Mr. Benton G. Payne, P.E.
NCDOT Division 10
716 West Main Street
Albemarle, NC 28001
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
JUN 2 7 200
DENR - WATER C1UALiT'r
WETLANDS AND STORMWATER t3KA1~t:M
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Payne:
June 24, 2005
DWQ# 05-1031
Stanly County
You have our approval, in accordance with the attached conditions and those listed below, to permanently
impact a total of 109 linear feet (If) of streams as listed in the table below:
LocationlStation
Station 44+50 Stream Name
Unnamed tributary to Big Bear Creek' Len th of Stream Im act
15 linear feet
Station 51+30 Unnamed tributary to Big Bear Creek* 26 linear feet
Station 79+80 Unnamed tributary to Big Bear Creek* 20 linear feet
Station 80+60 Unnamed tributary to Big Bear Creek* 12 linear feet
Station 95+20 Unnamed tributary to Big Bear Creek* 22 linear feet
Station 96+50 Unnamed tributary to Big Bear Creek* 14 linear feet
The impacts will be for the purpose of replacing, extending and/or adding culverts, and providing bank
stabilization associated with the paving of a secondary road as described in your application received by the
Division of Water Quality (DWQ) on June 10, 2005. The location of the project is State Road 1221 (Frog Pond
Road) in Stanly County. After reviewing your application, we have determined that this project is covered by
Water Quality General Certification Number 3404. Please note that you should get any other federal, state or
local permits before proceeding with your project, including those required by (but not limited to) Sediment and
Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This approval will expire with the
associated 404 permit unless otherwise specified in the Water Quality Certification.
This approval is valid solely for the purpose and design that you described in your application (unless modified
below). Should your project change, you must notify the DWQ in writing and you may be required to submit a
new application. If the property is sold, the new owner must be given a copy of this Certification and approval
letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in
the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet,
compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h)(6) and (7). For this approval
to remain valid, you must adhere to the conditions listed in the attached certification and those listed below:
*No stream determination performed.
°` Carolina
~aturalty
North Carolina Division of Water Quality 610 East Center Avenue, Suite 301
Internet h2o.enr.siate.nc.us Mooresville, NC 28115
Phone (704) 663-1699
Fax (704) 663-6040
An Equal OpportunitylAffirmative Action Empbyer - 50% Recyded110% Post Consumer Paper
Page 2
1. Placement of culverts and other structures in waters, streams and wetlands must be below the elevation of
the streambed by one (1) foot for all culverts with a diameter greater than 48 inches, and 20 percent of the
culvert diameter for culverts having a diameter less than 48 inches, to allow for low flow passage of water and
aquatic life, as well as prevent headcutting of the streams. The design and placement of culverts and other
structures including temporary erosion control measures shall be installed in such a manner that the original
stream profiles are not altered (i.e., the depth of the channel must not be reduced by a widening of the
streambed). Existing stream dimensions (including pattern and profile) are to be maintained above and
below locations of each culvert. The applicant may be required to provide evidence that the equilibrium has
been maintained, if requested in writing by the DWQ.
2. Riprap must not interfere with thalweg performance and aquatic life passage during low flow conditions.
3. The presence of equipment in the channel must be minimized. Under no circumstances must rock, sand or
other materials be dredged from the wetted stream channel.
4. Erosion and sediment control practices must utilize Best Management Practices (BMP) and be in full
compliance with all specifications governing the proper design, installation, and operation and maintenance of
such BMP in order to protect surface water standards:
a. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of
the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow pit sites, and waste pile (spoil) projects, including contractor-owned or
leased borrow pits associated with the project.
b. For borrow pit sites, t nedr nsaccordance'with the most recent version of the North Carolinla Surface
operated, and manta
Mining Manual.
c. The reclamation measures and implementation of these measures must be in accordance with the
requirements of the Sedimentation Pollution Control Act.
5. Heavy equipment must be operated from the banks rather than in the stream channel, when possible, in
order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream.
6. Temporary dewatering sites must be restored to pre-existing conditions unless more natural geomorphic
conditions can be provided.
7. No live or fresh concrete shall come into contact with waters of the state until the concrete has hardened.
8. The dimension, pattern and profile of the stream above and below the crossing should not be modified.
Disturbed floodplains and streams should be restored to natural geomorphic conditions.
9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to
prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
10. All work shall be performed during low or normal flow conditions.
11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to
surface waters is prohibited.
Page 3
12. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable,
they shall be removed and the natural grade restored within 30 days after the Division of Land Resources has
released the project.
13. The North Carolina Department of Transportation (NCDOT) and its contractors and/or agents shall not
excavate, fill or perform mechanized land clearing at any time in the construction or maintenance of this
project within waters and/or wetlands, except as authorized by this Certification, or any modification to this
Certification (e.g., no work shall occur outside of the footprint of the plans provided). In addition, there shall
be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this
Certification without appropriate modification. If this occurs, compensatory mitigation may be required since it
is a direct impact from road construction activities.
14. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to notify DWQ when all work included in the 401 Certification has been completed. Please
include photographs upstream and downstream of the structure to document correct installation.
15. Continuing Compliance. NCDOT shall conduct its activities in a manner so as not to contravene any state
water quality standard [including any requirements for compliance with section 303(d) of the Clean Water Act]
and any other appropriate requirements of state and federal law. If DWQ determines that such standards or
laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal
law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate
and modify this certification to include conditions appropriate to assure compliance with such standards and
requirements in accordance with 15 A NCAC 2H.0507(d): Before codifying the certification, DWQ shall notify
NCDOT and the USACE, provide public notice in accordance with 15A NCAC 2H.0503, and provide
opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall
be provided to NCDOT in writing, shall be provided to the USACE for reference in any permit issued pursuant
to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must
act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that
conforms to Chapter 1508 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714
Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless
you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If
you have any questions, please telephone Polly Lespinasse in the Mooresville Regional Office at 704-663-
1699.