Loading...
HomeMy WebLinkAbout19970656 Ver 1_Approval Letter_19970904State of North Carolina Department of Environment, Health and Natural Resources LT` . Division of Water Quality James B. Hunt, Jr., Governor ~ Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director p E H N FI September 4, 1997 Johnston County DWQ Project # 970656 APPROVAL of 401 Water Quality Certification and ADDMONAL CONDITIONS Partner's Equity Group P.O. Box 1089 Smithfield, NC 27577 Dear Sirs: You have our approval, in accordance with the attached conditions and those listed below, to place fill material in an additional 0.66 acres of wetlands or waters for the purpose of constructing a commercial site at US 70/1-95, as you described in your application dated 21 July 1997. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3108. This certification allows you to use Nationwide Permit Number 26 when it is issued by the Corps of Engineers. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Deed restrictions, conservation easements or similar mechanisms shall be placed in all lots with remaining jurisdictional wetlands and waters to restrict future wetland and/or water impact These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 Permit (whichever is later). An additional condition is that a final, written stormwater plan including an off-site wet detention basin and diversion of a portion of the stormwater into the remaining on-site wetlands must be approved by J5WQ before wetland (or stream) impacts occur. An operation and maintenance agreement is required for both stormwater management sites. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorey at 919-733-1786. Sin , Won Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office Raleigh DWQ Regional Office Mr. John Dorey Central Files Steve Kroeger Ray Cox Steve Roberts; Soil and Environmental Consultants 970656.1tr Division of Water Quality • Environmental Sciences Branch Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX #E 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper