HomeMy WebLinkAboutBogier Property ROY COOPER
Governor
a»
3b�
MICHAEL S.REGAN
- Secretary
Water Resources r" ' S: JAY ZIMMERMAN
ENVIRONMENTAL QUALITY
Director
August 25,2017 '
Kenneth and Retha Bogier
11704`Wake Bluff'Dr.;
' `'Raleigh,NC 27614
• Subject: Buffer Determination Letter
• RRO'#17-262
' Wake County
_
Determination Type:
Buffer Intermittent/Perennial
® Neuse(15A NCAC 2B .0233) - '
Tar-Pamli'ca(15A NCAC 2B .0259) . D Intermittent/Perennial Determination (where local buffer
ordinances apply): 1 ,
D Jordan(15A NCAC 2B .0267) '
(governmental-and/or interjurisdictional ,
projects);
Project Name:. Bogier.Property Stormwater Plan
Address/Location: Wake County PIN: 1749995383, 1749994199;
Stream(s).: Smith Creek ,
Determination Date: 08/25/2017 Staff:..Rick Trone
Feature E/I/P* Not Subject Subject Start@ Stop@ Soil . USGS
Survey Topo
A E X ; Throughout X '
B NA XNot'present X
,. *E/I/P=Ephemeral/Intermittent/Perennial ;
;;,.Explanation: The'features(s)listed above has been located on the most recent published NRCS Soil Survey of Wake
County,,North Carolina,and/or the most recent copy of the USGS'Topographic map at.a 1:24,000 scale. Each
' :'feature that is.checked'"Not Subject"has been'deter'mined to not be at least intermittent or not present, Streams
tht,rare,checked".Subject"have been located,on the property and possess'characteristics that qualify it to be at least
'an;'iriteimittent strewn.,,There may be other features located on the property that do not show up on the maps
referenced above brut may be co'nsidered';jurisdictional'according to the US Army Corps of Engineers.
U
Division of Water Resources, Raleigh Regional Office,Water Quality Operations Section http://portal.ncdenr.orgR eb/wq/aps
1628 Mail,Service Center;Raleigh,NC 27699-1628 " Phone:(919)791-4200
Location: 3800 Barrett Drive,Raleigh,NC 27609 Fax: (919)788-7159
This on-site determination shall expire five(5)years from the date of this letter. Landowners or affected
parties that dispute a determination made by the DWR may request a determination by the Director. An
appeal request must be made within sixty(60)days of date of this letter. A request for a determination by the
Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins;
DWR—401 &Buffer Permitting Unit;1617 Mail Service Center;Raleigh,NC 27699-1617. If sending via
delivery service(UPS,FedEx,etc.):Karen Higgins;DWR—401 &Buffer Permitting Unit;512 N.Salisbury
Street;Raleigh,NC 27604.
This determination is final and binding unless,as detailed above,an appeal is requested within sixty(60)
days.
This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the US Army Corp of Engineers(Raleigh Regulatory Field Office)at(919)-554-4884.
If you have questions regarding this determination,please feel free to contact Rick Trone at(919)791-4257,or by
email at rick.trone@ncdenr.gov
incere y,
) a ,..9 c "
army Smit
Supervise ,Water Quality Regional Operations Center
cc: RRO DWR File Copy
Bogier Property Stormwater Plan
Wake County, NC-DWR Project # 17-262
ii
Le/ A T •
'''N.-:„Na.....
•
4411. 1W
.'- $a r u
a
i
Illik
a`' t
4 , 6 ` kt‘.
Feature A > `4
„ ..IN
,. ......
Not Subject + 4
Feature
(ill
' Al
Not Pres •
"" A3
, iti \k C
1 ' -Ith;tal. ,, 4.' .
o 4
.4 -
WmC2
- u �
a-,;IN
4 ,, 3
I -�
.1 i
. -_ , _ ' '''Lti
I' ' ‘11 e ikliiik hi
It : ) ,,,,_
r
...ili Apt3 111 -..,_ ...
4'
NRCS Soil Survey Sheet 15 ..„-;.0 4A L,
�Q \
Wake Co NC 1970 ?s ::Locations are approximate
7-)_:41. p
Legend: and are provided for refer-
A -
Ci` ence only::
project boundary �' x,,r•
Bogier Property Stormwater Plan
Wake County, NC-DWR Project # 17-262
v w
Q _ a)
O
_____I
t., ,
_____ .7....‘4,,....) (..,‘...;
�P�
r 4 ("\-
4\51s
...-) vi,ji....,.....9..v �.
5
C."Nel ''b\
°'CP 60\>
� P
C:::::y
. ..
P ''PO
GF
4R- F.
k'c'' ...7C s ii)40
\....1
o __ ,
___ __ __
,,V(..,\:'1/ / _
USGS Topographical Map lo STATE,
MpM pt
Rolesville Quadrangle 2016 ::Locations are approximateAt
i 14-
; C and are provided for refer-
Legend:
IfI
. R V
V ;1 ence only
-Project boundary e �� „„