Loading...
HomeMy WebLinkAbout19970656 Ver 1_Staff Report_19970825MEMBRANDUM PRINT NAMES: r Reviewer: TO: JOHN DORNEY WQ SUPV.:_ ENVIRONMENTAL SCIENCES BRANCH DATE: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS -'**EACH ITEM MUST BE ANSWERED (USE N/A FOR NOT APPLICABLE) PERMIT YR: 97 PERMIT NO: 0000656 COUNTY: JOHNSTON APPLICANT NAME: PARTNERS EQUITY GROUP-SMITHFIELD PROJECT TYPE: COMMERCIAL LOT PERMIT TYPE: NW26 COE #: DOT #: RCD_FROM _CDA: APP DATE_FRM_CDA: 07/23/97 REG_OFFICE: ?V RIVER-AND-SUB-BASIN-#: 003004 STREAM_CLASS C WL_IMPACT? j/N WL_REQUESTED: O WL SCORE(#): q2?_ MITIGATION?: Y/ t7 MITIGATION SIZE: /?? STR INDEX N0: 27-46 vri WL_TYPE: WL_ACR_EST?: ON WATER IMPACTED BY FILL?: Y/6) MITIGATION-TYPE: DID YOU REQUEST MORE INFO?: Y/O IS WETLAND RATING SHEET ATTACHED?: YEN HAVE PROJECT CHANGES/CONDITIONS BEEN DISCUSSED WITH APPLICANT?: Y/6 RECOMMENDATION (Circle One): ISSUE ISSUE/ CO DENY COMMENTS: CC: Regional Office Central Files mrm?? r r' , Raleigh Regional Office August 18, 1997 MEMORANDUM To John Dorney Through Judy Garrett From :Danny Smith/ Subject Partners Equity -Group Smithfield Permit No. 656 Johnston County This wetland is an isolated upper Coastal Plain wetland located near Highway 1-95 in Smithfield. It has been cut-over and now consist of early successional wetland species and a few remnants of what was once a very nice black gum dominated wetland. Scirpus cyperinus, Cyrilla racemiflora, Magnolia virginiana, and Carex spp were prominent. Several years ago the RRO visited this site. After this visit (with the road foot print already installed), the project was placed on hold. This was due to the applicant's difficulty addressing stormwater requirements. Included with this current application is a proposal to avoid impacts to significant portions of the remaining wetlands and construct a wet retention pond off site (but downstream) to address stormwater concerns. (a significant improvement from the initial application). Please note total impact total just under 1 acre. It is my recommendation that the project be issued with the following stipulations: 1) that stormwater from sufficient surface area (parking lots and roof tops) are diverted into the wetland to maintain the hydrology and allow the wetland to provide water quality function. This is critical, due to topographic constraints. That is,large portion of the site will not readily drain (via stormwater pips ) into the wetland. Hence the off site stormwater pond. Also, it should be required by some sort of agreement that the stormwater drains be maintained such that water is not diverted away form the wetland. 2) require that the off site stormwater pond be designed to the stormwater groups guidelines ... Further, this stormwater pond will have to be maintained and properly managed. It is not on the main project site and it is unclear who will be the owner of this structure . The Division should require some kind of commitment for its operation by the applicant. 3) deed restriction language. rroyect name INeul-eJl County ZLe x ? Wetla area _ acres We Name of evaluator / weight Water storage x 4.00 Wetland Score •_• Bank/Shoreline stabilization x 4.00 Pollutant removal x 5 00 . Wildlife habitat x 2 00 . ? = s;'::..:>?%'•- , - Aquatic life value x 4.00 • iii>'??:> i???i?•\' / Recreation/Education -? x 1.00 Add 1 point if in sensitive watershed and > 10% nonpoint disturbance within 1/Z mile upstream, upslope, or radius