Loading...
HomeMy WebLinkAbout19970175 Ver 3_Certification of Completion_20170714A� NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor l j47 -o i7 v3 (m) DWR Project No: 2012-01767 j,� %i L Ole County: Cleveland Donald R. van der Vaart Secretary Applicant: Duke Energy Carolinas, LLC ff [E 0W E Project Name: Cliffside Steam Station Kr 401 Water Quality Certification Issued Date: October 29. 2012 1-1 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications,'the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, Dave Barnhardt hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial co I' nce and intent of the 401 Water Quality Certification and Buffer Rules, thea roved pl and sp Sfi tions, and other supporting ter' Is. Signature: Date: Agent's Certification 1, . hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Drosion o1 Nater o+:r Resces — 401 & Buffer Perrnitn l.+nit !617 Mail Service Center, Raleigh, North Carolina 27699.16" i.ocabcn: 512 N Sal sturf St. Rath, North Carouna 2760 Phone:9i4£Oi br9elFAX: 519607.6492 ir:terner: www nc ate pa&ty.cro Ar. E,W ".% p owtr A-tb-:Attica EMicsw - M.V q in .; vt :+i �tc�,k-1 }.X:_,