Loading...
HomeMy WebLinkAboutDuke 2C Variance FINAL_20150304NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor March 4, 2015 Sean DeNeale Duke Energy PO Box 1006 Mail Code EC13K Charlotte, NC 28201-1006 Donald R. van der Vaart Secretary Subject: Variance to 15A NCAC 02C.01 14(b)(2) for Duke Energy Groundwater Assessments at 14 Coal Ash Facilities Dear Mr. DeNeale: On February 25, 2015, the Division of Water Resources received a request for a variance to the North Carolina Well Construction Standards, specifically Rule 15A NCAC 02C .0114(b)(2). This rule requires well construction or abandonment records be submitted within 30 days after the completion or abandonment of the well. The variance request (attached) is to submit all well construction records after the last groundwater assessment well is completed. The well construction records will also be provided in the Groundwater Assessment Report to be submitted within 180 days of Department approval of the revised Groundwater Assessment Plans. Based upon the information provided by Mr. DeNeale, it is my finding that the factors specified are sufficient to satisfy the conditions for approval of a variance as defined in 15A NCAC 02C .0118. This variance will be effective for the duration of the groundwater assessment activities required for the preparation of the groundwater assessment report as required by G.S. 130A- 309.209. The granting of this variance in no way relieves the owner or agent from other requirements of the applicable North Carolina Well Construction Standards or any applicable law, rule, or regulation that may be regulated by other agencies. If you are dissatisfied with this decision, you may commence a contested case by filing a petition under G.S. 150-23 within sixty (60) days after the receipt of the decision. 1636 Mail Service Center, Raleigh, North Carolina 27699-1636 Phone: 919-807-64641Internet: http://www.ncwater.org An Equal Opportunity 1 Affirmative Action Employer— Made in pad by recycled paper Please contact Debra Watts at (919) 807-6338 if you have any questions or need additional information. Sincerely, S. Jay Zimmerman, P.G., Director Division of Water Resources Attachment: Variance Request submitted February 25, 2015 Cc: WQROS Regional Supervisors Michele Scott - DWR Information Processing Unit File Copy Smith, Eric From: DeNeale, Sean <Sean.DeNeale@duke-energy.com> Sent: Wednesday, February 25, 2015 4:46 PM To: Smith, Eric Cc: Watts, Debra; Zimmerman, Jay; Lanter, Steven Subject: Ash Basin Groundwater Assessments - Variance Request for Well Completion Record Submittals Eric, North Carolina Well Construction Record (GW -1) forms provide instructions to submit the forms to the NCDENR Division of Water Resources Information Processing Unit within 30 days of completion of well construction. In accordance with the Coal Ash Management Act of 2014, Duke Energy and its contractors/subcontractors will install over 800 wells during the first and second quarters of 2015 at 14 facilities across North Carolina. Given the significant duration and continual drilling required for this project at each site, Duke Energy requests a variance to the 30 -day instruction to allow our drillers, geologists, and engineers to focus more intently on this sensitive project. We propose to submit GW -1 forms for each of the 14 facilities to the Information Processing Unit within 30 days following completion of the last groundwater assessment well installed. Additionally, we propose to include each facility's well records in the Groundwater Assessment Report to be submitted within 180 days of Department approval. We appreciate your consideration of this request, and please let me know if you have any further questions. Searvl)eNecLZ& Duke Energy - Environmental Services Engineer II - Waste Programs Office: (704) 382-4761 Cell: (704) 617-2393 Sean. DeNea le@duke-energy.com