Loading...
HomeMy WebLinkAbout20081800 Ver 1_Application_200812101004 1 OC? UeC1 o? 0 ?N, ? '?006 '4D STATE or NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F EASLEY LYNDO TIPPETT GOVERNOR SECRETARY L cember 5, 2008 Mr Bill Biddlecome Washington Regulatory Field Office U S Army Corps of Engineers Post Office Box 1000 Washington, NC 27889 08180 o Dear Mr Biddlecome, The North Carolina Ferry Division is requesting a NW3 permit to replace broken dolphins and pilings at the basins of the Hatteras-Ocracoke Ferry This would include replacement in the turning basins on the Hatteras Island and the Ocracoke Island side of this Ferry operati6n I have included a PCN form with this packet If you need any additional information or have any questions concerning this project please call me at 252-473-3461 Sincerely, Lance Winslow 4+41? -- - ---- -----------Environmental-Supervisor- Ferry - -- - - - -- - - - Division 8550 Shipyard Road Manns Harbor, NC 27953 Far (252) 473-1490 Phone (252) 473-3461 oaf W a r?R?? 1 1 _ 7 ? Office Use Only Corps action ID no DWQ project no Porrrj uers n 1 n MO -tier 2008 Pre-Construction Notification (PCN) Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps ? Section 404 Permit ® Section 10 Permit 1 b Specify Nationwide Permit (NWP) number NW 3 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ® Yes ? No 1d Type(s) of approval sought from the DWQ (check all that apply) ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? ° For the record only for DWQ 401 Certification ® Yes ? No For the record only for Corps Permit ? Yes ® No 1f Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in-lieu fee program ? Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ® Yes ? No 1h Is the protect located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ? No 2 Project Information 2a Name of project Dolphin Replacement at Hatteras Ferry Operations on Hatteras and Ocracoke Island 2b County Dare 2c Nearest municipality / town Hatteras 2d Subdivision name N/A 2e NCDOT only T I P or state protect no 16 11001 3 Owner Information 3a Name on Recorded Deed NCDOT Ferry Division 3b Deed Book and Page No N/A 3c Responsible Party (for LLC if applicable) Lance Winslow 3d Street address 8550 Shipyard Road 3e City state zip Manns Harbor NC 27953 3f Telephone no 252-473-3461 3g Fax no 252-473-1490 3h Email address Iwmslow@ncdot gov Page 1 of 11 PCN Form - Version 1 0 November 2008 Version Section A Applicant Information, continued 4 Applicant Information (if different from owner) 4a Applicant is rEi Agent ? Other specify 4b Name Lance Winslow 4c Business name (if applicable) N/A 4d Street address 8550 Shipyard Road 4e City state zip Manns Harbor NC 27953 4f Telephone no 252-473-3461 4g Fax no 252-473-1490 4h Email address Iwmslow@ncdot gov 5 Agent/Consultant Information (if applicable) 5a Name N/A 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no ° 5g Email address Page 2 of 11 PCN Form - November 2008 Version B Project Information and Prior Project History 1 Property Identification 1 a pope^y,de^f-f-cat,on no (tax PIN or parcel ID) N/A 1 b Site coordinates (in decimal degrees) 35 20831 N - 75 70281 W 1c Property size 3 0 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to proposed project Pamlico River 2b Water Quality Classification of nearest receiving water SA HQW 2c River basin Pasquotank 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application This property is used by the N C Ferry Division to transfer automobiles and passengers from Hatteras to Ocracoke Island 3b List the total estimated acreage of all existing wetlands on the property 0 0 acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project To replace broken dolphins and pilings that are used to moor ferries 3e Describe the overall project in detail including the type of equipment to be used Broken pilings will be removed using a vibratory hammer and/or clam shell bucket New pilings will be installed in the same place as the existing pilings using a vibratory hammer A water jet will also be used to help install pilings if necessary All work will be performed off the barge SKYCO 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in We past? ? Yes ® No ? Unknown 4b If the Corps made the jurisdictional determination what type of determination was made ? Preliminary ? Final 4c If yes who delineated the jurisdictional areas? Name (if known) Agency/Consultant Company Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past ?Ye ? No ? Unknown 5b If yes explain in detail according to help file instructions CAMA major permit 224-87 Ex 12-31-2012 6 Future Project Plans 6a Is this a phased project? ? Yes ® No 6b If yes explain Page 3 of 11 PCN Form -Version 1 0 November 2008 Version C Proposed Impacts Inventory 1 Impacts Summary 1a Vv'hich sections were completed below for your project (check all that apply) ? Wetlands ? Streams - tributaries ? Buffers ® Open Waters ? Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction : number - ermanent (P) or Type of impact Type of wetland (if known) Forested (Corps - 404 10 DW Area of impact (acres) Tem orar T Q - non-404 other) W1 ? P ? T ? Yes ? No ? Corps ? DWQ W2 E:1 P ? T El Yes E-] No El Corps ? DWQ W3 ? P ? T ? Yes ? No ? Corps ? DWQ W4 ? P ? T ? Yes ? No ? Corps ? DWQ W5 ? P ? T ? Yes ? No ? Corps ? DWQ W6 ? P ? T ? Yes ? No ? Corps ? DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f Stream impact Type of Stream name Perennial (PER) or Average stream width (feet) Impact number - impact intermittent (INT)O length Permanent (P) or (linear feet) Temporary (T) S1 ?P?T ?PER ?INT S2 ? P ? T ? PER ? INT S3 ?P?T ?PER ?INT S4 ?P?T ?PER ?INT S5 ?P?T ?PER ?INT- S6 ?P?T ?PER ?INT 3g Total stream and tributary impacts 3h Comments Page 4 of 11 PCN Form - Version 1 0 November 2008 Version C Proposed Impacts Inventory, continued 4 Open Water Impacts if there are proposed impacts to lakes ponds estudnes tributaries sounas the Atlantic Ocean or any other open water of the U S then individual) list all open water impacts below 4a 4b 4c 4d 4e Open water Name of impact number waterbody Type of impact Waterbody type Area of impact (acres) - Permanent (if (P) or applicable) Tempo ry (T) 01 ®P ? T Pamlico Sound Fill Sound 0 5 acres 02 ?P?T 03 ?P?T 04 ?P?T 4f Total open water impacts 0 5 acres 4g Comments Page 5 of 11 PCN Form - November 2008 Version C Proposed Impacts Inventory, continued 5 Pond or Lake Construction If ?ond or take construction ?o osea then complete ine cnan oeiow 5a 5b 5c 5d 5e Pond ID Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland b (acres) num er purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ? Yes ? No If yes permit ID no 51 Expected pond surface area (acres) 5t Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If protect will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If an impacts re uire mitigation then ou MUST fill out Section D of this form 6a ? Neuse ? Tar-Pamlico ? Other Protect is in which protected basin? ? Catawba ? Randleman 6b 6c 6d 6e 6f 6g Buffer impact number - Reason Buffer Zone 1 impact (square Zone 2 impact Permanent (P) for impact Stream name mitigation feet) (square feet) or Temporary required? T B1 ?P?T ?Yes ?No B2 ?P?T ?Yes ?No B3 ?P?T ?Yes ?No 6h Total buffer impacts 61 Comments Formatted Page 6 of 11 PCN Form - November 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimizat.on la Specifically describe measures taken to avoid or minimize the proposed impacts in designing protect All piling work and dolphin replacement will take place where there are existing pilings and dolphins Therefore there will be no increase in fill lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Work will be done off one floating barge with a vibratory hammer, clam shell bucket and water jet A turbidity curtain will be onsde to be used if needed This will help minimize impacts to the surrounding water body 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the protect require Compensatory Mitigation for impacts to Waters of the US or Waters of the State? ? Yes ® No 2b If yes mitigation is required by (check all that apply) ? DWQ ? Corps 2c If yes which mitigation option will be used for this protects ? Mitigation bank E] Payment to in-lieu fee program ? Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank N/A 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In-lieu Fee Program 4a Approval letter from in-lieu fee program is attached ? Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature warm cool cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non-riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan N/A Page 7 of 11 PCN Form - Version 1 0 November 2008 Version D Impact Justification and Mitigation, continued 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) - reauired by DWQ 6a Will the protect result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone Reason for impact Total impact (square feet) Multiplier Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 Total buffer mitigation required 6c If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in-lieu fee fund) 6d Comments Page 8 of 11 PCN Form - November 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1 a Does the protect include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? lb If yes then is a diffuse flow plan included? ? Yes ? No 2 Determination if the Project Requires a Stormwater Management Plan 2a Does the protect require a Non-404 Jurisdictional General Permit? ? Yes ® No 2b Is the protect subject to General Certification 3704 or 3705? ? Yes ® No 3 Determination of Stormwater Review Jurisdiction 3a Is this protect subject to any of the following state-implemented stormwater ? Coastal counties management programs (check all that apply)9 /?/ / ? HQW ? ? ORW If so attach one copy of the approval letter from the DWQ and one copy of the ? Session Law 2006-246 approved stormwater management plan ? Other 3b In which local government s jurisdiction is this protect? 3c Is this local government certified to implement a state stormwater program? ? Yes ? No If so attach one copy of the approval letter from the local government and one copy of the approved stormwater management plan (or one copy of the approved Stormwater management plan stamped as approved) 4 information Required for DWQ 401 Unit Stormwater Review 4a What is the overall percent imperviousness according to the most current site lane N/A 4b Does this project contain any areas that meet the criteria for high density per ? Yes ® No General Certifications 3704 and 3705? 4c If the site is over 24% impervious and/or contains high density areas then provide a brief narrative description of the stormwater management plan N/A 4d Has a completed BMP Supplement Form with all required items been submitted ? Yes ® No for each stormwater BMP? Page 9 of 11 PCN Form - Version 1 0 November 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the protect involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b If you answered yes to the above does the protect require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter) ? Yes ? No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after-the-fact permit application? ? Yes ® No 2c If you answered 'yes to one or both of the above questions provide an explanation of the violation(s) N/A 3 Cumulative Impacts (DWQ Requirement) 3a Will this protect (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description N/A 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed protect or available capacity of the subject facility N/A Page 10 of 11 PCN Form - Version 1 0 November 2008 Version F Supplementary Information, continued 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a W-II th-s project occur - or near air area with federally protected species or Yes No ? ® habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? El Raleigh 5c if yes, indicate the USFWS Field Office you have contacted ? Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCDOT arcview database 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitats ? Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? NCDOT arcview database 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? NCDOT arcview database 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Lance Winslow__ _ _ _ _ - - ? _ _ _ _ _ -- ?j ?Cvw? ?Jt_ ,r 12-4-08 Applicant/Agent's Printed Name Applicant/Agent's Signature (Agent s signature is valid only if an authorization letter from the applicant Date is provided Page 11 of 11 PCN Form - November 2008 Version