Subject: Buffer Determination
NBRRO #16-311
Wake County
Determination Type:
Buffer Call Isolated or EIP Call
®Neuse(15A NCAC 2B.0233) Cl Ephemeral/Intermittent/Perennial
Cl Tar-Pamlico(15A NCAC 2B.0259) Determination
❑Jordan(15A NCAC 2B .0267) ❑ Isolated Wetland Determination
Project Name: Duke Energy Pine Lake 230KV Substation
Location/ 4201 Spring Forest Road, Raleigh,NC 27609
Directions: Turn left off Spring Forest Road past Millbrook
Magnet Middle School onto "Spring Forest Road
Park" and continue straight past the tennis courts
Subject Stream UT to Perry Creek
Determination Date: October 5, 2016 Staff: Laura Robertson
State of North Carolina I Environmental Quality I Water Resources
1628 Mail Service Center I Raleigh,North Carolina 27699-1628
919 791 4200
Not
Subject Subject NRCS USGS
E/I/P* Start@ Stop@
To To Buffers Soil Survey Topo
Buffers
Feature A X E Near the Continues to X
western west of
property property
boundary
*E/I/P-Ephemeral/Intermittent/Perennial
Explanation: Feature A was present on the property as an ephemeral channel, and was present
on the NRCS Soil Survey map of Wake County. It continues as an ephemeral channel for more
than 50 feet from the subject property.
There may be other streams located on your property that do not show up on the maps referenced
above but, still may be considered jurisdictional according to the US Army Corps of Engineers
and/or to the Division of Water Resources (DWR).
This on-site determination shall expire five (5) years from the date of this letter. Landowners or
affected parties that dispute a determination made by the DWR or Delegated Local Authority
may request a determination by the Director. An appeal request must be made within sixty(60)
days of date of this letter or from the date the affected party(including downstream and/or
adjacent owners) is notified of this letter. A request for a determination by the Director shall be
referred to the Director in writing c/o Karen Higgins, DWR WeBSCaPe Unit, 1650 Mail Service
Center, Raleigh,NC 27699.
This determination is final and binding unless, as detailed above, you ask for a hearing or appeal
within sixty (60) days.
The owner/future owners should notify the Division of Water Resources (including any
other Local, State, and Federal Agencies) of this decision concerning any future
correspondences regarding the subject property(stated above). This project may require
a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the
Division of Water Resources (Central Office) at (919)-807-6300, and the US Army Corp of
Engineers (Raleigh Regulatory Field Office) at(919)-554-4884.
If you have questions regarding this determination, please feel free to contact Laura Robertson at
(919) 791-4247.
Res- lly,
i
0 c) i /1.2 i
Danny Smi Supervisor
Water Quality Section
Raleigh Regional Office
cc: RRO/SWP File Copy
George Buchholz,McAdams Company, 2905 Meridian Pkwy, Durham,NC 27713
NBRRO #16-311
October 5, 2016
�• '�Q Lo f r,,,. i ,t i s �t t c
.44
. Amor.\
.?"- OiblIC. ill 011 "k`....... , 40:1tV
,i Ap,C ApC2 Ilk . 1..,..--. ,..--,,-,.„,:-,-,,,..E. # 'or',000'....:-''' i 4/011'NJ/ -
. Loc ( lir - Q mr we .4 '.
1 . -AV 01 • I ..... ol-ar.7
.... ..-: , . .
. it -4.0 ,-
,_
1 N. - <, ...7 . . •- 1 ' / PROJECT AREA ��.
A I
' ii, A'.
?Illiki Lpg‘ 'th Feature A LoB _ .,. . 4 i _,.......)r, II
Not Subject
ftp:. P " ---
YAW MI -
,tia A ,r , r, Sc ��i 4j Feature A i� �.
4 1r� ��
..._ _
p, O " I l 1,, Not Subject M/,�
I
pO''''.42 ro
. #