Loading...
HomeMy WebLinkAbout20000569 Ver 2_CAMA Application_20170828Coastal Management ENVIRONMENTAL QUALITY Zooa os tag v Z ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director August 21, 2017^ TO: Karen Higgins d 401 & Buffer Permitting Unit,nf� ?Dj, DWR/Water Quality Permitting�C FROM: Heather Coats, Assistant Major Permits Coordinator NG NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a)ncdenr.gov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Loder Landing HOA Project Location: end of Loder Ave., adjacent to the AIWW & Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to reconfigure an existing docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 14, 2017. If you have any questions regarding the proposed project, contact Courtney Spears at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Loder Landing HOA 2. LOCATION OF PROJECT SITE: end of Loder Avenue (S.R. 1523) adjacent to the AIWW and Myrtle Grove Sound, in Wilmington, New Hanover County. Photo Index - 2006: 21-7383 O, P, Q -14 Lat: 341107'25.68°N Long: 77°52'08.94"W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 8/16/17 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 8/9/17 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan- New Hanover County Land Classification From LUP - Conservation (B) AEC(s) Involved: PT, EW-ORW (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing- Municipal Sewer Planned- N/A (F) Type of Structures: Existing- Dock facility, bulkhead, and upland development Planned- replace portion of existing docking facility (G) Estimated Annual Rate of Erosion: N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (Coastal) (B) Non -Vegetated Wetlands (Open 7,200 ft2 Water) (incorporated) (C) Other - Highground disturbance (D) Total Area Disturbed: 7,200 ft2 (0.17 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SA-ORW Open: YES 8. PROJECT SUMMARY: The applicant proposes to reconfigure an existing docking facility. Loder Landing HOA Page Two 9. PROJECT DESCRIPTION The project site is located adjacent to the AIWW, on Myrtle Grove Sound, at the northeast end of Loder Avenue, New Hanover County. To get to the site from the Wilmington Regional Office travel southeast onto Eastwood Road for approximately 2 miles and then turn right on Military Cutoff Road which becomes Oleander Drive. Travel approximately 1.5 miles and turn left onto Greenville Loop Road. Travel approximately 3 miles and turn left onto Pine Grove Drive which becomes Masonboro Loop Road. Travel approximately 4 miles then turn left onto Myrtle Grove Road. Then, travel approximately 1 mile and turn left onto Loder Avenue and the project area will be located to the left at the terminus of the road. The 11.31 -acre tract is approximately 180' wide, running the entire length of Loder Avenue, or approximately 2500' in depth from Myrtle Grove Road. The existing subdivision include twenty- six (26) lots, with three (3) lots on the east side of the property that are oriented toward the sound. The waterfront lots average approximately 4'-5' above normal high water (NHW). High ground vegetation that exists on the property consists primarily of lawn grasses and the lots are developed with single family homes. The applicant's measured shoreline is approximately 235' in length and stabilized with a bulkhead. Along the shoreline is a narrow strip of trees and shrubs including Red Cedar (Juniperus virginiana), Oak (Quercus spp.), Yaupon (Ilex vomitoria), Marsh Elder (Iva frutescens), and Groundsel-bush (Baccharis ha/mifolia). Waterward there is a border of intertidal salt marsh, approximately 350' wide that consists primarily of Smooth Cordgrass (Spartina alterniflora), Glasswort (Salicorina spp.), and Sea Lavender (Limonium carolinana). At the transition to high ground there is Spike Grass (Distichlis spicata), Sea Oxeye (Borrichia frutescens), and Salt Meadow Cordgrass. There are several areas of high -marsh consisting primarily of Black Needlerush (Juncus roemerianus). An existing twenty-one (21) slip docking facility extends approximately 435 ft. waterward of the bulkhead between the southernmost and central waterfront lots in a easterly direction into Myrtle Grove Sound. It includes a 435' by 6' access pier leading to a 24' by 20' fixed platform, the landward -most 20' of which is covered. There is a 6' by 43' fixed pier that extends from the platform which connects to a large floating platform via a ramp. The main spine of the floating platform extends in a north -south direction and measures 7.5' in width by 180' in length. There are six perpendicular finger piers on the waterward edge, each measuring 5' wide by 24' long. There are twelve (12) slips on the waterward side of the main spine each of which has a 4 -pole boat lift and nine (9) slips on the back side of the floating platform, each of which has a single - pole boatlift. The existing facility is constructed up to the 80' federal channel setback from the AIWW. The facility extends approximately 150' into a waterbody that measures approximately 750' in width. Water depths are approximately A' at NLW along the landward side of the floating dock and -2' at NLW at the waterward end of the finger piers. The facility is built up to the adjacent 15 -ft. Riparian Corridor Setback Area on the north and south sides. This facility was originally authorized by CAMA Major Permit #46-01 which was issued 4/18/01. The New Hanover County Land Use Plan classifies adjacent land and waters as Conservation. ,The waters of the Myrtle Grove Sound are classified SA-ORW by the Division of Water Resources. They ARE designated as a Primary Nursery Area by the N.C. Division of Marine Fisheries and they are OPEN to the harvest of shellfish. Loder Landing HOA Page Three PROPOSED PROJECT The applicant proposes to reconfigure an existing docking facility. The applicant proposes to replace most of the floating portion of the existing docking facility with an elevated fixed dock. However, the application states that to load and unload people and equipment, two sections of floating platform would be needed. The main spine of the proposed fixed pier would be oriented in the same direction as the existing main spine, and measure approximately 7' wide by 180' in length. Two (2) elevated fixed finger piers each measuring 3' in width by 19' in length would extend from the north and south end of the main spine in a parallel direction. Along the eastern edge of the main spine would be six (6) fixed piers, the center two (2) would each measure approximately 5' by 24', and the remaining four (4) would each measure approximately 3' by 24'. Extending from the northernmost and southernmost finger piers would be ramps that would connect to the proposed floating platforms, each of which would measure approximately 27' by 6' extending perpendicular to the main spine (see Sheet 2 of 4). The 21 previously approved slips would remain in essentially the same area, with 4-pole lifts in the slips on the waterward edge and single pole lifts in the slips on the western edge of the main spine. Two (2) temporary slips, one on each end of the main spine, would be created with the addition of the proposed floating platforms. 10. ANTICIPATED IMPACTS The reconfigured facility would incorporate approximately 7,200 ft2 of Estuarine Waters and Public Trust Areas that is essentially usurped by the existing facility. The facility would accommodate twenty-one (21) boats on a permanent basis, and two (2) temporary slips with the potential for dockage for a total of twenty-three (23) vessels, in water depths ranging from A' to -2' at NLW. The facility would be built up to the 80' federal channel setback from the AIWW, and up to the adjacent 15' Riparian Corridor Area setbacks on the northern and southern sides. The facility would extend approximately 150' into a waterbody measuring 750' in width within the existing footprint. Minor turbidity should be expected during construction. Submitted by: Courtney Spears Date: August 18, 2017 Office: Wilmington Southeastern Coastal Construction Company, Inc. DBA Southeastern Marine Contractors Stephen B. Conway, Owner -Unlimited Contractors License & Fully Insured 910.538.9737 6252 Towles Rd, WUWngton, NC 28409 July 18, 2017 Narrative for Loder Landing HOA: My clients, The Loder Landing HOA would like to replace their existing floating dock structure which was originally permitted under permit #4601 for Loder Avenue Development Company. The existing floating dock is located at the end of their existing pier and around their existing boat lifts with a structure which would be more accommodating to all the boat wake activity which they receive from the AICWW. Since the conception of this project they have had constant maintenance on the existing floating dock structure which they would like to eliminate. While wishing to make the majority of it raised fixed pier, they would still need some floating structure to accommodate loading and off loading vessels which park along the back side of the existing floating dock structure. Current water depths show 18" of water at mean low water. If deemed less than 18" owners will include stops or shorten length of dock till water depth will be 18" under floating dock. We have made room for these floating structures by reconfiguring the last 3 slips on either side of the project to create the room for a 6ft wide floating dock within the 15 ft setback line. The new structure would accomplish several items. It would eliminate a large floating dock facility in an area where it might be marginally acceptable under current regulations. It would also decrease the square footage of the structure by 118 sq. feet. Thank you for your consideration of this request. Stephen B. Conway, Owner Southeastern Coastal Construction Company, Inc. 910.538.9737 sconway@ec.rr.com RECEIVED DCM WILMINGTON, NC DCM MP4 APPLICATION for Aus Major Development Permit (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Lokr Ave - oA1 11 ll PY'0J Applicant 1: First Name MI Last Name "r" Fi'. Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. PO Box Mailing Address City State 37 �OGfe-✓ ZIP Country ext. �? 32W 7��O� FAX No. Street Address (if different from above) City State ZIP Email Lr' 2. AgendContractor Information Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First 'Name MI Last Name PO Box City Mailing Address State Phone No. 1 Phone rV. 2 ZIP g7Vxt. ext. FAX No. Contractor # City State Street Address (if different from above) ZIP Email <Form continues on back> RECEIVED OCM WILMINGTON, NO ±i Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address t I(.lfll f'R' � &'� r✓'�✓ J % `� State Rd. # Subdivision Name City State /��-- � � tp L_ �,, tr?_ Phone No. No.(s) (if many, attach additional page with list) ±Lot - ext. d. Approximate elevation of tract above NHW (norm�j1 hi-gh water) or NWL (normal water level) f � r//JDvc_ a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Cq t'- F.edo-_' AIC V1W c. Is the water b identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. . .dy ❑Natural Y Manmade ❑Unknown kap l,C oceatj e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed �(es ❑No work falls within. N�•111� 14a I&'d�t 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) Size of individual lot(s) F d. Approximate elevation of tract above NHW (norm�j1 hi-gh water) or NWL (normal water level) f � r//JDvc_ (If many lot sizes, please attach additional page with, a list) �JNHW or ❑NWL e. Vegetation on tract _-6 e-5 f. Man-made features and uses now on tract ff .p a"dg g. Identify and describe the existing land uses adiacent to the proposed project site. f,�.Y h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable)_ a ,��, �eS'Ae9j WL i, Yes ❑No ❑NA i Is the Dr000sed activity part of an urban waterfront redevelopment proposal? ❑Yes AO k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes,,,Wo ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes o ❑NA National Register listed or eligible property? <Form continues on next page> Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (1) Are there wetlands on the site? fYes ❑No (ii) Are there coastal wetlands on the site? (es ❑No T❑Yes (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ANO (Attach documentation, if available) n. Describe existing wastewater treatment facilities. CF p' w A o. Describe existing drinking water supply source. CT['F UA p. Describe existing storm water management or treatment systems. �. 5. Activities and Impacts a. Will the project be for commercial., public, or private us ? ❑Commercial ❑Public/Government rl rivate/Community b. Give• a brief description of purpose, use, and daily operations of the project when complete. �J L °Tl-vj 0. !/Y �L.a fi'� O c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type. of equipment and where it is to be stored. d. List all development activities you propose. lam' � -ye &m 'Old �Y e. Are the proposed activities maintenance of an existing project, new work, or both? d f 4`�-)"ap. re— I. What is the approximate total disturbed land area resulting from the proposed project? sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. I` i. Will wastewater or stormwater be discharged into a wetland? ❑Yes No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes No ❑NA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED DCM WILMINGTON, NC Form DCM MP -1 (Page 4 of 4) AppucATION for Maps Development Permit M acid'don m this con*feled ,pplicadw form. (A/P-1) the foWowi g Renis below, A appkattie, awd be su wanted in order Mr dill apptiwtion Package to be complete- yes p) – p7 are ahvays appbcahls to anY Major cls" "lard r3ppliatior. Please consult ode applicaftorr instruction booklet on how M Noperfy Prepare me requireditems below. a. A project narrative. b. M acctrate. dated vtrorit Plat (tndudinp pan view artd cross sectional drawilwgs) dram to rPbastraps pts status o1 the proposed project• is any paten already complete? It previously authorized work, dearly on betwoull work completed and proposed. c. A site or krcaaion map "is suflidentty detailed to guide agency par --W urdarif" with the area to the site. d. A copy of the deed (with state appli 1*m eriY) tar other'Mrrument under v*wh the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. L A fist of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners; ; have received a copy of the applicallo" and plats by certified mail. Such landowners must be advised that they have 90 days in watch to submit cor:unel-As on hoe proposed project to the Division at coastal &tanagement. Name GrGw'4 J rnr* — P4 g Address f r 313t tint. n S _ Name vt� t g _. n aorta rvo. 49110 - Phone No Address t fio G- "acme 'Xe UJ" it rwr�i>rll►� f �VG. 2 $�fO cf _ Pham: No. Name Address A list of previous state or federai permits issued for work on the project tract. kwAWe pernut numbers, permittee. and issuing dates. h_ Signed consultant or agent auttworrzation form. if appkcable• — E'�.—A'sogned delineation, if necessary _ AEG hazard notice fr projects in o eanfront and inlet areas. (Alas! 6e signed 6Y property owner)ment of t�tnptiarnce with the N.C. Lnvmror,tat PoNcy Ad (N.C.G.S. tr3A 1-10).tfnecessary. rfthe project umvowesexpmdittue funds or use of public lands. attach a slalentenl documenting compliance wwtlh We f0orth Carolina Environmental Pokcy Act Jt 7. Certification and Permission to Enter on Land 1 understand that any permit issued in response to this application will allow only the devetopment described in the application. The project will be subject to the condjtians; and restrictions contained in the Permit. 1 certify that I ant authorized to grant, and do in fact grant permission to representatives of state and federal review agencies 10 enter on the aforementioned lands in connection with evaluating information related to this permit application and f01t0w up monitoring of the project. I further certify that the information provided in this application is trutholliao the be to y k edge 1 tieh— Date 7-/'?— _ Print Name Signature _ Please indicate application attachments pertaining W your proposed project. tDtm CM MP -2 Excavation and Fill Infoatan CM MP -3 Upland Development PCM MP -4 Structures InfonTta'.ion []DCM MP -5 Bridges and Culverts RECEIVED DCM WILMINGTON, NC Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 9. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Govemment Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number• (iii) Length_ 2L (iv) Width 3 % (v) Floating ❑Yes ❑No e. (i) Are Platforms included? Gies []No If yes: s (ii) Number (iii) Length -2 (iv) Width (v) Floating 'Yes ❑No Note: Rooted areas are calculated from dripline dimensions. g. (i) Number of slips proposed 2- TP^190114c60�7 Ti-e- (ii) i'e(ii) Number of slips existing i. Check the proposed type of siting: ❑ Land cut and access channel ,*pen water; dredging for basin and/or channel ❑Open water; no dredging required []Other; please describe: k. Typical boat length: 2 ,- m. (i) Will the facility have tie pilings? ❑Yes 4N (ii) If yes number of tie pilings? El This section not applicable b. (i) Will the facility be open to the general public? []Yes J No d. (i) Are Finger Piers included? Xyes ❑No If yes: (ii) Number (iii) Length 2L (iv) Width /_lo (v)Floating ❑Yes, No f. (i) Are Boatlifts included?1Yes [-]No If yes. C�n) Number v (iii) Length 5 ��� S �• ( •� (iv) Width 4- h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies 2-1 Dockage ("wet slips") only, number of slips: ❑ Dry storage: number of boats: ❑ Boat ramp(s); number of boat ramps: Other, please describe: tc j. Describe the typical boats to be served (e.g.. open runabout, charter boats. sail boats, mixed types). I. (i) Will the facqity be open to the general public? ❑Yes A 0 RECEIVED DCM WILMINGTON, NC [2. DOCKING FACILITY/MARINA OPERATIONS ZThis section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed., f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED DCM WILMINGTON, NC m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Ggvernment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS (This section not applicable a. Is the structure(s): [—]Commercial ❑Public/Government ❑Private/Community c Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED DCM WILMINGTON, NC 7. GENERAL a. Proximity of sauccG__re__(s)''to adjacent riparian property Unes b. P00x6mity of struc110e(0 to 303Cect pdo&9 facilities- ,Vote-. For buoy or mooring piling, use am of swing including length a vessel. c. Width of water body e. (i) Will navigational aids be required as a result of the project? []Yes * ❑KA (ii) it yes• explain what type and tow they will be implemented. 18. OTHER I—a.. Give complete description: Date Pcojecl Name ib Applicant Dame Applic Signature d. water depth at waterward end of structure alULW or NWL ft ❑This secbfon not applicable RECEIVED DCM WILMINGTON, NC ,� 01 sl W ,ogL�,L a --- c� —.;o T oz =„ i ins o 0q. 'A'S L G)< o vm C?�LCl/�}i�_►�aV�LVOO�� VC)I1 1r������'J� J`�J'�✓Q� s'outhea'st'on N:CRdmal DriCardmc al DY r" Tern left ontoita twood'Rd furh ng'hi'onto Military C_Alf Rd Ndmington �=1 . tin Conn tinue onto C Turn left o3to Gre�rNille Loop Rd� a r N -Ole i h s INS" t�. r'oney Island Turn left onto,Pme Grove Dr toward Vision Or anaerdyur 4'G1 nghtsville Beach Continue onto Masonboro Loo Rd XkSy u n . n i �+� U u liY 4: ZF �i tj lver,L��ce+�' ti�y,�Turn left onto Myrtle'Grove Rd +myrtle Grove Loder Ave Turn lefllonto Loder Ave 9 knas6&?A!:7 +e ___. r'nm nhc:'I !c on:t .tpy �•+.i. "i'.Tsn, _ Qa .'!? Nov, N e Google Earth ® ® k � Cardinal r A WilmingtoDn, NC BLoder Ave Wilmington, NC 28409 Suggested routes Masonboro Loop Rd Pine Grove Dr and Masonboro Loop Rd NC -132 S/S College Rd ACardinal Dr 1. Head southeast on N Cardinal Dr/Cardinal Dr Ewe toward Vision Dr 0.5 m 2. Tum left onto Eastwood Rd 1.8 rri 3. Turn right onto Mary Cutoff Rd 0.6 rri 4. Continue onto Oleander Or 0.7 rri S. Turn left onto Greenvale Loop Rd 2.8 m 6. Tum left onto Pine (move Dr 1.2 rri 7. Continue onto Masonboro Loop Rd 3.6 ni 8. Turn left onto Myrtle Grove Rd 0.7 rri 9. Turn left onto leder Ave 0.3 m BLoder Ave 12.2 miles,22 min 11.9 miles,22 min 10.5 miles,23 min RECEIVED DCM WILMINGTON, NC �a i9 ri Za 114: Ji ,raS5 raS V,A t a Loo o; 61, ileal s4r-f, --. _._. V J ...:4 aN `NO±ONIVnIM VgOC� I i M MA) I MLW 2 X11 f v Q N � L F,xedw4�/lw► P MOW 1 All L ° �f ocK P -7-13-- 1-7 1� ( 11, = 3c, HO! � \ � r v A ue.-f- Fi K PrO� Aacaw � �, y S�t�• (,;�,��c�� 1-7 �''_ 3c� 9 d O � d X11 f v Q N � L F,xedw4�/lw► P MOW 1 All L ° �f ocK P -7-13-- 1-7 1� ( 11, = 3c, HO! � \ � r v A ue.-f- Fi K PrO� Aacaw � �, y S�t�• (,;�,��c�� 1-7 �''_ 3c�