Loading...
HomeMy WebLinkAbout19970656 Ver 1_Staff Comments_19980203 41 W 11 W W N N h coo Inoo ^a^ AAA C4 N H ?CVOAJ ?cfw --o' ?v?M/tom mw ti?o• a Z-70 - N-r,'5 l ? Y. -0-66V - klENSIoKS rrZOM RJW5 6?6Tm&r-,p Aam s A7R+rUtGI,? " y h e? /.40 ^'p/o' ?II?S l/VA?C?` ?i Z/?G f1?VitGL?'s?? C*6144*05 7;k>ovIL*a IN.W+41-6 T2vE- 0 %, = Z, 03 7,0' sf/zw 134.0 6.c-r. is -.?Z)AQvr7-7 -7o '%o = 2,-z'7 1 V1,M (A 7 6 2, 36 ;t&41m No rjw8wy ,?ovi.*a - My ,- Ok // AIWD W P/540s6 Ass; f'vzy w SFtoR•t -Gat-utTi ?? C. 6?t? ?? ct ?E? Sim DFQ?(FIGE? ?2?4W ?o??AI ?ME I?oTC-C?io? ?N? Cioc?G cat U ? (? ?P? 4- f- Project No. DWQ 970656 Project Name: Partners Equity-Factory Stores of America DESIGN PARAMETERS: ELEVATIONS Bottom of Basin ( 130 Permanent Pool (ft 134 Temporary Pool (f 136.5 AREAS Permanent Pool S 52500 Drainage Area (ac) 46 Impervious Area ( 34.5 VOLUMES CALCULATION OF DESIGN REQUIREMENTS: % Impervious: 75.0% Permanent Pool Depth: Temporary Pool Depth: Required Surface Area: Permanent Pool (c 0 equired Temporary Pool: Temporary Pool (c 148104 Forebay (cu ft) 0 Drawdown Rate: HER PARAMETERS SA/DA 2.36 Draw-Down Time: Orifice Diameter ( 4 4.0 ft. ok 2.5 ft. - 47289 sq. f ok 121061 cu. f ok 0.47 cfs - 3.6 days ok Forebay: ###### % #DIV/0! NOTES: *This spreadsheet is designed to perform a quick preliminary check of design requirements and should not be considered a complete evaluation of any project. *All design parameters entered into this spreadsheet should be verified to be accurate based upon submitted plans and specs. *This spreadsheet is designed to calculate the draw-down time using the average temporary pool depth and the orifice equation to estimate the change in driving head over time. *The correct, not the reported, SA/DA value should be entered into the SA/DA block above. *For impervious areas that do not fall neatly into the categories provided in table I.1 of the BMP Manual, a linear interpolation subroutine is provided below. The SA/DA value it computes must be physically entered in the SA/DA space above.