Loading...
HomeMy WebLinkAboutNC0000396_Figure H-4 - Time v. Concentration - Sulfate, Thallium (1964)_20150823600 J t 500 a 400 +- 300 N 200 00 0 / 8/20 0 0.5 — — 5 NCAC 02L Standard —CB-9 CB -9 ND (BG) CCB -5 CB -5 ND O CB -6 4 CCB -6 ND O C13-7 —O— CCB -7 N D O CB -8 (O CB -8 ND ---- Oq�O 0 0 0 8 0 8 e 0 0 0 O / 3/20 2 3/ 0/20 3 5/5/20 4 7/ /20 5 S mpling D to 0 / 7/20 0 2/22/20 /25/20 3 3/ /20 4 S mpling D to 4/5/20 5 Notes: CB -9 installed 0/8/ 2; CB -5, CB -6, CB -7 installed 7/ 2/ 0; CB -8 installed 8/ 7/ 0; ND = Non detect, BG = Background well 5 NCAC 02L Standard J 0.4 FIGURE H-4 148 RIVER STREET, SUITE 220 - --Ml-- CB -9 CB -9 ND (BG) GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 BETWEEN COMPLIANCE AND BACKGROUND WELLS V —41--1 — CB -5 ND E 0.3 PROJECTMANAGER:J. MAHAN 3 CCB -6 --O—CB-6 ND P:\Duke Energy Progress.1 026\1 02. Asheville Ash Basin ■M ■ M 200 CPSL DRIVE t 0.2 1 ——— — — — — — fCB-7 CCB-7ND H ,f CB -8 --O— CB -8 ND 0. O 0 / 7/20 0 2/22/20 /25/20 3 3/ /20 4 S mpling D to 4/5/20 5 Notes: CB -9 installed 0/8/ 2; CB -5, CB -6, CB -7 installed 7/ 2/ 0; CB -8 installed 8/ 7/ 0; ND = Non detect, BG = Background well FIGURE H-4 148 RIVER STREET, SUITE 220 - TIME VERSUS CONCENTRATION – COMPARISON GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 BETWEEN COMPLIANCE AND BACKGROUND WELLS www.synterracorp.com SULFATE, THALLIUM DRAWN BY: J. GILMER DATE: J NE 2015 PROJECTMANAGER:J. MAHAN ■■■����� �/ er■ s T LAYOUT: ASHEVILLE STEAM ELECTRIC PLANT P:\Duke Energy Progress.1 026\1 02. Asheville Ash Basin ■M ■ M 200 CPSL DRIVE GWAssessment Plan\1.11 GSA Reporting\figures\StatiStatistics\Time-Series\1964 Ash Basin ARDEN, NORTH CAROLINA 28704