Loading...
HomeMy WebLinkAbout20080691 Ver 1_Approval Letter_20080811WAT~ Michael r. tasley, governor Q /Q William G. Ross Jr., Secretary \O~ QG North Carolina Department of Environment and Natural Resources fp r Coleen H. Sullins, Director ~ ~ Division of Water Quality o ~ August 11, 2008 Dr. Greg Thorpe, PhD., Branch Manager Project Development and Environmental Analysis Branch North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina, 27699-1548 Subject: Correction to 401 Water Quality Certification for the proposed improvements to SR 1306 (South Mebane Street) from SR 1158 (Huffman Mill Road) to NC 54 (Chapel Hill Road) in Alamance County, Federal Aid Project No. STP-1306(8), State Project No. 8.2473101, TIP U-3303A and U-3303B. DWQ Project No. 20080691 WQC No. 3750 Dear Dr. Thorpe: This letter is in regards to the 401 Water Quality Certification (WQC) issued on July 25, 2008 for the improvements to SR 1306 (South Mebane Street) from SR 1158 (Huffman Mill Road) to NC 54 (Chapel Hill Road) in Alamance County, Federal Aid Project No. STP-1306(8), State Project No. 8.2473101, TIl' U-3303A and U-3303B, DWQ Water Quality Certification No. 3750. It has been brought to our attention that the impact tables in the 401 Water Quality Certification issued on July 25, 2008 for this project erroneously referred to R-3303A and R-3303B instead of U-3303A and U- 3303B. In order to avoid confusion in the future, the impact tables in the attached 401 Water Quality Certification have been corrected. The attached 401 Water Quality Certification, dated August 11, 2008 replaces the previous 401 Water Quality Certification dated July 25, 2008. We are sorry for any inconvenience this may have caused. If you have any questions please contact David Wainwright at (919)-715-3415. Sincerely, oleen H. Sullins, Director cc: Amy Euliss, DWQ Winston-Salem Regional Office File Copy N~o~lrthCarolina Transportation Permitting Unit ~ vatura~~l~ 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet: http://h2o.enr.state.nc.us/ncwetlands An Equal OpportunitylAffirmativeRction Employer= 50% Recycled110% Post Consumer Paper P o~~~ w ~ r~R ~' _~ r ~_ ~ ~ ~ William G. Ross Jr., Secretary North Carolina Department of EnvironmentCo een Sulali neDirector Division of Water Quality ater uality Certification Pursuant to Section 401IONS Federal Clean Water Act with ADDITIONAL 401 W Q CONDIT Re ulations in I S THiS CERTIFICATION is issued in conformity withrol na Division of Water Qual~y (DWQ) awg 92 500 an593 95-217 of the United States and subject to the North Ca NCAC 2H .0500. This certification authorizes the N nDO~~~ propect shall be constructed puorsuant to thes an linear feet of jurisdictional streams in Alamance Cou y application dated received April l 5, 2008. The authorized impacts are as described below: Stream Im acts in the Ca a Fear Rrver Basm Stream Permanent Temporary Permanent Temporary Total Fill in Fill in rar Total Permanent Total Stream Impacts Requiring y Tempo Fill in Fill in termittent Perennial Perennial Impact I Impact Im act P Mitigation n Intermittent Site Stream Stream Stream (linear ft.) (linear ft.) (linear ft.) (linear ft.) Stream (linear ft.) (linear ft.) (linear ft.) (linear ft.) U-3303A 36 36 0 0 0 0 0 46 46 1 3 351 305 ~ 0 305 19 2 02 31 12 0 0 12 65 65 3 353 418 317 317 36 0 TOTAL for U-3303A U-3303B 39 67 0 1 39 28 O O 32 76 108 U 76 32 60 2 0 115 175 0 115 60 TOTAL for U-3303B 317 65 125 468 593 317 60 TOTAL FOR PROJECT 1.51 Total Stream Impact for Project: 593 linear feet Wetland Im acts in the Ca a Fear River Basin Total Fill Mechanized Hand Clearing Area under Wetland _ Permanent Excavation Clearing (acres) (temporary) (acres) Bridge (acres) Impact acres acres) Site Fill (acres) acres) ( U-3303A 0 0.03 0 0.02 1 ~0 0 0 1 0 0 0 ~ 2 0 ~ 0 0 0 0 0 3 ~ 0 0.02 0 0 0.03 0.01 0 TOTAL for U-3303A U-3303B 0 0 0 0 0 O O 0 0 l 2 0 0 Q 0 0 0 0 0 0 0 TOTAL for U-3303B 0 0.02 0 0 0.03 0.01 0 TOTAL FOR PROJECT Total Wetland Impact for Project: 0.03 acres. = NorthCarolina JVatura!!y Transportation Permitting Unit North Carolina 27699-1650 Raleigh t , er, 1650 Mail Service Cen 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 state.nc.us/ncwetlands enr //h2o . . Phone: 919-733-17861 FAX 919-733-689311nternet: htt : lAffirmativeAaion Employer - 50% Recycled110% Post Consumer Paper i ty An Equal Opportun William G. Ross ur., J2Greiaiy ~F W A fFRQ North Carolina Department of Environment and Natural Resources Coleen Sullins, Director G Division of Water Quality ~O r > _~ o `~ The application provides adequate assurance that the will nogresult~in aavtolation of applicable Water Qual tyr River Basin in conjunction with the proposed development Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not vio ate the applicable portions of Sections 301, 302, 303, 30~6,h307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set fo royal is onl valid for the purpose and des g~ ~ to notify t e~DWQ and submlit atnew app received Apri This app Y lication. If the 15, 2008. Should your project change, you are req rs sold, the new owner must be given a copy of this Certification and approval letter, and is there y property responsible for complying with all the conditions150 lineardfeet, respectivey ~~add't ona] compensaporysmitigation project (now or in the future) exceed one acre or 6 and 7 For this approval to remain valid, you are may be required as described in 15A NCAC 2H .0506 (h) O ~ )- required to comply with all the conditions li~toed beno luding (buttnot 1 mitedoto) Sediment) and Erosdion )control, r local permits before proceeding with your p J 1 watershed regulations. This Certification shall expire on the Coastal Stormwater,hon-discharge and Water Supp y same day as the expiration date of the corresponding Corps of Engineers Permit. Conditions of Certification: I , With exception to the double pipe extension at Site 3, placement of culverts and other structures in waters, streams, and wetlands shall be placed below ent of the ulvert diamet r~fo d b 1 erts having aldiameterslessh a diameter greater than 48 inches, and 20 perc than 48 inches, to allow low flow pas~aosion cont of meagsures shall not be condupcted in a mannervthat may other structures including temporary result in dis-equilibrium of wetlands or stre~omb o ide evidencedthat the equilibrium is being maintained tft e above structures. The applicant is required p requested in writing by DWQ. If this condition is unable to be met at other sites due to bedrock or other limiting features encountered during construction, please contact the NC DWQ for guidance on how to proceed and to determine whether or not a modification to this certification will be required. 2. Where multiple pipes or barrels are requ~ed, at floodaplain ele at ontand/orlsillstwhere appropriate ection as closely as possible including pipes or ba Widening the stream channel shall be ivoo dedau iag sedhinent depos tion that equines incrteasedd of structures typically decreases water ve y maintenance and disrupts aquatic life passage. 3. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in sctures shall besp openly des gned,tsazed andsinstal edede aquatic life passage. Bioengineering boulders or stru 4. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 5. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream waUert thete otent 1 foreelevated pHaand possib e aquaticelife and fi h kills. discharged to surface waters d p 6. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S. 7. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-689311nternet: htt ://h2o.enr.state.nc.uslncwetlands An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper pF w N rFR ~ QG o ~~ 1,,,Jwv~ -i o ~ William G. Ross Jr., SecreLaiy North Carolina Department of Environment and Natural Resources Coleen Sullins, Director Division of Water Quality All mechanized equipment operated near surface br cants, hydrauligfluids, or otherdtoxnamaterials.ed to 8. prevent contamination of stream waters from fuels, u 9. The dimension, pattern and profile of the stream above and below the chocs c~onditions.ot be modified. Disturbed floodplains and streams shall be restored to natural geomorp uld not be used in riparian areas. NCDOT should utilize used on banks~and tep slopes for 10. Tall fescue sho bank stabilization when practicable. Erosion control matting should e instead of straw mulch and should be well anchored with 12" staples, wooden survey stakes, or live stakes. 11. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDO her d version strudctures shall be used torprevent excavat on in sandbags, rock berms, cofferdams and of flowing water. 12. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 13. The permittee and its authorized agents shal~scoendlting from compliance w thr§303(d) of he Clean Water quality standards (including any requiremen ro riate requiremenn the failure to s utain aadesignatDed for ach eved use)aorsthat Act) and any other app p standards or laws are not being met (include g Hance, DWQ State or federal law is being violated, or that further conditions are necessary to assure comp may re-evaluate and modify this certification. 14. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. p roved b this - outside buffer, wetland or water boundary located within the construction corridor a p y 15. The rior to an land disturbing activities. Impacts certification shall be clearl amark hiblted~unlessrotherwise auhorized by this certification. - to areas within the fencing p ro ect b the end of 16. Native riparian vegetation must be re-established ~th~ the construction limits of the p j y the growing season following completion of constr Il be no excavation from, or waste disposal into, jurisdictibno~ wesitesd, oro access roads to vast nor - 17. There sha this certification without appropriate modification. Sho eld a aoste tniti ation will be required since that is a borrow sites, be located in wetlands or streams, comp rY g direct impact from road construction activities. d erosion control measures shall not be placed in wetlands or waters unless otherwise approved 18. Sediment an by this Certification. - ~ 19. Erosion and sediment control practices must oe ~ a~on and mame ance olf puchfBest ns governing the proper design, installation and p Management Practices in order to protect surface waters standards: - a. The design, installation, operation, and maintenance of the sediment and erosion control measures - must be such that they equal, or exceed, the regrol Manualp Tha devices hall be maintained on all the North Carolina Sediment and Erosion Cont oil ro ects, including contractor-owned or construction sites, borrow sites, and waste pile (sp ) p j - leased borrow pits associated with the project. NoithCarolina ~Vatura!!y Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX919-733-689311ntemet: htt :/Ih2o.enr.state.nc.us/ncvvetlands An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper William G. Ross Jr., 5ecrem~ y ~1~1 H rF North Carolina Department of Environment and Natural Resources /~ Coleen Sullins, Director O~~ QG Division of Water Quality _~ >_ ~ O ~ ro ect must be designed, installed, operated, b, The erosion and sediment control measures for the p j ained in accordance with the most recent version of the North Carolina Sedimenetdan and mamt install , Erosion Control Planning and Design Manual. most recent version of the North Carolina orrow pit sites, the erosion and sedim h thenttol measures must be designed, c. For b operated, and maintained in accordance wrt ~,,,ith the reclamation in accordance Surface Mining Manual. d, The reclamation measures and implementation must comply with the requirements of the Sedimentation Pollution Control Act. that the final design drawings adhere to the certification and to the drawings 20. The Permittee shall ensure submitted for approval. and all statutes, t the Permittee from complying with any other government agencies (i.e. local, state, and 21. The issuance of th~rcordinances thatsmay beeimposed by rules, regulations, abut not limited to applicable buffer rules, stormwater management federal) having jurisdiction, includinb uirements, etc. rules, soil erosion and sedimentation control 'req ualit Certification shall be maintained ~>~ ~ite at the construction site at all times. n cations, if any, shall be maintained with 22, A copy of this Water Q y uent m addition, the Water Quality Certification ectdman geTeq the Division Engineer and the on-site p j ~ the NCDOT ro ect (including any impacts at associated borrow or `'~'~~~ on Form" to notify 23. Upon completion of the p j ineer shall complete and return the enclosed "Certificati leted. °mp Division Eng DWQ when all work included in the 401 Certification has been coin ualit within 24 e shall report any violations of this certification to the Division of Water Q Y 24. The Permitte hours of discovery. result in criminal n condition herein set forth may result in revocation of this Certification and may hies. This Certification shall become nule and void unless the above conditions are ma ment Act Permit. This Certification shall expire upon the Violations of a y and/or civil pena conditions of the 404 orCAMA p/orr-ioastal Area anag expiration hearing upon written request within sixty ou have the right to an adjudicatory etition conforming to uest must be in the form of a written p 6714 If this Certification is unacceptable toy ou have the (60) days following receipt of this Certification. This req .ons are made to an original Certification, y the North Carolina General Statutes andfficlad with the Office of Administrative follown g receipt of Chapter 150B of 27699-6714. If mode 60 da s Raleigh, N.C. on the modifications upon written request within sixty ( ) y Mail Service J enter, hearing ication. Unless such demands are made, this Certification shall be final and binding. right to an ad~udicatory the Cert>f This the 11th day of August 2008 DIVISION OF WATER QUAD 1 eet~Sullins Director WQC No. 3750 N~ Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North CaroNnoatn Carol na5027604 2321 Crabtree Boulevard, Suite 250, Raleigh, one: 919-733-1786 !FAX 919-733-68931 Internet: htt alh2o.enr.state.nc.uslncwetlends Ph `• to er - 50% Recycled110% Post Consumer ap . ,._.__.,,,,,,fi,msr~rmative Action Emp Y • William G. Ross Jr., Secretary OF W H rER North Carolina Department of Environment and Natural Resources Coleen Sullins, Director p(~ Division of Water Quality O ~ r > -I O ~ Federal Clean Water Act with ADDITIONAL Section 401 of ualit Certification Pursuant to NS 401 Water Q Y CONDITIO 92-500 an aw Re ulations in 15 g ERTIFICATION is issued in conformity with thepa Div s on tof WatertQual~y (DWQ) 593 THIS C t to the North Caro tional wet an s an di c NCDOT to impact 0.03 acres of~urts 95-217 of the United States and subjec hall be constructed pursuant to the This certification authorizes the t 0 o s . nt .The projec NCAC 2H .050 linear feet of jurisdictional streams in Alamance C y The authorized impacts are as described below. lication dated received April 15, 2008. app Stream Im acts in the Ca a Fear River Basin Stream orar Total Total Permanent Temporary Permanent Temp Y Total Fill in Fill in Temporary Permanent Stream Impacts Requiring Fill in Fill in Im act Impact Impact Intermittent Intermittent Perennial Perennial p linear ft.) (linear ft.) (linear ft.) Stream Stream Site Mitigation (linear ft.) ( Stream Stream (linear ft.) (linear ft.) (linear ft.) (linear ft.) U-3303A 36 36 0 36 0 0 0 46 305 351 305 46 1 31 305 12 0 0 19 12 2 0 0 12 19 65 353 418 317 3 0 317 65 TOTAL for U-3303A 36 U-3303B 39 67 0 1 39 28 0 ~ 32 76 108 0 76 32 0 60 115 175 2 0 0 0 317 60 65 125 468 593 TOTAL for U-3303B 115 317 151 60 _ TOTAL FOR PROJECT Project: 593 linear feet f or Total Stream Impact Wetland Im acts in the Ca a Fear River Basin Total Mechanized Fill Excavation Hand Clearing Area under Bridge (acres) Clearing Wetland Impact (acres) Permanent tem orary) Site Fill (acres) ( p (acres) (acres) acres (acres) U-3303A 0 0.03 0 0.02 0 0 1 ' 1 <0 0 ~ 0 0 0 ~ 2 0 0 0 0 0 0.03 0 0 3 ~ 0 0 0.02 TOTAL for U-3303A 0.01 U-3303B 0 0 _ 1 0 0 0 ~ 0 0 0 0 0 ~ 0 0 2 0 0 0 0 0 0.03 0 0 TOTAL for U-3303B 0 0.02 0 TOTAL FOR PROJECT 0.01 Total Wetland Impact for Project: 0.03 acres. No e hCarolina ~atura!!y Transportation Permitting Unit North Carolina 27699-1650 h Ralei , g 1650 Mail Service Center, 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 61 FAX 919-733-68931 Internet: htt ://h2o.enr.state.nc.us/ncvvetlands Phone: 919-733-178 lAffirmativeAaion Employer - 50% Recycled110% Post Consumer Paper it y An Equal Opportun William G. Ross ur., aec~e~a~y pF W" ~Fq North Carolina Department of Environment and Natural Resources Q Coleen Sullins, Director p ~ Division of Water Quality >_ -I O ~ The application provides adequate assurance that en[ Will nogresult in a violation of applicable W ter Qualityr River Basin in conjunction with the proposed developm guidelines. Therefore, the State of North Carolina certifies that this activity will not vio ate Standards and discharge b the applicable portions of Sections 301, nafterOset forth~07 of PL 92-500 and PL 95-217 if conducted in accor ance with the application and conditions here lication. If the This approval is only valid for the purpose and des gY d to notifybhe~DWQ and submit atnew aapp received Apri 15, 2008. Should your project change, you are req ~s sold, the new owner must be given a copy of this Certification and approval letter, and is there y property responsible for complying with all the conditioons150 lineardfaet~respectived i~add t onal compensaporysmit gat on project (now or in the future) exceed one acre 6 and 7 For this approval to remain valid, you are may be required as described in I SA NCAC 2H .0506 (h) O ~ )~ required to comply with all the conditio ur li~toed beno luding (but~not 1 mitedoto) Sedamentl and Erosdion lcontrol, r local permits before proceeding with yo p ~ 1 watershed regulations. This Certification shall expire on the Coastal Stormwater,hon-discharge and Water Supp y same day as the expiration date of the corresponding Corps of Engineers Permit. Conditions of Certification: 1. With exception to the double pipe extension at Site 3, placement of culverts and other structures in waters, streams, and wetlands shall be placed bel~rcent of the ulvert dameterrford b l erts having aldiameterslessh a diameter greater than 48 inches, and 20 p than 48 inches, to allow low floowp asesaosion cont of meaaures hall nDot be conducted in a mannervthat may other structures including temp ry result in dis-equilibrium of wetlands or ~ ~~ b oxide evidence that the equilibrium is bei ng maint~ ned i t e above structures. The applicant rs requir p requested in writing by DWQ. If this condition is unable to be met at other sites due to bedrock or of er limiting features encountered during construction, please contact the NC DWQ for guidance on how to proceed and to determine whether or not a modification to this certification will be required. 2, Where multiple pipes or barrels are rebarrelds at flood plain elevat ontand/or~sills where appropriate ection as closely as possible including pipes o Widening the stream channel s aterbvelo~ deda sing sediment depos tionthat requires incrteasedd o structures typically decreases w y maintenance and disrupts aquatic life passage. 3. The use of rip-rap above the Normal High WaterMach a manner that it does not i pedp aqu tc life passage. stabilization shall be placed in stream channels m su Bioengineering boulders or structures shall be properly designed, sized and installed. 4. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 5. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadve levatedo H and possib e aquaticelifeaand fibh kills. discharged to surface waters due to the potential fore p 6. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S. 7. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. orthCarolina ,Naturally Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-689311nternet: htt ://h2o.enr.state.nc.us/ncwetlands An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper William G. Ross Jr., secreia~y OTC W A ~ERQ North Carolina Department of Environment and Natural Resources Coleen Sullins, Director ~i Division of Water Quality ~ ~ o ~ g. All mechanized equipment operated near surf~ls lubricants, hydraullgfluids, or otherdtoxicdmaterials.ed to prevent contamination of stream waters from fu , g. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. 10. Tall fescue should not be used in riparian area~~nNCo DO ~ ng should be usedton banksrand steep slopes for bank stabilization when practicable. Erosion instead of straw mulch and should be well anchored with 12" staples, wooden survey stakes, or live sta es 11. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NC dDt er diversion strudCtures shall be used to~pre~vent excavat on in sandbags, rock berms, cofferdams a flowing water. 12. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. of the Clean Water 13. The pernnittee and its authorized ag uirementscroesdulting from co~mpl ance withr§3O3(d)ent with State wa er quality standards (including any req Act) and any other appropriate requirements of State and Federal law. If DWQ determines that suc standards or laws are not being met (including rtheraconditions are ne essary to asosure compliance,oDWQ State or federal law is being violated, or that may re-evaluate and modify this certification. 14. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. 15. The outside buffer, wetland or water boundarysible fenc ng prior to nytland disturbing acrivities.dImpacts certification shall be clearly marked by highly to areas within the fencing are prohibited unless otherwise authorized by this certification. 16. Native riparian vegetation must be re-established within the construction limits of the project by the end of the growing season following completion of construction. 17. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this certification without appropriatde mood~fieams, compensatory mirigato n sw 11 be required s~nce thattis a borrow sites, be located in wetlan direct impact from road construction activities. 18. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. 19. Erosion and sediment ceont n linstallation and operation andpmainte ance olf puchfBest ns governing the proper d g , Management Practices in order to protect surface waters standards. a. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or excY~edon Control Manualp The devices shalltbe maintained on all the North Carolina Sediment and E construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. n.,,. Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-689311nternet: htt ://h2o.enr.state.nc.us/ncwetlands An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper William G. Ross Jr., Secrem~Y W H fF North Carolina Department of Environment and Natural Resources Coleen Sullins, Director ~~0~ RQG Division of Water Quality _~ r ~_ ~ ~ ~ ro ect must be designed, installed, operated, b. The erosion and sediment control measures for the p j ' din accordance with the most recent version of the North Carolina Sedime~aan and maintains n Manual. Erosion Control Planning and Desrg it sites, the erosion and sediment c~ most scent vers on of thesNorth Carolina c, For borrow p operated, and maintained in accordance with t 1 with the reclamation in accordance Surface Mining Manual. d, The reclamation measures and implementation must comp y with the requirements of the Sedimentation Pollution Control Actcertification and to the drawings The Permittee shall ensure that the final design drawings adhere to the 20. royal. submitted for app 1 in with any and all statutes, t the Permittee from comp y g cies (i.e. local, state, and be imposed by other government ag ement 21. The issuance of th~rcord n nces thatsmay exem licable buffer rules, stormwater manag rules, regulations, but not limited to app federal) having jurisdiction, including uirements, etc. rules, soil erosion and sedimentation control req 't Certification shall be maintained o d ~caat the construction site at all times. n lions, ~f any, shall be maintained with 22. A copy of this Water Quah y uent mo addition, the Water Quality Certificatio ~ ectdman g req the Division Engineer and the on-site p j ~ the NCDOT im acts at associated borrow or wletton~Forni' to notify 23. Upon completion of the project (including any p ineer shall complete and return the enclosed "Certificati letedComp Division Eng DWQ when all work included in the 401 Certification has been coin ualit within 24 all re ort any violations of this certification to the Division of Water Q Y 24. The Permittee sh p result in criminal hours of discovery. condition herein set forth may result in revocation of this Certification and may on the his Certification shall become null annt A d Pnless the above conditions are ma e Violations of any ermit. This Certification shall expire up and/or civil penalties. T conditions of the 404 orCAMA p/ermit astal Area Manageme expiration of the hearing upon written request within sixty ou have the right to an adjudicatory etition conforming to uest must be in the form of a written p s 6714 If this Certification i~e eact of thiseCertification. This req ou have the (60) days following p Carolina General Statutes and filed with the Office of Administrative Hearing , lei h, N.C. 27699-6714. If modificati~nen reque~de to an original Certification, y within sixty (d0) days following receipt of Chapter 150B of the North Mail Service Center, Ra g on the modifications upon wri 'on. Unless such demands are made, this Certification shall be final and binding. right to an adjudicatory hearing the Certificati This the 11th day of August 2008 DIVISION OF WATERQU eer~Sullins Director (me WQC No. 3750 Transportation Permitting Unit North Carolina 27699-1650 1650 Mail Service Center, Raleigh, North Carolina 27604 2321 Crabtree Boulevard, Suite 250, Raleigh, ne: 919-733-1786 !FAX 919-733-689311nternet: htt :IIh2 .enr.state.nc.us/n Patlends Pho to er - 50% Recycled110% Post Consume .,,___..,,.,;~,rn~r~rmativeAction mp y