Loading...
HomeMy WebLinkAbout20081114 Ver 1_Other Agency Comments_20080725 X!Z" ~n J G STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS W. LYNDO TIPPETT GOVERNOR SECRETARY July 23, 2008 North Carolina Division of Water Quality 401 Wetlands Certification Unit Attn: Mr. Brian Wrenn 2321 Crabtree Boulevard Raleigh, NC 27604-2260 Subject: Revision to SR 1931 (Benny Mills Road) Pre-Construction Notification Form Marshville, North Carolina (Union County) WBS Element Number 10.C090030 (DWQ Minor Permit Fee $240.00). Dear Mr. Wrenn: In a Pre-Construction Notification form (PCN) dated July 15, 2008, the North Carolina Department of Transportation (NCDOT) proposed to upgrade SR 1931 (Benny Mills Road) in Union County from an unpaved roadway to a paved roadway (total project length is 0.42 of a mile). The purpose of this letter is to advise you that the NCDOT has revised the proposed stream impacts. The proposed stream impacts have been reduced from 38 linear feet to 32 linear feet. The corrected PCN is attached. If you have any questions or need any additional information concerning this project, please feel free to contact Mr. Larry Thompson, Division Environmental Supervisor, at (704) 982-0101. Sincerely, Barry S. Moose, PE Division Engineer BSM/LBT cc: Polly Lespinasse, NDWQ David Gillette, CME Garland Haywood, BME Area Field Operations Unit 716 West Main Street, Albemarle, NC 28001 • (704) 982-0101 • Fax (704) 982-3146 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS W. LYNDO TIPPETT GOVERNOR SECRETARY July 15, 2008 North Carolina Division of Water Quality 401 Wetlands Certification Unit Attn: Mr. Brian Wrenn 2321 Crabtree Boulevard Raleigh, NC 27604-2260 Subject: Secondary Road Improvements to SR 1931 (Benny Mills Road), Union County. WBS Element Number 10.C090030 (DWQ Minor Permit Fee $240.00). Dear Mr. Wrenn: The North Carolina Department of Transportation (NCDOT) proposes to upgrade SR 1931 (Benny Mills Road) in Union County from an unpaved roadway to a paved roadway. The total project length is 0.42 of a mile. Transportation and highway laws of North Carolina (G. S. 136-44.6, 136-44.7, 136-44.7A, 136- 44.8 and 136-44.9) require the NCDOT to develop annual work programs for construction and maintenance of secondary roads. These general statutes specifically set forth requirements for annual construction and paving of existing unpaved roads. Paving of these roads is performed in priority order as established by the NCDOT for- each unpaved road within a given county. This number is based on characteristics of each road, including number of homes, schools, churches, businesses, industries, recreational facilities, traffic counts, presence of school bus routes, and value as a thoroughfare. Benny Mills Road is scheduled for paving in the 2008-2009 Secondary Roads Construction Program. Protected Species The subject project has been reviewed for the presence of federally listed threatened and endangered species. NCDOT biologists believe that the construction of this project will have "No Affect" on any federally listed species. Impacts to Waters of the United States This project cannot be completed without impacts to waters of the United States. This project is located within the Yadkin River Basin (Hydrologic Unit # 03040105) and would impact an 716 West Main Street, Albemarle, NC 28001 • (704) 982-0101 • Fax (704) 982-3146 unnamed tributary to Lanes Creek. There will be approximately 32 linear feet of permanent impacts to the existing intermittent stream channel as a result of the proposed construction. Avoidance/Minimization The proposed impacts to the jurisdictional areas on this project have been minimized as much as practical. NCDOT's best management practices for the protection of wetlands and surface waters will be applied during all phases of project construction in an effort to eliminate any further impacts. Summary The purpose of this letter is to request authorization to construct the proposed project under a Section 401 Water Quality Certificate (WQC) No. GC3704. If you have any questions or need any additional information concerning this project, please feel free to contact Mr. Larry Thompson, Division Environmental Supervisor, at (704) 982-0101. Sincerely, ~&73-AL-A' Barry S. Moose, PE Division Engineer BSM/LBT cc: John Dorney, NCDWQ Polly Lespinasse, NDWQ David Gillette, CME Garland Haywood, BME Area Field Operations Unit File 2 SR 1931 (Benny Mills Road) Union County Office Use Only; Form Version March 05 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ Z 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: Barry Moose P E Company Affiliation: Division Engineer Mailing Address: N. C. Dement of Transportation 716 West Main Street Albemarle NC 28001 Telephone Number: (704) 982-0101 Fax Number: (704) 982-3146 E-mail Address:. bmoose@dot.state.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Berry Moose P E _ Company Affiliation: Division Engineer Mailing Address: N C Department of Transportation 716 West Main Street Albemarle NC 28001 Telephone Number: (704) 982-0101 Fax Number: (704) 982-3146 E-mail Address: bmoose@dot.state. nc us Page 1 SR 1931 (Benny Mills Road) Union County III, Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1.Name of project:__ . SR. 1931(B = Mills Road) Union Coum 2.T.I.P. Project Number or State Project Number (NCDOT Only): 10C.090030 3.Property Identification Number (Tax PIN): 4.Location County: Union Nearest Town: Marshville Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): From the intersection of HWY 74 and SR 1005 (Lansford Road) in the town of Marshville travel south on (Lansford Road) for 3.1 miles to SR 1929 Whiladel hia Church Road. Turning right onto hiladel hia Church Road) and traveling 3.6 miles to SR 1003 ite Store Road), once on (White Store Road) travel 1.5 miles to SR 1931 Benny Mills Road Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 34.885042/80.3887 5.Property size (acres): 6.Name of nearest receiving body of water: Lanes Creek 7.River Basin: Yadkin (Hydrologic Unit 03040105) (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o,enr.state.nc.us/admin/maps/.) Page 2 SR 1931 (Benny Mills Road) Union County 8.Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: SR 1931 envy Mills Road ) is an unpaved secondary road in Union County,,The southern end of the road has single family homes along the road-way with the northern end still being used for agricultural practices 9.Describe the overall project in detail, including the type of equipment to be used: Benny Mills Road will be graded, the drainage improved and the road paved It has one jurisdictional crossing that will be replaced, STA 11+06. The work area will be cleared, as needed, followed by the implementation of the erosion control plan. To provide a quality job the following equipment will be used: Track hoe,.,_Vibrator Roller, Dun truck, Boom truck, and various hand tools. 10. Explain the purpose of the proposed work: To improve the public's safety and serviceability of the road. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules.N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A VL Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for Page 3 SR 1931 (Benny Mills Road) Union County wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: There will be 32'of permanent impacts to an unnamed tributary to Lanes Creek due to the construction of this project._ 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list imp acts due to both structure and flooding Wetland Impact Type of Wetland Located within Distance to Area of Site Number Type of Impact (e.g., forested, marsh, 100-year Nearest impact (indicate on map) herbaceous, bog, etc.) Floodplain Stream (acres) (yes/no) (linear feet) Total Wotland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Perennial or Average Impact Area of Number Stream Name Type of Impact Stream Width Length impact (indicate on ma) Intermittent? Before Impact (linear feet) (acres) Replacing STA 11+06 UT to Lanes Creek (28'x52") CMP perennial 32' .002 with a (60'x 3' 95"x67'CMPA) Total Stream .002 Page 4 SR 1931 (Benny Mills Road) Union County 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U. S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, draina e, bulkheads, etc. Open Water Impact Name of Waterbody Type of Waterbody Area of Site Number (if applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact (indicate on ma) ocean, etc.) (acres) Total Open Water Impact (acres) 6. List the cumulative impact to all Waters of the U.S. resulting om the project: Stream Im act acres : .002 Wetland Impact (acres): N/A Open Water Impact acres : N/A Total Impact to Waters of the U. S. (acres) N/A Total Stream Impact linear feet): 32' 7. Isolated Waters Do any isolated waters exist on the property? ? Yes No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The surface waters not affected Page 5 SR 1931 (Benny Mills Road) Union County by the construction of this project will be protected from unnecessarx encroachment. The staging of construction equipment will not be allowed near the jurisdictional stream crossing` Strict enforcement of the sediment and BMP's for the protection of wetlands and surface waters will be enforced during all phases of project construction VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size. of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Any requests received for mitigation will be routed through the NC Ecosystem Enhancement Program. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP Page 6 SR 1931 (Benny Mills Road) union county website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): • Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No N 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No IX. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Panilico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify V Yes ? No N 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. * Impact Required Zone (square feet) Multiplier Mitigation 1 3 (2 for Catawba) 2 1.5 Page 7 SR 1931 (Benny Mills Road) Union County Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B.0242 or.0244, or.0260. N/A X. Stormwater (required by DWQ) Describe impervious acreage, (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 201/o, please provide calculations demonstrating total proposed imperviouslevel. All =rooriate best management practices for sediment and erosion control will be implemented during work activities. There will not be an increase in the impervious area as a result of this project being constructed. XI. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A e Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XH. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XHL Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may Page 8 SR 1931 (Benny Mills Road) Union County choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). July 21, 2008 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 9