Loading...
HomeMy WebLinkAbout19930740 Ver 1_DCM Permit_20071231I Permit Class 5`h RENEWAL MAINTENANCE 5 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission ermit for X . Permit Number 224-87 yl,lyt?g1' R X00, O? X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to N.C. Department of Transportation, Ferry Operations, P.O. Box 57, Hatteras, NC 27943 Authorizing development in Hyde and Dare County at Hatteras Inlet , as requested in the permittee's application letter dated 11/5/07 This permit, issued on 12/11/07 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Hatteras Inlet Ferry Channel Maintenance Dredging 1) Nothing in this permit authorizes any activity which has not received approval from the National Park Service (NPS) for work within the Cape Hatteras National Seashore. The proposed work shall not commence until the permittee has been issued a Special Use Permit from the NPS, and a copy of the Special Use Permit is received by DCM. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2012 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. James H. Gregson, rector Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee N.C. Department of Transportation ADDITIONAL CONDITIONS Maintenance Clause Permit #224-87 Page 2 of 2 2) DCM shall be notified in writing at least two (2) weeks in advance of any maintenance work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross-hatching indicating the current channel location, the area to be maintained, the area to be used for spoil disposal, and the estimated amount of material to be removed. The location, design and holding capacity of the spoil disposal site must be approved by a representative of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee's signature shown anew on the original plan. 3) This renewal shall be attached to the original of Permit No. 224-87, which was issued on 11/20/87, as well as all subsequent modifications, renewals and letters of refinement, and all documents shall be readily available on site when a Division representative inspects the project for compliance. 4) All conditions and stipulations of the active permit remain in force under this renewal unless altered herein.