion Cumberland Install re -conductor Unknown In progress — Winter Street Loop into line 2014 through Raeford Spring 2017 Richmond — Fort Dominion Cumberland Install transmission Unknown Anticipated — Bragg 230 kV loop Summer 2015 through Winter 2018 U.S. 401 Corridor North Carolina Department Cumberland Road expansion study Unknown Anticipated Study of Transportation environmental impact statement date 2015; Not funded Atlantic Coast Atlantic Coast Pipeline, Cumberland Utility services for the Intersects Proposed, to Pipeline Utility LLC Fayetteville M&R Fayetteville M&R coincide with Services ` Station Station construction of the M&R Station Atlantic Coast Atlantic Coast Pipeline, Cumberland Microwave tower at Within the Proposed, to Pipeline LLC the Fayetteville M&R Fayetteville M&R coincide with Communications Station Station construction of ACP Network ` aboveground facilities Piedmont Piedmont Natural Gas Cumberland, Modifications to Varies Anticipated Winter Aboveground Robeson existing aboveground of 2018 Facilities facilities Piedmont Pipeline ° Piedmont Natural Gas Robeson 26 miles of 20 -inch Intersects at MP Anticipated Winter natural gas pipeline 181.8 of 2018 St. Pauls Johnson Johnson Brothers Utility Robeson New asphalt plant 2.2 miles southeast In progress — Phase I Brothers Facility and Paving Company completed July 2014 Weatherspoon — LOF Dominion Robeson Convert to remote Unknown In progress — Spring 115 kV control 2014 through Fall 2015 Weatherspoon Plant Dominion Robeson Install tap for solar Unknown Anticipated — Spring — Delco Bladen Solar facility 2015 through Winter Farm Tap 2016 Weatherspoon Plant Dominion Robeson Replace structures Unknown Anticipated — Spring — Delco Replace 2015 through Solar Tap Summer 2016 Weatherspoon Plant Dominion Robeson Install tap for solar Unknown Anticipated - - Fayetteville Solar facility Winter 2014 through Farm Tap Summer 2016 Weatherspoon Plant Dominion Robeson Install tap for solar Unknown In progress — Fall — Fayetteville Solar facility 2014 through Spring Tap 2016 Weatherspoon Plant Dominion Robeson Line replacement Unknown Anticipated - - Latta Replace and Winter 2016 through Pole Transmission Summer 2017 Weatherspoon Plant Dominion Robeson Replace existing Unknown Anticipated - - LOF 115 kV structures Winter 2016 through Structure Replace Spring 2017 Weatherspoon Plant Dominion Robeson Replace existing Unknown Anticipated - - Marion 115 kV structures Winter 2015 through Structure Replace Summer 2016 Attachment 1 Past, Present, and Reasonably Foreseeable Future Projects for the Atlantic Coast Pipeline Closest Distance Facility/State/ Common and Direction From Project Name Proponent Counties/Cities Description Project Status Weatherspoon- Dominion Robeson Line relocation Unknown Anticipated — Raeford 115 kV Line Summer 2016 Relocate through Winter 2018 Weatherspoon- Dominion Robeson Line replacement Unknown Anticipated — Raeford 115 kV Line Summer 2015 Replacement through Summer 2017 Atlantic Coast Atlantic Coast Pipeline, Robeson Utility services for the Intersects Proposed, to Pipeline Utility LLC Pembroke M&R Pembroke M&R coincide with Services ° Station Station construction of the M&R Station Atlantic Coast Atlantic Coast Pipeline, Robeson Microwave tower at Within the Proposed, to Pipeline LLC the Pembroke M&R Pembroke M&R coincide with Communications Station Station construction of ACP Network ° aboveground facilities Atlantic Coast Atlantic Coast Pipeline, Johnston A new office building Smithfield M&R To coincide with Pipeline LLC for Station construction of the Office Building pipeline operations to M&R be built station on the same site as the Smithfield M&R Station Atlantic Coast Atlantic Coast Pipeline, Johnston Utility services for the Smithfield M&R To coincide with Pipeline LLC Smithfield M&R Station construction of the Utility Services Station and M&R office Station Atlantic Coast Atlantic Coast Pipeline, Johnston Microwave tower at Smithfield M&R To coincide with Pipeline LLC the Station construction of the Utility Services Smithfield M&R M&R Station Station Piedmont Facility Piedmont Natural Gas Johnston Piping modifications Smithfield M&R Construction in Modifications and Station Winter additions for 2018 interconnect at the Smithfield M&R Station Piedmont Facility Piedmont Natural Gas Cumberland Piping modifications Fayetteville Construction in Modifications and M&R Station Winter additions for the 2018 interconnect at the Fayetteville M&R Station Atlantic Coast Atlantic Coast Pipeline, Cumberland Utility services for the Fayetteville To coincide with Pipeline LLC Fayetteville M&R M&R Station construction of the Utility Services Station M&R Station Atlantic Coast Atlantic Coast Pipeline, Cumberland Microwave tower at Fayetteville To coincide with Pipeline LLC the M&R Station construction of ACP Communications Fayetteville M&R aboveground Network Station facilities Piedmont Pipeline Piedmont Natural Gas Robeson 26 miles of 20-inch Crosses; Anticipated Winter natural gas pipeline Pembroke M&R 2018 Station Facility/State/ Project Name Piedmont Aboveground Facilities Atlantic Coast Pipeline Utility Services Atlantic Coast Pipeline Communications Network McClauren Subdivision U.S. 70 Corridor Fayetteville Outer Loop I-95 Diverging Diamond Interchange in Lumberton Complete 540 Lee-Sehna 115 kV Line Attachment 1 Past, Present, and Reasonably Foreseeable Future Projects for the Atlantic Coast Pipeline Closest Distance Common and Direction From Proponent Counties/Cities Description Project Status Piedmont Natural Gas Atlantic Coast Pipeline, LLC Atlantic Coast Pipeline, LLC McClauren Subdivision North Carolina Department of Transportation North Carolina Department of Transportation North Carolina Department of Transportation North Carolina Department of Transportation Duke Energy Robeson Piping modifications Station and additions for the 9.5 miles west interconnect at the Pembroke M&R Pembroke M&R Station Station Robeson Utility services Crossed forthe Cumberland Pembroke M&R Station Robeson Microwave Manchester tower at the Robeson Pembroke M&R Station Cumberland 36 -lot residential Johnston development Johnston Raleigh to Station Morehead City 9.5 miles west major road Pembroke M&R expansion from Station U.S. Highway to Fort Bragg Interstate Crossed Highway Cumberland New road construction and Crosses existing road Manchester improvements Robeson Intersection improvement Duke Energy project Johnston Completion of 115 kV Highway 540 toll road Johnston Line relocation Pembroke M&R Construction in Station Winter 2018 Pembroke M&R To coincide with Station construction of 9.5 miles west the M&R Station Pembroke M&R To coincide with Station construction of Fort Bragg the M&R Station Crossed Construction 12.8 miles west schedule unknown Crosses In development Manchester Construction date unknown 6.3 miles west In progress — 2016 through 2020 9.2 miles south- Completed January southeast 2017 Unknown 4.3 miles east Erwin -Selma 230 kV Duke Energy Johnston Line replacement 9.5 miles west Line Fort Bragg Duke Energy Cumberland Install reconductor line 12.8 miles west Woodruff— Manchester Erwin -Fayetteville Duke Energy Cumberland Relocate structures 7.7 miles 115 kV for North Carolina northwest — Change and Department of Relocate Transportation project Fayetteville Duke Energy Cumberland Install new tap line 2.7 miles west Vander 115 kV Line — Tap to Vander Fayetteville Duke Energy Cumberland Install new tap line 6.8 miles west Dupont 115 kV Line — Cumberland Solar Anticipated Spring 2018 to Spring 2022 Anticipated Spring 2016 through Summer 2017 Anticipated 2017 In progress — Fall 2014 through Spring 2017 Completed in Spring 2015 In progress; status unknown In progress; status unknown Attachment 1 Past, Present, and Reasonably Foreseeable Future Projects for the Atlantic Coast Pipeline Closest Distance Facility/State/ Common and Direction From Project Name Proponent Counties/Cities Description Project Status Fayetteville Duke Energy Cumberland Install new tap line 6.8 miles west Completed in Dupont 115 kV Summer 2015 Line — Grays Creek Tap Fayetteville Duke Energy Cumberland Install line switches 6.8 miles west In Dupont 115 kV progress; Line — Line status Switches unknown Weatherspoon Duke Energy Robeson Install tap for solar 2.8 miles In Plant — facility southeast progress; Fayetteville Solar status Farm Tap unknown Weatherspoon Duke Energy Robeson Install tap for solar 2.3 miles In Plant — Solar Tap facility southeast progress; status unknown Weatherspoon Duke Energy Robeson Replace existing 10.6 miles south Anticipated— Plant — LOF 115 structures Winter 2016 kV Structure through Spring Replace 2017 Weatherspoon- Duke Energy Robeson Line replacement Crosses In progress — Raeford 230 kV Summer 2015 Line Replacement through Spring 2017 Weatherspoon — Duke Energy Robeson Convert to remote 3.2 miles south Completed LOF 115 kV control Solar Farm Robert & Wellons Inc. Johnston New solar farm Abutting Completed 2015 - Smithfield M&R 2017 Station