Loading...
HomeMy WebLinkAbout20080881 Ver 1_Certification of Completion_20080801 ~L Ile, OW STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY. DIVISION OF HIGHWAYS LYND nPPETT GOVERNOR SECRETARY July 30, 2008 401 /Wetlands Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 To Whom It May Concern: Attached is a Certificate of Completion for the following project in Lee County, NCDOT District 2, Division 8: DWQ Project No. Applicant Project Name Date of Issuance 20080881 Tim Johnson NC 42 6/2/08 Please advise if you need additional information. Sincerel T othy Johnson, E Division Engineer cc: Art King, DEO T.F. Welch, PE, Division Bridge Maintenance Engineer C.E. Dumas, PE, District Engineer P.O. BOX 1067, ABERDEEN, NORTH CAROLINA 28315 PHONE (910) 944-2344 FAX (910) 944-5623 I M I)WQ Project No.: Z008 0 M County: Applicant: N C- NJ' ~D l V 00 O'Chl Y J G H N sD fJ Project Name: NG 42 (-y1-u4F-AT KCe1. CC M l~ N -F Date of Issuance of 401 Water Quality Certification: Ju N E Z~ 2 008 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Cert fication a-3-, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other suppo in materials. Signat Date: 22 Agent's Certification I, t r yJ L.C (A , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. d Signature: Date: :7/1 Engineer's Certification Partial Final as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date