Loading...
HomeMy WebLinkAboutDuke Energy Pine Lake 230KV Substation PAT MCCRORY Gorrrnur DONALD R. VAN DER VAART Water Resources c ENVIRONMENTAL QUALITY S. JAY ZIMMERMAN October 6, 2016 Duke Energy Progress, Inc. c/o Rodney Hutcherson 410 South Wilmington Street Raleigh,NC 27601 Subject: Buffer Determination NBRRO #16-311 Wake County Determination Type: Buffer Call Isolated or EIP Call ®Neuse(15A NCAC 2B.0233) Cl Ephemeral/Intermittent/Perennial Cl Tar-Pamlico(15A NCAC 2B.0259) Determination ❑Jordan(15A NCAC 2B .0267) ❑ Isolated Wetland Determination Project Name: Duke Energy Pine Lake 230KV Substation Location/ 4201 Spring Forest Road, Raleigh,NC 27609 Directions: Turn left off Spring Forest Road past Millbrook Magnet Middle School onto "Spring Forest Road Park" and continue straight past the tennis courts Subject Stream UT to Perry Creek Determination Date: October 5, 2016 Staff: Laura Robertson State of North Carolina I Environmental Quality I Water Resources 1628 Mail Service Center I Raleigh,North Carolina 27699-1628 919 791 4200 Not Subject Subject NRCS USGS E/I/P* Start@ Stop@ To To Buffers Soil Survey Topo Buffers Feature A X E Near the Continues to X western west of property property boundary *E/I/P-Ephemeral/Intermittent/Perennial Explanation: Feature A was present on the property as an ephemeral channel, and was present on the NRCS Soil Survey map of Wake County. It continues as an ephemeral channel for more than 50 feet from the subject property. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources (DWR). This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty(60) days of date of this letter or from the date the affected party(including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Karen Higgins, DWR WeBSCaPe Unit, 1650 Mail Service Center, Raleigh,NC 27699. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner/future owners should notify the Division of Water Resources (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property(stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Resources (Central Office) at (919)-807-6300, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at(919)-554-4884. If you have questions regarding this determination, please feel free to contact Laura Robertson at (919) 791-4247. Res- lly, i 0 c) i /1.2 i Danny Smi Supervisor Water Quality Section Raleigh Regional Office cc: RRO/SWP File Copy George Buchholz,McAdams Company, 2905 Meridian Pkwy, Durham,NC 27713 NBRRO #16-311 October 5, 2016 �• '�Q Lo f r,,,. i ,t i s �t t c .44 . Amor.\ .?"- OiblIC. ill 011 "k`....... , 40:1tV ,i Ap,C ApC2 Ilk . 1..,..--. ,..--,,-,.„,:-,-,,,..E. # 'or',000'....:-''' i 4/011'NJ/ - . Loc ( lir - Q mr we .4 '. 1 . -AV 01 • I ..... ol-ar.7 .... ..-: , . . . it -4.0 ,- ,_ 1 N. - <, ...7 . . •- 1 ' / PROJECT AREA ��. A I ' ii, A'. ?Illiki Lpg‘ 'th Feature A LoB _ .,. . 4 i _,.......)r, II Not Subject ftp:. P " --- YAW MI - ,tia A ,r , r, Sc ��i 4j Feature A i� �. 4 1r� �� ..._ _ p, O " I l 1,, Not Subject M/,� I pO''''.42 ro . #