Loading...
HomeMy WebLinkAbout19970656 Ver 1_Fax_19980211DWQ Wetlands Unit (919) 733-1786 Fax (919) 733-9959 Fax To: Dan Simmons, PE From: J. Ray Cox Fax: (919) 233-8031 Pages: 3 Phone: (919) 233-8091 Date: 02/11/98 Re: Partners Equity O&M Agreement • comments: I have crossed out the portions of the agreement that are not applicable. Feel free to add any requirements that you feel are necessary. For the wetland area that will receive stormwater from lots 10, 11, 12 and 17, 1 would recommend adding the following requirements: 1. Under Section 1, Item E: The wetland area shall be inspected for eroding areas and excessive debris/trash accumulation. Any eroding areas shall be stabilized immediately, and trash/debris shall be removed as necessary to maintain proper function and aesthetic appearance. 2. Under Section III, Item C: The wetland area shall be inspected to ensure proper vegetative growth and successful assimilation of the stormwater. Additional plantings or pruning of invasive species (by hand) should be conducted as necessary to promote proper functioning of the wetland. Item D: Sediment accumulation in the wetland area should be spread (by hand) to avoid choking out vegetation or creating localized channels. Excessive sediment accumulations must be removed to an upland area, with minimal disturbance to the wetland vegetation and in situ soils. I'll be in the office until 2119. Please call if you have any questions. Thanks for your patience and cooperation. i